Loading...
HomeMy WebLinkAboutscan-1712 0 w Nrl L-29 F-1 AHU-1 MCC-3 F D1 F-4 AHU-4 OPENTHOUSE DEMOLITION PLAN OPENTHOUSE DEMOLITION ROOF PLAN 2 -- - - I 3.1 3.2 SHEET NOTES 1. ALL EXISTING ELECTRICAL EQUIPMENT INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD OBSERVATION OF THE EXISTING BUILDING. 2. ALL EXISTING DEVICES SHOWN ON DEMOLITION PLANS AND ASSOCIATED WIRES ARE TO BE DEMOLISHED BACK TO SOURCE OF POWER, UNLESS NOTED OTHERWISE, 3, CONTRACTOR SHALL REMOVE ALL ABANDONED CABLING BACK TO SOURCE OF POWER. 4. CONTRACTOR IS RESPONSIBLE FOR RECONNECTION OF ANY EXISTING ACTIVE CIRCUITS AND/OR SPECIAL SYSTEM CABLES INTERRUPTED BY DEMOLITION AS REQUIRED TO KEEP OPERABLE. 5. ELECTRICAL PANELBOARDS AND SERVICE GEAR ARE TO REMAIN. PANELBOARDS ARE SHOWN FOR REFERENCE AND COORDINATION TO MAINTAIN CLEARANCES AROUND EQUIPMENT, 6. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND PAINTING ALL SURFACES WHERE RACEWAY HAS BEEN REMOVED. MATCH ADJACENT SURFACE. 4.1 4.2 5.1 F-3 AHU-2 Y. C-2 _CONDENSER PANEL P-7 — D2, P_1 P_� , D3, ET-1 - - - :�� ---------�'� CH-1 AS-1 'P'----- - - - - -- 600A DISCONNECT F-5 AdU-5-5 F-2 - D41 D4 ELECTRICAL KEYNOTE LEGEND _KEY _K_EYNOTETEX_T D1 DEMO GALLEY EXHAUST_FAN F-9, CCONDUCTORS, & CONDUITS BACK TO SOURCE, MCC-3. D2 DEMO CHILLED WATER PUMP DISCONNECTS, CONTROLS, CONDUCTORS, & CONDUITS BACK TO SOURCE, _ CONDESNER PANEL. D3 DEMO CHILLER DISCONNECT, CONDUCTORS, & CONDUITS BACK TO SOURCE, P-7, SALVAGE DISCONNECT TO OWNER. D4 DEMO ALL CONDENSING UNIT CONDUCTORS & CONDUITS BACK TO SOURCE, CONDENSER PANEL. - - A.8 B THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT 5 SULLIVAN BROTHERS CONVENTION CENTER PENTHOUSE ROOF REPLACEMENT WATERLOO IOWA REVISION SCHEDULE DATE---- -- _ _ _ - - - - DESCRIPTION -' - By ---- - - - - - - ----- -- ---- PROJECT NO. -- -- 19-23141 FILE NAME 23141 Elec R20 DRAWN BY NMS DESIGNED BY REH REVIEWED BY REH ORIGINAL ISSUE DATE 01/20/20 CLIENT PROJECT NO. TITLE PENTHOUSE DEMOLITION PLAN 1/20/2020 9:49:49 PM SHEET 5 E2=11