HomeMy WebLinkAboutINSTRUCTION FOR BIDDERS CITY OF WATERLOO, IOWA
l! --� -� m WASTE MANAGEMENT SERVICES
'4 ^"�^^�" 3505 EASTON AVE. WATERLOO, IA 50702 (319)291-4553 FAX(319)291-4523
�t@rf� �� TIM SHEA SUPERINTENDENT
Mayor
TIM
HURLEY Instructions to Prospective Bidders
COUNCIL The City of Waterloo incorporates(2)collection programs for yard waste materials. Both
MEMBERS programs are in operation from April through November each year.
The curbside yard waste program materials will be brought to the Easton Ave.Yard Waste
REGINALD Drop Site as collected each week. The Easton Ave.Drop Site is also open to Waterloo residential
SCHMITT customers 7 days a week April through November. This site may at the city's discretion be open to the
Ward I residents for storm related emergency relief.
CAROLYN The city anticipates total tonnage to be from 3,500 to 4,500 tons per season as scaled on city's
COLE scale after initially ground,to be transported by the city to the composting sites for further processing
Ward 2 by the contractor.
HAROLD Bids for processing this material should be in U.S.dollars per ton at city's scale on site
GETTY $ . /ton,as ground by contractor prior to compost processing.
Ward 3
QUENTIN All material ground and scaled shall be processed according to Best Management Practices
HART and in accordance with Iowa Administrative Code(IAC)Chapter 105. Any and all measurements,
Ward 4 records,and any other pertinent data involving the windrowing and composting process shall be
RON reported(in written form)to the city on a monthly basis.
WELPER
wards At end of processing,the contractor shall deem the process complete and the city shall assume
the responsibility of further disposition of the finished product.
BOB
GREENWOOD Sealed bid must be received by the City Clerks Office at 715 Mulberry St.Waterloo,Iowa
At-Large 50703 by 4:00 pm on Tuesday, September 2, 2008.
STEVE The city reserves the right to reject and/or refuse any and/or all bids for justifiable cause.
SCHMITT
At-Large Prospective bidders should include information as per experience and expertise with similar
activities past and ongoing with other Iowa communities with contact persons for city review.
If I,or my staff,can be of further assistance regarding this issue please contact us to your
discretion.
Sincerel
//
Tim Shea,Superintendent
Waste Management Services
WE'RE WORKING FOR YOU!
An Equal Opportunity/Affirmative Action Employer
FORM OF CONTRACT
CONTRACT FOR CITY OF WATERLOO YARD WASTE
COMPOSTING PROGRAM
CITY OF WATERLOO, IOWA
This contract is made and entered into this day of
20 , by and between the City of Waterloo, Iowa, a Municipal Corporation,
(hereinafter referred to as City), and
of , Iowa(hereinafter referred to as Contractor),
WITNESSETH:
PAR.1 This contract is to provide for the equipment, supervision, site
service, and processing of the yard wastes generated by the City Yard
Waste Programs. Materials processed shall become city commodity.
Cull wastes shall be disposed of by the City or recomposted by the
Contractor.
PAR. 2 It is understood and agreed that the resolution adopted by the City Council
approving these documents, the Performance and Payment Bonds, the
Council Proceedings relating to this matter, and Scope of Services shall all
be considered as forming a part of the contract the same as though they
were each set out in said contract.
PAR. 3 The Contractor agrees to furnish at its own cost and expense, all necessary
materials and labor for said work and to perform said services in a
thorough, substantial, and a workmanlike manner, and in strict accordance
with the requirements of this contract, and of the provisions made a part
hereof by reference, and to the satisfaction and approval of the City and its
Superintendent of Waste Management Services.
PAR. 4 Should The Contractor fail to perform said services in strict accordance
with the terms and conditions of this contract or provisions therefore as
herein specified, the City may pay such additional sums to another party
to perform the work Contractor failed to perform and deduct any and all
such sums from any amount due Contractor.
PAR. 5 Contractor agrees to comply with and obey all ordinances of City, and
agrees to assume all liability for any and all claims and/or causes of action
at law or equity or otherwise which may arise from this Agreement.
Contractor further agrees to release City, including its employees and
agents, from any and all claims and/or causes of action, which arise from
this Agreement. Contractor has been informed of the ramifications
involved with this Agreement, and knowing and acknowledging them,
Contractor voluntarily agrees to assume and accept these ramifications.
To the fullest extent permitted by law, Contractor shall indemnify and
hold harmless City, its consultants, agents and /or employees from and
against all claims, damages, losses and expenses, including but not limited
to attorney's fees whether incurred prior to or during, litigations,
administrative hearings, arbitration, or bankruptcy proceedings, including
trial and appellate levels, which may in any way arise out of or result
from this Agreement, provided that any such claim, damage, loss, or
expense is caused in whole or in part by any negligent act or omission or
other fault of Contractor or anyone directly or indirectly employed by
Contractor or anyone for whose acts Contractor may be liable, regardless
of whether or not it was caused in part by a party indemnified hereunder.
PAR. 6 The City shall have the right to appoint one or more contract reviewers
that shall review the contractor's operation in detail. Such contract
reviewer shall have full authority to pass judgement upon the manner of
doing the work, and their judgement on rejecting any manner of work
shall be final unless it is revoked or modified by the Superintendent of
Waste Management Services.
PAR. 7 The Contractor agrees to pay punctually all just claims of labor, material,
persons, or subcontractors who shall perform labor or furnish materials or
services entering into these services. It is agreed that the City need not
pay the contractor until all such claims are paid by the Contractor.
Contractor shall, prior to payment by City, provide City with a release of
lien of any subcontractors which shall release City from any liens on
account of Contractor's failure to pay for labor, material, or persons under
this Agreement.
PAR. 8 The Contractor agrees to furnish the City, simultaneously with this
contract, a bond on a form to be provided by the City in the amount
provided by law as stated in the Scope of Services, which shall be for the
benefit of the City, and any and all persons injured by the breach of any
terms of this contract. Said bond shall be filed with the City Clerk and
shall be subject to the approval of the City Council and is by reference
made apart of this contract.
PAR. 9 The Contractor agrees that should it abandon work under this contract or
cease the prosecution thereof without reasonable cause, or should it fail to
proceed with said work within 24 hours after a notice to continue or carry
it on has been served to it at the address given herein by the City, then the
city may proceed to complete said work, using any material, tools, or
machinery found along said line of work, doing the work either by
contract or as it may elect, and the contractor and the sureties on its bond
shall be liable to the City for all costs and expenses arising out of
contractor's failure as stated herein. Said costs shall be retained by the
City from any compensation due, or to become due the Contractor, or may
be recovered by the City in an action upon Contractor's bond.
PAR. 10 In consideration of the full compliance on the part of the Contractor with
all the provisions, stipulations, and conditions hereof, or contained in the
various instruments made a part of this contract by reference, the City
agrees to pay to the Contractor, in the manner set out in the Scope of
Services, the amount of money due the Contractor for work performed, at
the prices set out in the Scope of Services.
PAR. 11 This contract is not divisible, but in the event of a conflict between this
contract and the various instruments incorporated by reference, this
contract shall govern. This Agreement may not be altered, modified, or
changed in any manner without prior written approval of the parties.
CITY OF WATERLOO, IOWA
Mayor
City Clerk
CONTRACTOR
BY:
Title:
Approved by the City Council of the City of Waterloo, Iowa this day of
, 20 .
ATTEST; , City Clerk, Waterloo, Iowa.
REQUEST FOR PROPOSALS TO GRIND AND PROCESS
COLLECTED YARD WASTES TO REUSABLE COMPOST
The City of Waterloo, Iowa is seeking proposals to provide equipment, site
service for, processing yard wastes collected by curbside services and/or collected
at the City Yard Waste Drop Site to a reusable compost for City disposition.
Scope of Services:
1 I. Introduction
A. This contract is to provide for the equipment and labor to grind all
yard wastes collected by the City at its Easton Ave. Yard Waste site.
Grinding shall be basically monthly May-Nov, or, as necessary to
provide space for continuous collection.
B. The City shall scale and transfer all ground yard waste to composting
sites at the Easton Ave. Facilities and provide sscale totals to the
Contractor for billing calculations.
C. The composting of the ground material shall be the responsibility of
the Contractor at the designated sites in accordance with Iowa
Administrative Code (IAC) Chapter 105. Any and all process
measurements and performance date (ie: temperatures, moisture %,
etc) shall be maintained in a Data Log by the Contractor and monthly
reports (in writing) shall be provided to the City.
D. All compost materials shall be `screened' through a 3/4" mesh screen.
Organic material so screened may be reintroduced to fresh ground pre
compost stock and all inert materials stockpiled for City disposition.
E. Inbound yard wastes will vary with the seasons, but, composting will
be year round..
F. Contractor shall supply a water supply unit for moisture addition needs
and/or dust abatement during dry summer months.
II. Compensation
A monthly statement/payment and report of all materials processed shall
be submitted on/or before the 15th of the following month. Payments by
the City shall be made within thirty(30) days of receiving said statement
and report. The City small set all fees that are to be charged to residential
users should they ever be required.
•
V�orker's Compensation, Public Liability, and
Property Damage Insurance, including contractual
liability coverage for the indemnity and hold harmless
provisions of the contract. All insurance shall be by
insurers acceptable to the City and for policy limits
acceptable to the City. The City of Waterloo shall be
specifically named as an additional insured on all
insurance. Before commencement of work
hereunder, Contractor agrees to furnish the City
certificates of insurance or other evidence satisfactory
to the City to the effect that such insurance has been
procured and is in force. The certificates shall
contain the following express obligations:
"This is to certify that the policies of insurance
described herein have been issued to the insured for
whom this certificate is executed and are in force at this
time.
In the event of cancellation or material change, 30 days prior written notice will
be given the certificate holder."
For purpose of this contract, Contractor shall carry the following types of
insurance in at least the limits specified below:
COVERAGES LIMITS OF LIABILITY
Worker's Compensation Statutory
Employer's Liability $500,000
Bodily Injury Liability
Except Automobile $1,000,000 each occurrence
Property Damage Liability
Except Automobile $1,000,000 each occurrence
Automobile Bodily Injury
Liability $1,000,000 each occurrence
Additional Excess Liability $1,000,000
•
Automobile Property Damage
Liability $1,000,000 each occurrence
No deductible provisions shall prevail in any of the Insurance policies.
1
F. Performance, Payment, Guarantee Bond
a) The Contractor will be required to furnish a Performance,
Payment and Guarantee Bond as security for the performance
of this contract. Said bond must be in the amount of$25,000.
b) Premium for the bond described above shall be paid by the
Contractor. A certificate from the Surety showing that the
bond premiums are paid in full shall accompany the bond.
c) Contractor shall be required to submit to the City, at least 90
days prior to the expiration date of any such bond, either a
statement from it's surety that they intend to replace or renew
the bond, or a replacement bond in the same amount, said
replacement bond to take effect on or before the expiration date
{ of the prior bond. Should the Contractor fail to provide the
a statement required or replace an expiring bond at least 90 days
prior to the expiration date, the City shall have the right, in
addition to any other lawful remedy, to terminate the contract
with the Contractor and re-bid the contract.
d) The surety on all initial, renewal, and replacement
Performance, Payment and Guarantee Bonds (1) shall be a duly
authorized surety company, licensed to do business in the State
of Iowa, (2)must have and maintain a permanent agent or
representative in the City of Waterloo, Iowa, and (3) must have
an AM Best Company rating of"A"and must be on the
Federal Treasury list of approved bonding companies, and/or
must be satisfactory to the City.
G. Press and Publicity
The City of Waterloo shall be responsible for all press and
publicity related to recycling within the city of Waterloo. Any and
all efforts made by the contractor that will affect the operation
under this contract shall be reviewed by the City prior to initiation.
This is to assure that conflicting messages will not be conveyed.
The City shall not unreasonably restrict the normal business
advertising of the contractor.
H. Contract Monitor
The City will monitor the Contractor's operation on a regular basis
by having an observer on site. The role of this monitor will be to
assure that operations are conducted in accordance with the terms
of this agreement. The observer should not be expected to perform
any duties for or on behalf of the Contractor other than to act as a
resource for information relating to the City's solid waste
operations.
I. Term
The term of this contract shall be three (3) years, commencing
September 2°d, 2008, through September 2nd, 2011. The City and
the Contractor may mutually extend this contract for an additional
two (2) years. The only portion of this contract that must be
renegotiated for the two-year option period would be the
Compensation Schedule.
J. Attachments
The following attachments shall be a part of this contract:
1) Equal Opportunity Clause
2) Affirmative Action Program
3) Performance Bond
4) Certificate of Insurance
K. Award of Contract
Final selection of a contractor will be made of the responsive and
responsible firm or firms whose Proposal, conforming to these
documents, is most advantageous to the City of Waterloo; price
and other factors considered. The intention is to award the contract
within a reasonable time, not exceeding thirty(30) days.
The City Council may, when in it's interest, reject any or waive any
informality in Proposals received.
The City Council may reject any or all Proposals if deemed in the best
interests of the City.