Loading...
HomeMy WebLinkAboutscan-3MEDIACOM Contact Name : Brian Kadner Contact Phone : 845.544.9656 Contact Email : bkadner@mediacomcc.com CITY OF WATERLOO TRAFFIC Contact Name : Brandon Hodgin Contact Phone 319.291.4440 Contact Email : brandon.hodgin@waterloo-ia.org CENTURYLINK Contact Name : Tom Sturmer Contact Phone : 720.578.8090 Contact Email : Thomas.sturmer@centurylink.com IOWA COMMUNICATIONS NETWORK Contact Name : Shannon Marlow Contact Phone : 800.572.3940 Contact Email : icnoutsideplantiowaonecall@iowa.gov UTILITIES AUREON NETWORK SERVICES Contact Name : Jeff Klocko Contact Phone : 515.830.0445 Contact Email : jeff.klocko@aureon.com MIDAMER-ELEC Contact Name : Jordyn Weber Contact Phone :319.291.4728 Contact Email :jlweber@midamerican.com MIDAMER-GAS Contact Name : Jordyn Weber Contact Phone : 319.291.4728 Contact Email :jlweber@midamerican.com UNITE PRIVATE NETWORKS, LLC Contact Name : Joe Ozer Contact Phone :816.425.3556 Contact Email : upngis@upnfiber.com WINDSTREAM COMMUNICATIONS Contact Name : 3CATE DESK Contact Phone : 800.289.1901 Contact Email : LOCATE.DESK@WINDSTREAM.COM WATERLOO TELECOM PARTNERS Contact Name SATE MILLER Contact Phone 319.266.1700 Contact Email .ate.miller@teamnet.net CITY OF WATERL�O WMSD Contact Name -aura Wolff Contact Phone 319.2914553 Contact Email : aura.wclff@waterloo-ia.org WATERLOO WA -ER WORKS Contact Name SHAD COON Contact Phone _32,628 5013 Contact Email C1ad.Cocr@waterloo-ia.org CONSTRUCTION NOTES: 1. ALL WORK SHALL BE IN ACCORDANCE WITH OSHA CODES AND STANDARDS. NOTHING INDICATED ON THE DRAWINGS SHALL RELIEVE THE CONTRACTOR FROM COMPLYING WITH ANY APPROPRIATE SAFETY REGULATIONS. 2. ALL PROPERTY PINS SHALL BE PROTECTED FROM GRADING OR OTHER OPERATIONS. ANY PINS DISTURBED SHALL BE RESET AT THE CONTRACTOR'S EXPENSE. 3. THE 2021 EDITION OF THE URBAN STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS SHALL APPLY TO CONSTRUCTION WORK ON THE PROJECT (SODAS), EXCEPT AS SPECIFIED IN THE PROJECT MANUAL PREPARED BY I+S GROUP, INC. A FULL IOWA SUDAS SPECIFICATIONS MANUAL CAN BE FOUND ONLINE FOR FREE AT WWW.IOWASUDAS.COM, 4. THE WORK TO BE ACCOMPLISHED FOR THE CONSTRUCTION OF THIS PROJECT WILL OCCUR ON OWNER'S PROPERTY. THE CONTRACTOR SHOULD CONFINE OPERATION, PEOPLE, AND EQUIPMENT TO THE OWNER'S PROPERTY. 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE WASTE AREAS OR DISPOSAL SITES FOR EXCESS MATERIALS NOT TO BE INCORPORATED IN THE WORK INVOLVED IN THE PROJECT (UNSUITABLE EXCAVATION, WASTE PIPE, ETC.). 6. PUBLIC AND PRIVATE UTILITY FIXTURES ARE EXISTING WITHIN THE CONSTRUCTION AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE OWNERS OF THESE UTILITIES PRIOR TO THE BEGINNING OF ANY CONSTRUCTION. THE CONTRACTOR SHALL AFFORD ACCESS TO THESE FACILITIES FOR ANY NECESSARY MODIFICATION OF SERVICES. NO ADDITIONAL COMPENSATION WILL BE ALLOWED TO THE CONTRACTOR FOR ANY INTERFERENCE OR DELAY CAUSED BY SUCH WORK. 7. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY TRAFFIC CONTROL SIGNS, DEVICES, ETC., AND TO PLACE, MAINTAIN, AND REMOVE SAME AS CONSTRUCTION COMMENCES AND S COMPLETED IN ACCORDANCE WITH THE CURRENT EDITION OF THE IOWA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS & HIGHWAYS. FAILURE TO COMPLY WITH THIS PORTION OF THE SPECIFICATIONS WILL RESULT IN SUSPENSION OF WORK UNTIL THE SITUATION IS CORRECTED. A REDUCTION IN THE LUMP SUM TO BE PAID WILL BE MADE FOR EXCESSIVE NONCOMPLIANCE WITH REQUIRED TRAFFIC CONTROL. NO WORK SHALL COMMENCE IN ANY GIVEN AREA UNTIL ALL APPROPRIATE TRAFFIC CONTROL IS IN PLACE. 8. THE CONTRACTOR SHALL NOT DISTURB GRASSED AREAS AND TREES OUTSIDE THE CONSTRUCTION LIMITS. TREES AND SHRUBS SHALL BE RETAINED AS POSSIBLE. THE CONTRACTOR WILL NOT BE PERMITTED TO PARK SERVICE VEHICLES AND EQUIPMENT OR USE THESE AREAS FOR STORAGE OF MATERIALS. STORAGE, PARKING AND SERVICE AREA(S) WILL BE SUBJECT TO APPROVAL OF THE ENGINEER. 9. ALL EXISTING TREES AND SHRUBS SHALL BE MAINTAINED AND PROTECTED UNLESS NOTED OTHERWISE. AREAS OF HAND FORMING MAY BE REQUIRED TO PROTECT TREES. 10. THE CONSTRUCTION OPERATIONS ARE TO TAKE PLACE IN A COMMERICI AL AREA. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE REQUIREMENTS INCLUDED IN THE SPECIFICATIONS IN REGARD TO POSITIVE DUST CONTROL DURING ALL OPERATIONS TO INCLUDE REMOVAL, CLEAN UP, ETC, 11. CONTRACTOR SHALL PROVIDE BARRICADES AND SIGNS IDENTIFYING VEHICLES AND OBSTACLES IN THE DRIVEN ROADWAY. 12. EXISTING STORM SEWERS, SANITARY SEWERS, AND WATER MAINS ARE LOCATED BASED ON CITY RECORDS AND ACTUAL LOCATION MAY VARY GREATLY FROM THAT SHOWN. 13. ELEVATIONS GIVEN ON THE PLAN AND PROFILE SHEETS ARE TO CENTERLINE UNLESS OTHERWISE NOTED. 14. CONTRACTOR(S) SHALL BE RESPONSIBLE FOR SECURING THE SERVICES OF AN INDEPENDENT TESTING LABORATORY FOR ALL MATERIAL TESTING FOR THIS PROJECT. 15. A NEAT VERTICAL EDGE WILL BE REQUIRED FOR ALL JOINTS BETWEEN THE NEW PAVEMENT SURFACE AND EXISTING PAVING AS SHOWN IN THE PLANS. SAW CUTTING OR OTHER TECHNIQUES MAY BE USED TO PROVIDE THIS EDGE. COST OF THE SAW CUT IS TO BE CONSIDERED INCIDENTAL. ADDITIONAL REMOVAL AND REPLACEMENT DUE TO THE CONTRACTOR'S OPERATION WILL NOT BE MEASURED SEPARATELY BUT WILL BE THE CONTRACTOR'S RESPONSIBILITY. PROPOSED JOINTS ARE TO BE CONTIGUOUS WITH EXISTING JOINTS. CONTRACTOR TO VERIFY REMOVAL LIMITS AND NOTIFY ENGINEER OF ANY DISCREPANCIES. THIS DOCUMENT IS THE PROPERTY OF 1 & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT CITY OF WATERLOO SULLIVAN BROTHERS PLAZA RENOVATION WATERLOO IOWA 1i REVISION SCHEDULE I DATE DESCRIPTION I BY PROJECT NO. 21-25083 FILE NAME 25083 CO -DETAILS DRAWN BY TJBlPRA DESIGNED BY NSG / TJB / PRA REVIEWED BY NSG / TGV ORIGINAL ISSUE DATE 08/10/21 CLIENT PROJECT NO TITLE CONSTRUCTION SHEET NOTES CO=20