Loading...
HomeMy WebLinkAboutscan-3- 46 10 3"o CW- + 3/4" o G 6 3/4"o G 11/4"o G-e 11/4"o G 3/4" o G 6 10 11/4"o G8 17)-o 2 • -_ 11/2"o CW --1114"0 G 3Ilk 3/4" o G--* 3 -� 6 7 9 : � 2 7 _ 3/4"o G - -3"o CW 11/4"0 G- 6 J 10 ODEMOLITION PLAN 1/8 — 1t-oll I 3/4"o G 3/4"o G 1 1/4"o G J 3/4"o G - *---11/4"0 G 3/4"o G 15 40 47 -- - f 3/4,.o G _ 1 1/4"o G-• 41 Cod 22 23 �a\ 30 1 0 M 1"o HW (3) 1"o HW i i 3"o CW • i GENERAL NOTES 1. ALL TRUCK WASH EQUIPMENT PROVIDED BY WASH SYSTEM SUPPLIER. CONTRACTOR TO RECEIVE, UNPACKAGE, AND PLACE. 2. CONTRACTOR TO RUN ALL PIPING AND CONNECTIONS TO TRUCK WASH EQUIPMENT. SEE P3-21. 3. TRUCK WASH SUPPLIER TO TERMINATE PER SCHEMATIC DIAGRAM. 4. WATER HEATER, GAS PIPING AND FLUE BY WASH SYSTEM SUPPLIER. 5. WATER HEATER AND ASSOCIATED EQUIPMENT ARE INCLUDED AS PART OF ALTERNATE #1 1"o CW-9 SHEET NOTES 1. FIELD VERIFY ALL SITE CONDITIONS BEFORE STARTING CONSTRUCTION, 2. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF EXISTING BUILDING. 3. COORDINATE INSTALLATION OF ALL NEW DUCTWORK, PIPING, EQUIPMENT, ETC. WITH OTHER TRADES. KEYNOTE LEGEND 1 EXISTING ELECTRIC WATER HEATER TO REMAIN. 2 EXISTING FLOOR DRAIN TO REMAIN. 3 EXISTING FLOOR CLEANOUT TO REMAIN 5 EXISTING EYEWASH AND ASSOCIATED PIPING TO REMAIN. 6 EXISTING GAS PIPING TO REMAIN. 7—EXISTING RADIENT TUBE HEATER TO REMAIN. 8 'DEMOLISH EXISTING GAS PIPING AND PREPARE FOR NEW CONNECTION. FIELD VERIFY SIZE AND LOCATION. INSTALL NEW BALL VALVE. 9 EXISTING HOT WATER MI-T-M PRESSURE WASHER TO REMAIN. 10 EXISTING COLD WATER PIPING TO REMAIN. 15 WATER HEATER. TEMPERATURE SET AT 140°F. INSTALLED BY CONTRACTOR. 22 DETERGENT ARCH. EQUIPMENT FURNISHED BY WASH I SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 23 SALT BLOCK INHIBITOR. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 24 CHASSIS WASHER. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR 25 SPINNER ARCH. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 26 REAR WASH ARCH. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 30 i PVC80 SCHEDULE 40 GALVANIZED. 31 33 THESE LINES TO RUN UP HILL OR IN LEVEL (NOT DOWN HILL) 35 RUN 1-1/2" o SCH40 GALV. BELOW FLOOR TO CHASSIS WASHER. 38 SAW CUT CONCRETE FLOOR FOR COLD WATER PIPING. REPAIR CONCRETE TO MATCH EXISTING. SAW CUTTING BY GC. COORDINATE WITH WASH SYSTEM SUPPLIER PRIOR TO CUTTING FLOOR. 40 CONTRACTOR SHALL CONTACTGAS COMPANY TO VERIFY METER CAPACITY FOR NEW LOAD. 41 CONTRACTOR TO INSTALL GAS REGULATOR, SHUT OFF VALVE, UNION AND DIRT LEG AT NEW WATER HEATER LOCATION. 46 SAW CUT CONCRETE FLOOR FOR UNDERCHASSIS SPRAY BAR AND SLOPE TOWARDS TRENCH DRAIN. SAW CUTTING BY GC. COORDINATE WITH WASH SYSTEM SUPPLIER PRIOR TO CUTTING FLOOR. 47 WATER HEATER AND ASSOCIATED EQUIPMENT ARE INCLUDED AS PART OF ALTERNATE #1. THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT CITY OF WATERLOO = PUBLIC WORKS TRUCK WASH WATERLOO IOWA DATE - REVISION SCHEDULE DESCRIPTION BY - - - - PROJECT NO. 19-23490 FILE NAME 23490 Mech R20.rvt DRAWN BY CCK DESIGNED BY JPT REVIEWED BY JPT ORIGINAL ISSUE DATE 06/23/20 CLIENT PROJECT NO 111111111114 FIRST FLOOR PLUMBING PLAN - - _ N - SHEET GAS PLAN PLUMBING PLAN -- - -- - - -- P2 11 6123/2n2n 1 47 94 PM