Loading...
HomeMy WebLinkAboutCOMMUNICATION TO TRAFFIC DEPARTMENT Jerry Maffei() C.E.O. K Rich Muller Electric Inc. President 1127 Lincoln Street 4364 360th Street Brian DeVries P.O. Box 967 P.O.Box 426 Secretary Cedar Fails,Iowa 50613 Emmetsburg,Iowa 50536 Phone(319)277-0415 Phone(712)852-9077 Nick Steinkamp Fax(319)277.1418 Fax(712)852.8061 Vice President E-mail kwelectrlc.lnc@cfu.net Date: July 14rh,2005 TO: City of Waterloo Traffic Department Atten: Mohammed RE: Change order requests for F.Y,2005 US 218/west 11`"street traffic safety improvements Contract#671 This letter is In request of a change order. There are two items that this change order is need for. The first is the trench drain on 11`h street;Todd Van Dorn has requested that an ABT trench drain be used instead of the specified trench drain. If he is avowed to make this change there would be a deduction of$8,055.00 to the contract. This deduction is do to the need for only one utility access instead of three and bid item 34 trench drain gets decreased to$25,740.00 instead of$27,195.00. The new price for the trench drain Includes the custom catch basin. The second Item is the extra cost accrued to up date to the new Iowa Department of Transportation sign cantilever support standards. This needed to be done since the design used in the plans was not up to date with the new standards. The cost that was accrued to make this up date is$1,350.00 The net change order would deduct$6,705.00 from the contract. Please let me know If this change order is approved so that materials can be ordered. Please cal ' you have any questions, Key Martin Estimator/Project Manager Id Wd9Z:Zg SOW VT 'Pr : 'ON XUd : WO,yd