HomeMy WebLinkAboutMEMO TO COUNCIL - CHANGE ORDER W11TH & US218 IMPROVEMENTS rAr-r- CITY OF WATERLOO , IOWA .
G TRAFFIC OPERATIONS & PARKING MAINTENANCE DEPT.
�• ..�:y� 408 E. Sixth St. • Waterloo, IA 50703 • (319) 291-4440 Fax (319) 291-4094
�ter10 A0 SANDIE GRECO • Superintendent, Traffic Operations&Pariciny Maintenance
Ahu1oi July 25, 2005
rim(
I ll.JR1 l'Y
COUNCIl Honorable Mayor Tim Hurley
MEMBERSCity Council Members
City Hall
715 Mulberry St.
I:Ec:INAI.n n. Waterloo, Iowa 50703
Sc'l!MITI
Ward f RE: Change Order for W. 11th St. and U.S. 218 Traffic Improvements
CAR( 1.1'N TRAF-106-05 [DOT Project Number: CS-TSF-8155 (44)-85-07}
col r
Wad 2 Dear Mayor Hurley and Council Members,
Isl_ICK
AR K This is to re quest approval for a change order to reduce the contract amount b q pp 9 y
CLAR
Wan/ ; $6,705.00. The contractor is K & W Electric, Inc. The reasons for the change are
listed below:
JOIN A. 1- A deduct of$8,055.00 is due to changing the drain trench type.
KINCAID 2- An increase of $1,350.00 is due to the updating of the structural design of
Ward 4 the trusses. The City requested a design calculation to be included,
RON signed and sealed by an engineer registered in the state of Iowa.
vvri,PIHR The net change is a deduction in the contract price of$6,705.00.
Wend',
The construction cost of this project is 100% reimbursable through an Iowa DOT
Boll Traffic Safety Grant. There is a chance that item number 2, an increase of
GREENWOOD $1,350.00, might be considered as non-reimbursable by the DOT. This is due to the
ill-t.ar;
engineering design nature of the work. However, at this time we are approaching it
FRIG as a portion of the total cost to the contractor for supplying and installing the trusses.
(:V N DFRSON
nr t,a,t This item is scheduled to be on the agenda Monday, August 1, 2005.
If you have any questions regarding this change order, please give my office a call.