HomeMy WebLinkAboutPROJECT WORKSHEETS AND PROJECT APPLICATION SUMMARY - 6/16/2007 /o0 a7t) ,• ' - / I S5 '
6
Fields of Opportunities STATE OF IOWA
CHESTER J. CULVER DEPARTMENT OF PUBLIC DEFENSE
GOVERNOR IOWA HOMELAND SECURITY AND
EMERGENCY MANAGEMENT DIVISION
PATTY JUDGE DAVID L.MILLER,ADMINISTRATOR
LT.GOVERNOR
June 16, 2007
Ms. Nancy Eckert, City Clerk Disaster#: DR-1688-IA
City of Waterloo PA ID#: 013-82425-00
715 Mulberry Street Package#(s): 50
Waterloo, IA 50703
Dear Ms. Eckert:
Enclosed are copies of your Project Worksheets (PW's) and Project Application Summary (P.2), for your Public
Assistance application.
It is very important that you review each Project Worksheet for:
• accuracy/completeness;
• the scope of work to determine differences, if any, between the Project Worksheet and what
was
agreed upon when the site was inspected;
• calculation errors and corresponding dollar amounts.
If there are specific issues or discrepancies on a Project Worksheet you need to notify the Public Assistance
Officer immediately. Remember, you have 30 days from the receipt of this letter to request to have any issue
reconsidered for eligibility.
When all of your small projects are 100% complete, or when any one of your large projects is 100%
complete, please notify the Public Assistance Office of Iowa Homeland Security and Emergency Management
Division so that we may begin the closeout process. Remember, in the event that your actual project costs
exceed the approved amount shown on the project worksheet, you have 60 days from the date on which the
project work was completed to officially request a project cost adjustment, which must include documentation of
all project costs.
Payments received from Iowa Homeland Security and Emergency Management Division should be redeemed
upon receipt, regardless of the status of the respective project(s) they pertain to. The Catalog of Federal
Domestic Assistance (CFDA)number may be found on the"Payment Voucher"form enclosed with each warrant.
All records of work associated with the claimed costs on every project are to be maintained for a minimum of
three (3) years from the closing date of the grant or sub-grant and are subject to State and Federal review under
the "Single Audit Act, as amended"and the"Single Audit Act Amendments of 1996, as amended".
The Office of Management and Budget Circular A-133, the "Single Audit Act, as amended", and the "Single Audit
Act Amendments of 1996, as amended", require that Non-Federal entities that expend $500,000.00 or more in a
year in Federal awards shall have a single audit conducted. A program specific audit may be conducted in place
of a single audit if the auditee meets the terms specified in Office of Management and Budget Circular A-133
§ .200, paragraph C.
If there is a "finding" relating to a Federal program administered by Iowa Homeland Security and
Emergency Management Division:
A copy of the official audit must be submitted within nine (9) months of the end of the auditee's fiscal year
to:
State Fiscal Office
Department of Public Defense
7105 NW 70th Avenue, Bldg B-61
Johnston, IA 50131
If there are no "findings"
A copy of the audit report is not required, but the auditee shall provide written notification that:
♦ an audit was conducted, including -
entity(auditee)name
Catalog of Federal Domestic Assistance (CFDA) number(s)
the period covered by the audit
dollar amount expended
♦ the schedule of findings and questioned costs disclosed no audit findings relating to Federal
award(s) administered by Iowa Homeland Security and Emergency Management Division
♦ the summary of schedule of prior audit findings did not report on the status of any audit findings
related to Federal award(s) administered by Iowa Homeland Security and Emergency Management
Division
If you have any questions or concerns, please call the Public Assistance Office of Iowa Homeland
Security and Emergency Management Division at(515) 725-3231.
Sincerely,
Pehvitis 41-m-yer
Dennis Harper
State Public Assistance Officer
Enclosures
7105 NW 701h AVENUE/CAMP DODGE/ BLDG. W-4/JOHNSTON, IOWA 50131-1824/515-725-3231
WWW.IOWAHOMELANDSECURITY.ORG
DATE: 06/16/2007 FEDERAL EMERGENCY MANAGEMENT AGENCY
PROJECT APPLICATION SUMMARY (P.2)
DISASTER#: 1688
PACKAGE NO: 50
P.A. ID: 013-82425-00 APPLICANT: WATERLOO, CITY OF
PW# VSN CAT INF COST SHR PROJECTED COMPL DATE APPROVED PW AMOUNT
463 0 A N N 09/14/2007 $52,332.18
Site Number: 1
DAMAGED DEBRIS REMOVAL
FACILITY:
CITY WIDE PARKS AND RECREATION FACILITIES AND STREET RIGHT-OF-WAYS
FACILITY
LOCATION: WORK COMPLETED:
REMOVE TWELVE TREES DAMAGED IN EXCESS OF 50%, CUT OUT HANGERS IN ALL OTHER TREES AND PICK UP
SCOPE OF WORK: ALL WOODY DEBRIS, 2,901 CU.YDS. IN JURISDICTION OF THE LEISURE SERVICES DEPARTMENT OF THE CITY OF
WATERLOO AND CHIP SAID DEBRIS.CHIPS WERE DISTRIBUTED THROUGH THE CITY FOR RESIDENTS TO USE
OR WERE BURNED AT THE CITY DUMP.
THE PROJECT OFFICER WAS SHOWN SOME OF THE CHIPPED DEBRIS PILES.
THE WORK WAS DONE BY THE FORESTRY DIVISION OF THE LEISURE SERVICES COMMISSION OF THE CITY OF
WATERLOO, IA.
Page 1 of 2
DATE: 06/16/2007 FEDERAL EMERGENCY MANAGEMENT AGENCY
PROJECT APPLICATION SUMMARY (P.2)
DISASTER#: 1688
PACKAGE NO: 50
P.A. ID: 013-82425-00 APPLICANT: WATERLOO,CITY OF
PW# VSN CAT INF COST SHR PROJECTED COMPL DATE APPROVED PW AMOUNT
514 0 B N N 09/14/2007 $27,463.15
Site Number: 1
DAMAGED EMERGENCY PROTECTIVE MEASURES
FACILITY:
WATERLOO AIRPORT
FACILITY
LOCATION: WORK COMPLETED: THE AIRPORT OPERATED TWO GENERATORS FOR 49.5 HOURS EACH,USED 70.2 O.T.
FORCE ACCOUNT LABOR, 199.2 FORCE ACCOUNT EQUIPMENT TO BREAK UP THE ICE ON OVER 2 MILLION
SQUARE FEET OF RUNWAYS,TAXIWAYS AND APRONS BY APPLYING 2.64 TONS OF EURA,500 GAL.OF GLYCOL
SCOPE OF WORK: AND 25 TONS OF SAND APPLIED BY TWO PLOW/SANDING TRUCKS.THEY USED TWO FRONT END LOADERS WITH
SPECIAL SHOES TO BREAK UP THE ICE.THE TWO PLOW/SANDING TRUCKS PLOWED THE ICE ACROSS THE
PAVEMENT TO THE LAST LANE ON ONE SIDE OF THE PAVEMENT AND USED THE SNOW BLOWER TO THROW THE
ICE OVER THE LIGHTS ONTO THE GRASS AREA.THE SAME TWO PLOW/SANDING TRUCKS WERE USED TO
SPREAD SAND AND SALT IN THE PARKING AREAS AND ACCESS ROAD.
2 PWs $AMOUNT ELIGIBLE $FEDERAL SHARE
PWs: $79,795.33 $59,846.50
SUBGRANTEE ADMIN EXP: $2,077.33 $2,077.33
TOTAL: $81,872.66 $61,923.83
GRAND TOTAL: 2 PWs
$AMOUNT ELIGIBLE $FEDERAL SHARE
PWs: $79,795.33 $59,846.50
SUBGRANTEE ADMIN EXP: $2,077.33 $2,077.33
GRANTEE
TOTAL: $81,872.66 $61,923.83 ADMIN EXP: $309.61
APPROVED BY: DAVID TESKA DATE: 05/22/2007
PUBLIC ASSISTANCE OFFICER
Page 2 of 2
PROJECT WORKSHEET REPORT
DECLARATION NO.FEMA-IA-DR1688 PREPARED DATE 05/09/2007
FIPS NO. 013-82425-00 REPORT DATE 36/16/2007 08:32
APPLICANT NAME WATERLOO,CITY OF INF TYPE 3 INF
SUBDIVISION
• NON-INF
FEMA PW# 514 VSN 0 REF# RH-004 3 REC
CATEGORY B. Protective Measures COUNTY BLACK HAWK FUNDING OPTION COST SHARE 0.75
STD PROJECT NO. 299 PROJECT TITLE EMERGENCY PROTECTIVE MEASURES
PROJECTED CMPLTN DT09/14/2007 ACTUAL CMPLTN DT WORK COMPLETE AS OF 04/24/2007 100 %
ELIGIBILITY Yes AMOUNT ELIG$27,463.15 FEDERAL SHARE $20,597.36 PRIORITY Normal
PW REVIEWER DATA
BEGIN DESIGN DT BEGIN CONSTR DT
—
REVIEWER NAME DATE
END DESIGN DT END CONSTR DT I INITIAL REVIEW CHINN,PAUL 05/21/2007
PREPARER HUDSON, RAY j FINAL REVIEW TESKA,DAVID 05/22/2007
ROLE PO DATA SOURCE Paper
STATE DEAN, MARK
MT PROP 0 Yes• No VALIDATED • Yes O No
DATE OBLGTD 05/22/2007 PACKAGE DATE 05/22/2007 PNP QUESTIONS O Yes• No STATE RVWD 0 Yes• No
PACKAGE ID 50 ATTACH Yes 0 No
Does the Scope of Work change the pre-disaster conditions at the site? 0 Yes • No 0 Unsure
Special Considerations issues included? 0 Yes • No 0 Unsure
Is there insurance coverage on this facility? 0 Yes • No 0 Unsure
Hazard Mitigation proposal included? 0 Yes • No 0 Unsure
Page 1 of 7
PROJECT WORKSHEET REPORT
DECLARATION NO.FEMA-IA-DR1688 PREPARED DATE 05/09/2007
FIPS NO. 013-82425-00
REPORT DATE 06/16/2007 08:32
APPLICANT NAME WATERLOO,CITY OF
SUBDIVISION INF TYPE O INF
• NON-INF
FEMA PW# 514 VSN 0 REF# RH-004 Q REC
SITE NUMBER 1 of 1
FACILITY NAME EMERGENCY PROTECTIVE MEASURES Latitude 42.55079
ADDRESS Longitude-92.39799
CITY WATERLOO STATE IA ZIP
Was this site previously damaged? O Yes 0 No Unsure
SITE NUMBER 1 -LOCATION
WATERLOO AIRPORT
SITE NUMBER 1 -DAMAGE DIMENSIONS AND DESCRIPTION
SEVERE WINTER STORMS DURING THE EVENT PERIOD 2-23 TO 3-2-07 DEPOSITED ICE ON TREES AND POWER LINES KNOCKING
OUT POWER TO THE WATERLOO AIRPORT FOR 49.5 HOURS AND DEPOSITED UP TO ONE AND ONE HALF INCHES OF ICE ON OVER 2
MILLION SF OF RUNWAYS,TAXIWAYS AND APRONS PRODUCING EXTREMELY DANGEROUS CONDITIONS FOR AIRCRAFT LANDING,
TAXIING AND TAKING OFF. FAA REGULATIONS REQUIRE THAT THE AIRPORT MAINTAIN SURFACES CONDITIONS WHICH ALLOW
AIRCRAFT TO BRAKE SAFELY.WITH 1 1/2"OF ICE ON THE PAVEMENT, THE BRAKING ACTION IS NOT ACCEPTABLE.
FAA REGULATIONS DO NOT ALLOW FOR THE USE OF SALT ON THE RUNWAYS, ONLY THE USE OF GLYCOL, SAND AND UREA FOR
DEICING.WITH THE UNUSUAL CONDITION OF 1 1/2" OF ICE ON THE RUNWAYS.THE AIRPORT HAD TO UTILIZE TWO JOHN DEERE
FRONT END LOADERS TO GET UNDER THE ICE AND BREAK UP THE ICE SO IT COULD BE REMOVED FROM THE RUNWAYS. REMOVAL
REQUIRED THE USE OF TWO TRUCKS WITH PLOWS TO PUSH THE ICE TO THE EDGE OF THE RUNWAY AND A SNOW BLOWER TO
THROW THE ICE OVER THE LIGHTS THAT LINE THE OUTER EDGES OF THE RUNWAYS. DURING THE ICE BLOWER OPERATION,THE
ICE HIT AND DAMAGED ONE FAA CONTROLLER IN THE GRASS. FAA ORDER 5100.38C, CHAPTER 5 SECTION 5, PARAGRAPH 543C FAA
DOES NOT REIMBURSE FOR ANY COSTS ASSOCIATED WITH AIRPORT MAINTENANCE INCLUDING BUT NOT LIMITED TO LABOR,
VEHICLES USE AND MATERIALS ASSOCIATED WITH THAT WORK.SEE ATTACHED E-MAIL DATED 4/30/07 TO BRAD HAGEN FROM
CHERYL DOBSON OF THE FAA.
THE RUNWAYS ARE(#1, 8,400'X 150'= 1,260,000 SF+#2,6,002'X 150'=900,300 SF+#3,5,403'X 129'=696,987 SF=
TOTAL 2,857,287 SF OF RUNWAY TO DEICE PLUS THE TAXI WAYS AND APRONS. SEE ATTACHED MAP.
SAND AND SALT WERE USED ON THE ENTRY ROAD(25'X 5,400'= 135,000)AND IN THE PARKING AREA FOR THE FAF, FACILITIES AND
AIRPORT OPERATIONS(240'X. 360'X 2= 172,800 SF).
TWO BACKUP GENERATORS, #1. A CATERPILLAR MODEL 3406, 350 KW,438 KVA
#2. A CAT
Page 2 of 7
PROJECT WORKSHEET REPORT
DECLARATION NO. FEMA-IA-DR1688 PREPARED DATE 05/09/2007
FIPS NO. 013-82425-00 REPORT DATE 06/16/2007 08:32
APPLICANT NAME WATERLOO, CITY OF
INF TYPE 0 INF
SUBDIVISION • NON-INF
FEMA PW# 514 VSN 0 REF# RH-004 0 REC
SITE NUMBER 1 -DAMAGE DIMENSIONS AND DESCRIPTION
ERPILLAR MODEL D379,275 KW, 343.5 KVA
OWNED BY THE AIRPORT OPERATED FOR 49.5 HOURS EACH TO KEEP THE POWER TO THE OPERATIONS CENTER AND LIGHTS ON
THE AIR FIELD.AIRPORT PERSONAL CHECK THE GENERATORS ONCE EVERY SIX HOURS FOR ABOUT 15 MINUTES. THEY DO NOT
KEEP RECORDS OF THE PERSONAL TIME AND ARE THERE FOR NOT CLAIMING ANY OVERTIME.
THERE ARE NO CODES AND STANDARDS OR MITIGATION ISSUES WITH THIS PROJECT.
SITE NUMBER 1 -SCOPE OF WORK
WORK COMPLETED: THE AIRPORT OPERATED TWO GENERATORS FOR 49.5 HOURS EACH, USED 70.2 O.T. FORCE ACCOUNT
LABOR, 199.2 FORCE ACCOUNT EQUIPMENT TO BREAK UP THE ICE ON OVER 2 MILLION SQUARE FEET OF RUNWAYS,TAXIWAYS
AND APRONS BY APPLYING 2.64 TONS OF EURA, 500 GAL.OF GLYCOL AND 25 TONS OF SAND APPLIED BY TWO PLOW/SANDING
TRUCKS.THEY USED TWO FRONT END LOADERS WITH SPECIAL SHOES TO BREAK UP THE ICE.THE TWO PLOW/SANDING TRUCKS
PLOWED THE ICE ACROSS THE PAVEMENT TO THE LAST LANE ON ONE SIDE OF THE PAVEMENT AND USED THE SNOW BLOWER TO
THROW THE ICE OVER THE LIGHTS ONTO THE GRASS AREA.THE SAME TWO PLOW/SANDING TRUCKS WERE USED TO SPREAD
SAND AND SALT IN THE PARKING AREAS AND ACCESS ROAD.
COST ESTIMATE
ITEM'VSN CODE'[ MATERIAL AND/OR DESCRIPTION r UOM QTY UNIT PRICE COST
1 0 0000 WORK COMPLETED 0 0 $.00 $0.00
2 0 9007 LABOR LS 1 $2,314.88 82,314.88
3 0 9008 EQUIPMENT LS 1 $20,257.30 $20.257.30
Page 3 of 7
PROJECT WORKSHEET REPORT
DECLARATION NO.FEMA-IA-DR1688 PREPARED DATE 05/09/2007
FIPS NO. 013-82425-00
APPLICANT NAME WATERLOO, CITY OF REPORT DATE 06/16/2007 08:32
SUBDIVISION INF TYPE INF
• NON-INF
FEMA PW# 514 VSN 0 REF# RH-004 C REC
COST ESTIMATE
'ITEMI VSN''CODE] MATERIAL AND/OR DESCRIPTION ' UOM
71�. QTY �I UNIT PRICE COST
4 0 9009 MATERIAL LS 1 $4,890.97 $4,890.97
Eligible Amounts: Total(this version) $27,463.15
Total Oblig To Date $27,463.15
Unobligated+Obligated $27,463.15
Federal Share for Obligated and Unobligated $20,597.36
SPECIAL CONSIDERATIONS
Does the damaged facility or item of work have insurance coverage and/or is it an insurable risk
(e.g., buildings,equipment,vehicles,etc.)? Yes No [) Unsure
2 Is the damaged facility located within a floodplain or coastal high hazard area and/or does it have
an impact on a floodplain or wetland? Yes No 0 Unsure
3 Is the damaged facility or item of work located within or adjacent to a Coastal Barrier Resource
System Unit or an Otherwise Protected Area? Yes • No Unsure
4 Will the proposed facility repairs/reconstruction change the pre-disaster conditions(e.g.,footprint,
material, location,capacity,use or function)? 0 Yes • No C) Unsure
5 Does the applicant have a hazard mitigation proposal or would the applicant like technical
assistance for a hazard mitigation proposal? Yes • No C; Unsure
6 Is the damaged facility on the National Register of Historic Places or the state historic listing?Is it
older than 50 years?Are there more,similar buildings near the site? Yes • No C' Unsure
7 Are there any pristine or undisturbed areas on,or near,the project site?Are there large tracts of
forestland? 0 Yes • No C Unsure
8 Are there any hazardous materials at or adjacent to the damaged facility and/or item of work?
Yes • No C Unsure
Are there any other environmental or controversial issues associated with the damaged facility
and/or item of work? Yes • No Unsure
Page 4 of 7
PROJECT WORKSHEET REPORT
DECLARATION NO. FEMA-IA-DR1688 PREPARED DATE 05/09/2007
FIPS NO. 013-82425-00 REPORT DATE 06/16/2007 08:32
APPLICANT NAME WATERLOO,CITY OF
SUBDIVISION
INF TYPE INF
• NON-INF
FEMA PW# 514 VSN 0 REF# RH-004 3 REC
ENVIRONMENTAL -All Environmental Review is complete.
Laws and Executive Orders Review-All Other Laws/EOs complete.-PCHINNI
Laws/EOs Status
Coastal Barriers Resources Act(CBRA) Gen Revw/NA
Clean Water Act(CWA) Gen Revw/NA
Coastal Zone Management Act(CZMA) Gen Revw/NA
Endangered Species Act(ESA) Gen Revw/NA
Fish and Wildlife Coordination Act(FWCA) Gen Revw/NA
National Historic Preservation Act(NHPA) Gen Revw/NA
Clean Air Act(CAA) Gen Revw/NA
E.O. 11988: Floodplains Gen Revw/NA
E.O. 11990:Wetlands Gen Revw/NA
E.O. 12898: Environmental Justice for Low Income and Minority Populations Gen Revw/NA
NEPA Level of Review-06/16/2007 08:32:44-This project is statutorily excluded from the requirements of the National Environmental Policy Act
and no other environmental review or documentation is required.-PCHINNI
Page 5 of 7
PROJECT WORKSHEET REPORT
DECLARATION NO. FEMA-IA-DR1688 PREPARED DATE 05/09/2007
FIPS NO. 013-82425-00 REPORT DATE 06/16/2007 08:32
APPLICANT NAME WATERLOO,CITY OF
INF TYPE 0 INF
SUBDIVISION • NON-INF
FEMA PW# 514 VSN 0 REF# RH-004 0 REC
Standard Conditions
1. Any change to the approved scope of work will require re-evaluation for compliance with NEPA and other Laws and Executive Orders.
2. This review does not address all federal, state and local requirements.Acceptance of federal funding requires recipient to comply with all federal, state
and local laws. Failure to obtain all appropriate federal, state and local environmental permits and clearances may jeopardize federal funding.
3. If ground disturbing activities occur during construction, applicant will monitor ground disturbance and if any potential archeological resources are
discovered,will immediately cease construction in that area and notify the State and FEMA.
GENERAL COMMENTS
EMERGENCY PROTECTIVE MEASURES
THIS PROJECT IS AN EMERGENCY ACTION OF SEARCH AND RESCUE, EMERGENCY CARE, ISSUES OF LIVE SAFETY, 3ONSTRUCTION
OF TEMPORARY MEASURES TO REDUCE IMMEDIATE THREATS TO LIFE, PROPERTY AND PUBLIC HEALTH OR SAFETI' EMERGENCY
ACTIONS ARE STATUTORILY EXCLUDED FROM FURTHER REVIEW UNDER THE NATIONAL ENVIRONMENTAL POLICY ACT. THE
APPLICANT HAS IDENTIFIED NO ENVIRONMENTAL ISSUES WITH THIS PROJECT. PAUL CHINN 05/17/2007
RECORD MAINTENANCE
COMPLETE RECORDS AND COST DOCUMENTS FOR ALL APPROVED WORK MUST BE MAINTAINED FOR AT LEAST 3 YEARS FROM THE
DATE THE LAST PROJECT WAS COMPLETED OR FROM RECEIPT OF FINAL PAYMENT,WHICHEVER IS LATER. ALL APPROVED PWS
WITHIN A PROJECT APPLICATION ARE SUBJECT TO RANDOM AUDITS. QUARTERLY REVIEWS ARE CONDUCTED ON ALL APPROVED
PW'S WHICH EQUAL OR EXCEED$59,700 AND HAVE NOT RECEIVED FINAL PAYMENT. ANY JURISDICTION RECEIVING$500,000 OR
MORE IN TOTAL FEDERAL FINANCIAL ASSISTANCE IN A FISCAL YEAR MUST SUBMIT A COPY OF ITS SINGLE AUDIT(AS REQUIRED BY
THE SINGLE AUDIT ACT OF 1984)TO THE STATE.-PAUL CHINN 05/17/2007
Page 6 of 7
PROJECT WORKSHEET REPORT
DECLARATION NO. FEMA-IA-DR1688 PREPARED DATE 05/09/2007
FIPS NO. 013-82425-00 REPORT DATE 36/16/2007 08:32
APPLICANT NAME WATERLOO,CITY OF
INF TYPE ;, INF
SUBDIVISION
NON-INF
FEMA PW# 514 VSN 0 REF# RH-004 9 REC
PW REQUIRED REVIEWS
REVIEW ASSIGNED DATE DATE
REVIEW STATUS RECOMMENDATION REVIEWER REVIEWER SUBMITTED REVIEWED
Initial Complete Eligible pchinnl 05/17/2007 05/21/2007
STATE Complete Eligible phall 05/21/2007 05/22/2007
Final Complete Eligible dteska 05/22/2007 05/22/2007
Page 7 of 7
PROJECT WORKSHEET REPORT
DECLARATION NO. FEMA-IA-DR1688 PREPARED DATE 05/04/2007
FIPS NO. 013 82425 00 REPORT DATE 06/16/2007 08:32
APPLICANT NAME WATERLOO, CITY OF
SUBDIVISION
INF TYPE INF
• NON-INF
FEMA PW# 463 VSN 0 REF# RH-003 0 REC
CATEGORY A. Debris Removal COUNTY BLACK HAWK FUNDING OPTION COST SHARE 0.75
STD PROJECT NO. 199 PROJECT TITLE DEBRIS REMOVAL
PROJECTED CMPLTN DT09/14/2007 ACTUAL CMPLTN DT WORK COMPLETE AS OF 04/09/2007 100 %
ELIGIBILITY Yes AMOUNT ELIG$52,332.18 FEDERAL SHARE $39,249.14 PRIORITY Normal
BEGIN DESIGN DI BEGIN CONSTR DT
PW REVIEWER DATA
REVIEWER NAME DATE
END DESIGN DT END CONSTR DT INITIAL REVIEW CHINN,PAUL 05/22/2007
PREPARER HUDSON, RAY FINAL REVIEW TESKA,DAVID 05/22/2007
ROLE PAC DATA SOURCE Paper
STATE DEAN,MARK MT PROP 0 Yes• No VALIDATED • Yes 0 No
DATE OBLGTD 05/22/2007 PACKAGE DATE 05/22/2007 PNP QUESTIONS 0 Yes• No STATE RVWD 0 Yes• No
PACKAGE ID 50 ATTACH • Yes 0 No
Does the Scope of Work change the pre-disaster conditions at the site? 0 Yes • No 0 Unsure
Special Considerations issues included? 0 Yes • No 0 Unsure
Is there insurance coverage on this facility? 0 Yes • No 0 Unsure
Hazard Mitigation proposal included? 0 Yes • No 0 Unsure
Page 1 of 6
PROJECT WORKSHEET REPORT
DECLARATION NO.FEMA-IA-DR1688 PREPARED DATE 05/04/2007
FIPS NO. 013-82425-00 REPORT DATE:06/16/2007 08:32
APPLICANT NAME WATERLOO, CITY OF
INF TYPE O INF
SUBDIVISION • NON-INF
FEMA PW# 463 VSN 0 REF# RH-003 0 REC
SITE NUMBER 1 of 1
FACILITY NAME DEBRIS REMOVAL Latitude 42.48375
ADDRESS Longitude -92.37211
CITY STATE IA ZIP
Was this site previously damaged? 0 Yes O No • Lnsure
SITE NUMBER 1 -LOCATION
CITY WIDE PARKS AND RECREATION FACILITIES AND STREET RIGHT-OF-WAYS
SITE NUMBER 1 -DAMAGE DIMENSIONS AND DESCRIPTION
SEVERE WINTER STORMS DURING THE EVENT PERIOD 2-23-07 TO 3-2-07 CAUSED ICE AND SNOW ACCUMULATION WHICH BADLY
DAMAGED MANY TREES AND LIMBS.THE FORESTRY DIV.OF LEISURE SERVICES IS RESPONSIBLE FOR THE DAMAGE TO OVER
35,000 TREES IN THE 50 FOOT CITY RIGHT OF WAYS AND THE 11,000 ACRES OF PARKS AND 3 MUNICIPAL GOLF COURSES.THE
LEISURE SERVICES USED 50.9 OVERTIME HOURS FORCE ACCOUNT LABOR AND 1,617.4 HOURS OF FORCE ACCOUNT EQUIPMENT
TO REMOVE TWELVE TREES 19 INCHES TO 36 INCHES IN DIAMETER AND CHIPPED 2,901 CU YDS OF DEBRIS(726 X 4=2,901 CU YDS)
THERE ARE NO CODES AND STANDARDS OR MITIGATION ISSUES WITH THIS PROJECT.
SITE NUMBER 1 -SCOPE OF WORK
WORK COMPLETED:
REMOVE TWELVE TREES DAMAGED IN EXCESS OF 50%, CUT OUT HANGERS IN ALL OTHER TREES AND PICK UP ALL WOODY
DEBRIS,2,901 CU. YDS. IN JURISDICTION OF THE LEISURE SERVICES DEPARTMENT OF THE CITY OF WATERLOO AND CHIP SAID
DEBRIS. CHIPS WERE DISTRIBUTED THROUGH THE CITY FOR RESIDENTS TO USE OR WERE BURNED AT THE CITY DUMP.
THE PROJECT OFFICER WAS SHOWN SOME OF THE CHIPPED DEBRIS PILES.
THE WORK WAS DONE BY THE FORESTRY DIVISION OF THE LEISURE SERVICES COMMISSION OF THE CITY OF WA1 ERLOO, IA.
Page 2 of 6
PROJECT WORKSHEET REPORT
DECLARATION NO. FEMA-IA-DR1688 PREPARED DATE 05/04/2007
FIPS NO. 013-82425-00 REPORT DATE 06/16/2007 08:32
APPLICANT NAME WATERLOO,CITY OF
INF TYPE 0 INF
SUBDIVISION • NON-INF
FEMA PW# 463 VSN 0 REF# RH-003 O REC
COST ESTIMATE
ITEM VSN,CODE L_ MATERIAL AND/OR DESCRIPTION L LUOM I,I QTY J' UNIT PRICE -1 j COST
1 0 0000 WORK COMPLETED 0 0 $.00 $0.00
2 0 9007 FORCE ACCOUNT OVER TIME LABOR LS 1 $1,636.38 $1,636.38
3 0 9008 EQUIPMENT LS 1 850,695.80 $50.695.80
Eligible Amounts: Total(this version) $52,332.18
Total Oblig To Date $52,332.18
Unobligated+Obligated $52,332.18
Federal Share for Obligated and Unobligated $39,249.14
SPECIAL CONSIDERATIONS
Does the damaged facility or item of work have insurance coverage and/or is it an insurable risk 0 Yes • No 0 Unsure
(e.g., buildings,equipment,vehicles,etc.)?
2 Is the damaged facility located within a floodplain or coastal high hazard area and/or does it have 0 Yes • No () Unsure
an impact on a floodplain or wetland?
3 Is the damaged facility or item of work located within or adjacent to a Coastal Barrier Resource 0 Yes • No (0 Unsure
System Unit or an Otherwise Protected Area?
4 Will the proposed facility repairs/reconstruction change the pre-disaster conditions(e.g.,footprint, 0 Yes • No 0 Unsure
material, location,capacity,use or function)?
5 Does the applicant have a hazard mitigation proposal or would the applicant like technical 0 Yes • No 0 Unsure
assistance for a hazard mitigation proposal?
6 Is the damaged facility on the National Register of Historic Places or the state historic listing?Is it 0 Yes • No 0 Unsure
older than 50 years?Are there more,similar buildings near the site?
7 Are there any pristine or undisturbed areas on, or near,the project site?Are there large tracts of 0 Yes • No 0 Unsure
forestland?
8 Are there any hazardous materials at or adjacent to the damaged facility and/or item of work? 0 Yes • No 0 Unsure
y Are there any other environmental or controversial issues associated with the damaged facility 0 Yes • No 0) Unsure
and/or item of work?
Page 3 of 6
PROJECT WORKSHEET REPORT
DECLARATION NO. FEMA-IA-DR1688 PREPARED DATE 05/04/2007
FIPS NO. 013-82425-00 REPORT DATE )6/16/2007 08:32
APPLICANT NAME WATERLOO, CITY OF
INF TYPE D INF
SUBDIVISION
• NON-INF
FEMA PW# 463 VSN 0 REF# RH-003 D REC
ENVIRONMENTAL -All Environmental Review is complete.
Laws and Executive Orders Review-All Other Laws/EOs complete.-PCHINNI
Laws/EOs Status
Coastal Barriers Resources Act(CBRA) Gen Revw/NA
Clean Water Act(CWA) Gen Revw/NA
Coastal Zone Management Act(CZMA) Gen Revw/NA
Endangered Species Act(ESA) Gen Revw/NA
Fish and Wildlife Coordination Act(FWCA) Gen Revw/NA
National Historic Preservation Act(NHPA) Gen Revw/NA
Clean Air Act(CAA) Gen Revw/NA
E.O. 11988: Floodplains Gen Revw/NA
E.O. 11990:Wetlands Gen Revw/NA
E.O. 12898: Environmental Justice for Low Income and Minority Populations Gen Revw/NA
NEPA Level of Review-06/16/2007 08:32:19-This project is statutorily excluded from the requirements of the National Environmental Policy Act
and no other environmental review or documentation is required.-PCHINNI
Page 4 of 6
PROJECT WORKSHEET REPORT
DECLARATION NO. FEMA-IA-DR1688 PREPARED DATE 05/04/2007
FIPS NO. 013-82425-00 REPORT DATE 06/16/2007 08:32
APPLICANT NAME WATERLOO, CITY OF
INF TYPE 0 INF
SUBDIVISION
NON-INF
FEMA PW# 463 VSN 0 REF# RH-003 0 REC
Standard Conditions
1. Any change to the approved scope of work will require re-evaluation for compliance with NEPA and other Laws and Executive Orders.
2. This review does not address all federal, state and local requirements.Acceptance of federal funding requires recipient to comply with all federal,state
and local laws. Failure to obtain all appropriate federal, state and local environmental permits and clearances may jeopardize federal funding.
3. If ground disturbing activities occur during construction, applicant will monitor ground disturbance and if any potential archeological resources are
discovered,will immediately cease construction in that area and notify the State and FEMA.
GENERAL COMMENTS
DEBRIS REMOVAL
THE PROJECT IS TO REMOVE, STAGE AND DISPOSE OF VEGETATIVE DEBRIS IN ACCORDANCE WITH ALL APPLICABLE
ENVIRONMENTAL LAWS AND REGULATIONS. DEBRIS REMOVAL IS STATUTORILY EXCLUDED FROM FURTHER REVIEW UNDER THE
NATIONAL ENVIRONMENTAL POLICY ACT.
PAUL CHINN 05/17/2007
RECORD MAINTENANCE
COMPLETE RECORDS AND COST DOCUMENTS FOR ALL APPROVED WORK MUST BE MAINTAINED FOR AT LEAST 3 YEARS FROM THE
DATE THE LAST PROJECT WAS COMPLETED OR FROM RECEIPT OF FINAL PAYMENT,WHICHEVER IS LATER. ALL APPROVED PWS
WITHIN A PROJECT APPLICATION ARE SUBJECT TO RANDOM AUDITS. QUARTERLY REVIEWS ARE CONDUCTED ON ALL APPROVED
PW'S WHICH EQUAL OR EXCEED$59,700 AND HAVE NOT RECEIVED FINAL PAYMENT. ANY JURISDICTION RECEIVIN3$500,000 OR
MORE IN TOTAL FEDERAL FINANCIAL ASSISTANCE IN A FISCAL YEAR MUST SUBMIT A COPY OF ITS SINGLE AUDIT(F S REQUIRED BY
THE SINGLE AUDIT ACT OF 1984)TO THE STATE.-PAUL CHINN 05/17/2007
Page 5 of 6
PROJECT WORKSHEET REPORT
DECLARATION NO. FEMA-IA-DR1688 PREPARED DATE 05/04/2007
FIPS NO. 013-82425-00 REPORT DATE 06/16/2007 08:32
APPLICANT NAME WATERLOO,CITY OF
INF TYPE O INF
SUBDIVISION
• NON-INF
FEMA PW# 463 VSN 0 REF# RH-003 0 REC
PW REQUIRED REVIEWS
REVIEW ASSIGNED DATE DATE
REVIEW STATUS RECOMMENDATION REVIEWER REVIEWER SUBMIT`ED REVIEWED
Initial Complete Eligible pchinnl 05/17/2';07 05/22/2007
STATE Complete Eligible phall 05/22/2')07 05/22/2007
Final Complete Eligible dteska 05/22/2i:07 05/22/2007
Page 6 of 6