Loading...
HomeMy WebLinkAboutPCCOR_001_Rock Excavation and BackfillHenkel Construction Company 208 East State Street Mason City, Iowa 50401-3406 Phone: (641) 423-5674 Fax: (641) 423-9244 Project: 1978M - 5 Sullivan Bros CC Kitchen Imp 200 West 4th St Waterloo, Iowa 50701 Prime Contract Change Order Request #001: Rock Excavation and Backfill TO:City of Waterloo 715 Mulberry Street Waterloo, Iowa 50703 FROM:Henkel Construction Company 208 East State St Mason City, Iowa 50401 CHANGE ORDER REQUEST NUMBER / REVISION:  001 / 0 PRIME CONTRACT CHANGE ORDER:   #001 - Rock Excavation and Backfill   STATUS: Approved CREATED BY:Brian Tenge (Henkel Construction Company) SCHEDULE IMPACT: DATE CREATED:1/21/2020   TOTAL AMOUNT:$44,013.00  CHANGE ORDER REQUEST TITLE: Rock Excavation and Backfill CHANGE ORDER REQUEST DESCRIPTION:  CE #001 - Rock Excavation and Backfill Rock excavation, haul off spoils and backfill with sand.   Unit Price $850.00 per cubic Yard   Ticket #1 12/18/19 -  14.88 Ton Ticket #2  1/2/20   -  14.61 Ton Ticket #3  1/7/20  - 14.37 Ton x 35%=5.03 Ton  (only 35% of this load was used).     Total Tons = 34.52 Tons x 1.5 (conversion to CY) = 51.78   ATTACHMENTS: PR #2 Unit Pricing (2).pdf Bergan Sand Tickets.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER REQUEST: PCO #Contract Company Title Schedule Impact Amount 001 City of Waterloo Rock Excavation and Backfill $44,013.00  Total:$44,013.00  Cody Mills (InVision Architecture) City of Waterloo  Henkel Construction Company 501 Sycamore Street, Suite 101  715 Mulberry Street  208 East State St Waterloo, Iowa 50704  Waterloo, Iowa 50703  Mason City, Iowa 50401             ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate  ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE  SIGNATURE DATE  SIGNATURE DATE Henkel Construction Company page 1 of 1 Printed On: 4/10/2020  09:38 AM PCCOR #001