Loading...
HomeMy WebLinkAboutscan-16---EX MAIN SWITCHGEAR ..:SURFACER -'TOR;:,. E (2) RS/RL UP THROUGH EXISTVG ROOF PENETRATION a- 6 2 AHU 3 HEAT O2 480V 3P/90A RS/RL- SWITCHGEAR 7 2 AH-33 FAN O n ' 1 SWITCHGEAR SWITCHGEAR WIRE TO EF-3 :1CIC-3 DISCONNECT/BREAKER 6 F N LOWER LEVEL MEPT PLAN 1/8'' J„ 19-068 YOUNG ARENA MECHANICAL UPGRADES --32"x20" SA O--EX 32"x20" SA (2) RS/RL DN--'' SO THROUGH EXISTING"IP PITCH POCKET —AHU-3 ACCU-3A 480V-3P/25A 2 S SWITCHGEAR ,g EX 36"x12" CA EX 42"x20" E- — O 1� 480V-3P/25A SWITCHGEAR RS/RL (7 1 -- --- —ACCU-3A 1 N 'Z _MAIN LEVEL_MEPT PLAN. 1/8' = V-0 -A CU-36 (8 1 GENERAL NOTES. A. LAYOUT AND ROUTING SHOWN IS DIAGRAMMATIC AND SCHEMATIC IN NATURE. NOT ALL OFFSETS MAY BE SHOWN. CONTRACTOR SHALL VERIFY EXACT ROUTING REQUIRED AND NUMBER OF OFFSETS AND TRANSITIONS. B. ',IAINTAIN SERVICE CLEARANCE IN FRONT OF AND ABOVE ELECTRICAL EQUIPMENT AND ACCESS. DO NOT INSTALL EQUIPMENT OR ROUTE DUCTS IN CLEARANCE SPACE. REFER TO EQUIPMENT INSTALLATION AND INSTRUCTIONS. C. --OORDINATE THERMOSTAT LOCATIONS WITH CASEWORK, WALL TYPES, AND °JRNISHINGS PRIOR TO ROUGH -IN. D. -LL DISCONNECTS ON MECHANICAL EQUIPMENT SHALL BE MOUNTED ON STRUCTURE TO ALLOW REMOVAL OF THE EQUIPMENT FOR MAINTENANCE WITH A "INIMUM OF WIRING WORK, VERIFY NEC CLEARANCE REQUIREMENTS ARE MET �RIOR TO ROUGH -IN. E. -LL RECEPTACLE CIRCUITS SHALL HAVE DEDICATED NEUTRALS. REFERENCED NOTES: 1, REFERENCED WORK TO BE PERFORMED UNDER BASE BID, REFRIGERANT PIPING SHALL STILL BE INSTALLED IF ALTERNATE #8 IS ACCEPTED. 2. REFERENCED WORK TO BE PERFORMED UNDER ADD ALTERNATE #8 ONLY. IF ALTERNATE #8 IS REJECTED, REFERENCED EQUIPMENT & ACCESSORIES SHALL NOT BE FURNISHED/INSTALLED. 3 REFERENCED WORK TO BE PERFORMED UNDER ADD ALTERNATE #9 ONLY. IF ALTERNATE #9 IS REJECTED, REFERENCED EQUIPMENT & ACCESSORIES SHALL NOT BE FURNISHED/INSTALLED. INSTALL REPLACEMENT DX COOLING COIL IN EXISTING AHU-3 COIL MODULE. PROVIDE NEW CONDENSATE DRAIN PAN AND PIPING. ROUTE CONDENSATE TO NEAREST FLOOR DRAIN WITHIN MECHANICAL ROOM. INSTALL REPLACEMENT AIR HANDLER AHU-3 ON EXISTING CONCRETE PAD. POUR NEW SECTION OF 4" CONCRETE TO ACCOMMODATE ADDITIONAL UNIT LENGTH. COORDINATE NEW PAD SECTION DIMENSIONS WITH AHU-3 DIMENSIONS. 6. EtiTEND AND OFFSET EXISTING DUCTWORK AS NECESSARY TO RECONNECT EXISTING DUCTS TO NEW AHU-3 DUCT OPENINGS. REFRIGERANT PIPING AS INDICATED REPRESENTS (2) REFRIGERANT CIRCUITS. SEE DETAIL FOR FURTHER INFORMATION. INSTALL REPLACEMENT ACCUs ON EXISTING ROOF EQUIPMENT RAIL. -. PROVIDE NEW THERMOSTAT TO SERVE NEW AHU-3. UPDATE CONTROLS FOR NEW U^+IT, SEE SEQUENCE OF OPERATION FOR FURTHER INFORMATION. 10. I`ISTALL NEW IXHAUST FAN EF-1 ON EXISTING ROOF CURB. CONNECT NEW FAN TO EXISTING EXHAUST DUCTWORK, INVISION `I NNINO IARCHITECTURE IINTERIOR9 f 507 Sycamore Street 61 Suite 101 Waterloo, IA 50703 g 319.233.8479 319.233.9772 Fax www.invisionarch.com :3 CONSULTANT: I Lj Lj WATERLOO DES MOINES 1 IOWA CITY REVISIONS: .- Description_. Date No — -- —. — — — -_ -- — -- —— — --- -_ ohs_-.___ — —. — — — — -- — —— — — — — — — —. — OWNER SIGN -OFF: DATE_._NAME _J Q U 0 z 0 Q ry W U-J 3 � L a Q z uj ,Z Q CL cn ry Q w Cw 10 3+€ < Q L w Q z < EF-1 EF-1 (D 0 P/20A WIRE Z U WIRE TO SAME BREAKER AS REMOVED FAN 3O ,P�, 0 ZD 0 CL Lr) >- >- D N PROJECT NO: 19053 k DATE: 2019.08.06 SHEET SET: BID DOCUMENTS NOTE: VERIFY BUILDING DIMENSIONS FOR ROUGH -IN WORK WITH ARCHITECTS DRAWINGS. SHEET NAME: FLOOR PLANS SHEET: ME4.00