HomeMy WebLinkAboutscan-1712
0
w
Nrl
L-29
F-1
AHU-1
MCC-3
F
D1
F-4
AHU-4
OPENTHOUSE DEMOLITION PLAN
OPENTHOUSE DEMOLITION ROOF PLAN
2 -- - -
I
3.1
3.2
SHEET NOTES
1. ALL EXISTING ELECTRICAL EQUIPMENT INDICATED ON
PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION
DOCUMENTS AND FIELD OBSERVATION OF THE EXISTING
BUILDING.
2. ALL EXISTING DEVICES SHOWN ON DEMOLITION PLANS
AND ASSOCIATED WIRES ARE TO BE DEMOLISHED BACK TO
SOURCE OF POWER, UNLESS NOTED OTHERWISE,
3, CONTRACTOR SHALL REMOVE ALL ABANDONED CABLING
BACK TO SOURCE OF POWER.
4. CONTRACTOR IS RESPONSIBLE FOR RECONNECTION OF
ANY EXISTING ACTIVE CIRCUITS AND/OR SPECIAL SYSTEM
CABLES INTERRUPTED BY DEMOLITION AS REQUIRED TO
KEEP OPERABLE.
5. ELECTRICAL PANELBOARDS AND SERVICE GEAR ARE TO
REMAIN. PANELBOARDS ARE SHOWN FOR REFERENCE AND
COORDINATION TO MAINTAIN CLEARANCES AROUND
EQUIPMENT,
6. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING
AND PAINTING ALL SURFACES WHERE RACEWAY HAS BEEN
REMOVED. MATCH ADJACENT SURFACE.
4.1 4.2
5.1
F-3 AHU-2
Y. C-2 _CONDENSER
PANEL
P-7
— D2,
P_1 P_� ,
D3,
ET-1 - - -
:�� ---------�'� CH-1
AS-1 'P'----- - - - - --
600A DISCONNECT
F-5
AdU-5-5
F-2
- D41
D4
ELECTRICAL KEYNOTE LEGEND
_KEY _K_EYNOTETEX_T
D1 DEMO GALLEY EXHAUST_FAN F-9, CCONDUCTORS, &
CONDUITS BACK TO SOURCE, MCC-3.
D2 DEMO CHILLED WATER PUMP DISCONNECTS, CONTROLS,
CONDUCTORS, & CONDUITS BACK TO SOURCE, _ CONDESNER PANEL.
D3 DEMO CHILLER DISCONNECT, CONDUCTORS, & CONDUITS BACK TO SOURCE, P-7, SALVAGE
DISCONNECT TO OWNER.
D4 DEMO ALL CONDENSING UNIT CONDUCTORS & CONDUITS BACK TO SOURCE, CONDENSER PANEL.
- - A.8
B
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
PROJECT
5 SULLIVAN
BROTHERS
CONVENTION
CENTER
PENTHOUSE ROOF
REPLACEMENT
WATERLOO
IOWA
REVISION SCHEDULE
DATE----
-- _ _ _
- - - -
DESCRIPTION -' - By
---- - - - - -
-
----- -- ----
PROJECT NO.
-- --
19-23141
FILE NAME
23141 Elec R20
DRAWN BY
NMS
DESIGNED BY
REH
REVIEWED BY
REH
ORIGINAL ISSUE DATE
01/20/20
CLIENT PROJECT NO.
TITLE
PENTHOUSE
DEMOLITION
PLAN
1/20/2020 9:49:49 PM SHEET
5 E2=11