Loading...
HomeMy WebLinkAboutscan-422 WASH BAY ISOMETRIC DIAGRAM 33 Ii Ii Ir t 2"o CW-- r'-2"o CW II II II II II �� II II it 1 /4"o A 39 `. II �� Iljj m GENERAL NOTES 1. ALL TRUCK WASH EQUIPMENT PROVIDED BY WASH SYSTEM SUPPLIER. CONTRACTOR TO RECEIVE, UNPACKAGE, AND PLACE. 2. CONTRACTOR TO RUN ALL PIPING AND CONNECTIONS TO TRUCK WASH EQUIPMENT. SEE P3-21. 3. TRUCK WASH SUPPLIER TO TERMINATE PER SCHEMATIC DIAGRAM. 4. WATER HEATER, GAS PIPING AND FLUE BY WASH SYSTEM SUPPLIER. 5. WATER HEATER AND ASSOCIATED EQUIPMENT ARE INCLUDED AS PART OF ALTERNATE #1 SHEET NOTES 1. FIELD VERIFY ALL SITE CONDITIONS BEFORE STARTING CONSTRUCTION. 2. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF EXISTING BUILDING. 3, COORDINATE INSTALLATION OF ALL NEW DUCTWORK, PIPING, EQUIPMENT, ETC, WITH OTHER TRADES. KEYNOTE LEGEND 11 HI -PRESSURE LINE. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 12 DETERGENT MODULE. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 13 I DETERGENT CONTAINER. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 14 RUST INHIBITOR CONTAINER. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. -_ -� 15 - - R. TEM WATER HEATEPERATURE SET AT 140°F. INSTALLED BY CONTRACTOR. 16 WATER SOFTENER. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 18 AIR COMPRESSOR . EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 19 EXPANSION TANK. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 20 BOOSTER PUMP. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 21 HIGH PRESSURE PUMP. EEQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 22 DETERGENT ARCH. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 23 SALT BLOCK INHIBITOR. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 24 CHASSIS WASHER. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 25 SPINNERARCH. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 26 REAR WASH ARCH. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 28 INSTALL SOLENOID VALVE. FURNISHED BY WASH SYSTEM SUPPLIER. 29 INSTALL SHUT-OFF VALVE (TYP). 30 PVC80 33 _ THESE LINES TO RUN UP HILL OR IN LEVEL (NOT DOWN HILL) 34 MIXING VALVE SET TO 104°F. 35 RUN 1-1/2"o SCH40 GALV. BELOW FLOOR TO CHASSIS WASHER. 36 1-1/2"o CHECK VALVE. 38 SAW CUT CONCRETE FLOOR FOR COLD WATER PIPING. REPAIR CONCRETE TO MATCH EXISTING. SAW CUTTING BY GC. COORDINATE WITH WASH SYSTEM SUPPLIER PRIOR TO CUTTING FLOOR. 39 1/4" COMPRESSED AIR TUBING FROM AIR COMPRESSOR TO HIGH PRESSURE LINE ASSEMBLY. FURNISHED BY WASH SYSTEM SUPPLIER. 42 RUN PIPING A.F.F. 47 :WATER HEATER AND ASSOCIATED EQUIPMENT ARE INCLUDED AS PART OF ALTERNATE #1. II �� II 2"o CW� r r u it II ir11°o HW II It II rr II II I I rr !! II II !! II I I II rr II II it II,I;;,, II „ r� II II ii 1 1/2"o HW rr u 29; u 29' 28 2"o CW �f �, jj ,? r i i 1 1/2"o CV I� I - �� 14' 2"o CW 21 ( )MECH ROOM ISOMETRIC DIAGRAM 1 1/2"o CW 34 1 1/2"o CW it 19, - 1 1/2"o CW 36 --1"o CW CW CW THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT CITY OF WATERLOO 1111 PUBLIC WORKS TRUCK WASH WATERLOO IOWA DATE REVISION SCHEDULE DESCRIPTION BY PROJECT NO. 19-23490 FILE NAME 23490 Mech R20.rvt DRAWN BY CCK DESIGNED BY JPT REVIEWED BY JPT ORIGINAL ISSUE DATE 06/23/20 CLIENT PROJECT NO TITLE SHEET ISOMETRIC DIAGRAMS P3=21