Loading...
HomeMy WebLinkAboutAGREEMENT FOR PROFESSIONAL SERVICES - RESOLUTION 2002-727 /Io , '7 AGREEMENT FOR PROFESSIONAL SERVICES U.S.HIGHWAY 63 PLANNING STUDY U.S.218 TO DONALD STREET WATERLOO,IOWA This Agreement, made and entered between hereinafte�referred to as the Consultanf aterloo, Iowa, hereinafter referred to as the Owner and Earth Tech,Inc.,Waterloo, The Owner has decided to contract for consultant services for a planning study for the U.S. 63 corridor between U.S. 218 and Donald Street in the City of Waterloo, Iowa. The study will involve an evaluation of traffic operations along U.S. 63, evaluation of design alternatives for U.S. 63, evaluation of neighborhood impacts and the development of neighborhood planning concepts immediately adjacent to U.S. 63, an evaluation of environmental justice impacts and the development of an implementation plan. A public involvement program will be included throughout the duration of the study. The said Owner desires to employ the Consultant to provide consultant services in connection with the planning study for the U.S. 63 corridor. The Consultant is willing to perform said services in accordance with the terms hereinafter provided and warrants that it is in compliance with Iowa statutes relating to the licensure of Professional Engineers. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their proper officials thereunto duly authorized as of the dates below indicated. EARTH TECH,INC. B Date December 11,2002 Y Joe A.Becker,Vice President CITY OF WATERLOO,IOWA 4110 Date By ohn R.Rooff,Mayor IOWA DEP• ' T OF TRANSPORTATION ACCEPTED FOR AUTHORIZATION B /aaDate '�l`"/ -'O�j B MVC-�l+a James C.N, berger,P.E. Local Systems Engineer District 2 TABLE OF CONTENTS Article Number and Description 1 Initial Information 1.1 Project Parameters 1.2 Project Team 1.3 Time Parameters 2 Scope of Services and Other Special Terms and Conditions 2.1 Enumeration of Parts of the Agreement 3 Form of Compensation 3.1 Method of Reimbursement 3.2 Subconsultant 3.3 Special Experts 4 Terms and Conditions 4.1 Ownership of Engineering Documents 4.2 Revision of Plans 4.3 Extra Work 4.4 Progress Meetings 4.5 Additional Planning Documents 4.6 Termination of Agreement 4.7 Extension of Time 4.8 Mediation 4.9 Arbitration 4.10 Responsibility for Claims and Liability 4.11 Non-Raiding Clause 4.12 General Compliance with Laws 4.13 Subletting,Assignment or Transfer 4.14 Forbidding Use of Outside Agents 4.15 Consultant's Endorsement on Documents 4.16 Compliance with Title 49,Code of Federal Regulations 4.17 Access to Records 4.18 Federal Highway Administration Participation 4.19 Severability Attachment A-Scope of Services Attachment B -Fees and Payments Attachment C-Certification Attachment D-Certification of Consultant Attachment E-Certification of Owner Attachment F-Cost Analysis Article 1 -Initial Information This Agreement is based on the following information and assumptions. 1.1 Project Parameters The objective of this Agreement is to provide consultant services for a planning study for the U.S. 63 corridor between U.S. 218 and Donald Street in the City of Waterloo, Iowa. The study will involve an evaluation of traffic operations along U.S. 63, evaluation of design alternatives for U.S. 63, evaluation of neighborhood impacts and the development of neighborhood planning concepts immediately adjacent to U.S. 63, an evaluation of environmental justice impacts and the development of an implementation plan. A public involvement program will be included throughout the duration of the study. 1.2 Project Team 1.2.1 The Owner's designated representative,identified as the Planner,is Noel Anderson. The Planner is the authorized representative, acting as liaison officer for the Owner for purpose of coordinating and administering the work under the Agreement. The work under this Agreement shall at all times be subject to the general supervision and direction of the Planner and shall be subject to the Planner's approval. 1.2.2 The Consultant's designated representative is Robert Lentz. 1.2.3 The subconsultant retained at the Consultant's expense is Vandewalle&Associates. 1.2.4 Special experts retained at the Consultant's expense are: RDG Crose Gardner Shukert,Inc. Public Involvement Unlimited,LLC University of Northern Iowa, Center for Social and Behavioral Research Tallgrass Historians,LC David J.Forkenbrock,Ph.D. Karen Skelton,Dewey Square Group 1.3 Time Parameters Date to Proceed: Consultant shall not begin work under this Agreement until so directed in writing by the Owner. Consultant shall, upon receipt of said written notification to proceed, begin work thereon. No FHWA compensation will be made for any work performed prior to the effective date of the FHWA authorization to proceed. Date of Completion: Consultant shall complete the services defined in this agreement within 24 months after FHWA Authorization to Proceed. 1 Article 2-Scope of Services 2.1 Enumeration of Parts of the Agreement This Agreement represents the entire and integrated agreement between the Owner and the Consultant and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instruments signed by both Owner and Consultant. This Agreement comprises the documents listed below. 2.1.1 The work to be performed by the Consultant under this Agreement shall encompass and include all detail work, services, materials, equipment and supplies necessary to prepare and deliver the scope of services provided in Attachment A. 2.1.2 Other documents as follows: .1 Certificate of Debarment-Attachment C .2 Certification of Consultant-Attachment D .3 Certification of Owner-Attachment E .4 Cost Analysis-Attachment F Article 3-Form of Compensation 3.1 Method of Reimbursement 3.1.1 For the Consultant's services as described under Article 2, compensation shall be computed in accordance with a cost plus fixed fee compensation method as defined in Attachment B. 3.2 Subconsultant 3.2.1 The Consultant shall require the subconsultants to notify them if they at any time determine that their costs will exceed their estimated actual costs. The Consultant shall not allow the subconsultants to exceed their estimated actual costs without prior written approval of the Planner. The prime Consultant is cautioned that cost underruns associated with any subconsultant's contract are not available for use by the prime Consultant unless the Planner and Iowa Department of Transportation (IDOT) have given prior written approval. 3.3 Special Experts 3.3.1 Special experts are to be managed by the Consultant since their services are of an unknown level of service depending on the development of the planning study. Compensation for special experts shall be on a unit rate basis in accordance with the fee schedule in Attachment F. Said fee schedule may be adjusted by the Consultant based on documentation received from the special experts. Adjustments may include, but are not limited to, annual rate adjustments or addition of staff classification and rates. 2 3.3.2 Special experts are not subject to the conditions of Article 3.2.1. Article 4-Terms and Conditions 4.1 Ownership of Planning Documents 4.1.1 Sketches, tracings, plans, specifications, reports on special studies and other data prepared under this Agreement shall become the property of the Owner and shall be delivered to the Planner upon completion of the study or termination of the services of the Consultant. There shall be no restriction or limitation on their future use by the Owner, except any use on extensions of the project or on any other project without written verification or adaptation by the Consultant for the specific purpose intended will the Owner's sole risk and without liability or legal exposure to the Consultant. 4.1.2 The Owner acknowledges the Consultant's plans and specifications, including documents on electronic media, as instruments of professional service. Nevertheless, the plans and specifications prepared under this Agreement shall become the property of the Owner upon completion of the services and payment in full of all moneys due to the Consultant. 4.1.3 The Owner and the Consultant agree that any electronic files prepared by either party shall conform to standard electronic specifications. Any changes to these standards by either the Owner or the Consultant are subject to review and acceptance by the other party. Additional efforts by the Consultant made necessary by a change to the standard electronic specifications shall be compensated for as Additional Services. 4.1.4 The Owner is aware that significant differences may exist between the electronic files delivered and the respective planning documents due to various revisions. In the event of a conflict between the signed planning documents prepared by the Consultant and electronic files,the signed planning documents shall govern. 4.1.5 The Owner may reuse or make modifications to the planning documents or electronic files while agreeing to take responsibility for any claims arising from any modification or unauthorized reuse of the planning documents. 4.2 Revision of Planning Documents 4.2.1 Drafts of work products shall be submitted to the Planner by the Consultant for review and comment. The comments received from the Planner and the reviewing agencies shall be incorporated by the Consultant prior to submission of the final work product by the Consultant. Work products revised in accordance with review comments shall constitute "satisfactorily completed and accepted work." Requests for changes on work products by the Planner shall be in writing. In the event there are no comments from the Planner or reviewing agencies to be incorporated by the Consultant into the final work product, the Planner shall immediately notify the Consultant in writing that the work product shall constitute "satisfactorily completed and accepted work." 3 4.2.2 In the event that the work product prepared by the Consultant is found to be in error and revision or reworking of the work product is necessary,the Consultant agrees that it shall do such revisions without expense to the Owner, even though final payment may have been received. The Consultant must give immediate attention to these changes. The above and foregoing is not to be construed as a limitation of the Owner's right to seek recovery of damages for negligence on the part of the Consultant herein. 4.2.3 Should the Planner find it desirable to have previously satisfactorily completed and accepted work product or parts thereof revised, the Consultant shall make such revisions if requested and directed by the Planner in writing. This work will be paid for as provided in Article 4.3. 4.3 Extra Work 4.3.1 If the Consultant is of the opinion that any work it has been directed to perform is beyond the scope of this Agreement, and constitutes "Extra Work," it shall promptly notify the Planner in writing to that effect. In the event that the Planner determines that such work does constitute "Extra Work," the Owner will provide extra compensation to the Consultant upon the basis of actual costs plus a fixed fee amount or at a negotiated lump sum. Unless written approval for "Extra Work" has been secured in advance from the Planner, no claims will be allowed. However, the Owner shall have benefit of the service rendered. 4.4 Progress Meetings 4.4.1 From time to time as the work progresses, conferences will be held at mutually convenient locations at the request of the Planner to discuss details of the study and progress of the work. The Consultant shall prepare and present such information and studies as may be pertinent and necessary or as may be requested by the Planner, to enable the Planner to pass judgment on the features and progress of the work. 4.5 Additional Planning Documents 4.5.1. At the request of the Planner, the Consultant shall furnish sufficient copies of planning documents or other data in such detail as may be required, for the purposes of review of the planning documents. 4.6 Termination of Agreement 4.6.1 In the event of the death of any member or partner of the Consultant's firm, the surviving members shall complete the work, unless otherwise mutually agreed upon by the Owner and the survivors. 4.6.2 The right is reserved by the Owner to terminate this Agreement at any time upon not less than thirty(30) days written notice to the Consultant. 4.6.3 In the event the Agreement is terminated by the Owner without fault on the part of the Consultant, the Consultant shall be paid for the reasonable and necessary work 4 performed or services rendered and delivered up to the effective date of time of termination. The value of the work performed and services rendered and delivered, and the amount to be paid shall be mutually satisfactory to the Planner and to the Consultant. The Consultant shall be paid a portion of the fixed fee,plus actual costs. The portion of the fixed fee shall be based on the ratio of the actual costs incurred to the estimated actual costs contained in Attachment B. Actual costs to be reimbursed shall be determined by audit of such costs to the date established by the Planner in the termination notice,except that actual costs to be reimbursed shall not exceed the estimated actual cost, plus any authorized contingency. 4.6.4 In the event the Agreement is terminated by the Owner for fault on the part of the Consultant, the Consultant shall be paid only for work satisfactorily performed and delivered to the Planner up to the date established by the termination notice. After audit of the Consultant's actual costs to the date established by the Planner in the termination notice and after determination by the Planner of the amount of work satisfactorily performed,the Planner shall determine the amount to be paid to the Consultant. 4.6.5 The right is reserved by the Owner to suspend this Agreement at any time. The Planner may effect such suspension by giving the Consultant written notice and will be effective as of the date established in the suspension notice. Payment for the Consultant's services will be made by the Owner to the date of such suspension, in accordance with paragraph 4.6.3 above. 4.6.6 Should the Owner wish to reinstate the work after notice of suspension, such reinstatement may be accomplished by thirty (30) days written notice within a period of one year after such suspension, unless this period is extended by written consent of the Consultant. 4.6.7 This Agreement will be considered completed when the planning documents have been submitted to the Owner or if the Consultant is released prior to such time by written notice from the Planner. 4.7 Extension of Time 4.7.1 The time for completion of each phase of this Agreement shall not be extended because of any delay attributed to the Consultant, but may be extended by the Planner in the event of a delay attributed to the Owner or the Planner,or because of unavoidable delays caused by an act of God, war, government actions, or similar causes beyond the reasonable control of the Consultant. 4.8 Mediation 4.8.1 In an effort to resolve any conflicts that arise during the planning study or following the completion of the project, the Owner and the Consultant agree that all disputes between them arising out of or relating to this Agreement shall be submitted to non-binding mediation unless the parties mutually agree otherwise. The Owner and the Consultant further agree to include a similar mediation provision in all agreements with independent contractors and subconsultants retained for the project and to require all independent 5 contractors and subconsultants also to include a similar mediation provision in all agreements with subcontractors, subconsultants, suppliers or fabricators so retained, thereby providing for mediation as the primary method for dispute resolution between the parties to those agreements. 4.9 Arbitration 4.9.1 In the event the parties to this Agreement are unable to reach a settlement of any dispute arising out of the services under this Agreement in accordance with Paragraph 4.8, then such disputes shall be settled by binding arbitration by an arbitrator to be mutually agreed upon by the parties, and shall proceed in accordance with the current Code of Iowa. If the parties cannot agree on a single arbitrator, then the arbitrator(s) shall be selected in accordance with the above-referenced rules. 4.10 Responsibility for Claims and Liability 4.10.1 The Consultant shall defend, indemnify and save harmless the Owner, the IDOT, the State of Iowa, its agencies, agents, employees and assignees and the federal government from all claims and liabilities due to error, omission or negligent act of the Consultant, its members, agents, stockholders or employees in connection with performance of this Agreement. 4.11 Non-Raiding Clause 4.11.1 The Consultant shall not engage the services of any person or persons, then in the employment of the Owner, for work covered by this Agreement without the written consent of the employer of such person. 4.12 General Compliance with Laws 4.12.1 The Consultant shall comply with all federal, state and local laws and ordinances applicable to the work. 4.13 Subletting,Assignment or Transfer 4.13.1 Subletting, assignment or transfer of all or part of the interest of the Consultant in this Agreement is prohibited unless written consent is obtained from the Planner and approved by the Owner and the IDOT. 4.14 Forbidding Use of Outside Agents 4.14.1 The Consultant warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for the Consultant, to solicit or secure this Agreement, and that it has not paid or agreed to pay any company or person other than bona fide employees working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, the Owner shall have the right to annul the Agreement without liability, or in its 6 discretion to deduct from the agreement price or consideration or otherwise recover, the full amount of such fee,commissioning percentage,brokerage fee, or counterpart fee. 4.15 Consultant's Endorsement on Documents 4.15.1 The Consultant shall endorse applicable computations prepared under this Agreement, and shall affix thereto the seal of a Licensed Professional Engineer, licensed to practice in the State of Iowa,in accordance with the current Code of Iowa. 4.16 Compliance With Title 49,Code of Federal Regulations 4.16.1 During the performance of this Agreement, the Consultant and its assignees and successors in interest agree as follows: 4.16.1.1 Compliance With Regulations 4.16.1.1.1 The Consultant will comply with the regulations of the U.S. Department of Transportation, relative to nondiscrimination in federally-assisted programs of the U.S. Department of Transportation (Title 49, Code of Federal Regulations, Part 21, hereinafter referred to as the "Regulations"), which are herein incorporated by reference and made a part of this Agreement. 4.16.1.2 Nondiscrimination 4.16.1.2.1 The Consultant, with regard to the work performed by it, will not discriminate on the grounds of race, religion, age, physical disability, color, sex or national origin in the selection and retention of subconsultants, including procurement of materials and leases of equipment. The Consultant will not participate, either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the Agreement covers a program set forth in Attachments D,E and F of the Regulations. 4.16.1.3 Solicitation for Subconsultants, Including Procurement of Materials and Equipment 4.16.1.3.1 In all solicitations, either by competitive bidding or negotiation made by the Consultant for work to be performed under a subcontract, including procurement of materials or equipment, each potential subconsultant or supplier shall be notified by the Consultant of the Consultant's obligation under this contract and the regulations relative to nondiscrimination on the grounds of race,religion,age,physical disability, sex or national origin. 7 4.16.1.4 Minority/Women Business Enterprises 4.16.1.4.1 The Consultant or it subconsultants agree(s) to ensure that minority business enterprises as defined in 49 CFR, Part 23 Subpart D and Amendments 106(C) have the maximum opportunity to participate in the performance of contracts and subcontracts financed in whole or in part with federal funds provided under this Agreement. In this regard the Consultant and all of its subconsultants shall take all necessary and reasonable steps in compliance with the IDOT MBE/WBE Program to ensure minority and women business enterprises have the maximum opportunity to compete for and perform contracts. The Consultant and their subconsultants shall not discriminate on the basis of race, religion, age, physical disability, color, sex or national origin, in the award and performance of U.S. DOT assisted contracts. If, as a condition of assistance, the IDOT has submitted to U.S. DOT, or the Consultant has submitted to the IDOT, and the U.S. DOT or Department has approved a minority and women business enterprise affirmative action program which the IDOT and/or Consultant agree(s) to carry out, this program(s) is incorporated into this Agreement by reference. This program shall be treated as a legal obligation and failure to carry out its terms shall be treated as a violation of this financial assistance agreement. Upon notification to the Consultant of its failure to carry out the approved program,the Owner and/or the U.S.DOT shall impose sanctions, which may include termination of the Agreement or other measures that may affect the ability of the Consultant to obtain future U.S. DOT financial assistance. The Consultant or any of its subconsultants are hereby advised that failure to fully comply with the IDOT's MBE/WBE Program shall constitute a breach of contract and may result in termination of this Agreement or agreement(s)by the Owner or such remedy as the Owner deems appropriate. Refer to Article 4.6 of the Agreement. 4.16.1.5 Information and Reports 4.16.1.5.1 The Consultant will provide all information and reports required by the regulations, orders and instructions issued pursuant thereto, and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Owner, IDOT or the Federal Highway Administration, to be pertinent to ascertain compliance with regulations, orders and instructions. Where any information required of a Consultant is in the exclusive possession of another who fails or refuses to furnish this information, the 8 Consultant shall so certify to the Owner, IDOT or the Federal Highway Administration, as appropriate, and shall set forth what efforts it has made to obtain information. 4.16.1.6 Sanctions for Noncompliance 4.16.1.6.1 In the event of the Consultant's noncompliance with the nondiscrimination provisions of this Agreement,the Owner shall impose such contract sanctions as it, the IDOT or the Federal Highway Administration, may determine to be appropriate, including,but not limited to: • Withholding of payments to the Consultant under the Agreement until the Consultant complies, and/or • Cancellation,termination or suspension of the Agreement, in whole or in part. 4.16.1.7 Incorporation of Provisions 4.16.1.7.1 The Consultant will include the provisions of Article 4.16.1.1 through 4.16.1.6 of this Agreement in every subagreement, including procurements of materials and lease of equipment, unless exempt by the regulations, orders or instructions issued pursuant thereto. The Consultant will take such action with respect to any subagreement or procurement as the Owner, IDOT or Federal Highway Administration may direct as a means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event a Consultant becomes involved in, or is threatened with, litigation with a subconsultant or supplier as a result of such direction, the Consultant may request the Owner to enter into such litigation to protect the interests of the Owner and, in addition, the Consultant may request the United States to enter into such litigation to protect the interests of the United States. 4.17 Access to Records 4.17.1 The Consultant is to maintain all books, documents,papers, accounting records and other evidence pertaining to this Agreement and to make such materials available at their respective offices at all reasonable times during the Agreement period, and for three years from the date of final payment under the Agreement, for inspection and audit by the Owner,IDOT and Federal Highway Administration, or any authorized representatives of the federal government; and copies thereof shall be furnished, if requested. 9 4.18 Federal Highway Administration Participation 4.18.1 The work under this Agreement shall be contingent upon and subject to the approval of the Federal Highway Administration if applicable. The Federal Highway Administration shall have the right to participate in the conferences between the Consultant and the Owner and to participate in the review or examination of the work in progress. 4.19 Severability If any section, provision or part of this Agreement shall be adjusted invalid or unconstitutional, such adjudication shall not affect the validity of the Agreement as a whole or any section, provision,or part thereof not adjudged invalid or unconstitutional. L:\WORK\ADM IN\AGREE\PROF\WatUSHighway63.doc 10 Attachment A U.S.HIGHWAY 63 PLANNING STUDY CITY OF WATERLOO,IOWA SCOPE OF SERVICES This project consists of a planning study for the U.S. 63 corridor between U.S. 218 and Donald Street in the City of Waterloo, Iowa. The study will involve an evaluation of traffic operations along U.S. 63, evaluation of design alternatives for U.S. 63, evaluation of neighborhood impacts and the development of neighborhood planning concepts immediately adjacent to U.S. 63, an evaluation of environmental justice impacts, and the development of an implementation plan. A public involvement program will be included throughout the duration of the study. The scope of services for this project includes the following activities: 1. INVENTORY AND DATA MANAGEMENT This work element includes project inventory and data management consisting of an inventory phase, base map compilation,review of existing community plans and ordinances, data collection and synthesis, and the development of an inventory and analysis report. Task 1.1 - Inventory and Data Collection. The inventory phase involves gathering various demographic, economic, land use, and map data that will provide insight into existing conditions. Consultant will coordinate and conduct an inventory in the Highway 63 corridor and surrounding neighborhoods to include the following elements: a. Population/Demographics. Historical trends in population, size, distribution, age, gender, household size,educational levels and resident incomes. b. Housing Trends. Historical trends in housing, including size, type, age, tenure mix, vacancy rates,housing prices and rents compared to incomes. c. Transportation System. Existing transportation system in the community and its immediate vicinity, including a review of the location, capacity, traffic cross section and condition of Highway 63; existing public transit service; bikeways and walkways. This general analysis will also assess other arterial and collector streets that serve the neighborhoods. d. Roadway Characteristics. Included will be existing lane configurations, sidewalk locations, approximate right-of-way widths(from Black Hawk County tax mapping),and access locations. e. Community Facilities. Conditions, capacity, locations, and service areas of public and private schools, libraries, police, fire and rescue facilities, medical facilities, park and recreational facilities,and community centers. f. Economic Base. Existing economic activity within and near the neighborhoods, including number and type of jobs, mix of industries and retail uses, industry and occupation of employed residents, availability of sites for new commercial development and expansion, environmentally contaminated sites,and local economic development efforts. g. Land Use. Existing land uses and existing and potential land-use conflicts. h. Traffic Counts. Included will be the collection of previous traffic counts from Iowa DOT and the City of Waterloo and obtaining future traffic forecasts from the Iowa Northland Regional Council of Governments(INRCOG). New traffic counts and turning movement counts are not anticipated for this project,but will be added as a supplemental agreement,if required. i. Traffic Crash Reports. Included will be the collection and review of traffic crash reports and collision diagrams based on the most recent 5-year data available from the Iowa DOT. j. Drainage and Water Service Repair Data. Includes obtaining information about recurring drainage problems and water service repairs from City departments. Task 1.2 - Base Mapping. Consultant will compile existing mapping data from the City, County, State of Iowa and federal sources to produce a base map for corridor area, which will be used to produce maps for analysis. It is not anticipated that new aerial photography or field surveys will be completed. The City of Waterloo will be responsible for obtaining the rights to use the Black Hawk County digitized aerial photography and the electronic property line and ownership information for the study area. Task 1.3 - Database and GIS System. A database will be developed to organize and manage the data for this project. Portions of the data are also anticipated to be organized into a GIS system. Task 1.4 - Review of Existing Community Plans and Ordinances. Consultant will evaluate existing state and regional plans and studies that impact the growth and development of the corridor, including relevant studies from MOT, and other state and federal agencies. Consultant will review City plans, including the Land Use Plan, the Economic Development Plan and the environmental Justice and Transportation Investment Policy. Additionally, Consultant staff will use in-house knowledge regarding the City Master Plan,the Capital Improvement Plan and City ordinances. Task 1.5 - Data Synthesis and Analysis Report. This task includes a review and analysis of the inventory information and preparation of text, charts, tables, graphs and maps that will provide detailed information for the remainder of the study. An inventory and analysis report will be prepared to summarize the information obtained during this task. 2. OPPORTUNITY ANALYSIS The opportunity analysis is an element of the comprehensive planning process, which involves conceptualizing "big picture" ideas inspired from a community's given assets and unrealized potentials. The purpose of this activity is to identify the relationships and combinations of community attributes that can serve as catalysts for positive community change. The intent of this analysis is to help the City -2- recognize and protect its important resources; better manage development, economic development and environmental practices; and identify priority areas for future public programming. Task 2.1 - Development of Opportunity Analysis. Consultant will develop the Opportunity Analysis based on the priority areas identified by and for the small areas along the corridor, which will include recommendations for land use, transportation, neighborhood improvements, economic development and urban design. The analysis will be presented in the form of annotated maps, images, sketches and accompanying text. 3. DEVELOPMENT OF CORRIDOR ALTERNATIVES Consultant will develop alternatives for various aspects of the corridor including roadway alternatives. Recommendations for building locations, relationships and orientation as well as parking, circulation and landscape components for the integration of land uses along the corridor. The recommendations will also include strategies for integrating existing and future development opportunities. Task 3.1 - Roadway Alternatives. This task includes a review of the existing U.S. 63 roadway and connecting streets and development of alternative concepts for improvements in the roadway system. It is anticipated that the alternative concepts may include revisions in the lane configuration, intersection layout or intersection type, traffic control system, one-way/two-way operation, roadway alignment, and other roadway characteristics. The alternative concepts will be displayed on maps accompanied by written descriptions. Task 3.2 - Pedestrian/Bikeway Alternatives. This task includes the development of alternative concepts for the pedestrian and bikeway system. Included will be a review of sidewalk locations, bikeway locations, pedestrian overpasses and traffic control measures. The location of a proposed pedestrian overpass near the railroad crossing on East Fourth Street will also be reviewed as part of this task. Task 3.3 - Enhancement Concepts. This task includes the development of concepts for roadway enhancements along the U.S. 63 corridor. The concepts will be presented in the form of a plan view conceptual drawing. Task 3.4 - Land-Use Alternatives. Consultant will develop land-use alternatives for the Highway 63 corridor. The alternatives will include locations for different use and character types of residential, commercial, office, industrial, institutional,mixed use,parks and open space, and environmental corridor land uses throughout the corridor. These recommendations will be based on the analysis of the physical geography of the project area,economic opportunities and other factors influencing development location. Special emphasis will be placed on achieving smooth transitions between potentially incompatible land uses, encouraging a mix of uses where appropriate, and encouraging redevelopment of any vacant or underutilized lands. The alternatives will also identify structures that should be targeted for rehabilitation. Task 3.5 - Urban Design Alternatives. Consultant will develop urban design alternatives for the Highway 63 corridor. The alternatives will provide general design guidelines for commercial,residential and industrial development. -3- Task 3.6 - Drainage Alternatives. This task includes a review of the existing drainage system near the railroad underpass and development of alternative concepts for drainage and storm sewer improvements at this location. Task 3.7 - Review of Water Service Repairs. This task includes a review of known water service failures and repairs and development of alternative concepts for future accommodation or revisions to the water main system. 4. CORRIDOR PLANS After completion of the opportunity analysis and development of concepts, the project team will develop corridor plans for the U.S.63 corridor. It is anticipated that this task will include the development of draft plans for each of two subareas, a preliminary evaluation of advantages for each alternative, and refinement of the alternatives based on input from the City and community. Task 4.1 - Development of Draft Corridor Plans. Based on a review of the opportunity analysis and preliminary alternatives, and considering input from the City and public involvement process, a Draft Corridor Plan will be developed for each of the sub-areas along the corridor. A maximum of two(2)sub- areas will be considered for the Draft Corridor Plans. The process of developing the corridor plans will include the following elements: • Summary of the inventory and public participation process. • A written and graphical analysis of future opportunities and challenges for the corridor and surrounding neighborhoods. • A general evaluation of existing and possible future business mixes along the corridor. • Potential future land use along and surrounding the corridor, including opportunities for mixed- used and multi-family development as well as rehabilitation of existing structures. • Recommended development character of future land uses, including density, building design, setbacks/building orientation,parking,landscaping, signing and site layout. • Opportunities for restoration of natural systems,especially for storm water management. • Opportunities for drainage improvements at the railroad underpass. • Roadway lane configurations for U.S. 63. • Enhancement concepts,such as landscaping, streetscaping and lighting. • Opportunities for bicycle and pedestrian accommodations. -4- • Consideration of an implementation strategy for achieving the recommendations, including capital improvements, regulations, redevelopment incentives, business recruitment, partnerships and funding strategies. • Provide 25 copies of draft plan document. Task 4.2 - Refinement of Corridor Plans. The corridor plans will be refined based on community feedback and presented to the City as a final plan document. Twenty-five copies of the final corridor plan documents will be printed. 5. TRAFFIC ANALYSIS An analysis of traffic operations will be conducted to determine existing traffic conditions along U.S. 63 and to evaluate alternative improvements in the corridor. The following tasks are included. Task 5.1 -Obtain Traffic Counts and Projections. This task consists of obtaining current traffic counts from the City and/or Iowa DOT and developing the existing traffic model. Future traffic volumes will be obtained from INRCOG and will be used to develop the future traffic model. Task 5.2 - Traffic Simulation Model. A computerized traffic simulation model will be set up for the U.S. 63 roadway and major connecting streets. The model will include the existing lane configurations on U.S. 63 and major cross-streets, 1-way/2-way operation, major intersection locations, and traffic volumes as received from the City or Iowa DOT. The Synchro/SimTraffic Model will be used for this task. Two versions of the Synchro/SimTraffic Model will be developed, representing existing conditions and future(Year 2025)traffic conditions. Task 5.3 - Testing of Alternatives. The roadway alternatives developed in Task 3.1 will be evaluated for traffic capacity, level of service, delay and other measures of operation. It is anticipated that the following alternatives will be tested under this task: • Modifications to U.S. 218/U.S. 63 interchange. • Changes in the 1-way/2-way street system. • Alternative intersection configurations at major cross-streets, including the possibility of roundabout intersections. Task 5.4-Traffic Safety Review. A review of traffic crash statistics along U.S. 63 will be conducted for the most recent 5-year period for which records are available. The traffic safety review will evaluate traffic crash statistics, identify significant traffic safety problem areas,and summarize possible causes and possible remedies. Task 5.5 - Traffic Analysis Report. A Technical Memorandum will be prepared summarizing the findings of the traffic analysis tasks. -5- 6. PUBLIC INVOLVEMENT An ongoing public involvement program is included in this Scope of Services. The public involvement program will consist of the following activities. Task 6.1 - Corridor-Wide Forum. A corridor-wide forum will be conducted to identify the public's perception of a wide variety of issues along the corridor. The community-at-large will be invited as well as property and business owners within the corridor and key community leaders. The corridor-wide forum is anticipated to be a 3-hour session including a series of activities which will address quality of life issues in the general project area,including identifying what basic services are lacking in the corridor, how the area surrounding the corridor could better serve the community, what small areas could the corridor be broken into to make this project more manageable, and what resources could be utilized. The intent of this corridor-wide forum is to bring everyone together to gauge community needs, priorities and issues. The consultant will organize and conduct the forum,with assistance from the City. Task 6.2 - Small-Area Forums. A maximum of two (2) small-area forums will be conducted to obtain input on specific concerns and needs within the sub-areas decided upon in the community forum. Strengths, weaknesses, opportunities and threat (SWOT) exercises will be used, in addition to other activities determined in conjunction with the East Side Development Task Force. The consultant will organize and conduct the forums,with assistance from the City. Task 6.3 - Agency Surveys. The consultant will provide questionnaires to key agencies in order to determine their perception of opportunities and needs in the U.S. 63 corridor. Agencies that will be provided with questionnaires include the school district, social service organizations, Chamber of Commerce, churches, INRCOG, COPC/UNI Institute for Decision Making, Iowa DOT, Community Development Board, Cedar Valley Economic Development Corporation and adjacent neighborhood associations. Task 6.4 - Key Stakeholder Interviews. Telephone or personal interviews will be held with key stakeholders in the U.S. 63 corridor, including business owners, local financial institutions, non-profit organizations and community groups within the study area. A maximum of 25 interviews is included in this task. Task 6.5 - Social Issues Determination. The UNI Center for Social and Behavioral Research will provide input and guidance regarding the key social issues within the neighborhoods along U.S. 63. Included in this task are: • Attend a sampling of community meetings from among the Community Forum, Neighborhood Association meetings, small-area forums, public information meetings and East Side Development Task Force meetings. It is anticipated this activity will include three such meetings. • Offer an independent synthesis and analysis of the content of the meetings attended, plus the content of any other meetings for which there are available minutes or summaries. -6- • Prepare suggestions for consequent project activities that would be useful to the overall project based on these meetings. • In concert with the project team and community representatives, develop an appropriate survey instrument and protocol for use with a representative sample of the community. • Be available for implementing the community survey if this step is approved by the project team. Task 6.6 - Additional Public Informational Meetings. If requested by the City, additional public informational meetings will be added to the scope by a supplemental agreement. Task 6.7 - Neighborhood Association Meetings. One or more project team members will attend selected meetings of the neighborhood associations along U.S. 63. The purpose of attending these meetings is to foster ongoing dialogue with neighborhood residents, obtain their input into the project and provide feedback on project activities. This task includes attendance at a maximum of 12 neighborhood association meetings. Task 6.8 - East Side Development Task Force Meetings. The consultant will participate in periodic meetings with the East Side Development Task Force. A report or presentation on project activities will be made at each meeting and the consultant will be available for questions and answers. This task does not include the preparation of minutes or reports for the task force meetings. A maximum of eight task force meetings will be attended by the consultant. Task 6.9 - Newsletter Articles. This task consists of writing and submitting articles for publication in the existing neighborhood association newsletter. A total of 4 articles will be prepared and submitted to the city in electronic form. This task does not include printing and distribution of newsletters. Task 6.10 - Neighborhood Liaison. Public Involvement Unlimited, LLC, will provide an ongoing presence in the project corridor to provide a liaison between the City and the neighborhoods. The neighborhood liaison activities will include personal door-to-door contacts with neighborhood residents and businesses, communicating schedules for upcoming meetings, listening to comments and concerns from the neighborhoods,and communicating pertinent information to the project team. A log will be kept listing the name and address of each contact and summarizing the pertinent comments. The extent of this task will include an average of 3 hours per week for the duration of the project(72 weeks). Task 6.11 - Community Representative. This task includes the assistance of one local resident in the U.S. 63 corridor to serve as a liaison between the neighborhoods and the city. The community representative will attend neighborhood activities as needed, listen to the concerns of neighborhood residents, communicate issues and concerns to the project team, clarify answers to questions and bring project issues forward to the project team. The community representative will keep a log summarizing their activities, contacts and summaries of comments from neighborhood residents. The extent of work in this task will include an average of four hours per week for the duration of the project(72 weeks). Task 6.12 - Small Area Presentations. Consultant will meet with representatives of the two small areas for the following intermediate activities: -7- • Upon completion of the U.S. 63 Corridor Alternatives, Consultant will present the alternatives at one meeting for the two small areas. • Upon completion of the Draft Corridor Plans, Consultant will present the draft plans at one meeting for the two small areas. • Upon completion of the Draft Implementation Strategies, Consultant will present the draft implementation strategies at one meeting for each of the two small areas. Task 6.13 - Public Participation Summary Report. The Consultant will produce a summary report of the corridor-wide community forum, the small area forums, the agency survey and key stakeholder interviews. Consultant will provide 25 copies of the public participation summary report. Task 6.14-Other Public Involvement Activities. Additional public involvement activities, if requested by the city, will be added to the Scope as a supplemental agreement. Included are such items as the following: • Interactive Web Site • Project-Specific Newsletters • Community Displays and Models • Advertising and News Releases • Meetings and Presentations Beyond Those Listed in This Scope 7. ENVIRONMENTAL JUSTICE ANALYSIS An environmental justice analysis will be conducted in the U.S. 63 corridor to evaluate the current roadway design, as well as the future design alternatives, with respect to environmental justice. This task is intended to identify and evaluate whether the human health or environmental impacts of the highway alternatives will have a disproportionate impact on minority or low-income populations, as described in Executive Order 12898, February 11, 1994. A previous study of the U.S. 63 corridor, entitled "Environmental Justice and Transportation Investment Policy" by David J. Forkenbrock, Ph.D., will be used as a guide for the environmental justice analysis. The following subtasks are included: Task 7.1 - Identify and Quantify Impacts. The impacts to be evaluated with respect to environmental justice will be identified and quantified to the extent required for the analysis. The anticipated impacts include: • Noise • Transit Access • Access to Health Care • Access From Police or Fire Stations • Business Displacement • Construction Impacts -8- • Water Service Repair Impacts • Proximity/Setback of Homes • Proximity/Setback of Sidewalks • Traffic Safety on U.S. 63 • Traffic Operations/Congestion on U.S. 63 • Recreational Trail Opportunities Task 7.2 - Statistical Analysis. A statistical analysis will be conducted for the impacts identified in Task 7.1 to determine their relationship to low income and minority populations. Task 7.3 - Determine Environmental Justice Impacts. Based on the results of the statistical analysis, the impacts will be evaluated to determine if they have a disproportionate effect on low income or minority populations. Task 7.4-Evaluate Mitigation Measures. This task will identify potential improvements or mitigation measures along U.S. 63 that may address the environmental justice impacts identified in Task 7.3. Task 7.5-Evaluate Proposed Alternatives. The proposed alternatives for future improvements on U.S. 63 will be evaluated with respect to environmental justice to determine their effect on mitigating or eliminating any of the environmental justice impacts identified in Task 7.3. Task 7.6 - Environmental Justice Advisory Input. Advisory input and reviews for the environmental justice analysis will be provided by individuals with national experience or expertise in this area. The environmental justice advisors will be available to review the proposed work plan and provide input and recommendations on the analysis procedures. The following advisors are included: • David J.Forkenbrock,Ph.D. • Karen Skelton(Dewey Square Group) Task 7.7 - Environmental Justice Report. A final report will be prepared to summarize the Environmental Justice Analysis. A total of 25 copies of the environmental justice report will be printed. 8. IMPLEMENTATION PLAN Implementation strategies will be developed for each of the two small areas of the project. The following tasks are included. Task 8.1 - Draft Implementation Strategies. A Draft Implementation Strategy will be prepared for each of the two small areas, which will include identification of project priorities, identification of potential funding sources (local, state and federal), recommendations on necessary future partnerships (private and/or public),and potential obstacles that may be encountered during implementation. Task 8.2 - Refinement of Implementation Strategies. The consultant will revise the Draft Implementation Strategies based on community feedback. The final implementation strategies will be -9- summarized in a Technical Memorandum. Consultant will provide 25 copies of the Technical Memorandum. Task 8.3 - Federal Agency Liaison. The consultant will be available to monitor potential federal funding sources, assist in identifying key government officials involved in decision-making for special funding and will assist in arranging a meeting with such officials. Task 8.4 - Grant Applications. The consultant is available to assist the City in preparing grant applications for state or federal funding programs. This task is not included in the basic services but will be added as a supplemental agreement if requested by the City. 9. FINAL REPORT AND PRESENTATION Task 9.1 - Executive Summary Report. A final report of the project activities will be prepared by the consultant. It is anticipated that the final report will be an executive summary document and will not repeat the information from the technical memoranda. A total of 50 copies of the executive summary report will be printed. Task 9.2 -Final Presentation. The consultant will make a final presentation to the City Council and the East Side Development Task Force upon conclusion of the project. 10. PROJECT MANAGEMENT AND MEETINGS Task 10.1 -Agency Coordination. This task includes ongoing coordination with Iowa DOT, INRCOG, FHWA and other regulatory agencies. Task 10.2 - Subconsultant Coordination. This task includes the coordination, scheduling, correspondence and contract management for the various subconsultants on the project. Task 10.3 - Project Administration and Scheduling. This task includes project administration and internal coordination throughout the project development. The task includes intra-office meetings,project scheduling,day-to-day administrative tasks and typing of infra-office memoranda. Task 10.4- Project Review Meetings. In addition to the previously described public and neighborhood meetings, a project team meeting is anticipated with the City of Waterloo approximately every two months. A total of 9 project review meetings are included in this task. L:\WORK\ADM IN\AGREE\PROF\US63scope.doc -10- ATTACHMENT B (Referenced From 3.1) Cost Plus Fixed Fee 3.1.1 FEES AND PAYMENTS 3.1.1.1 Fees. For full and complete compensation for all work, materials, and services furnished under the terms of this Agreement, the Consultant shall be paid fees in the amount of the Consultant's actual cost plus applicable fixed fee amount. Consultant's actual costs shall include payments to any subconsultants. The estimated actual costs and fixed fee are shown below and are itemized in Attachment F. The nature of planning services is such that actual costs are not completely determinate. Therefore, it is possible that the Consultant's actual costs may exceed those shown in Attachment F and as shown below. A contingency amount has been established to provide for actual costs that exceed those estimated. Estimated Actual Costs $471,000.00 Fixed Fee 29,000.00 Contingency 0.00 Maximum Amount Payable $500,000.00 If at any time during the work the Consultant determines that its actual costs will exceed the estimated actual costs,thus necessitating the use of a contingency amount,it will promptly so notify the Planner in writing and describe what costs are causing the overrun and the reason. The Consultant shall not exceed the estimated actual costs without the prior written approval of the Planner. The Owner may audit the Consultant's cost records prior to authorizing the use of a contingency amount. The Consultant shall establish a procedure for comparing the actual costs incurred during the performance of the work to the estimated actual costs listed above. The purpose is to monitor these two elements and thus provide for early identification of any potential for the actual costs exceeding the estimated actual costs. If the Consultant exceeds the estimated actual costs for any reason, other than that covered in Paragraph B.3,before the Planner is notified in writing, the Owner will have the right, at its discretion,to deny the use of the contingency amount. The fixed fee amounts will not be changed unless there is a substantial change in scope, character, or complexity of the services covered by this Agreement or the time schedule is changed by the Owner. Any change in the fixed fee amount will be made by a Supplemental Agreement or Extra Work Order. The maximum amount payable under this Agreement is$500,000.00,which is the sum of the above amounts. The maximum amounts payable cannot be exceeded except by Supplemental Agreement, or Extra Work Order if the Consultant establishes and the Planner agrees that the original estimates of anticipated staff hours were inaccurate or that there is a justifiable change in the salary rates,payroll additives, overhead rates,or other supported costs from what was estimated. If, at any time, it is determined that a maximum amount payable will be or has been exceeded, the Consultant shall immediately so notify the Planner in writing. The maximum amount payable may be increased by a Supplemental Agreement or Extra Work Order,or this Agreement will be terminated,with the Owner having the right, at its discretion, to terminate this agreement without payment of the amount exceeding the maximum amount payable. The Owner may audit the Consultant's cost records prior to making a decision whether or not to increase the maximum amount payable. 3.1.1.2 Reimbursable Costs. Reimbursable costs are the actual costs incurred by the Consultant which are attributable to the specific work covered by this Agreement and allowable under the provisions of Title 48, Subchapter E, Parts 30 (full CAS), Parts 31.105 and 31.2 of the current Federal Acquisition Regulation. These include the following: 1. Salaries of the employees for time directly chargeable to work covered by the Agreement, and salaries of principals for time they are productively engaged in work necessary to fulfill the terms of the Agreement. 2. Direct, non-salary costs incurred in fulfilling the terms of this Agreement. The Consultant will be required to submit a detailed listing of direct, non-salary costs incurred and certify that such costs are not included in overhead expense pool. These costs may include travel and subsistence,reproductions,computer charges,and materials and supplies. 3. The indirect costs, salary related expenses and general overhead costs, to the extent that they are properly allowable to the work covered by this Agreement. The Consultant has submitted to the Owner the following indirect costs as percentages of direct salary costs to be used provisionally for progress payments for work accomplished during the Consultant's current fiscal year. Salary related expenses and general overhead costs are 160.00% of direct salary costs. Use of updated overhead percentage rates shall be requested by the Consultant after the close of each fiscal year in order to more accurately reflect the cost of work during subsequent years. Any actual fiscal year or fiscal year's audited or unaudited indirect cost rates known by the Consultant shall be used in computing the final invoice statement. All unverified overhead rates shall have a schedule of computation supporting the proposed rate attached to the final bill. Prior to final payment for work completed under this Agreement, all indirect cost rates shall be audited and adjusted to actual rates through the most recently completed fiscal year during which the work was actually accomplished. In the event that the work is completed in the current fiscal year, audited indirect cost rates for the most recently completed fiscal year may be applied also to work accomplished in the current fiscal year. If these new rates cause the estimated actual costs to be exceeded, the contingency amount will be used. 3.1.1.3 Premium Overtime Pay. Premium overtime pay shall not exceed 2 percent of the total direct salary cost without written authorization. B-2 3.1.1.4 Payments. Monthly payments shall be made based on the percentage of work completed and substantiated by monthly progress reports. The report shall indicate the direct and indirect costs associated with the work completed during the month. The Planner will check such progress reports and payment will be made for the direct,non- salary costs and salary and indirect costs during said month,plus a portion of the fixed fee. The portion of the fixed fee to be paid will be in the proportion of the actual work completed and documented on the monthly progress reports. Upon delivery and acceptance of all work contemplated under this Agreement, the Consultant shall submit one complete invoice statement of costs incurred and/or amounts earned. The final invoice shall include adjustment of provisional overhead rate to rates verified or unverified applied to the respective years that labor is incurred. Payment of the total cost claimed will be made upon receipt and review of such claim. Final audit will determine correctness of all invoiced costs and final payment will be based upon this audit. The Consultant agrees to reimburse the Owner for possible overpayment determined by final audit. B-3 ATTACHMENT C CERTIFICATION REGARDING DEBARMENT, SUSPENSION,AND OTHER RESPONSIBILITY MATTERS --PRIMARY COVERED TRANSACTIONS Instructions for Certification 1. By signing and submitting this proposal, the prospective primary participant is providing the certification set out below. 2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective primary participant to furnish a certification or an explanation shall disqualify such person from participation in this transaction. 3. The certification in this clause is a material representation of fact upon which reliance was placed when the department or agency determined to enter into this transaction. If it is later determined that the prospective primary participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause of default. 4. The prospective primary participant shall provide immediate written notice to the department or agency to which this proposal is submitted if at any time the prospective primary participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. 5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementating Executive Order 12549. You may contact the department or agency to which this proposal is being submitted for assistance in obtaining a copy of those regulations. 6. The prospective primary participant agrees by submitting this proposal that should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction. 7. The prospective primary participant further agrees by submitting this proposal that it will include the clause title "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier Covered Transaction," provided by the department or agency entering into this covered transaction, without modification in all lower tier covered transactions and in all solicitations for lower tier covered transactions. 8. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not debarred, suspended, ineligible or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the eligibility of its principals. Each participant may,but is not required to,check the Nonprocurement List(Tel#). 9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. 10. Except for transactions authorized under paragraph 6 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default. Certification Regarding Debarment, Suspension, and Other Responsibility Matters -- Primary Covered Transactions (1) The prospective primary participant certifies,to the best of its knowledge and belief,that it and its principals: (a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; (b) Have not, within a three-year period preceding this proposal, been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain or performing a public (federal, state or local) transaction or contract under a public transaction; violation of Federal or State Antitrust Statutes or commission of embezzlement, theft, forgery,bribery, falsification or destruction of records,making false statements, or receiving stolen property; (c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (federal, state or local) with commission of any other offenses enumerated in paragraph(1)(b)of this certification; and (d) Have not,within a three-year period preceding this application/proposal,had one or more public transactions(federal, state or local)terminated for cause or default. (2) Where the prospective primary participant is unable to certify to any of the statements in this certification,such prospective participant shall attach an explanation to this proposal. C-2 STATE OF IOWA Black Hawk County I, Joe A. Becker,Vice President, of Earth Tech,Inc.,being duly sworn(or under penalty of perjury under the laws of the United States and the State of Iowa) do hereby certify that the above statements are true and correct. Subscribed and sworn to this //' ^ day of a , 2002. C-3 ATTACHMENT D CERTIFICATION OF CONSULTANT I hereby certify that I am the Vice President and duly authorized representative of the firm of Earth Tech, Inc., whose address is 501 Sycamore, Suite 222, Waterloo, Iowa, and that neither the above firm nor I here represent has: (a) Employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above Consultant)to solicit or secure this Agreement, (b) Agreed, as an express or implied condition for obtaining this Agreement, to employ or retain the services of any firm or person in connection with carrying out the Agreement,or (c) Paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely for me or the above Consultant) any fee, contribution, donation or consideration of any kind for, or in connection with, procuring or carrying out the Agreement, except as here expressly stated(if any). I acknowledge that this certificate is to be furnished to the Iowa Department of Transportation and the Federal Highway Administration, U.S. Department of Transportation, in connection with this Agreement involving participation of Federal-Aid highway funds, and is subject to applicable state and federal laws, both criminal and civil. Joe A.Becker ATTACHMENT E CERTIFICATION OF CITY OF WATERLOO,IOWA I hereby certify that I am the Mayor of the City of Waterloo, Iowa, and that the above consulting firm or his representative has not been required, directly or indirectly, as an express or implied condition in connection with obtaining or carrying out this Agreement to: (a) Employ or retain,or agree to employ or retain,any firm or person,or (b) Pay, or agree to pay, to any firm, person, or organization, any fee, contribution donation, or consideration of any kind,except as here expressing stated(if any). I acknowledge that this certificate is to be furnished to the Iowa Department of Transportation, the Federal Highway Administration and U.S. Department of Transportation, in connection with this Agreement involving participation of Federal-Aid highway funds, and is subject to applicable state and federal laws,both criminal and civil. dersz&, fh.aia6oillgmh John ' Rooff,Mayor Fir L:\WORK\ADM .WG:."E\PROF\WatUSHighway63.doc Attachment F U.S. Highway 63 Planning Study Waterloo, Iowa COST ANALYSIS I. Direct Labor Cost(Earth Tech) Category Hours Rate/Hour Amount Senior Professional 690 $56.00 $38,640.00 Project Professional 680 $37.00 $25,160.00 Staff Professional 128 $26.50 $3,392.00 Professional 0 $20.50 $0.00 CADD Operator II 686 $21.00 $14,406.00 CADD Operator I 0 $14.50 $0.00 Technician 0 $19.00 $0.00 Project Administrator 192 $18.00 $3,456.00 $85,054.00 2376 II. Payroll Burden and Overhead Provisional Costs 160.00% $136,086.40 III. Direct Project Expenses Category Units Rate/Unit Amount Special Experts 0 $0.00 $88,000.00 Mileage 1000 0.365 $365.00 Per Diem 0 30.00 $0.00 Lodging 0 71.00 $0.00 Copier 20000 0.06 $1,200.00 Plan Copier 1500 0.50 $750.00 Sepias 0 5.00 $0.00 Miscellaneous, Other $1,000.00 $91,315.00 IV. Earth Tech Estimated Actual Costs $312,455.40 Rounded $312,500.00 V. Subcontract Expense Vandewalle&Associates $158,500.00 $158,500.00 VI. Estimated Actual Costs $471,000.00 VII. Fixed Fee $29,000.00 VIII. Contingency $0.00 IX. Maximum Amount Payable $500,000.00 L:\HOME\jbeckerlbaskefl[Wat U.S.63.xls]Costs Attachment F U.S. Highway 63 Planning Study Waterloo, Iowa SPECIAL EXPERT RATES Public Involvement Unlimited Lawrence T. Byrant $ 80.00 RDG Crose Gardner Shukert Principal $ 120.00 Partner 2 $ 84.00 Landscape Architect $ 48.00 Clerical I $ 57.50 Clerical II $ 31.00 UNI Center for Social & Behavioral Research Principal Investigators $ 80.00 Project Coordinator $ 42.10 Research Assistant $ 15.50 Administrative Support $ 30.25 Tallgrass Historians Prinicipal Investigator $ 59.00 Research Assistant $ 29.00 Dewey Square Group Karen Skelton $ 200.00 David J. Forkenbrock $ 125.00 Waterloo-Highway 63 Planning Services Attachment F Brian Melissa Rob Dean Stacy Mike Jeff Aaron Amy Ellen $275/hr $92/hr $139/hr $94/hr $46/hr $196/hr $51/hr $58/hr $55/hr $51/hr Hours Expenses Work Element One:Inventory and Data Management I 1 ------ V&A Inter4 2 4 2 2 4 2 16 - Inventory and Data Collection 8 2 8 16 - 34 Base Map Compilation 4 4 12 20 $200 Review of Existing Comm 8 4 4 18 34 $100 Data Collection and Synthesis 8 18 26 $0 Inventory and $30 Analysis Report 8 16 4 4 4 36 Subtotal 2 36 12 14 76 2 0 16 4 4 166 $330 Work Element Two:Opportunity Analysis _ V&A Intern 2 4 2 2 4 2 16 $0 On-Site Wu 12 18 12 18 18 78 $1,000 Developme nt of $90 Opportuni ty 4 24 8 16 36 4 24 8 16 140 V&A Intern 2 4 4 4 6 2 22 $0 _ Communit y $850 Presentatio n 10 10 4 4 4 8 40 Subtotal 20 60 36 I 44 68 8 28 8 8 16 296 $1,940 Work Element**:Development of Corridor Alternatives Development 4 8 16 16 20 4 24 24 116 $0 Corridor Alternatives Pr 8 12 12 8 12 12 8 72 $500 Subtotal 4 16 28 28 28 4 36 36 0 8 188 $500 Work Element Three:Draft Corridor Neighborhood Plans V&A Intern 4 6 4 4 6 4 4 4 36 $0 Developme nt of Draft $900 Plans 24 4 12 48 20 8 16 132 V&A Internal Work Session 2 4 4 4 6 20 Draft Neighborh $850 ood Plan Presentatio ns 16 12 28 Draft Neighborh ood Plans $900 Refinemen t 6 _ 2 8 8 16 40 Subtotal 6 56 12 22 68 4 32 12 12 32 256 $2,650 Work Element Five:Public Involvement Corridor- Wide Communit y Forum 12 20 8 4 4 48 $850 Small Area Forums(2) 24 30 16 4 74 $1,000 Agency 26 $74 Surveys 8 16 2 Key Stakeholde r Interviews 12 12 20 44 $850 Public Participati on $30 Summary Report 4 16 20 Subtotal 0 60 12 0 102 26 0 4 8 0 212 $2,804 Work Eletr 0 8 0 0 0 4 0 0 0 0 12 $0 Work Element Seven:Implementation Plan V&A Intern 2 4 2 2 4 2 16 $0 Developme nt of Draft Implement $30 ation Strategies 12 16 8 36 V&A Internal Work $30 Session 2 4 2 2 4 14 Draft Implement ation Strategy $850 Presentatio ns 8 2 2 8 8 28 Draft Implement ation Strategies $30 Refinemen t 8 8 8 24 Subtotal 4 36 6 6 40 2 0 0 8 16 118 $940 Work Element Eight:Final Plans V&A Intern 4 4 2 2 4 2 l 18 $0 Developme 11 nt of Final Draft Plans $ 900 2 38 6 8 48 16 8 16 142 Final Draft Neighborh ood Plan $850 Presentatio ns 22 6 4 22 8 62 Final Draft Neighborh ood Plans $900 Refinemen t 8 4 16 8 4 8 48 City Adoption Process 8 8 $800 Subtotal 6 80 14 18 90 2 24 12 8 24 _ 278 $3,450 Work Element Nine:Project Management Plan Scope Refinement 10 2 12 $850 Consultant 4 18 l 18 4 18 4 66 $850 Project Meetings (9) 4 70 2 2 9 4 91 $2,900 Subtotal 8 98 20 6 29 8 0 0 0 0 169 $4,600 i46 120 $... 48 400 11:40SN 9,214 Unit Rates $ 275.00 $ 92.00 $ 139.00 $ 94.00 $ 46.00 $ 196.00 $ 51.00 $ 58.00 $ 55.00 $ 51.00 Labor $13,750.00 $41,400.00 $19,460.00 $12,972.00 $23,046.00 $11,760.00 $6,120.00 $5,104.00 $2,640.00 $5,100.00 $141,352.00 Expenses $ 17,214.00 Total $158,566.00 Rounded $158,500.00 Waterloo,Iowa U.S.Highway 63 Planning Study STAFF HOUR ESTIMATE CADD Word Proc./ Senior Project Staff Operator Project Total Desorption of Work Prof. Prof. Prof. II Admin. 1.INVENTORY&DATA MANAGEMENT 1.1 Inventory&Data Collection 2 20 40 62 1.2 Base Mapping - 76 76 1.3 Database and GIS System - - 60 60 1.4 Review of Existing Community Plans&Ordinances -- 0 1.5 Data Synthesis&Analysis Report 0 , Subtotal 2 0 20 176 0 198 2.OPPORTUNITY ANALYSIS 2.1 Development of Opportunity Analysis 0 2.2 Community Presentation of Opportunity Analysis _-` -� 0 Subtotal 0 0 0 0 0 0 3.DEVELOPMENT OF ALTERNATIVES --- 3.1 Roadway Alternatives 32 32 32 96 3.2 Pedestrian/Bikeway Alternatives 4 16 8 28 3.3 Enhancement Concepts _ 3.4 Land Use Alternatives 335 Urban Design Alternatives 3.6 Drainage Alternatives 4 12 ��_- 8 - - 24_ 3.7 Review of Water Service Re airs 4 16 8 28 Subtotal 44 76 0 56 0 176 4.CORRIDOR PLANS 4.1 Development of Draft Corridor Plans 32 40 24 48 144 4.2 Refinement of Corridor Plans - 20 24 32 76 Subtotal 52 64 24 80 0 220 5.TRAFFIC ANALYSIS 5.1 Obtain Traffic Counts&Projections ---_ -__ _-_ 24 16 - - __-- 40 5.2 Traffic Simulation Model T-- 8 40 48 5.3 Testing of Alternatives 12 64 76__ 5.4 Traffic Safety Review . 8 .-_- 12 8 _ 28 5.5 Traffic Analysis Report -- 12 20 ----.-_ 16 4 52 Subtotal 40 160 24 16 4 244 6.PUBLIC INVOLVEMENT 6.1 Corridor-Wide Forum 20 16 16 4 56 6.2 Small-Area Forums 16 8 8 4 36 6.3 Agency Surveys .._.... 0 .6.4 Key.Stakeholder Interviews _.._ _-_._.._._..._..__...____.._.. ..-._._. __. 0 6.5 Social Issues Determination --`-------_-�_..__-__ .. ..._..._..___ _ _.._. 0 6.6 Additional Public Informational Meetings .__ 4_ ._ 0 6.7 Neighborhood Association Meetings -_ - 24 12 6 42 6.8 East Side Development Task Force Meetings - 40 -24 _ 20 16 100 6.9 Newsletter Articles 8 4 8 8 28 6.10 Neighborhood Liaison 0 6.11 Communi_ty Representative 0 6.12 Small Area Presentations 0 Waterloo,Iowa ua Highway m Planning Study STAFF HOUR ESTIMATE CAnu vwxd�'mc./ Senior Project Staff onemm, Project rota/ Description mWork Prof. prof. Prof. if Admin. 6.13 Public Participation vmmay����_______ -_--0 _ 6.14 Othe,p, mvnxemen1Actiyities --- ----� ouumta/ /08 64 o oo 32 --��- �Z.ENVIRONMENTAL _qpanmy __� ___ �� »u _60 _3u 1��-� 7.2 Statistical Analysis 8 � 60L 12 8 Determine Environmental Justice Impacts � __ *o � ' �96 � _7.4 Evaluate Mitigation Measures _ m -3216L --- 64 - 7.5- Evaluate � � �o - --- `~^���------ --- -' --_-j64_' 7.6 Environmental Justice Advi��r&p _I�_���omon�L�aum,nep�L_ �� - - e� --- ���------ ------- --'--� -- __. ______60 -40L196i_ mmmtax /36 236 60 om 40 '� -_ _--__ -____' =-== u6 ----�--'� ------------- �- u --'-------' 8. 16 ���-����/��������' ----___ ��_ »�-����2�����- --- ------''------------'--''�-------'--------- �- -= �----- ------------- Subtotal ux o o o o ----22''- FINAL REPORT& 9L I��L___.... _____ 9.1 Executive§yamarynrveq-- __�-__---- '---- 40 ------�� --��-'-���- _9.2_Final Presentation �� 8-------�---32�- Subtotal 56 20 o 40 32Coord —��- 10.PROJECT MANAGEMENT&MEETINGS ina«onL_ --- ----- -- ' -------��-------�-------'------ ------'------- �-----24-------24 ----------- -48L- ����������/m��___ ____� - ---- � ____-_' _ _-__-____ -� . -1 _-_-- _-__-_-�� ��-_120L 10.4 - �/ �� oo 12138__ Subtotal 230 oo o oe aw ­-410 - Total Hours 000 moo 128 xon 192 2,376