Loading...
HomeMy WebLinkAboutCHANGE ORDER 1 3c.''40wd /00 ``8_Iowa Department of Transportation Non- Change Order Part Part Non-Substantial: ❑ ❑ No. 1 Substantial: ❑ ❑ Concurrence Date Contract Accounting ID No.: County Black Hawk Project No: CS-TSF-8155(44)--85-07 Kind of Work: Construction Date Prepared: 5-03-2006 Contractor: KW Electric You are hereby authorized to make the following changes to the contract documents. A- Description of change to be made or extra work to be done: 1-Change some components of the trusses from that specified on the plans 2-Add five section programmable visibility signal head 3-Temporary signals on north side of 218, pull out wire,fix conduit, install new wire. 4-80 extra tons of granular material and extra asphalt 5-Change drain type to ABT trench drain B—Reason for change or extra work: 1-Original designs of some components were very old. Manufacturer would only supply based on new standards. Contractor is required to provide the City with design data and calculations signed by an Iowa licensed professional engineer. 2-This signal head was needed but was not shown on the original plans. 3-This was needed to be performed because of the drainage work's larger than anticipated excavation area, and the presence of an existing conduit within the expanded area. 4-More rock and asphalt were needed at same location due to the extra excavation as noted in B-3 above. 5-Requested by Contractor and approved by City of Waterloo(and IDOT). IC ADEPART EN'TOFTRA SPORTAT1.a Ditet 2 M � ,I ASO (Continued on?terse side), // Approved yt>-z S'% a h - %''fr, _51A,Z.21(2_ District Construction Engineer Date Project Engineer ate Receipt is acknowledged of this change or extra work and terms of settlement are hereby agreed to. Approved contingent upon funds being available under the existing x Kk {,J e, `,;e X_ project agreement or upon additional Federal-aid funds being Contractor made available by a modified project agreement. G By „5—NO& Date For the Division Administrator Federal Highway Administration Approved Assistant Construction Engineer Date DISTRIBUTION: Project Engineer—Forward original to District. District—Nonsubstantial—Forward original and one copy to the Office of Construction and two copies back to the Project Engineer. -Substantial -Forward original and two copies to the Office of Construction. Accounting ID No. I I I I I I 1 2 3 4 5 6 C-1 —Settlement for cost of work to be made as follows: Change Order No. 1 1) $1,350.00 (Applies to Bid Item#1) 2) $4750.00 (Applies to Bid Item#1) Total Bid Item#1: $6,100.00 3) $3,250.00 (Applies to Bid Item#2) 4) $2,200.00 (Applies to Bid Item#2) 5) $8,055.00 Credit (Applies to Bid Item#2) Total Bid Item#2 ($2,605.00) Credit Net Total This Change Order$3,495.00 C-2—Justification for cost(s) Item 1 was proposed by the contractor and agreed to by the City. Item 2 is based on breakdown of prices which were submitted by the contractor as part of his bid package. Item 3 is based on the costs for material and installation of conduit and cables. Item 4 quantities increased substantially compared to what was originally anticipated, as a result a lower unit price was used. Item 5 is a credit because the ABT drain tile is less costly than what was specified on the plans. D - ITEMS INCLUDED IN CONTRACT If Credit Add"CR" Change Line Item Number Unit Price Quantity Amount No. .xxx .xxx .xx 7 001 1 6,100.000 1.000 6,100.00 7 002 2 2,805.000 CR 1.000 CR 2,605.00 7 7 7 7 7 TOTAL 3,495.00 If Credit, E - ITEMS NOT INCLUDED IN CONTRACT Add"CR" Change Function Unit Price QuantityAmount No. Item Description Item Number Code xxx xx xx 8 8 8 8 8 8 8 TOTAL