HomeMy WebLinkAboutCHANGE ORDER #1 CITY OF WATERLOO, IOWA CHANGE ORDER #1 PROJECT: F.Y. 2017 SIDEWALK REPAIR PROGRAM —ZONE 7 & TRAIL REPAIRS CONTRACT NO. 914 Date Prepared: July 10, 2019 AMOUNT: $10,089.10 INCREASE TO: B & B BUILDERS & SUPPLY , Contractor You are hereby ordered to perform the following extra work on your contract dated June 5, 2017. A. Description of extra work to be done: 1001 Clean Walk 1002 Sod Division V— Emergency Trail Repairs 1 Remove PCC Sidewalk, 6" 2 PCC Sidewalk, 6" B. Reason for ordering extra work: 1001 As construction proceeded, additional City owned parcels (i.e. vacant lots acquired under the 657A program) with sidewalk repairs were added to the project. Several of these parcels with known repairs also required the sidewalk to be cleaned to determine extant of repairs. Other City Departments were first contacted for assistance, but they were unable to clean the sidewalks in the timeframes required. 1002 Ramp work at various locations required excavation and grading of the adjoining ground. The initial plan was to hydroseed these disturbed areas to reestablish vegetation. The slopes of some areas were enough that sodding was a better option to vegetate the soils and prevent erosion. Additionally, several adjoining property owners expressed interest in having the disturbed areas sodded. Division V— Emergency Trail Repairs: Leisure Services contacted Engineering regarding reported hazardous conditions on the River Road Trail between Ansborough Avenue and Black Hawk Creek. This work was not originally planned, but the Contractor was willing to include this work at the contract prices. C. Settlement for cost of extra work to be made as follows: 1001 Clean Walk $400.00 EACH property x 5 properties = $2,000.00 1002 Sod $1.50 per SF x 757.4 SF = $1,136.10 Division V— Emergency Trail Repairs 1 Remove PCC Sidewalk, 6" $3.00 per SF x 818.0 SF = $2,454.00 2 PCC Sidewalk, 6" $5.50 per SF x 818.0 SF = $4,499.00 TOTAL INCREASE $10,089.10 Change Order #1 Cont # 914 Sheet 1 of 2 B & B BUILDERS & SUPPLY CONTRACTOR BY: /0-1-11-0.e_A-0,,,„d„ 1 /2j 9 Date TITLE: ° APPROVED: Q tv '7�/6s19 ity Engineer 'Dater Change Order #1 Cont # 914 Sheet 2 of 2