Loading...
HomeMy WebLinkAbout09 67 00 Fluid-Applied Flooring Submittal Starting Line Floor Coatings, Inc. 14608 Felton Court Suite #102 Apple Valley, MN 55124 Phone: 952-882-9498 / Fax: 952-736-8376 5 Sullivan Brothers Convention Center SUBMITTAL DATA SHEET Date: 12/5/19 Project Name: 5 Sullivan Brothers Convention Center To: Ana Seaman Henkel Construction Co. 208 East State Street Mason City, IA 50401 From: Kelly DeMorett Starting Line Floor Coatings, Inc. 14608 Felton Court Ste. 102 Apple Valley, MN 55124 Architect: Invision 501 Sycamore St. Ste. 101 Waterloo, IA 50703 The following complete sets of data sheets are submitted for overall project Review and action: 09 67 00 Fluid-Applied Flooring Tnemec Series 245, 246 Starting Line Floor Coatings, Inc. 14608 Felton Court Suite #102 Apple Valley, MN 55124 Phone: 952-882-9498 / Fax: 952-736-8376 5 Sullivan Brothers Convention Center SYSTEM DATA SHEET System Number: 09 67 00 System Title: Fluid-Applied Flooring Manufacturer: Tnemec Supplier: Tnemec Mfg. Representative Name: Kevin Renslow Surface Preparation: Shot blast the surface of the floor to obtain a minimum profile of IRCI-CSP 4-6 Paint Material/Product Name & Number/Coverage: COVE BASE: 1. 4” high base w/ ¾” radius 2. Snap a tape line horizontally to the wall surface to form a controlled edge for placement of the cove base 3. Trowel up material 4” onto wall surface FLOOR: 1. ¼” overall thickness 2. Topping – Series 245 – 30 sq. ft. per gal. 3. Broadcast Flintshot 4. Topcoat – Series 246 – 100 sq. ft. per gal.