HomeMy WebLinkAboutCONTRACT SPECIFICATIONS (2) CONTRACT SPECIFICATIONS
FOR
F.Y. 2007 CYCLONE DRIVE/TITAN TRAIL
CONTRACT NO. 727
CITY OF WATERLOO, IOWA
RISE PROJECT NO. RM-8155(697)--9D-07
�H�lagyrl I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
w®Qrp?ESSIO „ PREPARED BY ME OR UNDER MY DIRECT PERSONAL
�l SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL
. 'A ENGINEER UNDER THE LAWS OF THE STATE OF IOWA.
BR1lCE �S
P
Otege
78 BRUCE P.RADUE A E RADUE
lowA� ®'�° MY LICENSE RENEWAL DATE IS DECEMBER 31,2007. PAGES OR
finifi "0 SHEETS COVERED BY THIS SEAL: SPECIFICATIONS
PREPARED BY:
_ SCHENK ENGINEERING COMPANY
216 BROOKERIDGE DRIVE
WATERLOO, IOWA 50702
PHONE (319) 232-7480
F.Y. 2007 CYCLONE DRIVE/TITAN TRAIL
CONTRACT NO. 727
CONTRACT DOCUMENTS
TABLE OF CONTENTS
1. NOTICE OF PUBLIC HEARING
2. NOTICE TO BIDDERS
3. INSTRUCTIONS TO BIDDERS
4. FORM OF BID OR PROPOSAL
5. SALES TAX EXEMPTION INFORMATION FORM
6. FORM OF BID BOND
7. NON-COLLUSION AFFIDAVITS
8. EQUAL OPPORTUNITY CLAUSE
9. RECIPROCAL RESIDENT BIDDER PREFERENCE AND RESIDENT
BIDDER CERTIFICATION
10. AFFIRMATIVE ACTION PROGRAM
11 . POTENTIAL ITEMS OF WORK FOR MBE/WBE PARTICIPATION
SUBCONTRACTOR'S BID REQUEST FORM,
LETTER FORM FOR SUBCONTRACTOR QUOTES,
MBE AND/OR WBE PREBID CONTACT INFORMATION FORM,
LETTER OF INTENT TO BID (MBE/WBE LETTER),
CERTIFICATION OF MBE/WBE ACCOMPLISHMENT
12. TARGETED SMALL BUSINESS (TSB) AFFIRMATIVE ACTION
RESPONSIBILITIES ON NON-FEDERAL AID PROJECTS (THIRD PARTY
STATE-ASSISTED PROJECTS)
13. WATERLOO/CEDAR FALLS MINORITY AND WOMEN BUSINESSES
ENTERPRISE CONSTRUCTION AND MAINTENANCE CONTRACTOR'S
GUIDE
14. STATEMENT OF BIDDER'S QUALIFICATIONS
15. GENERAL SPECIAL PROVISIONS
16. SPECIAL PROVISIONS
17. GENERAL SPECIFICATIONS FOR CONSTRUCTION
18. SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION
19. FORM OF CONTRACT
20. FORM OF BOND
21. FORM OF PAYMENT BOND
NOTICE OF PUBLIC HEARING
on Proposed Plans, Specifications, Form of Contract,
and Estimate of Cost
for the
F.Y. 2007 Cyclone Drive/Titan Trail
in the City of Waterloo, Iowa
CONTRACT NO. 727
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her
office in the City Hall of the said City on the 21st day of May, 2007, until 4:00 p.m. for
the construction of the F.Y. 2007 Cyclone Drive/Titan Trail, Contract No. 727, as
described in detail in the plans and specifications now on file in the Office of the City
Clerk.
OPENING OF BIDS
All proposals received will be opened in open Council meeting to be held in the Council
Chambers in the City Hall in the City of Waterloo, Iowa, on the 21st day of May, 2007, at
5:30 p.m., and the proposals will be acted upon at such later time and place as may
then be fixed.
PUBLIC HEARING
Notice is hereby given that the Council of said City will conduct a public hearing on the
proposed plans, specifications, form of contract, and estimate of cost for the
construction of the above-described improvement project at 5:30 p.m. on May 21, 2007,
said hearing to be held in the Council Chambers in the City Hall in said City. The
proposed plans, specifications, form of contract, and estimate of cost for said
improvements heretofore prepared by the City Engineer of the City of Waterloo are now
on file in the office of the City Clerk for public examination, and any person interested
therein may file written objection thereto with the City Clerk before the date set for said
hearing, or appear and make objection thereto with the City Clerk before the date set
for said hearing, or appear and make objection thereto at the meeting above set forth.
SCOPE OF WORK
The extent of the work involved is the construction of Cyclone Drive and Titan Trail
beginning at Highway 63 and extending West then North and South with 886 feet of
31-foot wide b-b, 7-inch thick Class "C" P.C.C. pavement with CD joints and 402 feet of
37-foot wide b-b Class "C" P.C.C. pavement with CD joints. And also on Highway 63,
380 feet of 12-foot left turn pocket and 330 feet of 12-foot right turn lane of 10" P.C.C.
pavement. Incidentals include longitudinal subdrain, storm sewer and appurtenances.
NOTICE OF HEARING CONTRACT NO. 727 Page 1 of 5
BEGINNING AND COMPLETION DATES
The work under the proposed contract shall be commenced within ten (10) working
days after receipt of "Notice to Proceed" and shall be completed on or before
August 31, 2007.
METHOD OF PAYMENT TO CONTRACTOR
The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-
five percent (95%) of the work as same is completed and materials delivered and work
approved. Final payment will be made thirty-one (31) days after completion of the work
and acceptance by the Council.
The Contractor is hereby notified that if the City does not have cash on hand to pay
monthly pay estimates, according to Chapter 384.57 of the Code of Iowa, payment may
be made by anticipatory warrants issued bearing a rate of interest not exceeding that
permitted by Chapter 74A, Code of Iowa.
PLANS AND SPECIFICATIONS
Plans and Specifications governing the construction of the proposed improvements
have been prepared by the City Engineer, which plans and specifications and also the
prior proceedings of the City Council referring to and defining said proposed
improvements are hereby made a part of this notice, and the proposed contract by
reference shall be executed in compliance therewith.
Plans and Specifications are obtainable by a qualified bidder from the City Engineer
upon payment of $25.00. The payment is not refundable. The prime contractor,
subcontractors, or suppliers working on the project shall retain their own set of plans
and specifications for use on the project.
The prime contractor will be supplied with the needed number of reduced sets of plans
and specifications at no additional cost.
CONTRACT AWARD
A contract will be awarded to the qualified bidder submitting the lowest total bid. A
Total Bid will be considered as the Division I Base Bid plus either Alternate A or
Alternate B and Division II.
The City reserves the right to reject any or all bids, readvertise for new bids, and to
waive informalities in the bids submitted that may be in the best interest of the City.
Bids may be held by the City of Waterloo, Iowa, for a period not to exceed thirty (30)
days from the day of the opening of bids for the purpose of reviewing the bids and
investigating the qualifications of bidders, prior to awarding the contract.
NOTICE OF HEARING CONTRACT NO. 727 Page 2 of 5
By virtue of statutory authority, a preference will be given to products and provisions
grown and coal produced with the State of Iowa and preference will be given to local
domestic labor in the construction of the improvement.
PROPOSALS SUBMITTED
The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly
write or type the unit bid price and the bid item extension (Unit Price x Estimated Qty) in
numerals on the blanks provided. Should there be any discrepancy between the unit
bid price and extension, the City of Waterloo shall consider the unit bid price as being
the valid unit bid price.
The bidder has the option to submit a computer-generated spreadsheet in lieu of the
portion of the Form of Bid or Proposal, which includes the Bid Item Number,
Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price and Total Bid. The
computer-generated spreadsheet shall include all of the information listed in that portion
of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor
submitting the bid. For the bidders who submit a computer-generated spreadsheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in the space(s)
provided on the Form of Bid or Proposal.
BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or cashier's check
drawn on an Iowa bank, or a bank chartered under the laws of the United States, a
certified share draft drawn on a credit union in Iowa or chartered under the laws of the
United States, or bid bond, (on the form furnished by the City) payable to the City of
Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted,
which certified check, certified share draft or bid bond will be held as security that the
Bidder will enter into a Contract for the construction of the work and will furnish the
required bonds, and in case the successful Bidder shall fail or refuse to enter into the
Contract and furnish the required bonds, his bid security may be retained by said City
as agreed upon liquidated damages. If bid bond is used, it must be signed by both the
Bidder and the surety or surety's agent. Signature of surety's agent must be supported
by accompanying Power of Attorney.
BONDS
The successful bidder will be required to furnish a "Performance Bond" and a "Payment
Bond" within ten (10) days after forms are presented to him in an amount equal to one
hundred percent (100%) of the contract price, said bonds to be issued by a responsible
surety approved by the City Council and shall guarantee the faithful performance of the
contract and the terms and conditions therein contained, and shall guarantee the
prompt payment of all materials and labor and protect and save harmless the City from
claims of any kind caused by the operations of the contractor.
Before the Contractor shall be entitled to receive final payment for work done under this
contract, it shall execute and file a bond in the penal sum of not less than 100% of the
NOTICE OF HEARING CONTRACT NO. 727 Page 3 of 5
total amount of the contract, same to be known as "Maintenance Bond," and which
bond must be approved by the City Council, and which bond is in addition to the bonds
given by the Contractor to guarantee the completion of the work and payment of
subcontractors, suppliers, etc.
CONTRACT COMPLIANCE PROGRAM / SUBCONTRACTING
The program proposes numerical projections regarding utilization of Minority Business
Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors
and suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa.
A goal of at least ten percent (10%) for MBE participation on all City funded
construction projects that are estimated at $50,000.00 or more. A goal of at least two
percent (2%) for WBE participation on all City funded construction projects that are
estimated at $50,000.00 or more. Any project funded in part or in total with federal
funds shall follow the respective agencies contract compliance program and goals. The
Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance
MBE/WBE goals. The MBE/WBE subcontractors, suppliers or vendors must provide
the Prime Contractor a reasonably competitive price for the service being rendered or
the Contractor is not required to accept their bid.
LIQUIDATED DAMAGES
Time is an essential element of this contract. It is important that the work be diligently
pursued to completion. If the work is not completed within the specified contract period,
plus authorized extensions, the contractor shall pay to the City Liquidated Damages in
the amount of three hundred dollars ($300.00) per day, for each day, as further
described herein, in excess of the authorized time.
Days beyond the specified completion date for which Liquidated Damages will be
charged will be working days that the contractor does, or could have worked, from
Monday through Saturday. Sundays will be counted only if work is performed. Partial
working days will be considered as a full working day. Days not chargeable for
Liquidated Damages will include rain days, Sunday if no work is done, and legal
holidays.
Working days will cease to be charged when only punch list items remain to be
completed. Punch list items do not include contract bid items or approved change/extra
work orders.
When the Contractor believes the project to be substantially completed, a written notice
stating the same shall be submitted to the Engineer and a request made for a Punch
List. If the work under the Contract extends beyond the normal construction season for
such work the Contractor shall submit to the Engineer in writing a request that working
days counted toward the project be suspended until work is resumed the following
construction season.
NOTICE OF HEARING CONTRACT NO. 727 Page 4 of 5
This amount is not construed as a penalty. These damages are for the cost to the City
of providing the required additional inspection, engineering and con-ract administration.
PRE-CONSTRUCTION CONFERENCE
Before the work is commenced on this contract, a conference snail be held for the
purpose of discussing the contract. The conference shall be attended by City officials,
the prime contractor, and all subcontractors, if any.
RECIPROCAL RESIDENT BIDDER PREFERENCE
Attention of bidders is called to the requirement of complying with the provisions of the
Reciprocal Resident Bidder Preference requirement. Each bidder submitting a bid shall
execute and include with the bid, a Resident Bidder Certification in the form herein
provided, to the effect that he will not have as employees, Illinois laborers on the work
site.
SALES TAX EXEMPTION CERTIFICATES
Contractors and approved subcontractors will be provided a Sales Tax Exemption
Certification to purchase building materials or supplies in the performance of
construction contracts let by the City of Waterloo.
Published pursuant to the provisions of Division VI of Chapter 384 of the City Code of
Iowa and upon order to the City Council of said Waterloo, Iowa, on the
day of , 2007.
CITY OF WATERLOO, IOWA
BY: Nancy Eckert
City Clerk
NOTICE OF HEARING CONTRACT NO. 727 Page 5 of 5
NOTICE TO BIDDERS
CITY OF WATERLOO, IOWA
PUBLIC IMPROVEMENT PROJECT
Time and Place for Receiving Sealed Proposals.
Sealed proposals for the work under the proposed contract as stated below must be filed before
4:00 p.m. on May 21, 2007, in the office of the City Clerk, l st Floor, City Hall, 715 Mulberry
Street, Waterloo, Iowa, 50703.
Time and Placed Sealed Proposals Will Be Opened and Considered.
Sealed proposals will be opened and bids read at 5:30 p.m. on May 21, 2007, in the Council
Chambers, 2nd Floor, City Hall, 715 Mulberry Street, Waterloo, Iowa, for consideration by the
City Council. The City of Waterloo reserves the right to reject any and all bids.
Time for Beginning and Completion of Work.
The work under the proposed contract shall be commenced upon approval of the contract by the
Council and issuance of a Notice to Proceed, and completed by August 31, 2007.
Bid Security. Each bidder shall accompany its bid with bid security as defined in Code of Iowa
Section 38.8 and as specified by the governmental entity.
Contract Documents. Copies of the contract documents are available from the City Engineer's
Office at a cost of$25.00 per set.
Preference for Iowa Products and Labor. By virtue of statutory authority,preference will be
given to products and provisions grown and coal produced within the State of Iowa, and to Iowa
domestic labor, to the extent lawfully required under Iowa statutes.
Sales Tax. The bidder should not include sales tax in the bid. A sales tax exemption certificate
will be available for all material purchased for incorporation in the project.
General Nature of Public Improvement.
F.Y. 2007 Cyclone Drive/Titan Trail, Contract No. 727
The extent of the work involved is the construction of Cyclone Drive and Titan Trail beginning
at Highway 63 and extending West then North and South with 886 feet of 31-foot wide b-b,
7-inch thick Class "C" P.C.C. pavement with CD joints and 402 feet of 37-foot wide b-b Class
"C" P.C.C. pavement with CD joints. And also on Highway 63, 380 feet of 12-foot left turn
pocket and 330 feet of 12-foot right turn lane of 10" P.C.C. pavement. Incidentals include
longitudinal subdrain, storm sewer and appurtenances.
Published pursuant to the provisions of Chapter 38 of the Code of Iowa and upon order of
the City Council of said Waterloo, Iowa, on the day of 2007.
CITY OF WATERLOO, IOWA
BY: Nancy Eckert
City Clerk
INSTRUCTIONS TO BIDDERS
1. EXPLANATIONS TO BIDDERS
Any explanation desired by a bidder regarding the meaning or
interpretation of the Notice to Bidders, Plans, Specifications, etc., must be
requested in writing and with sufficient time allowed for a reply to reach
bidders before submission of their bids. Any interpretation made will be in
the form of an amendment of the Notice to Bidders, Plans, Specifications,
etc., and will be furnished to all prospective bidders. Its receipt by the
bidder must be acknowledged in the space provided on the Proposal Form
or by letter or telegram received before the time set for opening of bids.
Oral explanations or instructions given before the award of the contract
will not be binding.
2. EXAMINATION OF PROPOSED WORK
Bidders should visit the site and take such other steps as may be
reasonably necessary to ascertain the nature and location of the work,
and the general and local conditions which can affect the work or the cost
thereof. Failure to do so will not relieve bidders from responsibility for
estimating properly the difficulty or cost of successfully performing the
work. The owner will assume no responsibility for any understanding or
representation concerning conditions made by any of its officers or agents
prior to the execution of the contract, unless included in the Notice to
Bidders, the Specifications or related documents.
3. PREPARATION OF BIDS
a. Bids shall be submitted on the forms furnished, or copies thereof,
and must be manually signed. If erasures or other changes appear
on the forms, each erasure or change must be initialed by the
person signing the bid.
The bidder has the option to submit a computer-generated
spreadsheet in lieu of the portion of the Form of Bid or Proposal,
which includes the Bid Item Number, Description, Unit, Estimated
Quantity, Unit Bid Price, Total Bid Price, and Total Bid. The
computer-generated spreadsheet shall include all of the information
listed in that portion of the Form of Bid or Proposal as well as bear
the signature of the Prime Contractor submitting the bid. For the
bidders who submit a computer-generated spread- sheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in
the space(s) provided on the Form of Bid or Proposal.
INSTRUCTIONS TO BIDDERS Page 1 of 14
b. The Bid Form may provide for submission of a price or prices for
one or more items, which may be lump sum bids, alternate prices,
schedule items resulting in a bid on a unit of construction or a
combination thereof, etc. When the Bid Form explicitly requires
that the bidder bid on all items, failure to do so will disqualify the
bid. When submission of a price on all items is not required,
bidders should insert the words "no bid" in the space provided for
any item on which no price is submitted.
c. Unless called for, alternate bids will not be considered.
d. Modifications of bids already submitted will be considered if
received at the office designated in the Notice to Bicders by the
time set for closing of bids. Telegraphic modificat ons will be
considered, but should not reveal the amount of the original or
revised bid.
e. In preparing his bid, the bidder shall specify the price, written legibly
in ink or with the typewriter, at which he proposes to do each item
of work. The unit price shall be stated in figures in the blank space
provided (i.e., $7.14). In items where unit price is required, the total
amount of each item shall be computed at the unit prices bid for the
quantities given on the Bid Form and stated in figures in the blank
space provided.
If the bidder chooses to submit the unit prices, total bid price, and
total bid on a computer-generated spreadsheet, all numbers shall
be easily legible.
f. Any changes or alterations made in the Bid Form, or any addition
thereto, may cause the rejection of the bid. No cid will be
considered which contains a clause in which the contractor
reserves the right to accept or reject a contract awarded him by the
city Council of Waterloo. Bids in which the unit prices are obviously
unbalanced may be rejected.
4. SUBMISSION OF BIDS
a. A bid must be sealed in a separate envelope and marked to
indicate its contents and be accompanied by the bid security in a
separate envelope. If forwarded by mail, the two envelopes shall
be placed in a third and mailed to the City Clerk/Auditor. All bids
must be filed with the City Clerk/Auditor of the City of Waterloo at
his office in the City Hall before the time specified for closing bids.
INSTRUCTIONS TO BIDDERS Page 2 of 14
b. Bids received prior to the advertised hour of opening will be
securely kept sealed. The officer whose duty it is to open them will
decide when the specified time has arrived, and no bid received
thereafter will be considered; except that when a bid arrives by mail
after the time fixed for opening, but before the reading of all other
bids is completed, and it is shown to the satisfaction of the City of
Waterloo, Iowa, that the non-arrival on time was due solely to delay
in the mails for which the bidder was not responsible, such bid will
be received and considered.
c. Bidders are cautioned that, while telegraphic modificat ons of bids
may be received as provided above, such modifications, if not
explicit and if in any sense subject to misinterpretation, shall made
the bid so modified or amended, subject to rejection.
5. LATE BIDS AND MODIFICATIONS OR WITHDRAWALS
Bids and modifications or withdrawals thereof received at the office
designated in the Notice to Bidders after the exact time set for closing of
bids will not be considered. However, a modification which is received
from an otherwise successful bidder, and which makes the terms of the
bid more favorable to the City of Waterloo, will be considered at any time it
is received and may therefore be accepted. Bids may be withdrawn by
written or telegraphic request received from bidders prior to the time set
for closing of bids.
6. PUBLIC OPENING OF BIDS
Bids will be publicly opened at that time and place set for opening in the
Notice to Bidders. Their content will be made public for the information of
bidders and others interested who may be present either in person or by
representative.
7. BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or
cashier's check drawn on an Iowa bank, or a bank chartered under the
laws of the United States, a certified share draft drawn on a credit union in
Iowa or chartered under the laws of the United States, or bid bond (on the
form furnished by the City) payable to the City of Waterloo, Iowa, in the
sum of not less than five percent (5%) of the bid submitted, which certified
check, certified share draft or bid bond will be held as security that the
Bidder will enter into a Contract for the construction of the work and will
furnish the required bonds, and in case the successful Bidder shall fail or
refuse to enter into the Contract and furnish the required bond, his bid
security may be retained by said City as agreed upon liquidated damages.
INSTRUCTIONS TO BIDDERS 'age 3 of 14
If bid bond is used, it must be signed by both the bidder and the surety or
surety's agent. Signature of surety's agent must be supported by
accompanying Power of Attorney.
8. COLLUSIVE AGREEMENTS
a. Each bidder submitting a bid shall execute and include with the bid,
a Non-Collusion Affidavit in the form herein provided, to the effect
that he as not colluded with any other person, firm, or corporation in
regard to any bid submitted.
b. Each bidder submitting a bid shall have each proposed
subcontractor, if any, execute and submit to the City Contract
Compliance Officer by 5:00 P.M. the business day following the day
bids on this project are due, a Non-Collusion Affidavit in the form
herein provided, to the effect that he has not colluded with any
other person, firm, or corporation in regard to any bid submitted.
Before executing any subcontract, the successful bidder shall
submit the name of any proposed subcontractor for approval by the
City.
9. MINORITY AND/OR WOMEN BUSINESS ENTERPRISE
SUBCONTRACTORS
a. CITY OF WATERLOO AND/OR WOMEN BUSINESS
ENTERPRISE PRE-BID CONTACT INFORMATION FORM
The City of Waterloo Minority and/or Women Business Enterprise
Pre-Bid Contact Information Form shall be submitted with the Form
of Bid or Proposal. Failure to do so shall be grounds for the bid
being rejected if subcontracting is proposed by the prime
contractor.
10. MBE/WBE CONTRACT COMPLIANCE PROGRAM PURPOSE
The purpose of the Contract Compliance Program hereinafter
called Program) is to act as an impetus for increasing the
participation of minority and women disadvantaged business
enterprise (MBE/WBE) in City awarded construction contracts.
The Program does not propose to eliminate any bonafide contractor
or subcontractor from bidding on City contracts, but it will hopefully
serve as a needed stimulus to help local MBE/WBE's grow and
eventually become mainstream contractors and subcontractors.
INSTRUCTIONS TO BIDDERS Page 4 of 14
This Contract Compliance Program does not propose to include
any set-aside or quotas, but only flexible goals where "good-faith
efforts" are required by the contractor to use MBE/WBE
subcontractors.
This Program shall not eliminate the need for contractors to
continue their "good-faith efforts" in using MBE/WBE
subcontractors on City contracts estimated at less than $50,000.
The City of Waterloo will make every effort to reduce in-house
construction and maintenance work that would be more cost
effectively performed by the private sector and, thus, would allow
additional bidding opportunities for MBE/WBE firms.
The City Contract Compliance Officer shall be advised of all City of
Waterloo awarded construction contracts.
DEFINITIONS
Goals:
A flexible numerically expressed objective which contractors are
required to make "good-faith efforts." The key to the requirement is
to make documented efforts. Goals are neither set-a-sides nor a
device to achieve proportional representation or equal results.
Numerical goals do not create set-a-sides for specific groups, nor
are they designed to achieve proportional representation or equal
results. Rather, the goal-setting process in affirmative action
planning is used to target and measure the effectiveness of
affirmative action efforts to eradicate and prevent discrimination.
Quota:
A flat numerical requirement that the contractor is required to meet
in order to obtain the benefit or be in compliance. The numerical
goal component of affirmative action programs is not designed to
be, nor may it properly or lawfully be interpreted as, permitting
unlawful preferential treatment and quotas with respect to persons
of any race, color, religion, sex, or national origin. The regulations
at 41 CFR 60-2.12(a), 60-2.15 and 60-2.30, specifically prohibit
discrimination and the use of goals as quotas. (U.S. Department of
Labor)
INSTRUCTIONS TO BIDDERS Page 5 of 14
Set-Aside:
An arrangement in which a particular contract is reserved for
competition solely among minority and women business
enterprises.
Contractor.
As used in this document means contractor, subcontractor,
supplier, vendor, and professional service provider.
Minority Business Enterprise (MBE)
Any business, which is at least 51%, owned by one or more
minorities and whose management and daily business operations
are controlled by one or more such individuals and is on the current
State Unified Certification List, or were listed on the City of
Waterloo Certified MBE/WBE Contractors list as of July 1, 2002
Women Business Enterprise (WBE):
Any business which is at least 51% owned by one or mcre women
and whose management and daily business operations are
controlled by one or more such individuals and is on the current
State Unified Certification List, or were listed on the City of
Waterloo Certified MBE/WBE Contractors list as of July 1, 2002
Minority:
Any person or persons who are considered as socially and
economically disadvantaged because of their identity as a group
member without regard to their individual qualities. The groups
include: Black American, Hispanic American, Native Americans,
Eskimos, Aleuts, and Asian-Pacific Americans. 13 C.F.R 124-
1.1(c)(3)(ii)(1983).
Lowest Responsible Bidder:
Bidder who has offered the lowest bid and who has exhibited skill
relative to the type of work bid on, judgment, financial responsibility,
and evidence of working with the Affirmative Action Employment
Program and the Contract Compliance Program.
Broker:
One buying or selling for others on commission or other fee basis
without maintaining a warehouse or other similar inventory storage
facility.
Mayor's Advisory Committee:
Mayor's Advisory Committee for Minority, Female, and
Disadvantaged Business Enterprise.
INSTRUCTIONS TO BIDDERS
Page 6 of 14
Good Faith Efforts:
The successful bidder shall be selected on the basis cf having
submitted the lowest responsible bid. The obligation o'the bidder is
to make good faith efforts. The bidder can demonstrate that it has
done so by the following:
1. The Prime Contractor met the project goal - No Action necessary
2. If the Prime Contractor failed to meet the goal, they must submit
documentation of good faith efforts.
CONTRACT COMPLIANCE PROGRAM SUBCONTRACTING
The program proposes numerical projections or goals regarding
utilization of Minority Business Enterprise (MBE) and Women
Business Enterprise (WBE) as subcontractors in the performance
of contracts awarded by the City of Waterloo, Iowa.
A goal of at least 10% for MBE participation on all City funded
construction projects that are estimated at $50,000 or more and
projects under $50,000 where applicable at the Contract
Compliance Officer's discretion. There is at least 2% WBE goal on
City funded projects. Any project which is funded solely or in part
with Federal funds shall follow the respective agencies contract
compliance program and goals. Any project which is funded solely
or in part with State funds shall follow the respective agencies
contract compliance program and goals. The City of Waterloo
Contract Compliance Program is for City awarded construction
contracts only. The prime contractor shall make "good-faith efforts"
to meet the Contract Compliance MBE/V1BE goals. The MBE/WBE
subcontracts must provide the prime contractor a reasonably
competitive price for the service being rendered or the contractor is
not required to accept the bid.
Administrative Reconsideration:
As part of this reconsideration, the bidder will have the opportunity
to provide written documentation or arguments concerning the
issue of whether they made adequate good faith efforts to meet the
goals. The bidder will have the opportunity to meet in person with
the City of Waterloo's Administrative Reconsideration Committee to
discuss the issue of whether they made adequate good faith efforts.
The Administrative Reconsideration Committee will forward a
written decision on reconsideration to the Mayor and City Council,
explaining the basis for finding that the bidder did or did not meet
the goal or make adequate good faith efforts to do so.
INSTRUCTIONS TO BIDDERS
Page 7 of 14
Documentation required will include but is not limited to the
following:
* Making portions of the work available for MBE/WBE
subcontracting
* Evidence of negotiating with MBE/WBE firms
* MBE/WBE quotes obtained and non-MBE/WBE quotes used
* Reasons agreements were not reached
* Follow-up after initial solicitations
* Efforts to assist in obtaining equipment, supplies and materials (at
competitive prices), bonding, lines of credit, insurance, etc.
* Evidence of past compliance or non-compliance by same
contractor
The Contract Compliance Officer will determine the weight to be
given to each item listed above (supported by appropriate
documentation) based on overall program goals.
RESPONSIBILITIES
1. City of Waterloo
A. The City Contract Compliance Officer has the responsibility
to assure the City's compliance with Federal, State and
Municipal regulations.
B. The City Contract Compliance Officer is responsible for
maintaining a current directory of certified firms. Certification
of MBE/WBE/DBE contractors is through the Iowa
Department of Transportation and its Unified Certification
Program. Only firms certified based on guidelines prescribed
in 49 CFR Part 26 and provisions of this agreement, shall be
recognized as certified by the City of Waterloo.
C. The City Contract Compliance Officer is responsible for
making available a list of future project information notices to
MBE/WBE firms.
D. The City Contract Compliance Officer shall send notices to
appropriate MBE/WBE firms in the directory of each bid
solicitation with opening date.
E. The City Contract Compliance Officer will receive MBE/WBE
Letter(s) of Intent to Bid and within two (2) business days
forward the complete list of MBE/WBE bidders who
submitted a Letter of Intent to Bid to prime contractors.
INSTRUCTIONS TO BIDDERS Page 8 of 14
ll. Prime Contractors
In order to be in compliance with the guidelines of this program, the
prime contractor must show good-faith efforts in following the
MBE/WBE Contract Compliance Program. Good-faith efforts
include, but are not limited to, the following:
A. Prime contractors shall send solicitation letters (Form CCO-
3) to appropriate MBE/WBE (those certified in directory
prepared by City Contract Compliance Officer) at least seven
(7) working days prior to bid date. Letters should identify
specific items to be subcontracted. A minimum of three (3)
disadvantaged business contacts must be made and
documented, if there are at least three disadvantaged
businesses offering services in the area to be subcontracted
(See City of Waterloo MBE/WBE Certification List). If less
than three (3) are offering the services to be subcontracted,
then a contact is required for any that are listed as providing
that service. If the Prime Contractor submits a MBE/WBE
contact not on the City's MBE/WBE list, attach a copy of the
MBE/WBE/DBE Certifications from another government
agency.
B. If a prime contract bidder is unable to identify MBE/WBE
firms to perform portions of the work, the City Contract
Compliance Officer should be contacted for assistance
immediately.
C. Prime contract bidders may solicit MBE/WBE proposals by
telephone or personal interviews, but all such contacts shall
be confirmed by Certified Mail, or subcontract bid request
forms (Form CCO-2).
D. If any MBE/WBE business submitting bids is not selected for
subcontract award, documentation must accompany the
"MBE/WBE Business Enterprise Pre-Bid Contact Information
Form" (Form CCO-4 and CCO-4A) on why the MBE/WBE
was not selected. These reasons could include:
a. Not low bid. Copies of the competing bids may be
required for verification.
b. MBE/WBE did not bid, withdrew bid or non-responsive.
c. Documentation of other business-related reason for not
selecting the MBE/WBE business for a subcontract.
d. Prime contractor self performs work.
e. Any other reason relied on by prime.
INSTRUCTIONS TO BIDDERS Page 9 of 14
The Contract Compliance Officer will determine the weight to be
given to each item listed above (supported by appropriate
documentation) based on overall program goals.
III. MBE/WBE Firms
A. MBE/WBE firms shall be certified by the Iowa Department of
Transportation as owners and controllers of their respective
businesses, or were listed on the City of Waterloo Certified
MBE/WBE Contractors list as of July 1, 2002.
B. MBE/WBE firms must perform the work on the project; they
cannot act as a broker by subcontracting the work out to
others.
C. Each MBE/WBE firm planning to submit quotes on
construction projects with goals, shall submit a Letter of
Intent to Bid (Form CCO-5) to the City Contract Compliance
Officer seven (7) working days prior to bid opening, listing
specific items which the MBE/WBE firm is interested in
bidding. If sufficient Letters of Intent to Bid are not received
by the City Contract Compliance Officer seven (7) working
days prior to bid opening, goals on subject project will be
reduced accordingly. Agreements between the
bidder/proposer and a MBE/WBE in which the MBE/WBE
promises not to provide subcontracting quotations to other
bidders/proposers are prohibited.
NON-COMPLIANCE OF CONTRACTORS
A. Noncompliance exists when the contractor's actions are not
consistent with the requirements of the Contract Compliance
Program in the areas of employment and subcontracting.
B. A bidder's failure to show good-faith efforts to meet project
goals or a failure to use certified MBE/WBE firms may be
grounds for finding its bid not responsible.
C. The Contract Compliance Officer shall submit to City Council
his/her recommendation on any non-compliant contract in
writing.
NOTICE TO PROCEED
Notice to proceed on any project with goals will not be issued until
City Contract Compliance Officer determines the lowest responsible
bidder has used good-faith efforts to comply with this Compliance
Program and the bid was responsive.
INSTRUCTIONS TO BIDDERS Page 10 of 14
CONCLUSION
This program repeals or revises all sections of previous Waterloo
Contract Compliance Programs.
11. TARGETED SMALL BUSINESS (TSB) AFFIRMATIVE ACTION
RESPONSIBILITIES
The Targeted Small Business (TSB) Pre-Bid Contact Information Form
shall be submitted with the Form of Bid or Proposal. Failure to do so shall
be grounds for the bid being rejected if subcontracting is proposed by the
prime contractor.
For further information on TSB submittal see the Targeted Small Business
(TSB) Affirmative Action Responsibilities section of the specifications.
12. EMPLOYMENT AND BUSINESS OPPORTUNITY
To the greatest extent feasible, suppliers, subcontractors, and low income
workers owning businesses or living in the Waterloo area must be given
priority in supplying materials, bidding for subcontract work, or applying for
employment by the contractor on this project. Opportunities for training
and for employment arising in connection with this project, shall to the
greatest extent feasible be made available to lower income persons
residing in the project area. The contract area is the City of Waterloo.
The City of Waterloo will require the contractor to document his efforts in
securing lower income workers living in the project area and in purchasing
supplies from, and awarding subcontracts to, businesses owned by
persons residing in the project area.
13. STATEMENT OF BIDDER'S QUALIFICATIONS
Each bidder shall, upon request of the City of Waterloo, Iowa, submit on
the form furnished for that purpose (a copy of which is included in the
contract documents), a statement of bidder's qualifications, his experience
record in constructing the type of improvements embraced, and his
organization and equipment available for the work contemplated; and,
when specifically requested, a detailed financial statement. The City of
Waterloo, Iowa, shall have the right to take such steps as it deems
necessary to determine the ability of the bidder to perform his obligations
under the contract, and the bidder shall furnish the City of Waterloo, Iowa,
all such information and data for this purpose as it may request. The right
INSTRUCTIONS TO BIDDERS Page 11 of 14
is reserved to reject any bid where an investigation of the available
evidence or information does not satisfy the City of Waterloo Iowa, that
the bidder is qualified to carry out properly the terms of the contract.
14. AWARD OF CONTRACT
a. Award of contract will be made to that responsive and responsible
bidder whose bid, conforming to the Specifications, is most
advantageous to the City of Waterloo; price and other factors
considered. The intention is to award the contract at any time of
opening bids, but the right is reserved to postpone such action for a
reasonable time, not exceeding thirty (30) days.
b. The City Council may, when in its interest, reject any cr all bids or
waive any informality in bids received.
c. The bidder shall submit bids on all the items listed in the proposal
and shall state the unit bid price in words in the blank spaces
provided beneath the item description. Should there be any
discrepancy between the unit bid price in words and listed numeral
unit bid price, the City of Waterloo shall consider the unit bid price
in words as being the valid unit bid price. A computer-generated
spreadsheet as herein provided shall also be acceptable.
Proposals requiring mathematical computations to determine unit
prices or totals will be rejected. A contract will be awarded to the
qualified bidder submitting the lowest total bid as indicated in the
NOTICE TO BIDDERS.
15. EXECUTION OF AGREEMENT, BONDS, AND CERTIFICATE OF
INSURANCE
a. Subsequent to the award and within ten (10) days after the
prescribed forms are presented for signature, the successful bidder
shall execute and deliver to the City of Waterloo, Iowa, an
agreement in the form included in the contract documents in such
number of copies as the City of Waterloo, Iowa, may require.
b. Having satisfied all conditions of award as set forth elsewhere in
these documents, the successful bidder shall, within the period
specified in paragraph "a" above, furnish a surety bond and a
payment bond in a penal sum not less than the amount of the
contract as awarded, as security for the faithful performance of the
contract and terms and conditions therein contained and shall
guarantee the prompt payment of all persons, firms, or corporations
to whom the contractor may become legally indebted for labor,
materials, tools, equipment, or services of any nature including
INSTRUCTIONS TO BIDDERS Page 12 of 14
utility and transportation services, employed or used by him in
performing the work. The bonds shall protect and save harmless
the City from claims and damages of any kind caused by the
operations of the contractor and shall also guarantee the
maintenance of the contract improvements for the period stated in
the Notice of Hearing from and after completion of said
improvements and their acceptance by the City. Such bonds shall
be in the same form as that included in the contract documents and
shall bear the same date as, or a date subsequent to that of the
agreement. The current Power of Attorney for the person who
signs for any surety company shall be attached to such bonds.
c. The successful bidder shall, within the period specified in
paragraph "a" above, furnish a certificate of insurance for approval
in amounts of not less than the amounts specified in the General
Specifications for Construction, Section F. No. 4 "Liability
Insurance," Pages 14 to 15 of 18 Pages. The certificate of
insurance shall be furnished in such number of copies as the City of
Waterloo may require. The City of Waterloo shall be named as an
"Additional Insured." The contractor shall similarly submit his
subcontractor's certificates of insurance in the amounts for approval
before each commences work. The contractor shall carry or
require that there be Workmen's Compensation Insurance for all his
employees and those of his subcontractors engaged in work at the
site, in accordance with State Workmen's Compensation Laws.
d. The failure of the successful bidder to execute such agreement and
to supply the required bond or bonds within ten (10) days after the
prescribed forms are presented for signature, or within such
extended period as the City of Waterloo, Iowa, may grant, based
upon reasons determined sufficient by the City of Waterloo, Iowa,
may either award the contract to the next lowest bidder or re-
advertise for bids, and may charge against the bidder the difference
between the amount of the bid an the amount for which a contract
for the work is subsequently executed, irrespective of whether the
amount thus due exceeds the amount of the bid guaranty. If a
more favorable bid is received by re-advertising, the defaulting
bidder shall have no claim against the City of Waterloo, Iowa, for a
refund.
16. RECIPROCAL RESIDENT BIDDER PREFERENCE
Attention of bidders is called to the requirement of complying with the
provisions of the Reciprocal Resident Bidder Preference requirement.
INSTRUCTIONS TO BIDDERS Page 13 of 14
Each bidder submitting a bid shall execute and include with the bid, a
Resident Bidder Certification in the form herein provided, to the effect that
he will not have as employees, Illinois laborers on the work site.
INSTRUCTIONS TO BIDDERS Fage 14 of 14
FORM OF BID OR PROPOSAL
F.Y. 2007 CYCLONE DRIVE/TITAN TRAIL
CONTRACT NO. 727
CITY OF WATERLOO, IOWA
Honorable Mayor and City Council
Waterloo, Iowa
Gentlemen:
1. The undersigned, being a Corporation existing under the laws of the State of
, a Partnership consisting of the following partners:
, having familiarized (himself) (themselves) (itself) with the existing conditions
on the project area affecting the cost of the work, and with all the contract
documents listed in the Table of Contents and Addenda (if any), as prepared
by Schenk Engineering Company, Waterloo, Iowa, now on file in the office of
the City Clerk, City Hall, Waterloo, Iowa, hereby proposes to furnish all
supervision, technical personnel, labor, materials, machinery, tools,
appurtenances, equipment, and services, including utility and transportation
services required to construct and complete this F.Y. 2007 CYCLONE
DRIVE/TITAN TRAIL, Contract No. 727, all in accordance with the above-
listed documents and for the unit prices for work in place for the following
items and quantities:
F.Y. 2007 CYCLONE DRIVE / TITAN TRAIL
CONTRACT NO. 727
BID DESCRIPTION UNIT EST. UNIT BID TOTAL BID
ITEM BASE BID QTY. PRICE PRICE
1 CLEARING & GRUBBING LS 1 $ $
2 EARTHEN BASE PREPARATION SY 9,200 $ _ $
CLASS 10 EXCAVATION, INCLUDES
3 TOPSOIL STRIPPING CY 2,400 $
EMBANKMENT FILL, W/M & D, INCLUDES
4 30% SHRINKAGE CY 11,310 $
5 RANDOM FILL CY 4,000 $ $
FORM OF BID CONTRACT NO. 727 PAGE 1 OF 5 PAGES
BID DESCRIPTION UNIT EST. UNIT BID TOTAL BID PRICE
ITEM BASE BID QTY. PRICE
6 REMOVE EXISTING PAVEMENT SY 64 $ $
7 SUBGRADE REPAIR CY 50 $ $
8 SPECIAL BACKFILL SUBBASE 6" TON 2,200 $ _ $
7" PCC PAVEMENT, CLASS C, WITH CD
9 JOINTS SY 4,950 $ _ $
10" PCC PAVEMENT, CLASS C, WITH CD
10 JOINTS SY 730 $ $
11 BT-5 JOINT LF 870 $ $
12 TRUNCATED DOMES, 24"x 24" SECTION EA 10 $ $
13 LINSEED OIL TREATMENT SY 4,950 $ _ $
2-1/2" TYPE A, ASPHALT SURFACE
14 COURSE, 3/8" MIX SY 12 $ $
15 5" PCC SIDEWALK SF 100
16 SAW CUT, FULL DEPTH, 3"ASPHALT LF 890 $ $
17 CRUSHED STONE ROCK, CLASS A TON 720 $ $
18 4" DRAIN TILE W/POROUS BACKFILL LF 2,338 $ $
19 RODENT GUARD, IDOT RF-19C, DETAIL A EA 11 $ $
20 RA-49, STORM MANHOLE EA 1 $ $
RA-49, STORM MANHOLE, W/6' WALL AND
21 TEMPORARY %4" STEEL TOP PLATE EA 1 $ $
22 RA-40, STORM INTAKE EA 2 $ $
23 RA-43, STORM INTAKE EA 4 $ $
24 15" RCP, 2000D STORM SEWER LF 329 $ $
25 18" RCP, 2000D STORM SEWER LF 45 $ $
26 24" RCP, 2000D STORM SEWER LF 38 $
27 24" RCP, 2000D CULVERT LF 104 $ $
28 18" APRON, W/TWO JOINT TIES EA 1 $ $
29 24"APRON, W/TWO JOINT TIES EA 3 $ $
30 CONNECT STORM TO EXISTING EA 1 $ $
FORM OF BID CONTRACT NO. 727 PAGE 2 OF 5 PAGES
BID DESCRIPTION UNIT EST. UNIT BID TOTAL BID PRICE
ITEM BASE BID QTY. PRICE
31 SANITARY MANHOLE TOP ADJUSTMENT EA 2 $ $
SANITARY MANHOLE TOP ADJUSTMENT,
32 W/CONE REPLACEMENT EA 1 $ $
33 REMOVE EX. STORM PIPE LF 15 $ $
34 HDPE EROSION CONTROL MAT SF 96 $ $
35 TRAFFIC CONTROL LS 1 $ $
36 TRAFFIC SIGNS, TYPE A SF 141 $ $
37 TRAFFIC SIGN POSTS, 14' WOOD EA 19 $ $
38 TRAFFIC SIGN POSTS, 12' WOOD EA 2 $ $
39 TRAFFIC SIGN POSTS, 10' METAL EA 2 $ $
40 IDOT TYPE RE-3B FOUR SIGN BARRICADE EA 1 $ $
41 IDOT TYPE III BARRICADE EA 2 $ $
42 PAVEMENT MARKINGS LS 1 $ $
43 SWPPP IMPLEMENTATION LS 1 $ $
44 SILT FENCE LF 3,420 $ $
45 DITCH CHECKS LF 160 $ $
46 6" TOPSOIL SALVAGE & SPREAD CY 2,500 $
47 TEMPORARY SEEDING AC 1.4 $ $
48 SEED, FERTILIZE & MULCH AC 1.4 $ $
49 BORROW AREA SEEDING AC 1.6 $ $
CITY OF WATERLOO 2-YEAR
50 MAINTENANCE BOND LS 1 $ $
51 MOBILIZATION LS 1 $ $
TOTAL BASE BID $
FORM OF BID CONTRACT NO. 727 PAGE 3 OF 5 PAGES
2. It is understood that the quantities set forth are approximate cnly and subject
to variation and that the unit bid price for the work done shall govern in the
actual payment to Contractor.
3. In submitting this bid, the bidder understands that the right is reserved by the
City of Waterloo, Iowa, to reject any or all bids. If written notice of the
acceptance of this bid is mailed, telegraphed, or delivered to the undersigned
within thirty (30) days after the opening thereof, or at any time thereafter
before this bid is withdrawn, the undersigned agrees to execute and deliver an
agreement in the prescribed form and furnish the required bond and certificate
of the insurance within ten (10) days after the agreement is presented to him
for signature, and start work within ten (10) days after "Notice to Proceed" is
issued.
4. Security in the sum of
Dollars ($ ) in the form of
, is submitted herewith in accordance with the INSTRUCTIONS TO BIDDERS.
5. Attached hereto is a Non-Collusion Affidavit of Prime Contractor,
6. Attached hereto is a Resident Bidder Certification.
7. The bidder is prepared to submit a financial and experience statement upon
request.
8. The Prime Contractor and Subcontractor(s), which have performed an
aggregate of $10,000.00 in work for the City in the current calendar year, are
prepared to submit an AAP or Update and an EOC, within ten (10) days of
notification that the bid submitted is lowest and acceptable.
9. The bidder has received the following Addendum or Addenda:
Addendum No. Date
10. The bidder shall list the MBE/WBE subcontractor(s), amount of subcontracts
and bid items on the City of Waterloo Minority and/or Women Business Pre-
bid Contact Information Form submitted with this Form of Bid or Proposal.
The apparent low Bidder shall submit a list of all other Subcontractor(s) to be
used on this Project to the City of Waterloo by 5:00 p.m. the business day
following the day Bids on this Project are due along with the Non-Collusion
Affidavits of All Subcontractor(s). The Contractor shall submit information on
the subcontractors on "SUBCONTRACTOR REQUIEST AND APPROVAL"
form to be provided prior to approval of contract.
FORM OF BID CONTRACT NO. 727 PAGE 4 OF 5 PAGES
The subcontractors listed on this proposal and/or submitted to the Contract
Compliance Officer cannot be changed except for the following reasons:
1) The City of Waterloo does not approve the subcontractors.
2) The subcontractors submit in writing that they cannot fulfill their
subcontracts.
11. The bidder shall follow the contract provisions titled "TSB Aff rmative Action
Responsibilities on Non-Federal Aid Project (Third-Party State-Assisted
Projects)".
12. The bidder has filled in all blanks on this proposal. Those blanks not
applicable are marked "none" or "NA".
13. The bidder has attached all applicable forms.
14. The Owner reserves the right to select alternates, delete line items,
and/or to reduce quantities prior to the award of a contract due to
budgetary limitations.
(Name of Bidder) (Date)
BY: Title
Official Address: (Including Zip Code):
I.R.S. No.
FORM OF BID CONTRACT NO. 727 PAGE 5 OF 5 PAGES
INFORMATION NEEDED
FOR
IOWA CONSTRUCTION SALES TAX EXEMPTION CERTIFICATE
CONTRACTOR NAME:
ADDRESS:
(Check One) PRIME SUBCONTRACTOR
FEDERAL ID#:
PROJECT NAME:
PROJECT CONTRACT NO.:
DESCRIPTION OF WORK:
❑ Brickwork ❑ Landscaping
❑ Carpentry ❑ Painting
❑ Concrete ❑ Paving
❑ Drywall-Plaster-Insulation ❑ Plumbing
❑ Electrical ❑ Roofing-Siding-Sheet Metal
❑ Excavation/Grading ❑ Windows
❑ Flooring ❑ Wrecking-Demolition
❑ Heavy Construction ❑ Other (Please specify)
❑ Heating-Ventilating-Air Cond.
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we,
as Principal, and
as Surety are held and firmly bound unto the CITY OF WATERLOO, Iowa, hereinafter called
"OWNER." In the penal sum of Dollars
($ ) lawful money of the United States, for the payment of which sum will and
truly be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and
severally, firmly by these presents. The condition of this obligation is such that whereas the Principal has
submitted the accompanying bid dated the day of 2007,
for
NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate,
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form specified
and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons
performing labor or furnishing materials in connection therewith, and shall in all other respects perform the
agreement created by the acceptance of said Bid,
Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly
understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event,
exceed the penal amount of this obligation as herein stated.
By virtue of statutory authority, the full amount of this bid bond shall be forfeited to the Owner in liquidation
of damages sustained in the event that the Principal fails to execute the contract and provide the bond as
provided in the specifications or by law.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its
bond shall be in no way impaired or affected by any extension of the time within which the Owner may
accept such Bid or execute such contract; and said Surety does hereby waive notice of any such
extension.
IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and seals, and such
of them as are corporations, have caused their corporate seals to be hereto affixed and these presents to
be signed by their proper officers this day of , A.D. 2007.
(Seal)
Principal
By
(Title)
(Seal)
Witness Surety
By
Witness Attorney-in-fact
NON-COLLUSION AFFIDAVIT OF PRIME BIDDER
State of )
)ss
County of )
, being first duly sworn, deposes
and says that:
1. He is (Owner, Partner, Officer, Representative, or Agent) of
, the Bidder that has submitted the
attached Bid;
2. He is fully informed respecting the preparation and contents of the attached Bid and of
all pertinent circumstances respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham Bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives,
employees, or parties in interest, including this affiant, has in any way colluded,
conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or
person to submit a collusive or sham Bid in connection with the Contract for which the
attached Bid has been submitted or to refrain from bidding in connection with such
Contract, or has in any manner, directly or indirectly, sought by agreement or collusion
or communication or conference with any other Bidder, firm or person to fix the price or
prices in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost
element of the bid price or the bid price of any other Bidder, or to secure through any
collusion, conspiracy, connivance, or unlawful agreement any advantage against the
City of Waterloo, Iowa, or any person interested in the Proposed Contract; and
5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or
any of its agents, representatives, owners, employees, or parties in interest, including
this affiant.
(Signed)
Title
Subscribed and sworn to before me this day of
20
Title
My commission expires
NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR
State of
)ss
County of
, being first duly sworn, deposes
and says that:
1. He is (Owner, Partner, Officer, Representative, or Agent) of
, hereinafter referred to as the
"Subcontractor;"
2. He is fully informed respecting the preparation and contents of the subcontractor's
proposal submitted by the subcontractor to
contract pertaining to the _ project in
the City of Waterloo, Iowa;
3. Such subcontractor's proposal is genuine and is not a collusive or sham proposal;
4. Neither the subcontractor nor any of its officers, partners, owners, agents,
representatives, employees, or parties in interest, including this affiant, has in any way
colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm
or person to submit a collusive or sham Bid in connection with the Contract for which the
attached Bid has been submitted or to refrain from bidding in connection with such
Contract, or has in any manner, directly or indirectly, sought by agreement or collusion
or communication or conference with any other Bidder, firm or person to fix the price or
prices in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost
element of the bid price or the bid price of any other Bidder, or to secure through any
collusion, conspiracy, connivance, or unlawful agreement any advantage against the
City of Waterloo, Iowa, or any person interested in the Proposed Contract; and
5. The price or prices quoted in the subcontractor's proposal are fair and proper and are
not
tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of
the Bidder or any of its agents, representatives, owners, employees, or parties in
interest, including this affiant.
(Signed)
Title
Subscribed and sworn to before me this day of
20
Title
My commission expires
EQUAL OPPORTUNITY CLAUSE
(As provided in Executive Order No. 11246)
All contractors, subcontractors, vendors and suppliers of goods and services doing
business with the City and value of said business equals or exceeds ten thousand
dollars ($10,000.00) annually agree as follows:
1. The contractors, subcontractor, vendor and supplier of goods and services will
not discriminate against any employee or applicant for employment because of
race, color, creed, sex, national origin, economic status, age, mental or physical
handicap, political opinions or affiliations. The contractor, subcontractor, vendor
and supplier will develop an Affirmative Action program to ensure that applicants
are employed and that employees are treated during employment without regard
to their race, creed, color, sex, national origin, religion, economic status, age,
mental or physical disability, political opinions or affiliations. Such actions shall
include but not be limited to the following:
a. Employment
b. Upgrading
c. Demotion or Transfer
d. Recruitment and Advertising
e. Layoff or Termination
f. Rates of Pay or Other Forms of Compensation
g. Selection for Training Including Apprenticeship
2. The contractor, subcontractor, vendor and supplier of goods and services will, in
all solicitations or advertisements for employees, state that all qualified
applicants will receive consideration for employment without regard to race,
creed, color, sex, national origin, religion, economic status, age, mental or
physical disabilities, political opinion or affiliations.
3. The contractor, subcontractor, vendor and supplier or his/her collective
bargaining representative will send to each labor union or representative of
workers which he/she has a collective bargaining agreement or other contract or
understanding, a notice advising said labor union or workers' representative of
the contractor's commitment under this section.
4. The contractor, subcontractor, vendor and supplier of goods and services will
comply with all published rules, regulations, directives, and order of the City of
Waterloo Affirmative Action Program Contract Compliance Provisions.
EQUAL OPPORTUNITY CLAUSE PAGE 1 OF 2 PAGES
5. The contractor, subcontractor, vendor and supplier of goods and services will
furnish and file compliance reports within such time and upon such forms as
provided by the Affirmative Action Officer. Said forms will elicit information as to
the policies, procedures, patterns, and practices of each subcontractor as well as
the contractor himself/herself and said contractor, subcontractor, vendor and
supplier will permit access to his/her employment books, records and accounts
to the City's Affirmative Action Officer, for the purpose of investigation to
ascertain compliance with this contract and with rules and regulations of the
City's Affirmative Action Program -- Contract Compliance Provisions relative to
Resolution No. 24664.
6. In the event of the contractor's non-compliance with the non-discrimination
clauses of this contract or with any of such rules, regulations and orders, this
contract may be canceled, terminated or suspended in whole or in part and the
contractor may be declared ineligible for further contracts in accordance with
procedures authorized by the City Council.
7. The contractor, subcontractor, vendor and supplier of goods and services will
include, or incorporate by reference, the provisions of the non-discrimination
clause in every contract, subcontract or purchase order unless exempted by the
rules, regulations or orders of the City's Affirmative Action Program and will
provide in every subcontract, or purchase order that said provisions will be
binding upon each contractor, subcontractor, or supplier.
8. We, the undersigned, recognize that we are morally and legally committed to
non-discrimination in employment. Any person who applies for employment with
our company will not be discriminated against because of race, creed, color, sex,
national origin, economic status, age, mental or physical disabilities.
(Signed)
(Appropriate Official)
(Title)
(Date)
EQUAL OPPORTUNITY CLAUSE PAGE 2 OF 2 PAGES
RECIPROCAL RESIDENT BIDDER PREFERENCE
In response to Illinois' law concerning resident preference and in accordance with
Section 23.21 of the Iowa Code, all non-federal-aid public improvement projects,
which include road construction, shall be performed by a qualified resident bidder.
The resident bidder has been further defined as follows:
To be a qualified resident bidder, the person, corporation, partnership, or firm
shall not have, as employees, Illinois laborers on the work site of a non-
federal-aid project within Iowa. An Illinois laborer is any person who has
resided in Illinois for at least 30 days and intends to become or remain an
Illinois resident. This applies to all labor on the project, whether skilled, semi-
skilled, or unskilled, whether manual or non-manual. This also applies to
work subcontracted by or to the resident bidder on a non-federal-aid project
within Iowa. The resident bidder may place on such work no more than three
residents of Illinois who are his regularly employed executive and technical
experts.
As noted, this definition gives a preference as to whom the contractors or
subcontractors can employ. The contractor shall provide the City with a certification
that he is a qualified resident bidder according to the above definition. The
Certification shall be submitted with the contractor's bid. A copy of the form of
"Resident Bidder Certification" is included in the Contract Documents. If it is
determined that the contractor does not meet this qualification after he begins work,
a shutdown notice shall be issued and the voiding of the contract shall begin unless
the contractor becomes qualified.
Revised February 2003
CONTRACTOR'S OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM
Check box that applies to party completing program:
( ) General Contractor
( ) Subcontractor
I. Section A to be completed by GENERAL CONTRACTORS only:
A.
Name of Company
Address of Company Zip
Telephone Number ( )
Federal ID Number (if no Federal ID Number, Owner/President's Social
Security Number)
Name of Equal Employment Officer
Name of Project
Project Contract Number
Estimated Construction Work Dates /
Start Finish
Section B to be completed by SUBCONTRACTORS only:
B.
Name of General or Prime Contractor
Name of Subcontractor
Subcontractor's Address Zip
Subcontractor's Telephone Number ( )
Subcontractor's Federal ID Number (if no Federal ID Number
Owner/President's Social Security Number)
Name of Equal Employment Officer
- 1 -
realizing that our qualification and/or merit system should be evaluated
and revised, if necessary.
D. We agree to put forth the maximum effort to achieve full employment
and utilization of capabilities and productivity of all our citizens without
regard to race, creed, color, sex, national origin, economic status, age,
and mental or physical handicap.
E. will give training
(Name of Company)
and employment opportunities to local residents of Waterloo, Iowa, to
the greatest extent feasible.
III. AFFIRMATIVE ACTION
A. recognizes that the
(Name of Company)
effective application of a policy of merit employment involves more than
just a policy statement, and
(Name of Company)
will, therefore, re-evaluate our Affirmative Action Program to ensure
that equal employment opportunities are available on the basis of
individual merit, and to actively encourage minorities, women and local
residents to seek employment with our company on this basis.
B. will undertake the
(Name of Company)
following six (6) steps to improve our Affirmative Action Program:
1. Minority Recruitment and Employment;
2. Local Recruitment and Employment;
3. Disabled Veteran and Vietnam Era Veteran Recruitment and
Employment;
4. Handicapped Recruitment and Employment;
5. Female Recruitment and Employment; and
6. Training, Upgrading and Promotional Opportunities.
C. will take
(Name of Company)
whatever steps are necessary to ensure that our total work force has
adequate minority, female, and local representation. We will utilize the
following methods in our recruitment attempts:
1. Local advertising media (newspapers, radio, TV);
2. Community organizations (churches, clubs, schools);
3. Public and private institutions in the area (UNI, Hawkeye
Community College);
4. Job Service of Iowa; and
5. Other.
- 3 -
D. will seek qualified minority,
(Name of Company)
female, and local group applicants for all job categories and will make
asserted efforts to increase minority, female and group representation
in occupations at the higher levels or skill and responsibility.
E. All sources of employment used shall be aware that we are an Equal
Employment Opportunity Employer. Labor organizations representing
our employees will be notified of our Equal Employment Opportunity
Policy and Affirmative Action Program.
F. Training, upgrading, promotion and transfer activities at all levels will be
monitored to ensure that full consideration has been given to qualified
minority, female, and local group employees.
G. will encourage other
(Name of Company)
companies with whom we are associated and/or do business, to do the
same and we will assist them in their efforts.
H. has taken the following
(Name of Company)
Affirmative Action to ensure that minority, female, local contractors
and/or suppliers were provided opportunities to negotiate and/or bid on
this project: (if none, write "NONE")
1.
2.
As a result of the above efforts, we have involved minority, female, and
local contractors and/or suppliers in the following areas of
subcontracting: (if none, write "NONE")
1.
2.
J. will require approved
(Name of Company)
Affirmative Action Programs from all nonexempt contractors who
propose to work on this project and will take whatever steps are
necessary to ensure that non-minority contractors have adequate
representation of minority, female and local persons in their total work
force.
- 4 -
K. In further accordance with rules and guidelines issued pursuant to
Executive Order 11246 as amended, we establish the goals for our
company, based on parity percentages supplied by the City, and we
realize these goals will be reviewed on an annual basis.
L. will keep records of
(Name of Company)
specific actions relative to recruitment, employment, training, upgrading
and promotion and will provide the City of Waterloo with any
information relative to same, including activities of our
SUBCONTRACTORS and suppliers as necessary or when requested.
M. Parity figures for companies located in Waterloo are as follows:
Minority Parity = .08 (8%)
N. Affirmative Action
(Name of Company)
Employment Goals:
The definition of Affirmative Action Goals is as follows: "Goals may not
be rigid and inflexible quotas which must be met, but must be targets,
reasonably attainable by means of applying every good faith effort to
make all aspects of the entire Affirmative Action Program work."
For the year 200 , please submit percentage targets for employing
minorities and women. If you already have reached your target for
hiring minorities and women, please submit that percentage.
*Goals for Minorities: 0/0
Goals for Women:
*your affirmative action goals should be between 1% and 10% or more
for minorities and 1% and 5% or more for women.
Please be advised that the goals or targets are purely your estimation
of how many women and minorities your company can reasonably
expect to hire in 200_. Note, that none of the goals are rigid or
inflexible. They are targets that your company calculates as
reasonably attainable. This will help the City in its monitoring
procedures as required by City of Waterloo Resolution No. 1984-
142(4).
- 5 -
CONTRACTOR'S TOTAL WORK FORCE
(WATERLOO)
HOURLY
NAME AND ADDRESS JOB CATEGORY RACE SEX WAGE
INDICATE: DISABLED VETERAN: DV
VIETNAM ERA VETERAN: VV
HANDICAPPED: H
- 6 -
We hereby certify that we are in compliance with all City and Federal
Affirmative Action Regulations and agree to accept all liability for failure to
comply.
Respectfully submitted,
By:
Company Executive
Date
By:
Equal Employment
Opportunity Officer
Date
City of Waterloo Affirmative Action Officer
Approved
Disapproved Reason:
By:
Date:
- 7 -
DESCRIPTION OF JOB CATEGORIES
1. Officials/Manager: Occupations in which employees set broad policies,
exercise overall responsibility for execution of all policies, or direct individual
departments or special phases of the agency's operations or provide
specialized consultation on a regional, district or area basis. Includes:
department heads, bureau chiefs, division chiefs, directors, deputy directors,
controllers, examiners, wardens, superintendents, unit supervisors, sheriffs,
police and fire chiefs and inspectors and kindred workers.
2. Professionals: Occupations which require specialized and theoretical
knowledge which is usually required through college training or thorough work
experience and other training which provides comparable knowledge.
Includes: personnel and labor relations workers, social workers, doctors,
psychologists, registered nurses, economists, dietitians, lawyers, system
analysts, accountants, engineers, employment and vocational rehabilitation
counselors, teachers or instructors, police and fire captains and lieutenants
and kindred workers.
3. Technicians: Occupations which require a combination of basic scientific or
technical knowledge and manual skill which can be obtained through
specialized post-secondary school education and through equivalent on-the-
job training. Includes: computer programmers and operations, draftsmen,
surveyors, licensed practical nurses, photographs, radio operators, technical
illustrators, police and fire sergeants and kindred workers.
4. Office/Clerical: Workers are responsible for internal and external
communication, recording and retrieval of data and/or information and other
paper work required in an office. Includes: bookkeepers, messengers, office
machine operators, clerk-typists, stenographers, court transcribers, hearing
reporters, statistical clerks, dispatchers, license distributors, payroll clerks and
kindred workers.
5. Skilled Craft Workers: Workers perform jobs which require special manual
skill and a thorough and comprehensive knowledge of the processes involved
in the work which is acquired through on-the-job training programs. Includes:
Mechanics and repairman, electricians, heavy equipment operators, stationary
engineers, skilled machine occupations, carpenters, compositors and
typesetters and kindred workers.
6. Sales Workers: Occupations engaging wholly and primarily in direct selling.
Includes: advertising agents and salesman, insurance agents and brokers,
real estate agents and brokers, stock and bond salesmen, demonstrators,
salesmen and sales clerks, grocery clerks and cashier checkers, and kindred
workers.
- 8 -
7. Operatives (semi-skilled): Workers who operate machine or processing
equipment or perform other factory-type duties of intermediate skill level which
can be mastered in a few weeks and require only limited training. Includes:
apprentices (auto mechanics), plumbers, building trades, metal working
trades, bricklayers, carpenters, electricians, machinists, mechanics, printing
trades, etc., operatives, attendants (auto service and parking), plasterers,
chauffeurs, deliverymen and furnacemen, heaters (metal), laundry and dry
cleaning operatives, milliners, mine operatives and laborers, motormen, oilers
and greasers, (except auto painters), (except construction and maintenance),
photographic process workers, stationary fireman, truck and tractor drivers,
weavers, (textile), welders and flame cutters and kindred workers
8. Laborers (unskilled): Workers in manual occupations which generally
require no special training. Perform elementary duties that may be learned in
few days and require the application of little or no independent judgment.
Includes: garage laborers, car washers and greasers, gardeners (except
farm) and groundskeepers, longshoremen, and stevedores, lumbermen,
raftsmen and woodchoppers, laborers performing lifing, digging, mixing,
loading and pulling operations and kindred workers.
9. Apprentices: Persons employed in a program including work training and
related instruction to learn a trade or craft which is traditionally an
apprenticeship, regardless of whether the program is registered with a Federal
or State agency.
10. Trainees (on-the-job): Production. . . persons in formal training for craftsmen
when not trained under apprentice programs--operative laborer, and service
occupations.
White Collar. . . persons engaged in formal training for clerical, managerial,
professional, technical, sales, office and clerical occupations.
- 9 -
t ,a
Exhibit E
CONTRACT PROVISION
Targeted Small Business (TSB)
Affirmative Action Responsibilities
on
Non-Federal Aid Projects (Third-Party State-Assisted Projects)
June 2004
June 2004
CONTRACT PROVISION
Targeted Small Business (TSB)Affirmative Action Responsibilities
on Non-Federal-aid Projects (Third-party State-Assisted Projects)
1. TSB DEFINITION
A TSB is a small business, as defined by Iowa Code Section 15.102(5),which is 51%or more owned, operated
and actively managed by one or more women, minority persons or persons with a disability. Generally this is a for-
profit small business enterprise under single management, is located in Iowa and has an annual gross income of
less than 3 million dollars computed as an average of the three preceding fiscal years.
2. TSB REQUIREMENTS
In all State-assisted projects made available through the Iowa Department of Transportation, local governments
have certain affirmative action requirements to encourage and increase participation of disadvantaged individuals
in business enterprises. These requirements are based on Iowa Code Section 19B.7 and 541 Iowa Administrative
Code Chapter 4. These requirements supersede all existing TSB regulations, orders, circulars and administrative
requirements.
3. TSB DIRECTORY INFORMATION
Available from: Iowa Department of Inspections and Appeals
Targeted Small Business
Lucas Building
Des Moines, IA 50319
Phone: 515-281-7357
Website:www.iowai.net/iowa/dia/tsb
4. THE CONTRACTOR'S TSB POLICY
The contractor is expected to promote participation of disadvantaged business enterprises as suppliers,
manufactures and subcontractors through a continuous, positive, result-oriented program. Therefore the
contractor's TSB policy shall be:
It is the policy of this firm that Targeted Small Business (TSB) concerns shall have the maximum practical
opportunity to participate in contracts funded with State-assisted funds which are administered by this firm
(e.g. suppliers, manufactures and subcontractors). The purpose of our policy is to encourage and
increase the TSB participation in contracting opportunities made available by State-assisted programs.
5. CONTRACTOR SHALL APPOINT AN EQUAL EMPLOYMENT OPPORTUNITY(EEO) OFFICER
The contractor shall designate a responsible person to serve as TSB officer to fulfill the contractors affirmative
action responsibilities. This person shall have the necessary statistics, funding, authority and responsibility to
carry out and enforce the firm's EEO policy. The EEO officer shall be responsible for developing, managing and
implementing the program on a day-to-day basis. The officer shall also:
A. For current TSB information, contact the Iowa Department of Inspections and Appeals (515-281-7357)to
identify potential material suppliers, manufactures and contractors.
B. Make every reasonable effort to involve TSBs by soliciting quotations from them and incorporating them
into the firm's bid.
C. Make every reasonable effort to establish systematic written and verbal contact with those TSBs having
the materials or expertise to perform the work to be subcontracted, at least two weeks prior to the time
quotations are to be submitted. Maintain complete records of negotiation efforts.
Page 1
TSB Affirmative Action Responsibilities
D. Provide or arrange for assistance to TSBs in seeking bonding, analyzing plans/specifications or other
actions that can be viewed as technical assistance.
E. Ensure the scheduled progress payments are made to TSBs as agreed in subcontract agreements.
F. Require all subcontractors and material suppliers to comply with all contract equal opportunity and
affirmative action provisions.
6. COUNTING TSBs PARTICIPATION ON A PROJECT
TSBs are to assume actual and contractual responsibilities for provision of materials/supplies, subcontracted work
or other commercially useful function.
A. The bidder may count:
(1) Planned expenditures for materials/supplies to be obtained from TSB suppliers and
manufacturers; or
(2) Work to be subcontracted to a TSB; or
(3) Any other commercially useful function.
B. The contractor may count:
(1) 100°/0 of an expenditure to a TSB manufacturer that produces/supplies gc ods manufactured from
raw materials.
(2) 60% of an expenditure to TSB suppliers that are not manufacturers; provided the suppliers
perform a commercially useful function in the supply process.
(3) Only those expenditures to TSBs that perform a commercially useful function in the work of a
contract, including those as a subcontractor.
(4) Work the Contracting Authority has determined that it involves a commercially useful function.
The TSB must have a necessary and useful role in the transaction of a kind for which there is a
market outside the context of the TSB program. For example, leasing equipment or purchasing
materials from the prime contractor would not count.
7. REQUIRED DATA, DOCUMENTS AND CONTRACT AWARD PROCEDURES FROM
BIDDERS/CONTRACTORS FOR PROJECTS WITH ASSIGNED GOALS
A. Bidders
Bidders who fail to demonstrate reasonable positive efforts may be declared ineligible to be awarded the
contract. Bidders shall complete the bidding documents plus a separate form called "TSB Pre-Bid Contact
Information". This form includes:
(1) Name(s) of the TSB(s) contacted regarding subcontractable items.
(2) Date of the contract.
(3) Whether or not a TSB bid/quotation was received.
(4) Whether or not the TSB's bid/quotation was used.
(5) The dollar amount proposed to be subcontracted.
B. Contractors Using Quotes From TSBs
Use those TSBs whose quotes are listed in the "Quotation Used in Bid" column along with a "yes"
indicated on the Pre-bid Contact Information form.
Page 2
TSB Affirmative Action Responsibilities
C. Contractors NOT Using Quotes From TSBs
If there are no TSBs listed on the Pre-bid Contract Information form,then the contractor shall document all
efforts made to include TSB participation in this project by documenting the following:
(1) What pre-solicitation or pre-bid meetings scheduled by the contracting authority were attended?
(2) Which general news circulation,trade associations and/or minority-focused media were advertised
concerning the subcontracting opportunities?
(3) Were written notices sent to TSBs that TSBs were being solicited and was sufficient time allowed
for the TSBs to participate effectively?
(4) Were initial solicitations of interested TSBs followed up?
(5) Were TSBs provided with adequate information about the plans,specifications and requirements
of the contract?
(6) Were interested TSBs negotiated with in good faith? If a TSB was rejected as unqualified,was
the decision based on an investigation of their capabilities?
(7) Were interested TSBs assisted in obtaining bonding, lines of credit or insurance required by the
contractor?
(8) Were services used of minority community organization, minority contractors groups; local, State
and Federal minority business assistance offices or any other organization providing such
assistance.
The above documentation shall remain in the contractor's files for a period of three (3)years after the completion
of the project and be available for examination by the Iowa Department of Inspections and Appeals.
8. POSITIVE EFFORT DOCUMENTATION WHEN NO GOALS ARE ASSIGNED
Contractors are also required to make positive efforts in utilizing TSBs on all State-assisted projects which are not
assigned goals. Form "TSB Pre-bid Contact Information"is required to be submitted with bids on all projects. If
there is no TSB participation,then the contractor shall comply with section 7C. of this document prior to the
contract award.
Page 3
/o
¥
O \ 00j
` 2
2
) CO §\
o
� k§
It / ( am
0 §§
a) } - / 0 §/
e % _ _
2 z
a)
§
/
,• all
z
\ \
a) m >
• j / a
u al co E H
co
i \ \ _ a
j \ - �n S§
\ j ƒ Ct( 0 e<
• ƒ< u oz
\ \_ co
_• §\ 2 /
* u
_ a
_ 6= a
CO j o\ 2
m o 2 Q z e
m \ { \ \ =Z 0 §/
m e 0 mm
k_ 0 0o
�§ \ \ _ \2 §
DP ) { aR e
� j f ( a)co z co/
Q ° ) 0 �\ 00
� / E - • 2 W< }
OCO / 0 0 / /� §
\ H
In al \ \ \ £
Uu
/ \ \ \ \
2 • \
o g0as = 7 0
O _ 0 § LS
- � a ) \
o { - 0 .
• ® <
\ ), \ z a \
070 ; j{
\\ =0 k\
_ ( 77 .
N.
0 cn_o j
CL _Q �� 2g
/ § I ( r
\ ® �\ \� § CU
0 //
£ 0 ƒ * 0 0 � u ° - !
r : f * »_ £/ 0 ! ]2
2 0 e 0 G _2 z± _ /j
r .a
November 2005
— UTILIZATION OF TARGETED SMALL BUSINESS (TSB)ENTERPRISES
ON NON-FEDERAL AID PROJECTS
(THIRD-PARTY STATE-ASSISTED PROJECTS)
In accordance with Iowa Code Section 19B.7 and 541 Iowa Administrative Code(IAC) Chapter 4, it is the
policy of the Iowa Department of Transportation(Iowa DOT) that Targeted Small Business (TSB) enterprises
— shall have the maximum practicable opportunity to participate in the performance of contracts financed in
whole or part with State funds.
— Under this policy the Recipient shall be responsible to make a positive effort to solicit bids or proposals from
TSB firms and to utilize TSB firms as contractors or consultants. The Recipient shall also ensure that the
contractors or consultants make positive efforts to utilize TSB firms as subcontractors, subconsultants,
suppliers, or participants in the work covered by this agreement.
The Recipient's "positive efforts" shall include, but not be limited to:
1. Obtaining the names of qualified TSB firms from the Iowa Department of Inspections and Appeals
— (515-281-7357) or from its website at: http://www.iowai.net/iowa/dia/tsb
2. Notifying qualified TSB firms of proposed projects involving State funding. Notification should be
— made in sufficient time to allow the TSB firms to participate effectively in the bidding or request for
proposal (RFP)process.
— 3. Soliciting bids or proposals from qualified TSB firms on each project, and identifying for TSB firms the
availability of subcontract work.
4. Considering establishment of a percentage goal for TSB participation in each contract that is a part of
this project and for which State funds will be used. Contract goals may vary depending on the type of
project,the subcontracting opportunities available,the type of service or supplies needed for the project,
— and the availability of qualified TSB firms in the area.
5. For construction contracts:
a) Including in the bid proposals a contract provision titled"TSB Affirmative Action
Responsibilities on Non-Federal Aid Projects (Third-Party State-Assisted Projects)" or a similar
document developed by the Recipient. This contract provision is available on-line at:
http://www.dot.state.ia.us/local_systems/publications/tsb_contract_provision.pdf
b) Ensuring that the awarded contractor has and shall follow the contract provisions.
— 6. For consultant contracts:
a) Identifying the TSB goal in the Request for Proposal (RFP), if one has been set.
b) Ensuring that the selected consultant made a positive effort to meet the established TSB goal, if
any. This should include obtaining documentation from the consultant that includes a list of TSB
— firms contacted; a list of TSB firms that responded with a subcontract proposal; and, if the
consultant does not propose to use a TSB firm that submitted a subcontract proposal, an
November 2005
explanation why such a TSB firm will not be used.
The Recipient shall provide the Iowa DOT the following documentation:
1. Copies of correspondence and replies, and written notes of personal and/or telephone contacts with any
TSB firms. Such documentation can be used to demonstrate the Recipient's positive efforts and it
should be placed in the general project file.
2. Bidding proposals or RFPs noting established TSB goals, if any.
3. The attached "Checklist and Certification." This form shall be filled out upon completion of each
project and forwarded to: Iowa Department of Transportation,EEO Administrator, Office of Contracts,
800 Lincoln Way,Ames, IA 50010.
. +y
- Z
November 2005
•
CHECKLIST AND CERTIFICATION
For the Utilization of Targeted Small Businesses (TSB)
On Non-Federal-aid Projects (Third-Party State-Assisted Projects)
Recipient: Project Number:
— County: Agreement Number:
- 1. Were the names of qualified TSB firms obtained from the Iowa Department of Inspections and Appeals?
❑ YES ❑NO
If no, explain
2. Were qualified TSB firms notified of project? ❑ YES ❑NO
If yes, by ❑letter, ❑telephone, ❑personal contact, or ❑ other(specify)
If no, explain
— 3. Were bids or proposals solicited from qualified TSB firms? ❑ YES ❑NO
If no, explain
4. Was a goal or percentage established for TSB participation? ❑ YES ❑NO
If yes, what was the goal or percentage?
If no, explain why not:
5. Did the prime contractor or consultant use positive efforts to utilize TSB firms on subcontracts?
❑ YES ❑NO
If no,what action was taken by Recipient?
Is documentation in files? ❑ YES ❑NO
6. What was the dollar amount reimbursed to the Recipient
from the Iowa Department of Transportation? $
What was the final project cost? $
What was the dollar amount performed by TSB firms? $
Name(s) and address(es) of the TSB firm(s)
(Use additional sheets if necessary)
November 2005
Was the goal or percentage achieved? ❑ YES ❑NO
If no, explain
As the duly authorized representative of the Recipient, I hereby certify that the Recipient used positive efforts to
utilize TSB firms as participants in the State-assisted contracts associated with this project.
Title
Signature Date
ITEMS OF POTENTIAL MBE/WBE PARTICIPATION
NOTICE TO PROSPECTIVE BIDDERS:
The following are items from the F.Y. 2007 CYCLONE DRIVE/TITAN TRAIL, Contract
No. 727, that have a potential for MBE/WBE Participation. This listing, however, is not
intended to be all encompassing; to preclude MBE/WBE Contractors from bidding on
any items of the Proposal as a Subcontractor or the entire Proposal as a Prime
Contractor.
BID DESCRIPTION UNIT EST.
ITEM BASE BID QTY.
1 CLEARING & GRUBBING LS 1
6 REMOVE EXISTING PAVEMENT SY 64
8 SPECIAL BACKFILL SUBBASE 6" TON 2,200
11 BT-5 JOINT LF 870
12 TRUNCATED DOMES, 24" x 24" SECTION EA 10
15 5" PCC SIDEWALK SF 100
16 SAW CUT, FULL DEPTH, 3"ASPHALT LF 890
17 CRUSHED STONE ROCK, CLASS A TON 720
18 4" DRAIN TILE W/POROUS BACKFILL LF 2,338
19 RODENT GUARD, IDOT RF-19C, DETAIL A EA 11
20 RA-49, STORM MANHOLE EA 1
RA-49, STORM MANHOLE, W/6' WALL AND
21 TEMPORARY W STEEL TOP PLATE EA 1
22 RA-40, STORM INTAKE EA 2
23 RA-43, STORM INTAKE EA 4
24 15" RCP, 2000D STORM SEWER LF 329
25 18" RCP, 2000D STORM SEWER LF 45
26 24" RCP, 2000D STORM SEWER LF 38
27 24" RCP, 2000D CULVERT LF 104
28 18"APRON, W/TWO JOINT TIES EA 1
29 24"APRON, W/TWO JOINT TIES EA 3
30 CONNECT STORM TO EXISTING EA 1
31 SANITARY MANHOLE TOP ADJUSTMENT EA 2
SANITARY MANHOLE TOP ADJUSTMENT,
32 W/CONE REPLACEMENT EA 1
33 REMOVE EX. STORM PIPE LF 15
34 HDPE EROSION CONTROL MAT SF 96
44 SILT FENCE LF 3,420
45 DITCH CHECKS LF 160
46 6" TOPSOIL SALVAGE & SPREAD CY 2,500
47 TEMPORARY SEEDING AC 1.4
MBE/WBE GOALS FOR THIS PROJECT
IMPORTANT: Prime Contract Bidders should be aware that ten percent (10%) MBE
goal and a two percent (2%) WBE goal is attached to this project. "Certified Return
Receipt" letters are no longer needed with the bid showing proof of contacting MBE or
WBE Subcontractors, but the Pre-Bid Contact Information Form must be filled out
completely.
City of Waterloo Contract Compliance Officer:
Contract Compliance Officer
Community Development Board
Carnegie Annex, Suite 202
620 Mulberry Street
Waterloo, IA 50703
Phone: (319) 291-4429
E
o c co 3o
CO la
o 4 N c a`) .�
p c ° N o •� a)
.0
L 7 f6 i+
— 0 0 c CO U .Q i. CI
_0 C O A � ++
§ (a E c 0 .'. ..� o
p o . w a) U a,, z u
6 ° a) .- := CO c a) O
— N L (B .E U 2 (0 -
f> c ° ° E Q U O y
y Q +L-' a) o E (III Q.
y a o > 0 E CO recta ca
a) O ° o O O O
— J ° � p o c = � c..) a) a A
o t 3oas a) _c a)CL_0a_.0 p +-. i L +.
U) _ ° c ( Eo o)� o
3 U) Env c E 00 O
°) � U) ppoi Lp
u) c V .L ° � W U)
a) O
WO � c � E c (n •�' `o (0 � IQ-
- � L1. o ° ac c .c o aZ
dZ L � a`°i .N om0 c ,� WQ
O o V ° 0 Q "�
CO w aL E m wa a,
c V) E '� = O W 14
h �+
— IW- Q O c O > V N 0 m es
4-4
o ° 'a
W � _ m _a .� ° i o ° Za AU
�/) O 72 OE � N ° cE .a.)
� > � L Q) QQ a) " > W V
U) a w � .. pL Qc3 pTo L vA
— = V c a) L o o v) o ZN 4.0 O
CO WZ 2 ° o °, ° u°i , _OW 0
(n w '(np0 °- N Z
000 ao ° vN o .so a) � Q � >4
U S L c (au - uc) .! 't �' 0
W � '3 E (N a) .-E a (� O m ^o
CO CO F- a) 1:3N N 13 N c Z v,
2di O � L- 0rn N pc E c � W a, u
Q' Z v' Cr c cv,W -0 '() `t j " CO ea �e�.+
0. a)0 2oa) U .? a) cc) ILL q g
as � L " cE o w fII O W U
o i ° o ff � = "- c ° W m
co
*- (a } C O
3 ca o :nt`- ma m
yrn W 0 'Q a `5w 20 Ia-
i- 0 u) O , p .,., L
— U 2 aw0 o �. w
'E:
vc1-- arc ° t
i- ° a � Q2N It= 3
Zs aw c ..ter ° o W O
o N act � � t � N = C N
(B m L Lt L o ° E :a N N c 6 O
3
Z O o as C U O 0 W o
2 a) a O
(0 p w (06 v_) V O U c Q .Q N
Ca ° _
604....-01r,
CU m (a c) o rn-c ° .c >r ° c c (a _ca Q (o (U a) uU
(- a`. E " co ° c c � fQa) = in ° a) U
— �r Is 'c O O o o o = w. o •(0 y Y
d ZNn U Cl) u) ) } Uj ca cE o
U o L N (1) (3)
0 a) c ` Z ca
0 0 �O _/� O p
N ET) Y
O 3 N O c
E N T p C O 0 Lo 0 a)
Y m 0 �+
L c 0 O L
w .r _c
0 0 O 0 n 7) _c CO
° U
�. a_ a) O - _a c Y W COm p O U a�
O 0 6 0 W o) OU 0 z E U E u) 3
a) c U m W () W U 0 1- (a c
a (n a) co
o o °>0 E Q 'c -°a (i CO W
ch
a) ° c pc W > .L 2 : -c a) cm
_` N N O m i' • Q. a) 7 -a
> a) c U O W a) _c O c6 m W
O c L m Y C� >, 0 '"' Q p m O W
= m LU o U v� R3 a' z O 0 (00 (12 0 N O° +- m
2 .0 ° (YL� a' 0 � (6 F- ua'j fl (°n C Q a)a .°c C C
-- m W V a) L a) E co O RI �' Y (
U c coo 0 p U c c
° m Y c ram+ H a- 0 L . - U > _
Z w 2a_ Q13 0m > o z a) rn as 0) w -0 ° � Wca
O a, w (0 0 (n 0 _C0 Y 0 Lc a) c6 a) p3 L
F- c coo f — a)Y o
u) U O U 7 L L 15 Y (n L 8a)
� � Ta
�. � _ ° ° > a . E E • ° o. —Ia) 4, o_1_
m u' c a) () (0 W �O .. C) C v) :t' ° a) o_ OL
noiZ W . (B E _cc Q a) Y O o (n (o
O a U to _ w O E W •3 0 CO -a .cc flH
a WcVu) c c a
ZIL � � � '� pEui °) Ya] w W � two m E 00i ° aj °
!A O c L O . Z a c o < c a) W p m (0 > a) a) i
V/ a) o E 0 O ,un a) -oW ,c ° cn Cl) � � W 'L o § o
Cn I- O U o _0 P C > pp -a E o Cr) a) co CO a) 0) tB -a
W Q 2 ..t . Q a) c2 '> E W E � - 2 > c a) o2Y c '
m 0 0 o E c L ;= O 0 Q O a)
Z ° o � � � 'Q ° 0 Qm z ° 0 O a? p m C
m O w E
� � = U � o ° Lm ° Nm E � c _0 -0 a) ,_ La) cu -•
� O sa) a) ° •� oc c� O � L c m a) 0 � ° N > 000 ( o
` CO E z c a) i� � � W .747, 0 i 3 '5 c p co c a� Q2
Z a) 'c U Y w) Y 0 c O c a' O c a) ° N
W '- a. a) as 1— u°) co .o •(n O (a m a) .0 o N L ° 2 U >,0 >' c
V Y } ou) Va) c 0 ° a) co Q ° � a) ma) ° ° O LaOa' O
0 c Q L W U Q I c U Y --
W Q 3 L. E z . = 0U ° co W o � O o o •� � °
m ~ � c0a) 0c� � 0a) _ � a) m � cn v°iLLEcaOi oa' UicUO
Z (L° � ' U � a) o ao a) c m z u' L 3 c O 'f° (°
O � � o 0 0) c •- Cr 0- °a 0 � 3 a a) 0 3 0- 0 .0)
� cvo `Ccn
0 w � � m ( c °° c CO m o 2F= ) o a3 E 0 aa)) 0 �'
° c a wo CO (n 0 p 0. a o Q mQ �'-a ` a c 0 ----co2 m Q) Y
> u) 0 Y
CO -• 0°o (D a a.. aa)) ca cE 0 U) o • o ° La00. U � CE ma) ` o
L _
W Y i CDL W (n 0 .L () U E ° co .0O E a) a) (n ) (n +- _0
�' cocn
c� a) •N w � � a� U ° o- 0)woLcE >' a) ELc 0
- Lt. O - (u CZ 0 -° (7) L . -a -o a) 0 = U
a N o o E •� a0 -0 m w ° o .c u -6 � o > = � a) .Q 't o '- u' > 3 -o
w O WU " -O N o- a E U U � V � a) 0. L m +- O a) >
O U O -O d$ a - a) 0 Q p 'O .c 2 •2 a) = a) a) U . O
U a) E w H ° W o o U W o c a0i > L `� z (n O a) a) U - c U a) °
c ° = -0co 8 � wt_ a) 2 (u'o o � m ° (Ya ° o U 3 a) O 0- 0 ° o 00 (n o •� - �. o
c E u)) c as a3 �° W «' a U o a) c U (O.) p j as vi 0 Q Q a) c o
ay) o0o w � u, a) a) oia 00 `� Ec _c (u'' c cm (Yu ,- ° 2o c E ° c = (n
`� z a) a) � = 3 O _a .I. W Y c L . 0) (I) L U 'a co a) O
a) Q E cn c c c n s p o c o N W W ID Co m ° a) o- W W 0 •- o •E >
- o ° - o m •- c 0 0 0 (00Z 73 Q� ° COW o a) o 0 al .) m " 0 u) o CC
0 � 'Lo a ° al a' 0 _-'m O 0 0 ... W U E >'U c ' �° o
i - (Q O W e E ° U O U c c W W OW 0 •L c ... O ram. ..... 0 0 <
+r _El' .c o_o m (o a�i 0 E E. - 2 3 5 Q • co 0) Z 2 m a. Q �' fl C0 W U -a 0)W '
U U m S a) ,- •� mom O om cU � ci �a •aim •C.) 'CS CU " _ � U co •
c5 0
o- L � m a) 3 c _0 . - c -0 a) 2 c � O a) 0 t L c W 0
m a) Ua) 0 0 (0 E •L = (n o _0 , (pW U > 0 a) oa) m
E E � � O - E � Qa) � >, O HU � F- a0 32 W c0 E
•i 'C c0 ca . p c 9- a) '—' a) (o Z -C c 0 0 0
0- a. 0- — 0 (0 N O _8 U CI) - d' a) In W I— 0 Cl) r LL
LETTER OF INTENT TO BID
(MBE/WBE LETTER)
According to the Current MBE/WBE Contract Compliance Program - 2002, all
MBE/WBE Contractors interested in submitting subcontractor quotes on
construction projects with goals, MUST submit a LETTER OF INTENT TO BID to
the City of Waterloo Contract Compliance Officer at least seven (7) days prior to
bid opening.
The LETTER OF INTENT TO BID must list the specific items which tie
MBE/WBE Contractor is interested in bidding.
Letter should include the following:
Name of Project:
Your Company Name:
Address:
Phone: Date:
List of Specific items to be bid:
Item No. Description:
Item No. Description:
Item No. Description:
Item No. Description:
Item No. Description:
(Subcontractor's Company Name and authorized signature)
Return this LETTER OF INTENT TO BID to:
Contract Compliance Officer
Community Development Board
620 Mulberry St.
Carnegie Annex, Suite 202
Waterloo, IA 50703
Phone: (319) 291-4429
Form CCO-5 (06-20-2002)
Tm
CITY OF WATERLOO
CERTIFICATION OF MBE/WBE ACCOMPLISHMENT
(To be completed by the Prime Contractor and submitted with the final documents)
Contract:
Prime
Contractor:
Letting Date: Completion Date:
MBE/WBE Commitment Listed on Pre-Bid Form: $
MBE/WBE Company Dollars Committed Dollar Amount Paid % of Goal
$ $
$ $
$ $
$ $
$ $
$ $
$ $
TOTAL
(Name)
the
(Corporate Officer)
of certify that the MBE/WBE
(Prime Contractor)
accomplishment to be true and accurate.
(Date) (Signature)
Form CCO -6 (11-28-2001)
CERTIFIED
MBE / WBE CONTRACTORS
CITY OF WATERLOO, IOWA
tt � `L
erloo
CONTRACT COMPLIANCE OFFICE
Community Development Board
Carnegie Annex, Suite 202
620 Mulberry Street
Waterloo,Iowa 50703
City WEB Site: www.ci.waterloo.ia.us
Contract Compliance
WEB Site
for listing updates: http://www.wplwloo.lih.iaais/contractcompliance/
Contact: Louis Starks, Contracts and Grants Coordinator
Email: louis.starks(a waterloo-ia.org
Phone: (319) 291-4429
Fax: (319) 291-4431
CERTIFIED MBE CONTRACTORS
CARTER ELECTRIC
725 Adams Street
Waterloo, IA 50703
Phone: (319) 232-9808
Pager: (319) 235-4021
Contact: Derrick Carter
Specializing in:
ELECTRICAL CONTRACTOR
COCKHREN ROOFING
1708 Newell Street
Waterloo, IA 50703
Phone: (319) 232-7513
Contact: James Cockhren
Specializing in:
ROOFING
CULPEPPER ELECTRIC
1731 Cottage Grove Avenue
-- Waterloo, IA 50707
Phone: (319) 235-0885
Fax: (319) 236-8177
Contact: Martin Culpepper
Certified: City of Waterloo Certified MBE, Licensed Electrician
Specializing in:
—' ELECTRICAL CONTRACTOR
DANIELS HOME IMPROVEMENT
339 Albany Street
Waterloo, IA 50703
Phone: (319) 833-0118
Contact: Sammy Daniels
-- Specializing in:
ALL TYPES OF CONCRETE FLATWORK, POURED WALLS—ALL TYPES, FOOTINGS,
LIGHT DEMOLITION
MB ti.. B - C fi d Corn wors 8_.k1
Poor
CERTIFIED MBE CONTRACTORS
DENTER CORPORATION
426 Beech Street
Waterloo, IA 50703
Phone: (319) 236-9075
FAX: (319) 236-0515
Contact: Terry Phillips
Certified: City of Waterloo Certified MBE, Iowa DOT, TSB Certified
Specializing in:
COMMERCIAL AND RESIDENTIAL DEMOLITION, CONCRETE PAVING, DRIVEWAYS,
TRUCKING (ALL TYPES), GENERAL CONSTRUCTION
GREER'S WORKS •
2003 Plainview Street
— Waterloo, IA 50703
Phone: (319) 233-4701
Contact: Willie Greer
-- Specializing in:
DRIVEWAYS, SIDEWALKS, CARPENTRY, ROOFING, GENERAL CONSTRUCTION
ELIAS GROVER CEMENT CONTRACTORS
116 Carl Street
Waterloo, IA 50703
Phone: (319) 234-3839
Contact: Elias Grover, Owner
Specializing in:
ALL TYPES OF CONCRETE FLATWORK, ASPHALT, GENERAL CONSTRUCTION
LOVE'S ENTERPRISE
835 West Fifth St.
P.O. Box 246
Waterloo, IA 50704
Phone: (319) 233-3260
Contact: David Love
Certified: Iowa DOT, City of Waterloo Certified MBE
Specializing in:
CONCRETE PAVING, ASPHALT, DRIVEWAYS, SIDEWALKS, TRUCKING
i8E/ BE <°=(iContracioN I_. st
OLD GREER'S WORKS
2309 Springview Street
Waterloo, IA 50707
Phone: (319) 233-2150
Contact: David L. Greer, Sr.
Specializing in:
GENERAL CONSTRUCTION
PAULINE COMPANY, INC.
139 Clark Street
P. O. Box 1623
Waterloo, IA 50703
Phone: (319) 236-2345
FAX: (319) 236-1568
email: DJToay a(aol corn
Certified: Targeted Small Business, Iowa DOT, City of Waterloo Certified MBE
Contact: W.C. Stokes, Owner
Specializing in:
EROSION CONTROL, TRUCKING, GUARDRAIL, CLEARING AND GRUBBING
CONCRETE PAVING, ASPHALT, CURB AND GUTTER, DRIVEWAYS, SIDEWALKS,
MASONRY WORK, ROOFING, CD BASKETS, ROADWAY PIPE, TILE LOCATING,
REVETMENT, SHOULDERS, FIELD FENCE, GENERAL CONSTRUCTION WORK
QUICK CONSTRUCTION
217 Bates Street
Waterloo, IA 50703
Phone: (319) 215-4166
Contact: Leroy Harrington
Specializing in:
ALL TYPES OF CONCRETE FLATWORK AND GENERAL CONSTRUCTION
CHARLIE SCHAUF TRUCKING
627 Adams Street
Waterloo, IA 50703
Phone: (319) 232-4717
Contact: Charles Schauf
Specializing in:
TRUCKING
N
CERTIFIED WBE CONTRACTORS
ATLAS PAINTING, INC.*
911 Sycamore Street
P.O. BOX 65
Waterloo, IA 50704
Phone: (319) 232-9164
Specializing in:
COMMERCIAL AND INDUSTRIAL PAINTING
PETERMAN & HAES CARPET ONE*
4003 University Avenue
Waterloo, IA 50701
Phone : (319) 23 3-6131
FAX: (319) 233-6133
email: TR 1 14R6@cfii.net
Certified: City of Waterloo WBE
Contact : Carol Reese
Specializing in:
FLOOR COVERING
WATCO CONSTRUCTION, INC.*
— 2920 Texas Street
Waterloo, IA 50702
Phone : (319) 233-7481
Certified: City of Waterloo WBE
Contact : Patricia J. Kimball
Specializing in:
STORM SEWER, INLETS, DRAIN TILE, WATER MAIN, SANITARY SEWER, INTAKE
STRUCTURES
* DENOTES WOMEN BUSINESS ENTERPRISE
MBEiWK.Certilied Contractors List
STATEMENT OF BIDDER'S QUALIFICATIONS
(To be submitted by the Bidder only upon the specific request of the City of
Waterloo, Iowa.)
All questions must be answered and the date given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of bidder
2. Permanent main office address.
3. When organized.
4. If a corporation, where incorporated.
5. How many years have you been engaged in the contracting business under
your present firm or trade name?
6. Contracts on hand: (Schedule these, showing amount of each contract and
the appropriate anticipated dates of completion.)
7. General character of work performed by your company.
8. Have you ever failed to complete any work awarded to you? If so, where and
why?
9. Have you ever defaulted on a contract? If so, where and why?
10. List the more important projects recently completed by your company, stating
the approximate cost for each, and the month and year completed.
11. List your major equipment available for this contract.
12. Experience in construction work similar in importance to this project.
13. Background and experience of the principal members of your organization,
including the officers.
14. Credit available: $
15. Give bank reference:
STATEMENT OF BIDDER'S QUALIFICATIONS PAGE 1 CF 2 PAGES
16. Will you, upon request, fill out a detailed financial statement and furnish any
other information that may be required by the City of Waterloo, Iowa?
17. The undersigned hereby authorizes and requests any person, firm, or
corporation to furnish any information requested by the City of Waterloo,
Iowa, in verification of the recitals comprising this Statement of Bidder's
Qualifications.
Dated at this day of
20
(Name of Bidder)
BY:
TITLE:
State of )
County of )
, being duly sworn deposes and
says that he is of
(Name of Organization)
and that the answers to the foregoing questions and all statements therein contained
are true and correct.
Subscribed and sworn to before me this day of
20
(Notary Public)
My commission expires , 20
STATEMENT OF BIDDER'S QUALIFICATIONS PAGE 2 OF 2 PAGES
GENERAL SPECIAL PROVISIONS
1. SCOPE OF WORK
The work covered by this contract consists of furnishing all labor, equipment,
and materials and performing all operations, in connection with the F.Y. 2007
CYCLONE DRIVE/TITAN TRAIL, Contract No. 727, as shown on the
contract drawings and in accordance with these specifications.
The contract drawings which accompany and form a part of this contract and
specifications are dated May 4, 2007. They have the general title of F.Y.
2007 CYCLONE DRIVE/TITAN TRAIL, Contract No. 727.
The drawings are numbered and separately entitled as follows:
Sheet No. Description
1. Title Sheet
2. Typical Cross-Sections, Estimate of Quantities, Tabulations
3. Cyclone Drive — Grading/Utility/Paving Plan
4. Titan Trail Sta. 16+54.85T — 20+04.85T
Grading/Utility/Paving Plan
5. Titan Trail Sta. 20+04.85T— 25+40.21 T
Grading/Utility/Paving Plan
6. U.S. 63 Left Turn Pocket — Grading/Utility/Paving Plan
7. U.S. 63 Right Turn Lane — Grading/ Paving Plan
8. Pavement Jointing Plan
9. Signing/Pavement Markings Plan
10. Storm Water Pollution Prevention Plan
Cross Sections
The standard specifications of the City of Waterloo are to be used along with
the special provisions described herein and shall be considered as part of
the contract documents.
2. CONFLICTING SPECIFICATIONS
All requirements of other specifications contained in the contract documents
which conflict with the provisions of the special provisions will be considered
void.
GENERAL SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 1 OF 6 PAGES
3. DUMPING AREAS
Excess material resulting from construction operations shall be hauled to the
County Landfill or other area secured by the Contractor and approved by the
City Engineer. Rubble, rubbish, trees, brush, and other unsuitable backfill
material, as designated by the City Engineer, shall be hauled to the County
Landfill. All Landfill charges are to be considered incidental to the contract
and are the responsibility of the Contractor.
4. CONSTRUCTION DAMAGE
The Contractor shall exercise care during construction operations to ensure
the safety and protection to existing features located near or within the limits
of construction. Damage caused by negligence or poor workmanship, as
determined by the Engineer, shall be considered the Contractor's
responsibility.
5. REMOVED MATERIALS
All materials removed as part of this Contract shall remain the property of the
City unless the City determines that the materials are not salvageable and
the City does not want to retain ownership of the materials. Materials
designated in the field by the Engineer as nonsalvageable shall be hauled
and disposed of by the Contractor at no cost to the City. All other materials
shall be transported to locations as directed by the Engineer. No separate
measurement or payment will be made for hauling or disposing of removed
materials and it shall be considered incidental to applicable items.
6. OVERHAUL
Overhaul will not be paid for "surplus material" obtained from any of the
items of construction under this contract. The cost of overhaul will be
considered as incidental to the items to which it applies.
7. MAILBOXES
The Contractor shall notify the United States Postal Department of
mailboxes which interfere with any part of the work before removing them,
and the Contractor will relocate them as required by the Postmaster. The
removal and replacement of mailboxes will not be considered for direct
payment, but will be considered incidental to the item to which it applies.
GENERAL SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 2 OF 6 PAGES
8. PAY ITEMS
All pay items are listed in the proposal and shall include the purchase of all
materials, delivery of these materials, and furnishing all labor, plant and
miscellaneous work needed to make the item complete. All such cost shall
be incidental to the proposed item to which it applies and shall not be
considered for separate payment.
9. BREAKDOWN OF LUMP SUM CONTRACT PRICE ITEMS
The Contractor shall, immediately upon execution and delivery of the
contract, before the first estimate for payment is made, deliver to the City
Engineer a detailed estimate giving a complete breakdown of the lump sum
contract prices. The submitted breakdown shall be approved by the City
Engineer prior to any payment of any lump sum price item.
10. PERMISSION TO HAUL OVER STREETS, RAILROADS AND HIGHWAYS
The Contractor will be required to secure, from the proper authorities,
permission or permit which may be required to haul over streets, highways,
railroads or private property, and any hauling operations of the Contractor
shall be subject to the requirements of such permits, permission, and to all
applicable regulations, laws, and ordinances governing hauling and
movement of equipment over streets, railroads, highways and private
property. Any costs or inconvenience caused by obtaining any necessary
permits or permission shall be considered completely covered by the price
bid for the items in the proposal.
11. CONSTRUCTION SCHEDULING
The City Engineer shall approve Contractor's work schedule plor to starting.
All revisions shall also be approved. The City Engineer may change the
schedule to accommodate changing construction conditions.
The Contractor shall coordinate the work under this contract with contractors
performing work under other contracts which may be performed
concurrently.
The Contractor shall be responsible to notify the Police, Fire, Street and
Engineering Departments of the closing and opening of streets.
GENERAL SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 3 OF 6 PAGES
The Contractor shall commence work within ten (10) days after receipt of the
"Notice to Proceed" and diligently execute the work of the contract to
completion.
12. PRE-CONSTRUCTION CONFERENCE
Before any work is started, the Contractor shall arrange with the City
Engineer to hold a pre-construction conference to discuss problems and
schedules of contracts.
13. UNDERGROUND UTILITIES
It is the responsibility of the Contractor to obtain the location of gas lines,
water lines, electric, telephone, and cable television cables or wires from the
various utility companies and the City electrician before starting any
excavation. The Contractor shall be responsible for any damage to any
underground utilities. The Contractor shall expose those utilities indicated on
the plans so that elevations may be determined before beginning
construction. This work shall be considered incidental to other items of work.
If the Contractor believes that additional costs have been incurred due to a
utility being improperly located, the resolution of the additional costs incurred
shall be made between the Contractor and the respective utility company.
14. TRAFFIC SIGNS AND STREET SIGNS
The Contractor shall contact the City of Waterloo Traffic Operations
Department to have any street sign that will be affected by construction
removed and replaced when the work has been completed.
15. TRAFFIC CONTROL DURING CONSTRUCTION
The Contractor shall, at his own expense and without further or other order,
provide, erect and maintain, at all times during the progress and suspension
of the work and until completion and final acceptance thereof, suitable and
requisite barricades, signs or other adequate protection, as required by the
latest edition of Part VI of the "Manual on Uniform Traffic Control Devices"
and shall provide, keep and maintain such barricades, signs, etc., as may be
required or as may be ordered by the Engineer, to ensure the safety of the
public as well as those engaged on the work. All barricading plans shall be
reviewed by the Engineer.
GENERAL SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 4 OF 6 PAGES
The Contractor shall determine, provide and obtain approval from the City
Engineer on all detour locations for all street closings, barricades and posting
prior to construction. These shall meet requirements of the City Police
Traffic Department. The Contractor shall notify the City Engineer's Office
and the Police, Fire and Street Departments when the street is closed for
construction. All barricading shall be in accordance with the atest edition of
Part VI of the "Manual on Uniform Traffic Control Devices." Encapsulated
lens sheeting is not required on this project.
No direct measurement for payment shall be made for any signs or
barricades, but shall be considered incidental to other items of work.
16. GRADES, LINES, LEVELS AND SURVEYS
All necessary grades, lines, levels and surveys shall be set by the City and
maintained by the Contractor.
The contractor shall report any need of stakes; a minimum of two (2)
workdays in advance. The contractor shall be responsible for the protection
of all stakes and shall report any damages immediately to the City Engineer.
The City Engineer's Office shall reset stakes and charge the cost of resetting
to the Contractor.
The Contractor shall verify all grades, lines, levels and dimensions as shown
on the drawings, and he shall report any errors or inconsistencies in the
same to the City Engineer before commencing work.
17. SAFETY OF WORKERS AND PUBLIC
The Contractor shall, at all times, take necessary precautions to protect the
life and health of all persons employed on this project and the public. He
shall provide necessary safety devices and safeguards in accordance with
latest and best accident prevention practices. All such protection shall be
furnished to employees without cost.
No direct measurement of payment shall be made for this protection, but
shall be considered incidental to other items of work. The public shall be
kept outside of any work area.
18. CONSTRUCTION EQUIPMENT FOR PORTLAND CEMENT CONCRETE
PAVEMENT
Section IX "Construction Equipment" of the "Specifications for Concrete
Paving, Widening, and Curb and Gutter" of the Standard Specifications for
GENERAL SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 5 OF 6 PAGES
Municipal Public Works Construction, City of Waterloo, Iowa, shall be
amended as follows:
Iowa Department of Transportation standard specification Section 2301.07
Construction Equipment For Portland Cement Concrete Pavement shall
apply with the following exception to Section 2301.07.A.7.b Finishing
Machine: The first sentence shall read as "A finishing machine will be
required on all uniform width slabs ten (10) feet or more in width upon which
a continuous line of forms more than one hundred fifty (150) feet in length
may be set, except for intersections or otherwise approved by the Engineer."
19. WORKING ON SATURDAYS, SUNDAYS AND LEGAL HOLIDAYS
The Contractor shall notify the Engineer in writing forty-eight (48) hours in
advance if work on Saturday is planned. By noon the Friday before the
planned Saturday work, the Contractor shall confirm the Saturday work
schedule with the project inspector.
Work on Sunday requires prior approval of the Engineer in accordance with
the Waterloo Standard Specifications.
There will be no work completed on legal holidays which include the
following:
Memorial Day - May 28, 2007
Independence Day - July 4, 2007
Labor Day - September 3, 2007
20. TAXES
Construction items and materials included in the Project are exempt from
State of Iowa and Local Option Sales and Use Taxes. Contractor is
responsible for obtaining the exemption on items included, as provided by
law or for applying for reimbursement for such taxes paid. Contractor shall
pay all other taxes required to be paid by Contractor in accordance with the
laws and regulations of the place of the Project that are applicable during the
performance of the Work. Contractor shall NOT include Sales and Use Tax
in Contractor's bid. For more information on this exemption, please check
the State of Iowa's website: www.state.ia.us/tax/business/Contr-ExEnt-
Index.html
GENERAL SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 6 OF 6 PAGES
SPECIAL PROVISIONS
1. STANDARD SPECIFICATIONS
The Standard Specifications which are referenced in the contract documents are
designated as follows:
WATERLOO STANDARD SPECIFICATIONS - "Standard Specifications for
Municipal Public Works Construction, City of Waterloo, Iowa."
IDOT STANDARD SPECIFICATIONS - "Iowa Department of Transportation
Standard Specifications for Highway and Bridge Construction, Series 2001, plus the
applicable General Supplemental Specifications, Developmental Specifications,
Supplemental Specifications and Special Provisions, shall apply to construction on
this project.
City of Waterloo Specifications shall be considered the primary specification except
when specific IDOT items are referenced.
2. PAVEMENT MATERIAL
A. CONCRETE MIXES:
1. Pavement, Curb & Gutter, Driveways and Sidewalk:
Air-entrained pavement Mix No. A-4, C-4 or M-4 with Class II
Aggregate. (Class C) Fly ash, in accordance with IDOT 2301.04,
Paragraph E, is permitted. Ground granulated blast furnace slag, in
accordance with IDOT 2301.04 Paragraph F is permitted.
2. Structural:
Air-entrained Mix No. C-4 or M-4. (Class C) Fly Ash and ground
granulated blast furnace slag, in accordance with IDOT 2403.03,
Paragraph D is permitted.
B. ASPHALT MIXES:
1. Surface Course:
HMA, 1M, 3M or 10M, S %2", 60% CR or 75% CR
PG 58-28 Asphalt Cement
Type A Aggregate
SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 1 OF 16 PAGES
2. Base/Intermediate Course:
HMA 1M, 3M or 10M, B/I 3/", 60% CR or 75% CR
PG 58-28 Asphalt Cement
Type A Aggregate
C. PRIMING/TACK-COAT BITUMEN:
RC-70, or IDOT approved emulsion for priming or tack-coat bitumen,
Section 2303.02 of the IDOT Specifications — GS-01011 with
revisions.
The Contractor shall provide job mix designs for asphalt mixes for the Engineer's
review and approval. The job mix designs shall be determined from the actual
aggregates and bitumen to be used for the w ork. The job mix designs shall be
submitted within fourteen (14) calendar days of the signing of the contract. The
Contractor shall submit certificates for the performance grade asphalt cement
(AASHTO MP-1) based on IDOT GS-01011.
3. REVISIONS TO WATERLOO STANDARD SPECIFICATIONS
A. Slump for PCC Paving—The slump, measured in accordance with AASHTO
T 119, shall not be less than one-half (1/2") inch or more than two and one-
half (2 1/2") inches for machine-finished pavement or four (4") inches for
hand-finished pavement.
B. Entrained Air Content for PCC Pavement—IDOT Specifications 2301.04
shall apply.
C. Protection of PCC Pavement—IDOT Specification 2301 19 shall apply
except that compensation will be made for cold weather protection at the unit
bid price.
4. SIDEWALK AND DRIVEWAY APPROACH REMOVAL
Where sidewalk and driveway approaches are to be removed, they must first be
sawed full depth with a concrete saw at the line designated by the Engineer before
the removal is started. If the concrete or asphalt is broken or damaged beyond the
sawed line during removal operations, it shall be resawed to obtain a straight-line
joint before replacement concrete or asphalt is placed. All additional concrete or
asphalt removed and replaced due to negligence by the Contractor shall be
considered incidental to this item. The Contractor shall use extra care in removal to
avoid disturbance or damage to adjoining sidewalk. All saw cutting shall be
considered incidental to applicable items.
SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 2 OF 16 PAGES
9. LINSEED OIL SURFACE TREATMENT OF PCC PAVING/CURB AND GUTTER
This item shall consist of extending the curing of concrete and protecting the entire
finished concrete surface of the pavement and curbs from the de-icing agents used
during cold weather by applying a linseed oil solution. The linseed oil solution
application is required only on paving placed after August 31. This section
only applies to paving on City streets.
A curing compound/linseed oil combination product may be used in lieu of separate
applications of linseed oil. Material shall conform to W.R. MEADOWS LIN-SEALTM
WHITE Curing and Anti-Spalling Compound or engineer approved equivalent.
Linseed oil treatment including curing compound/linseed oil combination shall be
paid at the unit price per square yard. If a combination oil is used prior to August
31, it shall not be paid for separately and shall be incidental to other bid items.
10. HOT-WEATHER CONCRETING
If water is added at the job site to compensate for loss of slump or workability during
hot weather, a plant ticket will be required for each load. This plant ticket shall
indicate the maximum amount of water that can be added per the maximum w/c
ratio in accordance with Iowa Department of Transportation Standard
Specifications.
11. MANHOLE BOXOUTS
Manhole boxouts shall be constructed with PCC with specified reinforcing.
Payment for this work shall be included in the bid item for PCC Pavement.
All structures in paving shall be referenced for location prior to placement of paving
material.
12. EARTHEN BASE PREPARATION PRIOR TO EMBANKMENT CONSTRUCTION
After all existing topsoil material has been stripped down to approved earthen
material as part of the roadway excavation, the top 12 inches of earthen base shall
be scarified and recompacted to 95% Standard Proctor Density. A "Load Test" will
then be conducted. Any unsuitable areas after the load test will need subgrade
repair as directed by the Engineer.
Prior to construction of the embankment, a reload test shall be done of the repaired
earthen base.
Work under this bid item shall be paid under Earthen Base Preparation. Payment
shall be on a square yard basis and measured at the embankment toe width.
SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 5 OF 16 PAGES
with a vibratory compactor, narrower than the trench. The second lift above the
pipe shall be compacted by the front and rear wheels of a tractor backhoe with a
loaded front bucket (or as approved by the Engineer). Final rolling shall be done
with the rolling of the subgrade prior to placement of Special Backfill Subbase.
Subdrains shall be installed prior to placing special backfill base material.
Drain tile pipe shall meet the following minimum requirements:
Pipe Dimensions: 4-inch or 6-inch nominal inside diameter.
Water Inlet Area (Perforations): Two (2) rows of 3/8" 4 holes maximum
perforations or slots shall be required with a minimum of 1.85 square inches
of opening per lineal foot of pipe.
PVC Pipe, Fittings and Couplings: Shall conform to ASTM D1784 cell class
12454B PVC compounds. Joints and couplings shall meet ASTM D3034
and/or F949 for materials, ASTM D3212 for performance and ASTM F477 for
gasket material.
PE Pipe, Fittings and Couplings: Pipe and fitting material shall be high
density polyethylene meeting ASTM D3350 minimum cell classification
324420C with carbon black content not greater than 5 percent (5%). Pipe
shall have a smooth interior and annular exterior corrugations meeting
AASHTO M252, Type S. Fittings shall confirm to AASHTO M252.
Fabricated fittings, where accessible, shall be welded on the interior and
exterior at all junctions.
Pipe shall be joined with a joint meeting AASHTO M252. The joint shall be
silt tight and non-rated watertight. Gaskets shall be made of polyisoprene
meeting the requirements of ASTM F477 with the addition that the gaskets
shall not have any visible cracking when tested according to ASTM D1149
after 72 hour exposure in 50 PPHM ozone at 104° Fahrenheit. Gaskets shall
be installed by the pipe manufacturer and covered with a removable wrap to
ensure the gasket is free from debris. A joint lubricant supplied by the
manufacturer shall be used on the gasket and bell during assembly.
Pipe Stiffness: Minimum 46 psi for PVC and a minimum of 50 psi for PE per
test method ASTM D-2412, 5% deflection.
Pipe Markings: The following shall be required to be shown on the pipe or
provided by certification:
1. Cell class
2. Pipe stiffness or SDR
3. Manufacturer's name
4. ASTM or AASHTO specification number for pipe
SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 10 OF 16 PAGES
Corrugated metal pipe subdrain outlets shall include rodent guards and shall be per
IDOT RF-19E and paid on a per each basis.
Rodent guards at intakes shall be per shall be per IDOT RF-19C Detail A and paid
on a per each basis.
Subdrain connections at intakes and manholes are only required on the down
stream end of the subdrain.
24. PAVEMENT SMOOTHNESS REQUIREMENTS
Any areas where the smoothness is less than desirable, as determined by the
Engineer, shall be checked by the City with a bump cart. Areas with bumps greater
than 1/4 inch in 10 feet shall be surface planed by the Contractor at the Contractor's
expense. The City may also require surface planing based on cross-sections. In
the case of an asphalt surface, planing or additional overlay may be required at the
Contractor's expense.
Areas to be checked for smoothness by a bump cart will be determined by the
Engineer based on the ride produced by the completed paving and/or a visual
inspection. Entire lengths of streets will not be bump cart tested unless conditions
warrant that it be done.
25. CRACKING
Should uncontrolled or random cracking occur, a joint of specified width and depth
shall be formed with a crack saw or router along the line of the crack, and the joint
shall be sand cleaned, roped and sealed as specified at the Contractor's expense.
Should a crack develop from pavement settlement, base repair and full panels shall
be removed and replaced at the Contractor's expense.
Should transverse or longitudinal joints widen or open up, the joirt shall be stitched
according to specifications determined by the Engineer.
26. HAUL ROUTES
Haul routes to and from the project site shall be submitted for review by the
Engineer. In general, the Contractor shall request haul routes over the main streets
in the area, staying on streets within the project as much as possible and should not
include truck-embargoed streets.
SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 11 OF 16 PAGES
27. BARRICADES AND SIGNS FOR TRAFFIC CONTROL
The Contractor shall provide, erect, and maintain, at all times during the progress
and suspension of the work and until completion and final acceptance thereof,
suitable and requisite barricades, signs, or other adequate protection, as required
by the latest edition of the Iowa Manual on Uniform Traffic Control Devices for
Streets and Highways" and shall provide, keep, and maintain such barricades,
signs, etc., as may be required or as may be ordered by the Engineer, to insure the
safety of the public as well as those engaged on the work. All barricading plans
shall be reviewed by the Engineer. This work shall be paid for as a lump sum item.
All requests for street closings shall be submitted in writing to the City Engineer a
minimum of seven (7) days prior to the date of closing.
28. SILT FENCE
All silt fence and silt fence ditch checks shall meet IDOT Specifications Section
2525. Payment shall be by the linear foot. General maintenance and straightening
to maintain the function of the silt fence shall be incidental to this bid item. Removal
and reinstallation at the direction of the Engineer shall be paid for as new silt fence.
29. PERCENT OF CONTRACT TO BE PERFORMED BY PRIME CONTRACTOR
The Prime Contractor shall be required to perform at least 35 percent of the total
contract amount of this project. Purchasing of materials for subcontractors will not
be an acceptable method for the prime contractor to meet the 35 percent
requirement.
30. SEED, FERTILIZE AND MULCH
IDOT Specification 2601, Erosion Control shall apply using the urban areas seed
mixture and application rate, where applicable.
The Contractor shall be paid on a per acre basis.
31. TEMPORARY SEEDING
Temporary seeding with oats — 2 to 3 bushels per acre — and mulch all slopes 4:1
and steeper will be initiated on all disturbed areas where construction activity will
not occur for a period of more than 21 calendar days by the 14th day after
construction activity has permanently or temporarily ceased.
This sequence shall repeat as ground cover is removed by subsequent construction
activity.
Payment shall be made on a per acre basis.
SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 12 OF 16 PAGES
32. GEOGRID
GEOGRID is being considered for possible use in situations requiring subgrade
repair. The extent of its use is unknown. An evaluation of subgrade conditions and
estimated costs will determine when it is to be used.
There were no known locations for use of Engineering fabric or Geogrid at the time
of design, but shall be used as directed in the field by the Engineer.
Geogrid used shall be Tensar BX1100 (BR-1), TENSAR BX4100(SG01) or
Engineer-approved equal.
Payment shall be made on a square-yard basis. Area considered for payment shall
be based on the area of subgrade covered, at the direction of the Engineer, and
shall not include double payment for overlapped areas.
33. HDPE EROSION CONTROL MAT
HDPE erosion control mat shall be ScourStop as manufactured by Erosion Tech,
Inc., 2501 SE Tones Drive, Suite 500, Ankeny, Iowa 50021, or Engineer approved
equal.
Mat shall be installed per manufacturer's Type A or B installation specifications.
Installation shall include either sod or a turf reinforcement mat under the erosion
control mat to 1' outside the limits of the mat. Payment shall be made on a square
foot basis as measured for the HDPE erosion control mat. This unit price also
includes the sod or turf reinforcement mat.
34. UNAUTHORIZED USE OF PAVING
If the Contractor or any of his subcontractors drives any unauthorized equipment on
the paving before it has reached its specified strength and age, the following
penalties shall be assessed to the Contractor:
A. If, in the opinion of the Engineer, the paving has been damaged to the
extent of surface indentations being visible, stress cracks or loss of
strength due to cracking, panels in the affected area(s) shall be removed
and replaced at Contractor's expense. "BT" joints needed to tie the
sections together are incidental to this bid item.
B. If no visible signs of damage are present, the unit bid price for the paving
shall be reduced by a percentage proportional to the cure time remaining.
(If paving requires a seven-day cure time and unauthorized Contractor
traffic is driven on the paving on the fifth day, 2/7 of the unit price shall be
deducted for the area affected.)
SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 13 OF 16 PAGES
35. STORM WATER POLLUTION PREVENTION PLAN
Contractor shall be required to implement all provisions of the Storm Water Pollution
Prevention Plan. All costs for implementation of this plan shown on the construction
drawings, shall be included in the lump sum price except for excluding the silt fence
and temporary and final seeding items which payment for are included in other
items. Contractor shall install an approved "access box" for keeping the SWPPP
logs as required on the site. Contractor shall also be required to make all required
weekly site inspections and post rain event inspections per the SWPPP. If proper
logs are not kept by the Contractor, only partial payment shall be made as
determined by the Engineer. Contractor also agrees to indemnify the City for any
fines received from the IDNR or EPA as a result of not implementing the SWPPP.
36. TRAFFIC CONTROL
The Engineer, or authorized representative, shall periodically review traffic control
that has been put in place by the Contractor. If traffic control devices are found to
be without proper maintenance, penalties shall be assessed. Improper
maintenance shall include, but not be limited to, the following situations:
A. Less than 100 percent of lights in working order.
B. Any barricade or sign moved or tipped over.
C. Fencing not supported in a vertical position.
D. Fencing not placed around excavations when workers/equipment
are not working at the location.
E. Lack of proper barricades or signage.
Each incident is treated as a separate citation on an individual basis. It is not
intended that minor deficiencies be price adjusted if corrected the day notification is
given. In addition to a price adjustment, the Engineer may suspend work for
irresponsible and/or repeated failure to construct the project using proper traffic
control procedures.
Penalties: 1st Offense Written warning given by City.
2nd Offense $ 100
3rd Offense $ 250
4th Offense $ 500
5th Offense $1,000
6th Offense Engineer's discretion (amount
or more equal or greater than $1,000)
Payment shall be on a lump sum basis.
SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 14 OF 16 PAGES
37. MOBILIZATION
Mobilization shall be per Iowa Department of Transportation Standard
Specifications.
Payment shall be on a lump sum basis.
38. PAVEMENT PAINT
Street paint shall be fast drying water base paint, Type L/F and/or IDOT approved
on the U.S. 63 portions of work.
39. TRAFFIC SIGNS, POSTS AND PAVEMENT PAINT
All traffic control signs and posts shall meet IDOT Specification Section 2524, Type
A signs; Section 4164 and Section 4183 and 4184. Street signs shall be per city of
Waterloo Sign and Traffic Department. Posts shall be 2" diameter black wall pipe,
10 feet in length. Payment shall be by the square foot for signs and per each for
14', 12' and 10' long posts. Payment for paint markings shall be lump sum.
40. PRECAST DETECTABLE WARNING SURFACES
A. General. Detectable warnings shall consist of a surface of truncated domes
aligned in a square grid pattern and shall comply with the manufacturer's
specifications for installation and materials. Payment shall be per each
24" x 24" section.
1. Dome Size. Truncated domes in a detectable warning surface shall
have a base diameter of 0.9 inches minimum to 1.4 inches maximum,
a top diameter of 50% of the base diameter minimum to 65% of the
base diameter maximum, and a height of 0.2 inches.
2. Dome Spacing. Truncated domes in a detectable warning surface
shall have a center-to-center spacing of 1.6 inches minimum and 2.4
inches maximum, and a base-to-base spacing of 0.65 inches
minimum, measured between the most adjacent domes on square
grid.
3. Contrast. Detectable warning surfaces shall contrast visually with
adjacent walking surfaces. Approved color shall be SOLOMAN #415
TONE DARK RED as supplied by Stetson Building Products or
Dynamic Color Solutions CS#1416 RED as supplied by Marquart
Block.
SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 15 OF 16 PAGES
4. Size. Detectable warning surfaces shall extend 24 inches minimum in
the direction of travel and the full width of the curb ramp, landing, or
blended transition. Approved size shall be 24" x 24" x 2".
5. Lifting Provisions. Units are to be made with cast in place inserts or
galvanized lift loops to facilitate installation.
6. Base. Precast concrete sections shall be placed over 5" thick
concrete base section.
B. Approved Vendors (or equal)
1. Lister Concrete Products, Inc.
2116 Commercial Street
Waterloo, Iowa 50702
(319)232-4724
2. Hanover Architectural Products
240 Bender Road
Hanover, Pennsylvania 17331
(717)637-0500
3. Steps Plus, Inc.
6375 Thompson Road
Syracuse, New York 13206
(315)432-0885
41. SOILS REPORT
Soils testing reports will be available upon request at the Engineer's office, Schenk
Engineering Company, 216 Brookeridge Drive, Waterloo, Iowa 50702, phone
319-232-7480.
SPECIAL PROVISIONS CONTRACT NO. 727 PAGE 16 OF 16 PAGES
GENERAL SPECIFICATIONS FOR CONSTRUCTION
CITY OF WATERLOO, IOWA
Department of Engineering
SECTION A - Definitions of Terms
SECTION B - Scope of work
SECTION C - Control of Materials and Work
SECTION D - Procedure and Progress
SECTION E - Measurements and Payments
SECTION F - Legal Relations and Responsibility
SECTION A - DEFINITIONS OF TERMS
1. CITY. The City of Waterloo, Iowa, which is the Party of the First Part
of the accompanying contract, acting through its authorized represen:ative.
2. COUNCIL. The duly elected Council of the City of Waterloo, Iowa.
3. ENGINEER. The City Engineer of Waterloo, Iowa, or his authorized
representative.
4. INSPECTOR. The authorized representative of the Engineer,
assigned to the detailed inspection of the work or materials therefor and to such
other duties as may be delegated to him in these specifications.
5. CONTRACTOR. The Party of the Second Part in the accompanying
contract for the improvement covered by these specifications, or his authorized
representative.
6. SUBCONTRACTOR. Any person, firm, or corporation who has, with
the approval of the Council, contracted with the Contractor to execute and perform
in his stead all or any part of the contract.
7. BIDDER. Any individual, firm, or corporation submitting a proposal for
all or a part of the work provided for in these specifications.
8. PROPOSAL GUARANTEE. The security designed in the Notice of
Bidders or Proposal to be furnished by the bidder as a guarantee of good faith to
enter into a contract and furnish an acceptable bond for the work contemplated if it
be awarded him.
9. SURETY. The corporate body bound with and for the Contractor for
the acceptable performance of the contract.
GENERAL SPECIFICATIONS PAGE 1 OF 18 PAGES
10. PROPOSAL. The written Proposal, submitted by the bidder in the
prescribed manner and on the standard form, for the improvements covered by
these specifications.
11. SPECIFICATIONS. The documents that set forth tie manner in
which the proposed work is to be accomplished which have been prepared by the
Engineer and approved by the City Council, official copies of which are now on file
with the City Clerk.
12. SPECIAL PROVISIONS. Clauses or memoranda not contained
herein, applying to the contract of which these specifications are a part, which
change or supplement these specifications.
13. CONTRACT. The agreement entered into between the City and the
Contractor, setting forth the terms under which the work covered by the plans and
specifications is to be performed. The contract includes all conditions, definitions,
and instructions set forth in the official publications relating to the work, the official
contract and specifications, the Proposal, official plans, and all supplemental
agreements entered into by the parties to the contract.
14. NOTICE TO BIDDERS. The notice called attention of bidders to the
time and place for receiving bids, containing a brief description of the work, and
briefly setting forth the requirements and conditions for submission of Proposals.
15. INSTRUCTIONS TO BIDDERS. The clauses setting forth in detail the
information relative to the proposed work and requirements for the submission of
Proposals.
16. PLANS. The plans for the improvement covered by the specifications
and approved by the Council, official copies of which are on file with the City Clerk.
17. CONTRACT BOND. The bond executed by the Contractor and his
surety in favor of the City of Waterloo, Iowa, guaranteeing the complete execution
of the contract in accordance with the plans and specifications, the payment of all
debts pertaining to the work, and maintenance of the work as provided by law or by
the specifications.
18. CONTRACT PERIOD. The period from the specified date for
beginning the work to the specified date of completion, both dates inclusive. The
contract period may be extended by the Council, as provided in these
specifications, in which event the contract period includes he new date of
completion.
19. OFFICIAL PUBLICATIONS. The official publications'are the formal
resolutions and notices relative to the proposed improvement that are required by
GENERAL SPECIFICATIONS PAGE 2 OF 18 PAGES
law to be published in a prescribed manner and that have actually been published
in accordance with the statutes relating thereto. Attention is directed to the fact that
these official publications are by statute vested with all of the force and effect of
contract obligations.
20. A.S.T.M. Abbreviation for American Society for Testing Materials.
21. WORK. The term "Work" of the Contractor and Subcontractor
includes labor or materials or both, equipment, transportation, or other facilities
necessary to complete the contract.
22. TIME. All time limits stated in the contract documents are of the
essence in the contract.
SECTION B - SCOPE OF WORK
1. CORRELATION AND INTENT OF DOCUMENTS. The Contract
documents are complementary, and what is called for by any one shall be as
binding as if called for by all. The intention of the documents is to include all labor,
materials, equipment, and transportation necessary for the proper execution of the
work. Materials or work described in words which, so applied, have a well-known
technical or trade meaning shall be held to refer to such recognized standard.
2. DRAWINGS AND SPECIFICATIONS. Unless otherwise provided in
the contract documents, the engineer shall furnish to the Contractor, free of charge,
all copies of drawings and specifications reasonably necessary for the execution of
the work.
The Contractor shall keep one (1) copy of all drawings and specifications on
the work available to the Engineer and to his representatives.
3. CONTRACTOR'S UNDERSTANDING. It is understood and agreed
that the Contractor has, by careful examination, satisfied himself as to the nature,
character and location of the work, the conformance to the ground, the character,
quality, and quantity of the materials to be encountered, the character of the
equipment and facilities needed preliminary to and during the prosecution of the
work, the general and local conditions, and all other matters which can, in any way,
affect the work under this contract. No verbal agreement or conversation with any
officer, agent, or employee of the City, either before or after the execution of the
Contract, shall affect or modify any of the terms or obligations herein contained.
4. REPORTING ERRORS AND DISCREPANCIES. If the Contractor, in
the course of the work, finds any discrepancies between the plans and the physical
conditions of the locality, or any errors of omission in plans or in the layout as given
GENERAL SPECIFICATIONS PAGE 3 OF 18 PAGES
by said stakes and instructions, it shall be his duty to inform the Engineer
immediately, in writing, and the Engineer shall promptly correct the same.
5. ALTERATION OR CORRECTION OF PLANS. The plans are made
up from surveys that are presumably correct and represent the foreseen
construction requirements. Any modification of the plans which may be required by
the exigencies of the construction or any corrections made necessary because of
errors in the original surveys, will be made by the Engineer. Should corrections or
modifications of the plans or specifications require a different qua',ity or class of
work than that upon which the unit prices in the Proposal are based, or if the
modifications or corrections are required in parts of the work partially completed
and such modifications result in an increased cost to the Contractor, the amount to
be paid for work resulting from such changes shall be agreed upon writing at the
time the changes are ordered and before the work is begun by the Contractor. No
allowance will be made for anticipated profits on work not performed.
6. CHANGES IN THE WORK. The City, without invalidating the
contract, may order extra work or make changes by altering, adding to, or deducting
from the work, the contract sum being adjusted by agreement or arbitration before
such changed work is undertaken. All such work shall be executed under the
conditions of the original contract, except that any claim for extension of time
caused thereby shall be adjusted at the time of ordering such change.
7. INCREASED OR DECREASED QUANTITIES. The right is reserved
without impairing the contract, to order the performance of such work of a class not
contemplated in the Proposal or to increase or decrease the quantities as may be
considered necessary to complete fully and satisfactorily the work included in the
contract. However, when the work is completed without change in the plans, and
the measured quantity of any item of work varies by more than twenty percent
(20%) from the estimated quantity specified in the contract, an adjustment in price
may be made for such item of work by agreement between the Engineer and the
Contractor, subject to the approval of the City Council. Either party to the contract
may request such an adjustment.
8. LANDS AND RIGHT OF WAY. The City shall provide the lands upon
which the work under this contract is to be done, except that the Contractor shall
provide land required for the erection of temporary construction facilities and
storage of his material, together with the right of access to same.
9. CITY WATER. The Contractor shall be allowed to use City Water but
before any water is used, the Contractor shall make application to the Waterloo
Water Works for a temporary water connection from a fire hydrant or by some other
connection method. Water usage will be charged at the rate for temporary water
service. The rules, regulations, and water rates are available at the Waterloo
Water Works offices located at 325 Sycamore Street or their telephone number is
319-232-6280.
GENERAL SPECIFICATIONS PAGE 4 OF 18 PAGES
10. RIGHTS OF VARIOUS INTERESTS. Whenever work oeing done by
the City's forces or by other Contractors is contiguous to work covered by this
contract, the respective rights of the various interests involved shall be established
by the Engineer to secure the completion of the various portions of the work in
general harmony.
11. CLOSING STREETS TO TRAFFIC. The Engineer shall be the judge
of how many streets or parts of streets it is necessary for the Contractor to close at
any time and may refuse to permit the closing of additional streets until such of the
work is finished and opened to traffic as he may direct.
12. OBSTRUCTION OF STREETS. The work is to be carried on in such
manner as to obstruct the streets, highways, and alleys as little as possible. The
Contractor shall carry on the different parts of the work so as to complete the
whole, as nearly as practicable, at the same time. In doing the work, the Contractor
shall follow the directions of the Engineer as to the place or places where work shall
be started or be carried on and the direction in which it shall be done.
13. SHANTIES AND BUILDINGS. Shanties or other buildings shall not
be erected in or upon any street, highway, or alley without permission of the
Engineer. If such permission be granted, it may be upon any reasonable terms
prescribed by the person or body granting such permission.
14. SANITARY CONVENIENCES. The Contractor shall furnish the
necessary sanitary conveniences, properly secluded, for the laborers on the work,
and these shall be maintained in a manner that will be inoffensive to the public.
15. CLEANING UP. The Contractor shall, as directed by the Engineer,
remove from the City's property and from all public and private property, at his own
expense, all temporary structures, rubbish, and waste materials resulting from his
operations before work can be considered completed. The Contractor shall also
renew or replace any and all fences, sidewalks, or other property damaged or
disturbed by his work.
16. OMISSION OF PARTS OF GENERAL SPECIFICATIONS. Parts of
the General Specifications deemed not to apply to some particular work may be
omitted by special reference in other parts of the contract documents
SECTION C - CONTROL OF MATERIALS AND WORK
1. SUPERVISION AND INSPECTION. The Engineer shall have
supervision of the construction provided for in this Contract and shall decide any
and all questions which may arise as to the quality and acceptability of materials
furnished, work performed, manner of performance, rate of progress on the work,
GENERAL SPECIFICATIONS PAGE 5 OF 18 PAGES
and all questions regarding the acceptable fulfillment of the terms of the Contract.
Materials and construction work shall, at all times, be subject to the inspection of
the Engineer or his representatives. The Contractor shall be held strictly to the true
intent of these specifications as regards the quality of materials, workmanship, and
the diligent prosecution of the work.
The Engineer and his representatives shall, at all times, have access to the
work wherever it is in preparation of progress, and the Contractor shall provide
proper facilities for such access and for inspection.
If the specifications, the Engineer's instructions, law ordinances, or any
public authority require any work and/or materials to be especially tested or
approved, the Contractor shall give the Engineer timely notice of readiness for
inspection. If the inspection is to be made by authority other than the Engineer, the
Contractor shall notify the engineer of the date fixed for inspection. nspections by
the Engineer will be promptly made and, where practicable, at the source of supply.
If any work should be covered up without the approval or consent of the Engineer, it
must, if required by the Engineer, be uncovered for examination at the Contractor's
expense.
Re-examination of questioned work may be ordered by the Engineer, and, if
so ordered, the work must be uncovered by the Contractor. If such work be found
in accordance with the Contract, the City shall pay the cost of re-examination and
replacement. If such work be found not in accordance with the Contract, the
Contractor shall pay such cost unless he shall show that the defect in the work was
caused by another Contractor, and, in that event, the City shall pay the cost.
2. AUTHORITIES AND DUTIES OF INSPECTORS. Inspectors may be
stationed on the work to report to the Engineer as to the progress of the work and
the manner in which it is being performed; also, to report whenever it appears that
materials furnished and work performed by the Contractor fail to fulfill the
requirements of the specifications and Contract, and to direct the attention of the
Contractor to such failure or infringement; but such inspection shall not relieve the
Contractor from any obligations to furnish acceptable materials or to provide
completed construction that is satisfactory in every particular.
In case of any dispute arising between the Inspector and the Contractor as
to materials furnished or the manner of performing the work, the Inspector shall
have the authority to reject materials or suspend the work until the question at issue
can be referred to and decided by the Engineer. Inspectors are not authorized to
revoke, alter, enlarge, relax, or release any requirements of these specifications.
The Inspector shall, in no case, act as foreman or perform other duties for the
Contractor, or interfere with the management of the work by the latter.
3. STATUS OF THE ENGINEER. The Engineer shall have general
supervision and direction of the work. He has authority to stop the work whenever
GENERAL SPECIFICATIONS PAGE 6 OF 18 PAGES
such stoppage may be necessary to insure the proper execution of the Contract.
He shall also have authority to reject any work and/or materials which do not
conform to the specifications, to direct the application of forces to any portion of the
work as, in his judgment, is required, and to order the force increased or
diminished, and to decide questions which arise in the execution of tre work.
4. ENGINEER'S DECISIONS. The Engineer shall, within a reasonable
time, make decisions on all claims of the Contractor and on all other matters
relating to the execution and progress of the work or the interpretation of the
contract documents.
All such decisions of the Engineer shall be final except as to the element of
time and financial consideration involved, which, if no agreement in regard thereto
is reached, shall be subject to arbitration.
5. STAKES AND INSTRUCTIONS. The Contractor shall provide
reasonable and necessary opportunities and facilities for setting stakes and making
measurements. The Contractor shall not furnish stakes or men to set them. He
shall not proceed until he has received from the Engineer such stakes and
instructions as may be necessary to the progress of the work.
The Contractor shall carefully preserve bench marks, reference points, and
stakes, and in case of willful or careless destruction, he shall be charged with the
resulting extra expense and shall be responsible for any mistakes that may be
caused, by their loss or disturbance.
6. SUPERINTENDENCE. The Contractor shall keep on his work during
its progress a competent superintendent and any necessary assistants, all
satisfactory to the Engineer. The Superintendent shall not be changed except with
the consent of the Engineer, unless the Superintendent proves to be unsatisfactory
to the Contractor and ceases to be in his employ. The Superintendent shall
represent the Contractor in his absence, and all directions given to him shall be as
binding as if given to the Contractor. Important decisions shall be confirmed in
writing to the Contractor. Other directions shall be so confirmed on written request
in each case.
The Contractor shall give efficient supervision to the work using his best skill
and attention. He shall carefully study and compare all drawings, specifications,
and other instructions, and shall report at once to the Engineer any error,
inconsistency, or omission which he may discover.
7. REMOVAL OF UNAUTHORIZED WORK. Work done without lines
and grade being give, work done beyond lines shown on the plans or as given,
except as herein provided, or any extra or additional work done without authority,
will be considered as unauthorized and at the expense of the Contractor and will
GENERAL SPECIFICATIONS PAGE 7 OF 18 PAGES
not be paid for under the provisions of the Contract. Work so done may be ordered
removed and replaced at the Contractor's expense.
8. REMOVAL OF DEFECTIVE MATERIALS OR WORK. The
Contractor shall promptly remove from the premises all materials condemned by
the engineer as failing to conform to the Contract; whether incorporated in the work
or not, and the Contractor shall promptly replace and re-execute his own work in
accordance with the contract and without expense to the City, and shall bear the
expense of making good all work of other Contractors destroyed or damaged by
such removal or replacement.
If the Contractor does not remove such condemned work and materials
within a reasonable time, fixed by written notice, the City may remove them and
may store the material at the expense of the Contractor. If the Contactor does not
pay the expense of such removal within a reasonable time thereafter, the City may,
upon ten (10) days' written notice, sell such materials at auction or at private sale
and shall account for the net proceeds thereof, after deducting all the costs and
expense that should have been borne by the Contractor; or, if the ret proceeds of
such sale are insufficient to pay the expenses of removal, the City may deduct the
balance from any amounts due the Contractor.
9. MATERIALS, EQUIPMENT, APPLIANCES, AND FACILITIES.
Unless otherwise stipulated, the Contractor shall provide and pay for all materials,
labor, water, tools, equipment, light, power, transportation, and other facilities
necessary for the execution and completion of the work. Materials shall be of the
quality specified for each particular part of the work.
Whenever, in construction of the work or in the manufacture of any article of
appliance necessary for the construction or operation of the work, it is necessary to
use any material that is not fully specified in these specifications, it shall be of good
quality and shall meet with the approval of the Engineer.
Any appliance that is necessary for the construction or operation of the work
and is commonly recognized as a part of the work, shall be furnished by the
Contractor as part of the work, whether or not it is specifically called for in the plans
and specifications, and such appliance shall be of good quality and standard make
and shall meet with the approval of the Engineer.
10. MATERIAL SAMPLES. Before the contract is awarded, the bidder
may be required to furnish a statement of the origin, composition, and manufacture
of any and all materials proposed for use in the performance of the Contract,
together with samples of the material. These samples will be considered as
representative and typical of the material to be obtained from any particular source.
11. CHARACTER OF WORKMEN AND EQUIPMENT. The Contractor
shall employ competent and efficient workmen for every kind of work. Any person
GENERAL SPECIFICATIONS PAGE 8 OF 18 PAGES
employed on the work who shall refuse or neglect to obey the directions of the
engineer or Inspector, or who shall be deemed incompetent or disorderly, or who
shall commit trespass upon public or private property in the vicinity of the work,
shall be dismissed when the Engineer so orders, and shall not be re-employed
unless express permission be given by the Engineer. The Contractor shall, at all
times, enforce discipline and good order among his employees.
The methods, equipment, and appliances used on the work, and the labor
employed, shall be such as will produce a satisfactory quality of work and shall be
adequate to complete the contract within the specified time limit.
12. HIRING CITY EMPLOYEES. The Contractor shall not employ and
hire any of the City's employees without the permission of the Engineer.
13. LABOR. Local labor shall be given preferences so far as practicable.
14. THE CITY'S RIGHT TO DO WORK. If the Contractor should neglect
to prosecute the work properly or fail to perform any provision of this Contract, the
City of Waterloo, after three (3) days' written notice to the Contractor may, without
prejudice to any other remedy he may have, make good such deficiencies and may
deduct the cost thereof from the payment then or thereafter due the Contractor,
provided, however, that the Engineer shall approve both such action and the
amount charged to the Contractor.
SECTION D - PROCEDURE AND PROGRESS
1. ORDER OF COMPLETION - USE OF COMPLETED PORTIONS.
The Contractor shall complete any portion or portions of the work in such order or
time as the Engineer may require. The City shall have the right to take possession
of an use completed or partially completed portion of the work at any time, but such
taking possession and use shall not be deemed an acceptance of work so taken or
used, or any part thereof. If such prior use increases the cost of or delays the work,
the Contractor shall be entitled to such extra compensation or extension of time, or
both, as the Engineer may determine.
2. WEATHER. During stormy or inclement weather, all work shall be
suspended, except such as can be done in an acceptable manner. Permission to
work during freezing, stormy, or inclement weather shall in no way be construed as
a release of the Contractor's responsibility regarding the quality of the finished work
at such time.
3. SUNDAYS AND LEGAL HOLIDAYS. Except for such work as may
be required to properly maintain or protect completed or partially completed
construction or to maintain lights and barricades, no work will be permitted on
Sundays or legal holidays without specific permission of the Engineer.
GENERAL SPECIFICATIONS PAGE 9 OF 18 PAGES
4. DELAYS AND EXTENSION OF TIME. If the Contractor be delayed in
the completion of the work by an act of neglect of the City, or its employees; or by
any other Contractor employed by the City; or by changes ordered in the work; or
by strikes, lockouts, fire, unusual delays in transportation, unavoidable casualties,
or any cause beyond the Contractor's control; or by delay authorized by the
Engineer pending arbitration; or by any cause which the Engineer shall decide
justifies the delay, then the time of completion shall be extended for such
reasonable time as the Engineer may decide will compensate for such delay.
No such extension shall be made for delay occurring more than thirty (30)
days before claim therefor is made in writing to the Engineer. In the case of a
continuing cause of delay, only one claim is necessary.
This article does not exclude the recovery of damages for delay by either
party under provisions in the contract documents.
5. TEMPORARY SUSPENSION OF WORK. The Engineer shall have
authority to suspend the work, wholly or in part, for such period or periods of time
as he may deem necessary, due to unsuitable weather or such other conditions as
are considered unfavorable for the suitable prosecution of the work, or for such time
as is necessary due to the failure to the Contractor to carry out orders given or to
perform any or all provisions of the Contract.
6. NOTICES - HOW SERVED. Any notice to be given by the City to the
Contractor under this contract shall be deemed to be served if the same be
delivered to the man in charge of any office used by the Contractor or his foreman
or agent at or near the work, or deposited in the post office, postpaic, addressed to
the Contractor at his last known place of business.
7. PROGRESS OF WORK. The progress of the work shall be such that,
at the expiration of one-fourth (1/4) of the contract period, one-eighth (1/8) of the
work shall be completed; at the expiration of one-half (1/2) of the contract period,
three-eighths (3/8) of the work shall be completed; at the expiration of three-fourths
(3/4) of the contract period, the work shall be three-fourths (3/4) completed, and the
whole work shall be completed at the expiration of the contract period.
If, at any time the above schedule is not being maintained, the Council may
give written notice to the Contractor and his sureties that the specifications are not
being complied with. Such notice shall state what action on the part of the
Contractor is required to bring the work within the requirements of the
specifications. If the Contractor fails, within ten (10) days, to proceed as directed in
the said notice, then the Council shall have authority to annul this contract without
process or action at law and take over the prosecution and completion of the work,
as provided under the article covering City's right to terminate contract.
GENERAL SPECIFICATIONS PAGE 10 OF 18 PAGES
8. CITY'S RIGHT TO TERMINATE CONTRACT. If the Contractor
should be adjudged a bankrupt; or if he should make a general assignment for the
benefit of this creditor; or if a Receiver should be appointed on account of his
insolvency; or if he should persistently or repeatedly refuse or should fail, except in
cases for which extension of time is provided, to supply enough skilled workmen or
proper materials; or if he should fail to make prompt payment to Subcontractors or
for materials or labor; or if he should persistently disregard laws, ordinances, or the
instructions of the Engineer; or if he should otherwise be guilty of a substantial
violation of any provision of the contract, then the City, upon the certificate of the
Engineer that sufficient cause exists to justify such action, may, without prejudice to
any other rights or remedy, and after giving the Contractor seven (7) days' written
notice, terminate the employment of the Contractor and take possession of the
premises and of all materials, tools and appliances thereon and finish the work by
whatever method he may deem expedient. In such cases, the Contractor shall not
be entitled to receive any further payment until the work is finished.
If the unpaid balance of the contract price shall exceed the expenses of
finishing the work, including compensation for additional managerial and
administration services, such excess shall be paid to the Contractor. If such
expense shall exceed such unpaid balance, the Contractor shall pay the difference
to the City. The expense incurred by the City as herein provided and the damage
incurred through the Contractor's default shall be certified by the Engineer.
9. REMOVAL OF EQUIPMENT. In the case of annulment of this
contract before completion, from any cause whatsoever, the Contractor, if notified
to do so by the City; shall promptly remove any part or all of his equipment and
supplies from the property of the City, failing which, the City shall have the right to
remove such equipment and supplies at the expense of the Contractor.
SECTION E - MEASUREMENTS AND PAYMENT
1. STANDARD OF MEASUREMENT. All work completed under the
contract shall be measured by the Engineer according to the United States
standard measures.
2. SCOPE OF PAYMENTS. The Engineer's measurements of quantities
shall be the basis for final payment for the work performed under this Contract.
After the work is completed, the Engineer will make measurements and
computations of the number of units of each of the various items of work
completed, and the Contractor will be paid for the actual amount of work performed
at the rates specified in his Proposal. Before final settlement is made, the Council
may require the Contractor to submit a list of all persons furnishing labor or
materials, with evidence that such persons have been paid in full. Payment shall
be made in the manner set forth in official publications and Council Proceedings
relative thereto.
GENERAL SPECIFICATIONS PAGE 11 OF 18 PAGES
3. PAYMENT FOR EXTRA WORK. Such extra work as may have been
ordered by the Engineer and performed by the Contractor shall be compensated for
as provided herein. If work is to be done or materials are to be furnished by the
Contractor which cannot properly be classified under unit prices included in the
Proposal, the Contractor shall be paid therefor the actual reasonable cost of the
labor and materials entering permanently in such work, plus fifteen percent (15%)
of the cost thereof. In computing the labor cost on such extra work, the following
items shall be included:
(a) Actual payroll expenditures for labor at the current rate therefor, and
cost of materials.
(b) Pay of foreman and timekeepers for actual time required on the extra
work.
(c) Liability insurance, prorated, for the extra work.
Labor cost items on extra work shall be furnished in duplicate by the
Contractor to the Inspector daily. The Inspector shall check the items, and if he
finds them to be correct, he shall so certify on the statement of cost returning one
copy to the Contractor and filing one copy with the Engineer.
The Engineer shall determine the cost of materials entering Into extra work
from the materials and receipted freight bills for the same.
For any special machine, power tools, or equipment, including fuel and
lubricants, but not including small hand tools, which may be deemed necessary or
desirable to use, the Contractor shall be allowed a reasonable rental thereon, to be
agreed upon in writing by the Engineer before such work is begun and to which
sum no percentage is to be added.
The item of cost shall not include repairs or replacement of equipment or
overhead expenses of any character. The fifteen percent (15%) allowed is
considered to cover the use of hand tools and all overhead expenses except liability
insurance.
In no case will a claim for extra compensation be allowed unless the work
upon which the claim is based has been ordered in writing, exceot as provided
hereinafter.
4. CLAIMS FOR EXTRA COST. If the Contractor claims that any
instructions, by drawings or otherwise, involved extra cost under this contract, he
shall give the Engineer written notice thereof within ten (10) days after completion
of the work.
No such claim shall be valid unless so made.
GENERAL SPECIFICATIONS PAGE 12 OF 18 PAGES
5. CLAIMS FOR EXTRA COMPENSATION. If the Contractor deems
that extra compensation is due him for work and/or materials that he considered is
not clearly covered in the items for which he submitted unit prices in his bid and that
were not ordered in writing by the Engineer as an extra s heretofore provided, the
Contractor shall notify the Engineer, in writing, of his intention to make claim for
extra compensation for work and/or material before starting construction. If such
written notification is not given or the Engineer is not afforded proper facilities by
the Contractor for keeping strict account of actual cost as defined herein, then the
Contractor hereby agrees to waive the claim for extra compensation. Such notice
to the engineer and the fact that the Engineer has kept account of cost as
aforesaid, shall not in any way be construed as proving the validity of the claim,
which must be passed upon by the Council. In the event that the Council finds the
claim to be just, it shall be allowed and paid for as extra work as provided herein.
6. COMPLETION REPORT AND OBJECTIONS THERETO. Within ten
(10) days after the full completion of the work to be done under th s contract, the
Engineer shall make a written statement of all the work done by the Contractor
hereunder, stating the quantity of each item as found by him aid including a
statement of all credits for extra work and all credits or debits for changes,
alterations, omissions, and defects, and shall forthwith deliver a copy of such
statement to the Contractor. The Contractor shall compare such statement with his
own records and shall then, in writing, either approve such statement or point out
any claimed errors or omissions. If any of such claims are found correct, the
Engineer shall, within ten (10) days, prepare a new statement, a copy of which shall
in like manner be delivered unto the Contractor. The Engineer will not file a formal
completion report with the City until the Contractor has approved the same.
If the figures of the Engineer and the Contractor cannot be reconciled, or
there is a difference of opinion regarding some item or items, then such difference
of opinion shall be submitted to arbitration as hereinafter provided, and the decision
of the arbitrator or arbitrators shall be final, and the Engineer shall, within a period
of five (5) days, file his completion report.
Before action by the City Council upon such completion report, the
Contractor shall also file a written statement of any claims he may have against the
City, other than those shown by such completion report, growing out of this contract
or the work done hereunder. The City shall retain ten percent (10%; of the amount
due the Contractor on the completion report for a period of thirty (30) days. If no
claims are filed against the Contractor within thirty (30) days, the final ten percent
(10%) shall then be paid to the Contractor.
7. WAIVER. By the execution of this contract ,the Contractor agrees
that any objections he may have to the statement of the amount of work done
hereunder included by the Engineer in this completion report, and any claims of the
Contractor against the City growing out of this contract and the work done
GENERAL SPECIFICATIONS PAGE 13 OF 18 PAGES
hereunder which are not stated in writing in the manner and within the time
provided in Article 6, Section E hereof, shall be waived, and no such claim shall
thereafter be asserted against the City.
SECTION F - LEGAL RELATIONS AND RESPONSIBILITIES
1. LAWS RELATING TO WORK. The Contractor is p-esumed to be
familiar with all laws, ordinances, and regulations which may, in any manner, affect
those engaged or employed upon the work or the materials or equipment used in or
upon the work, and shall conduct the work so as not to conflict with such laws,
ordinances, and regulations.
2. PROTECTION OF WORK AND PROPERTY. The Contractor for any
part of the improvement shall be held responsible for the care of materials and of
partially completed and completed work until final acceptance of the same by the
Council. He will be required to make good at his own expense any damage which
the work may sustain from any cause prior to the filing of the engineer's certificate
of completion. He shall take all risk from floods and casualties of every description
and make no charge for delay due to such cause. He may, however, be allowed a
reasonable extension of time on account of such delays. He shall correct or make
good at his own expense all damages to adjacent property due to the acts or
negligence of his employees of the prosecution of his work, and save the City
harmless therefor.
The Contractor shall be held liable and responsible for all damages done to
water, sewer, drain, or other underground pipes and structures, and to sidewalks
and private property.
3. RESPONSIBILITY FOR ACCIDENTS. The Contractor shall assume
full responsibility for all damages sustained by persons or property due to the
carrying on of his work until final acceptance thereof, or until released by the
Engineer in writing.
4. LIABILITY INSURANCE. The Contractor shall carry liability insurance
which shall save the City harmless and protect the public and any person from
injury sustained by the reason of the prosecution of the work or the handling or
storing of materials therefor, and said Contractor shall also carry liability insurance
which shall meet the requirements of the Iowa Workmen's Compensation Law.
Before work shall be started on this contract, the Contractor shall furnish the
City Clerk with proper affidavit or Affidavits executed by representatives of duly
qualified insurance companies, evidencing that said insurance company or
companies have issued liability insurance policies, effective during the life of the
contract, or for a period of a least ten (10) days following the filing of written notice
of cancellation, protecting the public and any person from injuries or damages
GENERAL SPECIFICATIONS PAGE 14 OF 18 PAGES
sustained by reason of carrying on the work involved in the Contract. The affidavit
shall specifically evidence the following forms of insurance protection
(a) Public liability insurance covering all operations performed by persons
directly employed by the Contractor.
(b) Public liability insurance covering all operations performed by any
Subcontractor to whom a portion of the work may have been
assigned.
(c) Public liability insurance covering all work upon the project performed
by any independent Contractor working under the direction of either
the principal Contractor or a Subcontractor.
(d) Motor vehicle bodily injury liability insurance and property damage
liability insurance on all motor vehicles employed on the work,
whether owned by the Contractor or by other persons, firms, or
corporations.
(e) The minimum protection shall be as follows:
Comprehensive General Liability Insurance
General Aggregate Limit $5,000,000
Products- Completed Operations
Aggregate Limit $5,000,000
Each Occurrence Limit $5,000,000
Comprehensive Automobile Liability
Insurance $'1,000,000
The contractor shall have the City of Waterloo, Iowa named as an
"Additional Named Insured." A certificate, or a policy if requested, shall be filed with
the owner.
All certificates and/or policies of insurance furnished by the Contractor to be
filed with the City Clerk shall include the name and address of the agency issuing
the same. It shall also be required that the City Clerk be notified by registered mail
of the cancellation or expiration of the above insurance.
5. BARRICADES AND SIGNS. The Contractor shall, at his own
expense and without further or other order, provide, erect, and maintain, at all times
during the progress and suspension of the work and until completion and final
acceptance thereof, suitable and requisite barricades, signs, or other adequate
GENERAL SPECIFICATIONS PAGE 15 OF 18 PAGES
protection, as required by the latest edition of the "Iowa Manual on Uniform Traffic
Control Devices for Streets and Highways" and shall provide, keep, and maintain
such barricades, signs, etc., as may be required or as may be ordered by the City
Engineer, to insure the safety of the public as well as those engaged on the work.
All barricading plans shall be approved by the City Engineer.
6. ROYALTIES AND PATENTS. The Contractor shall pay all royalties
and license fees. He shall defend all suits or claims for infringement of any patent
rights and shall save the City harmless from loss on account thereof, except that
the City shall be responsible for all such loss when a particular process or the
product of a particular manufacturer is specified.
7. PERMITS AND REGULATIONS. Permits and licenses of a
temporary nature for the prosecution of the work shall be secured and paid for by
the Contractor. Permits, license, and easements for permanent changes in existing
facilities shall be secured and paid for by the City.
8. CLAIMS FOR DAMAGES. Any claim for damages arising under this
Contract shall be made in writing to the party liable within a reasonable time of the
first observance of such damage and no later than the time of final payment, except
as expressly stipulated otherwise in the case of faulty work or materials, and shall
be adjusted by agreement or arbitration.
The Contractor shall be held for the payment of all just claims against him
arising out of the prosecution of this contract, and his bond will not be released until
such claims are paid for dismissed.
9. ASSIGNMENT OF CONTRACT. The Contractor sr all not sell or
assign the contract or sublet any portion of the work provided for therein without the
written consent of the City Council.
10. SUBCONTRACTORS. The Contractor shall, as soon as practicable
after the signature of the contract, notify the Engineer in writing of the names of the
Subcontractors proposed for the work and shall not employ any that the Engineer
may, within a reasonable time, object to as incompetent or unfit.
The Contractor agrees that he is as fully responsible to the City for the acts
and omission of his Subcontractors and of persons either directly or indirectly
employed by them as he is for the acts and omissions of persons directly employed
by him.
Nothing contained in the contract documents shall create any contractual
relation between any Subcontractor and the City.
11. ARBITRATION. All questions subject to arbitration under this
Contract shall be submitted to arbitration at the choice of either party to the dispute.
GENERAL SPECIFICATIONS PAGE 16 OF 18 PAGES
The Contractor shall not cause a delay of the work during any arbitration
proceedings, except by agreement with the Engineer.
The demand for arbitration shall be filed in writing with the Engineer, in the
case of an appeal from his decision, within ten (10) days of its receipt, and in any
other case, within a reasonable time after cause thereof, and in no case later than
the time of final payment, except as otherwise expressly stipulated in the contract.
If the Engineer fails to make a decision within a reasonable time an appeal to
arbitration may be taken as if his decision had been rendered against the part
appealing.
No one shall be nominated or act as an arbitrator who is in any way
financially interested in the contract or in the business affairs of either the City or
the Contractor.
The general procedure shall conform to the laws of the State of Iowa.
Unless otherwise provided by such laws, the parties may agree upon one arbitrator;
otherwise, there shall be three--one named in writing by each party to this contract
to the other party, and the third chosen by these two arbitrators, or, if they fail to
select a third within ten (10) days, then he shall be chosen by the Comptroller of the
State of Iowa. Should either party refuse or neglect to supply the arbitrators with
any papers or information demanded in writing, the arbitrators are empowered by
both parties to proceed ex parte.
If there be one arbitrator, his decision shall be binding; if three, the decision
of any two shall be binding. Such decision shall be a condition precedent to any
right of legal action, and, wherever permitted by law, it may be filed in Court to carry
it into effect.
The arbitrators, if they deem that the case demands it, are authorized to
award to the party whose contention is sustained such sums as they shall deem
proper for the time, expense, and trouble incident to the appeal, and, if the appeal
was taken without reasonable cause, damages for delay, the arbitrators shall fix
their own compensation unless otherwise provided by agreement, and shall assess
the costs and charges of the arbitration upon either or both parties.
The award of the arbitrators must be in writing, and it shall not be open to
objections on account of the form of proceeding or the award, unless otherwise
provided by the laws of Iowa.
In the event of such laws providing on any matter covered by this article
otherwise than as hereinbefore specified, the method of procedure throughout and
the legal effect of the award shall be wholly in accordance with the laws of the State
of Iowa, it being intended hereby to lay down a principle of action to be followed,
GENERAL SPECIFICATIONS PAGE 17 OF 18 PAGES
leaving its local application to be adopted to the legal requirements of the place in
which the work is to be done.
12. PERFORMANCE BOND. The Contractor shall, at the time of
execution and delivery of this contract and before the taking effect of same, furnish
and deliver to the City a written bond of indemnity to the amount required by law in
form and substance, and with surety thereon satisfactory and acceptable to the
City, to insure the faithful performance by the Contractor of all the covenants and
agreements on the part of the Contractor contained in this contract. This bond shall
remain in force and effect for the full amount of the Contract.
13. PERSONAL LIABILITY OF PUBLIC OFFICIALS. In carrying out any
of the provisions of the Contract or in exercising any power or authority granted him
thereby, there shall be no liability upon the Engineer or his authorized assistants,
either personally or as an official of the City, it being understood that in such
matters he acts as the agent and representative of the City.
14. JURISDICTION. Any action in Court against the Contractor or
sureties on his bond because of damages to property or individuals by said
Contractor or his workmen, or because of the violation of any provisions of the
specifications, or on account of the failure of said Contractor to comply fully with
these provisions, shall be brought in the District Court of the State of Iowa in and for
Black Hawk County.
15. TERMINATION OF RESPONSIBILITY. The Contract shall be
considered as completed and the Contractor released from further obligations
except as to the requirements of his bond, after the work has been completed and
finally accepted and final estimates have been allowed and the completion report of
the engineer has been filed and approved by the Council.
16. CITY'S LEGAL RIGHTS. The City shall not be precluded by any
measurements, estimate, or certificate made, either before or after the completion
and acceptance of the work and payment therefor, from showing the true amount
and character of the work performed and materials furnished by the Contractor, or
from showing that any such measurement, estimate, or certificate is untrue or
incorrectly made, or the work or materials do not, in fact, conform to the Contract.
The City shall not be precluded, notwithstanding any such measurements,
estimate, or certificate and payment in accordance therewith, from recovering from
the Contractor and his surety such damages as it may sustain by reason of his
failure to comply with the terms of the Contract. Neither the acceptance by the City
or any of its representatives, nor any payment for or acceptance of the whole or any
part of the work, nor any extension of time, nor any possession taken by the City,
shall operate as a waiver on any portion of the contract or of any power herein
reserved, or any right to damages herein provided. A waiver of any breach of the
contract shall not be held to be a waiver of any other or subsequent h reach.
GENERAL SPECIFICATIONS PAGE 18 OF 18 PAGES
SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION
1. SUBCONTRACTS
The contractor shall cause appropriate provisions to be inserted in all
subcontracts relative to the work to require compliance by each
subcontractor with the applicable provisions of the contract for the
improvements embraced in this contract.
2. REVIEW BY THE CITY OF WATERLOO
The City of Waterloo, its authorized representatives and agents, shall at all
times have access to and be permitted to observe and review all work,
materials, equipment, payrolls, personnel records, employment conditions,
material invoices, and other relevant data and records pertaining to this
contract, provided, however, that all instructions and approval with respect
to the work will be given to the contractor only by the City of Waterloo
through it authorized representative or agents.
3. INSPECTION
a. The contractor shall furnish promptly all materials reasonably
necessary for any tests which may be required. All tests by the City
of Waterloo will be performed in such manner as not to delay the
work unnecessarily and will be made in accordance with the
provisions of the Technical Specifications.
b. Inspection of materials and appurtenances to be incorporated in the
improvements embraced in this contract may be made at the place of
production, manufacture or shipment, whenever the quantity justifies
it, and such inspection and acceptance, unless otherwise stated in
the Technical Specifications, shall be final, except as regards (1)
latent defects, (2) departures from specific requirements of the
contract, (3) damage or loss in transit, or (4) fraud or such gross
mistakes as amount to fraud. Subject to the requirements contained
in the preceding sentence, the inspection of materials as a whole or
in part will be made at the project site.
4. WARRANTY OF TITLE
No material, supplies, or equipment to be installed or furnished under this
contract shall be purchased subject to any chattel mortgage or under a
conditional sale, lease-purchase or other agreement by which an interest
therein or in any part thereof is retained by the seller or supplier. The
contractor shall warrant good title to all materials, supplies, and equipment
SUPPLEMENTAL GENERAL SPECS FOR CONSTRUCTION PAGE ' OF 2 PAGES
installed or incorporated in the work and upon completion of all work, shall
deliver the same together with all improvements and appurtenances
constructed or placed thereon by him to the City of Waterloo free from any
claims, liens, or charges. Neither the contractor nor any person, firm, or
corporation furnishing any material or labor for any work covered by this
contract shall have any right to a lien upon any improvement or
appurtenance thereon. Nothing contained in this paragraph, however, shall
defeat or impair the right of persons furnishing materials or labor to recover
under any bond given by the contractor for their protection or any rights
under any law permitting such persons to look to funds due the contractor in
the hands of the City of Waterloo. The provisions of this paragraph shall be
inserted in all subcontracts and material contracts and nnotice of its
provisions shall be given to all persons furnishing materials for the work
when no formal contract is entered into for such materials.
SUPPLEMENTAL GENERAL SPECS FOR CONSTRUCTION PAGE 2 OF 2 PAGES
FORM OF CONTRACT
CONTRACT FOR THE CONSTRUCTION OF
F.Y. 2007 CYCLONE DRIVE/TITAN TRAIL
CITY OF WATERLOO, IOWA
CONTRACT NO. 727
This contract made and entered into this day of
, by and between the City of Waterloo, Iowa, a Municipal
Corporation, (hereinafter referred to as City), and
of , (hereinafter referred to as
Contractor), WITNESSETH:
PAR. 1 Contractor agrees to build and construct the
and furnish all necessary tools, equipment, materials, and labor necessary
to do all the work called for in the plans and specifications in a
workmanshiplike manner and for the prices set forth in Contractor's
proposal, which was accepted by the City, and which is understood and
agreed to be a part of this contract.
PAR. 2 It is understood and agreed that the resolution adopted by the City
Council ordering the construction of the improvement, the Notice to
Contractors as published, the Instruction to Bidders, the Form of Proposal,
the Construction and Maintenance Bonds, the Council Proceedings
relating to this matter, and the Plans and Specifications shall all be
considered as forming a part of the contract the same as though they
were each set out in said contract.
PAR. 3 The Contractor agrees to furnish at its own cost and expense, all
necessary materials and labor for said work and to construct said
improvements in a thorough, substantial, and workmanlike manner, and in
strict accordance with the requirements of this contract, and of the plans
and specifications made a part hereof by reference, and to the satisfaction
and approval of the City and its engineer.
FORM OF CONTRACT PAGE 1 OF 5 PAGES
PAR. 4 The Contractor agrees to perform said work and install said improvements
on the terms set out in bid or proposal to the Cit/ which has been
accepted by the City and which is by reference made a part of this
contract.
PAR. 5 The Contractor agrees to commence said work within ten (10) working
days after receipt of "Notice to Proceed" and complete it on or before
August 31, 2007, unless an extension of time is granted in writing by the
Council of the City.
PAR. 6 Should the Contractor fail to complete said improvements in strict
accordance with the terms and conditions of this contract, or the plans
and specifications therefor promptly by the date herein specified, the City
may pay such additional sums as it may be required to pay by reason of
the failure of said contractor and deduct any and all such sums from any
amount then due the Contractor.
PAR. 7 The Contractor agrees to comply with and obey all orainances of the City
of Waterloo, Iowa, relating to the obstruction of streets and alleys, keeping
open passage ways for water, traffic, and protecting any excavations in
any street or alley, and maintaining proper and sufficient barricades with
lights and signals during all hours of darkness, to see that the backfilling is
properly done, and agrees to keep the City whole and defend any and all
suits that may be brought against the City by reason of any injuries that
may be sustained by any person or property allegedly caused by the
Contractor, or his agents, while work is done pursuant to this agreement.
PAR. 8 The Contractor agrees that in the event a law suit is brought against the
City for damages allegedly sustained by reason of any act, omission or
negligence of the Contractor or its agents, or on account of any injuries
allegedly sustained by reason of any obstruction, hole, depression or
barrier placed or dug by the defendant or its agents, in the doing of the
work herein contracted for, that it will defend said suit and save the City
harmless therein, and in case judgment is rendered against the City, the
Contractor agrees to pay the same promptly. The Contractor agrees to
carry public liability insurance in a solvent company in a sufficient amount
to protect the City and those who use the streets of the City.
PAR. 9 The City shall have the right to appoint one or more construction
reviewers who shall review the progress of the work in detail; also, to
make any test or any material to be used in such work. No material shall
be used in any work until the same has first been approved by the
construction reviewer. Such construction reviewer shall have full authority
to pass judgment upon all materials and upon the manner of doing the
FORM OF CONTRACT PAGE 2 OF 5 PAGES
work, and their judgment on rejecting any materials, substance, or
manner of work shall be final unless it is revoked or modified by the City
Engineer.
PAR. 10 Any material which has been rejected by the construction reviewer shall
be at once removed from the line of work and shall riot be again taken
thereon or placed with the material proposed to be used without the
written consent of the City Engineer.
PAR. 11 The Contractor shall maintain no cause of action against the City on
account of delays and prosecution of work, but if said work is delayed by
the City, the Contractor shall have such extra time for completion of the
job as was lost by reason of the delay caused by the Ci-y.
PAR. 12 The Contractor agrees to pay punctually all just claims of labor, material,
men, or subcontractors who shall perform labor or furnish materials
entering into this improvement. It is agreed that the City need not pay the
Contractor until all such claims are paid by the Contractor. It is agreed
that the City shall not be liable for said labor, material, or men under this
contract.
PAR. 13 The Contractor agrees to furnish the City, simultaneously with this
contract, a bond on a form to be provided by the City in the amount
provided by law as stated in the Notice to Bidders, which shall be for the
benefit of the City, and any and all persons injured by the breach of any of
the terms of this contract. Said bond shall be filed with the City Clerk and
shall be subject to the approval of the City Council, and is by reference
made a part of this contract.
PAR. 14 The Contractor agrees that should it abandon work under this contract or
cease the prosecution thereof for a period of thirty (30) consecutive days
without reasonable cause, and should it fail to proceed with said work
within ten (10) days after a notice to continue or carry it on has been
mailed to it at the address given herein by the City, or after such notice
has been served on it, then the City may proceed to complete said work,
using any material, tools, or machinery found along said line of work,
doing the work either by contract or as it may elect, and the Contractor
and the sureties on its bond shall be liable to the City for the costs and
expenses so paid out. Said costs shall be retained by the City from any
compensation due, or to become due the Contractor, and may be
recovered by the City in an action upon Contractor's bond.
PAR. 15 In consideration of the full compliance on the part of the Contractor with all
the provisions, stipulations, and conditions hereof, cr contained in the
various instruments made a part of this contract by reference, and upon
FORM OF CONTRACT PAGE 3 OF 5 PAGES
completion and acceptance of said work, the City agrees to pay to the
Contractor, in the manner set out in the Notice to Contractors, the amount
of money due the Contractor for work performed and accepted, at the unit
prices set out in the Contractor's proposal, which has been accepted by
the City.
PAR. 16 The total amount of the contract, based on the Eng neer's estimates of
quantities and the Contractor's unit bid prices, and for which 100% surety
bond is required is $
PAR. 17 After the completion of said work, the Contractor ac rees to remove all
debris and clean up said streets, and to save the City harmless from any
damage allegedly resulting from a failure to clean up and remove the
debris or put the street back in a proper condition for travel.
PAR. 18 This contract is not divisible, but in the event of a conflict between this
contract and the various instruments incorporated by reference, this
contract shall govern.
PAR. 19 Before the Contractor shall be entitled to receive final payment for work
done under this contract, it shall execute and file a bond in the penal sum
of not less than 100% of the total amount of the contract, same to be
known as "Maintenance Bond," and which bond must be approved by the
City Council, and which bond is in addition to the bond given by the
Contractor to guarantee the completion of the work.
PAR. 20 The Contractor shall maintain all work done hereunder in good order for
the period of two (2) years from and after the date its accepted by the
Council of the City of Waterloo, Iowa. Said maintenance shall be made
without expense to the City or the abutting property. In the event of the
failure or default of the Contractor to remedy any or all defects appearing
in said work within a period of two (2) years from the date of its
acceptance by said Council, and after having been given ten (10) days
notice so to do by registered letter deposited in the United States Post
Office in said town, addressed to said contractor at the address herein
given, then the City may proceed to remedy such defects. The costs and
expenses thereof to be recovered from the Contractor and the sureties on
its maintenance bond by an action brought in any court of competent
jurisdiction.
PAR. 21 The Contractor shall give notice to said City by registered letter directed to
the Mayor or City Clerk/Auditor thereof not more than four (4) and not less
than three (3) months prior to the expiration of the term during which the
Contractor is required to maintain said improvements, in good repair by
the terms of its Contract. The liability of the Contractor and of the sureties
FORM OF CONTRACT PAGE 4 OF 5 PAGES
on its bond for maintenance of the said improvements shall continue until
three (3) months after such notice has been given to he City, and, in any
event, until two (2) years after the acceptance of the work.
CITY OF WATERLOO, IOWA
Mayor
City Clerk
Contractor
BY:
Title:
Approved by the City Council of the City of Waterloo, Iowa, this
day of , 2007.
ATTEST: , City Clerk
Waterloo, Iowa
FORM OF CONTRACT PAGE 5 OF 5 PAGES
KNOW ALL MEN BY THESE PRESENTS:
That we, of
(hereinafter called the Principal), and of
(hereinafter calleca the Surety),
are held and firmly bound unto the City of Waterloo (hereinafter called the
Obligee), in the penal sum of
Dollars ($ ), lawful money of the United States, to
payment of which sum, well and truly to be made, the Principal here firmly
binds himself/themselves, his/their heirs, executors, and administrators, and
the said Surety binds himself, his successors, assigns, executors, and
administrators, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that, WHEREAS the above
bounden Principal did, on the day of 2007,
enter into a written contract with the City of Waterloo, Iowa, for the
construction of F.Y. 2007 CYCLONE DRIVE/TITAN TRAIL, Contract No. 727
a copy of which contract, together with all of its terms, covenants, conditions, and
stipulations, is incorporated herein and made a part hereof as full and completely as
if said contract were recited at length herein; and
WHEREAS, the Principal and Surety on this bond hereby agree to pay to all
persons, firms or corporations having contracts directly with the Principal or with
subcontractors, all just claims due them for labor performed or materials furnished in
the performance of the contract on account of which bond is given when the same
are not satisfied out of the portion of the contract price which the public corporation is
required to retain until completion of the public improvement, but the Principal and
Surety shall not be liable to said persons, firms, or corporation unless the claims of
said claimants against said portion of the contract price shall have been established
as provided by law.
BOND PAGE 1 OF 2 PAGES
Now, if the Principal shall in all respects fulfill his said contract according to the
terms and tenor thereof, and shall satisfy all claims and demands incurred for the
same, and shall fully indemnify and save harmless the Obligee from all costs and
damages which it may suffer by reason of failure to do so, and shall fully reimburse
and repay the Obligee all outlays and expenses which it may incur in making good
any such default, then the obligation is to be void and of no effect, otherwise to
remain in full force and effect.
Every Surety on this bond shall be deemed and held, any contract to the
contrary notwithstanding, to consent without notice:
1. To any extension of time to the contract in which to perform the
contract.
2. To any change in the plans, specifications, or contract when such
change does not involve an increase of more than twenty percent
(20%) of the total contract price, and shall then be released only as to
such excess increase.
3. That no provision of this bond or of any other contract shall be valid
which limits to less than two (2) years from the time of the acceptance
of the work the right to sue on this bond for defect in workmanship or
material not discovered or known to the Obligee at the time such work
was accepted.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this
day of , 2007.
Principal
By:
Surety
Attorney-in-Fact
BOND PAGE OF 2 PAGES
— PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: that
— (Name of Contractor)
(Address of Contractor)
a , hereinafter called Principal,
(Corporation,Partnership or Individual)
and
(Name of Surety)
(Address of Surety)
hereinafter called Surety, are held and firmly bound unto
(Name of Owner)
(Address of Owner)
hereinafter called OWNER, in the penal sum of Dollars, $( )
in lawful money of the United States, for the payment of which sum well and truly to be made,
we bind ourselves, successors, and assigns,jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a
certain contract with the OWNER, dated the day of
20 , a copy of which is hereto attached and made a part hereof for the construction of:
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms,
SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the
prosecution of the WORK provided for in such contract, and any authorized extension or
modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and
coke, repairs on machinery, equipment and tools, consumed or used in connection with the
construction of such WORK, and all insurance premiums on said WORK, and for all labor,
performed in such WORK whether by SUBCONTRACTOR or otherwise, then this obligation
shall be void; otherwise to remain in full force and effect.
—
PROVIDED,no change, that the said Sure
WORK to b ge, extension of time, Surety for v
performed alterationvalue received any wise need thereunder or or additionhereby
affect its obligation on the SPECIFICATIONS
to the terms of the stipulates and agreestime, this
_ me, alteration , and it does
NS accompanying
or to the
SPECIFICATIONS nor addition to the terms o es hereby Pany1ng the same shall in
f the y Waive notice of
PROVIDED, contract or to the WORK
such change,
shall abridge FURTHER, that no final sett � or to the
ge the right of any beneficiary settlement between clai OWNER and the CONTRACTOR
NTRACTOR
_ HEREOF, this instrument ism may be unsatisfied.
which shall be deemed executed in
2= an original, this the (n counterparts, each
one of
day of
ATTEST:
(Principal)Secretary Principal
(SEAL)
By
(s)
(Address)
Witness as to Principal
(Address)
ATTEST:
Surety
By
Witness as to Surety
Attorney-in-Fact
( (Address)
(Address)
If NOTE:
Date of BOND
prior
OR is p must not bedate
— RACT Partnership, to of Contract.
.
gip, all partners should execute BOND.