HomeMy WebLinkAboutscan-15N
32
i 3
El
STORAGE
_ 109
3
R45 3
A4
1 FIRST FLOOR LIGHTING PLAN-- EXHIB-IT HALL
1/8" = 1'-0"
4/7/2020 4:27:35 PM
ELECTRICAL KEYNOTE LEGEND
KEY KEYNOTE TEXT
30 PROVIDE LVS, Inc EPC-2-D EMERGENCY POWER CONTROL.
DURING NORMAL OPERATION FIXTURE IS CONTROLLED BY
,ZONED LIGHTING CONTROLS. DURING UTILITY POWER
INTERRUPTION THE EPC-2-D AUTOMATICALLY BYPASSES
THE LIGHTING CONTROLS AND TURNS FIXTURE TO FULL
BRIGHTNESS. CEILING MOUNT DEVICE IN A SINGLE GANG
JUCTION BOX.
NEW FIXTURE TO CONNECT TO EXISTING CIRCUIT.
34 ETC ECHOTOUCH CONTROLLER- 7" TOUCHSCREEN. MAIN
CONTROL FOR ALL RELAYS, COLOR CHANGING, AND
DIMMING.
35 WALL CONTROL -CONTROLS LINEAR LIGHTING IN ALL 4
QUADRANTS.
a
ERP-3
SHEET NOTES
1. ALL EXISTING ELECTRICAL EQUIPMENT INDICATED ON
PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION
DOCUMENTS AND FIELD OBSERVATION OF THE EXISTING
BUILDING.
2. "X" = INDICATES EXISTING DEVICE TO REMAIN.
3. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE
COMPATIBLE LIGHTING CONTROL DEVICES ARE SUPPLIED.
4. REFER TO MANUFACTURERS INSTALLATION
INSTRUCTIONS PRIOR TO INSTALLATION.
5. SWITCHES SHALL BE FLUSH MOUNTED IN MASONRY
WALLS. COORDINATE WITH ALL TRADES.
6. ALL LIGHTING SHALL COMPLY WITH LOCAL AND STATE
ENERGY CODES.
7. PROVIDE SEPARATE BOXES AND CONDUIT FO EMERGENCY
AND NORMAL LIGHTING CIRCUITS.
6
I
�I
ti
3
El
35
v
cn
w
LLJ
h
r
ERP-2
I,
R-11
ERP-15
3
R45
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
PROJECT
5 SULLIVAN
STORAGE k
112 BROTHERS
I
T-CS I
CS-1 CONVENTION
CS-2 - --A.. S CENTER
EXHIBIT HALL
CEILING
A6
fit 3
I
s
I
I I
Space..�.��...,-�__�.__ I
3 3 QQ
Al2 Al2 Al2 A8 0 ELEVATOR I I A.0
- - - — - t
3
3 3 Al2 STAIR
Al2 Al2
A 12 �--- j
3
a �.m
I
R80I g g
3 t
E1 s CORRIDOR
S3In
-
-;
6
s — X X
RENOVATION
PROJECT NO.
19-XXXXX
FILE NAME
23141 Elec R20
DRAWN BY
CWR
DESIGNED BY
CWR
REVIEWED BY
MDN
ORIGINAL ISSUE DATE
04/14/20
CLIENT PROJECT NO.
TITLE
FIRST FLOOR
LIGHTING PLAN
EXHIBIT HALL
SHEET
3E2m21
N
7t
0