Loading...
HomeMy WebLinkAboutscan-15N 32 i 3 El STORAGE _ 109 3 R45 3 A4 1 FIRST FLOOR LIGHTING PLAN-- EXHIB-IT HALL 1/8" = 1'-0" 4/7/2020 4:27:35 PM ELECTRICAL KEYNOTE LEGEND KEY KEYNOTE TEXT 30 PROVIDE LVS, Inc EPC-2-D EMERGENCY POWER CONTROL. DURING NORMAL OPERATION FIXTURE IS CONTROLLED BY ,ZONED LIGHTING CONTROLS. DURING UTILITY POWER INTERRUPTION THE EPC-2-D AUTOMATICALLY BYPASSES THE LIGHTING CONTROLS AND TURNS FIXTURE TO FULL BRIGHTNESS. CEILING MOUNT DEVICE IN A SINGLE GANG JUCTION BOX. NEW FIXTURE TO CONNECT TO EXISTING CIRCUIT. 34 ETC ECHOTOUCH CONTROLLER- 7" TOUCHSCREEN. MAIN CONTROL FOR ALL RELAYS, COLOR CHANGING, AND DIMMING. 35 WALL CONTROL -CONTROLS LINEAR LIGHTING IN ALL 4 QUADRANTS. a ERP-3 SHEET NOTES 1. ALL EXISTING ELECTRICAL EQUIPMENT INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD OBSERVATION OF THE EXISTING BUILDING. 2. "X" = INDICATES EXISTING DEVICE TO REMAIN. 3. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE COMPATIBLE LIGHTING CONTROL DEVICES ARE SUPPLIED. 4. REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS PRIOR TO INSTALLATION. 5. SWITCHES SHALL BE FLUSH MOUNTED IN MASONRY WALLS. COORDINATE WITH ALL TRADES. 6. ALL LIGHTING SHALL COMPLY WITH LOCAL AND STATE ENERGY CODES. 7. PROVIDE SEPARATE BOXES AND CONDUIT FO EMERGENCY AND NORMAL LIGHTING CIRCUITS. 6 I �I ti 3 El 35 v cn w LLJ h r ERP-2 I, R-11 ERP-15 3 R45 THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT 5 SULLIVAN STORAGE k 112 BROTHERS I T-CS I CS-1 CONVENTION CS-2 - --A.. S CENTER EXHIBIT HALL CEILING A6 fit 3 I s I I I Space..�.��...,-�__�.__ I 3 3 QQ Al2 Al2 Al2 A8 0 ELEVATOR I I A.0 - - - — - t 3 3 3 Al2 STAIR Al2 Al2 A 12 �--- j 3 a �.m I R80I g g 3 t E1 s CORRIDOR S3In - -; 6 s — X X RENOVATION PROJECT NO. 19-XXXXX FILE NAME 23141 Elec R20 DRAWN BY CWR DESIGNED BY CWR REVIEWED BY MDN ORIGINAL ISSUE DATE 04/14/20 CLIENT PROJECT NO. TITLE FIRST FLOOR LIGHTING PLAN EXHIBIT HALL SHEET 3E2m21 N 7t 0