Loading...
HomeMy WebLinkAboutAddendum 1ADDENDUM 5 Sullivan Brother Convention Center Kitchen Remodel City of Waterloo LETTING DATE November 7th,2019 PROJECT OWNER PROJECT # DATE ADDENDUM# 1 16021 10.23.2019 TO ALL HOLDERS OF DRAWINGS AND PROJECT MANUALS This addendum is issued to incorporate the following changes in the drawings and project manual. For bids to be considered, this addendum must be acknowledged by so indicating on the Form of Bid. Bidders shall make the following corrections or additions to the bidding documents. These items shall supersede, modify, and/or change all statements or drawings to the contrary in the drawings and project manual and shall take precedence over these documents. Bidders shall base their bid on the drawings and project manual and as modified by the changes herein stated. This addendum consist of (# of pages) Supplemental Drawings Project ManualText8.5” x 11”Other Total Pages 2 2 REVISIONS 1 Pre-Bid Meeting comments 2 Architectural Project Manual Changes Item Section Paragraph Text # 00 21 13 2.011 Bid Submission - November 7th, 2019 @1 pm. Public Hearing - November 12th, 2019 @ 5:30pm.00 21 13 2.012 Prebid Conference - October 30th, 2019 @ 9am.00 21 13 4.023 Drawing Changes Item #Sheet Detail Attachment Description of Change INVISION © 2019 INVISION 1  2019 INVISION 1 ADDENDUM PROJECT 5 Sullivan Brother Convention Center Kitchen Remodel PROJECT #16021 OWNER City of Waterloo DATE 10.23.2019 LETTING DATE November 7th,2019 ADDENDUM #1 TO ALL HOLDERS OF DRAWINGS AND PROJECT MANUALS This addendum is issued to incorporate the following changes in the drawings and project manual. For bids to be considered, this addendum must be acknowledged by so indicating on the Form of Bid. Bidders shall make the following corrections or additions to the bidding documents. These items shall supersede, modify, and/or change all statements or drawings to the contrary in the drawings and project manual and shall take precedence over these documents. Bidders shall base their bid on the drawings and project manual and as modified by the changes herein stated. This addendum consist of (# of pages) Supplemental Drawings Text 8.5” x 11”Other Project Manual Total Pages 2 ---2 REVISIONS 1 Pre-Bid Meeting comments 2 Architectural Project Manual Changes Item # Section Paragraph Text 1 00 21 13 2.01 Bid Submission – November 7th, 2019 @1pm. 2 00 21 13 2.01 Public Hearing – November 12th, 2019 @ 5:30pm. 3 00 21 13 4.02 Prebid Conference – October 30th, 2019 @ 9am. Drawing Changes Item #Sheet Detail Attachment Description of Change 3 Plumbing Project Manual Changes Item Section Paragraph Text # Drawing Changes Item Description of Change#Sheet Detail Attachment End of Addendum Submitted By fl f Cody Mills, Assoc. AIA INVISION © 2019 INVISION 2  2019 INVISION 2 3 Plumbing Project Manual Changes Item # Section Paragraph Text Drawing Changes Item #Sheet Detail Attachment Description of Change End of Addendum Submitted By Cody Mills, Assoc. AIA