HomeMy WebLinkAboutPROJECT SPECIFICATIONS a — °O ,=,,,, -- PROJECT SPECIFICATIONS FOR F.Y. 2019 DYSART RD. AND W. 2ND STREET RECONSTRUCTION PROGRAM 3 ii -S---\-\-k‘-zi. l'.\,, i £ ` — _ *... ,* — CONTRACT NO. 970 _.. ok E s s ro,� I hereby certify that this engineering document was prepared by me or under my direct Q�°°°°° °O°° T< personal sup- 'isio- d to:t I am a duly licensed Professional Engineer under the laws of Q o DENNIS %°° the state o'iT a. '4 o GENTZ a Z DENN J.GEN ",..--.E. TE % 9662 arr7 My License R- ewal Date is December 31,2020. °°°° o 0 License No.is Iowa 9662. J/� °°°p°°°,°°°° Pages or sheets covered by this seal: P — -� _ .................. �0/,,, li I hereby certify that this engineering document was prepared by me or under my direct /ter q °°°°° °°°. - (Ji supervision and that I am a licensed Professional Engineer under the laws of the State of 0 `0 o °o �� Iowa. '" jLi o JAMIE A. %o �# -I %/ ass Alley G o?O/J o KNUTSON g z IE A.KNUTSON, '.E. DATE ;4 °0 16025 0 •r� ,,y License Renewal Date is December 31,2019. o, °° i �°°° Pages or sheets covered by this seal: o°O000000°°° �r '�.; o w P = �G FY 2019 DYSART RD. AND W. 2ND ST, REC ONSTRUCTION PROGRAM CONTRACT NO. 965 CONTRACT DOCUMENTS TABLE OF CONTENTS 1. NOTICE OF PUBLIC HEARING 2. NOTICE TO BIDDERS 3. INSTRUCTIONS TO BIDDERS 4. FORM OF BID OR PROPOSAL 5. SALES TAX EXEMPTION INFORMATION FORM 6. FORM OF BID BOND 7. NON-COLLUSION AFFIDAVITS 8. EQUAL OPPORTUNITY CLAUSE 9. TITLE VI CIVIL RIGHTS 10. BIDDER STATUS FORM 11. AFFIRMATIVE ACTION PROGRAM 12. POTENTIAL ITEMS OF WORK FOR MBE/WBE PARTICIPATION SUBCONTRACTOR'S BID REQUEST FORM, LETTER FORM FOR SUBCONTRACTOR QUOTES, MBE/WBE SCOPE LETTER, MBE AND/OR WBE PREBID CONTACT INFORMATION FORM 13. WATERLOO/CEDAR FALLS MINORITY AND WOMEN BUSINESSES ENTERPRISE CONSTRUCTION AND MAINTENANCE CONTRACTOR'S GUIDE 14. STATEMENT OF BIDDER'S QUALIFICATIONS 15. GENERAL SPECIAL PROVISIONS 16. SPECIAL PROVISIONS 17. SUPPLEMENTAL SUDAS SPECIFICATIONS 18. GEOTECHNICAL ENGINEERING REPORT-DYSART RD. 18. GENERAL SPECIFICATIONS FOR CONSTRUCTION 19. SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTIONS 20. FORM OF CONTRACT 21. FORM OF PERFORMANCE BOND 22. FORM OF PAYMENT BOND NOTICE OF PUBLIC HEARING On Proposed Plans, Specifications, Form of Contract, And Estimate of Cost For the FY 2019 DYSART RD. AND W. 2ND ST. RECONSTRUCTION PROGRAM In the City of Waterloo, Iowa CONTRACT NO. 970 RECEIVING OF BIDS Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her office in the City Hall of the said City on the 23rd day of May, 2019 until 1:00 p.m. for the construction of the FY 2019 DYSART RD. AND W. 2 ° ST. RECONSTRUCTION PROGRAM, Contract No. 970, as described in detail in the plans and specifications now on file in the Office of the City Clerk. OPENING OF BIDS All proposals received will be opened in the First Floor Conference Room at City Hall, in the City of Waterloo, Iowa, on the 23rd day of May, 2019 at 1:00 p.m., and the proposals will be acted upon at such later time and place as may then be fixed by the City Council. PUBLIC HEARING Notice is hereby given that the Council of said City will conduct a public hearing on the proposed plans, specifications, form of contract, and estimate of cost for the construction of the above-described improvement project at 5:30 p.m. on the 28th day of May, 2019, said hearing to be held in the Harold E. Getty Council Chambers in City Hall in said City. The proposed plans, specifications, form of contract, and estimate of cost for said improvements heretofore prepared by the City of Waterloo are now on file in the office of the City Clerk for public examination, and any person interested therein may file written objection thereto with the City Clerk before the date set for said hearing, or appear and make objection thereto with the City Clerk before the date set for said hearing, or appear and make objection thereto at the meeting above set forth. The NOTICE TO BIDDERS can be viewed at the following locations: 1) City of Waterloo web site at http://ci.waterloo.ia.us/ 2) Plan rooms: Master Builders of Iowa 221 Park Street, PO Box 695 Des Moines, IA 50303 McGraw Hill Construction Dodge 3315 Central Ave. Hot Springs, AR 71913 NC-yTIC`F nr HFARIN(; C:CINTRA(`T MCl Q7n Dmnc 9 of Reed Construction Data 30 Technology Parkway South, Ste. 500 Norcross, GA 30092 3) Plan Room Web sites: Master Builders of Iowa web site at www.mbionline.com Dodge Lead web site: http://dodgeprojects.construction.com/ Reed Const. Data Lead web site: http://www.cmdgroup.com/project-leads/ SCOPE OF WORK The extent of the work involved is the construction of street improvements in, along and upon portions of certain streets, avenues, roads, and alleys, and such other work as may be incidental thereto along and upon the following streets, avenues, roads and alleys. Street improvements consisting of: • 9-inch non-reinforced PCC paving with integral curb and gutter on W. 2nd Street • 10-inch non-reinforced PCC paving with CD joints on Dysart Road Subgrade drain tile, granular subbase, new storm sewer and appurtenances and other such work as may be incidental thereto. All street improvements consist of the reconstruction of an existing paved street, which is to be replaced with a proposed street. The list of streets, which are proposed for improvements, is as follows: STREET FROM TO W. 2nd Street Commercial Street Jefferson Street Dysart Road Orange Road Approximately 3,950 north of Orange Rd. Published pursuant to the provisions of Chapter 26 of the City Code of Iowa and upon order to the City Council of said Waterloo, Iowa, on the day of , CITY OF WATERLOO, IOWA BY: Kelley Felchle City Clerk NOTICE OF HEARING CONTRACT NO g7n Pare 2 of 7 NOTICE TO BIDDERS For the Taking of Construction Bids for the FY 2019 DYSART RD. AND W. 2ND ST. RECONSTRUCTION PROGRAM In the City of Waterloo, Iowa CONTRACT NO. 970 RECEIVING OF BIDS Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her office in the City Hall of the said City on the 23rd day of May, 2019 until 1:00 p.m. for the construction of the FY 2019 DYSART RD. AND W. 2NDSST. RECONSTRUCTION PROGRAM, Contract No. 970, as described in detail in the plans and specifications now on file in the Office of the City Clerk. OPENING OF BIDS All proposals received will be opened in the First Floor Conference Room at City Hall, in the City of Waterloo, Iowa, on the 23rd day of May, 2019, at 1:00 p.m., and the proposals will be acted upon at such later time and place as may then be fixed by the City Council. PUBLIC HEARING The Council of said City will conduct a public hearing on the proposed plans, specifications, form of contract, and estimate of cost for the construction of the above- described improvement project at 5:30 p.m. on May 28, 2019, said hearing to be held in the Harold E. Getty Council Chambers in City Hall in said City. SCOPE OF WORK The extent of the work involved is the construction of street improvements in, along and upon portions of certain streets, avenues, roads, and alleys, and such other work as may be incidental thereto along and upon the following streets, avenues, roads and alleys. Street improvements consisting of: • 9-inch non-reinforced PCC paving with integral curb and gutter on W. 2nd Street • 10-inch non-reinforced PCC paving with CD joints on Dysart Road Subgrade drain tile, granular subbase, new storm sewer and appurtenances and other such work as may be incidental thereto. All street improvements consist of the reconstruction of an existing paved street, which is to be replaced with a proposed street. NfTI(`P T(1 RIIlf1PRC (:C NJTRO('.T mn Q7f1 Pnnc I of F The list of streets, which are proposed for improvements, is as follows: STREET FROM TO W. 2nd Street Commercial Street Jefferson Street Dysart Road Orange Road Approximately 3,950 north of Orange Rd. BEGINNING AND COMPLETION DATES The work under the proposed contract shall be commenced within ten (10) working days after receipt of "Notice to Proceed" and all items shall be completed on or before November 1, 2019. METHOD OF PAYMENT TO CONTRACTOR The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety- five percent (95%) of the work as it is completed and materials delivered and work approved. Final payment will be made thirty-one (31) days after completion of the work and acceptance by the Council. Before final payment is made, vouchers showing that all subcontractors and workmen and all persons furnishing materials have been fully paid for such materials and labor will be required unless the City is satisfied that material, men and laborers have been paid. The Contractor is hereby notified that if the City does not have cash on hand to pay monthly pay estimates, according to Chapter 384.57 of the Code of Iowa, payment may be made by anticipatory warrants issued bearing a rate of interest not exceeding that permitted by Chapter 74A, Code of Iowa. PLANS AND SPECIFICATIONS Plans and Specifications governing the construction of the proposed improvements have been prepared by the City of Waterloo Engineering Department, which plans and specifications and also the prior proceedings of the City Council referring to and defining said proposed improvements are hereby made a part of this notice, and the proposed contract by reference shall be executed in compliance therewith. Plans and Specifications are available from the Engineering Department on the second floor of City Hall upon the receipt of a $25.00 refundable deposit. Deposits will be refunded if the plans are returned in usable condition (i.e. generally free of highlights, ink markings, tears, stickers, water stains and soiling) to the Engineer's Office by the end of the 14th consecutive day after the project has been awarded. No deposits will be refunded for any requests or plans received after the 14th consecutive day, which includes plans returned via mail service. Plan holders are responsible for ascertaining when the project has been awarded. If the plan holder is the prime contractor or a subcontractor or supplier of the prime contractor that has been awarded the project, Plans and Specifications do not need to be returned to receive the deposit. The prime contractor must submit a list of his subcontractors and suppliers for the City_to verify eligibility for the refundable deposit. NOTICE TO BIDDERS CONTRACT NO 97M Pant 7 of 5 Upon award of project, the prime contrac tor, his subcontractors and suppliers shall be needed number of plans and specifications at no additional cost. supplied with the CONTRACT AWARD the lowest bid. A contract will be awarded to the qualified bidder submitting bids, and to The City reserves the right to reject any or all bids, re-advertise for new waive informalities in the bids submitted that might be in the best interest of the City. of Waterloo, Iowa, for a period not to exceed thirty (30) be held by the City of reviewing the bids and investigating the qualifications of bidders, prior may of the opening of bids for the purpose days from the day rior to awarding the contract. provisions given to and By tue of statutory authority, a preference will be g nproducts will be given local owa grown and coal produced with the State of improvement. preference domestic labor in the construction of the imp PROPOSALS SUBMITTED bidson the items listed in the proposal. The bidder shall clearly The bidder typehhe submit between the unit pricewrite and the bid item extension (Unit Pricec x Estimated Qty) in numerals the blanks bid discrepancy provided. Should there be any as being bide on texens on, the City of Waterloo shall consider the unit bid price price and the valid unit bid price. The bidder has the option to submit a computer-generated spreadsheet in lieu of the of Bid or Proposal, which includes t Price and e Bid teml NumThe portion the Form Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid ofomputer-generated spreadsheet shall include all of the informeattii f the Ptlmethat portion as bear or computer-generated spreadsheet, the submittingthe Form of Bid F Proposal or the er whlo submti athe computer g in the spaces) TOTAL BIDe with alternates, if applicable) shall also be indicated TOTAL B provided on the Form of Bid or Proposal. BID SECURITY REQUIRED separate envelope by a certified or cashier's check Allr wns must Iowa accompanied in a chartered under the tofo the bank, or a bank chartered under the laws of the United States, a drawn on an eto lawse City t Unitedcertifi dd shareto es, draft drawn °(on the n a form furnished by the City) payable f States, or bid bond, ed, Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid dtsy omithat ted Bidder of the work and will furnish the required e Contractd certified check, certified share draft or bid bond will be heldas bonds,l enter into a eContractthe for the constructionas agreed in case successful Bidder shall fail be retained by saidtC rye andboth the Bidder and uponand liquid the required damages. bonds,bid dhbond is used, it mustbe signed bymust supported byd uretyat or dama9 agent. Signature of surety's agent the surety ' Power of Attorney. accompanying o��o �f rnm-rparT Nn C7n NnTIC'F Tn RIIlr1FRC PERFORMANCE 8 PAYMENT BONDS The successful bidder will be required to furnish a " Bond" within ten (10) days after forms are presented Performance Bond" and a "Payment hundred percent (100%) of the contract price, said bondY nt to toim in u d by a responsible equal one surety approved by the City Council and shall guarantee be issued by a contract and the terms and conditions therein contained and p payment of all materials and labor he faithful performance of the prompt a shall guarantee the claims of any kind caused by the operations of the con and protect and save harmless the City from MAINTENANCE BOND tractor. Before the Contractor shall be entitled to receive final contract, it shall execute and file a bond in the penal sum ofortotal amount of the contract, same tobe know payment less work done under this must be approved by the City Council, an n as "Maintenance not aintenance Bond,"than 100% cand htbo by the Contractor to guarantee the comple on of he work.hich dis In addition to the bond bvend g CONTRACT COMPLIANCE PROGRAM /SUBCONTRACTING The program proposes numericalprojections Enterprise (MBE) and Women Business Enterprri se rW g utilization of Minority Business and suppliers in the performance of Contracts awarded by (WBE) as Subcontractors, vendors A goal of at least ten percent (10%) for MBE the City of Waterloo, Iowa. projects that are estimated at $50,000.00 or more. participation goal all City funded construction for WBE participation on all City funded construction of at least two ° for$50,000.00 or more. Any percent e2 at project funded in part or in total with federal fundat are s ated w the respective agencies contract compliance program Prime Contractor shall make and goals. The shall follow Prime C E good-faith efforts" to meet the Contract Compliance MBE/ goals. The MBE/VVBE subcontractors, suppliers or vends the Prime Contractor a reasonably competitive price for the service being rendered or the Contractor is not required to accept their bid. rs must provide LIQUIDATED DAMAGES Time is an essential element of this contract. It is important ntly pursued to completion. If the work is not completed with n the specified the work t be t period, plus authorized extensions, the contractor shall pay to the C' the amount of five hundred dollars contract period, the herein, in excessffive of the authorized ($500 00eachh Liquidated her time. per day, for day, as further described Days beyond the specified completion date for which charged will be working days that the contractor does Liquidated Damageseworked, f be m Monday through Saturday. Sundays will be counted only or could have from working days will be considered as a full working day.y if work is wrkingLiquidated Damages will ind rain days, performed. Partial holidays. Y , Sunday if no work ss °done,t rg nd le for legal NOTICE TC) RinnPRs CnNTRACT Nn q7n Pan=d of F Working days will cease to be charged when only punch list items remain to be completed. Punch list items do not include contract bid items or approved change/extra work orders. When the Contractor believes the project to be substantially completed, a written notice stating the same shall be submitted to the Engineer and a request made for a Punch List. If the work under the Contract extends beyond the normal construction season for such work the Contractor shall submit to the Engineer in writing a request that working days counted toward the project be suspended until work is resumed the following construction season. This amount is not construed as a penalty. These damages are for the cost to the City of providing the required additional inspection, engineering and contract administration. PRE-CONSTRUCTION CONFERENCE Before the work is commenced on this contract, a conference shall be held for the purpose of discussing the contract. The conference shall be attended by the prime contractor, subcontractors and City Officials. BIDDER STATUS Attention of bidders is called to compliance with the provisions of the Resident Bidder/Non-Resident Bidder requirements. Each bidder submitting a bid shall execute and include with the bid, a Bidder Status Form in the form herein provided. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. SALES TAX EXEMPTION CERTIFICATES Contractors and approved subcontractors will be provided a Sales Tax Exemption Certification to purchase building materials or supplies in the performance of construction contracts let by the City of Waterloo. Posted pursuant to the provisions of Chapter 26 of the City Code of Iowa. CITY OF WATERLOO, IOWA NOTICE TO RIDDFRS C:nNTRACT NO Q711 Dana F of F INSTRUCTIONS TO BIDDERS 1. EXPLANATIONS TO BIDDERS Any explanation desired by a bidder regarding the meaning or interpretation of the Notice to Bidders, Plans, Specifications, etc., must be requested in writing and with sufficient time allowed for a reply to reach bidders before submission of their bids. Any interpretation made will be in the form of an amendment of the Notice to Bidders, Plans, Specifications, etc., and will be furnished to all prospective bidders. Its receipt by the bidder must be acknowledged in the space provided on the Proposal Form or by letter or telegram received before the time set for opening of bids. Oral explanations or instructions given before the award of the contract will not be binding. 2. EXAMINATION OF PROPOSED WORK Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The owner will assume no responsibility for any understanding or representation concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Notice to Bidders, the Specifications or related documents. 3. PREPARATION OF BIDS a. Bids shall be submitted on the forms furnished, or copies thereof, and must be manually signed. If erasures or other changes appear on the forms, each erasure or change must be initialed by the person signing the bid. The bidder has the option to submit a computer-generated spreadsheet in lieu of the portion of the Form of Bid or Proposal, which includes the Bid Item Number, Description, Unit Estimated Quantity, Unit Bid Price, Total Bid Price, and Total Bid. The computer-generated spreadsheet shall include all of the information listed in that portion of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor submitting the bid. For the bidders who submit a computer-generated spread- sheet, the TOTAL BID (with alternates, if applicable) shall also be indicated in the space(s) provided on the Form of Bid or Proposal. INSTRUCTIONS TO BIDDERS Page 1 of 14 b. The Bid Form may provide for submission of a price or prices for one or more items, which may be lump sum bids, alternate prices, schedule items resulting in a bid on a unit of construction or a combination thereof, etc. When the Bid Form explicitly requires that the bidder bid on all items, failure to do so will disqualify the bid. When submission of a price on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted. c. Unless called for, alternate bids will not be considered. d. Modifications of bids already submitted will be considered if received at the office designated in the Notice to Bidders by the time set for closing of bids. Telegraphic modifications will be considered, but should not reveal the amount of the original or revised bid. e. In preparing his bid, the bidder shall specify the price, written legibly in ink or with the typewriter, at which he proposes to do each item of work. The unit price shall be stated in figures in the blank space provided (i.e., $7.14). In items where unit price is required, the total amount of each item shall be computed at the unit prices bid for the quantities given on the Bid Form and stated in figures in the blank space provided. If the bidder chooses to submit the unit prices, total bid price, and total bid on a computer-generated spreadsheet, all numbers shall be easily legible. f. Any changes or alterations made in the Bid Form, or any addition thereto, may cause the rejection of the bid. No bid will be considered which contains a clause in which the contractor reserves the right to accept or reject a contract awarded him by the city Council of Waterloo. Bids in which the unit prices are obviously unbalanced may be rejected. g. If the bidder does not qualify as a resident bidder, the nonresident bidder shall specify on the project proposal whether any preference to resident bidders, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country is in effect in the nonresident bidder's state or country of domicile at the time of a bid submittal. INSTRUCTIONS TO BIDDERS Page 2 of 14 4. SUBMISSION OF BIDS a. A bid must be sealed in a separate envelope and marked to indicate its contents and be accompanied by the bid security in a separate envelope. If forwarded by mail, the two envelopes shall be placed in a third and mailed to the City Clerk/Auditor. All bids must be filed with the City Clerk/Auditor of the City of Waterloo at his office in the City Hall before the time specified for closing bids. b. Bids received prior to the advertised hour of opening will be securely kept sealed. The officer whose duty it is to open them will decide when the specified time has arrived, and no bid received thereafter will be considered; except that when a bid arrives by mail after the time fixed for opening, but before the reading of all other bids is completed, and it is shown to the satisfaction of the City of Waterloo, Iowa, that the non-arrival on time was due solely to delay in the mails for which the bidder was not responsible, such bid will be received and considered. c. Bidders are cautioned that, while telegraphic modifications of bids may be received as provided above, such modifications, if not explicit and if in any sense subject to misinterpretation, shall made the bid so modified or amended, subject to rejection. 5. LATE BIDS AND MODIFICATIONS OR WITHDRAWALS Bids and modifications or withdrawals thereof received at the office designated in the Notice to Bidders after the exact time set for closing of f bids will not be considered. However, a modification which is received from an otherwise successful bidder, and which makes the terms of the bid more favorable to the City of Waterloo, will be considered at anytimeit is received and may therefore be accepted. Bids may be withdraw by written or telegraphic request received from bidders prior to the time set for closing of bids.6. PUBLIC OPENING OF BIDS Bids will be publicly opened at that time and place set for opening in the Notice to Bidders. Their content will be made public for the information bidders and others interested who may be present either in person or y representative. by 7. BID SECURITY REQUIRED All bids must be accompanied in a separate envelope by a certified or cashier's check drawn on an Iowa bank, or a bank chartered under the INSTRUCTIONS TO BIDDERS Page 3 of 14 on a laws of the United States, a certified share draft States,drawn or bid bondt (onunion the in Iowa or chartered under the laws of the UnitedIowa, in the the City) a form furnished byable to the City of Waterloo,payable sum of not less than five percent (5%) of the bid h Id as securityed, whic certif tee d check, certified share draft or bid bond will bek and Bidder will enter into a Contract for the constructionof the worerkall fail or furnish the required bonds, and in case the successful refuse to enter into the Contract and furnish the req it dateed bo d, his bid es. security may be retained by said City as agreed upon both the bidder and the surety or If bid bond is used, it must be signed by surety's agent. Signature of surety's agent must be supported by accompanying Power of Attorney. 8. COLLUSIVE AGREEMENTS a. Each bidder submitting a bid shall execute rm iand in i lu dde, wittoh thee bid, a Non-Collusion Affidavit in the fotn her person, or corporation in ect that he as not colluded with anyher person regard to any bid submitted. b. Each bidder submitting a bid shall have each proposed subcontractor, if any, execute and submit to the City ontract day Compliance Officer by due, a Non-Collusion d following Affidavit in the form ay the bids on this project herein provided, to the effect that in eeha�not colluded bid s with other person, firm, or corporation g Before executing any subcontract, the successful biddderby thlll submit the name of any proposed subcontractor for approval City. 9. MINORITY ANDIOR WOMEN BUSINESS ENTERPRISE SUBCONTRACTORS a. CITY OF WATERLOO AND/OR M O ION FORBUSINESS ENTERPRISE PRE-BID CONTACT INFOR The City of Waterloo Minority and/or Pre-Bid Contact Information Form shall e submitted with the Form of Bid or Proposal. Failure to do so shall be grounds foey t t prime being rejected if subcontracting is proposed contractor. Page 4of14 INSTRUCTIONS TO BIDDERS 10. MBE/WBE CONTRACT COMPLIANCE PROGRAM PURPOSE The purpose of the Contract Compliance Program (hereinafter called Program) is to act as an impetus for increasing the participation of minority and women disadvantaged business enterprise (MBE/WBE) in City awarded construction contracts. The Program does not propose to eliminate any bonafide contractor or subcontractor from bidding on City contracts, but it will hopefully serve as a needed stimulus to help local MBE/WBE's grow and eventually become mainstream contractors and subcontractors. This Contract Compliance Program does not propose to include any set-aside or quotas, but only flexible goals where "good-faith efforts" are required by the contractor to use MBE/WBE subcontractors. This Program shall not eliminate the need for contractors to continue their "good-faith efforts" in using MBE/ VBE subcontractors on City contracts estimated at less than $50,000. The City of Waterloo will make every effort to reduce in-house construction and maintenance work that would be more cost effectively performed by the private sector and, thus, would allow additional bidding opportunities for MBE/WBE firms. The City Contract Compliance Officer shall be advised of all City of Waterloo awarded construction contracts. DEFINITIONS Goals: A flexible numerically expressed objective which contractors are required to make "good-faith efforts." The key to the requirement is to make documented efforts. Goals are neither set-a-sides nor a device to achieve proportional representation or equal results. Numerical goals do not create set-a-sides for specific groups, nor are they designed to achieve proportional representation or equal results. Rather, the goal-setting process in affirmative action planning is used to target and measure the effectiveness of affirmative action efforts to eradicate and prevent discrimination. INSTRUCTIONS TO BIDDERS Page 5 of 14 Quota: A flat numerical requirement that the contractor is required to meet in order to obtain the benefit or be in compliance. The numerical goal component of affirmative action programs is not designed to be, nor may it properly or lawfully be interpreted as, permitting unlawful preferential treatment and quotas with respect to persons of any race, color, religion, sex, or national origin. The regulations at 41 CFR 60-2.12(a), 60-2.15 and 60-2.30, specifically prohibit discrimination and the use of goals as quotas. (U.S. Department of Labor) Set-Aside: An arrangement in which a particular contract is reserved for competition solely among minority and women business enterprises. Contractor. As used in this document means contractor, subcontractor, supplier, vendor, and professional service provider. Minority Business Enterprise (MBE) Any business, which is at least 51%, owned by one or more minorities and whose management and daily business operations are controlled by one or more such individuals and is on the current State Unified Certification List, or were listed on the City of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002 Women Business Enterprise (WBE): Any business which is at least 51% owned by one or more women and whose management and daily business operations are controlled by one or more such individuals and is on the current State Unified Certification List, or were listed on the City of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002 Minority: Any person or persons who are considered as socially and economically disadvantaged because of their identity as a group member without regard to their individual qualities. The groups include: Black American, Hispanic American, Native Americans, Eskimos, Aleuts, and Asian-Pacific Americans. 13 C.F.R. 124- 1.1(c)(3)(ii)(1983). Lowest Responsible Bidder: Bidder who has offered the lowest bid and who has exhibited skill relative to the type of work bid on, judgment, financial responsibility, and evidence of working with the Affirmative Action Employment INSTRUCTIONS TO BIDDERS Page 6 of 14 Program and the Contract Compliance Program. Broker: One buying or selling for others on commission or other fee basis without maintaining a warehouse or other similar inventory storage facility. Good Faith Efforts: The successful bidder shall be selected on the basis of having submitted the lowest responsible bid. The obligation of the bidder is to make good faith efforts. The bidder can demonstrate that it has done so by the following: 1. The Prime Contractor met the project goal - No Action necessary 2. If the Prime Contractor failed to meet the goal, they must submit documentation of good faith efforts. CONTRACT COMPLIANCE PROGRAM SUBCONTRACTING The program proposes numerical projections or goals regarding utilization of Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) as subcontractors in the performance of contracts awarded by the City of Waterloo, Iowa. A goal of at least 10% for MBE participation on all City funded construction projects that are estimated at $50,000 or more and projects under $50,000 where applicable at the Contract Compliance Officer's discretion. There is at least 2% WBE goal on City funded projects. Any project which is funded solely or in part with Federal funds shall follow the respective agencies contract compliance program and goals. Any project which is funded solely or in part with State funds shall follow the respective agencies contract compliance program and goals. The City of Waterloo Contract Compliance Program is for City awarded construction contracts only. The prime contractor shall make "good-faith efforts" to meet the Contract Compliance MBE/WBE goals. The MBE/WBE subcontracts must provide the prime contractor a reasonably competitive price for the service being rendered or the contractor is not required to accept the bid. Administrative Reconsideration: As part of this reconsideration, the bidder will have the opportunity to provide written documentation or arguments concerning the issue of whether they made adequate good faith efforts to meet the INSTRUCTIONS TO BIDDERS Page 7 of 14 goals. The bidder will have the opportunity to meet in person with the City of Waterloo's Administrative Reconsideration Committee to discuss the issue of whether they made adequate good faith efforts. The Administrative Reconsideration Committee will forward a written decision on reconsideration to the Mayor and City Council, explaining the basis for finding that the bidder did or did not meet the goal or make adequate good faith efforts to do so. Documentation required will include but is not limited to the following: * Making portions of the work available for MBE/WBE subcontracting * Evidence of negotiating with MBE/WBE firms * MBE/WBE quotes obtained and non-MBE/WBE quotes used * Reasons agreements were not reached * Follow-up after initial solicitations * Efforts to assist in obtaining equipment, supplies and materials (at competitive prices), bonding, lines of credit, insurance, etc. * Evidence of past compliance or non-compliance by same contractor The Contract Compliance Officer will determine the weight to be given to each item listed above (supported by appropriate documentation) based on overall program goals. RESPONSIBILITIES 1. City of Waterloo A. The City Contract Compliance Officer has the responsibility to assure the City's compliance with Federal, State and Municipal regulations. B. The City Contract Compliance Officer is responsible for maintaining a current directory of certified firms. Certification of MBE/VVBE/DBE contractors is through the Iowa Department of Transportation and its Unified Certification Program. Only firms certified based on guidelines prescribed in 49 CFR Part 26 and provisions of this agreement, shall be recognized as certified by the City of Waterloo. C. The City Contract Compliance Officer is responsible for making available a list of future project information notices to MBE/WBE firms. D. The City Contract Compliance Officer shall send notices to appropriate MBE/WBE firms in the directory of each bid solicitation with opening date. INSTRUCTIONS TO BIDDERS Page 8 of 14 E. The City Contract Compliance Officer will receive MBE/WBE Letter(s) of Intent to Bid and within two (2) business days forward the complete list of MBE/WBE bidders who submitted a Letter of Intent to Bid to prime contractors. Prime Contractors In order to be in compliance with the guidelines of this program, the prime contractor must show good-faith efforts in following the MBE/WBE Contract Compliance Program. Good-faith efforts include, but are not limited to, the following: A. Prime contractors shall send solicitation letters (Form CCO- 3) to appropriate MBE/WBE (those certified in directory prepared by City Contract Compliance Officer) at least seven (7) working days prior to bid date. Letters should identify specific items to be subcontracted. A minimum of three (3) disadvantaged business contacts must be made and documented, if there are at least three disadvantaged businesses offering services in the area to be subcontracted (See City of Waterloo MBE/WBE Certification List). If less than three (3) are offering the services to be subcontracted, then a contact is required for any that are listed as providing that service. If the Prime Contractor submits a MBE/WBE contact not on the City's MBE/WBE list, attach a copy of the MBE/WBE/DBE Certifications from another government agency. B. If a prime contract bidder is unable to identify MBE/WBE firms to perform portions of the work, the City Contract Compliance Officer should be contacted for assistance immediately. C. Prime contract bidders may solicit MBE/WBE proposals by telephone or personal interviews, but all such contacts shall be confirmed by Certified Mail, or subcontract bid request forms (Form CCO-2). D. If any MBE/WBE business submitting bids is not selected for subcontract award, documentation must accompany the "MBE/WBE Business Enterprise Pre-Bid Contact Information Form" (Form CCO-4 and CCO-4A) on why the MBE/WBE was not selected. These reasons could include: a. Not low bid. Copies of the competing bids may be required for verification. INSTRUCTIONS TO BIDDERS Page 9 of 14 b. MBE/VVBE did not bid, withdrew bid or non-responsive. c. Documentation of other business-related reason for not selecting the MBE/WBE business for a subcontract. d. Prime contractor self performs work. e. Any other reason relied on by prime. The Contract Compliance Officer will determine the weight to be given to each item listed above (supported by appropriate documentation) based on overall program goals. ll. MBE/WBE Firms A. MBE/WBE firms shall be certified by the Iowa Department of Transportation as owners and controllers of their respective businesses, or were listed on the City of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002. B. MBE/WBE firms must perform the work on the project; they cannot act as a broker by subcontracting the work out to others. C. Each MBE/WBE firm planning to submit quotes on construction projects with goals, shall submit a Letter of Intent to Bid (Form CCO-5) to the City Contract Compliance Officer seven (7) working days prior to bid opening, listing specific items which the MBE/WBE firm is interested in bidding. If sufficient Letters of Intent to Bid are not received by the City Contract Compliance Officer seven (7) working days prior to bid opening, goals on subject project will be reduced accordingly. Agreements between the bidder/proposer and a MBE/WBE in which the MBE/WBE promises not to provide subcontracting quotations to other bidders/proposers are prohibited. NON-COMPLIANCE OF CONTRACTORS A. Noncompliance exists when the contractor's actions are not consistent with the requirements of the Contract Compliance Program in the areas of employment and subcontracting. B. A bidder's failure to show good-faith efforts to meet project goals or a failure to use certified MBE/WBE firms may be grounds for finding its bid not responsible. C. The Contract Compliance Officer shall submit to City Council his/her recommendation on any non-compliant contract in writing. INSTRUCTIONS TO BIDDERS Page 10 of 14 NOTICE TO PROCEED Notice to proceed on any project with goals will not be issued until City Contract Compliance Officer determines the lowest responsible bidder has used good-faith efforts to comply with this Compliance Program and the bid was responsive. CONCLUSION This program repeals or revises all sections of previous Waterloo Contract Compliance Programs. 11. EMPLOYMENT AND BUSINESS OPPORTUNITY To the greatest extent feasible, suppliers, subcontractors, and low income workers owning businesses or living in the Waterloo area must be given priority in supplying materials, bidding for subcontract work, or applying for employment by the contractor on this project. Opportunities for training and for employment arising in connection with this project, shall to the greatest extent feasible be made available to lower income persons residing in the project area. The contract area is the City of Waterloo. The City of Waterloo will require the contractor to document his efforts in securing lower income workers living in the project area and in purchasing supplies from, and awarding subcontracts to, businesses owned by persons residing in the project area. 12. STATEMENT OF BIDDER'S QUALIFICATIONS Each bidder shall, upon request of the City of Waterloo, Iowa, submit on the form furnished for that purpose (a copy of which is included in the contract documents), a statement of bidder's qualifications, his experience record in constructing the type of improvements embraced, and his organization and equipment available for the work contemplated; and, when specifically requested, a detailed financial statement. The City of Waterloo, Iowa, shall have the right to take such steps as it deems necessary to determine the ability of the bidder to perform his obligations under the contract, and the bidder shall furnish the City of Waterloo, Iowa, all such information and data for this purpose as it may request. The right is reserved to reject any bid where an investigation of the available evidence or information does not satisfy the City of Waterloo, Iowa, that the bidder is qualified to carry out properly the terms of the contract. INSTRUCTIONS TO BIDDERS Page 11 of 14 13. AWARD OF CONTRACT a. Award of contract will be made to that responsive and responsible bidder whose bid, conforming to the Specifications, is most advantageous to the City of Waterloo; price and other factors considered. The intention is to award the contract at the time of opening bids, but the right is reserved to postpone such action for a reasonable time, not exceeding thirty (30) days. b. The City Council may, when in its interest, reject any or all bids or waive any informality in bids received. c. The bidder shall submit bids on all the items listed in the proposal and shall state the unit bid price in words in the blank spaces provided beneath the item description. Should there be any discrepancy between the unit bid price in words and listed numeral unit bid price, the City of Waterloo shall consider the unit bid price in words as being the valid unit bid price. A computer-generated spreadsheet as herein provided shall also be acceptable. Proposals requiring mathematical computations to determine unit prices or totals will be rejected. A contract will be awarded to the qualified bidder submitting the lowest total bid for the BASE BID plus ALTERNATE(S) chosen by the City as indicated in the NOTICE TO BIDDERS. d. When a contract for a public improvement is to be awarded to the lowest responsive and responsible bidder, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. INSTRUCTIONS TO BIDDERS Page 12 of 14 14. EXECUTION OF AGREEMENT, BONDS, AND CERTIFICATE OF INSURANCE a. Subsequent to the award and within ten (10) days after the prescribed forms are presented for signature, the successful bidder shall execute and deliver to the City of Waterloo, Iowa, an agreement in the form included in the contract documents in such number of copies as the City of Waterloo, Iowa, may require. b. Having satisfied all conditions of award as set forth elsewhere in these documents, the successful bidder shall, within the period specified in paragraph "a" above, furnish a surety bond and a payment bond in a penal sum not less than the amount of the contract as awarded, as security for the faithful performance of the contract and terms and conditions therein contained and shall guarantee the prompt payment of all persons, firms, or corporations to whom the contractor may become legally indebted for labor, materials, tools, equipment, or services of any nature including utility and transportation services, employed or used by him in performing the work. The bonds shall protect and save harmless the City from claims and damages of any kind caused by the operations of the contractor and shall also guarantee the maintenance of the contract improvements for the period stated in the Notice of Hearing from and after completion of said improvements and their acceptance by the City. Such bonds shall be in the same form as that included in the contract documents and shall bear the same date as, or a date subsequent to that of the agreement. The current Power of Attorney for the person who signs for any surety company shall be attached to such bonds. c. The successful bidder shall, within the period specified in paragraph "a" above, furnish a certificate of insurance for approval in amounts of not less than the amounts specified in the General Specifications for Construction, Section F. No. 4 "Liability Insurance," Pages 14 to 15 of 18 Pages. The certificate of insurance shall be furnished in such number of copies as the City of Waterloo may require. The City of Waterloo shall be named as an "Additional Insured." The contractor shall similarly submit his subcontractor's certificates of insurance in the amounts for approval before each commences work. The contractor shall carry or require that there be Workmen's Compensation Insurance for all his employees and those of his subcontractors engaged in work at the site, in accordance with State Workmen's Compensation Laws. d. The failure of the successful bidder to execute such agreement and to supply the required bond or bonds within ten (10) days after the INSTRUCTIONS TO BIDDERS Page 13 of 14 prescribed forms are presented for signature, or within such extended period as the City of Waterloo, Iowa, may grant, based upon reasons determined sufficient by the City of Waterloo, Iowa, may either award the contract to the next lowest bidder or re- advertise for bids, and may charge against the bidder the difference between the amount of the bid an the amount for which a contract for the work is subsequently executed, irrespective of whether the amount thus due exceeds the amount of the bid guaranty. If a more favorable bid is received by re-advertising, the defaulting bidder shall have no claim against the City of Waterloo, Iowa, for a refund. 15. BIDDER STATUS Attention of bidders is called to the requirement of complying with the provisions of the Resident Bidder/Non-Resident Bidder requirement. Each bidder submitting a bid shall execute and include with the bid, a Bidder Status Form in the form herein provided. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. INSTRUCTIONS TO BIDDERS Page 14 of 14 FORM OF BID OR PROPOSAL FY 2019 DYSART RD. AND W. 2ND ST. RECONSTRUCTION PROGRAM CONTRACT NO. 970 CITY OF WATERLOO, IOWA Honorable Mayor and City Council Waterloo, Iowa Gentlemen: 1. The undersigned, being a Corporation existing under the laws of the State of a Partnership consisting of the following partners: , having familiarized (himself) (themselves) (itself) with the existing conditions on the project area affecting the cost of the work, and with all the contract documents listed in the Table of Contents and Addenda (if any), as prepared by the City Engineer of the City of Waterloo now on file in the office of the City Clerk, City Hall, Waterloo, Iowa, hereby proposes to furnish all supervision, technical personnel, labor, materials, machinery, tools, appurtenances, equipment, and services, including utility and transportation services required to construct and complete this FY 2019 DYSART RD. AND W. 2ND ST. RECONSTRUCTION PROGRAM, Contract No. 970, all in accordance with the above-listed documents and for the unit prices for work in place for the following items and quantities: FY 2019 DYSART RD. AND W. 2ND ST. RECONSTRUCTION PROGRAM CONTRACT NO. 970 SODAS SPECIFICATION *SEE TOTAL BID SUPPLEMENTAL UNIT BID BID ITEM SP=SPCL PROV DESCRIPTION UNIT EST QTY PRICE PRICE DIVISION 2-EARTHWORK 1 2010-108-D * TOPSOIL,4 INCHES, ON OR OFF SITE SY 1,460 00 $ $ 2 2010-108-E-0 * EXCAVATION, CLASS 10 CY 6,299.00 $ $ 3 2010-108-G SUBGRADE PREPARATION SY 13,740 00 $ $ SUBGRADE TREATMENT,WOVEN GEOTEXTILE 4 2010 108 H* OR GEOGRID SY 13,740.00 $ $ 5 2010-108-I * SUBBASE, MODIFIED TON 11,250.00 $ $ 6 IDOT 2121 GRANULAR SHOULDER,TYPE B TON 1,200.00 $ $ SUBTOTAL EARTHWORK $ DIVISION 4-SEWERS AND DRAINS-STORM _ STORM SEWER,TRENCHED, RCP 2000D, 24 7 4020 108 A 1 * INCH LF 10.00 $ $ STORM SEWER,TRENCHED, RCP 2000D, 15 8 4020-108 A 1 INCH LF 5.00 $ $ FORM OF BID CONTRACT NO. 970 Page 1 of 4 SUDAS SPECIFICATION *SEE BID SUPPLEMENTAL TOTAL UNIT BID BID ITEM SP=SPCL PROV DESCRIPTION UNIT EST QTY PRICE PRICE DIVISION 4-SEWERS AND DRAINS—STORM (CONTINUED) 9 4020-108-A-1 * STORM SEWER, TRENCHED, RCP 2000D, 12 INCH LF 28.00 $ $ 10 4040-108-A-0 SUBDRAIN, TYPE SP, 6 INCH LF 665.00 $ $ 11 4040-108-A-0 SUBDRAIN, TYPE SP, 4 INCH LF 8,250.00 $ $ SUBDRAIN OUTLETS AND CONNECTIONS, CMP, —12 4040 108 D 0 6 OR 8 INCH EACH 44.00 $ $ 13 4040-108-E-0 STORM SEWER SERVICE STUB, TYPE S, 4 INCH LF 30.00 $ $ $ $ DIVISION 6 -STRUCTURES FOR STORM ^' SEWERS (CONTINUED) $ $ 14 6010-108-A-0 * MANHOLE, SW-402 EACH 1.00 $ $ 15 6010-108-A-0 MANHOLE, SW-406, SHALLOW RECTANGULAR EACH 1.00 $ $ 16 6010-108-H-0 * REMOVE MANHOLE OR INTAKE, STORM EACH 4.00 $ $ 17 6010-108-B-0 INTAKE, SW-501, SINGLE GRATE EACH 2.00 18 6010-108-B-0 INTAKE, SW-507 EACH 1.00 19 SP#2 INTAKE, SW-507, R&R TOP& INSERT ONLY EACH 3.00 $ $ — 20 SP#2 INTAKE, E-1-C, R&R BOXOUT ONLY EACH 2.00 $ $ 21 SP#3 FURNISH AND INSTALL SW-603 TYPE R CASTING EACH 2.00 $ $ SUBTOTAL STORM SEWER $ DIVISION 5-WATER MAINS AND APPURTENANCES 22 SP# 1 WATER SERVICE KILL EACH 2.00 $ $ SUBTOTAL WATER APPURTENANCES $ DIVISION 7 -STREETS AND RELATED WORK PCC PAVEMENT 23 7010-108-A-0 PAVEMENT, PCC, 7 INCH, C-SUD OR IDOT QMC SY 548.00 $ $ 24 7010-108-A-0 PAVEMENT, PCC, 9 INCH, C-SUD OR IDOT QMC SY 990.00 $ $ 25 7010-108-A-0 PAVEMENT, PCC, 10 INCH, C-SUD OR IDOT QMC SY 11,937.00 26 7020-108-H-0 PCC PAVEMENT SAMPLES AND TESTING LS 1.00 $ $ 27 11,050-108-A-0 CONCRETE WASHOUT LS 1.00 $ $ — 28 7010-3.04 COLD WEATHER CONCRETE PROTECTION SY 600.00 $ $ 29 7010,3.02,J * LINSEED OIL TREATMENT SY 4,233.00 $ $ SIDEWALKS, SHARED USE PATHS AND DRIVEWAYS 30 7030-108-A-0 REMOVAL OF SIDEWALK AND DRIVEWAY SY 260.10 $ $ 31 7030-108-E-0 SIDEWALK, PCC, 4 INCH, C-4 SY 16.30 $ $ 32 7030-108-E-0 SIDEWALK, PCC, 6 INCH PEDESTIAN RAMP, C-4 SY 79.80 $ $ 33 7030-108-G-0 DETECTABLE WARNING SF 104.00 $ $ DRIVEWAY AND SIDEWALK, PAVED, PCC, 7 34 7030 108 H-1 INCH, C-4 SY 92.00 $ $ 35 7030-108-H-2 DRIVEWAY, GRANULAR TON 15.00 $ $ PAVEMENT REHABILITATION 36 7040-108-H-0 * PAVEMENT REMOVAL, CONCRETE SY 13,161.00 $ $ 37 7040-3.02-A SAW CUT LF 657.00 $ $ SUBTOTAL STREETS AND RELATED WORK $ FORM OF BID CONTRACT NO. 970 Page 2 of 4-- SUDAS SPECIFICATION *SEE TOTAL BID SUPPLEMENTAL UNIT BID BID ITEM SP=SPCL PROV DESCRIPTION UNIT EST QTY PRICE PRICE DIVISION 8-PAVEMENT MARKINGS AND TRAFFIC CONTROL PAVEMENT MARKINGS 38 8020 108 B 0 PAINTED PAVEMENT MARKINGS, SOLVENTNVATERBOURNE STA 87.67 $ $ TEMPORARY TRAFFIC CONTROL 39 8030-108-A-0 TEMPORARY TRAFFIC CONTROL LS 1.00 $ $ 40 8030-2.02 DIRECTIONAL SIGNS, PER DETAILS EACH 2.00 41 8030-2.02 DETOUR, DYSART ROAD LS 1.00 $ $ SUBTOTAL PAVEMENT MARKING AND TRAFFIC CONTROL $ DIVISION 9-SITE WORK AND LANDSCAPING SEEDING 42 9010 108 B 0 HYDRAULIC SEEDING, SEEDING, FERTILIZING AND MULCHING SY 1,936.00 $ $ 43 9010-108-E-0 * WARRANTY SY 750.00 $ $ EROSION AND SEDIMENT CONTROL 44 9040-108-F-1 WATTLE, STRAW,6 INCH LF 2,500.00 $ $ 45 9040-108-F-2 WATTLE, REMOVAL LF 2,500.00 $ $ 46 9040 108 T-1 INLET PROTECTION DEVICE, INTERMEDIATE AND DROP IN OR SURFACE APPLIED EACH 8.00 $ $ 47 9040-108-T-2 * INLET PROTECTION DEVICE, MAINTENANCE EACH 8.00 $ $ SUBTOTAL SITE WORK AND LANDSCAPING $ DIVISION 11 -MISCELLANEOUS CONSTRUCTION SURVEY 48 11010-108-A CONSTRUCTION SURVEY LS 1.00 $ $ SUBTOTAL MISCELLANEOUS $ TOTAL BID $ 2. It is understood that the quantities set forth are approximate only and subject to variation and that the unit bid price for the work done shall govern in the actual payment to Contractor. 3. In submitting this bid, the bidder understands that the right is reserved by the City of Waterloo, Iowa, to reject any or all bids. If written notice of the acceptance of this bid is mailed, telegraphed, or delivered to the undersigned within thirty (30) days after the opening thereof or at any time thereafter before this bid is withdrawn, the undersigned agrees to execute and deliver an agreement in the prescribed form and furnish the required bond and certificate of the insurance within ten (10) days after the agreement is presented to him for signature, and start work within ten (10) days after "Notice to Proceed" is issued. 4. Security in the sum of Dollars ($ ) in the form of , is submitted herewith in accordance with the INSTRUCTIONS TO BIDDERS. 5. Attached hereto is a Non-Collusion Affidavit of Prime Contractor. FORM OF BID CONTRACT NO. 970 Page 3 of 4 6. Attached hereto is a Bidder Status Form. 7. The bidder is prepared to submit a financial and experience statement upon request. 8. The Prime Contractor and Subcontractor(s), which have performed an aggregate of $10,000.00 in work for the City in the current calendar year, are prepared to submit an AAP or Update and an EOC,- within ten (10) days of notification that the bid submitted is lowest and acceptable. 9. The bidder has received the following Addendum or Addenda: Addendum No. Date 10. The bidder shall list the MBEANBE subcontractor(s), amount of subcontracts and bid items on the- City of Waterloo Minority and/or Women Business Pre-bid Contact Information Form submitted with this Form of Bid or Proposal. The apparent low Bidder shall submit a list of all other Subcontractor(s) to be used on this Project to the City of Waterloo by 5:00 p.m. the business day following the day- Bids on this Project are due along with the Non-Collusion Affidavits of All Subcontractor(s). The Contractor shall submit information on subcontractors on "SUBCONTRACTOR REQUEST AND- APPROVAL" Form to be provided by City prior to approval of contract. The subcontractors listed on this proposal and/or submitted to the Contract Compliance Officer cannot be changed except for the following reasons: 1) The City of Waterloo does not approve the subcontractors. 2) The subcontractors submit in writing that they cannot fulfill their subcontracts. 11. The bidder has filled in all blanks on this proposal. Those blanks not applicable are marked "none" or"NA". 12. The bidder has attached all applicable forms. 13. The Owner reserves the right to select alternates, delete line items, and/or to reduce quantities prior to the award of a contract due to budgetary limitations. (Name of Bidder) (Date) BY: Title Official Address: (Including Zip Code): I.R.S. No. FORM OF BID CONTRACT NO. 970 Page 4 of 4 - INFORMATION NEEDED FOR IOWA CONSTRUCTION SALES TAX EXEMPTION CERTIFICATE CONTRACTOR NAME: ADDRESS: (Check One) PRIME SUBCONTRACTOR FEDERAL ID#: PROJECT NAME: PROJECT CONTRACT NO.: DESCRIPTION OF WORK: ❑ Brickwork ❑ Landscaping ❑ Carpentry ❑ Painting ❑ Concrete ❑ Paving ❑ Drywall-Plaster-Insulation ❑ Plumbing ❑ Electrical ❑ Roofing-Siding-Sheet Metal ❑ Excavation/Grading ❑ Windows ❑ Flooring ❑ Wrecking-Demolition ❑ Heavy Construction ❑ Other (Please specify) ❑ Heating-Ventilating-Air Cond BID BOND KNOW ALL MEN BY THESE PRESENTS,that we, as Principal, and as Surety are held and firmly bound unto the CITY OF WATERLOO , Iowa, hereinafter called "OWNER." In the penal sum Dollars ($ ) lawful money of the United States, for the paymert of which sum will and truly be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. The condition of this obligation is such that whereas the Principal has submitted the accompanying bid dated the day of , 20 , for NOW, THEREFORE, (a) If said Bid shall be rejected, or in the alternate, (b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form specified and shall furnish a bond for his faithful performance of said contract, and for the paymen• of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid, Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. By virtue of statutory authority, the full amount of this bid bond shall be forfeited to the Owner in liquidation of damages sustained in the event that the Principal fails to execute the contract and provide the bond as provided in the specifications or by law. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the Owner may accept such Bid or execute such contract; and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and seals, and such of them as are corporations, have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers this day of ,A.D.201 (Seal) Principal By (Title) (Seal) Witness Surety By Witness Attorney-in-fact NON-COLLUSION AFFIDAVIT OF PRIME BIDDER State of )ss County of , being first duly sworn, deposes and says that: 1. He is (Owner, Partner, Officer, Representative, or Agent) , of_ , the Bidder that has submitted the attached Bid; 2. He is fully informed respecting the preparation and contents of the attachec Bid and of all pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost element of the bid price or the bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Waterloo, Iowa, or any person interested in the Proposed Contract; and 5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant. (Signed) Title Subscribed and sworn to before me this day of , 201 . Title My commission expires NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR State of ss: County of , being first duly sworn, deposes and says that: 1. He is (Owner, Partner, Officer, Representative, or Agent) , of hereinafter referred to as the "Subcontractor;" 2. He is fully informed respecting the preparation and contents of the subcontractor's proposal submitted by the subcontractor to , contract pertaining to the project in (City or County and State) 3. Such subcontractor's proposal is genuine and is not a collusive or sham proposal; 4. Neither the subcontractor nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affiant, has in any way colluded, conspired, connived, or agreed, directly or indirectly, with any other bidder, firm or person to submit a collusive or sham proposal in connection with such contract or to refrain from submitting a proposal in connection with such contract, or has in any manner, directly or indirectly, sought by unlawful agreement or connivance with any other bidder, firm or person to fix the price or prices in said subcontractor's proposal, or to fix any overhead, profit or cost element of the price of prices in said subcontractor's proposal, or to secure through collusion, conspiracy, connivance or unlawful agreement any advantage against the City of Waterloo, Iowa, or any person interested in the proposed contract; and 5. The price or prices quoted in the subcontractor's proposal are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant. (Signed) Title Subscribed and sworn to before me this day of , 201 . Title My commission expires EQUAL OPPORTUNITY CLAUSE (As provided in Executive Order No. 11246) All contractors, subcontractors, vendors and suppliers of goods and services doing business with the City and value of said business equals or exceeds ten thousand dollars ($10,000.00) annually agree as follows: 1. The contractors, subcontractor, vendor and supplier of goods and services will not discriminate against any employee or applicant for employment because of race, color, creed, sex, national origin, economic status, age, mental or physical handicap, political opinions or affiliations. The contractor, subcontractor, vendor and supplier will develop an Affirmative Action program to ensure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, sex, national origin, religion, economic status, age, mental or physical disability, political opinions or affiliations. Such actions shall include but not be limited to the following: a. Employment b. Upgrading c. Demotion or Transfer d. Recruitment and Advertising e. Layoff or Termination f. Rates of Pay or Other Forms of Compensation g. Selection for Training Including Apprenticeship 2. The contractor, subcontractor, vendor and supplier of goods and services will, in all solicitations or advertisements for employees, state that all qualified applicants will receive consideration for employment without regard to race, creed, color, sex, national origin, religion, economic status, age, mental or physical disabilities, political opinion or affiliations. 3. The contractor, subcontractor, vendor and supplier or his/her collective bargaining representative will send to each labor union or representative of workers which he/she has a collective bargaining agreement or other contract or understanding, a notice advising said labor union or workers' representative of the contractor's commitment under this section. 4. The contractor, subcontractor, vendor and supplier of goods and services will comply with all published rules, regulations, directives, and order of the City of Waterloo Affirmative Action Program Contract Compliance Provisions. EQUAL OPPORTUNITY CLAUSE PAGE 1 OF 2 PAGES 5. The contractor, subcontractor, vendor and supplier of goods and services will furnish and file compliance reports within such time and upon such forms as provided by the Affirmative Action Officer. Said forms will elicit information as to the policies, procedures, patterns, and practices of each subcontractor as well as the contractor himself/herself and said contractor, subcontractor, vendor and supplier will permit access to his/her employment books, records and accounts to the City's Affirmative Action Officer, for the purpose of investigation to ascertain compliance with this contract and with rules and regulations of the City's Affirmative Action Program—Contract Compliance Provisions relative to Resolution No. 24664. 6. In the event of the contractor's non-compliance with the non-discrimination clauses of this contract or with any of such rules, regulations and orders, this contract may be canceled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further contracts in accordance with procedures authorized by the City Council. 7. The contractor, subcontractor, vendor and supplier of goods and services will include, or incorporate by reference, the provisions of the non- discrimination clause in every contract, subcontract or purchase order unless exempted by the rules, regulations or orders of the City's Affirmative Action Program, and will provide in every subcontract, or purchase order that said provisions will be binding upon each contractor, subcontractor, or supplier. 8. We, the undersigned, recognize that we are morally and legally committed to non-discrimination in employment. Any person who applies for employment with our company will not be discriminated against because of race, creed, color, sex, national origin, economic status, age, mental or physical disabilities. (Signed) (Appropriate Official) (Title) (Date) EQUAL OPPORTUNITY CLAUSE PAGE 2 OF 2 PAGES TITLE VI CIVIL RIGHTS During the performance of this contract, the contractor (for itself), its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees as follows: 1. Compliance with Regulations: The contractor shall comply with the Regulations relative to non-discrimination in Federally assisted programs of the DOT Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract. 2. Nondiscrimination: The contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, national origin, sex, age, or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations. 3. Solicitations for Subcontracts, Including Procurement of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to non-discrimination on the grounds of race, color, national origin, sex, age, or disability. 4. Information and Reports: The contractor shall provide all information and reports required by the Regulations or directives issued pursuant there to, and shall allow access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Contracting Authority, the Iowa DOT, or FHWA to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information the contractor shall so certify to the Contracting Authority, the Iowa DOT, or the FHWA as appropriate, and shall set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of the contractor's noncompliance with the nondiscrimination provisions of this contract, the Contracting Authority, the Iowa DOT, or the FHWA shall impose such contract sanctions as they may determine to be appropriate, including, but not limited to: a. Withholding of payments to the contractor under the contract until the contractor complies, and/or b. Cancellation, termination, or suspension of the contract, in whole or in part. 6. Incorporation of Provisions: The contractor shall include the provisions of paragraphs (1) through (6) in every subcontract, including procurement of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement as the Contracting Authority, the Iowa DOT, or the FHWA may direct as a means of enforcing such provisions including sanctions for non-compliance: Provided, however, that, in the event of a contractor becomes involved in, or it threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request the Contracting Authority or the Iowa DOT to enter into such litigation to protect the interests of the Contracting Authority or the Iowa DOT; and, in addition, the contractor may request the United States to enter into such litigation to protect the interest of the United States. Bidder Status Form To be completed by all bidders Part A Please answer"Yes"or"No"for each of the following: ❑ Yes ❑ No My company is authorized to transact business in Iowa. (To help you determine if your company is authorized, please review the worksheet on the next page). ❑ Yes ❑ No My company has an office to transact business in Iowa. ❑ Yes ❑ No My company's office in Iowa is suitable for more than receiving mail, telephone calls, and e-mail. ❑ Yes ❑ No My company has been conducting business in Iowa for at least 3 years prior to the first request for bids on this project. ❑ Yes ❑ No My company is not a subsidiary of another business entity or my company is a subsidiary of another business entity that would qualify as a resident bidder in Iowa. If you answered "Yes"for each question above, your company qualifies as a resident bidder. Please complete Parts B and D of this form. If you answered "No"to one or more questions above, your company is a nonresident bidder. Please complete Parts C and D of this form. To be completed by resident bidders Part B My company has maintained offices in Iowa during the past 3 years at the following addresses: Dates: / / to / / Address: City, State, Zip: Dates: / / to / / Address: City, State, Zip: Dates: / / to / / Address: You may attach additional sheet(s) if needed. City, State, Zip: To be completed by non-resident bidders Part C 1. Name of home state or foreign country reported to the Iowa Secretary of State: 2. Does your company's home state or foreign country offer preferences to resident bidders, resident labor force preferences or any other type of preference to bidders or laborers? ❑ Yes ❑ No 3. If you answered"Yes"to question 2, identify each preference offered by your company's home state or foreign country and the appropriate legal citation. You may attach additional sheet(s)if needed. To be completed by all bidders Part D I certify that the statements made on this document are true and complete to the best of my knowledge and I know that my failure to provide accurate and truthful information may be a reason to reject my bid. Firm Name: Signature: Date: You must submit the completed form to the governmental body requesting bids per 875 Iowa Administrative Code Chapter 156. This form has been approved by the Iowa Labor Commissioner. 309-6001 (09-15) Worksheet: Authorization to Transact Business This worksheet may be used to help complete Part A of the Resident Bidder Status form. If at least one of the following describes your business, you are authorized to transact business in Iowa. ❑ Yes ❑ No My business is currently registered as a contractor with the Iowa Division of Labor. ❑ Yes ❑ No My business is a sole proprietorship and I am an Iowa resident for Iowa income tax purposes. ❑ Yes ❑ No My business is a general partnership or joint venture. More than 50 percent of the general partners or joint venture parties are residents of Iowa for Iowa income tax purposes. ❑ Yes ❑ No My business is an active corporation with the Iowa Secretary of State and has paid all fees required by the Secretary of State, has filed its most recent biennial report, and has not filed articles of dissolution. ❑ Yes ❑ No My business is a corporation whose articles of incorporation are filed in a state other than Iowa, the corporation has received a certificate of authority from the Iowa secretary of state, has filed its most recent biennial report with the secretary of state, and has neither received a certificate of withdrawal from the secretary of state nor had its authority revoked. ❑ Yes ❑ No My business is a limited liability partnership which has filed a statement of qualification in this state and the statement has not been canceled. ❑ Yes ❑ No My business is a limited liability partnership which has filed a statement of qualification in a state other than Iowa, has filed a statement of foreign qualification in Iowa and a statement of cancellation has not been filed. ❑ Yes ❑ No My business is a limited partnership or limited liability limited partnership which has filed a certificate of limited partnership in this state, and has not filed a statement of termination. ❑ Yes ❑ No My business is a limited partnership or a limited liability limited partnership whose certificate of limited partnership is filed in a state other than Iowa, the limited partnership or limited liability limited partnership has received notification from the Iowa secretary of state that the application for certificate of authority has been approved and no notice of cancellation has been filed by the limited partnership or the limited liability limited partnership. ❑ Yes ❑ No My business is a limited liability company whose certificate of organization is filed in Iowa and has not filed a statement of termination. ❑ Yes ❑ No My business is a limited liability company whose certificate of organization is filed in a state other than Iowa, has received a certificate of authority to transact business in Iowa and the certificate has not been revoked or canceled. 309-6001 (09-15) Revised February 2003 CONTRACTOR'S OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Check box that applies to party completing program: ( ) General Contractor ( ) Subcontractor I. Section A to be completed by GENERAL CONTRACTORS only: A. Name of Company Address of Company Zip Telephone Number ( ) Federal ID Number (if no Federal ID Number, Owner/President's Social Security Number) Name of Equal Employment Officer Name of Project Project Contract Number Estimated Construction Work Dates / Start Finish Section B to be completed by SUBCONTRACTORS only: B. Name of General or Prime Contractor — Name of Subcontractor Subcontractor's Address Zip Subcontractor's Telephone Number ( ) Subcontractor's Federal ID Number (if no Federal ID Number Owner/President's Social Security Number) Name of Equal Employment Officer - 1 - C. Remainder of program to be completed by party completing program, either Prime or Subcontractor. 1. The Owners and/or Principals of your company: Ethnic Name Address Position Sex Origin 2. Other Areas of Interest: If your company has branches or subsidiaries, or if your company is a branch or subsidiary of a parent organization, give the following information: Type of Name Address Affiliation Degree II. EMPLOYER'S POLICY (Please read carefully.) A. We, the undersigned, recognize that we are morally and legally committed to nondiscrimination in employment. Any person who applies for employment with our company will not be discriminated against because of race, color, creed, sex, national origin, economic status, age, mental or physical handicap. B. The employment policies and practices of the undersigned are to recruit and hire employees without discrimination, and to treat them equally with respect to compensation and opportunities for advancement, including training, upgrading, promotion, and transfer. However, we realize the inequities associated with employment training, upgrading, contracting and subcontracting for minorities and women and we will direct our efforts to correcting any deficiencies to the maximum extent possible. The same will be required of our SUBCONTRACTORS and suppliers. C. We submit this program to assure compliance with Executive Order 11246, as amended, and other subsequent orders that may pertain to equal employment opportunity and merit employment policies, fully - 2 - realizing that our qualification and/or merit system should be evaluated and revised, if necessary. D. We agree to put forth the maximum effort to achieve full employment and utilization of capabilities and productivity of all our citizens without regard to race, creed, color, sex, national origin, economic status, age, and mental or physical handicap. E. will give training (Name of Company) and employment opportunities to local residents of Waterloo, Iowa, to the greatest extent feasible. III. AFFIRMATIVE ACTION A. recognizes that the (Name of Company) effective application of a policy of merit employment involves more than just a policy statement, and (Name of Company) will, therefore, re-evaluate our Affirmative Action Program to ensure that equal employment opportunities are available on the basis of individual merit, and to actively encourage minorities, women and local residents to seek employment with our company on this basis. B. will undertake the (Name of Company) following six (6) steps to improve our Affirmative Action Program: 1. Minority Recruitment and Employment; 2. Local Recruitment and Employment; 3. Disabled Veteran and Vietnam Era Veteran Recruitment and Employment; 4. Handicapped Recruitment and Employment; 5. Female Recruitment and Employment; and 6. Training, Upgrading and Promotional Opportunities. C. will take (Name of Company) whatever steps are necessary to ensure that our total work force has adequate minority, female, and local representation. We will utilize the following methods in our recruitment attempts: 1. Local advertising media (newspapers, radio, TV); 2. Community organizations (churches, clubs, schools); 3. Public and private institutions in the area (UNI, Hawkeye Community College); 4. Job Service of Iowa; and 5. Other. - 3 - D. will seek qualified minority, (Name of Company) female, and local group applicants for all job categories and will make asserted efforts to increase minority, female and group representation in occupations at the higher levels or skill and responsibility. E. All sources of employment used shall be aware that we are an Equal Employment Opportunity Employer. Labor organizations representing our employees will be notified of our Equal Employment Opportunity Policy and Affirmative Action Program. F. Training, upgrading, promotion and transfer activities at all levels will be monitored to ensure that full consideration has been given to qualified minority, female, and local group employees. G. will encourage other (Name of Company) companies with whom we are associated and/or do business, to do the same and we will assist them in their efforts. H. has taken the following (Name of Company) Affirmative Action to ensure that minority, female, local contractors and/or suppliers were provided opportunities to negotiate and/or bid on this project: (if none, write "NONE") 1. 2. As a result of the above efforts, we have involved minority, female, and local contractors and/or suppliers in the following areas of subcontracting: (if none, write "NONE") 1. 2. J. will require approved (Name of Company) Affirmative Action Programs from all nonexempt contractors who propose to work on this project and will take whatever steps are necessary to ensure that non-minority contractors have adequate representation of minority, female and local persons in their total work force. - 4 - K. In further accordance with rules and guidelines issued pursuant to Executive Order 11246 as amended, we establish the goals for our company, based on parity percentages supplied by the City, and we realize these goals will be reviewed on an annual basis. L. will keep records of (Name of Company) specific actions relative to recruitment, employment, training, upgrading and promotion and will provide the City of Waterloo with any information relative to same, including activities of our SUBCONTRACTORS and suppliers as necessary or when requested. M. Parity figures for companies located in Waterloo are as follows: Minority Parity = .08 (8%) N. Affirmative Action (Name of Company) Employment Goals: The definition of Affirmative Action Goals is as follows: "Goals may not be rigid and inflexible quotas which must be met, but must be targets, reasonably attainable by means of applying every good faith effort to make all aspects of the entire Affirmative Action Program work." For the year 201_, please submit percentage targets for employing minorities and women. If you already have reached your target for hiring minorities and women, please submit that percentage. *Goals for Minorities: 0/0 Goals for Women: *your affirmative action goals should be between 1% and 10% or more for minorities and 1% and 5% or more for women. Please be advised that the goals or targets are purely your estimation of how many women and minorities your company can reasonably expect to hire in 201_. Note, that none of the goals are rigid or inflexible. They are targets that your company calculates as reasonably attainable. This will help the City in its monitoring procedures as required by City of Waterloo Resolution No. 1984-142(4). - 5 - CONTRACTOR'S TOTAL WORK FORCE (WATERLOO) HOURLY NAME AND ADDRESS JOB CATEGORY RACE SEX WAGE INDICATE: DISABLED VETERAN: DV VIETNAM ERA VETERAN: VV HANDICAPPED: H - 6 - We hereby certify that we are in compliance with all City and Federal Affirmative Action Regulations and agree to accept all liability for failure to comply. Respectfully submitted, By: Company Executive Date By: Equal Employment Opportunity Officer Date City of Waterloo Affirmative Action Officer Approved Disapproved Reason: By: Date: - 7 - DESCRIPTION OF JOB CATEGORIES 1. Officials/Manager: Occupations in which employees set broad policies, exercise overall responsibility for execution of all policies, or direct individual departments or special phases of the agency's operations or provide specialized consultation on a regional, district or area basis. Includes: department heads, bureau chiefs, division chiefs, directors, deputy directors, controllers, examiners, wardens, superintendents, unit supervisors, sheriffs, police and fire chiefs and inspectors and kindred workers. 2. Professionals: Occupations which require specialized and theoretical knowledge which is usually required through college training or thorough work experience and other training which provides comparable knowledge. Includes: personnel and labor relations workers, social workers, doctors, psychologists, registered nurses, economists, dietitians, lawyers, system analysts, accountants, engineers, employment and vocational rehabilitation counselors, teachers or instructors, police and fire captains and lieutenants and kindred workers. 3. Technicians: Occupations which require a combination of basic scientific or technical knowledge and manual skill which can be obtained through specialized post-secondary school education and through equivalent on-the- job training. Includes: computer programmers and operations, draftsmen, surveyors, licensed practical nurses, photographs, radio operators, technical illustrators, police and fire sergeants and kindred workers. 4. Office/Clerical: Workers are responsible for internal and external communication, recording and retrieval of data and/or information and other paper work required in an office. Includes: bookkeepers, messengers, office machine operators, clerk-typists, stenographers, court transcribers, hearing reporters, statistical clerks, dispatchers, license distributors, payroll clerks and kindred workers. 5. Skilled Craft Workers: Workers perform jobs which require special manual skill and a thorough and comprehensive knowledge of the processes involved in the work which is acquired through on-the-job training programs. Includes: Mechanics and repairman, electricians, heavy equipment operators, stationary engineers, skilled machine occupations, carpenters, compositors and typesetters and kindred workers. 6. Sales Workers: Occupations engaging wholly and primarily in direct selling. Includes: advertising agents and salesman, insurance agents and brokers, real estate agents and brokers, stock and bond salesmen, demonstrators, salesmen and sales clerks, grocery clerks and cashier checkers, and kindred workers. - 8 - 7. Operatives (semi-skilled): Workers who operate machine or processing equipment or perform other factory-type duties of intermediate skill level which can be mastered in a few weeks and require only limited training. Includes: apprentices (auto mechanics), plumbers, building trades, metal working trades, bricklayers, carpenters, electricians, machinists, mechanics, printing trades, etc., operatives, attendants (auto service and parking), plasterers, chauffeurs, deliverymen and furnacemen, heaters (metal), laundry and dry cleaning operatives, milliners, mine operatives and laborers, motormen, oilers and greasers, (except auto painters), (except construction and maintenance), photographic process workers, stationary fireman, truck and tractor drivers, weavers, (textile), welders and flame cutters and kindred workers. 8. Laborers (unskilled): Workers in manual occupations which generally require no special training. Perform elementary duties that may be learned in few days and require the application of little or no independent judgment. Includes: garage laborers, car washers and greasers, gardeners (except farm) and groundskeepers, longshoremen, and stevedores, lumbermen, raftsmen and woodchoppers, laborers performing lifing, digging, mixing, loading and pulling operations and kindred workers. 9. Apprentices: Persons employed in a program including work training and related instruction to learn a trade or craft which is traditionally an apprenticeship, regardless of whether the program is registered with a Federal or State agency. 10. Trainees (on-the-job): Production. . . persons in formal training for craftsmen when not trained under apprentice programs--operative laborer and service occupations. White Collar. . . persons engaged in formal training for clerical, managerial, professional, technical, sales, office and clerical occupations. - 9 - ITEMS OF POTENTIAL MBE/WBE PARTICIPATION NOTICE TO PROSPECTIVE BIDDERS: The following are items from the FY 2019 DYSART RD. AND W. 2ND ST. RECONSTRUCTION PROGRAM, Contract No. 970, that have a potential for MBE/WBE Participation. This listing, however, is not intended to be all encompassing; to preclude MBE/VVBE Contractors from bidding on any items of the Proposal as a Subcontractor or the entire Proposal as a Prime Contractor. SUDAS SPECIFICATION TOTAL BID *SEE EST ITEM SUPPLEMENTAL DESCRIPTION UNIT QTY SP=SPCL PROV DIVISION 4-SEWERS AND DRAINS -STORM 7 4020-108-A-1 * STORM SEWER,TRENCHED, RCP 2000D,24 INCH LF 10.00 8 4020-108-A-1 * STORM SEWER,TRENCHED, RCP 2000D, 15 INCH LF 5.00 9 4020-108-A-1 * STORM SEWER,TRENCHED, RCP 2000D, 12 INCH LF 28.00 10 4040-108-A-0 SUBDRAIN,TYPE SP,6 INCH LF 665.00 11 4040-108-A-0 SUBDRAIN,TYPE SP,4 INCH LF 8,250.00 SUBDRAIN OUTLETS AND CONNECTIONS, CMP,6 OR 8 12 4040 108 D 0 INCH EACH 44.00 13 4040-108-E-0 STORM SEWER SERVICE STUB,TYPE S, 4 INCH LF 30.00 DIVISION 6-STRUCTURES FOR STORM SEWERS 14 6010-108-A-0 * MANHOLE, SW-402 EACH 1.00 15 6010-108-A-0 MANHOLE, SW-406, SHALLOW RECTANGULAR EACH 1.00 16 6010-108-H-0 * REMOVE MANHOLE OR INTAKE, STORM EACH 4.00 17 6010-108-B-0 INTAKE, SW-501, SINGLE GRATE EACH 2.00 18 6010-108-B-0 INTAKE, SW-507 EACH 1.00 19 SP#2 INTAKE, SW-507, R&R TOP& INSERT ONLY EACH 3.00 20 SP#2 INTAKE, E-1-C, R&R BOXOUT ONLY EACH 2.00 21 SP#3 FURNISH AND INSTALL SW-603 TYPE R CASTING EACH 2.00 DIVISION 5-WATER MAINS AND APPURTENANCES 22 SP# 1 WATER SERVICE KILL EACH 2.00 DIVISION 7-STREETS AND RELATED WORK SIDEWALKS,SHARED USE PATHS AND DRIVEWAYS 31 7030-108-E-0 SIDEWALK, PCC C-4,4 INCH, C-4 SY 16.30 32 7030-108-E-0 SIDEWALK, PCC C-4, 6 INCH PEDESTIAN RAMP, C-4 SY 79.80 33 7030-108-G-0 DETECTABLE WARNING SF 104.00 34 7030-108-H-1 DRIVEWAY AND SIDEWALK, PAVED, PCC, 7 INCH, C-4 SY 92.00 35 7030-108-H-2 DRIVEWAY, GRANULAR TON 15.00 MBE/WBE GOALS FOR THIS PROJECT IMPORTANT: Prime Contract Bidders should be aware that ten percent (10%) MBE goal and a two percent (2%) WBE goal is attached to this project. "Certified Return Receipt" letters are no longer needed with the bid showing proof of contacting MBE or WBE Subcontractors, but the Pre-Bid Contact Information Form must be filled out completely. City of Waterloo Contract Compliance Officer: Contract Compliance Officer Community Development Board Carnegie Annex, Suite 202 620 Mulberry Street Waterloo, IA 50703 Phone: (319) 291-4429 SUBCONTRACTOR'S BID REQUEST FORM PRIME BIDDER'S LETTERHEAD Contract No.: Letting Date: I, (subcontractor's name), hereby attest that I have been solicited for a bid on (project name) in the area of (description of work and bid item no.). (Prime contractor) has informed me that if I am interested in bidding, a subcontracting bid proposal must be submitted to the company office by (date) and (time). Subcontractor's Company Name Date Subcontractor's Signature Date Prime Bidder's Signature LETTER TO BE USED WHEN SOLICITING FOR SUBCONTRACTOR QUOTES Subcontractor Company Name Address RE: Contract No.: Dear • (Prime Contractor's Company Name) is presently soliciting for the following work in connection with the above referenced project. (Insert bid Item Nos. and Description of Work) (Prime Contractor's Company Name) is an Equal Opportunity Employer, and all qualified bidders will not be discriminated against due to race, religion, color, sex, or origin. If interested in bidding your proposal must be turned in to this office by and (Date) (Time) Sincerely, (Prime Contractor's Representative) Form CCO- 3 (11/28/2001) LETTER OF INTENT TO BID (MBE/WBE LETTER) According to the Current MBE/WBE Contract Compliance Program - 2002, all MBE/WBE Contractors interested in submitting subcontractor quotes on construction projects with goals, MUST submit a LETTER OF INTENT TO BID to the City of Waterloo Contract Compliance Officer at least seven (7) days prior to bid opening. The LETTER OF INTENT TO BID must list the specific items which the MBE/WBE Contractor is interested in bidding. Letter should include the following: Name of Project: Your Company Name: Address: Phone: Date: List of Specific items to be bid: Item No. Description: Item No. Description: Item No. Description: Item No. Description: Item No. Description: (Subcontractor's Company Name and authorized signature) Return this LETTER OF INTENT TO BID to: Contract Compliance Officer Community Development Board 620 Mulberry St. Carnegie Annex, Suite 202 Waterloo, IA 50703 Phone: (319) 291-4429 Form CCO-5 (06-20-2002) - E - 0 - N o c N O 1-= E u, o m o v cas 0 c = = o cu ou Ca 4 L CC -c O c LLJ U O : at O p 0 O m U O 4 co -0 .S 0 2 m p . v1 0 C _p a) S' L O 44 O7 • Q L O o E ` !A '�~,. CI CI :P a) > >' 0 Co ca 70o U 0 m U o 0) rn O o —Ia) p o 5 }, • c c ++U U "� A 7 p U p a) C.' u) - o = WEo rn � 0 - t .. 3 aiN EcU aE m o a) 0 'Nc �ic°� N as WN 2 ar) co ° 0 � o �' V 04 IX E cn as E r C ° m O �- Q WO oc m " C0 > oa) reF- NW ocoi -Oc Cp = OCZ dZ ` = a, .N :�, - W O o ai a) .- i '� 0 V b a' O 0W 6 � 'Li= CDc - .� 0 0 z � m c E 'c c W el el H Q o c o > v a) rn m Cl) RI w Z � o � '� SOo E0 (. � A = W � 0m � .N y � cNo 0o Z04 _ n•CX ,� U - tn0 � � ° � a) �n a� � W v wZ11- wco � � � ° � ` eU L. 0 - g _ `� '- = Z ZH ° .°-: oQ ac3 o � NW r NV a magi �_ ° o � rno Zto °�) o O mH o °, aSE uoi OW o mo c_co I- Z d LU 0 � a) LE � OE re m .o m m H N N ; a) N c E N c U.O W 04 2W O � cur- � o `o c � Zm °�' 0 a, Z ( a� 'u) 't C co Rs �+ d � T Cr200 ( •N0 mQ LL � A o co o 02 o0 oIn o m o CU Om U cv �.., O t W o N J N o L U - 'a E O m 3 >- CC o23 me Q com Wo a = m 2 `o H J � La o a) 1— mo a.. cA O = p +-, t U p W "CO Q D Jm U ,_ .O2aco ) 3 u) 7.1 E OZ > QmV 12 0 � c u) 0:1 o et cv m .c � � o o ESN o co " N z = E O o � Soo � - W C co p cn o ` a; I- Ty .a U N , "O C co V c�`II m N L J 3 U C _ z ,1�:��e� c • O ,' Z Q N p 7 O 1- '�js� €� °o 0 m C c t O �-Q m •N O 0 m> 7, O - I11p °' 2coo L- V 3 � co ra = al a) v ;II •E Q'C C mpp � � oN E. E d ZaXia 0 t= � � } W "-- us cE ° u) -a° . Cl) a) �. a E— Lli (0 0 ... > (n ,U O 0 o r o) E .c Ta) Ua) N C - m .0 or - EO a) `) ca, U " p w `�° Off .° �O Q N � o� 7 C V- m ai a) U •E Q.r i - - 0) o O Z '0 E L (n 3 O°) ooin ° ui w .` U 0 0 wV v E '~ Nc t ,c N -0 V m a) Wm N P. CO C_ O a) U N uj 0 zG Q = -a• m m ija G 70 N N O m I- w • W L O ••E W Y > a) 3 UU com m 0 y0 L mOw o c ' N - g u › rn v 0_ 22 3m Q'�nW c v �vto a) Z pa) c c 2 2 c ° �� 22 � °) 0 m m c°n c °- a) CO w U N 0 U c (d 0 (o c .c C ccv CO cnmw '- E0 _c -F Q o� 0 - 4 - > c Z N � 2 Q Q ("n a � 0 Z cn 0) m N = us ms ° 3 co m_ CD � cn � N i p 2c or ° oN � � � w .E .c _ (n O U `O (3 = E- 0 ) E N a r � 2w " c co U > 0 E E ° J � ' 0_la M w U . . N O N O fi Ow m 0 N co •=' c�U-, a) Q o m c o) N U O .. Oco w O N a) c O E U o a) °- Nto z 0 U c •C to >, ° d - o c a) 7 > 3 a) 0 -O N Z wy � ° E N DJµ c w . a mY -0 .0° CO (/) 0 = O Y w rn N d _o o of E e .o `o E w 3 0 on -o °c •.c ( _c a`, 0 �- a CO p (n cA y • �. u) W0 _c2 ga � a0) aa) cc m r- CC a � • w N ui— = aa O ` co .E CC E aU ° a w w2� aw o m E o m � a) 2 O.tL � 2 -0 (n O ° Z Z 0 co ct w 0 `o = m f as a z � w 3 � c > c`n cow Z -°o c o � 0)c a>i w a) m s 0. 0 `m (n0 a) o a) ONa) awca) cn �_ 2 U• w •co c 0co 3o2oa W Q ° ° Q « a) � ma ° w Ego, c.`° 2 > a) o aEi (n c O U c Z N c _c Q aa) O Q > 0 Cl) 2o U L of wc N C O o 0 N ai to 7 0 la 0 p N N -0 - U C7 E c 0 >'0 .>_ co) > Q,O O O — D0 0a) . 0 woc co °: f0 c m > (n � � .. rn c `- � Qo mZ � E � a) zaU a) E w 00 oc0occ a) - v)0 co W Nil- 4U) N F- cn cn _E > ,0 O co m O (n Q -Q U >,. O) c m ~ Yvioc UQ Tea 0Ocoio � 215 " c ° N � 0c_O V ° m (n o F- d E m o 2 LU m �j a . aa)iu_ >, o N a c c c o 0 0 11.1 H c o CD Oc�� cn 0 � ,� m ca)lL E U) o 'a) c°) Y a � CT .• c c Z (ULo C 0 U Q uoj >,.0 coQL O Z p U O 0 3 'Q-0 m 2 O ° porn c c = w cn � c0 3 o a) L cn E m = c 0 N o a co ca a) >' m a) F- � o c—"o E � a? � o U ° 0 O -0 4- III c) > u) N O `) a o) c°i °>' � � � � �` 6" aU -23 c m 0co 00 c cu a a) N c . N U u°) EO w — 0 2 rx Q 3 co _c E _ aa) o N 0 w m m m o) Luce .- = 0 a _c (n c o Q ° rnz o45 •o E � O) _a a) EIn 0 re v 0 -0 .0 0- co �« a cZ U in L = Y rn .� a N �+- N +. O O :_ 0 0 c = cn U U 3 O) a 4 c co c EEp w cn '- O .c (n -o -a U > a) . _a 't o • >,... -6 m o o E '3 wU ate) m a) 12 >, z Oo a) ca •a) EV a) -O N o0 ;= U > W 0 wU N � � o .0 E U •a) -a aQ o -a_ ) aa) m °; Cr) oU o 0 = U o 0 0 E woo U w o c 0 > (I) co -a o a) U = c � � Qa N c Ey- z m N c m ma = o ` 'm cNo wz a) o � (n co .... Q o = o c 0 a) wu_ v0) co o � L -.E. U � U 3 a�'' O ° c ° o op rn co n— ° � o0 o N c .c O a) O O N cn La a) U O c a) • c 0 0 mEc° mco _8 � � c° w ,, a) `na) ` aa)i .VDU -0000cm o aEo)0c q a)re Q °t ° E z w m• � 2 > 0 .w4 o � w - mo o a) Q 0) N U -0 N in ~o O co U) c ;. _c c ,N s 0 0 - 0 -O 0 w O O .c E re w 0 _ O E a) .. c• Ln a.a o = •0) 0 . v CO 1- -0 .° >,� m m 0_ 3 � E E co m N O W o oa) Uo m � c o axiom a) U mm o 0 0 > W � w o E °,U 0) `o o •` o fl- Q ` cUo moo w c � E ,U o a) 3 U c c w � om o c co o v wU �w ' . a m co a) 0 E 0 c o � Q w Cu Z � � aQ a m >, a) m 0 0 000 � a�i � om o am c° ° ci �a cd � ci 6 ai 2 `= v) m U V U a mo 3 c m.82 c .0 m2 cct O a) o c�i m m aw U d a) 'U 0 O a (o E •c N U OLa st w 0 O co ° mE E E - •E U - E .0 < a) Oa) F- U Z _c c = o � o Q.• a 0..0 .13 •- 0 (o (V 0 _o U ri - v a) Sri w I- 0 Cl) — LI. CERTIFIED MBE / WBE CONTRACTORS CITY OF WATERLOO, IOWA aL wloo CONTRACT COMPLIANCE OFFICE Community Development Board Carnegie Annex,Suite 202 620 Mulberry Street Waterloo,Iowa 50703 City WEB Site: www.ci.waterloo.ia.us Contract Compliance WEB Site for listing updates: http://www.cityofwaterlooiowa.com/contractcompliance Contact: Rudy Jones,Community Development Director Email: rudv.ionesnwaterloo-ia.org -- Phone: (319) 291-4429 Fax: (319) 291-4431 MBE/WBE Certified Contractors List Page 1 of 4 CERTIFIED MBE CONTRACTORS - CARTER ELECTRIC ... 725 Adams Street Waterloo, IA 50703 Phone: (319)232-9808 _. Pager: (319) 235-4021 Contact: Derrick Carter Specializing in: ELECTRICAL CONTRACTOR CULPEPPER ELECTRIC 1731 Cottage Grove Avenue Waterloo, IA 50707 Phone: (319)235-0885 Fax: (319)236-8177 Contact: Martin Culpepper Certified: City of Waterloo Certified MBE, Licensed Electrician Specializing in: ELECTRICAL CONTRACTOR DANIELS HOME IMPROVEMENT 339 Albany Street Waterloo, IA 50703 _ Phone: (319) 961-1659 Contact: Sammy Daniels Specializing in: ALL TYPES OF CONCRETE FLATWORK, POURED WALLS ALL TYPES, FOOTINGS, LIGHT DEMOLITION D.C. CORPORATION 426 Beech Street Waterloo, IA 50703 Phone: (319) 493-2542 FAX: (319)236-0515 Contact: Terry Phillips Certified: City of Waterloo Certified MBE, Iowa DOT, TSB Certified Specializing in: COMMERCIAL AND RESIDENTIAL DEMOLITION, CONCRETE PAVING, DRIVEWAYS, TRUCKING (ALL TYPES), GENERAL CONSTRUCTION GREER'S WORKS 2003 Plainview Street Waterloo, IA 50703 Phone: (319)233-4701 Contact: Willie Greer Specializing in: DRIVEWAYS, SIDEWALKS, CARPENTRY, ROOFING, GENERAL CONSTRUCTION OLD GREER'S WORKS 2309 Springview Street Waterloo, IA 50707 Phone: (319)233-2150 Contact: David L. Greer, Sr. Specializing in: ROOFING& GENERAL CONSTRUCTION QUICK CONSTRUCTION 217 Bates Street Waterloo, IA 50703 Phone: (319)215-4166 Contact: Leroy Harrington Specializing in: ALL TYPES OF CONCRETE FLATWORK AND GENERAL CONSTRUCTION D & D CONSTRUCTION 1124 West Donald Street Waterloo, IA 50703 Phone: (319) 961-4208 Contact: Darrell E. Caldwell, Sr. Specializing in: ROOFING AND GENERAL CONSTRUCTION E. CASTRO ROOFING 702 Riehl Street Waterloo, IA 50701 Phone: (319)215-5683 Contact:Emillio Castro Specializing in: ROOFING, SIDING, GENERAL CONSTRUCTION CERTIFIED WBE CONTRACTORS ATLAS PAINTING, INC.* 911 Sycamore Street P.O. BOX 65 Waterloo, IA 50704 Phone: (319)232-9164 Specializing in: _ COMMERCIAL AND INDUSTRIAL PAINTING WATCO CONSTRUCTION, INC.* 2920 Texas Street Waterloo, IA 50702 Phone: (319)233-7481 Certified: City of Waterloo WBE Contact: Patricia J. Kimball Specializing in: STORM SEWER, INLETS, DRAIN TILE, WATER MAIN, SANITARY SEWER, INTAKE STRUCTURES PETERMAN & HAES CARPET ONE* 4003 University Waterloo, IA 50701 Phone: (319) 233-6131 Fax: (319) 233-6133 Certified: City of Waterloo WBE Email: JR11486@cfu.net Contact: Carol Reese Specializing in: FLOOR COVERING *DENOTES WOMEN BUSINESS ENTERPRISE STATEMENT OF BIDDER'S QUALIFICATIONS (To be submitted by the Bidder only upon the specific request of the City of Waterloo, Iowa.) All questions must be answered and the date given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of bidder. 2. Permanent main office address. 3. When organized. 4. If a corporation, when incorporated. 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion.) 7. General character of work performed by your company. 8. Have you ever failed to complete any work awarded to you? If so, where and why? 9. Have you ever defaulted on a contract? If so, where and why"? 10. List the more important projects recently completed by your company, stating the approximate cost for each, and the month and year completed. 11. List your major equipment available for this contract. 12. Experience in construction work similar in importance to this project. 13. Background and experience of the principal members of your organization, including the officers. 14. Credit available: $ 15. Give bank reference: STATEMENT OF BIDDER'S QUALIFICATIONS PAGE 1 OF 2 PAGES 16. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the City of Waterloo, Iowa? 17. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the City of Waterloo, Iowa, in verification of the recitals comprising this Statement of Bidder's Qualifications. Dated at , this day of , 201_. (Name of Bidder) By: Title: State of ) ) ss: County of ) , being duly sworn deposes and says that he is of (Name of Organization) and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of , 201 Notary Public My commission expires , STATEMENT OF BIDDER'S QUALIFICATIONS PAGE 2 OF 2 PAGES GENERAL SPECIAL PROVISIONS 1. SCOPE OF WORK The work covered by this contract consists of furnishing all labor, equipment, and materials and performing all operations, in connection with the FY 2019 DYSART RD. AND W. 2ND ST. RECONSTRUCTION PROGRAM, Contract No. 970, as shown on the contract drawings and in accordance with these specifications. The contract drawings, which accompany and form a part of this contract and specifications are dated May 6, 2019. They have the general title of FY 2019 DYSART RD. AND W. 2ND ST. RECONSTRUCTION PROGRAM, Contract No. 970. The drawings are numbered and separately entitled as follows: SHEET# PLAN SHEET DESCRIPTION 1 TITLE SHEET, LOCATION MAP, PLAN SHEET INDEX 2 GENERAL NOTES 3 PAVEMENT MARKINGS TABULATION, IDOT STANDARD ROAD PLANS, SUDAS DETAILS LIST, & LEGEND 4 ESTIMATE OF QUANTITIES 5 TYPICAL SECTIONS, PAVEMENT THICKNESS AND WIDTH 6—22 DYSART ROAD— PLAN/PROFILE, TABLES, INTER. DETAILS, STAGING, DETOUR 23—25 W. 2ND STREET—PLAN PROFILE, TABLES, INTER. DETAILS 26—31 STANDARD DETAILS 32—33 STORMWATER POLLUTION PROTECTION DETAILS The standard specifications of the City of Waterloo are to be used along with the special provisions described herein and shall be considered as part of the contract documents. 2. CONFLICTING SPECIFICATIONS All requirements of other specifications contained in the contract documents which conflict with the provisions of the special provisions will be considered void. 3. DUMPING AREAS Excess material resulting from construction operations shall be hauled to the County Landfill or other area secured by the Contractor and approved by the City Engineer. Rubble, rubbish, trees, brush, and other unsuitable backfill material, as designated by the City Engineer, shall be hauled to the County Landfill. All Landfill charges are to be considered incidental to the contract and are the responsibility of the Contractor. 4. CONSTRUCTION DAMAGE The Contractor shall exercise care during construction operations to ensure the safety and protection to existing features located near or within the limits of construction. Damage caused by negligence or poor workmanship, as determired by the Engineer, shall be considered the Contractor's responsibility. GENERAL SPECIAL PROVISIONS CONTRACT NO. 970 Page 1 of 5 5. REMOVED MATERIALS All materials removed as part of this Contract shall remain the property of the City unless the City determines that he materials are not salvageable and the City does not want to retain ownership of the materials. Materials designated in the field by the Engineer as nonsalvageable shall be hauled and disposed of by the Contractor at no cost to the City. All other materials shall be transported to locations as directed by the Engineer. No separate measurement or payment will be made for hauling or disposing of removed materials and it shall be considered incidental to applicable items. 6. OVERHAUL Overhaul will not be paid for "surplus material" obtained from any of the items of construction under this contract. The cost of overhaul will be considered as incidental to the items to which it applies. 7. MAILBOXES/STOP SIGNS The Contractor shall notify the United States Postal Department of mailboxes, which interfere with any part of the work before removing them, and the Contractor will relocate them as required by the Postmaster. The removal and replacement of mailboxes will not be considered for direct payment, but will be considered incidental to the item to which it applies. The removal and replacement of stop signs will not be considered for direct payment, but will be considered incidental to the item to which it applies. 8. PAY ITEMS All pay items are listed in the proposal and shall include the purchase of all materials, delivery of these materials, and furnishing all labor, plant and miscellaneous work needed to make the item complete. All such cost shall be incidental to the proposed item to which it applies and shall not be considered for separate payment. 9. BREAKDOWN OF LUMP SUM CONTRACT PRICE ITEMS The Contractor shall, immediately upon execution and delivery of the contract, before the first estimate for payment is made, deliver to the City Engineer a detailed estimate giving a complete breakdown of the lump sum contract prices. The submitted breakdown shall be approved by the City Engineer prior to any payment of any lump sum price item. 10. PERMISSION TO HAUL OVER STREETS, RAILROADS AND HIGHWAYS The Contractor will be required to secure, from the proper authorities, permission or permit which may be required to haul over streets, highways, railroads or private property, and any hauling operations of the Contractor shall be subject to the requirements of such permits, permission, and to all applicable regulations, laws, and ordinances governing hauling and movement of equipment over streets, railroads, highways and private property. Any costs or inconvenience caused by obtaining any GENERAL SPECIAL PROVISIONS CONTRACT NO. 970 Page 2 of 5 necessary permits or permission shall be considered completely covered by the price bid for the items in the proposal. 11. CONSTRUCTION SCHEDULING The City Engineer shall approve Contractor's work schedule prior to starting. All revisions shall also be approved. The City Engineer may change the schedule to accommodate changing construction conditions. The Contractor shall coordinate the work under this contract with contractors performing work under other contracts which may be performed concurrently. The Contractor shall be responsible to notify the Police, Fire, Street and Engineering Departments of the closing and opening of streets. The Contractor shall commence work within ten (10) days after receipt of the "Notice to Proceed" and diligently execute the work of the contract to completion. 12. PRE-CONSTRUCTION CONFERENCE Before any work is started, the Contractor shall arrange with the City Engineer to hold a pre-construction conference to discuss problems and schedules of contracts. 13. UNDERGROUND UTILITIES It is the responsibility of the Contractor to obtain the location of gas lines, water lines, electric, telephone, and cable television cables or wires from the various utility companies and the City electrician before starting any excavation. The Contractor shall be responsible for any damage to any underground utilities. The Contractor shall expose those utilities indicated on the plans so that elevations may be determined before beginning construction. This work shall be considered incidental to other items of work. If the Contractor believes that additional costs have been incurred due to a utility being improperly located, the resolution of the additional costs incurred shall be made between the Contractor and the respective utility company. 14. TRAFFIC SIGNS AND STREET SIGNS The Contractor shall contact the City of Waterloo Traffic Operations Department to have any street sign that will be affected by construction removed and replaced when the work has been completed. 15. TRAFFIC CONTROL DURING CONSTRUCTION The Contractor shall, at his own expense and without further or other order, provide, erect and maintain, at all times during the progress and suspension of the work and until completion and final acceptance thereof, suitable and requisite barricades, signs or other adequate protection, as required by the latest edition of Part VI of the "Manual on Uniform Traffic Control Devices" and shall provide, keep and maintain such barricades, signs, etc., as may be required or as may be ordered by the Engineer, to ensure the safety of GENERAL SPECIAL PROVISIONS CONTRACT NO. 970 Page 3 of 5 the public as well as those engaged on the work. All barricading plans shall be reviewed by the Engineer. The Contractor shall determine, provide and obtain approval from the City Engineer on all detour locations for all street closings, barricades and posting prior to construction. These shall meet requirements of the City Police Traffic Department. The Contractor shall notify the City Engineer's Office and the Police, Fire and Street Departments when the street is closed for construction. All barricading shall be in accordance with the latest edition of Part VI of the "Manual on Uniform Traffic Control Devices." Encapsulated lens sheeting is not required on this project. 16. GRADES, LINES, LEVELS AND SURVEYS All necessary grades, lines, levels and surveys shall be established and maintained by the Contractor. The Contractor shall verify all grades, lines, levels and dimensions as sown on the drawings, and he shall report any errors or inconsistencies in the same to the City Engineer before commencing work. 17. SAFETY OF WORKERS AND PUBLIC The Contractor shall, at all times, take necessary precautions to protect the life and _. health of all persons employed on this project and the public. He shall provide necessary safety devices and safeguards in accordance with latest and best accident prevention practices. All such protection shall be furnished to employees without cost. No direct measurement of payment shall be made for this protection, but shall be considered incidental to other items of work. The public shall be kept outside of any work area. 18. CONSTRUCTION EQUIPMENT FOR PORTLAND CEMENT CONCRETE PAVEMENT Section IX "Construction Equipment" of the "Specifications for Concrete Paving, Widening, and Curb and Gutter" of the Standard Specifications for Municipal Public Works Construction, City of Waterloo, Iowa, shall be amended as follows: Iowa Department of Transportation standard specification Section 2301.07 Construction Equipment For Portland Cement Concrete Pavement shall apply with the following exception to Section 2301.07.A.7.b Finishing Machine: The first sentence shall read as "A finishing machine will be required on all uniform width slabs ten (10) feet or more in width upon which a continuous line of forms more than one hundred fifty (150) feet in length may be set, except for intersections or otherwise approved by the Engineer." 19. WORKING ON SATURDAYS, SUNDAYS AND LEGAL HOLIDAYS The Contractor shall notify the Engineer in writing forty-eight (48) hours in advance if work on Saturday is planned. By noon the Friday before the planned Saturday work, the - Contractor shall confirm the Saturday work schedule with the project inspector. GENERAL SPECIAL PROVISIONS CONTRACT NO. 970 Page 4 of 5 Work on Sunday requires prior approval of the Engineer in accordance with the Waterloo Standard Specifications. The Contractor shall not work the following days in 2019 due to City holidays: May 27, July 4, and September 2. GENERAL SPECIAL PROVISIONS CONTRACT NO. 970 Page 5 of 5 SPECIAL PROVISIONS DIVISION 5 — WATER MAINS AND APPURTENANCES 1. WATER SERVICE KILL The work involved in this item is for the Contractor to locate the water service connections at the addresses or locations indicated on the plans, and to remove the existing water service line and curb box and stop, if necessary, and install a plug at the tap location where the corporation is located. This item shall include all work necessary to perform this work including excavation and backfilling operations. If the water service is found to have already been killed (plugged), the Contractor shall be paid for an Underground Investigation. If more than one kill is done per excavation, only one water service kill will be paid. This bid item shall be paid on a per each basis. When a water service kill can be made as part of another water service excavation, i.e. as part of a new or renew water service installation, no separate payment shall be made for the kill. DIVISION 6 — STRUCTURES FOR SANITARY AND STORM SEWERS 2. REMOVE AND REPLACE BOXOUTS: E-1-C INLET; E-2-C INLET; E-3-C INLET; SW INSERTS AND TOPS; MODIFIED INLETS These bid items involve removing and replacing concrete boxouts, inserts or tops around castings of inlet structures. The Contractor shall remove the existing boxout and casting from the structure, remove the concrete from the casting, reset the casting to the proper elevation according to the standard detail included in the plans. Any damages to the casting or structure caused by the Contractor's operations will be the Contractor's responsibility. The Contractor shall be responsible for protecting existing castings from theft or damage whether to be reused in this project or to be delivered to the City Waste Management Yard. If theft or damage of castings should occur, the castings shall be replaced at Contractor expense. 3. FURNISH AND INSTALL MANHOLE CASTING (RING AND COVER) FURNISH AND INSTALL SW-603 TYPE R CASTING (INTAKE FRAME & GRATE) Broken manhole and intake frame and covers/grates castings shall be transported to location(s) designated by the Engineer. Replacement frame and covers/grates shall be Neenah R-1642 or approved equal (manholes) and Neenah R-3067V, or approved equal (intakes), and shall be installed and grouted SPECIAL PROVISIONS CONTRACT 970 Page 1 of 5 as directed in the field by the Engineer. Only those broken castings authorized by the Engineer shall be replaced per bid item "FURNISH AND INSTALL MANHOLE CASTING" and "FURNISH AND INSTALL SW-603 TYPE R CASTING". Castings broken due to the negligence of the Contractor shall be replaced by the Contractor at the Contractor's expense. MISCELLANEOUS 4. ACCESS TO PROPERTIES The intent of construction staging is to maintain access to businesses, schools, churches, apartments, etc. Other staging proposals submitted by the Contractor will be considered as long as adequate access is maintained. The Contractor shall make every effort to minimize the amount of time that access to private properties and driveways is blocked. To allow businesses the opportunity to arrange alternate directional signing for customers, the Contractor shall inform businesses ten (10) days in advance of the anticipated street closing. In cases where residential ingress-egress is limited by the Contractor's operations, he shall give the property owner involved at least 36 hours notice. The contractor shall provide the Engineer with a copy of the notice (see order of construction) mailed or delivered, the date of mailing or delivery, and a list of addresses, properties, or persons contacted. Those streets with staging indicated on the plans shall be constructed so that not more than one stage is closed at a time (unless otherwise noted). The stage closed for construction shall be completed prior to the subsequent stage being closed. The staging for this project shall be as follows: NO TWO CONSECUTIVELY NUMBERED STAGES ON ANY STREET MAY BE CLOSED AT THE SAME TIME 5. LIQUIDATED DAMAGES Time is an essential element of this contract. It is important that the work be diligently pursued to completion. If the work is not completed within the specified contract period, plus authorized extensions, the Contractor shall pay to the City Liquidated Damages in the amount of $500.00 per day, for each day, as further described herein, in excess of the authorized time. Days beyond the specified completion date for which Liquidated Damages will be charged will be working days that the Contractor does, or could have worked from Monday through Saturday. Sundays will be counted only if work is performed. Partial working days will be considered as a full working day. Days SPECIAL PROVISIONS CONTRACT 970 Page 2 of 5 not chargeable for Liquidated Damages will include rain days, Sundays, if no work is done, and legal holidays. Working days will cease to be charged when only punch list items remain to be completed. Punch list items do not include contract bid items or approved change/extra work orders. When the Contractor believes the project to be substantially completed, a written notice stating the same shall be submitted to the Engineer and a request made for a Punch List. If the work under the Contract extends beyond the normal construction season for such work, the Contractor shall submit to the Engineer in writing a request that working days counted toward the project be suspended until work is resumed the following construction season. This amount is not construed as a penalty. These damages are for the cost to the City of providing the required additional inspection, engineering and contract administration. 6. CONCRETE CLEAN-UP AND WASHOUT Runoff from concrete cleanup is a caustic pollutant that can harm wildlife and vegetation. DO NOT clean tools, equipment, and concrete trucks into or allow wastes to enter into the modified subbase, streets, ditches, storm drains or waterways. In Waterloo, failure to follow proper concrete clean-up procedures is a violation of the City's Code of Ordinances and is considered a municipal infraction, punishable by fines. The current City of Waterloo schedule of fines is: 1st offense $200 fine and court costs 2"d offense $500 fine and court costs 3rd and subsequent offense $750 fine and court costs 7. QUANTITY ADJUSTMENTS The following Bid Items are exempted from consideration under the provisions of Section B. "Scope of Work," Paragraph 7 of the "General Specifications for Construction" concerning the variance of the "As-Built" quantity of the listed item by more than twenty (20%) percent from the estimated quantity specified in the contract: SPECIAL PROVISIONS CONTRACT 970 Page 3 of 5 SUDAS SPECIFICATION BID *SEE SUPPLEMENTAL ITEM SP=SPCL PROV DESCRIPTION UNIT EST QTY _ DIVISION 2-EARTHWORK 1 2010-108-D * TOPSOIL,4 INCHES, ON OR OFF SITE SY 1,460.00 4 2010-108-H* SUBGRADE TREATMENT,WOVEN GEOTEXTILE OR GEOGRID SY 13,740.00 6 IDOT 2121 GRANULAR SHOULDER,TYPE B TON 1,200.00 DIVISION 7-STREETS AND RELATED WORK PCC PAVEMENT 28 7010-3.04 COLD WEATHER CONCRETE PROTECTION SY 600.00 29 7010,3.02,J * LINSEED OIL TREATMENT SY 4,233.00 _. DIVISION 9-SITE WORK AND LANDSCAPING SEEDING HYDRAULIC SEEDING,SEEDING,FERTILIZING AND 42 9010-108-B-0 * MULCHING SY 1,936.00 43 9010-108-E-0 * WARRANTY SY 750.00 EROSION AND SEDIMENT CONTROL 44 9040-108-F-1 WATTLE,STRAW,6 INCH LF 2,500.00 45 9040-108-F-2 WATTLE,REMOVAL LF 2,500.00 8. PERCENT OF CONTRACT TO BE PERFORMED BY PRIME CONTRACTOR The Prime Contractor shall be required to perform at least 30 percent of the total contract amount of this project. Purchasing of materials for subcontractors will not be an acceptable method for the prime contractor to meet the 30 percent requirement. 9. STORM WATER POLLUTION PREVENTION/INLET PROTECTION DEVICE Storm water pollution prevention has become an important issue on construction projects. Therefore, the City is requiring that the storm sewer system on this project -- be protected in order to reduce and minimize the impact of sediment-laden runoff flowing into the storm sewer system. Detail sheets are included in the plans with representation of various structures and the proposed protection to be provided. Structures that are unlikely to receive storm water during the construction process are not included in the Estimated Quantity for Inlet Protection Device. Protection will be placed at those locations directed by the Engineer or his representative. No separate payment will be made for protection of open ends of storm sewer pipe, but this will be considered incidental to applicable items. SPECIAL PROVISIONS CONTRACT 970 Page 4 of 5 Should the protection not be provided or not maintained, the contractors will be required to remove sediment from the inlets or storm sewer at his own expense. The materials shall be removed in such a manner as to present further contamination of the storm sewer system and subsequent impairment of downstream receiving waters of the sewer. SPECIAL PROVISIONS CONTRACT 970 Page 5 of 5 Mml• MN= V.E.• t•IM. IMMO 1•••• 1.11 1••• IMIN= Wm.= Om. lamp. •••••• 11••••• I 1 I,, 1 i i r I I I I I 1 1 i i IT I' 1. i I I li, . 1. i i I i triii::"...,:irt:,:,:_,,- 4_ _ I:.: II;itire',_'.i',:r.',.:- ,gyp--:: H � - - -: lit. S �,_ _.��..__..... �,.� n+'xds.al w.crnu .....vai. ._ SUPPLEMENTAL SPECIFICATIONS TO THE SUDAS SPECIFICATIONS DIVISION 1 — GENERAL PROVISIONS AND COVENANTS 1010 — 1090 In lieu of SUDAS Division 1, GENERAL SPECIFICATIONS FOR CONSTRUCTION, CITY OF WATERLOO, IOWA, DEPARTMENT OF ENGINEERING shall apply, which are included in the contract documents for this project. DIVISION 2— EARTHWORK, SUBGRADE AND SUBBASE 2010, 1.08, D Measurement and Payment for Topsoil will be made in SY. 2010, 1.08, E,4 Stripping, salvaging and spreading of topsoil is included in TOPSOIL, 4 INCHES, ON OR OFF SITE bid item, per SY. 2010, 1.08, F, 1 Below grade excavation will be determined in the field by the engineer and be field measured and paid through the EXCAVATION. CLASS 10 bid item in CY. 2010, 1.08, I Subbase will be paid by TON of subbase placed based on ticket weights, with reduction in quantity made for over width placement or waste at 135#/CF. 2010, 1.08, J, 1 Removal of inlet runs (inlet to manhole) are considered incidental to inlet removals. 2010, 1.08, J, 3 Removal of pipe and conduits shall include capping or plugging when determined necessary in the field by the Engineer. 2010, 2.01 Both on site and off site topsoil may be used when complying with 2010, 2.01. 2010, 2.04, C, 6 Geotextiles used shall be Geotextile Systems by Propex Geotex 350 ST, TenCate Mirafi HP 370, or approved equal. Geogrids used shall be Tensar BX4100 (Type 1), Tensar BX4200 (Type 2), Tensar Triax TX-160 (Type 3), or approved equal. 2010, 2.04, D, 3 Recycled Modified Subbase material made from onsite PCC may be used. No Modified Subbase from BMC Aggregates, LC Raymond/Peske Quarry will be accepted on this project. 2010, 3.03 E After pavement removal, all subsequent construction operations must leave the construction site in a condition that is graded to drain to existing intakes or isolated areas, and if ponding occurs the contractor must pump the standing water as soon as reasonable after a rainfall event has ended to prevent the subgrade from becoming saturated. Pumped water must be directed through approved sediment reduction measures before entering the storm sewer or other drainage system. SUPPLEMENTAL SUDAS SPECIFICATIONS CONTRACT 970 Page 1 of 5 6010, 2.05, B, 2, b 6010, 2.05, B, la is acceptable; Engineering Fabric Wrap shall not be used. 6010, 2.10, D, 1 Fixed Manhole Casting Types will be used for both sanitary and storm manholes. 6010, 2.11, A, 2 Only Internal Chimney Seal Infiltration Barriers will be used. 6010, 3.01 K Only Internal Chimney Seal Infiltration Barriers will be used. 6010, 3.01, F, 1 Install only Rubber 0-ring or Profile Gaskets 6010, 3.06 Remove Manhole or Intake will include complete removal of the structure. DIVISION 7 STREETS AND RELATED WORK SECTION 7010 — PORTLAND CEMENT CONCRETE PAVEMENT 7010, 1.08, A, 3 Pavement smoothness testing by profilometer will be required on Dysart Road and will not be required on W. 2nd Street. When cold weather protection or linseed oil is applied, measurement and payment will be per SY. 7010, 3.02, F The use of a paving machine will be required on all sections of 150 feet or more in length. 7010, 3.02, I, 5 Artificial Turf or Burlap Drag Surface Texture is required on Dysart Road. Burlap Drag Surface Texture is required on W. 2nd Street. 7010, 3.02, J For Portland Cement Concrete Placement after August 31, Surface Curing shall include application of linseed oil at a rate of 15 SY per gallon. A curing compound/linseed oil combination product may be used. If used, material shall conform to W.R. MEADOWS LIN-SEAL TM WHITE Curing and Anti-spalling compound or approved equal. 7010, 3.02, K Figure 7010.101/Standard Road Plan PV-101, Details A, B and C, Sheet 2 of 8, shall apply to joint sealing. 7010, 3.03, B Hand finish methods may be used for curb and gutter sections 150 feet or less in length. 7010, 3.07, A Material Testing for Plastic and Hardened Concrete will be performed by the City of Waterloo, Iowa. SECTION 7030 —SIDEWALKS, SHARED USE PATHS AND DRIVEWAYS 7030, 1.08, A, 3 Sawing for removal will be measured and paid for at the unit price per linear foot. SUPPLEMENTAL SUDAS SPECIFICATIONS CONTRACT 970 Page 3 of 5 SECTION 9040 — EROSION AND SEDIMENT CONTROL 9040, 1.08, T, 1 Inlet Protection Device will include the intermediate protection (prior to paving) as per detail included in the plans, as well as Drop In Intake Protection or Surface Applied Intake Protection. 9040, 1.08, T, 2 Maintenance of Inlet Protection Devices will include maintenance from initial installation of intermediate protection through removal at the time vegetation has been established. Maintenance will also include, when and where required, removal prior to winter conditions and replacement in the spring if vegetation has not been established. DIVISON 11 - MISCELLANEOUS SECTION 11,030 —TEMPORARY SERVICES DURING CONSTRUCTION 11,030, 108, A Maintenance of Postal Service will be considered incidental to applicable items. Detail 11030.101 will be used for temporary mailboxes. SUPPLEMENTAL SUDAS SPECIFICATIONS CONTRACT 970 Page 5 of 5 WWI irmair Imam Irmmo ... s ti Now Immo /le I__ 1 3 l Ite p,... 1 1 +. t I I 1 i I 1 i I p � i j w i, l 1 I i` ,T F ;_ _ .,_, ,,,,... ..... ..,„ .. ,_, 1... . _, ..„ . . .....„:„. .... „. ,.. .. . . ..,... .. . . ._ , . _ . . _. . .. , .. . ...,.. , Ir.: ,.. 4,,,.... ..,,,. .. , .. . ...,. .. ..... ...„.„,. .. .. .„ ....... 1_ . .. ,,,,,, . . - I - . .„.., . ....... , . . ......„, _ ., , . . . ..... _ ... .. . ii,..... . .. , . . ., . ... .:7-ri'-- - . . ir, .„ ,.. . . _.... . . ., _ .. ._.. . ...... . . . . ...„....„ . .. ... . .. . 4„... . . ,.., . . .. . .. . .. . ... .. . „, ._ . . . .,,,,,.... . . 1.. ... . ..., .„.. . :. ., : . ,„„ ..„,... . . ,... .... _ . .: ,,....... _ _,,,7, 7 ,. . - - I. . . _,.._, .. . . . .. ,.,... _. . , , .. ,, , . . _ . ., . ..--,..-_, , a-...-- : -.., 4v t, . - fi _ ` �_ ,. .' 'lir,...-,-. rt . . �.� lierracon GeoReport Geotechnical EngineeringReport Dysart Road Reconstruction Waterloo, Iowa April 15, 2019 Terracon Project No. 13185119-01 Prepared for: City of Waterloo Engineering Department Waterloo, Iowa Prepared by: Terracon Consultants, Inc. Cedar Falls, Iowa Environmental Facilities Geotechnical Materials April 15, 2019 llerracon GeoReport City of Waterloo Engineering Department 715 Mulberry Street Waterloo, Iowa 50703 Attn: Mr. Jamie Knutson, P.E. - Interim City Engineer P: (319)291 4312 E: Jamie.knutson@waterloo-ia.org Re: Geotechnical Engineering Report Dysart Road Reconstruction Waterloo, Iowa Terracon Project No. 13185119-01 Dear Mr. Knutson: Terracon Consultants, Inc. (Terracon) has performed geotechnical engineering services for the Dysart Road Reconstruction project in general accordance with Terracon Proposal No. P13185119 dated March 4, 2018. This report presents the findings of the subsurface exploration and provides geotechnical recommendations concerning subgrade preparation and subgrade parameters for the proposed project. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us. Sincerely, Terracon Consultants, Inc. 11-ekrz 711411/-e-,--;zy Brian A. Weiner, E.I. Jason P. Heinz, P.E Staff Engineer Department Manager Geotechnical Services Terracon Consultants, Inc. 3105 Capital Way, Ste. 5 Cedar Falls, Iowa 50613 P (319) 277 4016 F(319) 277 4320 terracon.com Environmental Facilities Geotechnical Materials '� REPORT TOPICS INTRODUCTION 1 SITE CONDITIONS 1 PROJECT DESCRIPTION 2 GEOTECHNICAL CHARACTERIZATION 2 GEOTECHNICAL OVERVIEW 3 EARTHWORK 4 PAVEMENTS 6 GENERAL COMMENTS 8 Note: This report was also delivered in a web-based format. For more interactive features, please view your project online at client.terracon.com. ATTACHMENTS EXPLORATION AND TESTING PROCEDURES SITE LOCATION AND EXPLORATION PLANS EXPLORATION RESULTS SUPPORTING INFORMATION Note: Refer to each individual Attachment for a listing of contents. Geotechnical Engineering Report Dysart Road Reconstruction Waterloo, Iowa Terracon Project No. 13185119-01 April 15, 2019 INTRODUCTION This report presents the results of our subsurface exploration and geotechnical engineering services performed for the proposed reconstruction of a portion of Dysart Road in Waterloo, Iowa. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: • Subsurface soil conditions • Site preparation and earthwork • Groundwater conditions • Pavement subgrade support The geotechnical engineering Scope of Services for this project included the advancement of four test borings to depths of approximately 101/2 to 15'/2 feet below existing site grades. Maps showing the site and boring locations are shown in the Site Location and Exploration Plans section. The results of the laboratory testing performed on soil samples obtained from the site during the field exploration are included on the boring logs in Exploration Results. SITE CONDITIONS The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps. Item Description Project Location Dysart Road extending from Mills Road to Orange Road in Waterloo, Iowa. Latitude: 42.4326°, Longitude: -92.2979° See Site Location Existing Improvements Existing Portland cement concrete (PCC) roadway and underground utilities Existing Based upon preliminary plans provided by the City of Waterloo, pavement Topography elevations at the site range from about 915 feet near Orange Road to about 895 feet near Mills Road. Responsive■ Resourceful • Reliable 1 Geotechnical Engineering Report lierracon Dysart Road Reconstruction • Waterloo, Iowa April 15, 2019 • Terracon Project No. 13185119-01 GeoReport PROJECT DESCRIPTION Item Description Project Description Reconstruction of Dysart Road extending about 2,300 feet trom Mills Road to Orange Road is planned. The existing PCC pavement is planned to be replaced with 10 inches of Proposed PCC pavement with dowels over 6 to 8 inches of aggregate subbase. The Construction new pavement will be along the same or similar horizontal and vertical alignments. GEOTECHNICAL CHARACTERIZATION Subsurface Profile Based on the results of the borings, subsurface conditions can be generalized as follows: Approximate Depth to Stratum . Material Description Consistency Bottom of Stratum(feet) 5 to 7 inches PCC pavement Surface 1 Crushed stone with fines -- Existing 4%to 9 Sandy lean clay and Sand Fill -� 1 9 to 12%2 Sandy lean clay (CL), trace gravel Medium stiff to stiff and occasional sand seams (very soft in Boring 4) 2 3 Undetermined: Boring 1 Lean clay(CL), trace sand and terminated in this layer organics(buried topsoil) Medium stiff 3 4 Undetermined: Borings 2 and 4 Sandy lean clay(CL), trace gravel terminated within this stratum and occasional sand seams(till) Stiff to hard 1. Below pavement surface 2. Boring 3 terminated in Stratum 2 at a depth of 10%feet. 3. Stratum 3 was only encountered in Boring 1. 4. Stratum 4 was encountered in Borings 2 and 4 to planned termination depths of 13 and 15%feet, respectively. Conditions encountered at each boring location are indicated on the individual boring logs in the Exploration Results section. Stratification boundaries on the boring logs represent the Responsive • Resourceful • Reliable 2 Geotechnical Engineering Report ll2rracon Dysart Road Reconstruction • Waterloo, Iowa April 15, 2019 • Terracon Project No. 13185119-01 GeoReport approximate location of changes in material types; in situ, the transition between materials may be gradual or abrupt horizontally and vertically. Groundwater Conditions The boreholes were observed while drilling and sampling and shortly after completion for the presence and level of groundwater. The water levels observed in the boreholes can be found on the boring logs in Exploration Results. Groundwater was observed in Boring 4 during our field exploration at a depth of about 10 feet. Groundwater was not observed in the other borings or for the short duration the boreholes were left open. However,this does not necessarily mean the borings terminated above groundwater. A relatively long period may be necessary for a groundwater level to develop and stabilize in a borehole within fine-grained materials. Long term observations in piezometers or observation wells sealed from the influence of surface water would be required to provide a better evaluation of groundwater levels at this site. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff, and other factors not evident at the time the borings were performed. Therefore, groundwater levels during construction or at other times during the life of the pavement may be different than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. GEOTECHNICAL OVERVIEW Existing fill was encountered in the borings to depths of about 4'h to 9 feet below existing grades. Based on the results of the subsurface exploration and laboratory tests, it appears that the existing fill was generally placed with some degree of moisture and density control. However, zones of apparent lower density existing fill were encountered in Borings 3 and 4 about 6 feet below the existing pavement levels and buried partly organic soil (i.e., topsoil) was encountered about 9 feet below the pavement level in Boring 1. In our opinion, new pavements can be supported on existing fill materials improved by scarification, moisture conditioning, and compaction in-place. However,the City of Waterloo will need to accept the risk that some settlement related to the presence of possible low density existing fill and buried partly organic material could occur. Even with the recommended construction observation and testing,there will still be a risk that buried low density, existing fill and/or partly organic soil will not be discovered during pavement subgrade preparation operations. Recommendations for subgrade preparation and subgrade support are presented in the following Earthwork and Pavements sections. Responsive is Resourceful ■ Reliable 3 Geotechnical Engineering Report lierracon Dysart Road Reconstruction ■Waterloo, Iowa __ April 15, 2019 • Terracon Project No. 13185119-01 GeoReport EARTHWORK Site Preparation Site preparation within planned new construction areas should commence with the removal of pavements and the aggregate base, and the stripping of vegetation, organic soils, root systems, and any other unsuitable materials (e.g., debris, desiccated soil, frozen soil, disturbed soils) from the pavement areas. After the completion of cuts needed to reach the design subgrade levels, the resulting subgrade should be evaluated by the geotechnical engineer. Subgrade evaluations should include visual classifications, probing, laboratory compaction testing, and moisture content testing. Prior to the placement of new fill, the pavement subgrade should also be proof-rolled with heavy, rubber tire construction equipment, to aid in delineating areas of low density disturbed, or otherwise unsuitable material. Particular attention should be given to areas with existing utility trench backfill. Proofrolling should be accomplished using a fully loaded, tandem-axle dump truck with a minimum gross weight of 25 tons. Any unstable areas identified by proofrolling should be undercut to expose stable material and backfilled with low plasticity fill or improved in-place. The fill could consist of approved off-site earthen fill or granular material or on-site materials. The appropriate method of improvement, if required, would be dependent on factors such as schedule, weather, the size of area to be stabilized, and the nature of the instability. More detailed recommendations can be provided during construction as the need for subgrade stabilization occurs during construction. Upon completion of any required undercuts and subgrade improvement, and prior to the placement of new fill in areas below design grade, the subgrade should be scarified to a depth of about 9 inches, moisture conditioned, and compacted to the density and water content ranges recommended in this report. The surficial compaction will aid in providing a firm base for compaction of new fill. Fill Material Types Fill placed below pavements should meet the following material property requirements. Soil Type USCS Acceptable Location for Placement Classification On-site, Low plasticity CL, CL/SC ■ Below the aggregate base for pavements Fine-grained 2°3 Imported, GW, GP, GM, Coarse-grained/Granular 4 SW, SP, ■ Below pavements Table continued on page 5 Responsive • Resourceful • Reliable 4 Geotechnical Engineering Report lierracon Dysart Road Reconstruction ■Waterloo, Iowa GeoReport April 15, 2019■ Terracon Project No. 13185119-01 Table continued from page 4 1. Fill below pavements should consist of approved materials that are free of organic matter and debris. Frozen material should not be used,and fill should not be placed on a frozen subgrade. A sample of each material type should be submitted to the Geotechnical Engineer for evaluation prior to use on this site. 2. Some moisture conditioning (e.g.,wetting or drying)would be necessary to achieve compaction requirements if fine-grained material is used for fill. 3. By our definition, low plasticity materials should have a liquid limit of 45 or less and a plasticity index of 23 or less(ASTM D4318). 4. Specific material requirements will need to be satisfied based on intended use. Structural Fill Compaction Requirements Fill below pavements should be placed and compacted in accordance with the following requirements. Item Description • 9 inches or less in loose thickness when heavy, self-propelled compaction equipment is used Lift Thickness • 4 inches or less in loose thickness when hand-guided equipment (i.e. jumping jack or plate compactor) is used Fine-grained soils: • 95% of maximum > 1 foot below pavements • 98% of maximum <_ 1 foot below pavements Minimum Coarse-grained soils: Compaction • 98% of maximum Requirements 1 • If the material is a coarse sand or gravel, or of a uniform size, or has a low fines content, compaction comparison to relative density may be more appropriate. In this case, coarse-grained soils should be compacted to at least 70% relative density (ASTM D4253 and D4254). Fine-grained material: • 0to +4% Water Content Range Coarse-grained material: from Optimum 4 • Water content should be maintained at levels satisfactory for compaction to be achieved without the coarse-grained material bulking during placement or pumping when proofrolled. 1. Maximum dry density and optimum water content as determined using standard effort(ASTM D698). Responsive• Resourceful ■ Reliable 5 Geotechnical Engineering Report _lrerracon Dysart Road Reconstruction • Waterloo, Iowa April 15, 2019 • Terracon Project No. 13185119-01 GeoReport Earthwork Considerations The on-site materials are anticipated to consist of low plasticity clays. These materials will be susceptible to disturbance from construction equipment and changes in moisture conditions and are frost susceptible. Unstable subgrade conditions could develop during general construction operations, particularly if the earthen fill becomes saturated and/or subjected to repetitive construction traffic. Where soft and wet subgrades are encountered, stabilization measures will be required to help provide a stable working base for construction. Limiting the amount of construction traffic over subgrades and the use of low contact pressure equipment or remote excavation equipment would help reduce the amount of subgrade disturbance. Upon completion of filling and grading, care should be taken to maintain the subgrade moisture content. The pavement subgrade should be graded (crowned) to prevent ponding of water. Water that collects on or adjacent to construction areas should be promptly removed. If the subgrade should become frozen, desiccated, saturated, or disturbed, the affected material should be removed or the materials should be scarified, moisture conditioned, and compacted prior to further construction. As a minimum, all temporary excavations should be sloped or braced as required by Occupational Safety and Health Administration (OSHA) regulations to provide stability and safe working conditions. Temporary excavations will be required during grading operations and/or installation of utilities. Contractors, by their contract, are usually responsible for designing and constructing stable, temporary excavations and should shore, slope or bench the sides of the excavations as required, to maintain stability of both the excavation sides and bottom. All excavations should comply with applicable local, state and federal safety regulations, including the current OSHA Excavation and Trench Safety Standards. PAVEMENTS Pavement Subgrade Support We anticipate the pavement subgrade will consist of a minimum of 8 to 9 inches of low plasticity, fine-grained fill compacted in accordance with the recommendations in the Earthwork section. Provided the pavement subgrades have been prepared as recommended in this report, a modulus of subgrade reaction (k) of 100 pci (pounds per square inch per inch of deflection) can be used for design of pavement sections for this project. Pavement Subsurface Drainage Subsurface drainage systems (i.e., a permeable base and subdrains) below pavement areas generally prolong the life of a pavement and help to prevent saturation of the pavement subgrade that can result in a reduction of subgrade strength and greater than normal and/or erratic heaving. Responsive • Resourceful • Reliable 6 Geotechnical Engineering Report lierracon Dysart Road Reconstruction ■ Waterloo, Iowa April 15, 2019 • Terracon Project No. 13185119-01 GeoReport We recommend installing a subdrain system along the shoulders (or back of curb) of new pavement areas, including all openings in the pavement, such as intake structures, to improve long term pavement performance. The pavement subgrade should be crowned at least 2 percent to promote the flow of water towards the subdrains. Design recommendations for the subdrains are provided in the following table: Item Description • A minimum of 4 inches of material meeting the specifications for Pavement aggregate base Iowa DOT Section No. 4115, Gradation No. 4, PCC CA, Iowa DOT Section No.4121, Gradation No. 12a, Granular Subbase, or Section No. 4123, Gradation No. 14, Modified Subbase • Minimum 4-inch pipe diameter. • Pipe perforations should be appropriately sized to prevent free- draining coarse-grained (granular) material from entering the subdrain pipe. Subdrain pipe • Pipe invert should preferably be at least 3.5 feet below subgrade • Subdrain lines should be sloped to provide positive gravity drainage to a reliable discharge point • Subdrain lines should be embedded in at least 6 inches of subdrain trench backfill material • Iowa DOT porous backfill (Section 4131) or other free-draining Subdrain trench backfill 1 coarse-grained material encapsulated with non-woven geotextile filter fabric (Contech C60NW or equivalent). 1. The subdrain trench backfill should extend up to and be hydraulically connected to the aggregate base layer below the pavements. Pavement Construction Considerations Fine-grained soils, such as those encountered at this site, generally provide relatively poor pavement support and are susceptible to rutting and pumping under repeated construction traffic. Construction scheduling often involves grading and paving by separate contractors and can involve a time lapse between the end of grading operations and the commencement of paving. Disturbance, desiccation, or wetting of the subgrade between grading and paving can result in deterioration of the previously completed subgrade. A non-uniform subgrade can result in poor pavement performance and local failures relatively soon after pavements are constructed. The pavement subgrade should be proofrolled prior to paving operations to help delineate disturbed areas. A Terracon representative should observe the proof-rolling. If a significant precipitation event occurs after the evaluation, or if the surface becomes disturbed, the subgrade should be reviewed by qualified personnel immediately prior to paving. The subgrade should be in its finished form at the time of the final review. Responsive • Resourceful ■ Reliable 7 Geotechnical Engineering Report lierracon Dysart Road Reconstruction •Waterloo, Iowa April 15, 2019 • Terracon Project No. 13185119-01 GeoReport GENERAL COMMENTS Our analysis and opinions are based on our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration. Natural variations will occur between exploration point locations or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon should be retained to provide observation and testing services during grading, pavement construction, and other earth-related construction phases of the project. If variations appear, we can provide further evaluation and supplemental recommendations. If variations are noted in the absence of our observation and testing services on-site, we should be immediately notified so that we can provide evaluation ana supplemental recommendations. Our Scope of Services does not include either specifically or by implication any ervironmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. Our services and any correspondence or collaboration through this system are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in accordance with generally accepted geotechnical engineering practices with no third party beneficiaries intended. Any third party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client. Reliance on the services and any work product is limited to our client, and is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made. Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly impact excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing. Site safety, and cost estimating including, excavation support, and dewatering requirements/design are the responsibility of others. If changes in the nature, design, or location of the project are planned, our conclusions and recommendations shall not be considered valid unless we review the changes and either verify or modify our conclusions in writing. Responsive • Resourceful • Reliable 8 Geotechnical Engineering Report lierracon Dysart Road Reconstruction Waterloo, Iowa GeoReport April 15, 2019 w Terracon Project No. 13185119-01 I hereby certify that this engineering document was prepared by me or • under my direct personal supervision and that I am a duly licensed .tee } Professional Engineer under the laws of the State of iowa. rat, JASON R t .0\t‘ 4/15/2019 ear • son Patrick Heinz, P.E Date '•......mod ♦ My license renewal date is December 31,2020. Responsive■ Resourceful is Reliable 9 ATTACHMENTS Geotechnical Engineering Report lierracon Dysart Road Reconstruction •Waterloo, Iowa April 15, 2019 • Terracon Project No. 13185119-01 GeoReport. EXPLORATION AND TESTING PROCEDURES Field Exploration Boring Numbers Boring Depths(feet) I Location 1 through 4 10%to 15% Dysart Road Boring Layout and Elevations: Terracon personnel staked the boring locations using handheld GPS equipment with respect to the site plan provided to us and coordinates determined from a "best fit"overlay of the plans on a GIS system. The boring locations are shown on the Exploration Plan. The coordinates of the borings are indicated on the boring logs. Approximate ground surface elevations were not obtained as part of our field exploration. The locations of the borings are considered accurate only to the degree implied by the means and methods used to define them. Subsurface Exploration Procedures: The borings were drilled with a drill rig using continuous flight hollow-stem augers. Soil sampling was performed using thin-walled tube and split-barrel sampling procedures. In the thin-walled tube sampling procedure, a thin-walled, seamless steel tube with a sharp cutting edge is pushed hydraulically into the soil to obtain a relatively undisturbed sample. In the split-barrel sampling procedure, a standard 2-inch outer diameter split-barrel sampling spoon is driven into the ground by a 140-pound automatic hammer falling a distance of 30 inches. The number of blows required to advance the sampling spoon the last 12 inches of a normal 18-inch penetration is recorded as the Standard Penetration Test (SPT) resistance value. The SPT resistance values, also referred to as N-values, are indicated on the boring logs at the test depths. The samples were placed in appropriate containers and taken to our laboratory for testing. We observed and recorded groundwater levels during, and shortly after drilling and sampling. The borings were backfilled with sand and bentonite chips after drilling and capped with asphalt upon completion. The drill crew prepared a field log of each boring to record field data including visual descriptions of the materials encountered during drilling as well as the driller's interpretation of the subsurface conditions between samples. The boring logs included with this report represent an interpretation of the subsurface conditions at each boring location based on field and laboratory data, and observation of the samples. Laboratory Testing _. In the laboratory, water content tests were performed on portions of the recovered samples. The dry unit weight of intact, thin-walled tube samples was determined. Unconfined compressive strength and hand penetrometer tests were performed to estimate the consistency of select samples of fine-grained soils. Moisture-density relationships were determined for select samples Responsive ■ Resourceful ■ Reliable EXPLORATION AND TESTING PROCEDURES 1 of 2 Geotechnical Engineering Report lierracon Dysart Road Reconstruction ■ Waterloo, Iowa April 15, 2019 ■ Terracon Project No. 13185119-01 GeoReport of the existing fill from Borings 1, 3, and 4. The results of the laboratory tests are shown on the boring logs at their corresponding sample depths and/or as separate graphs in Exploration Results. The samples were described in the laboratory based on visual observation, texture and plasticity, and the laboratory testing described above. The descriptions of the soils indicated on the boring logs are in general accordance with the General Notes and Unified Soil Classification System (USCS) summarized and included in Supporting Information. Responsive ■ Resourceful • Reliable EXPLORATION AND TESTING PROCEDURES 2 of 2 SITE LOCATION AND EXPLORATION PLANS Contents: Site Location Exploration Plan Note: All attachments are one page unless noted above. SITE LOCATION lierracon Dysart Road Reconstruction ®Waterloo, Iowa April 15, 2019■ Terracon Project No. 13185119-01 GeoReport t 1FT ',,'E i Fl A li . iItUJ t - 4 1 4 = t_5 ke ghts k 'a Mp . F . ..: a� f Via_ r. ` k= vaf. .jc 'S' _ � r � ; ,x $ +, r' r t � f me 4 *4 r4-_, ‘,..• .itiiii,.. 1 .. :: ' -_-. i : . -*� . @ a p s:..E. sr,C 3 Cedar IQ l ,1r1t „ ar€t Rdball 4 ,.-. r 1ra'✓1 i- .Fa�i .r CI I mlie, 11 Microsoft Co,•Ix ration .. 2012 HE-RE DIAGRAM IS FOR GENERAL LOCATION ONLY,AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS EXPLORATION PLAN lrerracon Dysart Road Reconstruction ■Waterloo, Iowa April 15, 2019 ■Terracon Project No. 13185119-01 GeoReport fit` t e4 --t e ' r --- " J , '.. 'IP Et aiot, ,,, '''.. ,1-- lit 1, ,-4,--4‘ • r'E , o.rt v. ., :mot M ' 1c - :. '9,. - - fir: ' = ` J i- ' - 1 4 j, 41:1:ji+re.'"i'411!far' 11 a . , edr'isti �. .'a. - 4, e. • R ''''}`J. ._: } • i to r I i . ze t Rcig .,IX** %I *** — �tf n s l.. # air } .�. .: ._ ; . ow — kk { a si z i a !$i . 'fit i. e -- _ 1 _ 4 r 1 4. — ! 44 `- .GIB • a 11 n c n,,.r`{,�_ •. -.- -.`_ t r -d - ` 91 D I e . li?C.' 2019 Microsoft Corparasan 201g iERE DIAGRAM IS FOR GENERAL LOCATION ONLY,AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS EXPLORATION RESULTS Contents: Boring Logs (1 through 4) Moisture Density Relationship (3 pages) Note: All attachments are one page unless noted above. BORING LOG NO. 1 Page 1 of 1 PROJECT: Dysart Road Reconstruction CLIENT: City of Waterloo IA Waterloo, IA SITE: Dysart Road Waterloo, IA o LOCATION See Exploration Plan J co Lu . y STRENGTH TEST l w J '% w Q }} H o Latitude:42.4347°Longitude:-92.298° = J Q F X r 1- o i_n a �c z z'a- t—) w .. w 0 0 Q� Q 0 -CC m= 0) a-cr X �OZ 0 DEPTH ELEVATION(Ft.) O C ~ o~" CO~ U U .g e.m 0.5 PORTLAND CEMENT CONCRETE,approx.6" �•�•�•1 o FILL-CRUSHED STONE,with fines __ CV; FILL-SANDY LEAN CLAY,trace gravel,gray,brown,and ••••�• dark brown — ♦♦♦ _ i�i�i� 16 5-10-12 14 ♦•♦♦� N=22 _ ♦,AA 3.0 ♦KV FILL-SANDY LEAN CLAY,with crushed stone,gray, ♦♦♦4 9 Y ♦r.♦rl brown,and dark brown cn 1 ♦♦♦♦♦4 • ♦�♦�♦� 12 5-10-10 11 ••♦4 • • 5— N=20 w ♦♦♦♦♦i Q ♦♦♦ a ♦♦♦♦♦♦ 13 4 0 :♦!♦!�7.5 14 5-15-7 ♦-•i N=22 -- O ♦♦♦Q♦ FILL-SAND,with gravel,fine to medium grained,gray • / LEAN CLAY(CL1,trace sand and organics,dark brown, a d1o.5 (buried topsoil) 3-3-3 11, N=642 I 7 Boring Terminated at 10.5 Feet ...- co Co J J W O 2 0 O cIYY)_ Bulk sample; cc L% 1-7.5 ft. 0 w 0 cc 0 a. — LLI Z o 0 0 U- u_ 0 W a Stratification lines are approximate.In-situ,the transition may be gradual. Hammer Type: Automatic ce a -� w LL Advancement Method: See Exploration and Testing Procedures for a Notes: o Hollow stem auger description of field and laboratory procedures used 2 and additional data(If any). 1- See Supporting Information for explanation of ..... O Abandonment Method: symbols and abbreviations. coBoring backfilled with sand,bentonite chips,and capped with O asphalt upon completion 0 J WATER LEVEL OBSERVATIONS 0 Boring Started:03-14-2019 Boring Completed:03.14-2019 — None observed while drilling lerraconn°m None observed after drilling Drill Rig:#546 Driller.WE ca 3105 Capttal Way,Ste 5 T Cedar Falls,IA Project No.:13185119 BORING LOG NO. 2 Page 1 of 1 PROJECT: Dysart Road Reconstruction CLIENT: City of Waterloo IA Waterloo, IA — SITE: Dysart Road Waterloo, IA o LOCATION See Exploration Plan w co a} v > STRENGTH TEST e O F w H v Latitude:42.4332°Longitude:-92.298° _ -I¢ W a a r r W z a a W� a > -J w moo_ W 2 f Z ¢H >-0 RQ w f-W , �U W� m= Cl)~ aka O 0 m0 Q W w 5 W 2 - H o DEPTH ELEVATION(Ft.) ~ o a. 0.4 PORTLAND CEMENT CONCRETE,approx 5" •S••0.9 FILL-CRUSHED STONE,with fines :4+ FILL-SANDY LEAN CLAY,trace gravel,gray,brown,and •••��� dark brown 'i•ii 8-10-11 16 14 •�••� N=21 iii• v '�:!�*�4.5 R �,�f' SANDY LEAN CLAY(CLI,trace gravel,brown,stiff X14 N4$ 15 5— W - r — X oR /1/1 12 N=52-2-3 13 o V - - W Q: O r�/.�s'1.9.0 re ` %jam SANDY LEAN CLAY(CLi,trace gravel,gray brown,hard ✓ /A✓ 10— X 14 8N 233 11 „ ./ o,, P E`ry 9000+(HP) clot m Of _ 12.0 _ SANDY LEAN CLAY(CU,trace gravel,with occasional X 16 10-11-13 9000+ 11 o N=24 (HP) Z A sand seams,gray,hard - '-'_1 13.0 Boring Terminated at 13 Feet rr 0 0 �Y12 Bulk sample; ,_ � 7 4.5-9 ft. cc 0 a w o_ a '... Z 0 0 0 0 0 re w — o W a Stratification lines are approximate.In-situ,the transition may be gradual. Hammer Type: Automatic o: a. w LL Advancement Method: See Exploration and Testing Procedures for a Notes: o Hollow stem auger description of field and laboratory procedures used 71 and additional data(If any). F- See Supporting Information for explanation of O Abandonment Method: symbols and abbreviations. w Boring backfilled with bentonite chips and capped with asphalt O upon completion 0 WATER LEVEL OBSERVATIONS O Boring Started:03-14-2019 Boring Completed:03-14-2019 E None observed while drilling lierracon o Drill Rig:#546 Driller.WE m None observed after drilling cn 3105 Capital Way,Ste 5 I Cedar Falls,IA Project No.:13185119 BORING LOG NO. 3 Page 1 of 1 PROJECT: Dysart Road Reconstruction CLIENT: City of Waterloo IA Waterloo, IA — SITE: Dysart Road Waterloo, IA 0 LOCATION See Exploration Plan0 J 1 W STRENGTH TEST Latitude:42.4314°Longitude:-92.2982° x _I< w it 1--1 co 0, OH Q wa o f a w z j F w n rL a w� a > 0w a wZy z ¢F rI w HW ., Ov ww mx awa ¢ z w5 O <m Q W (L 5 Co g� 0 0 �. 0 CO IX co 00 DEPTH ELEVATION(Ft.) I— o . °.a o 5 PORTLAND CEMENT CONCRETE,approx 6.5' • • 0.8 \FILL-CRUSHED STONE,with fines J ♦�♦�♦� FILL-SANDY LEAN CLAY,trace gravel,gray,brown,and •••••• dark brown •••••• 14 7-l3 14 13 ♦�♦�♦i N=27 �!�!�!3.0 •♦i♦i♦i FILL-SANDY LEAN CLAY,with zones of sand,trace ♦•♦•♦• gravel,brown and gray a ♦i♦i♦i 2-2-4 o i♦i♦A X10 N=6 15 5 •♦i•i♦i — o ♦♦•♦♦i 0_ ♦.,.•A X12 2-3-2 17N=5 _ o SANDY LEAN CLAY(CLI,trace gravel,with sand seams, a gray and brown,stiff 2-3-3 3000 0 10— N=6 (HP) 15 0, 10.5 7, Boring Terminated at 10.5 Feet co Co J J W O Z (.7 o �YY� Bulk sample; cc 11 7.5-10.5 ft. Co 0 w (0 LU cc 0 a w cc QJ Z Q: 0 a O cc w 0 w a Stratification lines are approximate.In-situ,the transition may be gradual. Hammer Type: Automatic o: a —. a w Co Advancement Method: Notes: LL Hollow stem auger See Exploration and Testing Procedures for a o description of field and laboratory procedures used aZr and additional data(If any). 1- See Supporting Information for explanation of o Abandonment Method: symbols and abbreviations. u, Boring backfilled with soil cuttings and capped with asphalt upon completion 0 J WATER LEVEL OBSERVATIONS 0 Boring Started:03-14-2019 Boring Completed:03-14-2019 -- E None observed while drilling llerracon o Drill Rig:#546 Driller.WE m None observed after drilling co 3105 Capital Way,Ste 5 Cedar Falls,IA Project No.:13185119 BORING LOG NO. 4 _ Page 1 of 1 PROJECT: Dysart Road Reconstruction CLIENT: City of Waterloo IA Waterloo, IA — SITE: Dysart Road Waterloo, IA O LOCATION See Exploration Plan r w z a v F >. STRENGTH TEST o v Latitude:42.4294°Longitude:-92.298° _ -J¢ Lu W W" . yay c I- W w D_ I d WIX d > D ui y °0_ F WE2 Z QF- WU' 0 Qm O IWi� m= co o_ re 0 °L11 O 3 m < LLl 5 W z F h- o DEPTH ELEVATION(Ft.) ~ o 03 N t.ir 0.6 PORTLAND CEMENT CONCRETE,approx 7" :•:•:•1.o FILL-CRUSHED STONE,with fines _ • • ♦•♦•♦ FILL-SANDY LEAN CLAY,with gravel,dark brown •%%i — X12 8-10-13 17 �•�••• N=23 ♦�•-•�3.0 _ 1117.0 FILL-LEAN CLAY,with sand,trace organics,dark brown 3 5-6 26 a _ el' SANDY LEAN CLAYX1-2-2 U ICU,with sand seams,trace gravel, 12 N=4 25 obrown and gray,medium stiff 29 W ce 8.5 oSANDY LEAN CLAY(CL),with zones of sand,trace gravel,re gray and brown,very soft to soft — ix 12 0-0-0 27 } 1 0-- N=0 o ,_ / el m � — - J ✓/ — 8 0-0-1 25 Z12.5 N=1 O SANDY LEAN CLAY(CL),with sand layers,trace gravel, W00(HP) - o gray and brown,stiff — 5 f l` — O Lij- o �4`° 10 4-6-8 16 cc if 15— X N=14 o • ,';115.5 3000(HP) w Boring Terminated at 15.5 Feet J Q z 5 E Q m Q U- w — 0 W 1- Stratification lines are approximate.In-situ,the transition may be gradual. Hammer Type: Automatic Q a w Advancement Method: See Exploration and Testing Procedures for a Notes: Hollow stem auger o description of field and laboratory procedures used and additional data(If any). F- See Supporting Information for explanation of o Abandonment Method: symbols and abbreviations. Boring backfilled with soil cuttings,bentonite chips,and capped with asphalt upon completion o WATER LEVEL OBSERVATIONS 0 Boring Started:03-14-2019 Boring Completed:03-14-2019 g n 10'observed while sampling lierracon mo Drill Rig:#546 Driller WE w 3105 Capital Way,Ste 5 1- Cedar Falls,IA Project No.:13185119 MOISTURE-DENSITY RELATIONSHIP ASTM D698/D1557 — 135 130 ` Source of Material 3 @ 7.5 feet Description of Material SANDY LEAN CLAY,trace �- gravel,gray and brown 125 Remarks: Bulk sample; 7.5-10 feet 120 Test Method ASTM D698 Method A — N F 115 - 1\ 5 TEST RESULTS Z 110 Maximum Dry Density 117.1 PCF Optimum Water Content 12.9 % w v, Percent Fines % — F- z a W o 105 ATTERBERG LIMITS U p W — o LL PL PI 100 >- m m M 95 — > Z 0 U 90 0 w 6 z 85 0 it 0 0 1L — 0 6 \\:\ 80co 75 0 5 10 15 20 25 30 35 40 45 -' 0 UI WATER CONTENT,% icf, PROJECT: DysartRoad Reconstruction PROJECT NUMBER: 13185119 0 1 ierracon 6 g SITE: Dysart Road 3105 Capital Way,Ste 5 CLIENT: City of Waterloo IA O Waterloo,IA Cedar Falls,IA Waterloo, IA 4 MOISTURE-DENSITY RELATIONSHIP ASTM D698/D1557 135 — 130 Source of Material 4 A 4.5 feet Description of Material LEAN CLAY,with sand,trace organics, dark brown 125 Remarks: Bulk sample; 4.5-9 feet 120 Test Method ASTM D698 Method B a I 0 115— mu" 2 TEST RESULTS 110 Maximum Dry Density 115.4 PCF 0 0_ 0 Optimum Water Content 11.7 % wPercent Fines z a W 0 0 0 105 ATTERBERG LIMITS w 0 O LL PL PI 100 0 m_ N 0) M 95 — z 0 0 U 0 a 90 0 a w J — 85 0 0 0 cc UJ UJ 80 w O^r`` V 75 0 5 10 15 20 25 30 35 40 45 0 z WATER CONTENT,% PROJECT: Dysart Road Reconstruction PROJECT NUMBER: 13185119 cc li— >- erracon SITE: Dysart Road 3105 Capital Way, �Ste5 CLIENT: City of Waterloo IA mWaterloo, IA Waterloo,IA MOISTURE-DENSITY RELATIONSHIP _ ASTM D698/D1557 135 \\A 130 1 feet Source of Material 1 @ Description of Material SANDY LEAN CLAY,with crushed stone, gray, brown, 125 Remarks: and dark brown Bulk sample; 1-7.5 feet — 120 — Test Method ASTM D698 Method A 115 W - TEST RESULTS , — Maximum Dry Density 112.8 PCF z' t5 110 13.7 o Optimum Water Content \\\ — Percent Fines % — 1- z � z - W z o 105 ATTERBERG LIMITS o o p Li, o LL PL PI 0 rd 100 co — r rn U) m C N 95 > z 0 F O — a • 90 0 a w J z 85 0 a — o O R 0 W 80 ��s \?8 — o,, it . Lu coo ?R a 75— > 0 5 10 15 20 25 30 35 40 45 1-0w WATER CONTENT, a en 2 PROJECT: Dysart Road Reconstruction PROJECT NUMBER: 13185119 ct >- lierracon SITE: Dysart Road 3105 Capital Way,Ste 5 CLIENT: City of Waterloo IA _ 0 Waterloo,IA Cedar Falls,IA Waterloo,IA m 4 SUPPORTING INFORMATION Contents: General Notes Unified Soil Classification System Note: All attachments are one page unless noted above. GENERAL NOTES lierracon DESCRIPTION OF SYMBOLS AND ABBREVIATIONS Dysart Road Reconstruction ■ Waterloo,IA GeoReport April 15,2019■ Terracon Project No.13185119 SAMPLING WATER LEVEL FIELD TESTS N Standard Penetration Test Water Initially Resistance(Blows/Ft.) Encountered 17 Water Level After a (HP) Hand Penetrometer Grab Specified Period of Time Sample Split Spoon Water Level After (Tl Torvane a Specified Period of Time Water levels indicated on the soil boring logs are (DCP) Dynamic Cone Penetrometer the levels measured in the borehole at the times indicated. Groundwater level variations will occur uC Unconfined Compressive over time. In low permeability soils, accurate Strength determination of groundwater levels is not possible with short term water level observations. (PID) Photo-Ionization Detector (OVA) Organic Vapor Analyzer DESCRIPTIVE SA14..ASSIFICATION Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50%of their dry weight retained on a#200 sieve;their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50%of their dry weight retained on a#200 sieve;they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. LOCATION AND ELEVATION NOTES Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device.The accuracy of such devices is variable. Surface elevation data annotated with+/-indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead,the surface elevation was approximately determined from topographic maps of the area. STRENGTH TERMS RELATIVE DENSITY OF COARSE-GRAINED SOILS CONSISTENCY OF FINE-GRAINED SOILS (More than 50°�o retained on No.200 sieve.) (50%or more passing the No.200 sieve.) Density determined by Standard Penetration Resistance Consistency determined by laboratory shear strength testing,field visual-manual procedures or standard penetration resistance Descriptive Term Standard Penetration or Descriptive Term Unconfined Compressive Strength Standard Penetration or (Density) N-Value (Consistency) Qu,(psf) N-Value Blows/Ft. Blows/Ft. Very Loose 0-3 Very Soft less than 500 0-1 Loose 4-9 Soft 500 to 1,000 2-4 Medium Dense 10-29 Medium Stiff 1,000 to 2,000 4-8 Dense 30-50 Stiff 2,000 to 4,000 8-15 Very Dense >50 Very Stiff 4,000 to 8,000 15-30 Hard >8,000 >30 RELATIVE PROPORTIONS OF SAND AND GRAVEL RELATIVE PROPORTIONS OF FINES Descriptive Term(s)of Percent of Descriptive Term(s)of Percent of other constituents Dry Weight other constituents Dry Weight Trace <15 Trace <5 With 15-29 With 5-12 Modifier >30 Modifier >12 GRAIN SIZE TERMINOLOGY PLASTICITY DESCRIPTION Major Component of Sample Particle Size Term Plasticity Index Boulders Over 12 in.(300 mm) Non-plastic 0 Cobbles 12 in.to 3 in.(300mm to 75mm) Low 1-10 Gravel 3 in.to#4 sieve(75mm to 4.75 mm) Medium 11-30 Sand #4 to#200 sieve(4.75mm to 0.075mm High >30 Silt or Clay Passing#200 sieve(0.075mm) lierracon UNIFIED SOIL CLASSIFICATION SYSTEM GeoReport Clean Gravels: Cu>_4 and 1 <Cc<3 E GW Well-graded gravel F Gravels: o Less than 5%fines c Cu<4 and/or[Cc<1 or Cc>3.0]E GP Poorly graded gravel F — More than 50%of coarse fraction Fines classify as ML or MH GM Silt ravel F,G,H retained on No.4 sieve Gravels with Fines: Y 9 Coarse-Grained Soils: More than 12%fines c Fines classify as CL or CH GC Clayey gravel F,G,H More than 50%retained on No.200 sieve Clean Sands: Cu>_6 and 1 <Cc<3 E SW Well-graded sand t Sands: Less than 5%fines D Cu<6 and/or[Cc<1 or Cc>3.0]E SP Poorly graded sand t 50%or more of coarse fraction passes No.4 Sands with Fines: Fines classify as ML or MH SM Silty sand G,H,I sieve More than 12%fines D Fines classify as CL or CH SC Clayey sand G,H,t PI>7 and plots on or above"A" CL Lean clay K,L,M Inorganic: Silts and Clays: PI<4 or plots below"A"lined ML Salt,L,M Liquid limit less than 50 Liquid limit-oven dried Organic clay K,L,M,N Fine-Grained Soils: Organic: <0.75 OL 50%or more passes the Liquid limit-not dried Organic silt K,L+M,o -- No.200 sieve Inorganic: PI plots on or above"A"line CH Fat clay K,L,M Silts and Clays: PI plots below"A"line MH Elastic Silt K,L,M Liquid limit 50 or more Liquid limit-oven dried Organic clay K,L,M,P Organic: <0.75 OH Liquid limit-not dried Organic silt K,L,M,Q Highly organic soils: Primarily organic matter,dark in color,and organic odor PT Peat A Based on the material passing the 3-inch(75-mm)sieve. H If fines are organic,add"with organic fines"to group name. B If field sample contained cobbles or boulders, or both,add"with cobbles t If soil contains>_15%gravel,add"with gravel"to group name. or boulders,or both"to group name. 'If Atterberg limits plot in shaded area,soil is a CL-ML,silty clay. c Gravels with 5 to 12%fines require dual symbols: GW-GM well-graded K if soil contains 15 to 29%plus No.200,add"with sand"or"with gravel with silt,GW-GC well-graded gravel with clay,GP-GM poorly gravel,"whichever is predominant. graded gravel with silt,GP-GC poorly graded gravel with clay. — D o L If soil contains>_30%plus No.200 predominantly sand, add Sands with 5 to 12/o fines require dual symbols: SW-SM well-graded "sandy"to group name. sand with silt,SW-SC well-graded sand with clay,SP-SM poorly graded sand with silt,SP-SC poorly graded sand with clay. MY soil contains_>30%plus No.200, predominantly gravel,add "gravelly"to group name. 2— (D 30) N PI>_4 and plots on or above"A"line. E Cu=Dea/D10 Cc= o PI<4 or plots below"A"line. D10 x D60 P PI plots on or above"A"line. — F If soil contains_>15%sand,add"with sand"to group name. QPI plots below"A"line. G If fines classify as CL-ML,use dual symbol GC-GM,or SC-SM. 60 I I For classification of fine-grained soils and fine-grained fraction 50 —of coarse-grained soils `. , e Equation of"A"-line ! A,, 4- 6: Horizontal at P1=4 to LL=25.5. W 40 — then PI ).73(LL-20) ' O+ — a Equation of"U"-line �°t Z Vertical at LL=16 to PI=7, ,,/ O 30 -- then PI=0.9(LL-8) �' _ U O� c~n � a MH or OH 10 4 -- ML or OL 0 -- I — 0 10 16 20 30 40 50 60 70 80 90 100 110 LIQUID LIMIT(LL) i i imm i Mime lame e‘eg I �F. l I I a • . . 1 �' I:. {ttr. I r" Pr I ? P. I I- - - -- erg;-; - - . l',? I. li g, - - - - - .. i-- Irr GENERAL SPECIFICATIONS FOR CONSTRUCTION CITY OF WATERLOO, IOWA Department of Engineering SECTION A - Definitions of Terms SECTION B - Scope of work SECTION C - Control of Materials and Work SECTION D - Procedure and Progress SECTION E - Measurements and Payments SECTION F - Legal Relations and Responsibility SECTION A - DEFINITIONS OF TERMS 1. CITY. The City of Waterloo, Iowa, which is the Party of the First Part of the accompanying contract, acting through its authorized representative. 2. COUNCIL. The duly elected Council of the City of Waterloo, Iowa. 3. ENGINEER. The City Engineer of Waterloo, Iowa, or his authorized representative. 4. INSPECTOR. The authorized representative of the Engineer, assigned to the detailed inspection of the work or materials therefor and to such other duties as may be delegated to him in these specifications. 5. CONTRACTOR. The Party of the Second Part in the accompanying contract for the improvement covered by these specifications, or his authorized representative. 6. SUBCONTRACTOR. Any person, firm, or corporation who has, with the approval of the Council, contracted with the Contractor to execute and perform in his stead all or any part of the contract. 7. BIDDER. Any individual, firm, or corporation submitting a proposal for all or a part of the work provided for in these specifications. 8. PROPOSAL GUARANTEE. The security designed in the Notice of Bidders or Proposal to be furnished by the bidder as a guarantee of good faith to enter into a contract and furnish an acceptable bond for the work contemplated if it be awarded him. 9. SURETY. The corporate body bound with and for the Contractor for the acceptable performance of the contract. GENERAL SPECS Page 1 of 18 10. PROPOSAL. The written Proposal, submitted by the bidder in the prescribed manner and on the standard form, for the improvements covered by these specifications. 11. SPECIFICATIONS. The documents that set forth the manner in which the proposed work is to be accomplished which have been prepared by the Engineer and approved by the City Council, official copies of which are now on file with the City Clerk. 12. SPECIAL PROVISIONS. Clauses or memoranda not contained herein, applying to the contract of which these specifications are a part, which change or supplement these specifications. 13. CONTRACT. The agreement entered into between the City and the Contractor, setting forth the terms under which the work covered by the plans and specifications is to be performed. The contract includes all conditions, definitions, and instructions set forth in the official publications relating to the work, the official contract and specifications, the Proposal, official plans, and all supplemental agreements entered into by the parties to the contract. 14. NOTICE TO BIDDERS. The notice called attention of bidders to the time and place for receiving bids, containing a brief description of the work, and briefly setting forth the requirements and conditions for submission of Proposals. 15. INSTRUCTIONS TO BIDDERS. The clauses setting forth in detail the information relative to the proposed work and requirements for the submission of Proposals. 16. PLANS. The plans for the improvement covered by the specifications and approved by the Council, official copies of which are on file with the City Clerk. 17. CONTRACT BOND. The bond executed by the Contractor and his surety in favor of the City of Waterloo, Iowa, guaranteeing the complete execution of the contract in accordance with the plans and specifications, the payment of all debts pertaining to the work, and maintenance of the work as provided by law or by the specifications. 18. CONTRACT PERIOD. The period from the specified date for beginning the work to the specified date of completion, both dates inclusive. The contract period may be extended by the Council, as provided in these specifications, in which event the contract period includes the new date of completion. 19. OFFICIAL PUBLICATIONS. The official publications are the formal resolutions and notices relative to the proposed improvement that are required by law to be published in a prescribed manner and that have actually GENERAL SPECS Page 2 of 18 been published in accordance with the statutes relating thereto. Attention is directed to the fact that these official publications are by statute vested with all of the force and effect of contract obligations. 20. A.S.T.M. Abbreviation for American Society for Testing Materials. 21. WORK. The term "Work" of the Contractor and Subcontractor includes labor or materials or both, equipment, transportation, or other facilities necessary to complete the contract. 22. TIME. All time limits stated in the contract documents are of the essence in the contract. SECTION B - SCOPE OF WORK 1. CORRELATION AND INTENT OF DOCUMENTS. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the documents is to include all labor, materials, equipment, and transportation necessary for the proper execution of the work. Materials or work described in words which, so applied, have a well-known technical or trade meaning shall be held to refer to such recognized standard. 2. DRAWINGS AND SPECIFICATIONS. Unless otherwise provided in the contract documents, the engineer shall furnish to the Contractor, free of charge, all copies of drawings and specifications reasonably necessary for the execution of the work. The Contractor shall keep one (1) copy of all drawings and specifications on the work available to the Engineer and to his representatives. 3. CONTRACTOR'S UNDERSTANDING. It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the nature, character and location of the work, the conformance to the ground, the character, quality, and quantity of the materials to be encountered, the character of the equipment and facilities needed preliminary to and during the prosecution of the work, the general and local conditions, and all other matters which can, in any way, affect the work under this contract. No verbal agreement or conversation with any officer, agent, or employee of the City, either before or after the execution of the Contract, shall affect or modify any of the terms or obligations herein contained. 4. REPORTING ERRORS AND DISCREPANCIES. If the Contractor, in the course of the work, finds any discrepancies between the plans and the physical conditions of the locality, or any errors of omission in plans or in the layout as given by said stakes and instructions, it shall be his duty to inform the GENERAL SPECS 'age 3 of 18 Engineer immediately, in writing, and the Engineer shall promptly correct the same. 5. ALTERATION OR CORRECTION OF PLANS. The plans are made up from surveys that are presumably correct and represent the foreseen construction requirements. Any modification of the plans which may be required by the exigencies of the construction or any corrections made necessary because of errors in the original surveys, will be made by the Engineer. Should corrections or modifications of the plans or specifications require a different quality or class of work than that upon which the unit prices in the Proposal are based, or if the modifications or corrections are required in parts of the work partially completed and such modifications result in an increased cost to the Contractor, the amount to be paid for work resulting from such changes shall be agreed upon in writing at the time the changes are ordered and before the work is begun by the Contractor. No allowance will be made for anticipated profits on work not performed. 6. CHANGES IN THE WORK. The City, without invalidating the contract, may order extra work or make changes by altering, adding to, or deducting from the work, the contract sum being adjusted by agreement or arbitration before such changed work is undertaken. All such work shall be executed under the conditions of the original contract, except that any claim for extension of time caused thereby shall be adjusted at the time of ordering such change. 7. INCREASED OR DECREASED QUANTITIES. The right is reserved without impairing the contract, to order the performance of such work of a class not contemplated in the Proposal or to increase or decrease the quantities as may be considered necessary to complete fully and satisfactorily the work included in the contract. However, when the work is completed without change in the plans, and the measured quantity of any item of work varies by more than twenty percent (20%) from the estimated quantity specified in the contract, an adjustment in price may be made for such item of work by agreement between the Engineer and the Contractor, subject to the approval of the City Council. Either party to the contract may request such an adjustment. 8. LANDS AND RIGHT OF WAY. The City shall provide the lands upon which the work under this contract is to be done, except that the Contractor shall provide land required for the erection of temporary construction facilities and storage of his material, together with the right of access to same. 9. CITY WATER. The Contractor shall be allowed to use City Water but before any water is used, he shall make application to the Waterloo Water Works for a temporary water connection from a fire hydrant or by some other connection method. Water usage will be charged at the rate for temporary water service. The rules, regulations, and water rates are available at the Waterloo Water Works offices at 325 Sycamore Street or their telephone number is 319- 232-6280. GENERAL SPECS Page 4 of 18 10. RIGHTS OF VARIOUS INTERESTS. Whenever work being done by the City's forces or by other Contractors is contiguous to work covered by this contract, the respective rights of the various interests involved shall be established by the Engineer to secure the completion of the various portions of the work in general harmony. 11. CLOSING STREETS TO TRAFFIC. The Engineer shall be the judge of how many streets or parts of streets it is necessary for the Contractor to close at any time and may refuse to permit the closing of additional streets until such of the work is finished and opened to traffic as he may direct. 12. OBSTRUCTION OF STREETS. The work is to be carried on in such manner as to obstruct the streets, highways, and alleys as little as possible. The Contractor shall carry on the different parts of the work so as to complete the whole, as nearly as practicable, at the same time. In doing the work, the Contractor shall follow the directions of the Engineer as to the place or places where work shall be started or be carried on and the direction in which it shall be done. 13. SHANTIES AND BUILDINGS. Shanties or other buildings shall not be erected in or upon any street, highway, or alley without permission of the Engineer. If such permission be granted, it may be upon any reasonable terms prescribed by the person or body granting such permission. 14. SANITARY CONVENIENCES. The Contractor shall furnish the necessary sanitary conveniences, properly secluded, for the laborers on the work, and these shall be maintained in a manner that will be inoffensive to the public. 15. CLEANING UP. The Contractor shall, as directed by the Engineer, remove from the City's property and from all public and private property, at his own expense, all temporary structures, rubbish, and waste materials resulting from his operations before work can be considered completed. The Contractor shall also renew or replace any and all fences, sidewalks, or other property damaged or disturbed by his work. 16. OMISSION OF PARTS OF GENERAL SPECIFICATIONS. Parts of the General Specifications deemed not to apply to some particular work may be omitted by special reference in other parts of the contract documents. SECTION C - CONTROL OF MATERIALS AND WORK 1. SUPERVISION AND INSPECTION. The Engineer shall have supervision of the construction provided for in this Contract and shall decide any and all questions which may arise as to the quality and acceptability of materials furnished, work performed, manner of performance, rate of progress on the work, and all questions regarding the acceptable fulfillment of the terms of the Contract. GENERAL SPECS Page 5 of 18 Materials and construction work shall, at all times, be subject to the inspection of the Engineer or his representatives. The Contractor shall be held strictly to the true intent of these specifications as regards the quality of materials, workmanship, and the diligent prosecution of the work. The Engineer and his representatives shall, at all times, have access to the work wherever it is in preparation of progress, and the Contractor shall provide proper facilities for such access and for inspection. If the specifications, the Engineer's instructions, law ordinances, or any public authority require any work and/or materials to be especially tested or approved, the Contractor shall give the Engineer timely notice of readiness for inspection. If the inspection is to be made by authority other than the Engineer, the Contractor shall notify the engineer of the date fixed for inspection. Inspections by the Engineer will be promptly made and, where practicable, at the source of supply. If any work should be covered up without the approval or consent of the Engineer, it must, if required by the Engineer, be uncovered for examination at the Contractor's expense. Re-examination of questioned work may be ordered by the Engineer, and, if so ordered, the work must be uncovered by the Contractor. If such work be found in accordance with the Contract, the City shall pay the cost of re- examination and replacement. If such work be found not in accordance with the Contract, the Contractor shall pay such cost unless he shall show that the defect in the work was caused by another Contractor, and, in that event, the City shall pay the cost. 2. AUTHORITIES AND DUTIES OF INSPECTORS. Inspectors may be stationed on the work to report to the Engineer as to the progress of the work and the manner in which it is being performed; also, to report whenever it appears that materials furnished and work performed by the Contractor fail to fulfill the requirements of the specifications and Contract, and to direct the attention of the Contractor to such failure or infringement; but such inspection shall not relieve the Contractor from any obligations to furnish acceptable materials or to provide completed construction that is satisfactory in every particular. In case of any dispute arising between the Inspector and the Contractor as to materials furnished or the manner of performing the work, the Inspector shall have the authority to reject materials or suspend the work until the question at issue can be referred to and decided by the Engineer. Inspectors are not authorized to revoke, alter, enlarge, relax, or release any requirements of these specifications. The Inspector shall, in no case, act as foreman or perform other duties for the Contractor, or interfere with the management of the work by the latter. GENERAL SPECS Page 6 of 18 3. STATUS OF THE ENGINEER. The Engineer shall have general supervision and direction of the work. He has authority to stop the work whenever such stoppage may be necessary to insure the proper execution of the Contract. He shall also have authority to reject any work and/or materials which do not conform to the specifications, to direct the application of forces to any portion of the work as, in his judgment, is required, and to order the force increased or diminished, and to decide questions which arise in the execution of the work. 4. ENGINEER'S DECISIONS. The Engineer shall within a reasonable time, make decisions on all claims of the Contractor and on all other matters relating to the execution and progress of the work or the interpretation of the contract documents. All such decisions of the Engineer shall be final except as to the element of time and financial consideration involved, which, if no agreement in regard thereto is reached, shall be subject to arbitration. 5. STAKES AND INSTRUCTIONS. The Contractor shall provide reasonable and necessary opportunities and facilities for setting stakes and making measurements. The Contractor shall not furnish stakes or men to set them. He shall not proceed until he has received from the Engineer such stakes and instructions as may be necessary to the progress of the work. The Contractor shall carefully preserve bench marks, reference points, and stakes, and in case of willful or careless destruction, he shall be charged with the resulting extra expense and shall be responsible for any mistakes that may be caused, by their loss or disturbance. 6. SUPERINTENDENCE. The Contractor shall keep on his work during its progress a competent superintendent and any necessary assistants, all satisfactory to the Engineer. The Superintendent shall not be changed except with the consent of the Engineer, unless the Superintendent proves to be unsatisfactory to the Contractor and ceases to be in his employ. The Superintendent shall represent the Contractor in his absence, and all directions given to him shall be as binding as if given to the Contractor. Important decisions shall be confirmed in writing to the Contractor. Other directions shall be so confirmed on written request in each case. The Contractor shall give efficient supervision to the work using his best skill and attention. He shall carefully study and compare all drawings, specifications, and other instructions, and shall report at once to the Engineer any error, inconsistency, or omission which he may discover. 7. REMOVAL OF UNAUTHORIZED WORK. Work done without lines and grade being give, work done beyond lines shown on the plans or as given, except as herein provided, or any extra or additional work done without authority, will be considered as unauthorized and at the expense of the Contractor and will GENERAL SPECS Page 7 of 18 not be paid for under the provisions of the Contract. Work so done may be ordered removed and replaced at the Contractor's expense. 8. REMOVAL OF DEFECTIVE MATERIALS OR WORK. The Contractor shall promptly remove from the premises all materials condemned by the engineer as failing to conform to the Contract; whether incorporated in the work or not, and the Contractor shall promptly replace and re-execute his own work in accordance with the contract and without expense to the City, and shall bear the expense of making good all work of other Contractors destroyed or damaged by such removal or replacement. If the Contractor does not remove such condemned work and materials within a reasonable time, fixed by written notice, the City may remove them and may store the material at the expense of the Contractor. If the Contractor does not pay the expense of such removal within a reasonable time thereafter, the City may, upon ten (10) days' written notice, sell such materials at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs and expense that should have been borne by the Contractor; or, if the net proceeds of such sale are insufficient to pay the expenses of removal, the City may deduct the balance from any amounts due the Contractor. 9. MATERIALS, EQUIPMENT, APPLIANCES, AND FACILITIES. Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation, and other facilities necessary for the execution and completion of the work. Materials shall be of the quality specified for each particular part of the work. Whenever, in construction of the work or in the manufacture of any article of appliance necessary for the construction or operation of the work, it is necessary to use any material that is not fully specified in these specifications, it shall be of good quality and shall meet with the approval of the Engineer. Any appliance that is necessary for the construction or operation of the work and is commonly recognized as a part of the work, shall be furnished by the Contractor as part of the work, whether or not it is specifically called for in the plans and specifications, and such appliance shall be of good quality and standard make and shall meet with the approval of the Engineer. 10. MATERIAL SAMPLES. Before the contract is awarded, the bidder may be required to furnish a statement of the origin, composition, and manufacture of any and all materials proposed for use in the performance of the Contract, together with samples of the material. These samples will be considered as representative and typical of the material to be obtained from any particular source. 11. CHARACTER OF WORKMEN AND EQUIPMENT. The Contractor shall employ competent and efficient workmen for every kind of work. Any person employed on the work who shall refuse or neglect to obey the directions GENERAL SPECS Page 8 of 18 of the engineer or Inspector, or who shall be deemed incompetent or disorderly, or who shall commit trespass upon public or private property in the vicinity of the work, shall be dismissed when the Engineer so orders, and shall not be re- employed unless express permission be given by the Engineer. The Contractor shall, at all times, enforce discipline and good order among his employees. The methods, equipment, and appliances used on the work, and the labor employed, shall be such as will produce a satisfactory quality of work and shall be adequate to complete the contract within the specified time limit. 12. HIRING CITY EMPLOYEES. The Contractor shall not employ and hire any of the City's employees without the permission of the Engineer. 13. LABOR. Local labor shall be given preferences so far as practicable. 14. THE CITY'S RIGHT TO DO WORK. If the Contractor should neglect to prosecute the work properly or fail to perform any provision of this Contract, the City of Waterloo, after three (3) days' written notice to the Contractor may, without prejudice to any other remedy he may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor, provided, however, that the Engineer shall approve both such action and the amount charged to the Contractor. SECTION D - PROCEDURE AND PROGRESS 1. ORDER OF COMPLETION - USE OF COMPLETED PORTIONS. The Contractor shall complete any portion or portions of the work in such order or time as the Engineer may require. The City shall have the right to take possession of an use completed or partially completed portion of the work at any time, but such taking possession and use shall not be deemed an acceptance of work so taken or used, or any part thereof. If such prior use increases the cost of or delays the work, the Contractor shall be entitled to such extra compensation or extension of time, or both, as the Engineer may determine. 2. WEATHER. During stormy or inclement weather, all work shall be suspended, except such as can be done in an acceptable manner. Permission to work during freezing, stormy, or inclement weather shall in no way be construed as a release of the Contractor's responsibility regarding the quality of the finished work at such time. 3. SUNDAYS AND LEGAL HOLIDAYS. Except for such work as may be required to properly maintain or protect completed or partially completed construction or to maintain lights and barricades, no work will be permitted on Sundays or legal holidays without specific permission of the Engineer. GENERAL SPECS Page 9 of 18 4. DELAYS AND EXTENSION OF TIME. If the Contractor be delayed in the completion of the work by an act of neglect of the City, or its employees; or by any other Contractor employed by the City; or by changes ordered in the work; or by strikes, lockouts, fire, unusual delays in transportation, unavoidable casualties, or any cause beyond the Contractor's control; or by delay authorized by the Engineer pending arbitration; or by any cause which the Engineer shall decide justifies the delay, then the time of completion shall be extended for such reasonable time as the Engineer may decide will compensate for such delay. No such extension shall be made for delay occurring more than thirty (30) days before claim therefor is made in writing to the Engineer. In the case of a continuing cause of delay, only one claim is necessary. This article does not exclude the recovery of damages for delay by either party under provisions in the contract documents. 5. TEMPORARY SUSPENSION OF WORK. The Engineer shall have authority to suspend the work, wholly or in part, for such period or periods of time as he may deem necessary, due to unsuitable weather or such other conditions as are considered unfavorable for the suitable prosecution of the work, or for such time as is necessary due to the failure to the Contractor to carry out orders given or to perform any or all provisions of the Contract. 6. NOTICES - HOW SERVED. Any notice to be given by the City to the Contractor under this contract shall be deemed to be served if the same be delivered to the man in charge of any office used by the Contractor or his foreman or agent at or near the work, or deposited in the post office, postpaid, addressed to the Contractor at his last known place of business. 7. PROGRESS OF WORK. The progress of the work shall be such that, at the expiration of one-fourth (1/4) of the contract period, one-eighth (1/8) of the work shall be completed; at the expiration of one-half (1/2) of the contract period, three-eighths (3/8) of the work shall be completed; at the expiration of three-fourths (3/4) of the contract period, the work shall be three-fourths (3/4) completed, and the whole work shall be completed at the expiration of the contract period. If, at any time the above schedule is not being maintained, the Council may give written notice to the Contractor and his sureties that the specifications are not being complied with. Such notice shall state what action on the part of the Contractor is required to bring the work within the requirements of the specifications. If the Contractor fails, within ten (10) days, to proceed as directed in the said notice, then the Council shall have authority to annul this contract without process or action at law and take over the prosecution and completion of the work, as provided under the article covering City's right to terminate contract. GENERAL SPECS Page 10 of 18 8. CITY'S RIGHT TO TERMINATE CONTRACT. If the Contractor should be adjudged a bankrupt; or if he should make a general assignment for the benefit of this creditor; or if a Receiver should be appointed on account of his insolvency; or if he should persistently or repeatedly refuse or shoulc fail, except in cases for which extension of time is provided, to supply enough skilled workmen or proper materials; or if he should fail to make prompt payment to Subcontractors or for materials or labor; or if he should persistently disregard laws, ordinances, or the instructions of the Engineer; or if he should otherwise be guilty of a substantial violation of any provision of the contract, then the City, upon the certificate of the Engineer that sufficient cause exists to justify such action, may, without prejudice to any other rights or remedy, and after giving the Contractor seven (7) days' written notice, terminate the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method he may deem expedient. In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the contract price shall exceed the expenses of finishing the work, including compensation for additional managerial and administration services, such excess shall be paid to the Contractor. If such expense shall exceed such unpaid balance, the Contractor shall pay the difference to the City. The expense incurred by the City as herein provided and the damage incurred through the Contractor's default shall be certified by the Engineer. 9. REMOVAL OF EQUIPMENT. In the case of annulment of this contract before completion, from any cause whatsoever, the Contractor, if notified to do so by the City; shall promptly remove any part or all of his equipment and supplies from the property of the City, failing which, the City shall have the right to remove such equipment and supplies at the expense of the Contractor. SECTION E - MEASUREMENTS AND PAYMENT 1. STANDARD OF MEASUREMENT. All work completed under the contract shall be measured by the Engineer according to the Un ted States standard measures. 2. SCOPE OF PAYMENTS. The Engineer's measurements of quantities shall be the basis for final payment for the work performed under this Contract. After the work is completed, the Engineer will make measurements and computations of the number of units of each of the various items of work completed, and the Contractor will be paid for the actual amount of work performed at the rates specified in his Proposal. Before final settlement is made, the Council may require the Contractor to submit a list of all persons furnishing labor or materials, with evidence that such persons have been paid in full. GENERAL SPECS Page 11 of 18 Payment shall be made in the manner set forth in official publications and Council Proceedings relative thereto. 3. PAYMENT FOR EXTRA WORK. Such extra work as may have been ordered by the Engineer and performed by the Contractor shall be compensated for as provided herein. If work is to be done or materials are to be furnished by the Contractor which cannot properly be classified under unit prices included in the Proposal, the Contractor shall be paid therefor the actual reasonable cost of the labor and materials entering permanently in such work, plus fifteen percent (15%) of the cost thereof. In computing the labor cost on such extra work, the following items shall be included: (a) Actual payroll expenditures for labor at the current rate therefor, and cost of materials. (b) Pay of foreman and timekeepers for actual time required on the extra work. (c) Liability insurance, prorated, for the extra work. Labor cost items on extra work shall be furnished in duplicate by the Contractor to the Inspector daily. The Inspector shall check the items, and if he finds them to be correct, he shall so certify on the statement of cost, returning one copy to the Contractor and filing one copy with the Engineer. The Engineer shall determine the cost of materials entering into extra work from the materials and receipted freight bills for the same. For any special machine, power tools, or equipment, including fuel and lubricants, but not including small hand tools, which may be deemed necessary or desirable to use, the Contractor shall be allowed a reasonable rental thereon, to be agreed upon in writing by the Engineer before such work is begun, and to which sum no percentage is to be added. The item of cost shall not include repairs or replacement of equipment or overhead expenses of any character. The fifteen percent (15%) allowed is considered to cover the use of hand tools and all overhead expenses except liability insurance. In no case will a claim for extra compensation be allowed unless the work upon which the claim is based has been ordered in writing, except as provided hereinafter. 4. CLAIMS FOR EXTRA COST. If the Contractor claims that any instructions, by drawings or otherwise, involved extra cost under this contract, he shall give the Engineer written notice thereof within ten (10) days after completion of the work. GENERAL SPECS Page 12 of 18 No such claim shall be valid unless so made. 5. CLAIMS FOR EXTRA COMPENSATION. If the Contractor deems that extra compensation is due him for work and/or materials that he considered is not clearly covered in the items for which he submitted unit prices in his bid and that were not ordered in writing by the Engineer as an extra s heretofore provided, the Contractor shall notify the Engineer, in writing, of his intention to make claim for extra compensation for work and/or material before starting construction. If such written notification is not given or the Engineer is not afforded proper facilities by the Contractor for keeping strict account of actual cost as defined herein, then the Contractor hereby agrees to waive the claim for extra compensation. Such notice to the engineer and the fact that the Engineer has kept account of cost as aforesaid, shall not in any way be construed as proving the validity of the claim, which must be passed upon by the Council. In the event that the Council finds the claim to be just, it shall be allowed and paid for as extra work as provided herein. 6. COMPLETION REPORT AND OBJECTIONS THERETO. Within ten (10) days after the full completion of the work to be done under this contract, the Engineer shall make a written statement of all the work done by the Contractor hereunder, stating the quantity of each item as found by him and including a statement of all credits for extra work and all credits or debits for changes, alterations, omissions, and defects, and shall forthwith deliver a copy of such statement to the Contractor. The Contractor shall compare such statement with his own records and shall then, in writing, either approve such statement or point out any claimed errors or omissions. If any of such claims are found correct, the Engineer shall, within ten (10) days, prepare a new statement, a copy of which shall in like manner be delivered unto the Contractor. The Engineer will not file a formal completion report with the City until the Contractor has approved the same. If the figures of the Engineer and the Contractor cannot be reconciled, or there is a difference of opinion regarding some item or items, then such difference of opinion shall be submitted to arbitration as hereinafter provided, and the decision of the arbitrator or arbitrators shall be final, and the Engineer shall, within a period of five (5) days, file his completion report. Before action by the City Council upon such completion report, the Contractor shall also file a written statement of any claims he may have against the City, other than those shown by such completion report, growing out of this contract or the work done hereunder. The City shall retain ten percent (10%) of the amount due the Contractor on the completion report for a period of thirty (30) days. If no claims are filed against the Contractor within thirty (30) days, the final ten percent (10%) shall then be paid to the Contractor. 7. WAIVER. By the execution of this contract ,the Contractor agrees that any objections he may have to the statement of the amount of work done hereunder included by the Engineer in this completion report, and any claims of GENERAL SPECS Page 13 of 18 the Contractor against the City growing out of this contract and the work done hereunder which are not stated in writing in the manner and within the time provided in Article 6, Section E hereof, shall be waived, and no such claim shall thereafter be asserted against the City. SECTION F - LEGAL RELATIONS AND RESPONSIBILITIES 1. LAWS RELATING TO WORK. The Contractor is presumed to be familiar with all laws, ordinances, and regulations which may, in any manner, affect those engaged or employed upon the work or the materials or equipment used in or upon the work, and shall conduct the work so as not to conflict with such laws, ordinances, and regulations. 2. PROTECTION OF WORK AND PROPERTY. The Contractor for any part of the improvement shall be held responsible for the care of materials and of partially completed and completed work until final acceptance of the same by the Council. He will be required to make good at his own expense any damage which the work may sustain from any cause prior to the filing of the engineer's certificate of completion. He shall take all risk from floods and casualties of every description and make no charge for delay due to such cause. He may, however, be allowed a reasonable extension of time on account of such delays. He shall correct or make good at his own expense all damages to adjacent property due to the acts or negligence of his employees of the prosecution of his work, and save the City harmless therefor. The Contractor shall be held liable and responsible for all damages done to water, sewer, drain, or other underground pipes and structures, and to sidewalks and private property. 3. RESPONSIBILITY FOR ACCIDENTS. The Contractor shall assume full responsibility for all damages sustained by persons or property due to the carrying on of his work until final acceptance thereof, or until released by the Engineer in writing. 4. LIABILITY INSURANCE. The Contractor shall carry liability insurance which shall save the City harmless and protect the public and any person from injury sustained by the reason of the prosecution of the work or the handling or storing of materials therefor, and said Contractor shall also carry liability insurance which shall meet the requirements of the Iowa Worker's Compensation Law. Before work shall be started on this contract, the Contractor shall furnish the City Clerk with proper affidavit or Affidavits executed by representatives of duly qualified insurance companies, evidencing that said insurance company or companies have issued liability insurance policies, effective during the life of the contract, or for a period of a least ten (10) days following the filing of written notice of cancellation, protecting the public and any person from injuries or GENERAL SPECS Page 14 of 18 damages sustained by reason of carrying on the work involved in the Contract. The affidavit shall specifically evidence the following forms of insurance protection: (a) Public liability insurance covering all operations performed by persons directly employed by the Contractor. (b) Public liability insurance covering all operations performed by any Subcontractor to whom a portion of the work may have been assigned. (c) Public liability insurance covering all work upon The project performed by any independent Contractor working under the direction of either the principal Contractor or a Subcontractor. (d) Motor vehicle bodily injury liability insurance and property damage liability insurance on all motor vehicles employed or the work, whether owned by the Contractor or by other persons, firms, or corporations. (e) The minimum protection shall be as follows: Comprehensive General Liability Insurance General Aggregate Limit $ 5,000,000.00 Products—Completed Operations Aggregate Limit $ 5,000,000.00 Each Occurrence Limit $ 5 ,000,000.00 Comprehensive Automobile Liability Insurance $ 1,000,000.00 The Contractor shall have the City of Waterloo, Iowa, named as an "Additional Named Insured". A certificate, or a policy if requested, shall be filed with the Owner. All certificates and/or policies of insurance furnished by the Contractor to be filed with the City Clerk shall include the name and address of the agency issuing the same. It shall also be required that the City Clerk be notified by registered mail of the cancellation or expiration of the above insurance. 5. BARRICADES AND SIGNS. The Contractor shall, at his own expense and without further or other order, provide, erect, and maintain, at all times during the progress and suspension of the work and until completion and final acceptance thereof, suitable and requisite barricades, signs, or other adequate protection, as required by the latest edition of the "Iowa Manual on GENERAL SPECS Page 15 of 18 Uniform Traffic Control Devices for Streets and Highways" and shall provide, keep, and maintain such barricades, signs, etc., as may be required or as may be ordered by the City Engineer, to insure the safety of the public as well as those engaged on the work. All barricading plans shall be approved by the City Engineer. 6. ROYALTIES AND PATENTS. The Contractor shall pay all royalties and license fees. He shall defend all suits or claims for infringement of any patent rights and shall save the City harmless from loss on account thereof, except that the City shall be responsible for all such loss when a particular process or the product of a particular manufacturer is specified. 7. PERMITS AND REGULATIONS. Permits and licenses of a temporary nature for the prosecution of the work shall be secured and paid for by the Contractor. Permits, license, and easements for permanent changes in existing facilities shall be secured and paid for by the City. 8. CLAIMS FOR DAMAGES. Any claim for damages arising under this Contract shall be made in writing to the party liable within a reasonable time of the first observance of such damage and no later than the time of final payment, except as expressly stipulated otherwise in the case of faulty work or materials, and shall be adjusted by agreement or arbitration. The Contractor shall be held for the payment of all just claims against him arising out of the prosecution of this contract, and his bond will not be released until such claims are paid for dismissed. 9. ASSIGNMENT OF CONTRACT. The Contractor shall not sell or assign the contract or sublet any portion of the work provided for therein without the written consent of the City Council. 10. SUBCONTRACTORS. The Contractor shall, as soon as practicable after the signature of the contract, notify the Engineer in writing of the names of the Subcontractors proposed for the work and shall not employ any that the Engineer may, within a reasonable time, object to as incompetent or unfit. The Contractor agrees that he is as fully responsible to the City for the acts and omission of his Subcontractors and of persons either directly or indirectly employed by them as he is for the acts and omissions of persons directly employed by him. Nothing contained in the contract documents shall create any contractual relation between any Subcontractor and the City. 11. ARBITRATION. All questions subject to arbitration under this Contract shall be submitted to arbitration at the choice of either party to the dispute. GENERAL SPECS Page 16 of 18 The Contractor shall not cause a delay of the work during any arbitration proceedings, except by agreement with the Engineer. The demand for arbitration shall be filed in writing with the Engineer, in the case of an appeal from his decision, within ten (10) days of its receipt, and in any other case, within a reasonable time after cause thereof, and in no case later than the time of final payment, except as otherwise expressly stipulated in the contract. If the Engineer fails to make a decision within a reasonable time, an appeal to arbitration may be taken as if his decision had been rendered against the part appealing. No one shall be nominated or act as an arbitrator who is in any way financially interested in the contract or in the business affairs of either the City or the Contractor. The general procedure shall conform to the laws of the State of Iowa. Unless otherwise provided by such laws, the parties may agree upon one arbitrator; otherwise, there shall be three--one named in writing by each party to this contract to the other party, and the third chosen by these two arbitrators, or, if they fail to select a third within ten (10) days, then he shall be chosen by the Comptroller of the State of Iowa. Should either party refuse or neglect to supply the arbitrators with any papers or information demanded in writing, the arbitrators are empowered by both parties to proceed ex parte. If there be one arbitrator, his decision shall be binding; if three, the decision of any two shall be binding. Such decision shall be a condition precedent to any right of legal action, and, wherever permitted by law, it may be filed in Court to carry it into effect. The arbitrators, if they deem that the case demands it, are authorized to award to the party whose contention is sustained such sums as they shall deem proper for the time, expense, and trouble incident to the appeal, and, if the appeal was taken without reasonable cause, damages for delay, the arbitrators shall fix their own compensation unless otherwise provided by agreement, and shall assess the costs and charges of the arbitration upon either or both parties. The award of the arbitrators must be in writing, and it shall not be open to objections on account of the form of proceeding or the award, unless otherwise provided by the laws of Iowa. In the event of such laws providing on any matter covered by this article otherwise than as hereinbefore specified, the method of procedure throughout and the legal effect of the award shall be wholly in accordance with the laws of the State of Iowa, it being intended hereby to lay down a principle of action to be followed, leaving its local application to be adopted to the legal requirements of the place in which the work is to be done. GENERAL SPECS Page 17 of 18 12. PERFORMANCE AND PAYMENT BONDS. The Contractor shall, at the time of execution and delivery of this contract and before the taking effect of same, furnish and deliver to the City written bonds of indemnity to the amount required by law in form and substance, and with surety thereon satisfactory and acceptable to the City, to insure the faithful performance and payment by the Contractor of all the covenants and agreements on the part of the Contractor contained in this contract. These bonds shall remain in force and effect for the full amount of the Contract. 13. PERSONAL LIABILITY OF PUBLIC OFFICIALS. In carrying out any of the provisions of the Contract or in exercising any power or authority granted him thereby, there shall be no liability upon the Engineer or his authorized assistants, either personally or as an official of the City, it being understood that in such matters he acts as the agent and representative of the City. 14. JURISDICTION. Any action in Court against the Contractor or sureties on his bond because of damages to property or individuals by said Contractor or his workmen, or because of the violation of any provisions of the specifications, or on account of the failure of said Contractor to comply fully with these provisions, shall be brought in the District Court of the State of Iowa in and for Black Hawk County. 15. TERMINATION OF RESPONSIBILITY. The Contract shall be considered as completed and the Contractor released from further obligations except as to the requirements of his bond, after the work has been completed and finally accepted and final estimates have been allowed and the completion report of the engineer has been filed and approved by the Council. 16. CITY'S LEGAL RIGHTS. The City shall not be precluded by any measurements, estimate, or certificate made, either before or after the completion and acceptance of the work and payment therefor, from showing the true amount and character of the work performed and materials furnished by the Contractor, or from showing that any such measurement, estimate, or certificate is untrue or incorrectly made, or the work or materials do not, in fact, conform to the Contract. The City shall not be precluded, notwithstanding any such measurements, estimate, or certificate and payment in accordance therewith, from recovering from the Contractor and his surety such damages as it may sustain by reason of his failure to comply with the terms of the Contract. Neither the acceptance by the City or any of its representatives, nor any payment for or acceptance of the whole or any part of the work, nor any extension of time, nor any possession taken by the City, shall operate as a waiver on any portion of the contract or of any power herein reserved, or any right to damages herein provided. A waiver of any breach of the contract shall not be held to be a waiver of any other or subsequent breach. GENERAL SPECS Page 18 of 18 1 • IT . • 1 i • . 1 i j t ......... , . . I: 1 1 I .. :. I, , „...., ..._, it1 1 1 -"""'I ' - In �S . lit• 1v ,° i I r_ ., ,,,..-:,,, , , _. . _„ „...,......., '4,' • to '„" - 1 � S t c;,,, ', !I: - 'g,_'..,.: — l'''.' ' SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION 1. SUBCONTRACTS The contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to require compliance by each subcontractor with the applicable provisions of the contract for the improvements embraced in this contract. 2. REVIEW BY THE CITY OF WATERLOO The City of Waterloo, its authorized representatives and agents shall at all times have access to and be permitted to observe and review all work, materials, equipment, payrolls, personnel records, employment conditions, material invoices, and other relevant data and records pertaining to this contract, provided, however, that all instructions and approval with respect to the work will be given to the contractor only by the City of Waterloo through its authorized representative or agents. 3. INSPECTION a. The contractor shall furnish promptly all materials reasonably necessary for any tests, which may be required. All tests by the City of Waterloo will be performed in such manner as not to delay the work unnecessarily and will be made in accordance with the provisions of the Technical Specifications. b. Inspection of materials and appurtenances to be incorporated in the improvements embraced in this contract may be made at the place of production, manufacture or shipment, whenever the quantity justifies it, and such inspection and acceptance, unless otherwise stated in the Technical Specifications, shall be final, except as regards (1) latent defects, (2) departures from specific requirements of the contract, (3) damage or loss in transit, or (4) fraud or such gross mistakes as amount to fraud. Subject to the requirements contained in the preceding sentence, the inspection of materials as a whole or in part will be made at the project site. 4. WARRANTY OF TITLE No material, supplies, or equipment to be installed or furnished under this contract shall be purchased subject to any chattel mortgage or under a conditional sale, lease-purchase or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. The contractor shall warrant good title to all materials, supplies, and equipment SUPPLEMENTAL GENERAL SPECIFICATIONS installed or incorporated in the work and upon completion of all work, shall deliver the same together with all improvements and appurtenances constructed or placed thereon by him to the City of Waterloo free from any claims, liens, or charges. Neither the contractor nor any person, firm, or corporation furnishing any material or labor for any work covered by this contract shall have any right to a lien upon any improvement or appurtenance thereon. Nothing contained in this paragraph, however, shall defeat or impair the right of persons furnishing materials or labor to recover under any bond given by the contractor for their protection or any rights under any law permitting such persons to look to funds due the contractor in the hands of the City of Waterloo. The provisions of this paragraph shall be inserted in all subcontracts and material contracts and notice of its provisions shall be given to all persons furnishing materials for the work when no formal contract is entered into for such materials. SUPPLEMENTAL GENERAL SPECIFICATIONS F t 1 @. • Ry . . . .... ,_ _ , . .. , .. • ,., . , , -tr; , ,, ,, ..,. , _, ,. ..„.„7_ , ,:. ... .. . . _ ,‘.., . .. ._ __._,•• •• , . „.,„, ,,.. _ , .„. ., „ , .. , ,„. . .. -, . . . . .,., . . . ,_.„.., .--.... _ ...-,-,-;.- • • „„ , iri., ;•.,i ,_ . , „....._ „„, _ fi,:_.., L.,„. t .„. ... . . , _ ,._. • _ . ..... . i_. ..,... .. , ...,..;., ... _,,.... , . __,....„,, _„•,-,., . _,..._ _ _ „..... ..,... ,..__ .... .. ,. _ .,,, . ,. . • , „.„, . ,,, ."•,.., .._ _,•.„ . ,..,„,..,... , ,,,,..•. _ „" . • • _ ,.,_:, •• .. . . „. . . „. . ..., : , .. .. , ,, . ,. „7„, , ,,, ,. . , „4::::,,-..' 2-',:' i',r.-.::.,' - ...i.-- .,---- - ..T.., . ..... _ . ,, _, _ .,_ ....,, ,,,.....„.„ _ L - - •I . , y,_.• - - t _ _ _ ` ili. ' I.: I , ' ,:::,?,:::. ''''.:';',, . • t_., .„. „... .. ..,.. ,,, ,,.:,, .. .• .. , , ,,,,, ...._.,„. ., .. . •. ,...,_ „._ _ , „,, . . „,. ,. ,..,, . . , ,,._,....,-,,_ '.';:f.:::. :1, :-.. L .,.., -K».ms"spa - _ FORM OF CONTRACT CONTRACT FOR THE CONSTRUCTION OF FY 2019 DYSART RD. AND W. 2ND ST. RECONSTRUCTION PROGRAM CITY OF WATERLOO, IOWA CONTRACT NO. 970 This contract made and entered into this day of , 20_, by and between the City of Waterloo, Iowa, a Municipal Corporation, (hereinafter referred to as City), and of (hereinafter referred to as Contractor), WITNESSETH: PAR. 1 Contractor agrees to build and construct the FY 2019 DYSART RD. AND W. 2ND ST. RECONSTRUCTION PROGRAM, Contract No. 970, and furnish all necessary tools, equipment, materials, and labor necessary to do all the work called for in the plans and specifications in a workmanshiplike manner and for the prices set forth in Contractor's proposal, which was accepted by the City, and which is understood and agreed to be a part of this contract. PAR. 2 It is understood and agreed that the resolution adopted by the City Council ordering the construction of the improvement, the Notice to Contractors as published, the Instruction to Bidders, the Form of Proposal, the Construction and Maintenance Bonds, the Council Proceedings relating to this matter, and the Plans and Specifications shall all be considered as forming a part of the contract the same as though they were each set out in said contract. PAR. 3 The Contractor agrees to furnish at its own cost and expense, all necessary materials and labor for said work and to construct said improvements in a thorough, substantial, and workmanlike manner, and in strict accordance with the requirements of this contract, and of the plans and specifications made a part hereof by reference, and to the satisfaction and approval of the City and its engineer. PAR. 4 The Contractor agrees to perform said work and install said improvements on the terms set out in bid or proposal to the City which has been accepted by the City and which is by reference made a part of this contract. FORM OF CONTRACT PAGE 1 OF 5 PAGES PAR. 5 The Contractor agrees to commence said work within ten (10) working days after receipt of "Notice to Proceed" and complete it on or before , unless an extension of time is granted in writing by the Council of the City. PAR. 6 Should the Contractor fail to complete said improvements in strict accordance with the terms and conditions of this contract, or the plans and specifications therefor promptly by the date herein specified, the City may pay such additional sums as it may be required to pay by reason of the failure of said contractor and deduct any and all such sums from any amount then due the Contractor. PAR. 7 The Contractor agrees to comply with and obey all ordinances of the City of Waterloo, Iowa, relating to the obstruction of streets and alleys, keeping open passage ways for water, traffic, and protecting any excavations in any street or alley, and maintaining proper and sufficient barricades with lights and signals during all hours of darkness, to see that the backfilling is properly done, and agrees to keep the City whole and defend any and all suits that may be brought against the City by reason of any injuries that may be sustained by any person or property allegedly caused by the Contractor, or his agents, while work is done pursuant to this agreement. PAR. 8 The Contractor agrees that in the event a law suit is brought against the City for damages allegedly sustained by reason of any act, omission or negligence of the Contractor or its agents, or on account of any injuries allegedly sustained by reason of any obstruction, hole, depression or barrier placed or dug by the defendant or its agents, in the doing of the work herein contracted for, that it will defend said suit and save the City harmless therein, and in case judgment is rendered against the City, the Contractor agrees to pay the same promptly. The Contractor agrees to carry public liability insurance in a solvent company in a sufficient amount to protect the City and those who use the streets of the City. PAR. 9 The City shall have the right to appoint one or more construction reviewers who shall review the progress of the work in detail; also, to make any test or any material to be used in such work. No material shall be used in any work until the same has first been approved by the construction reviewer. Such construction reviewer shall have full authority to pass judgment upon all materials and upon the manner of doing the work, and their judgment on rejecting any materials, substance, or manner of work shall be final unless it is revoked or modified by the City Engineer. FORM OF CONTRACT PAGE 2 OF 5 PAGES PAR. 10 Any material, which has been rejected by the construction reviewer, shall be at once removed from the line of work and shall not be again taken thereon or placed with the material proposed to be used without the written consent of the City Engineer. PAR. 11 The Contractor shall maintain no cause of action against the City on account of delays and prosecution of work, but if said work is delayed by the City, the Contractor shall have such extra time for completion of the job as was lost by reason of the delay caused by the City. PAR. 12 The Contractor agrees to pay punctually all just claims of labor, material, men, or subcontractors who shall perform labor or furnish materials entering into this improvement. It is agreed that the City need not pay the Contractor until all such claims are paid by the Contractor. It is agreed that the City shall not be liable for said labor, material, or men under this contract. PAR. 13 The Contractor agrees to furnish the City, simultaneously with this contract, a bond on a form to be provided by the City in the amount provided by law as stated in the Notice to Bidders, which shall be for the benefit of the City, and any and all persons injured by the breach of any of the terms of this contract. Said bond shall be filed with the City Clerk and shall be subject to the approval of the City Council, and is by reference made a part of this contract. PAR. 14 The Contractor agrees that should it abandon work under this contract or cease the prosecution thereof for a period of thirty (30) consecutive days without reasonable cause, and should it fail to proceed with said work within ten (10) days after a notice to continue or carry it on has been mailed to it at the address given herein by the City, or after such notice has been served on it, then the City may proceed to complete said work, using any material, tools, or machinery found along said line of work, doing the work either by contract or as it may elect, and the Contractor and the sureties on its bond shall be liable to the City for the costs and expenses so paid out. Said costs shall be retained by the City from any compensation due, or to become due the Contractor, and may be recovered by the City in an action upon Contractor's bond. PAR. 15 In consideration of the full compliance on the part of the Contractor with all the provisions, stipulations, and conditions hereof, or contained in the various instruments made a part of this contract by reference, and upon completion and acceptance of said work, the City agrees to pay to the Contractor, in the manner set out in the Notice to Contractors, the amount of money due the Contractor for work performed and accepted, at the unit prices set out in the Contractor's proposal, which has been accepted by the City. FORM OF CONTRACT PAGE 3 OF 5 PAGES PAR. 16 The total amount of the contract, based on the Engineer's estimates of quantities and the Contractor's unit bid prices, and for which 100% surety bond is required is PAR. 17 After the completion of said work, the Contractor agrees to remove all debris and clean up said streets, and to save the City harmless from any damage allegedly resulting from a failure to clean up and remove the debris or put the street back in a proper condition for travel. PAR. 18 This contract is not divisible, but in the event of a conflict between this contract and the various instruments incorporated by reference, this contract shall govern. PAR. 19 Before the Contractor shall be entitled to receive final payment for work done under this contract, it shall execute and file a bond in the penal sum of not less than 100% of the total amount of the contract, same to be known as "Maintenance Bond," and which bond must be approved by the City Council, and which bond is in addition to the bond given by the Contractor to guarantee the completion of the work. PAR. 20 The Contractor shall maintain all work done hereunder in good order for the period of two (2) years from and after the date it is accepted by the Council of the City of Waterloo, Iowa. Said maintenance shall be made without expense to the City or the abutting property. In the event of the failure or default of the Contractor to remedy any or all defects appearing in said work within a period of two (2) years from the date of its acceptance by said Council, and after having been given ten (10) days notice so to do by registered letter deposited in the United States Post Office in said town, addressed to said contractor at the address herein given, then the City may proceed to remedy such defects. The costs and expenses thereof to be recovered from the Contractor and the sureties on its maintenance bond by an action brought in any court of competent jurisdiction. PAR. 21 The Contractor shall give notice to said City by registered letter directed to the Mayor or City Clerk/Auditor thereof not more than four (4) and not less than three (3) months prior to the expiration of the term during which the Contractor is required to maintain said improvements, in good repair by the terms of its Contract. The liability of the Contractor and of the sureties on its bond for maintenance of the said improvements shall continue until three (3) months after such notice has been given to the City, and, in any event, until two (2) years after the acceptance of the work. FORM OF CONTRACT PAGE 4 OF 5 PAGES CITY OF WATERLOO, IOWA Mayor City Clerk Contractor BY: Title: Approved by the City Council of the City of Waterloo, Iowa, this day of , 20 . ATTEST: , City Clerk Waterloo, Iowa FORM OF CONTRACT PAGE 5 OF 5 PAGES S �m �3 w I I 4� I JJi {{ ■ y r . it'-:_- I .,. ..„„, ';:': ..1, . . . . „,...... .. ..,... _ . ., „ ... . . , . ... , . ..,_ . .. , ........., „.„.... - - -. . .... . ... . . „....... .,..,.. - - I.. . ..„ _...,...... .. , .T-_,...--... -'lrltlr-IF''''''''''''''''''''''' t' . .....„.......... . . ...... „,.........__. :.... • . . _ -�. - - - - 1,,... . . ..„... . , .. .. . „... . „ , . .. ._ . .. , ..._ .,,,,. .. , .. .. . .,.. , .. .. . .„ . .. . _ . ..,. .. .._ .. .. r__.. . ._ - .. - -.41r---:.'--,- f. - ...,._. _ _a _ _ ,. + - �..�_....,.._. m,.,....�._,. S ..., v_ai e,.c.:e- :. .-,^za..,s .a: ._rw .+. .A..ilrme:.tea.�,,._...w. ,.w->• ,,., .. .. .i;: PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS: That we, of (the "Principal"), and of (the "Surety"), are held and firmly bound unto the City of Waterloo, Iowa (the "Obligee"), in the penal sum of Dollars ($ ), lawful money of the United States, for the payment of said sum in connection with a contract (the "Contract") dated on or about for the purpose of . The Contract is incorporated herein by reference as though fully set forth herein. Whenever the Principal shall be and is declared by the Obligee to be in default under the Contract, with the Obligee having performed its obligations in the Contract, then the Surety, acknowledging that time is of the essence, may promptly remedy the default, or shall promptly undertake to: 1. Complete the Contract in accordance with its terms and conditions; or 2. Obtain one or more bids for completing the Contract in accordance with its terms and conditions, and upon determination by the Surety of the lowest responsible bidder, or negotiated proposal, or, if the Obligee elects, upon determination by the Obligee and the Surety jointly of the lowest responsible bidder, or negotiated proposal, arrange for a contract between such party and the Obligee. The Surety will make available as work progresses sufficient funds to pay the cost of completion less the balance of the Contract price. The cost of completion includes responsibilities of the Principal for correction of defective work and completion of the Contract, the Obligee's legal and design professional costs resulting directly from the Principal's default, and liquidated damages or actual damages if no liquidated damages are specified in the Contract. The term "balance of the Contract price" means the total amount payable by the Obligee to the Principal under the Contract and any amendments thereto, less the amount properly paid by the Obligee to the Principal; or 3. Determine the amount for which it is liable to the Obligee and pay the Obligee that amount as soon as practicable. In the event this bond is enforced, Principal and Surety agree to indemnify Obligee and hold Obligee harmless from and against any and all costs of enforcement including but not limited to reasonable attorneys' fees and expenses. Every Surety on this bond shall be deemed and held, any contract to the contrary notwithstanding, to consent to each and all of the following matters, without notice: Performance Bond Page 1 of 2 1. To any extension of time to the Contract in which to perform the Contract. 2. To any change in the plans, specifications, or Contract when such change does not involve an increase of more than twenty percent (20%) of the total Contract price, and shall then be released only as to such excess increase. 3. That no provision of this bond or of any other contract shall be valid which limits to less than one (1) year from the time of the acceptance of the work the right to sue on this bond for defect in workmanship or material not discovered or known to the Obligee at the time such work was accepted. If the Principal performs the Contract, then this bond shall be null and void; otherwise it shall remain in full force and effect. In no event shall the Surety's total obligation exceed the penal amount of this bond. Terms used herein shall include, as appropriate, the singular or plural number, or the masculine, feminine or neuter gender. IN WITNESS WHEREOF, the undersigned Principal and Surety have executed this Performance Bond as of PRINCIPAL SURETY Name Name By: By: Title: Title: [attach Power of Attorney] NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is Partnership, all partners should execute BOND. If this project includes Federal Funds, the following applies to the payment bond: IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located. Performance Bond Page 2 of 2 1 i s { i . . i. . 1:,...'. .... .. . ....41,.-.... . ,.,....f. �_ �Y. hT.:.-'::-....-......-11..--•-•-..-..... - -.:':',-..-.-,- - --: i ..._.....,."........._, ,....,..,,-...,.-..,-....,.-..., , ..:.__..._,_...,....4......i...i.,,.....„,..,:„:.:.:„,_--....-_._.. . ,... . . .. , .. ,,. .„_......._ .. ............ . ..,.._ .. .......„,... .. ..,. .„.„,..,...............,... ,.. . ._..... ..,..... " _•., „..... ......... . . ... ._ ... .... .. . . .. .... . .„.... . . . ......„.. ,,,..,. . I; ... • ............... . Via. ,. ...._...,.. ,,.._. ,,,:-... ... •. ...... .... . „,..............„..., .._ .. 4 ....... I _ . .„. ,,,,., :._ . ,:.,:.•„:.„ . ........ ..„.. . .......„..„.:,, . . ... .. . . „.„.. •„1:-_--,: . . .. ...,.. „._,,, ,..,..„ . t---. . . ......... ..,,.. . . ......_ .........• •••. ei..„:„ . _•. .•.„-„... •„•,,ii,.,.,,,:::•."__•...,,,,•,„..„...„••__,..•• • . . . . ........ ._. i ,t,•;-„:•••:_,-.. • . .......,..„........,„,„,„:„......„:„.„.„,:,.. ., . . . . ...,....._,•..,_,. _., , „, . . . . .„ ... ..,•.,„ .„ ....... ... . „,„„....,, ,.........,... .. . . , .. ... ._ .... ,„ ...".......... .. . .. ...„ , ....,,,. .,,..,.. .r.:•, . , ..,. . ., ..,..........„..:„...........;.... ... ",„ tz„:,,...,,...,,....... li , . . . •....:....,.„.._,:z:...i.,: „,.,....i..„„,..,,„.........,i,,...,.„,.••_ . . .. . , . ...„. ... .... , .. ...„:„_ .•,...,•T:.:„...:,.:.-..:.:44;,,..•-•:,,„•.•„;.1.-.z..„.•-:-:._- - _ - _ . .. . . ..,.. .. . .. . ..... ...•i„.....,...„. .. .... .. .. . . . ... .. .. ...........:........,..„...„......„ , .....,.... ..„...,:„.„ . ..• .iit......,„„,..,. - t-f------. ...._ ...,....„„.. .._„_ ,...„.. .. •. „...„.„.,„_,.....„.,...,..., . _ . , .... ..............,.....„,..„,„...„ . .... . .....,.,. . .. ... . ..... .„... ... _... .. „.. . . . • ,... ,...•........... „ ._„„...... ,„,..._.....„.... ...,". .. ...,.„...... ...:...., .,....... „, ... . ,„.. - - - I` - - _ _ Y,_ • • `tee: 2 _ - - ��'S. U •'• • .-•---".---:.:.:.-----r,,.:::::----'.--•...•:-.-----.',--,:ii.-",---•••••:-.",':::,•---...--." `'''ili-?--,4-•:•kr -'-':•--•-•••.--• -• - ; . . - .. . -'.-... ... .. . . . . .. . ' . • - - ..- -•:-•':r.---.--:-.•:-•-•-'•••'1r Y ru PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS: that (Name of Contractor) (Address of Contractor) a , hereinafter called Principal, (Corporation, Partnership or Individual) and, (Name of Surety) (Address of Surety) hereinafter called Surety, are held and firmly bound unto (Name of Owner) (Address of Owner) hereinafter called OWNER, in the penal sum of Dollars,($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas, the Principa, entered into a certain contract with the OWNER, dated the day of_ 20 , a copy of which is hereto attached and made a part hereof for the construction of: NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the prosecution of the WORK provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such WORK, and all insurance premiums on said WORK, and for all labor, performed in such WORK whether by SUBCONTRACTOR or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the WORK or to the SPECIFICATIONS. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. IN WITNESS HEREOF, this instrument is executed in counterparts, each one of (number) which shall be deemed an original, this the day of 20 ATTEST: Principal (Principal)Secretary (SEAL) By (s) (Address) Witness as to Principal (Address) Surety ATTEST: By Attorney-in-Fact Witness as to Surety (Address) (Address) NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is Partnership, all partners should execute BOND. If this project includes Federal Funds, the following applies to the payment bond: IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located.