Loading...
HomeMy WebLinkAboutscan-3F / Rp� 011 �121 / 0 pR GOND SEII , o �11 / F�0OR / FI �� 0 �10 BRICK REMOVED FOR CLARITY EXIST. W 12x53 ® NEW W8X31 STEEL COLUMN W/10"X10"X1" TOP AND 12"X12"X1" BOTTOM PLATES. - ENCASED IN 16" X 20" BRICK PILASTER r � TEMPORARY SHORING @ MIN, (2) LOCATIONS. SHORING TO BE ADJUSTABLE AND ABLE TO SLOWLY JACK FACADE TO ORIGINAL '_OCr' L 1\ I . V -V AV -V - -V 3D — EXTERIOR VIEW LAID I . VV 14A I L I 47'- V 4 7'- V 411 E) A QC MI AT= EXIST. 4'-6"x 5'-6 "x 1 '-' / MlPl n1 IMn 1T11r ^1 �1­\ ^11 T 16O.C. VERT RAPPED ul�ilf\ r IL/-%J 1 LIl 1 lJ IVIH I UFI GA10 1 IIV V =IV.: COTT - KING SIZE BRICK -COLOR 80% MEDIUM IRONSPOT 77 SMOOTH MOD LAR 20% MEDIUM IRONSPOT 46 SMOOTH MOE .-LAR VERIFY COLOR AND BLEND BEFORE CONSTRUCTION ATTACHE BRICK TIES TO PLYWOOD ENLARGED COLUMN DETAIL 1 1 /2" = V-0" N C /I z EXIST. #4 BAR CONT. W/ WIRE TIES @ 16" O.C. (EXIST.)W21x44 (EXIST.)SLOTTED INSERT 2/BAY @ 1/5 PTS 5000# WORKING LOAD (EXIST.) (3) THREE #5 CONT NEW 10" X 10" X 1" TOP PLATE W/(4) 3/4"0 BOLTS REMOVE EXISTING CORBELED FACE BRICK AND \ BACK-UP MATERIAL AS NEED TO INSERT JACK POSTS AND INSERT THE NEW COLUMN - RE -BUILD CORBELED FACE BRICK AND BACK-UP AFTER INSTALLATION OF COLUMN - NEW W8X31 STEEL COLUMN EXIST. SUSPEr\ :m BLACK IRON SUPPC=1 (EXIST.) 1"X1/4"X1'-0" STRAPS @ 24" O.C. TO REMAIN - AD_ -`. (EXIST.) 3/8"X4"STUDS @ 24" O.C. SUPPENSIOI WI _ (USE HALF BRICK AT STUDS) F NEE (EXIST.) SOFFIT TO BE REMOVED AND REPLACED (EXIST.) L6x3-12 EXISTING SOFFIT -NEW SOFFIT - "J" BEAD FINISI- -F (EXIST.) L6x3-12x5/16 CAULK TO A', 3 NEW 7/8" FURRING CHANNELS ATTAC-: (EXIST.) PLASTER SOFFIT TO EXISTING SUPPORT FRAME' 5/8 " CERTAINTEED EXTERIOR SOFFIT BOAR- ✓ I, APPROVED EQUAL. FOLLOW N-31S. INSTALLATIONS RECOMMENDATION ,ND REQUIREMENTS. FINISH AND PAINT T LINTEL/FASCIA DETAIL ORIC NAL 1 1 /2" = V-0" ACTUAL VIEW OF EXTERIOR SIDE OF WALL AT SAGGED END ACTUAL VIEW IF BACK SIDE OF WALL AT SAGGED END ----------j7k—'ROOF LINTEL — ROOF 1 /8" = 1 '-0" 22 THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT 5 SULLIVAN BROTHERS CONVENTION CENTER LINTEL REPLACEMENT WATERLOO • ' REVISION SCHEDULE ' DATE DESCRIPTION BY PROJECT NO. 19-23187 FILE NAME 19-23185-5 Sullivan Bros Project Arch 20 DRAWN BY RRB DESIGNED BY JEH REVIEWED BY JEH ORIGINAL ISSUE DATE 09/18/19 CLIENT PROJECT NO TITLE LINTEL - FRAMING PLAN SHEET LINTEL — SECTION A 3/8" =11-01, 2S4ml I 10/4/2019 9:47:35 AM