Loading...
HomeMy WebLinkAbout1_Plumbing ClarificationsHenkel Construction Company 208 East State Street Mason City, Iowa 50401-3406 Phone: (641) 423-5674 Fax: (641) 423-9244 Project: 1978M - 5 Sullivan Bros CC Kitchen Imp 200 West 4th St Waterloo, Iowa 50701 Plumbing Clarifications TO: Cody Mills (InVision Architecture) DATE INITIATED:12/13/2019 LOCATION: PROJECT STAGE: SUB JOB: COST IMPACT: DRAWING NUMBER: LINKED DRAWINGS: FROM:Ana Seaman (Henkel Construction Company) 208 East State Street Mason City, Iowa 50401 STATUS:Closed on 12/19/19 DUE DATE:12/18/2019 COST CODE: SCHEDULE IMPACT: SPEC SECTION: REFERENCE: RECEIVED FROM: Eric Frost (Bergen PHC) COPIES TO: Ethan Bachinski (Modus Engineering), Mike Chafa (Iron Works Ltd), Kelly DeMorett (Starting Line Flr Coatings Inc), Eric Frost (Bergen PHC), Alex Matheson (Modus Engineering), Cody Mills (InVision Architecture), Mike Palmer (Community Electric, Inc.), Wes Putney (Henkel Construction Company), Ana Seaman (Henkel Construction Company), Tiffany Swayzer (Modus Engineering), Brian Tenge (Henkel Construction Company) Question from Ana Seaman (Henkel Construction Company) at 01:12 PM on 12/13/2019 I have attached a marked up print of some items that my guys on site are asking for some direction with. The print shows tying on to the existing DWV on the East side of the kitchen exterior wall. In order for this to be done, Henkel will need to remove a lot of concrete in the storage area on the back side of that wall to allow us access to these points which could result in some extra cost. This could also create a depth problem for the grease trap depending on existing depth of the pipe. I also believe that these would be the drains that Osgood was concerned about running through the interceptor. I believe that there is a couple of ways to remedy this. One would be to tie the existing into the new piping in just the main location instead of the four separate locations. This would still have these lines running through the interceptor which may cause an issue with the city. The other solution would be to leave these lines tied to the existing drain line that isn’t being removed. Please let me know your thoughts on this. Attachments: Plumbing Marked.pdf Official Response: Cody Mills (InVision Architecture) responded on Thursday, December 19th, 2019 at 7:03AM CST See comments from consultant Attachments: Official Response: Alex Matheson (Modus Engineering) responded on Tuesday, December 17th, 2019 at 9:02PM CST Extend the floor cutting as required to take the vents on the backside of the kitchen wall to conceal piping as discussed at the construction progress meeting held 12/17 at 2:30 pm. The contractor shall connect the existing sanitary sewer piping that is deemed unacceptable to be routed through the grease interceptor to an existing active sanitary sewer that will bypass the grease interceptor. Please keep record of these revisions on the as-built drawings. Attachments: All Replies: Response from Cody Mills (InVision Architecture) at 07:03 AM on 12/19/2019 See comments from consultant Attachments: Henkel Construction Company Page 1 of 2 Printed On: 04/10/2020 09 :39 AM RFI #1 Response from Alex Matheson (Modus Engineering) at 09:02 PM on 12/17/2019 Extend the floor cutting as required to take the vents on the backside of the kitchen wall to conceal piping as discussed at the construction progress meeting held 12/17 at 2:30 pm. The contractor shall connect the existing sanitary sewer piping that is deemed unacceptable to be routed through the grease interceptor to an existing active sanitary sewer that will bypass the grease interceptor. Please keep record of these revisions on the as-built drawings. Attachments: BY DATE COPIES TO Henkel Construction Company Page 2 of 2 Printed On: 04/10/2020 09:39 AM RFI #1