HomeMy WebLinkAboutSUPPLEMENTAL AGREEMENT NO. 1 - RESOLUTION 2009-123 (14-92,�',m,,,,`'� ' :'1 6, 7.2-93 AECOM AECOM 501 Sycamore Street,Suite 222,Waterloo,Iowa 50703 T 319.232.6531 F 319.232.0271 www.aecom.com SUPPLEMENTAL AGREEMENT NO. 1 STORAGE BUILDING WATERLOO POLLUTION CONTROL FACILITY WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa, (Client) and AECOM Technical Services, Inc. (ATS), previously known as Earth Tech, Inc. (Consultant), of Waterloo, Iowa, dated July 28, 2008,for the design of a new storage building at the Waterloo Pollution Control Facility for the City of Waterloo, Iowa; and WHEREAS, the Client and the Consultant now desire to enter into Supplemental Agreement No. 1 for construction-related services for the new storage building. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. PROJECT DESCRIPTION The project consists of a 70' x 150' steel building with 8" concrete floor, three overhead doors, three man-doors and a rough-in bathroom. The project does not included HVAC, electrical and plumbing. II. SCOPE OF SERVICES The Scope of Services will include the work, services, materials, equipment, personnel and supplies necessary to provide construction-related services including survey, shop drawing review, design interpretation, periodic field observation and contract administration. The services are further defined as follows: 1. Assign a project manager who will coordinate the project activities and will be the principal liaison with the Client. 2. Conduct a preconstruction conference with representatives of the Contractor, Client, Consultant and other interested parties. 3. Provide survey stakes to establish a benchmark, base line and locate corners of the storage building which will be used by the Contractor throughout the construction activities. 4. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the Project and compliance with the information given in the contract documents. 5. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. 6. Process monthly applications for payment submitted by the Contractor and forward to the Client for execution with recommendations for approval and payment. 7. Witness/provide,where applicable,field testing of the facilities furnished under the contract to assist in determining conformance with the contract documents. Page 2 8. Visit the construction site by design personnel at appropriate stages of construction to review the quality of the work and to determine, in general, whether the work conforms with the contract documents. 9. Assist the Client and Contractor in preparing and processing contract change orders if needed. 10. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Periodic field observation staff shall consist of a field representative for approximately 60 hours of service. Staffing requirements may be adjusted during the project in relation to the level of construction activity. 11. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents,and advise the Client of any work that should be corrected or rejected. 12. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. 13. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda,change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project-related documents. 14. Keep a diary, log book or report for those times on site, recording hours on the job site; weather conditions; data relative to questions of extras or deductions; list of visiting officials and representatives of manufacturers, fabricators, suppliers and distributors; activities; decisions,observations in general and specific observations in more detail when necessary,as in the case of observing test procedures. 15. Conduct a review of the project near completion and prepare a list of items to be completed or corrected. 16. Perform a field observation of the completed project before a final application for payment is processed for the Contractor. 17. Provide the Client with a copy of revised drawings of the construction plans for the project based on the construction observation records of the review staff and Contractor showing those changes made during construction considered significant. 18. Assist the Client with the final close-out documentation from the Contractor. AECOM Page 3 III. COMPENSATION AND PAYMENT Compensation for the above services shall be on an hourly basis in accordance with the hourly fees and other direct expenses at the time the services are performed. The estimated compensation of Twenty-Seven Thousand Dollars ($27,000.00) shall not be exceeded without authorization from the Client. IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated July 28, 2008. IN WITNESS WHEREOF,the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below. CITY OF WATERLOO, IOW AECOM TECHNICAL SERVICES, INC. By: .?� By: l�`1 �u --_ Timothy J. Hurley Joe A. Becker Mayor Vice President Date: ^)Co— 6 / Date: February 11, 2009 ATTEST: By: L:\work\ADMIN\AGREE\S P LE\SA1 WPCFStorageBldg.doc AECOM