HomeMy WebLinkAboutscanSS-5GENERAL NOTES FOOTINGS AND FOUNDATIONS REINFORCING STEEL A NOTES AND DETAILS ON THE STRUCTURAL DRAWINGS TAKE PRECEDENCE OVER THESE STANDARD STRUCTURAL NOTES TYPICAL DETAILS SHALL BE USED WHENEVER APPLICABLE. B. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE STARTING WORK AND THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED, IN WRITING, OF ANY DISCREPANCIES. C IN NO CASE SHALL DIMENSIONS BE SCALED FROM PLANS. SECTIONS.. OR DETAILS ON THE STRUCTURAL DRAWINGS, D THE CONTRACTOR SHALL DETERMINE THE LOCATION OF UTILITY SERVICES IN THE AREA TO BE EXCAVATED BEFORE BEGINNING EXCAVATION. E. NO PIPES, DUCTS SLEEVES, CHASES ETC SHALL BE PLACED IN SLABS OR WALLS NOR SHALL ANY STRUCTURAL MEMBER BE CUT FOR PIPES DUCTS ETC F THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TEMPORARY SHORING AND BRACING OF EXISTING STRUCTURAL ELEMENTS DURING CONSTRUCTION ALL SHORING SHALL BE ADEQUATE TO SUPPORT ALL STRUCTURAL LOADS DURING THE REMOVAL OF THE EXISTING STRUCTURE. TEMPORARY SHORING MUST REMAIN IN PLACE UNTIL ALL NEW STRUCTURAL ELEMENTS ARE SECURED INTO PLACE PER CONSTRUCTION DOCUMENTS. G ALL MATERIAL AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS OF THE FOLLOWING CODES AND MANUALS (LATEST ADOPTED EDITION): 1 2015 INTERNATIONAL BUILDING CODE (IBC). 2. AMERICAN CONCRETE INSTITUTE (ACI). 3. CONCRETE REINFORCING STEEL INSTITUTE (CRSI) MANUAL OF STANDARD PRACTICE (FOR PLACING AND DETAILING OF ALL REINFORCING). 4 AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC). 5 AMERICAN WELDING SOCIETY (AWS) STANDARDS FOR WELDING AS MODIFIED BY AISC SPECIFICATION. 6 MASONRY STANDARDS JOINT COMMITTEE (MSJC) 7 AMERICAN FOREST & PAPER ASSOCIATION NATIONAL DESIGN SPECIFICATION (AF & PA NDS) SHOP DRAWINGS A SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR APPROVAL SIGNED AND SEALED BY A PROFESSIONAL ENGINEER RESPONSIBLE FOR ITS PREPARATION, WHO IS REGISTERED IN THE STATE WHICH THE PROJECT IS LOCATED. B PRIOR TO SUBMITTAL, THE CONTRACTOR SHALL REVIEW THE SHOP DRAWINGS AND MAKE ANY CORRECTIONS REQUIRED. THE CONTRACTOR SHALL STAMP AND SIGN THE SHOP DRAWINGS PRIOR TO SUBMITTAL TO THE ENGINEER. C THE ENGINEER'S REVIEW OF SHOP DRAWINGS IS FOR GENERAL CONFORMANCE OF THE DESIGN CONCEPT. CONTRACTOR SHALL SUBMIT A SCHEDULE OF SHOP DRAWING SUBMITTALS THAT IS ACCEPTABLE TO BOTH CONTRACTOR AND ENGINEER. AFTER THE CONTRACTOR HAS REVIEWED THE SHOP DRAWINGS, PROMPT REVIEW BY THE ENGINEER WILL BE MADE OF ALL SUBMITTALS. D FOR LARGE SUBMITTALS, REASONABLE REVIEW TIME SHALL BE ALLOWED AND MAY EXCEED TWO WEEKS. THE CONTRACTOR SHALL SUBMIT NECESSARY REQUEST FOR INFORMATION (RFI's) DURING THE DETAILING PROCESS TO AVOID SUBMITTALS THAT ARE INCOMPLETE OR NEED SIGNIFICANT VERIFICATIONS THE CONCURRENT SUBMITTAL OF MULTIPLE SHOP DRAWINGS ("DUMPING") WILL FURTHER EXTEND THE REVIEW PROCESS AND TIME FRAME NECESSARY TO PROPERLY REVIEW EACH SUBMITTAL. E UNLESS INDICATED OTHERWISE, THE GENERAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF THE FOLLOWING ITEMS FOR STRUCTURAL REVIEW. REFER TO SPECIFIC SECTION OF STRUCTURAL NOTES FOR ANY ADDITIONAL CRITERIA: 1. CONCRETE MIX DESIGNS 2 STRUCTURAL STEEL 3 ADDITIONAL STRUCTURAL SHOP DRAWINGS REQUESTED IN THE SPECIFICATIONS F. A COPY OF ALL SHOP DRAWINGS SHALL BE MAINTAINED ON SITE AT ALL TIMES. G SHOP DRAWINGS SHALL INCLUDE COMPLETE DETAIL SCHEDULES, PROCEDURES AND DIAGRAMS FOR FABRICATION AND ASSEMBLY OF STRUCTURAL MEMBERS AND SUBMIT PRIOR TO FABRICATION. H ERECTION PLANS ARE THE RESPONSIBILITY OF THE FABRICATOR. SPECIAL INSPECTIONS A SPECIAL INSPECTIONS SHALL BE PROVIDED IN ACCORDANCE WITH IBC SECTION 1704 AND 1705 THE SPECIAL INSPECTOR SHALL BE EMPLOYED BY THE OWNER SHALL BE THOROUGHLY KNOWLEDGEABLE OF IBC SPECIAL INSPECTION REQUIREMENTS AND SHALL DEMONSTRATE COMPETENCE TO THE SATISFACTION OF THE BUILDING OFFICIAL. THE CONTRACTOR SHALL CONTACT THE SPECIAL INSPECTOR DURING APPROPRIATE PHASES OF CONSTRUCTION SO THAT INSPECTIONS CAN BE MADE IN A TIMELY MANNER THE SPECIAL INSPECTOR SHALL SUBMIT WRITTEN INSPECTION REPORTS TO THE ENGINEER OF RECORD'S OFFICE.. WITHIN 3 WORKING DAYS OF EACH INSPECTION. ANY PROBLEMS SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR THE FOLLOWING ITEMS WILL REQUIRE SPECIAL INSPECTION. 1. CONCRETE a. REINFORCEMENT: REINFORCING STEEL SHALL BE INSPECTED ON A PERIODIC BASIS WELDING OF REINFORCEMENT SHALL BE CONTINUOUSLY INSPECTED. ONLY ASTM A706 REINFORCEMENT MAY BE WELDED. b. SAMPLING AND TESTING: CONTINUOUS INSPECTIONS SHALL BE PROVIDED DURING SLUMP TESTS AND WHEN DETERMINING THE TEMPERATURE OF FRESH CONCRETE AT THE TIME OF MAKING SPECIMENS FOR STRENGTH TESTS. c. CONCRETE PLACEMENT. CONTINUOUS INSPECTION REQUIRED d. COLD AND HOT WEATHER CONCRETING PERIODIC INSPECTION OF COMPLIANCE IS REQUIRED 2. SOILS a. THE SPECIAL INSPECTOR SHALL DETERMINE COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS FOR SITE PREPARATION, FILL PLACEMENT AND DENSITY TESTS. B TESTING REQUIREMENTS 1 CONCRETE. a. SAMPLE FOR STRENGTH TESTS OF EACH CLASS OF CONCRETE PLACED EACH DAY SHALL BE TAKEN NOT LESS THAN ONCE A DAY, NOR LESS THAN ONCE FOR EACH 150 CUBIC YARDS OF CONCRETE NOR LESS THAN ONCE FOR EACH 5.000 SQUARE FEET OF SURFACE AREA FOR SLABS OR WALLS A MINIMUM OF FIVE STRENGTH TESTS SHOULD BE MADE FOR A GIVEN PROJECT. A SOIL BEARING DESIGN VALUE. 1 1500PSF(PRESUMED). 2. BEARING VALUE TO BE VERIFIED IN FIELD BY GEOTECHNICAL ENGINEER. B PROTECT FOUNDATION EXCAVATIONS FROM FROST, DO NOT PLACE CONCRETE ON FROZEN GROUND. C FOUNDATION EXCAVATIONS SHALL BE KEPT FREE OF LOOSE MATERIAL AND STANDING WATER AND SHALL BE CHECKED AND APPROVED BY THE ENGINEER BEFORE THE PLACEMENT OF ANY CONCRETE D DESIGN FROST PENETRATION DEPTH: 42 INCHES E MINIMUM OF 6" COMPACTED GRANULAR SUBGRADE BELOW SLAB (IOWA DOT GRADATION #4121 OR APPROVED EQUIVALENT) F SOIL MATERIALS TO BE USED AS BACKFILL INCLUDING ANY ON SITE SOILS AVAILABLE FROM EXCAVATIONS ARE SUBJECT TO APPROVAL OF THE GEOTECHNICAL ENGINEER. MATERIAL COMPACTION CRITERIA LOCATION MINIMUM RELATIVE COMPACTION PERCENTAGE (ASTM D698 STANDARD PROCTOR DENSITY (SPD)) V-0" BELOW FOUNDATION AND SLAB SUBGRADE ELEVATIONS 98% ABOVE BOTTOM OF FOUNDATIONS AND BELOW SLAB SUBGRADE ELEVATIONS 95% BELOW EXTERIOR SLAB, WITHIN V-0" OF SUBGRADE ELEVATIONS 98% 3ELOW EXTERIOR SLAB MORE THAN V-0" BELOW SUBGRADE ELEVATIONS 950 CONCRETE CONCRETE SHALL BE STANDARD WEIGHT MIX UNLESS NOTED OTHERWISE AND MEET THE FOLLOWING CRITERIA. LOCATIONS fc @ 28 DAYS AIR ENTRAINMENT MAX WATER!CEMENT RATIO =OOTINGS /FOUNDATIONS 4000 PSI 6% t 1,5% 0.50 XTERIOR SLABS ON GRADE 4500 PSI 6'/0 + 1.5% 045 EXPOSED EXTERIOR WALLS 4500 PSI 6% t 1.5% 0 45 CEMENT SHALL CONFORM TO ASTM C150 TYPE 1 / II. C READY -MIX CONCRETE SHALL BE MIXED AND DELIVERED IN ACCORDANCE WITH ASTM C94. L CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF ACI 301 (LATEST EDITION) "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS", EXCEPT AS MODIFIED BY THESE NOTES. E ADMIXTURES MAY BE USED WITH PRIOR APPROVAL OF THE ENGINEER. ADMIXTURES SHALL COMPLY WITH ASTM C494 AND BE OF A TYPE THAT INCREASES THE WORKABILITY OF THE CONCRETE, BUT SHALL NOT BE CONSIDERED TO REDUCE THE SPECIFIED MINIMUM CEMENT CONTENT (CALCIUM CHLORIDE SHALL NOT BE USED). F CONTRACTOR SHALL SUBMIT MIX DESIGNS FOR APPROVAL 10 DAYS PRIOR TO FABRICATION AND INSTALLATION ALL CONCRETE MIXES SHALL BE DESIGNED AND CERTIFIED BY A MATERIALS TESTING COMPANY. G PROJECTING CORNERS OF SLABS BEAMS WALLS.. COLUMNS ETC. SHALL BE FORMED WITH A 3/4" CHAMFER UNLESS DETAILED OR NOTED OTHERWISE. H CONCRETE FLOOR SHALL BE CURED IN ACCORDANCE WITH ASTM C309 CONCRETE FLOOR SHALL BE PROTECTED FROM MOISTURE LOSS FOR A MINIMUM OF 14 DAYS USING AN APPROVED SHEET MEMBRANE IN ACCORDANCE WITH C171. I. FLYASH: LIMIT TO 15% REPLACEMENT RATIO J PROVIDE AGGREGATES FREE OF SHALE AT ALL SLAB LOCATIONS. AND USE FINE AGGREGATE WITH A PROVEN HISTORY OF NOT BEING SUSCEPTIBLE TO POPOUTS, IMPORTED SAND IF NECESSARY. A. BAR REINFORC=MINT SHALL BE ASTM A615, GRADE 60, B MINIMUM DEVE_OP','ENT LENGTH OF REINFORCING BARS SHALL BE AS FOLLOWS UNLESS NOTED OTHERWISE. MINIMUM LENGTH FOR STANDARD UN -COATED BARS IN NORMAL WEIGHT CONCRETE CONCRETE DEVE OPMENT LENGTH (Ld) FOR STRAIGHT BARS (MIN OF 12 INCHES) FOR 90 DEGREE STRENGTH TE"SION CLASS A TENSION CLASS B COMPRESSION HOOKED BARS. fc IN PSI # A SMA-E-ER #7 TO #11 #6 & SMALLER #7 TO #11 #18. #14 & #11 HOOK DEVELOPMENT AND SMALLER 3000 44;b _ 55 Db 57 Db 71 Db - 30 Db LENGTH 22 Db 3500 41 -C 51 Db 53 Db 66 Db -30-Db- - 20 Db- - 4000 38:c 47 Db 49 Db 62 Db _ 30 Db 4500 - _ 36-0 45 Db 47 Db _ 58 Db 30 Db 18 Db 5000 34-c 42 Db 44 Db -- 55 Db - - -_ - 30 Db 17 Db NOTE. Db = DIAMETER-= REINFORCEMENT Ld = DEVELOPMENT LENGTH C. TYPICAL SPLICES.; -ASS B AS DEFINED IN ACI318.. UNLESS NOTED OTHERWISE D ADJUSTMENT FAC CRS FOR STRAIGHT BARS IN TENSION 1 LIGHTWEIGHT:ONCRETE=1.3, 2 EPDXY COATE = 1.2. 3 EPDXY COATE `KITH COVER LESS THAN 3DB OR CLEAR SPACING LESS THAN 6 DB = 1.5, 4. HORIZONTAL "DP" BARS WITH 12" OF CONCRETE CAST BELOW = 1.3 5, EPDXY COATE HORIZONTAL "TOP" BARS WITH 12" OF CONCRETE CAST BELOW = NOT GREATER THAN 1.7. E ADJUSTMENT =ACCRS FOR STRAIGHT HOOKS IN TENSION I. LIGHTWEIGHT;DNCRETE = 1.3, 2 EPDXY CC ATE = 1.2. F REINFORCING STE_ SHALL BE PROVIDED WITH THE FOLLOWING AMOUNTS OF COVER FOR CAST -IN - PLACE CONCRETIUNLESS NOTED OTHERWISE PNIMUM CLEAR C=RRTEINFORCINGFOR REINFORCING STEEL CONCRETE ON S-1L )IRECT CONTACT3„SLAB ON GRADE- - - - - CENTER-- STRUCTL�A_;LABS EXPOSED HER- _ --#6 TO #1c PEBR2"#5 AND S% ALL? REBAR1 1/2"WALLS, STRUCTURAL-ABS NOT EXPOWEATHER3/4"COLUMNS AND PIERS OVER TO STIRR1-1/2 - - G ALL REINFORCINGTEEL, ANCHOR BOLTS. DOWELS, AND INSERTS SHALL BE SECURED IN POSITION WITH WIRE POSITIJERS, OR EQUAL, BEFORE PLACING CONCRETE OR GROUT. H. DOWELS BETWEE-_OOTINGS AND WALLS SHALL BE THE SAME GRADE, SIZE, AND SPACING AS VERTICAL WALL RJFORCING. I CONTRACTOR SH.- SUBMIT REINFORCING STEEL SHOP DRAWINGS FOR APPROVAL A MINIMUM OF 10 DAYS PRIOR TCABRICATION AND INSTALLATION. J. BARS TO BE WELD SHALL BE ASTM A706, GRADE 60 WELDING OF REINFORCING BARS SHALL CONFORM TO AWlt4. STRUCTURALSTEEL A SPECIFICATIONS: 1, DESIGN, FABRaTION.. AND ERECTION OF STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH THE "STEEL CSTRUCTION MANUAL". 14TH EDITION, BY THE AMERICAN INSTITUTE OF STEEL CONSTRUCTI( UNLESS NOTED OTHERWISE. 2 STEEL MATERS SHALL MEET THE REQUIREMENTS OF THE FOLLOWING SPECIFICATIONS. UNLESSNOTETHERWISE: STRUCTURALPE/SHAPE ASTM DESIGNATION_ MATERIAL STRENGTH M S C MC. AND L-SHA5 PLATES AND BARS A36 Fy = 36 KSI PIPES A53 GRADE B Fy = 35 KSI - - HSS RECTANGULAR A500 GRADE B Fy = 46 KSI HSS ROUND A500 GRADE B Fy 42 KSI WELDS - - - - - - -- - - -- - - - - E70XX ELECTRODE; A233 FU = 70 KSI 3. CLEAN ALL EX?IOR FIELD WELDS AND MEMBERS PER SSPC-SPG AND PRIME PAINT WITH GRAY INORGANIC ZIN-O A 3-5 MIL THICKNESS. B. WELDING. 1 ALL WELDING 5LL CONFORM TO THE REQUIREMENTS OF AWS D1,1 STRUCTURAL WELDING CODE. 2 WELDER CERT ATION PROCEDURES SHALL BE AS FOLLOWS: a. ALL WELD[ SHALL BE CURRENTLY CERTIFIED AND REGISTERED BY THE LOCAL OFFICIALS AND/OR ThMERICAN WELDING SOCIETY AND, IF REQUIRED. ALL WELDERS SHALL HAVE THEIR CERICATION AVAILABLE TO THE ENGINEER. 3. ALL WELD FILL METAL SHALL BE AWS E70XX WITH A MINIMUM CHARPY V-NOTCH (CVN TOUGHNESS LOFT -LB AT 0 DEG F AS DETERMINED BY THE APPROPRIATE AWS A5 CLASSIFICATI(TEST METHOD OR MANUFACTURER CERTIFICATION, UNLESS NOTED OTHERWISE, 4. ALL BUTTNEI SHALL BE COMPLETE JOINT PENETRATION (CJP) WELDS. UNLESS NOTED OTHERWISE. 5. ALL GROOVE LDS SHALL BE COMPLETE JOINT PENETRATION (CJP) WELDS UNLESS NOTED OTHERWISE. 6. WELDING PRCDURE AND SEQUENCES SHALL BE PLANNED TO MINIMIZE WELD SHRINKAGE THAT COULD RESU N LAMELLAR TEARING. 7 FIELD WELDIM1iLL BE ALLOWED ONLY WHERE SHOWN ON THE DRAWINGS. 8. EXISTING ANEW STEEL SURFACES TO BE WELDED SHALL BE CLEANED OR PAINT.. GREASE, SCALE OR O=R FOREIGN MATERIAL REMOVED, 9, ALL FIELD'NES SHALL BE WIRE BRUSHED AND CLEANED THEN TOUCHED -UP PAINTED. A PIPE AND TUBE RINGS a, FIT ANC SP ASSEMBLE HANDRAIL COMPONENTS WHERE POSSIBLE GRIND EXPOSED JOINTS FLUSH AI3MOOTH. b. SHOP PR, WITH TWO COATS. THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT WATERLOO PUBLIC LIBRARY EXTERIOR STAIR RENOVATION WATERLOO IOWA PROJECT NO 19-22713 FILE NAME DRAWN BY BWP DESIGNED BY BWP REVIEWED BY BWP ORIGINAL ISSUE DATE 7/08/19 CLIENT PROJECT NO TITLE STRUCTURAL SHEET NOTES 7/2/2019 11:22:56 AM