HomeMy WebLinkAboutPLUMBING FIXTURES_Rev_0Five Sullivan Brothers CC Kitchen Plmb Improvements 22 40 00City of Waterloo PLUMBING FIXTURES
INVISION #16021 1 of 2
SECTION 22 40 00
PLUMBING FIXTURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. See plumbing fixture schedules on drawings.
1.02 RELATED SECTIONS
A. Specification Section 22 0529 - Hangers and Supports for Plumbing Piping and Equipment
B. Specification Section 22 1116 - Domestic Plumbing Piping
C. Specification Section 22 1119 - Domestic Plumbing Specialties
1.03 REFERENCES
A. ASME A112.18.1 - Finished and Rough Brass Plumbing Fixture Fittings.
B. ASME A112.19.1 - Enameled Cast Iron Plumbing Fixtures.
C. ASME A112.19.5 - Trim for Water-Closet Bowls, Tanks, and Urinals.
D. NFPA 70 - National Electrical Code.
E. NSF/ANSI 61 - Drinking Water System Components - Health Effects.
F. NSF/ANSI 372 - Drinking Water System Components - Lead Content.
1.04 SUBMITTALS
A. Product Data: Provide catalog illustrations of fixtures, sizes, rough in dimensions, utility sizes,trim, and finish.
B. Manufacturer's Instructions: Indicate installation methods and procedures.
C. Maintenance Data: Include fixture trim exploded view and replacement parts lists.
D. Warranty: Submit manufacturer's warranty and ensure forms have been completed in owner's
name and registered with manufacturer.
E. The mechanical contractor shall coordinate all fixtures with general construction and cabinetryprior to submitting for review.
1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing the products specified inthis section with minimum three years experience.
1.06 REGULATORY REQUIREMENTS
A. Products Requiring Electrical Connection: Listed and classified by Underwriters Laboratories
Inc., as suitable for the purpose specified and indicated.
B. Wetted surfaces of brass and bronze components shall contain <0.25% weighted average lead
content (lead free) as defined by NSF/ANSI Standards 61 and 372.
1.07 DELIVERY, STORAGE, AND PROTECTION
A. Accept fixtures on site in factory packaging. Inspect for damage.
B. Protect installed fixtures from damage by securing areas and by leaving factory packaging in
place to protect fixtures and prevent use.
1.08 WARRANTY
A. Provide manufacturer's standard warranty for electric water cooler.
Five Sullivan Brothers CC Kitchen Plmb Improvements 22 40 00City of Waterloo PLUMBING FIXTURES
INVISION #16021 2 of 2
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that walls and floor finishes are prepared and ready for installation of fixtures.
B. Verify that electric power is available and of the correct characteristics.
C. Confirm that millwork is constructed with adequate provision for the installation of counter toplavatories and sinks prior to ordering.
D. Confirm that hole drillings are of appropriate number and spacing for trim.
3.02 PREPARATION
A. Rough-in fixture piping connections in accordance with minimum sizes indicated in fixturerough-in schedule for particular fixtures.
3.03 INSTALLATION
A. Install in accordance with manufacturer's instructions.
B. Install each fixture with trap, easily removable for servicing and cleaning.
C. Provide chrome plated rigid or flexible supplies to fixtures with 1/4 turn loose key stops,
reducers and escutcheons.
D. Install components level and plumb.
E. Install and secure fixtures in place with wall supports or wall carriers and bolts.
F. Seal fixtures to wall and floor surfaces with sealant. Color to match fixture.
G. Solidly attach water closets to floor with lag screws. Flashing is not intended to hold fixture in
place.
3.04 INTERFACE WITH OTHER PRODUCTS
A. Review millwork shop drawings. Confirm location and size of fixtures and openings beforerough-in and installation.
3.05 ADJUSTING
A. Adjust stops or valves for intended water flow rate to fixtures without splashing, noise oroverflow.
3.06 CLEANING
A. Clean plumbing fixtures and equipment.
END OF SECTION