.,-„..- PROJECT SPECIFICATIONS FOR
i
,.L F.Y. 2018
...... ,,....+- ASPHALT OVERLAY PROGRAM ._
_...
,.„.
,.-
.._
-
__ -1
-...,,-.V---
, 4k1,4
:.:7'i erb0 0
,‘,--
A
„:7,1
, CONTRACT NO. 943
- ,
- ,
_ 1
- - -
n
_
. ,
,..s
—
-Il,
s s rkrile\ou I hereby certify that this engineering document was prepared by me or under my direct
supervision and that I am a licensed Professional Engineer under the laws of the State of
_-.9."-.\--o00.0° °000%7<'-IC Iowa..„,,, I" .
00
„.„ to . . <,1 . ,
JAMIE A. =26/‘&//5
-,....,
0, (f) KNUTSON 1 '-'1VA*KNUTSON, '. . ATE
i-c. 0 Z ° 0 -ense No.is Iowa 16025.
-'-' +0, 1 6025 of ito
- ,,,,fif, My License Renewal Date is December 31,2019.
.? Os 0 '000
ie.1 000000o° -k,./f Pages or sheets covered by this seal:
4s; ,„,..... . . ,
- ‘,-„
7-,; --
- ..,,,,,
...,, *‘‘,........ -.,.....-
-4::..-T.,..-.7..-- -#1,---Kirlx...-„wq,
F.Y. 2018 ASPHALT OVERLAY PROGRAM
CONTRACT NO. 943
CONTRACT DOCUMENTS
TABLE OF CONTENTS
1. NOTICE OF PUBLIC HEARING
2. NOTICE TO BIDDERS
3. INSTRUCTIONS TO BIDDERS
4. FORM OF BID OR PROPOSAL
5. SALES TAX EXEMPTION INFORMATION FORM
6. FORM OF BID BOND
7. NON-COLLUSION AFFIDAVITS
8. EQUAL OPPORTUNITY CLAUSE
9. TITLE VI CIVIL RIGHTS
10. BIDDER STATUS FORM
11. AFFIRMATIVE ACTION PROGRAM
12. POTENTIAL ITEMS OF WORK FOR MBE/WBE PARTICIPATION
SUBCONTRACTOR'S BID REQUEST FORM,
LETTER FORM FOR SUBCONTRACTOR QUOTES,
MBE/WBE SCOPE LETTER,
MBE AND/OR WBE PREBID CONTACT INFORMATION FORM
13. WATERLOO/CEDAR FALLS MINORITY AND WOMEN BUSINESSES
ENTERPRISE CONSTRUCTION AND MAINTENANCE
CONTRACTOR'S GUIDE
14. STATEMENT OF BIDDER'S QUALIFICATIONS
15. GENERAL SPECIAL PROVISIONS
16. SPECIAL PROVISIONS
17. GENERAL SPECIFICATIONS FOR CONSTRUCTION
18. SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION
19. FORM OF CONTRACT
20. FORM OF PERFORMANCE BOND
21. FORM OF PAYMENT BOND
NOTICE OF PUBLIC HEARING
On Proposed Plans, Specifications, Form of Contract,
And Estimate of Cost
For the
FY 2018 ASPHALT OVERLAY PROGRAM
In the City of Waterloo, Iowa
CONTRACT NO. 943
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her
office in the City Hall of the said City on the 22nd day of March until 1:00 p.m. for the
construction of the FY 2018 ASPHALT OVERLAY PROGRAM, Contract No. 943, as
described in detail in the plans and specifications now on file in the Office of the City
Clerk.
OPENING OF BIDS
All proposals received will be opened in the First Floor Conference Room at City Hall, in
the City of Waterloo, Iowa, on the 22nd day of March, 2018, at 1:00 p.m., and the
proposals will be acted upon at such later time and place as may then be fixed by the
City Council.
PUBLIC HEARING
Notice is hereby given that the Council of said City will conduct a public hearing on the
proposed plans, specifications, form of contract, and estimate of cost for the
construction of the above-described improvement project at 5:30 p.m. on the 26th day of
March, 2018, said hearing to be held in the Harold E. Getty Council Chambers in City
Hall in said City. The proposed plans, specifications, form of contract, and estimate of
cost for said improvements heretofore prepared by the City of Waterloo are now on file
in the office of the City Clerk for public examination, and any person interested therein
may file written objection thereto with the City Clerk before the date set for said hearing,
or appear and make objection thereto with the City Clerk before the date set for said
hearing, or appear and make objection thereto at the meeting above set forth. The
NOTICE TO BIDDERS can be viewed at the following locations:
1) City of Waterloo web site at http://ci.waterloo.ia.us/
2) Plan rooms:
Master Builders of Iowa
221 Park Street, PO Box 695
Des Moines, IA 50303
McGraw Hill Construction Dodge
3315 Central Ave.
Hot Springs, AR 71913
NOTICE OF HEARING CONTRACT NO. 943
Page 1 of 2
Reed Construction Data
30 Technology Parkway South, Ste. 500
Norcross, GA 30092
3) Plan Room Web sites:
Master Builders of Iowa web site at www.mbionline.com
Dodge Lead web site: http://dodgeprojects.construction.com/http://wwvv.cmdgroup.com/project-leads/com/project-leads/
Reed Const. Data Lead web site:
SCOPE OF WORK
The extent of the work involved is the milling of existing asphalt streets or cracking and
seating of concrete streets. Placing a new hot mix asphalt overlay on these streets and
any other work needed to complete the overlay of said streets.
STREET FROM TO
Fletcher Ave. Sergeant Rd. Black Hawk Rd.
Grant Ave. 5th St., W. 4th St., W.
Hackett Rd., S. Greenhill Rd. 370' south of Sager Ave.
Idaho St. Dubuque Rd. Independence Ave.
Idaho St. Independence Ave. MLK Jr. Dr.
Olympic North Olympic Dr. Ridgemont Rd.
St. Francis Dr. Ravenwood Rd. 633' South
Texas St. San Marnan Dr., E. 723' South
Wilbur Ave. Janney Ave. Falls Ave.
Published pursuant to the provisions of Chapter 26 of the City Code of Iowa and upon
order to the City Council of said Waterloo, Iowa, on the day of
CITY OF WATERLOO, IOWA
BY:
Kelley Felchle
City Clerk
NOTICE OF HEARING
CONTRACT NO. 943 Page 2 of 2
NOTICE TO BIDDERS
For the Taking of Construction Bids for the
FY 2018 ASPHALT OVERLAY PROGRAM
In the City of Waterloo, Iowa
CONTRACT NO. 943
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her
office in the City Hall of the said City on the 22nd day of March, 2018 until 1:00 p.m. for
the construction of the FY 2018 ASPHALT OVERLAY PROGRAM, Contract No. 943,
as described in detail in the plans and specifications now on file in the Office of the City
Clerk.
OPENING OF BIDS
All proposals received will be opened in the First Floor Conference Room at City Hall, in
the City of Waterloo, Iowa, on the 22nd day of March, 2018, at 1:00 p.m., and the
proposals will be acted upon at such later time and place as may then be fixed by the
City Council.
PUBLIC HEARING
The Council of said City will conduct a public hearing on the proposed plans,
specifications, form of contract, and estimate of cost for the construction of the above-
described improvement project at 5:30 p.m. on March 26, 2018, said hearing to be held
in the Harold E. Getty Council Chambers in City Hall in said City.
SCOPE OF WORK
The extent of the work involved is the milling of existing asphalt streets or cracking and
seating of concrete streets. Placing a new hot mix asphalt overlay on these streets and
any other work needed to complete the overlay of said streets.
STREET FROM TO
Fletcher Ave. Sergeant Rd. Black Hawk Rd.
Grant Ave. 5th St., W. 4th St., W.
Hackett Rd., S. Greenhill Rd. 370' south of Sager Ave.
Idaho St. Dubuque Rd. Independence Ave.
Idaho St. Independence Ave. MLK Jr. Dr.
Olympic North Olympic Dr. Ridgemont Rd.
St. Francis Dr. Ravenwood Rd. 633' South
Texas St. San Marnan Dr., E. 723' South
Wilbur Ave. Janney Ave. Falls Ave.
NOTICE TO BIDDERS CONTRACT NO. 943 Page 1 of 5
BEGINNING AND COMPLETION DATES
The work under the proposed contract shall be commenced within ten (10) working
days after receipt of "Notice to Proceed" and all items shall be completed on or before
October 19, 2018.
METHOD OF PAYMENT TO CONTRACTOR
The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-
five percent (95%) of the work as it is completed and materials delivered and work
approved. Final payment will be made thirty-one (31) days after completion of the work
and acceptance by the Council. Before final payment is made, vouchers showing that
all subcontractors and workmen and all persons furnishing materials have been fully
paid for such materials and labor will be required unless the City is satisfied that
material, men and laborers have been paid.
The Contractor is hereby notified that if the City does not have cash on hand to pay
monthly pay estimates, according to Chapter 384.57 of the Code of Iowa, payment may
be made by anticipatory warrants issued bearing a rate of interest not exceeding that
permitted by Chapter 74A, Code of Iowa.
PLANS AND SPECIFICATIONS
Plans and Specifications governing the construction of the proposed improvements
have been prepared by the City of Waterloo Engineering Department, which plans and
specifications and also the prior proceedings of the City Council referring to and defining
said proposed improvements are hereby made a part of this notice, and the proposed
contract by reference shall be executed in compliance therewith.
Plans and Specifications are available from the Engineering Department on the second
floor of City Hall upon the receipt of a $25.00 refundable deposit. Deposits will be
refunded if the plans are returned in usable condition (i.e. generally free of highlights,
ink markings, tears, stickers, water stains and soiling) to the Engineer's Office by the
end of the 14th consecutive day after the project has been awarded. No deposits will be
refunded for any requests or plans received after the 14th consecutive day, which
includes plans returned via mail service. Plan holders are responsible for ascertaining
when the project has been awarded. If the plan holder is the prime contractor or a
subcontractor or supplier of the prime contractor that has been awarded the project,
Plans and Specifications do not need to be returned to receive the deposit. The prime
contractor must submit a list of his subcontractors and suppliers for the City_to verify
eligibility for the refundable deposit.
Upon award of project, the prime contractor, his subcontractors and suppliers shall be
supplied with the needed number of plans and specifications at no additional cost.
CONTRACT AWARD
A contract will be awarded to the qualified bidder submitting the lowest bid.
The City reserves the right to reject any or all bids, re-advertise for new bids, and to waive informalities in the bids submitted that might be in the best interest of the City.
NOTICE TO BIDDERS CONTRACT NO. 943 Page 2 of 5
Bids may be held by the City of Waterloo, Iowa, for a period not to exceed thirty (30)
days from the day of the opening of bids for the purpose of reviewing the bids and
investigating the qualifications of bidders, prior to awarding the contract.
By virtue of statutory authority, a preference will be given to products and provisions
grown and coal produced with the State of Iowa and preference will be given to local
domestic labor in the construction of the improvement.
PROPOSALS SUBMITTED
The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly
write or type the unit bid price and the bid item extension (Unit Price x Estimated Qty) in
numerals on the blanks provided. Should there be any discrepancy between the unit
bid price and extension, the City of Waterloo shall consider the unit bid price as being
the valid unit bid price.
The bidder has the option to submit a computer-generated spreadsheet in lieu of the
portion of the Form of Bid or Proposal, which includes the Bid Item Number,
Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price and Total Bid. The
computer-generated spreadsheet shall include all of the information listed in that portion
of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor
submitting the bid. For the bidders who submit a computer-generated spreadsheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in the space(s)
provided on the Form of Bid or Proposal.
BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or cashier's check
drawn on an Iowa bank, or a bank chartered under the laws of the United States, a
certified share draft drawn on a credit union in Iowa or chartered under the laws of the
United States, or bid bond, (on the form furnished by the City) payable to the City of
Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, which
certified check, certified share draft or bid bond will be held as security that the Bidder
will enter into a Contract for the construction of the work and will furnish the required
bonds, and in case the successful Bidder shall fail or refuse to enter into the Contract
and furnish the required bonds, his bid security may be retained by said City as agreed
upon liquidated damages. If bid bond is used, it must be signed by both the Bidder and
the surety or surety's agent. Signature of surety's agent must be supported by
accompanying Power of Attorney.
PERFORMANCE & PAYMENT BONDS
The successful bidder will be required to furnish a "Performance Bond" and a "Payment
Bond" within ten (10) days after forms are presented to him in an amount equal to one
hundred percent (100%) of the contract price, said bond to be issued by a responsible
surety approved by the City Council and shall guarantee the faithful performance of the
contract and the terms and conditions therein contained, and shall guarantee the
prompt payment of all materials and labor and protect and save harmless the City from
claims of any kind caused by the operations of the contractor.
NOTICE TO BIDDERS CONTRACT NO. 943 Page 3 of 5
MAINTENANCE BOND
Before the Contractor shall be entitled to receive final payment for work done under this
contract, it shall execute and file a bond in the penal sum of not less than 100% of the
total amount of the contract, same to be known as "Maintenance Bond," and which bond
must be approved by the City Council, and which bond is in addition to the bond given
by the Contractor to guarantee the completion of the work.
CONTRACT COMPLIANCE PROGRAM / SUBCONTRACTING
The program proposes numerical projections regarding utilization of Minority Business
Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors
and suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa.
A goal of at least ten percent (10%) for MBE participation on all City funded construction
projects that are estimated at $50,000.00 or more. A goal of at least two percent (2%)
for WBE participation on all City funded construction projects that are estimated at
$50,000.00 or more. Any project funded in part or in total with federal funds shall follow
the respective agencies contract compliance program and goals. The
Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance
MBE/WBE goals. The MBE/WBE subcontractors, suppliers or vendors must provide
the Prime Contractor a reasonably competitive price for the service being rendered or
the Contractor is not required to accept their bid.
LIQUIDATED DAMAGES
Time is an essential element of this contract. It is important that the work be diligently
pursued to completion. If the work is not completed within the specified contract period,
plus authorized extensions, the contractor shall pay to the City Liquidated Damages in
the amount of five hundred dollars ($500.00) per day, for each day, as further described
herein, in excess of the authorized time.
Days beyond the specified completion date for which Liquidated Damages will be
charged will be working days that the contractor does, or could have worked, from
Monday through Saturday. Sundays will be counted only if work is performed. Partial _.
working days will be considered as a full working day. Days not chargeable for
Liquidated Damages will include rain days, Sunday if no work is done, and legal
holidays.
Working days will cease to be charged when only punch list items remain to be
completed. Punch list items do not include contract bid items or approved change/extra
work orders.
When the Contractor believes the project to be substantially completed, a written notice
stating the same shall be submitted to the Engineer and a request made for a Punch
List. If the work under the Contract extends beyond the normal construction season for
such work the Contractor shall submit to the Engineer in writing a request that working
days counted toward the project be suspended until work is resumed the following
construction season.
This amount is not construed as a penalty. These damages are for the cost to the City
of providing the required additional inspection, engineering and contract administration.
NOTICE TO BIDDERS CONTRACT NO. 943 Page 4 of 5
PRE-CONSTRUCTION CONFERENCE
Before the work is commenced on this contract, a conference shall be held for the
purpose of discussing the contract. The conference shall be attended by the prime
contractor, subcontractors and City Officials.
BIDDER STATUS
Attention of bidders is called to compliance with the provisions of the Resident
Bidder/Non-Resident Bidder requirements.
Each bidder submitting a bid shall execute and include with the bid, a Bidder Status
Form in the form herein provided.
Failure to submit a fully completed Bidder Status Form with the bid may result in the bid
being deemed nonresponsive and rejected.
SALES TAX EXEMPTION CERTIFICATES
Contractors and approved subcontractors will be provided a Sales Tax Exemption
Certification to purchase building materials or supplies in the performance of
construction contracts let by the City of Waterloo.
Posted pursuant to the provisions of Chapter 26 of the City Code of Iowa.
CITY OF WATERLOO, IOWA
NOTICE TO BIDDERS CONTRACT NO. 943 Page 5 of 5
INSTRUCTIONS TO BIDDERS
1. EXPLANATIONS TO BIDDERS
Any explanation desired by a bidder regarding the meaning or
interpretation of the Notice to Bidders, Plans, Specifications, etc., must be
requested in writing and with sufficient time allowed for a reply to reach
bidders before submission of their bids. Any interpretation made will be in
the form of an amendment of the Notice to Bidders, Plans, Specifications,
etc., and will be furnished to all prospective bidders. Its receipt by the
bidder must be acknowledged in the space provided on the Proposal Form
or by letter or telegram received before the time set for opening of bids.
Oral explanations or instructions given before the award of the contract
will not be binding.
2. EXAMINATION OF PROPOSED WORK
Bidders should visit the site and take such other steps as may be
reasonably necessary to ascertain the nature and location of the work,
and the general and local conditions which can affect the work or the cost
thereof. Failure to do so will not relieve bidders from responsibility for
estimating properly the difficulty or cost of successfully performing the
work. The owner will assume no responsibility for any understanding or
representation concerning conditions made by any of its officers or agents
prior to the execution of the contract, unless included in the Notice to
Bidders, the Specifications or related documents.
3. PREPARATION OF BIDS
a. Bids shall be submitted on the forms furnished, or copies thereof,
and must be manually signed. If erasures or other changes appear
on the forms, each erasure or change must be initialed by the
person signing the bid.
The bidder has the option to submit a computer-generated
spreadsheet in lieu of the portion of the Form of Bid or Proposal,
which includes the Bid Item Number, Description, Unit, Estimated
Quantity, Unit Bid Price, Total Bid Price, and Total Bid. The
computer-generated spreadsheet shall include all of the information
listed in that portion of the Form of Bid or Proposal as well as bear
the signature of the Prime Contractor submitting the bid. For the
bidders who submit a computer-generated spread- sheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in
the space(s) provided on the Form of Bid or Proposal.
INSTRUCTIONS TO BIDDERS Page 1 of 14
b. The Bid Form may provide for submission of a price or prices for
one or more items, which may be lump sum bids, alternate prices,
schedule items resulting in a bid on a unit of construction or a
combination thereof, etc. When the Bid Form explicitly requires
that the bidder bid on all items, failure to do so will disqualify the
bid. When submission of a price on all items is not required,
bidders should insert the words "no bid" in the space provided for
any item on which no price is submitted.
c. Unless called for, alternate bids will not be considered.
d. Modifications of bids already submitted will be considered if
received at the office designated in the Notice to Bidders by the
time set for closing of bids. Telegraphic modifications will be
considered, but should not reveal the amount of the original or
revised bid.
e. In preparing his bid, the bidder shall specify the price, written legibly
in ink or with the typewriter, at which he proposes to do each item
of work. The unit price shall be stated in figures in the blank space
provided (i.e., $7.14). In items where unit price is required, the total
amount of each item shall be computed at the unit prices bid for the
quantities given on the Bid Form and stated in figures in the blank
space provided.
If the bidder chooses to submit the unit prices, total bid price, and
total bid on a computer-generated spreadsheet, all numbers shall
be easily legible.
f. Any changes or alterations made in the Bid Form, or any addition
thereto, may cause the rejection of the bid. No bid will be
considered which contains a clause in which the contractor
reserves the right to accept or reject a contract awarded him by the
city Council of Waterloo. Bids in which the unit prices are obviously
unbalanced may be rejected.
g. If the bidder does not qualify as a resident bidder, the nonresident
bidder shall specify on the project proposal whether any preference
to resident bidders, including but not limited to any preference to
bidders, the imposition of any type of labor force preference, or any
other form of preferential treatment to bidders or laborers from that
state or foreign country is in effect in the nonresident bidder's state
or country of domicile at the time of a bid submittal.
INSTRUCTIONS TO BIDDERS Page 2 of 14
4. SUBMISSION OF BIDS
a. A bid must be sealed in a separate envelope and marked to
indicate its contents and be accompanied by the bid security in a
separate envelope. If forwarded by mail, the two envelopes shall
be placed in a third and mailed to the City Clerk/Auditor. All bids
must be filed with the City Clerk/Auditor of the City of Waterloo at
his office in the City Hall before the time specified for closing bids.
b. Bids received prior to the advertised hour of opening will be
securely kept sealed. The officer whose duty it is to open them will
decide when the specified time has arrived, and no bid received
thereafter will be considered; except that when a bid arrives by mail
after the time fixed for opening, but before the reading of all other
bids is completed, and it is shown to the satisfaction of the City of
Waterloo, Iowa, that the non-arrival on time was due solely to delay
in the mails for which the bidder was not responsible, such bid will
be received and considered.
c. Bidders are cautioned that, while telegraphic modifications of bids
may be received as provided above, such modifications, if not
explicit and if in any sense subject to misinterpretation, shall made
the bid so modified or amended, subject to rejection.
5. LATE BIDS AND MODIFICATIONS OR WITHDRAWALS
Bids and modifications or withdrawals thereof received at the office
designated in the Notice to Bidders after the exact time set for closing of
bids will not be considered. However, a modification which s received
from an otherwise successful bidder, and which makes the terms of the
- bid more favorable to the City of Waterloo, will be considered at any time it
is received and may therefore be accepted. Bids may be withdrawn by
written or telegraphic request received from bidders prior to the time set
for closing of bids.
6. PUBLIC OPENING OF BIDS
Bids will be publicly opened at that time and place set for opening in the
Notice to Bidders. Their content will be made public for the information of
bidders and others interested who may be present either in person or by
representative.
7. BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or
cashier's check drawn on an Iowa bank, or a bank chartered under the
INSTRUCTIONS TO BIDDERS Page 3 of 14
laws of the United States, a certified share draft drawn on a credit union in
Iowa or chartered under the laws of the United States, or bid bond (on the
form furnished by the City) payable to the City of Waterloo, Iowa, in the
sum of not less than five percent (5%) of the bid submitted, which certified
check, certified share draft or bid bond will be held as security that the
Bidder will enter into a Contract for the construction of the work and will
furnish the required bonds, and in case the successful Bidder shall fail or
refuse to enter into the Contract and furnish the required bond, his bid
security may be retained by said City as agreed upon liquidated damages.
If bid bond is used, it must be signed by both the bidder and the surety or
surety's agent. Signature of surety's agent must be supported by
accompanying Power of Attorney.
8. COLLUSIVE AGREEMENTS
a. Each bidder submitting a bid shall execute and include with the bid,
a Non-Collusion Affidavit in the form herein provided, to the effect
that he as not colluded with any other person, firm, or corporation in
regard to any bid submitted.
b. Each bidder submitting a bid shall have each proposed
subcontractor, if any, execute and submit to the City Contract
Compliance Officer by 5:00 P.M. the business day following the day
bids on this project are due, a Non-Collusion Affidavit in the form
herein provided, to the effect that he has not colluded with any
other person, firm, or corporation in regard to any bid submitted.
Before executing any subcontract, the successful bidder shall
submit the name of any proposed subcontractor for approval by the
City.
9. MINORITY AND/OR WOMEN BUSINESS ENTERPRISE
SUBCONTRACTORS
a. CITY OF WATERLOO AND/OR WOMEN BUSINESS
ENTERPRISE PRE-BID CONTACT INFORMATION FORM
The City of Waterloo Minority and/or Women Business Enterprise
Pre-Bid Contact Information Form shall be submitted with the Form
of Bid or Proposal. Failure to do so shall be grounds for the bid
being rejected if subcontracting is proposed by the prime
contractor.
INSTRUCTIONS TO BIDDERS Page 4 of 14
10. MBE/WBE CONTRACT COMPLIANCE PROGRAM
PURPOSE
The purpose of the Contract Compliance Program (hereinafter
called Program) is to act as an impetus for increasing the
participation of minority and women disadvantaged business
enterprise (MBE/WBE) in City awarded construction contracts.
The Program does not propose to eliminate any bonafide contractor
or subcontractor from bidding on City contracts, but it will hopefully
serve as a needed stimulus to help local MBE/WBE's grow and
eventually become mainstream contractors and subcontractors.
This Contract Compliance Program does not propose to include
any set-aside or quotas, but only flexible goals where "good-faith
efforts" are required by the contractor to use MBE/WBE
subcontractors.
This Program shall not eliminate the need for contractors to
continue their "good-faith efforts" in using MBE/WBE
subcontractors on City contracts estimated at less than $50,000.
The City of Waterloo will make every effort to reduce in-house
construction and maintenance work that would be more cost
effectively performed by the private sector and, thus, would allow
additional bidding opportunities for MBE/WBE firms.
The City Contract Compliance Officer shall be advised of all City of
Waterloo awarded construction contracts.
DEFINITIONS
Goals:
A flexible numerically expressed objective which contractors are
required to make "good-faith efforts." The key to the requirement is
to make documented efforts. Goals are neither set-a-sides nor a
device to achieve proportional representation or equal results.
Numerical goals do not create set-a-sides for specific groups, nor
are they designed to achieve proportional representation or equal
results. Rather, the goal-setting process in affirmative action
planning is used to target and measure the effectiveness of
affirmative action efforts to eradicate and prevent discrimination.
INSTRUCTIONS TO BIDDERS Page 5 of 14
Quota:
A flat numerical requirement that the contractor is required to meet
in order to obtain the benefit or be in compliance. The numerical
goal component of affirmative action programs is not designed to
be, nor may it properly or lawfully be interpreted as, permitting
unlawful preferential treatment and quotas with respect to persons
of any race, color, religion, sex, or national origin. The regulations
at 41 CFR 60-2.12(a), 60-2.15 and 60-2.30, specifically prohibit
discrimination and the use of goals as quotas. (U.S. Department of
Labor)
Set-Aside:
An arrangement in which a particular contract is reserved for
competition solely among minority and women business
enterprises.
Contractor.
As used in this document means contractor, subcontractor,
supplier, vendor, and professional service provider.
Minority Business Enterprise (MBE)
Any business, which is at least 51%, owned by one or more
minorities and whose management and daily business operations
are controlled by one or more such individuals and is on the current
State Unified Certification List, or were listed on the City of
Waterloo Certified MBE/WBE Contractors list as of July 1, 2002
Women Business Enterprise (WBE):
Any business which is at least 51% owned by one or more women
and whose management and daily business operations are
controlled by one or more such individuals and is on the current
State Unified Certification List, or were listed on the City of
Waterloo Certified MBE/WBE Contractors list as of July 1, 2002
Minority:
Any person or persons who are considered as socially and
economically disadvantaged because of their identity as a group
member without regard to their individual qualities. The groups
include: Black American, Hispanic American, Native Americans,
Eskimos, Aleuts, and Asian-Pacific Americans. 13 C.F.R. 124-
1.1(c)(3)(ii)(1983). _
Lowest Responsible Bidder:
Bidder who has offered the lowest bid and who has exhibited skill
relative to the type of work bid on, judgment, financial responsibility,
and evidence of working with the Affirmative Action Employment
INSTRUCTIONS TO BIDDERS Page 6 of 14
Program and the Contract Compliance Program.
Broker.
One buying or selling for others on commission or other fee basis
without maintaining a warehouse or other similar inventory storage
facility.
Mayor's Advisory Committee:
Mayor's Advisory Committee for Minority, Female, and
Disadvantaged Business Enterprise.
Good Faith Efforts:
The successful bidder shall be selected on the basis of having
submitted the lowest responsible bid. The obligation of the bidder is
to make good faith efforts. The bidder can demonstrate that it has
done so by the following:
1. The Prime Contractor met the project goal - No Action necessary
2. If the Prime Contractor failed to meet the goal, they must submit
documentation of good faith efforts.
CONTRACT COMPLIANCE PROGRAM SUBCONTRACTING
The program proposes numerical projections or goals regarding
utilization of Minority Business Enterprise (MBE) and Women
Business Enterprise (WBE) as subcontractors in the performance
of contracts awarded by the City of Waterloo, Iowa.
A goal of at least 10% for MBE participation on all City funded
construction projects that are estimated at $50,000 or more and
projects under $50,000 where applicable at the Contract
Compliance Officer's discretion. There is at least 2% WBE goal on
City funded projects. Any project which is funded solely or in part
with Federal funds shall follow the respective agencies contract
compliance program and goals. Any project which is funded solely
or in part with State funds shall follow the respective agencies
contract compliance program and goals. The City of Waterloo
Contract Compliance Program is for City awarded construction
contracts only. The prime contractor shall make "good-faith efforts"
to meet the Contract Compliance MBE/WBE goals. The MBE/WBE
subcontracts must provide the prime contractor a reasonably
competitive price for the service being rendered or the contractor is
not required to accept the bid.
INSTRUCTIONS TO BIDDERS Page 7 of 14
Administrative Reconsideration:
As part of this reconsideration, the bidder will have the opportunity
to provide written documentation or arguments concerning the
issue of whether they made adequate good faith efforts to meet the
goals. The bidder will have the opportunity to meet in person with
the City of Waterloo's Administrative Reconsideration Committee to
discuss the issue of whether they made adequate good faith efforts. -
The Administrative Reconsideration Committee will forward a
written decision on reconsideration to the Mayor and City Council,
explaining the basis for finding that the bidder did or did not meet
the goal or make adequate good faith efforts to do so.
Documentation required will include but is not limited to the -
following:
* Making portions of the work available for MBE/WBE
subcontracting
* Evidence of negotiating with MBE/VVBE firms
* MBE/WBE quotes obtained and non-MBE/WBE quotes used -
* Reasons agreements were not reached
* Follow-up after initial solicitations
* Efforts to assist in obtaining equipment, supplies and materials (at
competitive prices), bonding, lines of credit, insurance, etc.
* Evidence of past compliance or non-compliance by same
contractor
The Contract Compliance Officer will determine the weight to be
given to each item listed above (supported by appropriate
documentation) based on overall program goals.
RESPONSIBILITIES
1. City of Waterloo
A. The City Contract Compliance Officer has the responsibility
to assure the City's compliance with Federal, State and
Municipal regulations.
B. The City Contract Compliance Officer is responsible for
maintaining a current directory of certified firms. Certification
of MBE/WBE/DBE contractors is through the Iowa
Department of Transportation and its Unified Certification
Program. Only firms certified based on guidelines prescribed
in 49 CFR Part 26 and provisions of this agreement, shall be
recognized as certified by the City of Waterloo.
INSTRUCTIONS TO BIDDERS Page 8 of 14
C. The City Contract Compliance Officer is responsible for
making available a list of future project information notices to
MBE/WBE firms.
D. The City Contract Compliance Officer shall send notices to
appropriate MBE/WBE firms in the directory of each bid
solicitation with opening date.
E. The City Contract Compliance Officer will receive MBE/WBE
Letter(s) of Intent to Bid and within two (2) business days
forward the complete list of MBE/WBE bidders who
submitted a Letter of Intent to Bid to prime contractors.
Prime Contractors
In order to be in compliance with the guidelines of this program, the
prime contractor must show good-faith efforts in following the
MBE/WBE Contract Compliance Program. Good-faith efforts
include, but are not limited to, the following:
A. Prime contractors shall send solicitation letters (Form CCO-
3) to appropriate MBE/WBE (those certified in directory
prepared by City Contract Compliance Officer) at least seven
(7) working days prior to bid date. Letters should identify
specific items to be subcontracted. A minimum of three (3)
disadvantaged business contacts must be made and
documented, if there are at least three disadvantaged
businesses offering services in the area to be subcontracted
(See City of Waterloo MBE/WBE Certification List). If less
than three (3) are offering the services to be subcontracted,
then a contact is required for any that are listed as providing
that service. If the Prime Contractor submits a MBE/WBE
- contact not on the City's MBE/WBE list, attach a copy of the
MBE/WBE/DBE Certifications from another government
agency.
B. If a prime contract bidder is unable to identify MBE/WBE
firms to perform portions of the work, the City Contract
Compliance Officer should be contacted for assistance
immediately.
C. Prime contract bidders may solicit MBE/WBE proposals by
telephone or personal interviews, but all such contacts shall
be confirmed by Certified Mail, or subcontract bid request
forms (Form CCO-2).
D. If any MBE/WBE business submitting bids is not selected for
subcontract award, documentation must accompany the
INSTRUCTIONS TO BIDDERS Page 9 of 14
"MBE/WBE Business Enterprise Pre-Bid Contact Information
Form" (Form CCO-4 and CCO-4A) on why the MBENVBE
was not selected. These reasons could include:
a. Not low bid. Copies of the competing bids may be
required for verification.
b. MBE/WBE did not bid, withdrew bid or non-responsive.
c. Documentation of other business-related reason for not
selecting the MBENVBE business for a subcontract.d. Prime contractor self performs work.
e. Any other reason relied on by prime.
The Contract Compliance Officer will determine the weight to be
given to each item listed above (supported by appropriate
documentation) based on overall program goals.
Il. MBE/WBE Firms
A. MBENVBE firms shall be certified by the Iowa Department of
Transportation as owners and controllers of their respective
businesses, or were listed on the City of Waterloo Certified -
MBENVBE Contractors list as of July 1, 2002.
B. MBENVBE firms must perform the work on the project; they
cannot act as a broker by subcontracting the work out to
others.
C. Each MBE/WBE firm planning to submit quotes on
construction projects with goals, shall submit a Letter of
Intent to Bid (Form CCO-5) to the City Contract Compliance
Officer seven (7) working days prior to bid opening, listing
specific items which the MBENVBE firm is interested in
bidding. If sufficient Letters of Intent to Bid are not received
by the City Contract Compliance Officer seven (7) working
days prior to bid opening, goals on subject project will be
reduced accordingly. Agreements between the
bidder/proposer and a MBE/WBE in which the MBENVBE
promises not to provide subcontracting quotations to other
bidders/proposers are prohibited.
NON-COMPLIANCE OF CONTRACTORS
A. Noncompliance exists when the contractor's actions are not
consistent with the requirements of the Contract Compliance
Program in the areas of employment and subcontracting.
INSTRUCTIONS TO BIDDERS Page 10 of 14
B. A bidder's failure to show good-faith efforts to meet project
goals or a failure to use certified MBE/WBE firms may be
grounds for finding its bid not responsible.
C. The Contract Compliance Officer shall submit to City Council
his/her recommendation on any non-compliant contract in
writing.
NOTICE TO PROCEED
Notice to proceed on any project with goals will not be issued until
City Contract Compliance Officer determines the lowest responsible
bidder has used good-faith efforts to comply with this Compliance
Program and the bid was responsive.
CONCLUSION
This program repeals or revises all sections of previous Waterloo
Contract Compliance Programs.
11. EMPLOYMENT AND BUSINESS OPPORTUNITY
To the greatest extent feasible, suppliers, subcontractors, and low income
workers owning businesses or living in the Waterloo area must be given
priority in supplying materials, bidding for subcontract work, or applying for
employment by the contractor on this project. Opportunities for training
and for employment arising in connection with this project, shall to the
greatest extent feasible be made available to lower income persons
residing in the project area. The contract area is the City of Waterloo.
The City of Waterloo will require the contractor to document his efforts in
securing lower income workers living in the project area and in purchasing
supplies from, and awarding subcontracts to, businesses owned by
persons residing in the project area.
12. STATEMENT OF BIDDER'S QUALIFICATIONS
Each bidder shall, upon request of the City of Waterloo, Iowa, submit on
the form furnished for that purpose (a copy of which is included in the
contract documents), a statement of bidder's qualifications, his experience
record in constructing the type of improvements embraced, and his
organization and equipment available for the work contemplated; and,
when specifically requested, a detailed financial statement. The City of
- Waterloo, Iowa, shall have the right to take such steps as it deems
necessary to determine the ability of the bidder to perform his obligations
under the contract, and the bidder shall furnish the City of Waterloo, Iowa,
all such information and data for this purpose as it may request. The right
INSTRUCTIONS TO BIDDERS Page 11 of 14
is reserved to reject any bid where an investigation of the available
evidence or information does not satisfy the City of Waterloo, Iowa, that
the bidder is qualified to carry out properly the terms of the contract.
13. AWARD OF CONTRACT
a. Award of contract will be made to that responsive and responsible
bidder whose bid, conforming to the Specifications, is most
advantageous to the City of Waterloo; price and other factors
considered. The intention is to award the contract at the time of
opening bids, but the right is reserved to postpone such action for a
reasonable time, not exceeding thirty (30) days.
b. The City Council may, when in its interest, reject any or all bids or
waive any informality in bids received.
c. The bidder shall submit bids on all the items listed in the proposal
and shall state the unit bid price in words in the blank spaces
provided beneath the item description. Should there be any
discrepancy between the unit bid price in words and listed numeral
unit bid price, the City of Waterloo shall consider the unit bid price
in words as being the valid unit bid price. A computer-generated
spreadsheet as herein provided shall also be acceptable.
Proposals requiring mathematical computations to determine unit
prices or totals will be rejected. A contract will be awarded to the
qualified bidder submitting the lowest total bid for the BASE BID
plus ALTERNATE(S) chosen by the City as indicated in the
NOTICE TO BIDDERS.
d. When a contract for a public improvement is to be awarded to the
lowest responsive and responsible bidder, a resident bidder shall
be allowed a preference as against a nonresident bidder from a
state or foreign country if that state or foreign country gives or
requires any preference to bidders from that state or foreign
country, including but not limited to any preference to bidders, the
imposition of any type of labor force preference, or any other form
of preferential treatment to bidders or laborers from that state or
foreign country. The preference allowed shall be equal to the
preference given or required by the state or foreign country in which
the nonresident bidder is a resident. In the instance of a resident
labor force preference, a nonresident bidder shall apply the same
resident labor force preference to a public improvement in this state
as would be required in the construction of a public improvement by
the state or foreign country in which the nonresident bidder is a
resident.
INSTRUCTIONS TO BIDDERS Page 12 of 14
14. EXECUTION OF AGREEMENT, BONDS, AND CERTIFICATE OF
INSURANCE
a. Subsequent to the award and within ten (10) days after the
prescribed forms are presented for signature, the successful bidder
shall execute and deliver to the City of Waterloo, Iowa, an
agreement in the form included in the contract documents in such
number of copies as the City of Waterloo, Iowa, may require.
b. Having satisfied all conditions of award as set forth elsewhere in
these documents, the successful bidder shall, within the period
specified in paragraph "a" above, furnish a surety bond and a
payment bond in a penal sum not less than the amount of the
contract as awarded, as security for the faithful performance of the
contract and terms and conditions therein contained and shall
guarantee the prompt payment of all persons, firms, or corporations
to whom the contractor may become legally indebted for labor,
materials, tools, equipment, or services of any nature including
utility and transportation services, employed or used by him in
performing the work. The bonds shall protect and save harmless
the City from claims and damages of any kind caused by the
operations of the contractor and shall also guarantee the
maintenance of the contract improvements for the period stated in
the Notice of Hearing from and after completion of said
improvements and their acceptance by the City. Such bonds shall
be in the same form as that included in the contract documents and
shall bear the same date as, or a date subsequent to that of the
agreement. The current Power of Attorney for the person who
signs for any surety company shall be attached to such bonds.
c. The successful bidder shall, within the period specified in
paragraph "a" above, furnish a certificate of insurance for approval
in amounts of not less than the amounts specified in the General
Specifications for Construction, Section F. No. 4 "Liability
Insurance," Pages 14 to 15 of 18 Pages. The certificate of
insurance shall be furnished in such number of copies as the City of
Waterloo may require. The City of Waterloo shall be named as an
"Additional Insured." The contractor shall similarly submit his
subcontractor's certificates of insurance in the amounts for approval
before each commences work. The contractor shall carry or
require that there be Workmen's Compensation Insurance for all his
employees and those of his subcontractors engaged in work at the
site, in accordance with State Workmen's Compensation Laws.
INSTRUCTIONS TO BIDDERS Page 13 of 14
d. The failure of the successful bidder to execute such agreement and
to supply the required bond or bonds within ten (10) days after the
prescribed forms are presented for signature, or within such
extended period as the City of Waterloo, Iowa, may grant, based
upon reasons determined sufficient by the City of Waterloo, Iowa,
may either award the contract to the next lowest bidder or re- _.
advertise for bids, and may charge against the bidder the difference
between the amount of the bid an the amount for which a contract
for the work is subsequently executed, irrespective of whether the amount thus due exceeds the amount of the bid guaranty. If a
more favorable bid is received by re-advertising, the defaulting
bidder shall have no claim against the City of Waterloo, Iowa, for a
refund.
15. BIDDER STATUS
Attention of bidders is called to the requirement of complying with the
provisions of the Resident Bidder/Non-Resident Bidder requirement.
Each bidder submitting a bid shall execute and include with the bid, a
Bidder Status Form in the form herein provided.
Failure to submit a fully completed Bidder Status Form with the bid may
result in the bid being deemed nonresponsive and rejected.
INSTRUCTIONS TO BIDDERS Page 14 of 14
FORM OF BID OR PROPOSAL
F.Y. 2018 ASPHALT OVERLAY PROGRAM
CONTRACT NO. 943
CITY OF WATERLOO, IOWA
Honorable Mayor and City Council
Waterloo, Iowa
Gentlemen:
1. The undersigned, being a Corporation existing under the laws of the State of
, a Partnership consisting of the following partners:
having familiarized (himself) (themselves) (itself) with the existing conditions on
the project area affecting the cost of the work, and with all the contract documents
listed in the Table of Contents and Addenda (if any), as prepared by the City
Engineer of the City of Waterloo now on file in the office of the City Clerk, City
Hall, Waterloo, Iowa, hereby proposes to furnish all supervision, technical
personnel, labor, materials, machinery, tools, appurtenances, equipment, and
services, including utility and transportation services required to construct and
complete this F.Y. 2018 ASPHALT OVERLAY PROGRAM, Contract No. 943, all
in accordance with the above-listed documents and for the unit prices for work in
place for the following items and quantities:
F.Y. 2018 ASPHALT OVERLAY PROGRAM
CONTRACT NO. 943
BID DESCRIPTION UNIT EST.QTY. UNIT BID TOTAL BID PRICE
ITEM
PRICE
REMOVE C AND REPLACE WITH E-1
1 INLET EACH 1.00 $' $
REMOVE AND REPLACE E-1-C (USE
2 EXISTING CASTING) EACH 8.00 �' $
REMOVE AND REPLACE E-2-C (USE
3 EXISTING CASTING) EACH 1.00 $ $
REMOVE AND REPLACE INTAKE
4 BOXOUT/E-1-C EACH 2.00 $ $
REMOVE AND REPLACE INTAKE
5 BOXOUT/E-2-C EACH 2.00 $ $
6 FURNISH E-1-C INLET CASTING EACH 2.00 $ $
FURNISH E-1-C DRIVE OVER INLET
7 CASTING EACH 1.00,$ $
8 REMOVE AND REPLACE MH BOXOUT EACH 5.00 $ $
9 SUBDRAIN OUTLET EACH 8.00 $ $
FORM OF BID CONTRACT NO. 943 Page 1 of 4
10 STORM SEWER, 10"TRUSS LF 32.00 $ $ -
11 REMOVE SIDEWALK SF 3,146.20 $ $
12 SIDEWALK, 4" PCC SF 2,089.00 $ $
13 SIDEWALK, 6" PCC SF 1,559.00 $ $
PEDESTRIAN RAMP DETECTABLE
14 WARNING SURFACE SF 254.00 $ $
15 TOPSOIL REMOVAL FROM PARKING SY 378.70 $ $
16 REMOVE AND REPLACE 24" C&G/9" PCC LF 278.50 $ $
FULL DEPTH PATCH OR DRIVEWAY, _
17 REM/REP 6" PCC SY 194.50 $ $
18 RECYCLED ASPHALT TON 237.00 $ $
19 PAVEMENT SCARIFICATION SY 19,036.30 $ $
20 MILL WEDGE EACH 17.00 $ $
21 CRACK AND SEAT SY 21,931.30 $ $
22 SURFACE PATCH TON 26.00 $ $
23 SPEED HUMP EACH 1.00 $ $
HMA STANDARD TRAFFIC(ST)
INTERMEDIATE, 1/2" MIX, PG 58-28S, 60% $ $
24 CR. TON 2,994.20
HMA STANDARD TRAFFIC(ST) SURFACE,
1/2" MIX, PG 58-28S, 75% CR., NO $ $
25 FRICTION REQD. TON 3,197.40
26 HMA PAVEMENT SAMPLES AND TESTING LS 1.00 $ $
27 CASTING EXTENSION RING (INLET) EACH 8.00 $ $
28 CASTING EXTENSION RING (MANHOLE) EACH 23.00 $ $ _
FURNISH AND INSTALL MANHOLE
29 CASTING EACH 3.00 $ $
30 PRE-CUT PAVEMENT SYMBOLS EACH 1.00 $ $ r.
31 PAINTED PAVEMENT MARKINGS STA 63.68 $ $
32 TRAFFIC CONTROL LS 3.48 $ $
TOTAL BID $
FORM OF BID CONTRACT NO. 943 Page 2 of 4
2. It is understood that the quantities set forth are approximate only and subject to
variation and that the unit bid price for the work done shall govern in the actual
payment to Contractor.
3. In submitting this bid, the bidder understands that the right is reserved by the City
of Waterloo, Iowa, to reject any or all bids. If written notice of the acceptance of
this bid is mailed, telegraphed, or delivered to the undersigned within thirty (30)
days after the opening thereof, or at any time thereafter before this bid is
withdrawn, the undersigned agrees to execute and deliver an agreement in the
prescribed form and furnish the required bond and certificate of the insurance
within ten (10) days after the agreement is presented to him for signature, and
start work within ten (10) days after"Notice to Proceed" is issued.
4. Security in the sum of
Dollars ($ ) in the form of
is submitted herewith in accordance with the INSTRUCTIONS TO BIDDERS.
5. Attached hereto is a Non-Collusion Affidavit of Prime Contractor.
6. Attached hereto is a Resident Bidder Certification ( ), or Non-Resident
Bidder Certification ( ). (Mark one.)
7. The bidder is prepared to submit a financial and experience statement upon
request.
8. The Prime Contractor and Subcontractor(s), which have performed an aggregate
of $10,000.00 in work for the City in the current calendar year, are prepared to
submit an AAP or Update and an EOC, within ten (10) days of notification that the
bid submitted is lowest and acceptable.
9. The bidder has received the following Addendum or Addenda:
Addendum No. Date
10. The bidder shall list the MBE/WBE subcontractor(s), amount of subcontracts and
bid items on the City of Waterloo Minority and/or Women Business Pre-bid
Contact Information Form submitted with this Form of Bid or Proposal. The
apparent low Bidder shall submit a list of all other Subcontractor(s) to be used on
this Project to the City of Waterloo by 5:00 p.m. the business day following the day
Bids on this Project are due along with the Non-Collusion Affidavits of All
Subcontractor(s).
The Contractor shall submit information on subcontractors on
"SUBCONTRACTOR REQUEST AND APPROVAL" Form to be provided by City
prior to approval of contract.
FORM OF BID CONTRACT NO. 943 Page 3 of 4
The subcontractors listed on this proposal and/or submitted to the Contract
Compliance Officer cannot be changed except for the following reasons:
1) The City of Waterloo does not approve the subcontractors.
2) The subcontractors submit in writing that they cannot fulfill their
subcontracts.
11. The bidder has filled in all blanks on this proposal. Those blanks not applicable
are marked "none" or"NA".
12. The bidder has attached all applicable forms.
13. The Owner reserves the right to select alternates, delete line items, and/or to
reduce quantities prior to the award of a contract due to budgetary limitations.
(Name of Bidder) (Date)
BY: Title
Official Address: (Including Zip Code):
I.R.S. No.
FORM OF BID CONTRACT NO. 943 Page 4 of 4
FORM OF BID OR PROPOSAL
F.Y. 2018 ASPHALT OVERLAY PROGRAM
CONTRACT NO. 943
CITY OF WATERLOO, IOWA
Honorable Mayor and City Council
Waterloo, Iowa
Gentlemen:
1. The undersigned, being a Corporation existing under the laws of the State of
, a Partnership consisting of the following partners:
having familiarized (himself) (themselves) (itself) with the existing conditions on
the project area affecting the cost of the work, and with all the contract documents
listed in the Table of Contents and Addenda (if any), as prepared by the City
Engineer of the City of Waterloo now on file in the office of the City Clerk, City
Hall, Waterloo, Iowa, hereby proposes to furnish all supervision, technical
personnel, labor, materials, machinery, tools, appurtenances, equipment, and
services, including utility and transportation services required to construct and
complete this F.Y. 2018 ASPHALT OVERLAY PROGRAM, Contract No. 943, all
in accordance with the above-listed documents and for the unit prices for work in
place for the following items and quantities:
F.Y. 2018 ASPHALT OVERLAY PROGRAM
CONTRACT NO. 943
BID DESCRIPTION UNIT EST.QTY. UNIT BID TOTAL BID PRICE
ITEM PRICE
REMOVE C AND REPLACE WITH E-1
1 INLET EACH 1.0015 $
REMOVE AND REPLACE E-1-C (USE
2 EXISTING CASTING) EACH 8.00 '6 $
REMOVE AND REPLACE E-2-C (USE
3 EXISTING CASTING) EACH 1.00 $ $
REMOVE AND REPLACE INTAKE
4 BOXOUT/E-1-C EACH 2.00 $ $
REMOVE AND REPLACE INTAKE
5 BOXOUT/E-2-C EACH 2.00 $ $
6 FURNISH E-1-C INLET CASTING EACH 2.00 $ $
FURNISH E-1-C DRIVE OVER INLET
7 CASTING EACH 1.00 $ $
8 REMOVE AND REPLACE MH BOXOUT EACH 5.00 $ $
9 SUBDRAIN OUTLET EACH 8.00 $ $
FORM OF BID CONTRACT NO. 943 Page 1 of 4
10 STORM SEWER, 10" TRUSS LF 32.00 $ $
11 REMOVE SIDEWALK SF 3,146.20 $ $
12 SIDEWALK, 4" PCC SF 2,089.00 $ $
13 SIDEWALK, 6" PCC SF 1,559.00 $ $
PEDESTRIAN RAMP DETECTABLE
14 WARNING SURFACE SF 254.00 $ $
15 TOPSOIL REMOVAL FROM PARKING SY 378.70 $ $
16 REMOVE AND REPLACE 24" C&G/9" PCC LF 278.50 $ $
FULL DEPTH PATCH OR DRIVEWAY,
17 REM/REP 6" PCC SY 194.50 $ $
18 RECYCLED ASPHALT TON 237.00 $ $
19 PAVEMENT SCARIFICATION SY 19,036.30 $ $
20 MILL WEDGE EACH 17.00 $ $
21 CRACK AND SEAT SY 21,931.30 $ $
22 SURFACE PATCH TON 26.00 $ $
23 SPEED HUMP EACH 1.00 $ $
HMA STANDARD TRAFFIC(ST)
INTERMEDIATE, 1/2" MIX, PG 58-28S, 60% $ $
24 CR. TON 2,994.20
HMA STANDARD TRAFFIC(ST) SURFACE,
1/2" MIX, PG 58-28S, 75% CR., NO $ $
25 FRICTION REQD. TON 3,197.40
26 HMA PAVEMENT SAMPLES AND TESTING LS 1.00 $ $
27 CASTING EXTENSION RING (INLET) EACH 8.00 ;6 $
28 CASTING EXTENSION RING (MANHOLE) EACH 23.00 ' $
FURNISH AND INSTALL MANHOLE
29 CASTING EACH 3.00 9' $
30 PRE-CUT PAVEMENT SYMBOLS EACH 1.00 $ $
31 PAINTED PAVEMENT MARKINGS STA 63.68 $ $
32 TRAFFIC CONTROL LS 3.48 $ $
TOTAL BID $
FORM OF BID CONTRACT NO. 943 Page 2 of 4
2. It is understood that the quantities set forth are approximate only and subject to
variation and that the unit bid price for the work done shall govern in the actual
payment to Contractor.
3. In submitting this bid, the bidder understands that the right is reserved by the City
of Waterloo, Iowa, to reject any or all bids. If written notice of the acceptance of
this bid is mailed, telegraphed, or delivered to the undersigned within thirty (30)
days after the opening thereof, or at any time thereafter before this bid is
withdrawn, the undersigned agrees to execute and deliver an agreement in the
prescribed form and furnish the required bond and certificate of the insurance
within ten (10) days after the agreement is presented to him for signature, and
start work within ten (10) days after"Notice to Proceed" is issued.
4. Security in the sum of
Dollars ($ ) in the form of
is submitted herewith in accordance with the INSTRUCTIONS TO BIDDERS.
5. Attached hereto is a Non-Collusion Affidavit of Prime Contractor.
6. Attached hereto is a Resident Bidder Certification ( j, or Non-Resident
Bidder Certification ( ). (Mark one.)
7. The bidder is prepared to submit a financial and experience statement upon
request.
8. The Prime Contractor and Subcontractor(s), which have performed an aggregate
of $10,000.00 in work for the City in the current calendar year, are prepared to
submit an AAP or Update and an EOC, within ten (10) days of notification that the
bid submitted is lowest and acceptable.
9. The bidder has received the following Addendum or Addenda:
Addendum No. Date
10. The bidder shall list the MBE/WBE subcontractor(s), amount of subcontracts and
bid items on the City of Waterloo Minority and/or Women Business Pre-bid
Contact Information Form submitted with this Form of Bid or Proposal. The
apparent low Bidder shall submit a list of all other Subcontractor(s) to be used on
this Project to the City of Waterloo by 5:00 p.m. the business day following the day
Bids on this Project are due along with the Non-Collusion Affidavits of All
Subcontractor(s).
The Contractor shall submit information on subcontractors on
"SUBCONTRACTOR REQUEST AND APPROVAL" Form to be provided by City
prior to approval of contract.
FORM OF BID CONTRACT NO. 943 Page 3 of 4
The subcontractors listed on this proposal and/or submitted to the Contract
Compliance Officer cannot be changed except for the following reasons:
1) The City of Waterloo does not approve the subcontractors.
2) The subcontractors submit in writing that they cannot fulfill their
subcontracts.
11. The bidder has filled in all blanks on this proposal. Those blanks not applicable
are marked "none" or"NA".
12. The bidder has attached all applicable forms.
13. The Owner reserves the right to select alternates, delete lire items, and/or to
reduce quantities prior to the award of a contract due to budgetary limitations.
(Name of Bidder) (Date)
BY: Title
Official Address: (Including Zip Code):
I.R.S. No.
FORM OF BID CONTRACT NO. 943
Page 4 of 4
INFORMATION NEEDED
FOR
IOWA CONSTRUCTION SALES TAX EXEMPTION CERTIFICATE
CONTRACTOR NAME:
ADDRESS:
(Check One) PRIME SUBCONTRACTOR
FEDERAL ID#:
PROJECT NAME:
PROJECT CONTRACT NO.:
DESCRIPTION OF WORK:
❑ Brickwork ❑ Landscaping
❑ Carpentry ❑ Painting
❑ Concrete ❑ Paving
❑ Drywall-Plaster-Insulation ❑ Plumbing
❑ Electrical ❑ Roofing-Siding-Sheet Metal
❑ Excavation/Grading ❑ Windows
❑ Flooring ❑ Wrecking-Demolition
❑ Heavy Construction ❑ Other (Please specify)
❑ Heating-Ventilating-Air Cond
BID BOND
KNOW ALL MEN BY THESE PRESENTS,that we,
as Principal,and
as Surety are held and firmly bound unto the CITY OF WATERLOO , Iowa, hereinafter called
"OWNER." In the penal sum
Dollars($ ) lawful money of the United States,for the payment
of which sum will and truly be made, we bind ourselves, our heirs, executors, administrators, and
successors, jointly and severally, firmly by these presents. The condition of this obligation is such that
whereas the Principal has submitted the accompanying bid dated the day of
, 20 ,for
NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate,
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form specified
and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons
performing labor or furnishing materials in connection therewith, and shall in all other respects perform the
agreement created by the acceptance of said Bid,
Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly
understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event,
exceed the penal amount of this obligation as herein stated.
By virtue of statutory authority,the full amount of this bid bond shall be forfeited to the Owner in liquidation of
damages sustained in the event that the Principal fails to execute the contract and provide the bond as
provided in the specifications or by law.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond
shall be in no way impaired or affected by any extension of the time within which the Owner may accept
such Bid or execute such contract; and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and seals, and such
of them as are corporations, have caused their corporate seals to be hereto affixed and these presents to be
signed by their proper officers this day of ,A.D. 201 .
(Seal)
Principal
By
(Title)
(Seal)
Witness Surety
By
Witness Attorney-in-fact
NON-COLLUSION AFFIDAVIT OF PRIME BIDDER
State of
)ss
County of
, being first duly sworn, deposes and says that:
1. He is (Owner, Partner, Officer, Representative, or Agent) _, of
, the Bidder that has submitted the attached Bid;
2. He is fully informed respecting the preparation and contents of the attached Bid and of all
pertinent circumstances respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham Bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives,
employees, or parties in interest, including this affiant, has in any way colluded,
conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person
to submit a collusive or sham Bid in connection with the Contract ifor which the attached
Bid has been submitted or to refrain from bidding in connection with such Contract, or
has in any manner, directly or indirectly, sought by agreement or collusion or
communication or conference with any other Bidder, firm or person to fix the price or
prices in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost
element of the bid price or the bid price of any other Bidder, or to secure through any
collusion, conspiracy, connivance, or unlawful agreement any advantage against the City
of Waterloo, Iowa, or any person interested in the Proposed Contract; and
5. The price or prices quoted in the attached Bid are fair and proper and are lot tainted by
any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or
any of its agents, representatives, owners, employees, or parties in interest, including this
affiant.
(Signed)
Title
Subscribed and sworn to before me this day of
, 201 .
Title
My commission expires
NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR
State of
) ss:
County of
, being first duly sworn, deposes and says
that:
1. He is (Owner, Partner, Officer, Representative, or Agent) , of
hereinafter referred to as the"Subcontractor;"
2. He is fully informed respecting the preparation and contents of the subcontractor's
proposal submitted by the subcontractor to
, contract pertaining to the
project in
•
(City or County and State)
3. Such subcontractor's proposal is genuine and is not a collusive or sham proposal;
4. Neither the subcontractor nor any of its officers, partners, owners, agents,
representatives, employees, or parties in interest, including this affiant, has in any way
colluded, conspired, connived, or agreed, directly or indirectly, with any other bidder, firm
or person to submit a collusive or sham proposal in connection with such contract or to
refrain from submitting a proposal in connection with such contract, or has in any manner,
directly or indirectly, sought by unlawful agreement or connivance with any other bidder,
firm or person to fix the price or prices in said subcontractor's proposal, or to fix any
overhead, profit or cost element of the price of prices in said subcontractor's proposal, or
to secure through collusion, conspiracy, connivance or unlawful agreement any
advantage against the City of Waterloo, Iowa, or any person interested in the proposed
contract; and
5. The price or prices quoted in the subcontractor's proposal are fair and proper and are not
tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the
bidder or any of its agents, representatives, owners, employees, or parties in interest,
including this affiant.
(Signed)
Title
Subscribed and sworn to before me this day of
, 201 .
Title
My commission expires .
EQUAL OPPORTUNITY CLAUSE
(As provided in Executive Order No. 11246)
All contractors, subcontractors, vendors and suppliers of goods and services
doing business with the City and value of said business equals or exceeds ten
thousand dollars ($10,000.00) annually agree as follows:
1. The contractors, subcontractor, vendor and supplier of goods and services
will not discriminate against any employee or applicant for employment
because of race, color, creed, sex, national origin, economic status, age,
mental or physical handicap, political opinions or affiliations. The
contractor, subcontractor, vendor and supplier will develop an Affirmative
Action program to ensure that applicants are employed and that
employees are treated during employment without regard to their race,
creed, color, sex, national origin, religion, economic status, age, mental or
physical disability, political opinions or affiliations. Such actions shall
include but not be limited to the following:
a. Employment
b. Upgrading
c. Demotion or Transfer
d. Recruitment and Advertising
e. Layoff or Termination
f. Rates of Pay or Other Forms of Compensation
g. Selection for Training Including Apprenticeship
2. The contractor, subcontractor, vendor and supplier of goods and services
will, in all solicitations or advertisements for employees, state that all
- qualified applicants will receive consideration for employment without
regard to race, creed, color, sex, national origin, religion, economic status,
age, mental or physical disabilities, political opinion or affiliations.
3. The contractor, subcontractor, vendor and supplier or his/her collective
bargaining representative will send to each labor union or representative
of workers which he/she has a collective bargaining agreement or other
contract or understanding, a notice advising said labor union or workers'
representative of the contractor's commitment under this section.
4. The contractor, subcontractor, vendor and supplier of goods and services
will comply with all published rules, regulations, directives, and order of
the City of Waterloo Affirmative Action Program Contract Compliance
Provisions.
EQUAL OPPORTUNITY CLAUSE PAGE 1 OF 2 PAGES
5. The contractor, subcontractor, vendor and supplier of goods and services
will furnish and file compliance reports within such time and upon such
forms as provided by the Affirmative Action Officer. Said forms will elicit
information as to the policies, procedures, patterns, and practices of each
subcontractor as well as the contractor himself/herself and said contractor,
subcontractor, vendor and supplier will permit access to his/her
employment books, records and accounts to the City's Affirmative Action
Officer, for the purpose of investigation to ascertain compliance with this
contract and with rules and regulations of the City's Affirmative Action
Program—Contract Compliance Provisions relative to Resolution No.
24664.
6. In the event of the contractor's non-compliance with the non-discrimination
clauses of this contract or with any of such rules, regulations and orders,
this contract may be canceled, terminated or suspended in whole or in
part and the contractor may be declared ineligible for further contracts in
accordance with procedures authorized by the City Council.
7. The contractor, subcontractor, vendor and supplier of goods and services
will include, or incorporate by reference, the provisions of the non-
discrimination clause in every contract, subcontract or purchase order
unless exempted by the rules, regulations or orders of the City's
Affirmative Action Program, and will provide in every subcontract, or
purchase order that said provisions will be binding upon each contractor,
subcontractor, or supplier.
8. We, the undersigned, recognize that we are morally and legally committed
to non-discrimination in employment. Any person who applies for
employment with our company will not be discriminated against because
of race, creed, color, sex, national origin, economic status, age, mental or
physical disabilities.
(Signed)
(Appropriate Official)
(Title)
(Date)
EQUAL OPPORTUNITY CLAUSE PAGE 2 OF 2 PAGES
TITLE VI CIVIL RIGHTS
During the performance of this contract, the contractor (for itself), its assignees, and
successors in interest (hereinafter referred to as the "contractor") agrees as follows:
1. Compliance with Regulations: The contractor shall comply with the Regulations
relative to non-discrimination in Federally assisted programs of the DOT Title 49,
Code of Federal Regulations, Part 21, as they may be amended from time to
time, (hereinafter referred to as the Regulations), which are herein incorporated
by reference and made a part of this contract.
— 2. Nondiscrimination: The contractor, with regard to the work performed by it during
the contract, shall not discriminate on the grounds of race, color, national origin,
sex, age, or disability in the selection and retention of subcontractors, including
procurement of materials and leases of equipment. The contractor shall not
participate either directly or indirectly in the discrimination prohibited by section
21.5 of the Regulations, including employment practices when the contract
covers a program set forth in Appendix B of the Regulations.
3. Solicitations for Subcontracts, Including Procurement of Materials and
Equipment: In all solicitations either by competitive bidding or negotiation made
by the contractor for work to be performed under a subcontract, including
procurement of materials or leases of equipment, each potential subcontractor or
— supplier shall be notified by the contractor of the contractor's obligations under
this contract and the Regulations relative to non-discrimination on the grounds of
race, color, national origin, sex, age, or disability.
4. Information and Reports: The contractor shall provide all information and reports
required by the Regulations or directives issued pursuant there to, and shall
allow access to its books, records, accounts, other sources of information, and its
facilities as may be determined by the Contracting Authority, the Iowa DOT, or
FHWA to be pertinent to ascertain compliance with such Regulations, orders and
instructions. Where any information required of a contractor is in the exclusive
possession of another who fails or refuses to furnish this information the
contractor shall so certify to the Contracting Authority, the Iowa DOT, or the
FHWA as appropriate, and shall set forth what efforts it has made to obtain the
information.
5. Sanctions for Noncompliance: In the event of the contractor's noncompliance
with the nondiscrimination provisions of this contract, the Contracting Authority,
the Iowa DOT, or the FHWA shall impose such contract sanctions as they may
determine to be appropriate, including, but not limited to:
a. Withholding of payments to the contractor under the contract until the
contractor complies, and/or
b. Cancellation, termination, or suspension of the contract, in whole or in
part.
6. Incorporation of Provisions: The contractor shall include the provisions of
paragraphs (1) through (6) in every subcontract, including procurement of
materials and leases of equipment, unless exempt by the Regulations, or
directives issued pursuant thereto. The contractor shall take such action with
respect to any subcontract or procurement as the Contracting Authority, the Iowa
DOT, or the FHWA may direct as a means of enforcing such provisions including
sanctions for non-compliance: Provided, however, that, in the event of a
contractor becomes involved in, or it threatened with, litigation with a
subcontractor or supplier as a result of such direction, the contractor may request
the Contracting Authority or the Iowa DOT to enter into such litigation to protect
the interests of the Contracting Authority or the Iowa DOT; and, in addition, the
contractor may request the United States to enter into such litigation to protect
the interest of the United States.
Bidder Status Form
To be completed by all bidders Part A
Please answer"Yes"or"No"for each of the following:
❑ Yes ❑ No My company is authorized to transact business in Iowa.
(To help you determine if your company is authorized, please review the worksheet on the next page).
❑ Yes ❑ No My company has an office to transact business in Iowa.
❑ Yes ❑ No My company's office in Iowa is suitable for more than receiving mail, telephone calls, and e-mail.
❑ Yes ❑ No My company has been conducting business in Iowa for at least 3 years prior to the first request for
bids on this project.
❑ Yes ❑ No My company is not a subsidiary of another business entity or my company is a subsidiary of another
business entity that would qualify as a resident bidder in Iowa.
If you answered"Yes"for each question above, your company qualifies as a resident bidder. Please
complete Parts B and D of this form.
If you answered"No"to one or more questions above, your company is a nonresident bidder. Please
complete Parts C and D of this form.
To be completed by resident bidders Part B
My company has maintained offices in Iowa during the past 3 years at the following addresses:
Dates: / / to / / Address:
City, State, Zip:
Dates: / / to / / Address:
City, State, Zip:
Dates: / / to / / Address:
You may attach additional sheet(s)if needed. City, State, Zip:
To be completed by non-resident bidders Part C
1. Name of home state or foreign country reported to the Iowa Secretary of State:
2. Does your company's home state or foreign country offer preferences to resident bidders, resident abor
force preferences or any other type of preference to bidders or laborers? ❑ Yes ❑ No
3. If you answered"Yes"to question 2, identify each preference offered by your company's home state or foreign country
and the appropriate legal citation.
You may attach addiqonal sheet(s)if needed.
To be completed by all bidders Part D
I certify that the statements made on this document are true and complete to the best of my knowledge and I know that my
failure to provide accurate and truthful information may be a reason to reject my bid.
Firm Name:
Signature: Date:
You must submit the completed form to the governmental body requesting bids per 875 Iowa Administrative Code
Chapter 156. This form has been approved by the Iowa Labor Commissioner.
309-6001 (09-15)
Worksheet: Authorization to Transact Business
This worksheet may be used to help complete Part A of the Resident Bidder Status form. If at least one of the following
describes your business, you are authorized to transact business in Iowa.
❑ Yes ❑ No My business is currently registered as a contractor with the Iowa Division of Labor.
❑ Yes ❑ No My business is a sole proprietorship and I am an Iowa resident for Iowa income tax purposes.
❑ Yes ❑ No My business is a general partnership or joint venture. More than 50 percent of the general
partners or joint venture parties are residents of Iowa for Iowa income tax purposes.
❑ Yes ❑ No My business is an active corporation with the Iowa Secretary of State and has paid all fees
required by the Secretary of State, has filed its most recent biennial report, and has not filed
articles of dissolution.
❑ Yes ❑ No My business is a corporation whose articles of incorporation are filed in a state other than Iowa,
the corporation has received a certificate of authority from the Iowa secretary of state, has filed
its most recent biennial report with the secretary of state, and has neither received a certificate of
withdrawal from the secretary of state nor had its authority revoked.
❑ Yes ❑ No My business is a limited liability partnership which has filed a statement of qualification in this
state and the statement has not been canceled.
❑ Yes ❑ No My business is a limited liability partnership which has filed a statement of qualification in a
state other than Iowa, has filed a statement of foreign qualification in Iowa and a statement of
cancellation has not been filed.
❑ Yes ❑ No My business is a limited partnership or limited liability limited partnership which has filed a
certificate of limited partnership in this state, and has not filed a statement of termination.
❑ Yes ❑ No My business is a limited partnership or a limited liability limited partnership whose certificate of
limited partnership is filed in a state other than Iowa,the limited partnership or limited liability
limited partnership has received notification from the Iowa secretary of state that the application
for certificate of authority has been approved and no notice of cancellation has been filed by the
limited partnership or the limited liability limited partnership.
❑ Yes ❑ No My business is a limited liability company whose certificate of organization is filed in Iowa and has
not filed a statement of termination.
❑ Yes ❑ No My business is a limited liability company whose certificate of organization is filed in a state other
than Iowa, has received a certificate of authority to transact business in Iowa and the certificate
has not been revoked or canceled.
309-6001 (09-15)
Revised February 2003
CONTRACTOR'S OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM
Check box that applies to party completing program:
( ) General Contractor
( ) Subcontractor
Section A to be completed by GENERAL CONTRACTORS only:
A.
Name of Company
Address of Company Zip
Telephone Number ( )
Federal ID Number (if no Federal ID Number, Owner/President's Social
Security Number)
Name of Equal Employment Officer
Name of Project
Project Contract Number
Estimated Construction Work Dates
Start Finish
Section B to be completed by SUBCONTRACTORS only:
B.
Name of General or Prime Contractor
Name of Subcontractor
Subcontractor's Address Zip
Subcontractor's Telephone Number ( )
Subcontractor's Federal ID Number (if no Federal ID Number
Owner/President's Social Security Number)
Name of Equal Employment Officer
- 1 -
C. Remainder of program to be completed by party completing program, -
either Prime or Subcontractor.
1. The Owners and/or Principals of your company:
Ethnic
Name Address Position Sex Origin
2. Other Areas of Interest:
If your company has branches or subsidiaries, or if your company is a
branch or subsidiary of a parent organization, give the following
information:
Type of
Name Address Affiliation Degree
II. EMPLOYER'S POLICY (Please read carefully.)
A. We, the undersigned, recognize that we are morally and legally
committed to nondiscrimination in employment. Any person who
applies for employment with our company will not be discriminated
against because of race, color, creed, sex, national origin, economic
status, age, mental or physical handicap.
B. The employment policies and practices of the undersigned are to recruit
and hire employees without discrimination, and to treat them equally
with respect to compensation and opportunities for advancement,
including training, upgrading, promotion, and transfer. However, we -
realize the inequities associated with employment training, upgrading,
contracting and subcontracting for minorities and women and we will
direct our efforts to correcting any deficiencies to the maximum extent -
possible. The same will be required of our SUBCONTRACTORS and
suppliers.
C. We submit this program to assure compliance with Executive Order
11246, as amended, and other subsequent orders that may pertain to
equal employment opportunity and merit employment policies, fully
- 2 -
realizing that our qualification and/or merit system should be evaluated
and revised, if necessary.
D. We agree to put forth the maximum effort to achieve full employment
and utilization of capabilities and productivity of all our citizens without
regard to race, creed, color, sex, national origin, economic status, age,
and mental or physical handicap.
E. will give training
(Name of Company)
and employment opportunities to local residents of Waterloo, Iowa, to
the greatest extent feasible.
III. AFFIRMATIVE ACTION
A. recognizes that the
(Name of Company)
effective application of a policy of merit employment involves more than
just a policy statement, and
(Name of Company)
will, therefore, re-evaluate our Affirmative Action Program to ensure that
equal employment opportunities are available on the basis of individual
merit, and to actively encourage minorities, women and local residents
to seek employment with our company on this basis.
B. will undertake the
(Name of Company)
following six (6) steps to improve our Affirmative Action Program:
1. Minority Recruitment and Employment;
2. Local Recruitment and Employment;
3. Disabled Veteran and Vietnam Era Veteran Recruitment and
Employment;
4. Handicapped Recruitment and Employment;
5. Female Recruitment and Employment; and
6. Training, Upgrading and Promotional Opportunities.
C. will -ake
(Name of Company)
whatever steps are necessary to ensure that our total work force has
adequate minority, female, and local representation. We will utilize the
following methods in our recruitment attempts:
1. Local advertising media (newspapers, radio, TV);
2. Community organizations (churches, clubs, schools)
3. Public and private institutions in the area (UNI, Hawkeye
Community College);
4. Job Service of Iowa; and
5. Other.
- 3 -
D. will seek qualified minority,
(Name of Company)
female, and local group applicants for all job categories and will make
asserted efforts to increase minority, female and group representation
in occupations at the higher levels or skill and responsibility.
E. All sources of employment used shall be aware that we are an Equal
Employment Opportunity Employer. Labor organizations representing
our employees will be notified of our Equal Employment Opportunity Policy and Affirmative Action Program.
F. Training, upgrading, promotion and transfer activities at all levels will be
monitored to ensure that full consideration has been given to qualified
minority, female, and local group employees.
G. will encourage other
(Name of Company)
companies with whom we are associated and/or do business, to do the
same and we will assist them in their efforts.
H. has taken the following
(Name of Company)
Affirmative Action to ensure that minority, female, local contractors _
and/or suppliers were provided opportunities to negotiate and/or bid on
this project: (if none, write "NONE")
1.
2. -
As a result of the above efforts, we have involved minority, female, and
local contractors and/or suppliers in the following areas of -
subcontracting: (if none, write "NONE")
1.
2.
J. will require approved
(Name of Company)
Affirmative Action Programs from all nonexempt contractors who propose to work on this project and will take whatever steps are
necessary to ensure that non-minority contractors have adequate
representation of minority, female and local persons in their total work
force.
- 4 -
K. In further accordance with rules and guidelines issued pursuant to
Executive Order 11246 as amended, we establish the goals for our
company, based on parity percentages supplied by the City, and we
realize these goals will be reviewed on an annual basis.
L. will keep records of
(Name of Company)
specific actions relative to recruitment, employment, training, upgrading
and promotion and will provide the City of Waterloo with any information
relative to same, including activities of our SUBCONTRACTORS and
suppliers as necessary or when requested.
M. Parity figures for companies located in Waterloo are as follows:
Minority Parity = .08 (8%)
N. Affirmative Action
(Name of Company)
Employment Goals:
The definition of Affirmative Action Goals is as follows: "Goals may not
be rigid and inflexible quotas which must be met, but must be targets,
reasonably attainable by means of applying every good faith effort to
make all aspects of the entire Affirmative Action Program work."
For the year 201 , please submit percentage targets for employing
minorities and women. If you already have reached your target for
hiring minorities and women, please submit that percentage.
*Goals for Minorities: %
Goals for Women: %
*Your affirmative action goals should be between 1% and "0% or more
for minorities and 1% and 5% or more for women.
Please be advised that the goals or targets are purely your estimation
of how many women and minorities your company can reasonably
expect to hire in 201 Note, that none of the goals are rigid or
inflexible. They are targets that your company calculates as reasonably
attainable. This will help the City in its monitoring procedures as
required by City of Waterloo Resolution No. 1984-142(4).
- 5 -
CONTRACTOR'S TOTAL WORK FORCE
(WATERLOO)
HOURLY
NAME AND ADDRESS JOB CATEGORY RACE SEX WAGE
INDICATE: DISABLED VETERAN: DV
VIETNAM ERA VETERAN: VV
HANDICAPPED: H
- 6 -
We hereby certify that we are in compliance with all City and Federal
Affirmative Action Regulations and agree to accept all liability for failure to
comply.
Respectfully submitted,
By:
Company Executive
Date
By:
Equal Employment
Opportunity Officer
Date
City of Waterloo Affirmative Action Officer
Approved
- Disapproved Reason:
By:
Date:
- 7 -
DESCRIPTION OF JOB CATEGORIES
1. Officials/Manager: Occupations in which employees set broad policies,
exercise overall responsibility for execution of all policies, or direct individual
departments or special phases of the agency's operations or provide
specialized consultation on a regional, district or area basis. Includes:
department heads, bureau chiefs, division chiefs, directors, deputy directors,
controllers, examiners, wardens, superintendents, unit supervisors, sheriffs,
police and fire chiefs and inspectors and kindred workers.
2. Professionals: Occupations which require specialized and theoretical
knowledge which is usually required through college training or thorough work
experience and other training which provides comparable knowledge.
Includes: personnel and labor relations workers, social workers, doctors,
psychologists, registered nurses, economists, dietitians, lawyers, system
analysts, accountants, engineers, employment and vocational rehabilitation
counselors, teachers or instructors, police and fire captains and lieutenants
and kindred workers.
3. Technicians: Occupations which require a combination of basic scientific or
technical knowledge and manual skill which can be obtained through
specialized post-secondary school education and through equivalent on-the-
job training. Includes: computer programmers and operations, draftsmen,
surveyors, licensed practical nurses, photographs, radio operators, technical
illustrators, police and fire sergeants and kindred workers.
4. Office/Clerical: Workers are responsible for internal and external
communication, recording and retrieval of data and/or information and other
paper work required in an office. Includes: bookkeepers, messengers, office
machine operators, clerk-typists, stenographers, court transcribers, hearing
reporters, statistical clerks, dispatchers, license distributors, payroll clerks and
kindred workers.
5. Skilled Craft Workers: Workers perform jobs which require special manual
skill and a thorough and comprehensive knowledge of the processes involved
in the work which is acquired through on-the-job training programs. Includes:
Mechanics and repairman, electricians, heavy equipment operators, stationary
engineers, skilled machine occupations, carpenters, compositors and --
typesetters and kindred workers.
6. Sales Workers: Occupations engaging wholly and primarily in direct selling.
Includes: advertising agents and salesman, insurance agents and brokers,
real estate agents and brokers, stock and bond salesmen, demonstrators,
salesmen and sales clerks, grocery clerks and cashier checkers, and kindred
workers.
- 8 -
7. Operatives (semi-skilled): Workers who operate machine or processing
equipment or perform other factory-type duties of intermediate skill level which
can be mastered in a few weeks and require only limited training. Includes:
apprentices (auto mechanics), plumbers, building trades, metal working
trades, bricklayers, carpenters, electricians, machinists, mechanics, printing
trades, etc., operatives, attendants (auto service and parking), plasterers,
chauffeurs, deliverymen and furnacemen, heaters (metal), laundry and dry
cleaning operatives, milliners, mine operatives and laborers, motormen, oilers
and greasers, (except auto painters), (except construction and maintenance),
photographic process workers, stationary fireman, truck and tractor drivers,
weavers, (textile), welders and flame cutters and kindred workers.
8. Laborers (unskilled): Workers in manual occupations which generally
require no special training. Perform elementary duties that may be learned in
few days and require the application of little or no independent judgment.
Includes: garage laborers, car washers and greasers, gardeners (except
farm) and groundskeepers, longshoremen, and stevedores, lumbermen,
raftsmen and woodchoppers, laborers performing lifing, digging, mixing,
loading and pulling operations and kindred workers.
9. Apprentices: Persons employed in a program including work training and
related instruction to learn a trade or craft which is traditionally an
apprenticeship, regardless of whether the program is registered with a Federal
or State agency.
10. Trainees (on-the-job): Production. . . persons in formal training for craftsmen
when not trained under apprentice programs--operative laborer, and service
occupations.
White Collar. . . persons engaged in formal training for clerical, managerial,
professional, technical, sales, office and clerical occupations.
- 9 -
ITEMS OF POTENTIAL MBE/WBE PARTICIPATION
NOTICE TO PROSPECTIVE BIDDERS:
The following are items from the F.Y. 2018 ASPHALT OVERLAY PROGRAM,
Contract No. 943, that have a potential for MBE/WBE Participation. This listing,
however, is not intended to be all encompassing; to preclude MBE/WBE Contractors
from bidding on any items of the Proposal as a Subcontractor or the entire Proposal as
a Prime Contractor.
BID DESCRIPTION
ITEM
UNIT EST.QTY.
1 REMOVE C AND REPLACE WITH E-1 INLET EACH 1.00
REMOVE AND REPLACE E-1-C (USE EXISTING
2 CASTING) EACH 8.00
REMOVE AND REPLACE E-2-C (USE EXISTING
3 CASTING) EACH 1.00
REMOVE AND REPLACE INTAKE BOXOUT/E-
4 1-C EACH 2.00
REMOVE AND REPLACE INTAKE BOXOUT/E-
5 2-C EACH 2.00
6 FURNISH E-1-C INLET CASTING EACH 2.00
7 FURNISH E-1-C DRIVE OVER INLET CASTING EACH 1.00
8 REMOVE AND REPLACE MH BOXOUT EACH 5.00
9 SUBDRAIN OUTLET EACH 8.00
10 STORM SEWER, 10"TRUSS LF 32.00
11 REMOVE SIDEWALK SF 3,146.20
12 SIDEWALK, 4" PCC SF 2,089.00
13 SIDEWALK, 6" PCC SF 1,559.00
PEDESTRIAN RAMP DETECTABLE WARNING
14 SURFACE SF 254.00
15 TOPSOIL REMOVAL FROM PARKING SY 378.70
16 REMOVE AND REPLACE 24" C&G/9" PCC LF 278.50
FULL DEPTH PATCH OR DRIVEWAY,
17 REM/REP 6" PCC SY 194.50
18 RECYCLED ASPHALT TON 237.00
30 PRE-CUT PAVEMENT SYMBOLS EACH 1.00
31 PAINTED PAVEMENT MARKINGS STA 63.68
32 TRAFFIC CONTROL LS 3.48
MBE/WBE GOALS FOR THIS PROJECT
IMPORTANT: Prime Contract Bidders should be aware that ten percent (10%) MBE
goal and a two percent (2%) WBE goal is attached to this project. "Certified Return
Receipt" letters are no longer needed with the bid showing proof of contacting MBE or
WBE Subcontractors, but the Pre-Bid Contact Information Form must be filled out
completely.
City of Waterloo Contract Compliance Officer:
Contract Compliance Officer
Community Development Board
Carnegie Annex, Suite 202
620 Mulberry Street
Waterloo, IA 50703
Phone: (319) 291-4429
SUBCONTRACTOR'S BID REQUEST FORM
PRIME BIDDER'S LETTERHEAD
Contract No.:
Letting Date:
I, (subcontractor's name), hereby attest that I have been solicited for a bid on
(project name) in the area of (description of work and bid item no.).
(Prime contractor) has informed me that if I am interested in bidding, a
subcontracting bid proposal must be submitted to the company office by (date)
and (time).
Subcontractor's Company Name
Date Subcontractor's Signature
Date Prime Bidder's Signature
LETTER OF INTENT TO BID
(MBE/WBE LETTER)
According to the Current MBE/WBE Contract Compliance Program - 2002, all
MBE/WBE Contractors interested in submitting subcontractor quotes on
construction projects with goals, MUST submit a LETTER OF INTENT TO BID to
the City of Waterloo Contract Compliance Officer at least seven (7) days prior to
bid opening.
The LETTER OF INTENT TO BID must list the specific items which the
MBE/WBE Contractor is interested in bidding.
Letter should include the following:
Name of Project:
Your Company Name:
Address:
Phone: Date:
List of Specific items to be bid:
Item No. Description:
Item No. Description:
Item No. Description:
Item No. Description:
Item No. Description:
(Subcontractor's Company Name and authorized signature)
Return this LETTER OF INTENT TO BID to:
Contract Compliance Officer
Community Development Board
620 Mulberry St.
Carnegie Annex, Suite 202
Waterloo, IA 50703
Phone: (319) 291-4429
Form CCO-5 (06-20-2002)
LETTER TO BE USED WHEN SOLICITING FOR
SUBCONTRACTOR QUOTES
Subcontractor Company Name
Address
RE: Contract No.:
Dear •
(Prime Contractor's Company Name) is presently soliciting for the following work
in connection with the above referenced project.
(Insert bid Item Nos. and Description of Work)
(Prime Contractor's Company Name) is an Equal Opportunity Employer, and all
qualified bidders will not be discriminated against due to race, religion, color, sex,
or origin.
If interested in bidding your proposal must be turned in to this office by
and
(Date) (Time)
Sincerely,
(Prime Contractor's Representative)
Form CCO-3 (11/28/2001)
E 3
a) ° u) O
E coo c I-- o w)ms --
0 co
Un o a m N .Q i�-
ca a) C >+ W 0 O .� a r'
Q Q m 0 p 0 —
a)
° a) o O m c :
ai a) `�' c cf°i 2 ca - o d
0 c ai a) ` o- U .. •; � � —
c o > U •c o 0 0
va) c° 7O � c m = A
° 2 � o � � � a
o Cl) E EV rnE m
`" 3 > •ai cn `ooN 10 Wv)
i u) c L L U (a +
cn re I— aaz
N 0 C 0 Cl) 'a N
Q Q.N = a) �O d V
L U Cl) Q
W O U o 92 p O C = a) .c W Z
C. O o N 7s 03 `� R5 O Cl W v0
_ '' W () I— E 'L C V
WH E2m c O > o � rn m � � �
Zc c°) o c O w E a 0 a' "as A o —
W
a, � m � � a) a) cE 5W ��
CD Y ZWZ 'CD' mal � N 5 'N > cn � 2
To � W
—
Z 1_ •o `~ ai '5 2 Qc
o
V) () a. W F- o o Z 0
o
4.
a S oO °
ml— ° o ,° a> wO ` Z
—
>' Q LO Lrn o co QNQa ,
WZC to
m C) al - 'aa) N C .= C 2 U C
C) ac = O a N C CN ' A QC NW O
(i) w 0m
a)WCI N
m m I— a) V O • EU EL) c `o CLLW
c N Z m �
2 W O _ .5 � Cj a) .Q U (o — Ct
CL Z c u) a) 0-
CO U. A coaL a) c WcOWa Via) UU E
Vas —
o co`a ° O � � 00 � W m
O CI U O O N J 2
>' N O m U c o O m
'- ca � Cc Omµ= me <
O `° '' L W o I—vi :a —
Oc - E .6 >'� a) a)
U y 0 o W - .8
V � UWV >o, Lm � .c
Q c Wm U i .° 2ai .� ril
re 0 o a W c O N W U o
a) O a g U -2 ca a) 7 E c° t`., N
E m N = O C E N a) o W O
Z = ?i Si O O _ N O a) C co V —
y o ,a31
U "- a) o . N '�
0 W u) o) oo Lciii --
2 m O uJ W J L O C a' +� a) d
+L. oF J O aU 7 ''
co 0 ZQ O N N v a) �
rot if'Oo V m N 0 U Q c' O N 'C (a N a) (a 0
FLT.�� o cca 0 m 3 c° a) o •�' E
a Za) cp. U v) u) v) >- W "- (a EE
U o a) O "a
L co a)
o 1 O c E L w
co
> U O O _Z L a
- o fn Z cn O
a .�' co `43 a a) co +' m
0 w
Q w LL p"a = c LL m c ,N .0 U
api >° ai Q� � c) o o ZO � � a) UE °--
L c v) 'a cn- m .c W W , E >, 3
c) o L W c
+ •- to U m a) i= m e O O N .
N N C ` C w p E < - a a L.L. m �w
O
cOn 0 U O m i- w w a) 5 o :O c m
O c N ` 2 cam a) O L o •a m W Y
U m O W
— ° cm o v —RI a) Z O � c p 22303
CD co c 2
° a) a) a a3 6L Qo col,
6 w >, a) o ,_ _, .-
..c ...-s- a) -0 U c cm Ea) 0 c°a o ccv
(/) u) m w U O a) Q o O `) o >, c -c c
Z u) . 2o_ Q� U0 _ 0 Z vim) co oa) U) -D oCaa)
0 a) W cn a) vai cu o Z a) CD m u) ( N ` 3 ° co
H cm o. = a) w O - ° c °) en cn a) a
cn O 0
V CO = LTo cn j •c 'O a) = 1- O o N E a) p o
� � vt a) mco • o ZE E � Q -I a) Q-�
cc w 'cn o •3 3 S 2 L co m co 00 tom o �
— W m w C a) a U as 7 O co L1J = 4O := o a) v •+' 4v-- n Q O
N to � o c°� c _ .S L cn >, � o o � •- a) � ° o a) e-
_ L c a)
7, Z m � 09 .o Yam "- c dL-. Q o o = O.. y � a)
Li- Y W 3 L m ft _ cn as
d .- -o o w E - w ,� o >co W 3 m c)•aci
WO _c N co1-11.G ) a) c c m LLJ 3 p p C °
LL a) a) vi N •) a) W W -a C W13 - co-- N a) Q
c -ccn O
Z a co c -t Li_ 0 `o Ems aci ~ 03 � t° 0° E ° •� o a) Q
Np c cow z -a c o � °) c w ° m co � a=i 'a>i °�' n
a) oEa) Ocna) awca) cn m g _ W •c ° Qv a)
m E- o o o _c pE > mimes E o m a) c°um a) an ca ° o �
W Q o < — a) c2 > E w EL 2 > c a) a c
Z occn 2ca •L co ° a) E z o ca) `o P $ ° � ca) �
N 5 o o Ira o Q E C 9 o o E 9 2 C a) O O N
CrO Omm co ` N � D � c � >,� > o a) 2La) a) �..
m0 a) a) o � LLoc Eo ° � c m Da) NLa � > Qo �omo
W Z caio Z o con a) � oL E w `0 3 0 0 c m 0 Q � Q o
MI-I- coa N OM How
c`nv a`ni o '� a) m a 0 0 Q >,'0 � c
V L o c < c a ao co Q O ° co o � a a) .- o o mco+' � c o
0000 F- a E } ca E o c c� ° � � � 0 1 --E;n
° rnOacoW w -cE Z • .n U ..w as o w a) o cp O cn ccoo0
� Z oo o Oo � °) "- °) coca) N � Ecac°i °) 0Lc0o-
0 E .0L O Uo o) Fa 0,„ 0- -c 11.1 co
Q OZ -`na 3v 0 a) 0 3 mac° c)
c �.
0 O = a= -a mN c 0 O co a) m >, m � `.- c0 � Lo) () _c cn E a�) 4«=
Q o a 9 a) co c co o , c 2 ` O N Q co o co .c a) o v o U D
m 0 c -o •� cn (Vo N Q a) Q .} .� N ` a c C U 'a +L+
- fo O a" co a) 73 a) M E L p o O a) a) c
4) O N Q a) c c O U p - V Q E > N O
W i a) � wM•-�'-a (70 # a) a) c°) E ° ca .0O E a) a) cn -' o v°) E' o -9
IX tea) . L o oQ 0)Lioi- c >Lo E c a
d O LL a a) c6 p "O cZ ot •N EL -a L a) o = co
ei o c O a W e a) O •c u _ C ° > = O = a O c = = ° U .3 a)
>, c 3 � Uo m o .N >, = ao > c� 'a) E ~ y � � ° = co 3 in o � � �
Q E U ' o L V a) Q L d a- a)
72 U o IW- U a°i o ° c°i c coo aQ ol6 = µ- 'a) a) P maU .o 0
N) 0 U O W O a) m e m 0 o `) 'w to Z •c N Q O N
c c LL to co O Lo U U fn O 'Q o C O c . 4- U ++ O
H E cn 0Y Eio `° `�° m m a) m cc-npU o N o QE a, c o
w •D o ° _Zo = 0) .c � � m - coo � m __ wo c 2 _ m w '- ULa U a) 0
L. cn c- _n. �� .� � 'N cLi ° o ° a uQi W W m N of QE M w v ;a 0 'N >
0 i- o D • o a ° -a >,- a) mW 3 � E E al - E m
-1 o 0_ U p m N c O 0) o W a) a)W Q L > a O , a) 0 0 2 CO m " c en o ct
— co o a) tm U cm o 0 o W W V E > U rn p c ' co Q
'- 0) C Q p m m N n •� o a) • U 4- - W O m O c U o C) w ° O)W 'T
= e o ,' w - QUJ - - m Z � OdQ co Q ea Ca m
a) p � � � Ea) c w
0 ° o - c m O m 2 0 O m ai si U M W cd .) ci ai >'N m 0
d o •i '- 0 00 Qm E .�� � o : N2 cW U � U o c U
E .O LL > V a) N a) co
E E u) Ea Q m °) �, O 1--- o wH a) o .0 c Q E
` •c co co a - . o c a) - c co Z L c 7 W O o
m m Q.n � r ° co cci o .0 U cries 4 o cri es Ho Cl) LL