HomeMy WebLinkAboutADDENDUM NO 2 ADDENDUM NO. 2
TO THE BIDDING DOCUMENTS FOR
F. Y. 2008 WEST COMMERCIAL ST. EXTENSION,
RIVER ROAD RELOCATION AND STORM WATER PUMP STATION
CITY OF WATERLOO CONTRACT NO. 720
WATERLOO, IOWA
DATE: July 10, 2008
LETTING DATE&TIME: July 14, 2008, 4:00 P. M.
TO ALL BIDDERS ON THE ABOVE PROJECT:
All Bidders submitting a bid on the above contract shall
carefully read this
Addendum
UdeIUUY and give it
consideration in the preparation of their bid.
1. Foim of Bid-Replace Page 2 of 10 with the attached Page 2 of 10, this updates Item No.
20 Description and Quantity.
Any revisions to any of the Contract Documents made by this Addendum shall be considered as
the same revision to any and all related areas of the Contract Documents not specifically called
out in this Addendum.
The bidder shall acknowledge receipt of this Addendum by inserting the number and date in the
spaces provided in the Form of Bid or Proposal, Item 9, Page 9 of 10.
er-714az r_
Thomas J. •nan, . E.
Wayne Claassen Engineering and Surveying, Inc.
ADDENDUM NO.2 F.Y.2008 WEST COMMERCIAL ST.EXTENSION Page 1 of 1
JULY 10,2008 RIVER ROAD RELOCATION AND
STORMWATER PUMP STATION
CONTRACT 720
008, Removal of foundations-CoJu
009, Removal ror Piers C.Y.
of steam tunnel Walls 128.5
OT 0. Pavement removal C.Y. _"__
P.C.C. 117
OTT T. Pavement removalA.C.C. S.Y.
12,777
012. Removal of S.Y. `�—
driveway,P.0 C.C.
5643
013. Removal of S.Y.
sidewalk or bikewa 361
014. Removal of Granular surfacing 566 _`'-----
015, Removal S.Y. �—
of concrete retainin 425
016. Removal of g walls
C
Storm Y
Sewers 126
017. ctures -_.________
Removal ofstor Each
or less n Sewer 40
pipe, 12-inch dia. L.P. ��
018, Removal of2578
24-inch dia.
storm Sewer pipe, 1 S-inch thru L.F.
I514
019. Removal ofstorm Sewer �- —
pipe,27-inch tlrr u L.F.
38
020. Removal and Relocation �—
of chairrlulk fence L.P.
441
021. Removal of bollards
022. Removal of Each
26
--�—
guardrail
023. RemovalL.F.
light poles 52
024. Removal of of gs for Each —
concrete footings 12
025. con light poles Each _''
Removal of traffic sign 12
026. Removal of streetsign
s
Each
027. Removal of
traffic signalization 1
028. Removal of L.S.
1
—
2 abandoned concrete
bases L.S.
1
FORM OF BID
CONTRACT NO. 720 —
PAGE 2
OF 10
ADDENDQVI NO.2
��I CITY , IOWA
WATERLOO ENGINEERING DEPARTMENT
715 Mulberry St. • Waterloo. IA 50703 • (319) 291-4312 Fax (319) 291-4262
ERIC THORSON,P.E. • City Engineer email:city.engineer@waterloo-ia.org
July 18, 2008 �u a � G �7
9002
ay°, A072808
TIMOTHYRL J. Honorable Mayor Hurleyand CityCouncil Members
HURLEY Y
Waterloo City Hall
Waterloo, IA 50703
COUNCIL
MEMBERS RE: AWARDING OF CONTRACT
for the
REGINALD A. F.Y. 2008 WEST COMMERCIAL STREET EXTENSION, RIVER ROAD
SCHMITT RELOCATION, AND STORM WATER PUMP STATION
"a"' BASE BID + ALTERNATES 2 and 3
CAROLYN Contract No. 720
COLE
Word 2 Honorable Mayor Hurley and Council Members:
HAROLD
GETTY At the City Council meeting on July 14, 2008, bids were opened for the
t'snrii ; F.Y. 2008 WEST COMMERCIAL STREET EXTENSION, RIVER ROAD
c>L;ENn\ RELOCATION AND STORM WATER PUMP STATION, Contract No. 720 with
HART CEDAR VALLEY CORPORATION, of Waterloo, Iowa, as the apparent low
Word 4 bidder.
rod The Contracts and Grants Coordinator has reviewed the items relating to the
'`FELLER
Ward ; 2002 Contract Compliance Program requirements and has transmitted his
recommendation in the attached letter.
BOB
GREENWOOD After review of the bids, it is being recommended that the award of the contract
4r-L r,e
be made to Cedar Valley Corporation of Waterloo, Iowa, in the amount of
STEVE $5,024,362.36 for the construction of the BASE BID + ALTERNATES 2 and 3.
SCHMITT
41 Oir e Recommendation of award includes waiving the specification requirement
regarding the percent of contract to be performed by the prime contractor.
Sincerely,
ennis . Gentz, .
Assistant City Engineer
cc: Louis Starks, Contracts and Grants Coordinator
Cedar Valley Corporation
CITY WEBSITE: www.ci.waterloo.ia.us
WE'RE WORKING FOR YOU!
An Equal Opportunity/Affirmative Action Employer
CITY OF WATERLOO 2 IOWA
Otalgilft
L�•=11111r4111.074, COMMUNITY DEVELOPMENT
°fe WOO-N
'O p 620 Mulberry St., Carnegie Annex • Waterloo, IA 50703 • (319) 291-4429 Fax (319) 291-4431
Alai tic)/
TIMOTHY J. MEMORANDUM
HURLEY
COUNCIL TO: Mayor Hurley and City Council
MEMBERS FROM: Louis Starks, Contracts and Grants Coordinator
SUBJECT: F.Y. 2008 W. COMMERCIAL ST. EXTENSION, RIVER ROAD
REGINALD A. RELOCATION, AND STORMWATER PUMP STATION
SCHMITT CONTRACT NO. 720
Wail 1 DATE: July 23, 2008
CAROLYN
COLE
t aid 2 Three companies submitted bids for this construction project, the Bid Tabulation is set
HAROLD forth below:
GETTY
tOr 3 Firm Base Bid M/WBE
QUENTIN M.
HART Cedar Valley Corp. $4,751,535.20 $196,000.00
Ward 4 Peterson (PCI) $4,783,054.72 $0.00
K. Cunningham Const. Co., Inc $5,264,874.46 $100,691.00
RON
WEEPER
Ward 3 It appears that Cedar Valley Corp. is the lowest responsible bidder; it also appears that
they have committed to the highest level of MBE participation of the three.
BOB
GREENWOOD
At_L, No City of Waterloo WBE firms contacted by the potential Prime Subcontractor(s)
submitted bids. Under these circumstances, "Good Faith" is established and Staff
STEVE recommends award to Cedar Valley Corp.
SCHMI IT
At-Large
Cc: Eric Thorson, City Engineer
Noel Anderson, C P &D Director
Nancy Eckert, City Clerk
Rudy D. Jones, Community Development Director
Michelle Weidner, Finance Director
J:\LOUIS-S\Contract Compliance\Compliance Reviews\W.Commer.Ext.and Water Pumps\#720 Compliance
Review.doc
® CITY WEBSITE: www.ci.waterloo.ia.us
EQUAL HOUSING WE'RE WORKING FOR YOU!
OPPORTUNITY An Equal q pportunity/Affirmative Action Employer
. -i
This Resolution prepared by Nancy Eckert, City Clerk, 715 Mulberry
Street, Waterloo, Iowa.
RESOLUTION NO. 2008-627
RESOLUTION MAKING AWARD OF CONTRACT TO CEDAR
VALLEY CORPORATION OF WATERLOO, IOWA, FOR THE
F.Y. 2008 WEST COMMERCIAL STREET EXTENSION,
RIVER ROAD RELOCATION AND STORM WATER PUMP
STATION (BASE BID + ALTERNATES 2 AND 3) ,
CONTRACT NO. 720, IN THE AMOUNT OF
$5, 024, 362.36.
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA:
That the bid of Cedar Valley Corporation of Waterloo, Iowa,
in the amount of $5, 024, 362 . 36, for the construction of the F.Y.
2008 West Commercial Street Extension, River Road Relocation and
Storm Water Pump Station (Base Bid + Alternates 2 and 3) ,
Contract No. 720, described in the plans and specifications
heretofore adopted by this Council for said project, after public
hearing on published notice required by law, be and is hereby
accepted, the same being the lowest bid received for said work.
The Mayor and City Clerk are hereby directed to execute
contract with the said contractor for the construction of said
improvements, said contract not to be binding on the City until
approved by this Council.
PASSED AND ADOPTED this 28th day of July, 2008 .
Tim Hurley, Ma r
ATTEST:
Nancy Eck t, CMC
City Cler
I_n� Icy CITY OF WATERLOO , IOWA
�,.. WATERLOO ENGINEERING DEPARTMENT
S1 715 Mulberry St. • Waterloo, IA 50703 • (319) 291-4312 Fax (319) 291-4262
lier100`AO ERIC THORSON,P.E. • City Engineer email:city.engineer@waterloo-ia.org
Matzos July 29, 2008 p / �v0$ - Co
TIMOTHY J. U�
HURLEY 9002
A080408
COUNCIL Honorable Mayor Hurley and City Council Members
MEMBERS Waterloo City Hall
Waterloo, IA 50703
REGINALD A.
SCHMITT
Ward 1 RE: CONTRACT, BONDS AND CERTIFICATES OF INSURANCE
CAROLYN CEDAR VALLEY CORPORATION
COLE F.Y. 2008 WEST COMMERCIAL STREET EXTENSION,RIVER ROAD
Ward 2 RELOCATION,AND STORM WATER PUMP STATION
HAROLD BASE BID +ALTERNATES 2 and 3
GETTY Contract No. 720
Ward 3
HART QUENTIN M. Honorable Mayor Hurley and City Council Members:
I1rd4
Transmitted herewith are six (6) copies of each of the Contract, Bond and Certificate of
RON Insurance on the F.Y. 2008 WEST COMMERCIAL STREET EXTENSION,
WELPER Ward 5 RIVER ROAD RELOCATION,AND STORM WATER PUMP STATION
BASE BID +ALTERNATES 2 and 3, Contract No. 720, for approval and signatures
BOB of City officials. The contract is with Cedar Valley Corporation, of Waterloo, Iowa in
GREENWOOD the amount of$5,024,362.36.
At-Large
STEVE Please return five (5) executed copies to this office for distribution.
SCHMITT
At-Large Sincerely,
ennis . Gentz, P.E.
Assistant City Engineer
Attachments
cc: Louis Starks, Contracts and Grants Coordinator
Cedar Valley Corporation
CITY WEBSITE: www.ci.waterloo.ia.us
WE'RE WORKING FOR YOU!
An Equal Opportunity/Affirmative Action Employer
1
w
This Resolution prepared by Nancy Eckert, City Clerk, 715 Mulberry
Street, Waterloo, Iowa.
RESOLUTION NO. 2008-646
RESOLUTION APPROVING CONTRACTS, BONDS AND
CERTIFICATES OF INSURANCE FROM CEDAR VALLEY
CORPORATION OF WATERLOO, IOWA, FOR THE F.Y.
2008 WEST COMMERCIAL STREET EXTENSION, RIVER
ROAD RELOCATION, AND STORM WATER PUMP STATION
(BASE BID + ALTERNATES 2 AND 3) , IN THE CITY
OF WATERLOO, IOWA, BEING CONTRACT NO. 720 .
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA,
that the contract of Cedar Valley Corporation of Waterloo, Iowa,
for the F.Y. 2008 West Commercial Street Extension, River Road
Relocation, and Storm Water Pump Station (Base Bid + Alternates 2
and 3) , Contract No. 720, in the City of Waterloo, Iowa, signed
on behalf of the City of Waterloo, Iowa, by the Mayor Pro Tem and
the City Clerk as of the 4th day of August, 2008, together with
the accompanying bond for the faithful performance of said
contract signed by Liberty Mutual Insurance Company of Boston,
Massachusetts, as surety thereon, be, and the same are hereby
approved.
PASSED AND ADOPTED this 4th day Au ust, 2008 .
- 0-Lj
Reggie Schmitt, Mayor Pro Tem
ATTEST:
Nanc Eck t, CMC LI—
City Cler
pilL, CITYir: : 1 O WA
1/40aL it",•,� WATERLOO ENGINEERING DEPARTMENT
�1m 715 Mulberry St. • Waterloo, IA 50703 • (319) 291-4312 Fax (319) 291-4262
�terfoo \O ERIC THORSON,P.E. • City Engineer email:city.engineer@waterloo-ia.org
m„to, /r/eai-
(24_0, �-,�. 2.o4, 665
TIMOTHY J. June 12, 2008 C O474
HURLEY
A0601608
COUNCIL
MEMBERS Honorable Mayor Hurley and Council Members
Waterloo City Hall
REGINALD A. Waterloo, IA 50703
SCHMII T
Ward 1
CAROLYN RE: F.Y. 2008 WEST COMMERCIAL STREET EXTENSION, RIVER ROAD
COLE RELOCATION, AND STORM WATER PUMP STATION
Ward
RiO CONTRACT NO. 720
HAROLD
CETTY Honorable Mayor Hurley and Council Members:
IEVarS 3
QLJFNTIN Transmitted herewith are the Notice to Bidders, Notice of Public Hearing and
HART the Plans and Specifications for the F.Y. 2008 WEST COMMERCIAL STREET
Ward 4 EXTENSION, RIVER ROAD RELOCATION, AND STORM WATER PUMP
[zOti STATION, Contract No. 720, as prepared by Wayne Claassen Engineering &
\YELPER Surveying, Inc., of Waterloo, Iowa.
I'Vor 1 S
It is recommended that Council approve these documents, set July 14, 2008,
as the date for the public hearing and bid opening and instruct the City Clerk to
GREENWOODGRE
At L7ige publish said notices.
STEVE
SC.HMITT Sincer ly,
At-Lame
Dennis J. Gentz, .E.
Assistant City Engineer
cc: Louis Starks, Contracts and Grants Coordinator
CITY WEBSITE: www.ci.waterloo.ia.us
WE'RE WORKING FOR YOU!
An Equal Opportunity/Attirmative Action Employer
N
c
' (S L % 1)
W 8
N M
O Q 5 o
�1 a
U
0
i N I\ ck V.' g
Wv E
• a
O wo N • El ‘;
� w N N -N F ,
Wp ¢ � � M
°° - H
zH o 0 Q ,, I
b % F W .� r(
WWV W a FEZ0 Q �
A L. V
E' Q W L. o
WWiz W a oNs
� � A cz 0
p
p V 2a bw co o '
o
WM � o CO �
�� N
3 < E a IN N ›; H
c Waa •
oo
� �' N w g
N V] O O U C%
W a N 1 W
Q = C/A U
;I; z 3 v - a
o s
A 74
w A ° o v N Z A a p
° N\ ccd V U Aj U Q
4
J v,z o z
O m ' m 73 ' O
co�—F-, V U a V w i
.
This Resolution prepared by Nancy Eckert, City Clerk, 715 Mulberry
Street, Waterloo, Iowa.
RESOLUTION NO. 2008-603
RESOLUTION CONFIRMING APPROVAL OF PLANS,
SPECIFICATIONS, FORM OF CONTRACT, ETC. , IN
CONJUNCTION WITH THE F.Y. 2008 WEST
COMMERCIAL STREET EXTENSION, RIVER ROAD
RELOCATION AND STORM WATER PUMP STATION,
CONTRACT NO. 720 .
WHEREAS, the City Council of the City of Waterloo, Iowa,
heretofore instructed the City Engineer of said City to prepare
proposed plans, specifications, form of contract, etc. , for the
F.Y. 2008 West Commercial Street Extension, River Road Relocation
and Storm Water Pump Station, Contract No. 720, in the City of
Waterloo, Iowa, and
WHEREAS, said City Engineer did file said preliminary plans,
specifications, form of contract, etc. , for the F.Y. 2008 West
Commercial Street Extension, River Road Relocation and Storm
Water Pump Station, Contract No. 720, which were preliminarily
approved on June 16, 2008, and
WHEREAS, a public hearing, upon notice, was held on July 14,
2008 .
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
WATERLOO, IOWA, that said proposed plans, specifications, form of
contract, etc. , for the F.Y. 2008 West Commercial Street
Extension, River Road Relocation and Storm Water Pump Station,
Contract No. 720, in the City of Waterloo, Iowa, be, and the same
are hereby, approved as filed.
PASSED AND ADOPTED this 14th day of July, 2008 .
Tim Hurley, Mayo
ATTEST:
Nancy Eck , CMC
City Cler
This Resolution prepared by Nancy Eckert, City Clerk, 715 Mulberry
Street, Waterloo, Iowa.
RESOLUTION NO. 2008-604
RESOLUTION ORDERING THE CONSTRUCTION OF THE
F.Y. 2008 WEST COMMERCIAL STREET EXTENSION,
RIVER ROAD RELOCATION AND STORM WATER PUMP
STATION, CONTRACT NO. 720 .
WHEREAS, by Resolution No. 2008-603, plans, specifications,
form of contract, etc. , for the F.Y. 2008 West Commercial Street
Extension, River Road Relocation and Storm Water Pump Station,
Contract No. 720, in the City of Waterloo, Iowa, have been
approved and adopted by this Council after the hearing prescribed
by statute.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
WATERLOO, IOWA, that it is deemed advisable and necessary and it
is so ordered on motion by this Council that the said
improvements be constructed in accordance with said plans and
specifications .
That the work herein ordered is to be paid in monthly
estimates, in cash, on the basis of 90 percent of the work as the
same is completed and materials delivered and the work approved,
except that before the last month' s payment is made the
contractor may be required to furnish the City Council vouchers
showing that all subcontractors and workmen and persons
furnishing materials have been fully paid for such materials and
labor, and that the City may retain the last month' s payment for
a period of 31 days following such completion and approval,
unless satisfied that materials, men and laborers have been paid.
That said work shall be done by contract and shall be
commenced promptly after receipt of "Notice to Proceed".
PASSED AND ADOPTED this 14th day of July, 2008 .
Tim Hurley, Mayor
ATTEST:
Nancy Ecke , CMC
City Clerk
//� pqr,�, CITY WATERLOO , I O WA
CITY CLERK AND FINANCE DEPARTMENT
y�� 715 Mulberry St. • Waterloo, IA 50703 • (319) 291-4323 Fax (319) 291-4571
��OrI00 �� NANCY ECKERT • City Clerk MICHELLE WEIDNER,CPA • Chief Financial Officer
Almjor
TIMOTHY J.
HURLEY July 30, 2008
COUNCIL
MEMBERS
REGINALD A. Gale Peterson, Jr.
SCHMITT Peterson Contractors, Inc.
h'oof 1 104 Blackhawk, P.O. Box A
CAROLYN Reinbeck, IA 50669
COLE
Wa.(12 Dear Mr. Peterson:
HAROLD
GETTY Enclosed please find your bid bond which accompanied your bid on F.Y.
Ward ; 2008 West Commercial Street Extension, River Road Relocation and Storm
Water Pump Station, Contract No. 720 at the meeting of the City Council of
QUENTIN M.
HART Waterloo, Iowa, held on July 14, 2008.
Ward 4
The bid of Cedar Valley Corporation of Waterloo, Iowa in the amount of
ROB $5,024,362.36 was accepted.
WELPER
Thank you for submitting your bid. If you have any questions, please feel
RE free to contact our office.
GREENWOOD
At-Lure'
Sincerely,
STEVE
SCNMITT
.-lf-L.?rtir'
Nancy Eckert, CMC
City Clerk,
Enclosure
mfalne
CITY WEBSITE: www.ci.waterloo.ia.us
WE'RE WORKING FOR YOU!
An Equal Opportunity/Affirmative Action Employer
A_�puti, Iey CITYWATERLOO , I O WA
... CITY CLERK AND FINANCE DEPARTMENT
715 Mulberry St. • Waterloo, IA 50703 • (319) 291-4323 Fax (319) 291-4571
•PierIpo A0 NANCY ECKERT • City Clerk MICHELLE WEIDNER,CPA • Chief Financial Officer
TIMOTHY j.
HURLEY July 30, 2008
COUNCIL
MEMBERS
REGINALD A. K. Cunningham Construction Co., Inc.
SCH''vIITT 1025 Center Street
Ward I Cedar Falls, IA 50613
CAROLYN
COLL Dear Mr. Cunningham:
I4'ard 2
HAPOLD Enclosed please find your bid bond which accompanied your bid on F.Y.
GETTY 2008 West Commercial Street Extension, River Road Relocation and Storm
Wv it f 3 Water Pump Station, Contract No. 720 at the meeting of the City Council of
Waterloo, Iowa, held on July 14, 2008.
QUENTIN M.
HART
Ward 4 The bid of Cedar Valley Corporation of Waterloo, Iowa in the amount of
$5,024,362.36 was accepted.
RON
WEEPER
tV,,,.,f 5 Thank you for submitting your bid. If you have any questions, please feel
free to contact our office.
BOB
GREENWOOD
;,,,,,, Sincerely,
3t_L
SIEVE ce
SCH1vtITT
At-urge
Nancy Eckert, CMC
City Clerk,
Enclosure
mfa/ne
CITY WEBSITE: www.ci.waterloo.ia.us
WE'RE WORKING FOR YOU!
An Equal Opportunity/Affirmative Action Employer