HomeMy WebLinkAboutMidAmerican_FY26_Parkview_Manor_$13,342.64_Cont_No._1137_-_9.21.26
MidAmerican Energy
Attn: Derek Johnson - DMCC
PO Box 657
Des Moines, IA 50306
9/9/2026
City of Waterloo
Attention: Jamie Knutson
Jamie.Knutson@Waterloo-IA.org
Dear Jamie,
Enclosed is our streetlight proposal for Parkview Manor near Upland Drive in Waterloo,
IA. MX: 7088112.
This proposal includes the installation of streetlights on:
Pelican Drive & Fairway Lane
We Propose To:
The cost for MidAmerican Energy Company to install these streetlights is $13,342.64.
Payment is required before installation can begin.
These lights will be installed on steel poles and served by underground conductors, but
will be billed to the city at the wood pole, overhead rate because the developer has agreed
to pay the streetlight facilities charge.
MidAmerican Energy Company’s street light proposal is based on the approved street
light analysis provided by the City. MidAmerican Energy Company will install the lights
based on the staked locations provided in the field by the customer.
Pursuant to MidAmerican’s tariff, the Applicant is required to pay actual permit fees.
Permit fees may not be offset by Revenue Credit and are to be paid regardless of whether
the applicant is required to pay a Refundable Advance or a Nonrefundable Contribution. If
a permit is required for design approval and the local government agency requests a
modification of the proposed design, any additional cost incurred will be paid by the
applicant and conversely if the modification results in a lower cost a refund will be issued.
Install: 2 100W LED streetlights on 28’ steel poles
Docusign Envelope ID: BC8E2C16-1130-854F-8075-F456735987A1
MidAmerican Energy
Attn: Derek Johnson - DMCC
PO Box 657
Des Moines, IA 50306
9/9/2026
Page 2
If this proposal is satisfactory, please sign and return one (1) copy to me. MidAmerican
Energy Company will release the work for scheduling upon receipt of the signed
proposal, payment of $13,342.64, and site readiness. This proposal is valid for 90 days
and if MidAmerican Energy Company construction has not commenced within 12
months it may be voided.
Sincerely,
MidAmerican Energy Company
Derek Johnson
Customer Project Coordinator
Enclosures: Design Map
Accepted By: ________________________________________________
Date Service Required: ______________
Docusign Envelope ID: BC8E2C16-1130-854F-8075-F456735987A1
Council approved 9/21/26