HomeMy WebLinkAboutEXPRESS MART-2027 FALLS AV OF w A rF INVOICE DATE DUE DATE INVOICE# TOTAL DUE
, 10/20/2026 11/24/2026 2027-00000204 $100.00
mot . //' 0
41 0
47_7=_ 0
Customer#: 24520 Please Make Check Payable and Remit To:
City of Waterloo
ATTN: City Clerk/Accounts Receivable
EXPRESS MART 715 Mulberry St
2027 FALLS AVE WATERLOO, IA 50703
WATERLOO, IA 50701
Amount Enclosed:
DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT
KEEP THIS PORTION FOR YOUR RECORDS
COMMERCIAL FIRE INSPECTION-2027 FALLS AV-10/19/26 FOR BILLING INQUIRY: (319)291-4323
Description Total Price
REINSPECTION 1 $100.00
CUSTOMER# BILLING DATE DUE DATE INVOICE# CHARGES
24520 10/20/2026 11/24/2026 2027-00000204 $100.00
Less Prepayment $0.00
Total Due -* $100.00
City of Waterloo
Failure to pay in full debts listed herein within ninety days of the due date will result in an additional twenty-five percent
late fee applied to any outstanding balance. The delinquent account will be forwarded to Municipal Collections of
America for further collection efforts. Debts shall also be subject to collection through the Iowa Department of
Administrative Services Offset Program if not paid in full within ninety days.
Waterloo Fire Rescue
016.4 Inspection Report 425 E.3rd Street
Express Mart-2027 Falls AVE,BLDG 2027 Falls Ave,Waterloo IA 50701
INSPECTION DETAILS
Inspection Date Inspection Type Inspection Number
10119/2028 Annual Inspection(1Yr) LREINSPECTION I t 18901-R2
Lead Inspector Shift Station Unit
BRAD BALDWIN NIA NIA NIA
Other Inspectors
N/A
SUMMARY OF INSPECTION
0 0 ® 2
Passed codes Failed codes
NEXT STEPS
Please direct questions about your Inspection to: Reinspection Date
BRAD BALDWIN
11/11/2026
brad.baldwin@waterloo-ia.org,3192914319
GENERAL NOTES
BRAD BALDWIN-10/20/2026 @ 07:39
$100 re-inspection fee for failure to correct violations on 10/19/26.Complete corrections to avoid fees at following inspections.
BRAD BALDWIN-09124/2026 @ 11:58
Withholding re-inspection fee on 9/24/26.Complete all corrections to avoid fees at following inspections.
carried over from inspection 18901-R1
BRAD BALDWIN-0910312026 @ 14:26
•$80 annual inspection fee
carried over from inspection 18901-R1
BRAD BALDWIN-09/0312026 @ 14:26
•Commercial Fire Inspector-brad.baldwin@waterloo-ia.org-Work:319-291-4319(#0)-Cell:319-230-1224
carried over from inspection 18901-R1
BRAD BALDWIN-09/03/2026 @ 14:26
•Provide corrections to avoid progressive re-inspection fees beginning at$100.Beer/Liquor application will not be signed until violations and hazards
corrected
carried over from inspection 18901-R1
BRAD BALDWIN-09103/2026 @ 14:26
•If all corrections are made before the scheduled re-inspection date,you can call to set up an earlier re-inspection.Normal operating hours for
inspections&re-inspections are Monday-Friday,9:00 a.m.-4:00 p.m.*****Re inspection fees may be assessed for subsequent re-inspections.Re-
inspection fees start at$100,then$150,and$200 for all subsequent re-inspections.
carried over from inspection 18901-R1
BRAD BALDWIN-09/03/2026 @ 14:26
Fire extinguishers due annually serviced in October 2026
carried over from inspection 18901-R1
GENERATED ON 10/20/26, 7:42 AM 1 OF 3
SIGNATURES
Contact signature Inspector signature
No signature
Report completedeelpost inspection
nspection
Sonny(2025) Date: BRAD BALDWIN 10/2012026
CHECKLISTS
Reinspection
S a:us Code Description
Fail 102.4-Application of building code.
The design and construction of new structures shall comply Location:Roof
with the International Building Code,and any alterations, Comments:Licensed contractor shall obtain permit and inspection
additions,changes in use or changes in structures required for roof replacement completed without required permit.
by this code,which ate within the scope of the International
Building Code,shall be made in accordance therewith. Additional comments:No inspection on record on 10/19126
Fail 509.2-Equipment access.
Approved access shall be provided and maintained for all fire Location:Basement
protection system equipment to permit immediate safe Comments:Storage obstructing ready access to electric panels shall
operation and maintenance of such equipment.Storage,trash be removed or relocated to maintain a clear,unobstructed path.
and other materials or objects shall not be placed or kept in
such a manner that would prevent such equipment from Additional comments:furniture still obstructing access on 10/19/26.
being readily accessible. Spoke with staff on-site to explain requirement of access to electric
panel
AS
, ! " f .
[ - .
I:
I
i
tom.
GENERATED ON 10/20/26, 7:42 AM 2 OF 3
E-'o Statement of Fees
FEE
Invoice Date Inspection Fee Date Paid Amount Paid
NIA $100.00
Invoice Number Check Number Transaction Number
NIA NIA NIA
3 OF 3
GENERATED ON 10/2e/28, 7:42 AM