HomeMy WebLinkAbout2_Stainless PipingHenkel Construction Company 208 East State Street Mason City, Iowa 50401-3406 Phone: (641) 423-5674 Fax: (641) 423-9244 Project: 1978M - 5 Sullivan Bros CC Kitchen Imp 200 West 4th St Waterloo, Iowa 50701 Stainless Piping TO: Cody Mills (InVision Architecture) DATE INITIATED:12/13/2019 LOCATION: PROJECT STAGE: SUB JOB: COST IMPACT: DRAWING NUMBER: LINKED DRAWINGS: FROM:Eric Frost (Bergen PHC) 35 Fletcher Ave. Waterloo, Iowa 50701 STATUS:Closed on 12/19/19 DUE DATE:12/18/2019 COST CODE: SCHEDULE IMPACT: SPEC SECTION: REFERENCE: RECEIVED FROM: Eric Frost (Bergen PHC) COPIES TO: Ethan Bachinski (Modus Engineering), Mike Chafa (Iron Works Ltd), Kelly DeMorett (Starting Line Flr Coatings Inc), Eric Frost (Bergen PHC), Alex Matheson (Modus Engineering), Cody Mills (InVision Architecture), Mike Palmer (Community Electric, Inc.), Wes Putney (Henkel Construction Company), Ana Seaman (Henkel Construction Company), Tiffany Swayzer (Modus Engineering), Brian Tenge (Henkel Construction Company) Question from Eric Frost (Bergen PHC) at 03:12 PM on 12/13/2019 The plans call for 10' of stainless piping to be provided before tying into the PVC sewer for the trench drains and 1 floor sink. The style of stainless pipe that is allowed underground via the AHJ does not have wye fittings available. They do make the Tees for this pipe, however, Tees are not allowed underground in Waterloo. There is an option to custom order or have wye's specially made for this pipe but that could turn into a timing and cost issue. The alternate options that we have discussed would be either cast iron piping to cover these 3 10' runs or chemical resistant CPVC. Both items would be rated to handle the high temp of the dishwasher discharge. The cast iron pipe would provide a small deduct in price where as the chemical resistant CPVC would be about a wash in pricing. Official Response: Cody Mills (InVision Architecture) responded on Thursday, December 19th, 2019 at 7:03AM CST See Comments from consultant. Attachments: Official Response: Alex Matheson (Modus Engineering) responded on Tuesday, December 17th, 2019 at 9:05PM CST The contractor shall use CPVC in lieu of stainless steel for the three (3) 10' runs of piping that require a higher temperature resistance immediately downstream of the drain. Attachments: All Replies: Response from Cody Mills (InVision Architecture) at 07:03 AM on 12/19/2019 See Comments from consultant. Attachments: Response from Alex Matheson (Modus Engineering) at 09:05 PM on 12/17/2019 The contractor shall use CPVC in lieu of stainless steel for the three (3) 10' runs of piping that require a higher temperature resistance immediately downstream of the drain. Attachments: Henkel Construction Company Page 1 of 2 Printed On: 04/10/2020 09 :39 AM RFI #2 BY DATE COPIES TO Henkel Construction Company Page 2 of 2 Printed On: 04/10/2020 09:39 AM RFI #2