Loading...
HomeMy WebLinkAboutLETTER FROM VJ ENINEERING vj engineering 463 northland dr. NE suite #202 cedar rapids, iowa 52402 ph: (319) 447-2222 fax: (319) 447-2229 engineering—surveying June 22, 2007 City of Waterloo Attn: Louis Cutwright, Jr. Building Department 715 Mulberry Street Waterloo, IA 50703 RE: F.Y. 2007 Waterloo Roof Repair Program, Contract No.731 Dear Lou; Per the attached letter we are formally requesting an increase of our design fees from Lump Sum fee of$21,500 to $25,500 (an increase of$4,000)to cover the additional work outlined in the letter. We do not anticipate any increase in our construction services fee due to this additional design work. If this amendment to our original proposal is acceptable, please sign below and return one signed copy to our Cedar Falls office. Amendment to VJ Engineering Consultant Agreement dated February 5, 2007 increasing lump sum design fee of$21,500 to $25,500. Agreed to by; Darrell L. Smith,P.E., RRC, Vice-President TE VJ Engineering Accepted By, e7 CLIENT-City of Water o DATE