Loading...
HomeMy WebLinkAboutMINOR PLUMBING DEMOLITION FOR REMODELING_Rev_0Five Sullivan Brothers CC Kitchen Plmb Improvements 22 00 90City of Waterloo MINOR PLUMBING DEMOLITION FOR REMODELING INVISION #16021 1 of 2 SECTION 22 00 90 MINOR PLUMBING DEMOLITION FOR REMODELING PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements of the Contract Forms, the Conditions of the Contract, Division 1 - GeneralRequirements and Specification Section 22 00 50 - Basic Mechanical Requirements "General Provisions" apply to this section. 1.02 SCOPE A. This contractor shall be responsible for the demolition and removal of all existing mechanicalelements within the project area except as follows: 1. Elements shown on the drawings as "existing to remain and/or to be relocated". 2. Elements serving adjacent areas. 3. Elements required for the support of the newly remodeled areas. B. Preserve services to the existing facility. Extend, reroute, and reconnect existing systems asrequired providing for the continued function of these systems. C. This contractor shall be responsible for the cutting and capping of all existing gas, water, sewer, and any other utility service. D. Demolition shall be accomplished by the proper tools and equipment for the work to be removed. Personnel shall be experienced and qualified in the type of work to be performed. E. This contractor shall remove all abandon equipment, piping, ductwork, supports, equipmentcurbs, and bases associated with the remodeled areas unless noted otherwise. F. This contractor is responsible to provide temporary plumbing protection during this project. 1.03 MATERIALS A. All elements to be removed are subject to the Owner's Right of Salvage. B. All materials removed shall be the property of the removing contractor and shall be removedfrom the site by him, unless otherwise specified. C. The owner may designate and have salvage rights to any material herein demolished by this contractor. The contractor shall coordinate with the owner prior to start of demolition. 1.04 WORK BY OTHERS A. Unless specifically noted under other contracts, this mechanical contractor shall assume he willperform all required work. In general, the following will be performed by others: 1. The electrical contractor will disconnect all electrical service and remove conduit back to behind finished surfaces, close and cap ends of conduits. 1.05 EXISTING CONDITIONS A. If any piping serving existing fixtures or equipment (that are to remain) are disturbed byoperations under this contract, this contractor shall provide pipe and insulation required to re-establish continuity of such piping systems. B. This contractor shall arrange for the general contractor to repair and patch all construction withmaterial necessary to match surrounding due to the removal of equipment, piping, and ductwork. C. This contractor shall furnish all required labor and material, where required, to extend new work to connect to similar work for extension of existing systems. D. Demolition drawings are based on casual field observation and existing record documents. Report discrepancies to the owner before disturbing existing installation. Beginning of demolition means installer accepts existing conditions. Five Sullivan Brothers CC Kitchen Plmb Improvements 22 00 90City of Waterloo MINOR PLUMBING DEMOLITION FOR REMODELING INVISION #16021 2 of 2 PART 2 PRODUCTS NOT USED PART 3 EXECUTION NOT USED END OF SECTION