HomeMy WebLinkAboutUNIT PRICES_Rev_0Five Sullivan Brothers CC Kitchen Plmb Improvements 01 22 00
City of Waterloo UNIT PRICES
INVISION #16021 1 of 2
SECTION 01 22 00
UNIT PRICES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. List of unit prices, for use in preparing Bids.
B. Measurement and payment criteria applicable to Work performed under a unit price payment method.
1.02 RELATED REQUIREMENTS
A. Document 00 21 13 - Instructions to Bidders: Instructions for preparation of pricing for Unit Prices.
B. Section 01 20 00 - Price and Payment Procedures: Additional payment and modification procedures.
1.03 DEFINITIONS
A. Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a
price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or
deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities
of Work required by the Contract Documents are increased or decreased.
1.04 COSTS INCLUDED
A. Unit Prices included on the Bid Form shall include full compensation for all required labor, products, tools,
equipment, plant, transportation, services and incidentals; erection, application or installation of an item
of the Work; overhead and profit.
1.05 UNIT QUANTITIES SPECIFIED
A. Quantities indicated in the Bid Form are for bidding and contract purposes only. Quantities and
measurements of actual Work will determine the payment amount.
1.06 MEASUREMENT OF QUANTITIES
A. A registered engineer, surveyor, or inspections agency, selected and paid for by the Owner and approved
by the Architect, shall provide cross sections and quantity calculations for determining the actual amount
of material excavated; as applicable for unit price.
1. Cross sections shall be taken as necessary to obtain accurate quantities.
B. Assist by providing necessary equipment, workers, and survey personnel as required.
1.07 PAYMENT
A. Payment for Work governed by unit prices will be made on the basis of the actual measurements and
quantities of Work that is incorporated in or made necessary by the Work and accepted by the Design
Professional, multiplied by the unit price.
B. Payment will not be made for any of the following:
1. Products wasted or disposed of in a manner that is not acceptable.
2. Products determined as unacceptable before or after placement.
3. Products not completely unloaded from the transporting vehicle.
4. Products placed beyond the lines and levels of the required Work.
5. Products remaining on hand after completion of the Work.
6. Loading, hauling, and disposing of rejected Products.
1.08 SCHEDULE OF UNIT PRICES
A. Unit Price No. 01: Excavation of uninterrupted rock materials (i.e. limestone or bedrock). Trenching is
required for mechanical, electrical, plumbing pipping and components below concrete slabs on grade.
Provide pricing per cubic foot for trenching and removal of uninterrupted rock materials.
(Excavation of granular and/or cohesive fill materials is to be included in Base Bid pricing and is not
applicable to the intent of this unit pricing)
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
THIS PAGE IS
INTENTIONALLY
LEFT BLANK
Five Sullivan Brothers CC Kitchen Plmb Improvements 01 22 00
City of Waterloo UNIT PRICES
INVISION #16021 2 of 2
THIS PAGE IS
INTENTIONALLY
LEFT BLANK