WASH BAY ISOMETRIC DIAGRAM
33
Ii Ii Ir t
2"o CW-- r'-2"o CW
II II
II II
II ��
II II
it
1 /4"o A 39 `.
II ��
Iljj m
GENERAL NOTES
1. ALL TRUCK WASH EQUIPMENT PROVIDED BY WASH
SYSTEM SUPPLIER. CONTRACTOR TO RECEIVE,
UNPACKAGE, AND PLACE.
2. CONTRACTOR TO RUN ALL PIPING AND CONNECTIONS
TO TRUCK WASH EQUIPMENT. SEE P3-21.
3. TRUCK WASH SUPPLIER TO TERMINATE PER
SCHEMATIC DIAGRAM.
4. WATER HEATER, GAS PIPING AND FLUE BY WASH
SYSTEM SUPPLIER.
5. WATER HEATER AND ASSOCIATED EQUIPMENT ARE
INCLUDED AS PART OF ALTERNATE #1
SHEET NOTES
1. FIELD VERIFY ALL SITE CONDITIONS BEFORE STARTING
CONSTRUCTION.
2. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, ETC.
INDICATED ON PLANS ARE BASED ON INFORMATION
FROM CONSTRUCTION DOCUMENTS AND FIELD
VERIFICATION OF EXISTING BUILDING.
3, COORDINATE INSTALLATION OF ALL NEW DUCTWORK,
PIPING, EQUIPMENT, ETC, WITH OTHER TRADES.
KEYNOTE LEGEND
11
HI -PRESSURE LINE. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
12
DETERGENT MODULE. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
13
I DETERGENT CONTAINER. EQUIPMENT FURNISHED BY
WASH SYSTEM SUPPLIER AND INSTALLED BY
CONTRACTOR.
14
RUST INHIBITOR CONTAINER. EQUIPMENT FURNISHED BY
WASH SYSTEM SUPPLIER AND INSTALLED BY
CONTRACTOR. -_
-�
15
- - R. TEM
WATER HEATEPERATURE SET AT 140°F. INSTALLED
BY CONTRACTOR.
16
WATER SOFTENER. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
18
AIR COMPRESSOR . EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
19
EXPANSION TANK. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
20
BOOSTER PUMP. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
21
HIGH PRESSURE PUMP. EEQUIPMENT FURNISHED BY
WASH SYSTEM SUPPLIER AND INSTALLED BY
CONTRACTOR.
22
DETERGENT ARCH. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
23
SALT BLOCK INHIBITOR. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
24
CHASSIS WASHER. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
25
SPINNERARCH. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
26
REAR WASH ARCH. EQUIPMENT FURNISHED BY WASH
SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR.
28
INSTALL SOLENOID VALVE. FURNISHED BY WASH SYSTEM
SUPPLIER.
29
INSTALL SHUT-OFF VALVE (TYP).
30
PVC80
33
_
THESE LINES TO RUN UP HILL OR IN LEVEL (NOT DOWN
HILL)
34
MIXING VALVE SET TO 104°F.
35
RUN 1-1/2"o SCH40 GALV. BELOW FLOOR TO CHASSIS
WASHER.
36
1-1/2"o CHECK VALVE.
38
SAW CUT CONCRETE FLOOR FOR COLD WATER PIPING.
REPAIR CONCRETE TO MATCH EXISTING. SAW CUTTING
BY GC. COORDINATE WITH WASH SYSTEM SUPPLIER
PRIOR TO CUTTING FLOOR.
39
1/4" COMPRESSED AIR TUBING FROM AIR COMPRESSOR
TO HIGH PRESSURE LINE ASSEMBLY. FURNISHED BY
WASH SYSTEM SUPPLIER.
42
RUN PIPING A.F.F.
47
:WATER HEATER AND ASSOCIATED EQUIPMENT ARE
INCLUDED AS PART OF ALTERNATE #1.
II
��
II
2"o CW�
r r
u
it
II
ir11°o HW
II
It
II
rr
II
II
I I
rr
!!
II
II
!!
II
I I
II
rr
II
II
it
II,I;;,,
II
„
r�
II II ii 1 1/2"o HW
rr u 29;
u
29'
28
2"o CW �f �, jj ,?
r i i 1 1/2"o CV
I� I -
�� 14'
2"o CW
21
( )MECH ROOM ISOMETRIC DIAGRAM
1 1/2"o CW
34 1 1/2"o CW
it 19,
- 1 1/2"o CW
36
--1"o CW
CW
CW
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
PROJECT
CITY OF
WATERLOO 1111
PUBLIC WORKS
TRUCK WASH
WATERLOO IOWA
DATE
REVISION SCHEDULE
DESCRIPTION
BY
PROJECT NO.
19-23490
FILE NAME
23490 Mech R20.rvt
DRAWN BY
CCK
DESIGNED BY
JPT
REVIEWED BY
JPT
ORIGINAL ISSUE DATE
06/23/20
CLIENT PROJECT NO
TITLE
SHEET
ISOMETRIC
DIAGRAMS
P3=21