Loading...
HomeMy WebLinkAboutscan-152 7 EX AHU-3 BREAKER 1 7 EX ACCU-3 BREAKER -� RES:..1k.FAr FP �T 'R n.i.. -- EX SF; ITCHGEAR ER RS/RL UP ER RS/RL ON -- — MAINTAIN EX PITCH POCKET I FOR REUSE tIIII EX 32"x20" SA — If ER RS/RL ( f � �" T 2 8 / 1 ��� J- ER 32lx20"� 7' I -- - ER AHU-3 1--- $0 _ ____ 2 —ER— —Eft — $ r : Ol ERRS/RL -- '� ER DX —� EX 36"x12" OA COOLING COIL L___J D EX 42"x20" EA -- N LOWER LEVEL MEPT DEMO PLAN N 19-068 YOUNG ARENA MECHANICAL UPGRADES MECH 214 ER ACCU-3 CD EX CONDENSING UNIT RAIL TO BE REUSED BY REPLACEMENT UNIT 2,, MAIN LEVEL MEPT DEMO PLAN 1_1 STAIR 212 (CY )NCOURSE 213 - -ER EXHAUS— =AN (y , -� 3 WOMEN 211 DEMO GENERAL NOTES.• A, DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED DEMOLITION IN THE BID. B. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE DOCUMENTS THAT ALL MECHANICAL AND ELECTRICAL SYSTEMS (NOT TO BE REUSED OR EXTENDED) BE REMOVED. COORDINATE WITH ARCHITECTURAL DRAWINGS. C REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL DEMOLITION REQUIREMENTS. D. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING ALL MECHANICAL EQUIPMENT TO BE REMOVED. MAINTAIN FIRE RATINGS OF AFFECTED WALLS AND FLOORS. EXISTING MECHANICAL AND ELECTRICAL SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE. CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED. DEMO REFERENCED NOTES: 1. REFERENCED WORK TO BE PERFORMED UNDER BASE BID. WORK SHALL STILL BE PERFORMED IF ALTERNATE #8 IS ACCEPTED. 2. REFERENCED WORK TO BE PERFORMED UNDER ADD ALTERNATE #8 ONLY. IF ALTERNATE #8 IS REJECTED, REFERENCED EXISTING EQUIPMENT SHALL REMAIN. 3. REFERENCED WORK TO BE PERFORMED UNDER ADD ALTERNATE #9 ONLY. IF ALTERNATE #9 IS REJECTED, REFERENCED EXISTING EQUIPMENT SHALL REMAIN. 4. REMOVE DX COOLING COIL SECTION SERVING EX AHU-3. REMOVE ALL ASSOCIATED REFRIGERANT & CONDENSATE PIPING. REMOVE ALL ASSOCIATED CONTROLS & CONTROLS ACCESSORIES. PREPARE EX AHU-3 FOR INSTALLATION OF REPLACEMENT COIL MODULE. 5, UNDER BASE BID, EX AHU-3 SHALL REMAIN. UNDER ADD ALTERNATES, REMOVE EX AHU-3 AND ALL ASSOCIATED CONTROLS & ELECTRICAL ACCESSORIES. MAINTAIN ASSOCIATED DUCTWORK AND PREPARE FOR RECONNECTION TO REPLACEMENT UNIT. 6. REMOVE EX ACCU-3 AND ALL ASSOCIATED REFRIGERANT PIPING, CONTROLS ACCESSORIES, AND ELECTRICAL EQUIPMENT & ACCESSORIES. 7. REMOVE EXISTING EQUIPMENT CIRCUIT BREAKER AND ALL ASSOCIATED CONDUIT & WIRING. PREPARE DISTRIBUTION PANEL FOR INSTALLATION OF NEW BREAKER TO SERVE REPLACEMENT UNIT. 8. REMOVE AHU-3 MOTOR STARTER AND DISCONNECT. 9. REMOVE ROOF MOUNTED EXHAUST FAN. REMOVE ASSOCIATED CONTROLS AND ELECTRICAL ACCESSORIES. MAINTAIN ASSOCIATED ROOF CURB AND EXHAUST DUCTWORK. NOTE: VERIFY BUILDING DIMENSIONS FOR ROUGH -IN WORK WITH ARCHITECTS DRAWINGS. INVISION PL NNING IARC HIi CNRE IINMRI016 501 Sycamore Street Suite 101 Waterloo, IA 50703 319.233.8419 319-233.9772 Fax www.invisionarch.com CONSULTANT: 21 M V u u -� WATERLOO DES MOINES 10 WA CITY REVISIONS: Descrption. Date No. OWNER SIGN -OFF: —DATE — — -- -- — NAME Q Q _U o Z p Q J 2 U U-1 Q 3 cw > I. 1--- Z < z w Q= cn ry Q Z CLI 0 Z ZD (D U Z O O^ L() >_ � N PROJECT NO: 19053 DATE: 2019.08.06 SHEET SET: BID DOCUMENTS SHEET NAME: DEMOLITION PLANS SHEET: ME3.00