HomeMy WebLinkAboutscan-152
7 EX AHU-3 BREAKER
1
7 EX ACCU-3 BREAKER -�
RES:..1k.FAr FP
�T 'R n.i..
-- EX SF; ITCHGEAR
ER RS/RL UP
ER RS/RL ON --
— MAINTAIN EX
PITCH POCKET
I FOR REUSE
tIIII EX 32"x20" SA —
If ER RS/RL ( f � �" T
2 8 / 1
��� J- ER 32lx20"�
7'
I -- - ER AHU-3
1--- $0 _ ____ 2
—ER— —Eft — $ r :
Ol ERRS/RL
-- '�
ER DX
—� EX 36"x12" OA COOLING COIL
L___J
D
EX 42"x20" EA --
N
LOWER LEVEL MEPT DEMO PLAN N
19-068 YOUNG ARENA MECHANICAL UPGRADES
MECH
214
ER ACCU-3
CD
EX CONDENSING UNIT RAIL TO BE
REUSED BY REPLACEMENT UNIT
2,, MAIN LEVEL MEPT DEMO PLAN
1_1
STAIR
212
(CY
)NCOURSE
213
- -ER EXHAUS— =AN (y , -�
3
WOMEN
211
DEMO GENERAL NOTES.•
A, DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS AND
CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL CONTRACTORS
SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED DEMOLITION IN THE
BID.
B. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL MECHANICAL AND ELECTRICAL SYSTEMS (NOT TO BE
REUSED OR EXTENDED) BE REMOVED. COORDINATE WITH ARCHITECTURAL
DRAWINGS.
C REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL DEMOLITION
REQUIREMENTS.
D. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING ALL
MECHANICAL EQUIPMENT TO BE REMOVED.
MAINTAIN FIRE RATINGS OF AFFECTED WALLS AND FLOORS.
EXISTING MECHANICAL AND ELECTRICAL SYSTEMS LOCATED IN WALLS AND
CHASES NOT BEING REMOVED OR REUSED FOR NEW SYSTEMS MAY BE
ABANDONED IN PLACE. CAP AT MAINS OR IN A CONCEALED LOCATION IF
REQUIRED.
DEMO REFERENCED NOTES:
1. REFERENCED WORK TO BE PERFORMED UNDER BASE BID. WORK SHALL
STILL BE PERFORMED IF ALTERNATE #8 IS ACCEPTED.
2. REFERENCED WORK TO BE PERFORMED UNDER ADD ALTERNATE #8
ONLY. IF ALTERNATE #8 IS REJECTED, REFERENCED EXISTING
EQUIPMENT SHALL REMAIN.
3. REFERENCED WORK TO BE PERFORMED UNDER ADD ALTERNATE #9
ONLY. IF ALTERNATE #9 IS REJECTED, REFERENCED EXISTING
EQUIPMENT SHALL REMAIN.
4. REMOVE DX COOLING COIL SECTION SERVING EX AHU-3. REMOVE ALL
ASSOCIATED REFRIGERANT & CONDENSATE PIPING. REMOVE ALL ASSOCIATED
CONTROLS & CONTROLS ACCESSORIES. PREPARE EX AHU-3 FOR INSTALLATION
OF REPLACEMENT COIL MODULE.
5, UNDER BASE BID, EX AHU-3 SHALL REMAIN. UNDER ADD ALTERNATES, REMOVE
EX AHU-3 AND ALL ASSOCIATED CONTROLS & ELECTRICAL ACCESSORIES.
MAINTAIN ASSOCIATED DUCTWORK AND PREPARE FOR RECONNECTION TO
REPLACEMENT UNIT.
6. REMOVE EX ACCU-3 AND ALL ASSOCIATED REFRIGERANT PIPING, CONTROLS
ACCESSORIES, AND ELECTRICAL EQUIPMENT & ACCESSORIES.
7. REMOVE EXISTING EQUIPMENT CIRCUIT BREAKER AND ALL ASSOCIATED
CONDUIT & WIRING. PREPARE DISTRIBUTION PANEL FOR INSTALLATION OF
NEW BREAKER TO SERVE REPLACEMENT UNIT.
8. REMOVE AHU-3 MOTOR STARTER AND DISCONNECT.
9. REMOVE ROOF MOUNTED EXHAUST FAN. REMOVE ASSOCIATED CONTROLS AND
ELECTRICAL ACCESSORIES. MAINTAIN ASSOCIATED ROOF CURB AND EXHAUST
DUCTWORK.
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH -IN
WORK WITH ARCHITECTS DRAWINGS.
INVISION
PL NNING IARC HIi CNRE IINMRI016
501 Sycamore Street
Suite 101
Waterloo, IA 50703
319.233.8419
319-233.9772 Fax
www.invisionarch.com
CONSULTANT:
21 M V u u -�
WATERLOO DES MOINES 10 WA CITY
REVISIONS:
Descrption. Date No.
OWNER SIGN -OFF:
—DATE — — -- -- — NAME
Q
Q
_U
o
Z
p
Q
J
2
U
U-1
Q
3
cw
>
I.
1---
Z
<
z
w
Q=
cn
ry
Q
Z
CLI
0
Z
ZD
(D
U
Z
O
O^
L()
>_
�
N
PROJECT NO:
19053
DATE:
2019.08.06
SHEET SET:
BID DOCUMENTS
SHEET NAME:
DEMOLITION PLANS
SHEET:
ME3.00