Loading...
HomeMy WebLinkAboutscanSS-2- - - - - - -- - DN DN _ -- - -- -- D 1 ► D 3 D 1 - - — DN - -- _ _- +D1 D1 _ - - D1 ► D1 .-_ D4 D4 f D4 f D4 D4- - - - - D5 D2 OFIRST FLOOR DEMOLITION PLAN FIRST FLOOR PLAN 1/8" - 1'-0" - - - - WALL LEGEND EXISTING CONSTRUCTION TO REMAIN NEW CONSTRUCTION SHEET NOTES 1 AL_ _-XISTING INFORMATION INDICATED ON PLANS ARE BAE-D ON INFORMATION FROM EXISTING CONSTRUCTION DOC 1MENTS AND FIELD OBSERVATION OF THE EXISTING BU -)ING CONTRACTOR TO FIELD VERIFY ALL DIC'_NSIONS AND ELEVATIONS. KEYNOTE LEGEND 1 N-.'. HANDRAIL - REFER TO DTL 3/A2-11 2 N-.'. HANDRAIL - REFER TO DTL 3/A2-11 -3 t`-.'i RAILING TO MATCH EXIST - REFER TO DTL. 2/A2-11 4 I`F.'J 4" SLAB ON GRADE REINFORCED WITH #4@ 18" O.C. E .. CENTERED IN SLAB OVER 6" COMPACTED GRANULAR f_3GRADE. VERIFY ELEVATIONS TO MATCH TO EXIST. (=NSTRUCTION TO REMAIN IN PLACE. 5 PF!N SIDEWALK AS REQ'D - VERIFY ELEVATIONS TO MATCH E� ST. CONSTRUCTION TO REMAIN IN PLACE. 6 ErIST. ORNAMENTAL RAILING & GRANITE BASE TO REMAIN 7 FlIST RAILING -To -REMAIN - NEW PAINT REQ D. 8 1.=W LANDSCAPING AREA. 9 _gSTING LANDSCAPING AREA - BUILD GRADE UP TO 6" _LOW TOP OF WALL, 10 3" x 1-0" CONT. STRIP FTG W/ #5 CONT. & #5 @ 24 'ANSVERSE MATCH ELEVATION OF NEW FOOTING WITH -'ISTING DRILL AND EPDXY LONGITUDINAL REBAR INTO FISTING USING HIT HY 200 EPDXY SYSTEM BY HILTI (6" ' IBED;. 11 =°ILL AND EPDXY #4 X 2'-0- DOWELS@ 18 O C, USING HIT 200 EPDXY SYSTEM BY HILTI (4" EMBED). 12 .;W &' CONC WALL REINFORCED W/#4 @ 12" O C. E W 13 '.;W 12" CONC WALL REINFORCED W/#4 @ 12" O.0 E.F. E.W. D1 =zMOVE EXIST. RETAINING WALL & FOOTING FULL DEPTH. D2 =;MOVE EXIST STAIRS. _ D3 =EMOVE EXIST. CONCRETE STRUCTURAL SLAB. D4 =_-MOVE EXIST HANDRAIL D5 =EMOVE EXIST. SIDEWALK AS REQ'D FOR NEW WALL ISTALLATION. THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT WATERLOO PUBLIC LIBRARY EXTERIOR STAIR RENOVATION WATERLOO PROJECT NO. 19-22713 FILE NAME DRAWN BY Psi DESIGNED BY PSJ, BWP REVIEWED BY PSJ, BWP ORIGINAL ISSUE DATE 7/08/19 CLIENT PROJECT N0. TITLE SHEET FIRST FLOOR PLAN Al w21 IOWA 7/2/2019 11 22:47 AM i