LIMITS OF WORK
I
CONSTRUCTION
PHASING PLAN
SYMBOL DESCRIPTION
EkPHASE 1
OPHASE 2
OPHASE 3
® °HASE 4
UUN6 I RUCTION SEQUENCE
PHASE 1
I. NOTIFY PROPERTY OWNER OF COMMENCEMENT OF
CONSTRUCTION.
2. FURNISH AND INSTALL TRAFFIC CONTROL AND
PEDESTRIAN CHANNELIZATION DEVICE AND REMOVE
EXISTING SIGNAGE.
3. REMOVE NECESSARY PAVEMENT AND PORTION OF
SIDEWALK CLOSEST TO ROADWAY, LEAVE A MINIMUM
OF 8 FT OF SIDEWALK ACCESS NEAR BUILDINGS.
4. NOTIFY UTILITY COMPANIES OF PAVEMENT REMOVAL
FOR ANY NECESSARY UTILITY RELOCATION.
5. CONSTRUCT ALL STORM SEWER, SUBDRAIN, PAVER,
PAVEMENT AND CURB AND GUTTER INSTALLATIONS.
6. REMOVE REMAINDER OF SIDEWALK UPON ENGINEER
AND CITY APPROVAL.
7. INSTALL TEMPORARY ROCK ACCESS (APPROXIMATELY 5'
WIDTH) TO BUILDING ENTRANCES.
8. SIDEWALK REPLACEMENT SHALL BE SCHEDULED PRIOR
TO FULL SIDEWALK REMOVAL AS TO PROVIDE A
MAXIMUM OF ONE WEEK SIDEWALK ACCESS
DISRUPTION.
9. CONSTRUCT SIDEWALK
10. INSTALL LANDSCAPING, PLANTING, GRASSES, AND ANY
SITE AMENITIES.
PHASE 2
1. ALL PHASE 1 ITEMS SHALL BE COMPLETED PRIOR TO
THE COMMENCEMENT OF PHASE 2.
2, REMOVE PHASE 1 TRAFFIC CONTROL AND
CONSTRUCTION FENCING AND INSTALL AT PHASE 2
LOCATIONS,
3. REPEAT ITEMS 1-10 AS OJTLINED ABOVE.
4. REMOVE ALL TRAFFIC CONTROL,
5. REMOVE STORM WATER PROTECTION CONTROL
DEVICES UPON SITE ESTABLISHMENT.
PHASE 3
1. ALL PHASE 2 ITEMS SHALL BE COMPLETED PRIOR TO
THE COY"MENCEMENT OF PI-ASE 3.
2. REMOVE PHASE 2 TRAFFIC CONTROL AND INSTALL AT
PHASE 3 LOCATIONS.
3. REPEAT ITEMS 1-10 AS OUTLINED ABOVE.
4. REMOVE ALL TRAFFIC CONTROL.
5. REMOVE STORM WATER PROTECTION CONTROL
DEVICES UPON SITE ESTABLISHMENT.
TEMPORARY CONSTRUC73N FENCING (ADJUST FENCING
EXTENTS DURING CONSTRJCTION PER PHASING'LAN)
0 20 40
SCALE IN FEET
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
PROJECT
CITY OF
WATERLOO
SULLIVAN
BROTHERS PLAZA
RENOVATION
WATERLOO
REVISION SCHEDULE
DATE
PROJECT NO.
21-25083
FILE NAME
25083 CO -PHASING
DRAWN BY
TJB / PRA
DESIGNED BY
NSG / TJB / PRA
REVIEWED BY
NSG/TGV
ORIGINAL ISSUE DATE
O8/10/21
CLIENT PROJECT NO
TITLE
IOWA
CONSTRUCTION
PHASING PLAN
SHEET
CO=40
BY