Loading...
HomeMy WebLinkAboutscan-51' 1" 13'-9„ (V O 0 79! 43 5'- 0„ -_ 5,_ 0„ 1 1 c� J u] 2'-9'- 43 I N I 43 ro i - 3, 6„ HOUSEKEEPING PAD PLAN ENLARGEMENT 1 /4 - - 1 0 -- --- 18. �SECTION TWO , 29 11/2"m HW—11/2"m CW { III q1 111 M _ 1 „m H W III 34 Imo_ III M III Itl 11/2"m HW—III -III iI 19 UI III III II 1"m HW-9 _29 IIM 11/2"m CW IW-11/2"m CW III ❑ III III -. _ .. 1,�m CW -III -. -- _ IppBII © III INO IIIIN AA 77 GENERAL NOTES 1. ALL TRUCK WASH EQUIPMENT PROVIDED BY WASH SYSTEM SUPPLIER, CONTRACTOR TO RECEIVE, UNPACKAGE,AND PLACE . 2. CONTRACTOR TO RUN ALL PIPING AND CONNECTIONS TO TRUCK WASH EQUIPMENT. SEE P3-21. 3. TRUCK WASH SUPPLIER TO TERMINATE PER SCHEMATIC DIAGRAM, 4. WATER HEATER, GAS PIPING AND FLUE BY WASH SYSTEM SUPPLIER. 5. WATER HEATER AND ASSOCIATED EQUIPMENT ARE INCLUDED AS PART OF ALTERNATE #1 SHEET NOTES 1. FIELD VERIFY ALL SITE CONDITIONS BEFORE STARTING CONSTRUCTION. 2, ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF EXISTING BUILDING. 3. COORDINATE INSTALLATION OF ALL NEW DUCTWORK, PIPING, EQUIPMENT, ETC. WITH OTHER TRADES. W N Vo HW 12 451 PLUMBING SYMBOL SCHEDULE BALL VALVE SANITARY SEWER BUTTERFLY VALVE A COMPRESSED AIR PIPING GATE VALVE G GAS GAS COCK ----------------- VENT CHECK VALVE - - - — COLD WATER IN LINE PUMP — - - - - — HOT WATER — STRAINER - - - - - --- — HOT WATER RECIRC MANUAL FLOW CONTROL VALVE FCO- FLOOR CLEANOUT UNION WHTR- ELECTRIC WATER HEATER _M_ METER FD- FLOOR DRAIN PIPING DROP HB- HOSE BIBB - INLINE PIPING DROP LAV- LAVATORY PIPING RISE MB- MOP BASIN -- PIPE CAP PIPE BREAK RPBP- REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER WALL CLEANOUT/ END FERRULE CLEANOUT SK- SINK CONNECT TO EXISTING T' UR- URINAL THERMOMETER VTR- VENT THROUGH ROOF O CLEAN OUT e FLOOR DRAIN WSB- WATER SUPPLY BOX O FLOOR SINK WC- WATER CLOSET WALL HYDRANT/ HOSE BIBB NFWH- FIRE CONNECTION / WALL HYDRANT REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER WCO- WALL CLEANOUT A.F.F. ABOVE FINISHED FLOOR I I I I r 0 � -- - � -� 1 O , 19 �� �CW 2"m CW— 1 II 11/2"m HWI 11/2 CW II 14i45, 131461 2 I 47 5 , 20, P4-21 1 1 /2"m CW — — — — — 16 — — — — _Il 27.44- 1 2" o C i I , L 45ar� —:'zs 128' I 2"m CW II I I I O4"m CW 31 2 m CW 31 2"m CW 1 I KEYNOTE LEGEND 11 HI -PRESSURE LINE. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 12 !DETERGENT MODULE. EQUIPMENT FURNISHED BY WASH ,SYSTEM SUPPLIERAND INSTALLED BY CONTRACTOR. 13 DETERGENT CONTAINER. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 14 RUST INHIBITOR CONTAINER. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 15 WATER HEATER. TEMPERATURE SET AT 140°F. INSTALLED BY CONTRACTOR. 16 WATER SOFTENER EQUIPMENT FURNISHED BY WASH (SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR 17 925 GALLON TANK. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 18 AIR COMPRESSOR. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 19 EXPANSION TANK. EQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 20 i BOOSTER PUMP. EQUIPMENT FURNISHED BY WASH L_ !SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 21 HIGH PRESSURE PUMP. EEQUIPMENT FURNISHED BY WASH SYSTEM SUPPLIER AND INSTALLED BY CONTRACTOR. 27 BACKFLOW PREVENTER. 28 INSTALL SOLENOID VALVE. FURNISHED BY WASH SYSTEM SUPPLIER. 29 I INSTALL SHUT-OFF VALVE (TYP). 30 !PVC80 31 SCHEDULE 40 GALVANIZED. 34 MIXING VALVE SET TO 104°F. 36 1-1/2" m CHECK VALVE. 37 USE SCHEDULE 40 GALVANIZED PIPE WITHIN 3 FEET OF HEATER. 39 1/4" COMPRESSED AIR TUBING FROM AIR COMPRESSOR TO HIGH PRESSURE LINE ASSEMBLY. FURNISHED BY WASH SYSTEM SUPPLIER. 43 NEW HOUSEKEEPING PAD BY GENERAL CONTRACTOR. 44 PIPE TO NEAREST FLOOR DRAIN. 45 1/2" OD TUBING TO DETERGENT MODULE. FURNISHED BY WASH SYSTEM SUPPLIER. 47 WATER HEATER AND ASSOCIATED EQUIPMENT ARE INCLUDED AS PART OF ALTERNATE #1. THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT CITY OF WATERLOO = PUBLIC WORKS TRUCK WASH WATERLOO IOWA REVISION SCHEDULE DATE DESCRIPTION BY PROJECT NO. 19-23490 FILE NAME 23490 Mech R20.rvt DRAWN BY CCK DESIGNED BY JPT REVIEWED BY JPT ORIGINAL ISSUE DATE 06/23/20 CLIENT PROJECT NO, TITLE ENLARGEMENTS AND SECTIONS N OPLUMBING PLAN ENLARGEMENT - SHEET SECTION ONE v2 -1-0 P 4-21 6/23/202