HomeMy WebLinkAboutNOTICE OF PUBLIC HEARING N•TICE OF PU=LIC HEARING
On Proposed Plans, Specifications, Form of Contract,
And Estimate sl Cost
For the
FY 2020 LEVEE RIP RAP SPRAYING
In the City of Waterloo, Iowa
CONTRACT NO. 989
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo. Iowa, at her
office in the City Hall of the said City on the 1st day of August, 2019 until 1:00 p.m. for
the construction of the FY 2020 LEVEE RIP RAP SPRAYING, Contract 989 as
described in detail in the plans and specifications now on file in the Office of the City
Clerk.
OPENING OF BIDS
All proposals received will be opened in the First Floor Conference Room at City Hall, in
the City of Waterloo, Iowa, on the 1st day of August, 2019 at 1:00 p.m., and the
proposals will be acted upon at such later time and place as may then be fixed by the
City Council.
PUBLIC HEARING
Notice is hereby given that the Council of said City will conduct a public I-earing on the
proposed plans, specifications, form of contract, and estimate of cost for the
construction of the above-described improvement project at 5:30 p.m. on the 5th day of
August, 2019, said hearing to be held in the Harold E. Getty Council Chambers in City
Hall in said City. The proposed plans, specifications, form of contract, and estimate of
cost for said improvements heretofore prepared by the City Engineering Department are
now on file in the office of the City Clerk for public examination, and any person
interested therein may file written objection thereto with the City Clerk before the date
set for said hearing, or appear and make objection thereto with the City Clerk before the
date set for said hearing, or appear and make objection thereto at the meeting above
set forth. The NOTICE TO BIDDERS can be viewed at the following locations:
1) City of Waterloo web site at http://ci.waterloo.ia.us/
2) Plan rooms:
Master Builders of Iowa
221 Park Street, PO Box 695
Des Moines, IA 50303
McGraw Hill Construction Dodge
3315 Central Ave.
Hot Springs, AR 71913
NOTICE OF HEARING CONTRACT NO. 989 Page 1 of 2
Reed Construction Data
30 Technology Parkway South, Ste. 500
Norcross, GA 30092
3) Plan Room Web sites:
Master Builders of Iowa web site at www.mbionline.com
Dodge Lead web site: http://dodgeprojects.construction.com/
Reed Const. Data Lead web site: http://www.cmdgroup.com/project-leads/
SCOPE OF WORK
The work involved in this project consists of cut stump treatment or sprayinc trees and
shrubs in various reaches of rock riprap along the levees of the Waterloo Flood Control
System. Target trees shall include trees that obstruct the efficient operation of
structures, prevent proper maintenance of the levee, or threaten the safety of the levee.
Published pursuant to the provisions of Chapter 26 of the City Code of Iowa and upon
order to the City Council of said Waterloo, Iowa, on the day of
CITY OF WATERLOO, IOWA
BY:
Kelley Felchle
City Clerk
NOTICE OF HEARING CONTRACT NO. 989 Page 2 of 2
NOTICE TO IDIaEJ!S
Fir the Taking of Constriction Bids for the
FY 2020 LEVEE RIP RAP SPRAYING
In the City of Waterloo, Iowa
CONTRACT NO. 989
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo. Iowa, at her
office in the City Hall of the said City on the 1st day of August, 2019 until 1:00 p.m. for
the construction of the FY 2020 LEVEE RIP RAP SPRAYING, Contract No. 989, as
described in detail in the plans and specifications now on file in the Office of the City
Clerk.
OPENING OF BIDS
All proposals received will be opened in the First Floor Conference Room at City Hall, in
the City of Waterloo, Iowa, on the 1st day of August, 2019, at 1:00 p.m., and the
proposals will be acted upon at such later time and place as may then be fixed by the
City Council.
PUBLIC HEARING
The Council of said City will conduct a public hearing on the proposed plans,
specifications, form of contract, and estimate of cost for the construction of the above-
described improvement project at 5:30 p.m. on August 5, 2019, said hearing to be held
in the Harold E. Getty Council Chambers in City Hall in said City.
SCOPE OF WORK
The work involved in this project consists of cut stump treatment or spraying trees and
shrubs in various reaches of rock riprap along the levees of the Waterloo Flood Control
System. Target trees shall include trees that obstruct the efficient operation of
structures, prevent proper maintenance of the levee, or threaten the safety of the levee.
BEGINNING AND COMPLETION DATES
The work under the proposed contract shall be commenced within ten (10) working
days after receipt of "Notice to Proceed" and all items shall be completed on or before
October 18, 2019.
METHOD OF PAYMENT TO CONTRACTOR
The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-
five percent (95%) of the work as it is completed and materials delivered and work
approved. Final payment will be made thirty-one (31) days after completion of the work
and acceptance by the Council. Before final payment is made, vouchers showing that
all subcontractors and workmen and all persons furnishing materials have been fully
paid for such materials and labor will be required unless the City is satisfied that
material, men and laborers have been paid.
NOTICE TO BIDDERS CONTRACT NO. 989 Page 1 of 5
The Contractor is hereby notified that if the City does not have cash on hand
nt may
monthly pay estimates, accordig to issuedChapter bear8ng57 of the a rate of�tde of erestlnot exceeding that
y
be made by anticipatory warrants
permitted by Chapter 74A, Code of Iowa.
PLANS AND SPECIFICATIONS
Plans and Specifications governing the construction of the proposed improvements
have been prepared by the City of Waterloo Engineering Department, which plans and
specifications and also the prior proceedings of the City Council referring to and defining
said proposed improvements are hereby e a pa
tof this notice, and the proposed
in cam
contract by reference shall be executedcompliance
h.
Plans and Specifications are available from the Engineering Department on the second
floor of City Hall upon the receipt of a $25.00 refundable deposit. Deposits will be
refunded if the plans are returned in usable condition (i.e. generally free of highlights,
ink markings, tears, stickers, water stains and soiling) to the Engineer's Office by the
end of the 14th consecutive day after the project has been awarded. No deposits will be
refunded for any requests or plans received after the 14th consecutive day, which
includes plans returned via mail service. Plan holders are responsible for ascertaining
when the project has been awarded. If the plan holder is the prime contractor or a
subcontractor or supplier of the prime contractor that has been awarded the project,
Plans and Specifications do not
need
sub ontractors returned
and receive
suppliersthe
fodeposit.
City to prime
e verify
contractor must submit a list of his
eligibility for the refundable deposit.
Upon award of project, the prime contractor, his subcontractors and suppliers shall be
supplied with the needed number of plans and specifications at no additional cost.
CONTRACT AWARD
A contract will be awarded to the qualified bidder submitting the lowest bid.
The City reserves the right to reject any or all bids, re-advertise for new bids, and to
waive informalities in the bids submitted that might be in the best interest of the City.
Bids may be held by the City of Waterloo, Iowa, for a period not to exceed thirty (30)
days from the day of the opening of bids for the purpose of reviewirg the bids and
investigating the qualifications of bidders, prior to awarding the contract.
By virtue of statutory authority, a preference will be given to products and provisions
grown and coal produced with the State of Iowa and preference will be given to local
domestic labor in the construction of the improvement.
PROPOSALS SUBMITTED
The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly
write or type the unit bid price and the bid item extension (Unit Price x Estimated Qty) in
numerals on the blanks provided. Should there be any discrepancy between the unit
bid price and extension, the City of Waterloo shall consider the unit bid price as being
the valid unit bid price.
NOTICE TO BIDDERS CONTRACT NO. 989 Page 2 of 5
The bidder has the option to submit a computer-generated spreadsheet in lieu of the
portion of the Form of Bid or Proposal, which includes the Bid Item Number,
Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price and Total Bid. The
computer-generated spreadsheet shall include all of the information listed in that portion
of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor
submitting the bid. For the bidders who submit a computer-generated spreadsheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in the space(s)
provided on the Form of Bid or Proposal.
BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or cashier's check
drawn on an Iowa bank, or a bank chartered under the laws of the United States, a
certified share draft drawn on a credit union in Iowa or chartered under the laws of the
United States, or bid bond, (on the form furnished by the City) payable to the City of
Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, which
certified check, certified share draft or bid bond will be held as security that the Bidder
will enter into a Contract for the construction of the work and will furnish the required
bonds, and in case the successful Bidder shall fail or refuse to enter into the Contract
and furnish the required bonds, his bid security may be retained by said City as agreed
upon liquidated damages. If bid bond is used, it must be signed by both the Bidder and
the surety or surety's agent. Signature of surety's agent must be supported by
accompanying Power of Attorney.
PERFORMANCE & PAYMENT BONDS
The successful bidder will be required to furnish a "Performance Bond" and a "Payment
Bond" within ten (10) days after forms are presented to him in an amount equal to one
hundred percent (100%) of the contract price, said bond to be issued by a responsible
surety approved by the City Council and shall guarantee the faithful performance of the
contract and the terms and conditions therein contained, and shall guarantee the
prompt payment of all materials and labor and protect and save harmless the City from
claims of any kind caused by the operations of the contractor.
MAINTENANCE BOND
Before the Contractor shall be entitled to receive final payment for work done under this
contract, it shall execute and file a bond in the penal sum of not less than 100% of the
total amount of the contract, same to be known as "Maintenance Bond," and which bond
must be approved by the City Council, and which bond is in addition to the bond given
by the Contractor to guarantee the completion of the work.
CONTRACT COMPLIANCE PROGRAM / SUBCONTRACTING
The program proposes numerical projections regarding utilization of Minority Business
Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors
and suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa.
A goal of at least ten percent (10%) for MBE participation on all City funded construction
projects that are estimated at $50,000.00 or more. A goal of at least two :percent (2%)
for WBE participation on all City funded construction projects that are estimated at
NOTICE TO BIDDERS CONTRACT NO. 989 Page 3 of 5
$50,000.00 or more. Any project funded in part or in total with federal funds shall follow
the respective agencies contract compliance program and goals. The
Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance
MBE/VVBE goals. The MBE/VVBE subcontractors, suppliers or vendors must provide
the Prime Contractor a reasonably competitive price for the service being rendered or
the Contractor is not required to accept their bid.
LIQUIDATED DAMAGES
Time is an essential element of this contract. It is important that the work be diligently
pursued to completion. If the work is not completed within the specified contract period,
plus authorized extensions, the contractor shall pay to the City Liquidated Damages in
the amount of five hundred dollars ($500.00) per day, for each day, as further described
herein, in excess of the authorized time.
Days beyond the specified completion date for which Liquidated Damages will be
charged will be working days that the contractor does, or could have worked, from
Monday through Saturday. Sundays will be counted only if work is performed. Partial
working days will be considered as a full working day. Days not chargeable for
Liquidated Damages will include rain days, Sunday if no work is done, and legal
holidays.
Working days will cease to be charged when only punch list items remain to be
completed. Punch list items do not include contract bid items or approved change/extra
work orders.
When the Contractor believes the project to be substantially completed, a written notice
stating the same shall be submitted to the Engineer and a request made for a Punch
List. If the work under the Contract extends beyond the normal construction season for
such work the Contractor shall submit to the Engineer in writing a request that working
days counted toward the project be suspended until work is resumed the following
construction season.
This amount is not construed as a penalty. These damages are for the cost to the City
of providing the required additional inspection, engineering and contract administration.
PRE-CONSTRUCTION CONFERENCE
Before the work is commenced on this contract, a conference shall be held for the
purpose of discussing the contract. The conference shall be attended by the prime
contractor, subcontractors and City Officials.
BIDDER STATUS
Attention of bidders is called to compliance with the provisions of the Resident
Bidder/Non-Resident Bidder requirements.
Each bidder submitting a bid shall execute and include with the bid, a Bidder Status
Form in the form herein provided.
Failure to submit a fully completed Bidder Status Form with the bid may result in the bid
being deemed nonresponsive and rejected.
NOTICE TO BIDDERS CONTRACT NO. 989 Page 4 of 5
SALES TAX EXEM!TION CERTIFICATES
Contractors and approved subcontractors will be provided a Sales Tax Exemption
Certification to purchase building materials or supplies in the performance of
construction contracts let by the City of Waterloo.
Posted pursuant to the provisions of Chapter 26 of the City Code of Iowa.
CITY OF WATERLOO, IOWA
NOTICE TO BIDDERS CONTRACT NO. 989 Page 5 of 5