Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Addendum 3
ADDENDUM 5 Sullivan Brother Convention Center Kitchen Remodel City of Waterloo LETTING DATE November 7th,2019 PROJECT # DATE ADDENDUM# 3 16021 11.5.2019 PROJECT OWNER TO ALL HOLDERS OF DRAWINGS AND PROJECT MANUALS This addendum is issued to incorporate the following changes in the drawings and project manual. For bids to be considered, this addendum must be acknowledged by so indicating on the Form of Bid. Bidders shall make the following corrections or additions to the bidding documents. These items shall supersede, modify, and/or change all statements or drawings to the contrary in the drawings and project manual and shall take precedence over these documents. Bidders shall base their bid on the drawings and project manual and as modified by the changes herein stated. This addendum consist of (# of pages) Supplemental Drawings Project Manual Total PagesText8.5” x 11”Other 11 REVISIONS 1 Architectural Project Manual/Drawing Changes NONE 2 Plumbing Project Manual/Drawing Changes NONE 3 Substitution Requests Sheet/ Detail/ Item# Section Paragraph Attachment Description of Change APPROVED SUBSTITUTION - Sherwin Williams General Polymers Fastop 12SL Self-Leveling Urethane Slurry system w/ Fastop TC w/ Fastop Cove Material 1 09 67 00 End of Addendum Submitted By f Cody Mills, Assoc. AIA INVISION © 2019 INVISION 1 2019 INVISION 1 ADDENDUM PROJECT 5 Sullivan Brother Convention Center Kitchen Remodel PROJECT #16021 OWNER City of Waterloo DATE 11.5.2019 LETTING DATE November 7th,2019 ADDENDUM #3 TO ALL HOLDERS OF DRAWINGS AND PROJECT MANUALS This addendum is issued to incorporate the following changes in the drawings and project manual. For bids to be considered, this addendum must be acknowledged by so indicating on the Form of Bid. Bidders shall make the following corrections or additions to the bidding documents. These items shall supersede, modify, and/or change all statements or drawings to the contrary in the drawings and project manual and shall take precedence over these documents. Bidders shall base their bid on the drawings and project manual and as modified by the changes herein stated. This addendum consist of (# of pages) Supplemental Drawings Text 8.5” x 11”Other Project Manual Total Pages 1 ---1 REVISIONS 1 Architectural Project Manual/Drawing Changes NONE 2 Plumbing Project Manual/Drawing Changes NONE 3 Substitution Requests Item # Sheet/ Section Detail/ Paragraph Attachment Description of Change 1 09 67 00 APPROVED SUBSTITUTION – Sherwin Williams General Polymers Fastop 12SL Self-Leveling Urethane Slurry system w/ Fastop TC w/ Fastop Cove Material End of Addendum Submitted By Cody Mills, Assoc. AIA