HomeMy WebLinkAboutSUPPLEMENTAL AGREEMENT NO 2 r A i T Ear`1 ITecI 1 501 Sycamore Street P319.232.6531 Suite 222 F319.232.0271 A tggCO International Ltd.Company Waterloo, IA 50703 www.earthtech.com U.S.HIGHWAY 63 IMPROVEMENTS U.S.HIGHWAY 63—WESTFIELD AVENUE CONNECTION WATERLOO,IOWA SUPPLEMENTAL AGREEMENT NO.2 WHEREAS,a Professional Services Agreement was entered into by the City of Waterloo,Iowa("City"),and Earth Tech, Inc. ("Consultant"), of Waterloo, Iowa, dated April 3, 2006, for the alternative evaluation, traffic analysis, environmental documentation,preliminary design,final design and construction review for improvements on U.S. Highway 63 between the U.S. 218 Interchange and Donald Street in Waterloo,Iowa; and WHEREAS,Preliminary Engineering(NHSX-63-6(69)--3H-07)was defined and authorized in said agreement dated April 3,2006; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 1 dated July 27, 2007, for engineering services during the construction phase of the U.S.Highway 63—Westfield Avenue Connection Project; and WHEREAS,the Estimated Actual Costs for Task 15—Management of Contaminated Subsurface Soil provided by Weston Solutions, Inc., needs to be increased due to delay in construction progress related to inclement weather conditions and management/disposal for excess spoil. NOW THERI;,FORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. SCOPE OF SERVICES Services to be provided under this supplemental agreement shall be consistent with those provided under Supplemental Agreement No. 1 dated July 27, 2007. II. COMPENSATION The Consultant shall be reimbursed for the actual costs incurred in accordance with Article 3 of the original Agreement with the exception that all parties agree that Weston Solutions will exceed their Total Estimated Costs prior to the approval of this Supplemental Agreement No.2 to allow construction activities to continue at the construction site. Weston's Total Estimated Costs shall be increased by Fifty-Three Thousand Five Hundred Dollars ($53,500.00) which is further defined in Attachment B. Weston's assumptions and clarifications for this budget estimate are noted in Attachment C. The Estimated Actual Costs,Fixed Fee,Contingency and Maximum Amount Payable for this supplemental agreement as stated below and as shown in Attachment A, replace those previously provided in Supplemental Agreement No. 1. . • Estimated Actual Costs $194,000.00 Fixed Fee 11,000.00 Contingency 9,500.00 Maximum Amount Payable $214,500.00 III. In all other aspects,the obligations of the City and Consultant shall remain as specified in the Professional Services Agreement dated April 3,2006, and subsequent amendments. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as of the dates shown below: EARTH TECH, By Date November 13,2007 Joe A.Becker Vice President CITY OF WATERLOO,IOWA By Date �—/ 3 - 0 7 T y . urley ayor IOWA DEPARTMENT OF TRANSPORTATION ACCEPTED FOR AUTHORIZATION y / Date J es C. emberger,P.E. Local Systems Engineer District 2- L:\work\ADMIN\AGREE\SUPPLE\SA2Hwy63.doc -2- Attachment A U.S. Highway 63 -Westfield Avenue Connection City of Waterloo, Iowa Construction Related Services Cost Analysis I. Direct Labor Cost (Earth Tech) Category Hours Rate/Hour Amount Senior Professional 0 $71.00 $0.00 Project Professional 130 $45.25 $5,882.50 Staff Professional 30 $33.00 $990.00 CADD Operator I 40 $18.00 $720.00 Senior Technician 640 $27.00 $17,280.00 Technician 270 $20.00 $5,400.00 Project Support 60 $22.25 $1,335.00 $31,607.50 1170 II. Payroll Burden and Overhead Provisional Costs 160.00% $50,572.00 Ill. Direct Project Expenses Category Units Rate/Unit Amount Mileage 3500 0.485 1,697.50 Per Diem 0 30.00 0.00 Lodging 0 50.00 0.00 Copier 1000 0.06 60.00 Blueprinting 60 0.50 30.00 GPS 10 25.00 250.00 Geodimeter 40 12.50 500.00 Testing 1,000.00 Miscellaneous, Other 300.00 $3,837.50 IV. Earth Tech Estimated Actual Costs $86,017.00 Rounded $86,000.00 V. Subcontract Expense Weston Solutions SA No. 1 $54,500.00 Weston Solutions SA No. 2 (See Attachment B) $53,500.00 $108,000.00 VI. Estimated Actual Costs $194,000.00 VII. Fixed Fee $11,000.00 VIII. Contingency Earth Tech $4,000.00 Weston Solutions $5,500.00 $9,500.00 IX. Maximum Amount Payable $214,500.00 ATTACHMENT C Weston Solutions, Inc. — Change Order Request City of Waterloo/Iowa Department of Transportation Iowa DOT Project HDP-8155(698)--71-07 Assumptions and Clarifications for the Budget Estimate • Performance or other bonds are not required; • The estimate assumes that field oversight activities are required for five consecutive weeks at 50 hours per week (Monday through Friday). This will extend Weston's scope of services through November of 2007. Construction oversight costs are subject to change based on weather, contractor schedule and other field conditions. • Construction oversight costs include travel time and expenses for WESTON personnel to mobilize/demobilize between the work site and our office in Vernon Hills, Illinois. The estimate assumes that one WESTON employee will demobilize from and remobilize back to the work site on a bi-weekly basis(i.e. every other weekend). • It is assumed that Modified Level D personal protection equipment is adequate for conducting field oversight activities (Refer to SSHASP). Higher levels of personal protection will trigger additional costs.