HomeMy WebLinkAboutscan-3- 46
10
3"o CW- +
3/4" o G
6
3/4"o G 11/4"o G-e 11/4"o G
3/4" o G
6
10 11/4"o G8 17)-o 2
• -_
11/2"o CW --1114"0 G 3Ilk
3/4" o G--* 3 -� 6
7 9 : � 2
7 _
3/4"o G - -3"o CW
11/4"0 G-
6 J 10
ODEMOLITION PLAN
1/8 — 1t-oll
I
3/4"o G
3/4"o G
1 1/4"o G
J
3/4"o G -
*---11/4"0 G
3/4"o G
15 40 47
-- - f
3/4,.o G _
1 1/4"o G-• 41
Cod
22
23
�a\
30 1 0
M 1"o HW
(3) 1"o HW
i
i 3"o CW •
i
GENERAL NOTES
1. ALL TRUCK WASH EQUIPMENT PROVIDED BY WASH
SYSTEM SUPPLIER. CONTRACTOR TO RECEIVE,
UNPACKAGE, AND PLACE.
2. CONTRACTOR TO RUN ALL PIPING AND CONNECTIONS
TO TRUCK WASH EQUIPMENT. SEE P3-21.
3. TRUCK WASH SUPPLIER TO TERMINATE PER
SCHEMATIC DIAGRAM.
4. WATER HEATER, GAS PIPING AND FLUE BY WASH
SYSTEM SUPPLIER.
5. WATER HEATER AND ASSOCIATED EQUIPMENT ARE
INCLUDED AS PART OF ALTERNATE #1
1"o CW-9
SHEET NOTES
1. FIELD VERIFY ALL SITE CONDITIONS BEFORE STARTING
CONSTRUCTION,
2. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, ETC.
INDICATED ON PLANS ARE BASED ON INFORMATION
FROM CONSTRUCTION DOCUMENTS AND FIELD
VERIFICATION OF EXISTING BUILDING.
3. COORDINATE INSTALLATION OF ALL NEW DUCTWORK,
PIPING, EQUIPMENT, ETC. WITH OTHER TRADES.
KEYNOTE LEGEND
1
EXISTING ELECTRIC WATER HEATER TO REMAIN.
2
EXISTING FLOOR DRAIN TO REMAIN.
3
EXISTING FLOOR CLEANOUT TO REMAIN
5
EXISTING EYEWASH AND ASSOCIATED PIPING TO REMAIN.
6
EXISTING GAS PIPING TO REMAIN.
7—EXISTING
RADIENT TUBE HEATER TO REMAIN.
8
'DEMOLISH EXISTING GAS PIPING AND PREPARE FOR NEW
CONNECTION. FIELD VERIFY SIZE AND LOCATION. INSTALL
NEW BALL VALVE.
9
EXISTING HOT WATER MI-T-M PRESSURE WASHER TO
REMAIN.
10
EXISTING COLD WATER PIPING TO REMAIN.
15
WATER HEATER. TEMPERATURE SET AT 140°F. INSTALLED
BY CONTRACTOR.
22
DETERGENT ARCH. EQUIPMENT FURNISHED BY WASH
I
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
23
SALT BLOCK INHIBITOR. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
24
CHASSIS WASHER. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR
25
SPINNER ARCH. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
26
REAR WASH ARCH. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
30
i PVC80
SCHEDULE 40 GALVANIZED.
31
33
THESE LINES TO RUN UP HILL OR IN LEVEL (NOT DOWN
HILL)
35
RUN 1-1/2" o SCH40 GALV. BELOW FLOOR TO CHASSIS
WASHER.
38
SAW CUT CONCRETE FLOOR FOR COLD WATER PIPING.
REPAIR CONCRETE TO MATCH EXISTING. SAW CUTTING
BY GC. COORDINATE WITH WASH SYSTEM SUPPLIER
PRIOR TO CUTTING FLOOR.
40
CONTRACTOR SHALL CONTACTGAS COMPANY TO VERIFY
METER CAPACITY FOR NEW LOAD.
41
CONTRACTOR TO INSTALL GAS REGULATOR, SHUT OFF
VALVE, UNION AND DIRT LEG AT NEW WATER HEATER
LOCATION.
46
SAW CUT CONCRETE FLOOR FOR UNDERCHASSIS SPRAY
BAR AND SLOPE TOWARDS TRENCH DRAIN. SAW CUTTING
BY GC. COORDINATE WITH WASH SYSTEM SUPPLIER
PRIOR TO CUTTING FLOOR.
47
WATER HEATER AND ASSOCIATED EQUIPMENT ARE
INCLUDED AS PART OF ALTERNATE #1.
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
PROJECT
CITY OF
WATERLOO =
PUBLIC WORKS
TRUCK WASH
WATERLOO
IOWA
DATE
-
REVISION SCHEDULE
DESCRIPTION BY
- - - -
PROJECT NO.
19-23490
FILE NAME
23490 Mech R20.rvt
DRAWN BY
CCK
DESIGNED BY
JPT
REVIEWED BY
JPT
ORIGINAL ISSUE DATE 06/23/20
CLIENT PROJECT NO
111111111114
FIRST FLOOR
PLUMBING PLAN
- - _ N -
SHEET
GAS PLAN PLUMBING PLAN
-- - -- - - -- P2 11
6123/2n2n 1 47 94 PM