FORM OF CONTRACT
CONTRACT FOR THE CONSTRUCTION OF
F.Y.2008 WEST COMMERCIAL STREET STORM WATER PUMPS
CITY OF WATERLOO,IOWA
CONTRACT NO. 750
This contract made and entered into this 4 day of il L 5 t r,S I— , 200K by and between the City
of Waterloo,Iowa,a Municipal Corporation,(hereinafter referred to as City), and
ELECTRIC PUMP,INC. of Des Moines ,Iowa, (hereinafter referred to as
Contractor),
WITNES SETH:
PAR. 1 Contractor agrees to build and construct the F.Y.2008 WEST COMMERCIAL
STREET STORM WATER PUMPS,(BASE BID+ALTERNATE 2),and furnish
all necessary tools,equipment,materials,and labor necessary to do all the work called
for in the plans and specifications in a workmanship like manner and for the prices set
forth in Contractor's proposal,which was accepted by the City,and which is understood
and agreed to be a part of this contract.
PAR. 2 It is understood and agreed that the resolution adopted by the City Council ordering the
construction of the improvement,the Notice to Contractors as published,the Instruction
to Bidders,the Form of Proposal,the Construction and Maintenance Bonds,the Council
Proceedings relating to this matter, and the Plans and Specifications shall all be
considered as forming a part of the contract the same as though they were each set out in
said contract.
PAR. 3 The Contractor agrees to furnish at its own cost and expense,all necessary materials and
labor for said work and to construct said improvements in a thorough, substantial,and
workmanlike manner, and in strict accordance with the requirements of this contract, and
of the plans and specifications made a part hereof by reference, and to the satisfaction
and approval of the City and its Engineer.
PAR. 4 The Contractor agrees to perform said work and install said improvements on the terms
set out in bid or proposal to the City which has been accepted by the City and which is
by reference made a part of this contract.
PAR. 5 The Contractor agrees to commence said work within ten(10)working days after receipt
of"Notice to Proceed".
FORM OF CONTRACT CONTRACT NO.750 PAGE 1 OF 5
Equipment shall be delivered to the project site within the following time periods after
issuance of a Notice to Proceed by the City:
Delivery time after issuance
Items of Notice to Proceed by City
1. Pump base elbows,guide bars, access covers,
level sensing equipment and appurtenant items,
for all four(4)pumps. 14 weeks
2. All pumps and appurtenant items, for the Base Bid,
Base Bid plus the Alternate No. 1 Bid or the Base
Bid plus the Alternate No. 2 Bid. 26 weeks
3. Motor control center,variable frequency drives
and all other equipment and appurtenant items for the
Base Bid,Base Bid plus Alternate No. 1 Bid or Base
Bid plus the Alternate No. 2 Bid. 26 weeks
The above delivery times are for the Base Bid and the Base Bid plus either Alternate Bid.
unless an extension of time is granted in writing by the Council of the City.
PAR. 6 Should the Contractor fail to complete said improvements in strict accordance with the
terms and conditions of this contract, or the plans and specifications therefore promptly
by the date herein specified,the City may pay such additional sums as it may be required
to pay by reason of the failure of said contractor and deduct any and all such sums from
any amount then due the Contractor.
PAR. 7 The Contractor agrees to comply with and obey all ordinances of the City of Waterloo,
Iowa,relating to the obstruction of streets and alleys,keeping open passage ways for
water,traffic,and protecting any excavations in any street or alley, and maintaining
proper and sufficient barricades with lights and signals during all hours of darkness,to
see that the backfilling is properly done,and agrees to keep the City whole and defend
any and all suits that may be brought against the City and/or Engineer by reason of any
injuries that may be sustained by any person or property allegedly caused by the
Contractor,or his agents,while work is done pursuant to this agreement.
PAR. 8 The Contractor agrees that in the event a law suit is brought against the City and/or
Engineer for damages allegedly sustained by reason of any act,omission or negligence of
the Contractor or its agents, or on account of any injuries allegedly sustained by reason of
any obstruction,hole,depression or barrier placed or dug by the defendant or its agents,
in the doing of the work herein contracted for,that it will defend said suit and save the
City harmless therein, and in case judgment is rendered against the City,and/or
Engineer,the Contractor agrees to pay the same promptly. The Contractor agrees to
carry public liability insurance in a solvent company in a sufficient amount to protect the
City and/or Engineer and those who use the streets of the City.
PAR. 9 The City shall have the right to appoint one or more construction reviewers who shall
review the progress of the work in detail; also,to make any test or any material to be
FORM OF CONTRACT CONTRACT NO.750 PAGE 2 OF 5
f ;
used in such work. No material shall be used in any work until the same has first been
approved by the construction reviewer. Such construction reviewer shall have full
authority to pass judgment upon all materials and upon the manner of doing the work,
and their judgment on rejecting any materials, substance,or manner of work shall be
final unless it is revoked or modified by the City Engineer.
PAR. 10 Any material which has been rejected by the construction reviewer shall be at once
removed from the line of work and shall not be again taken thereon or placed with the
material proposed to be used without the written consent of the City Engineer.
PAR. 11 The Contractor shall maintain no cause of action against the City on account of delays
and prosecution of work,but if said work is delayed by the City,the Contractor shall
have such extra time for completion of the job as was lost by reason of the delay caused
by the City.
PAR. 12 The Contractor agrees to pay punctually all just claims of labor,material,men, or
subcontractors who shall perform labor or furnish materials entering into this
improvement. It is agreed that the City need not pay the Contractor until all such claims
are paid by the Contractor. It is agreed that the City shall not be liable for said labor,
material, or men under this contract.
PAR. 13 The Contractor agrees to furnish the City, simultaneously with this contract,a bond on a
form to be provided by the City in the amount provided by law as stated in the Notice to
Bidders,which shall be for the benefit of the City, and any and all persons injured by the
breach of any of the terms of this contract. Said bond shall be filed with the City Clerk
and shall be subject to the approval of the City Council, and is by reference made a part
of this contract.
PAR. 14 The Contractor agrees that should it abandon work under this contract or cease the
prosecution thereof for a period of thirty(30) consecutive days without reasonable cause,
and should it fail to proceed with said work within ten(10)days after a notice to
continue or carry it on has been mailed to it at the address given herein by the City, or
after such notice has been served on it,then the City may proceed to complete said work,
using any material,tools, or machinery found along said line of work, doing the work
either by contract or as it may elect, and the Contractor and the sureties on its bond shall
be liable to the City for the costs and expenses so paid out. Said costs shall be retained
by the City from any compensation due, or to become due the Contractor,and may be
recovered by the City in an action upon Contractor's bond.
PAR. 15 In consideration of the full compliance on the part of the Contractor with all the
provisions, stipulations,and conditions hereof, or contained in the various instruments
made a part of this contract by reference,and upon completion and acceptance of said
work,the City agrees to pay to the Contractor,in the manner set out in the Notice to
Contractors,the amount of money due the Contractor for work performed and accepted,
at the unit prices set out in the Contractor's proposal,which has been accepted by the
City.
FORM OF CONTRACT CONTRACT NO.750 PAGE 3 OF 5
PAR. 16 The total amount of the contract,based on the Engineer's estimates of quantities and the
Contractor's unit bid prices,and for which 100%surety bond is required is$730,281.00.
PAR. 17 After the completion of said work,the Contractor agrees to remove all debris and clean
up said streets,and to save the City and/or Engineer harmless from any damage allegedly
resulting from a failure to clean up and remove the debris or put the street back in a
proper condition for travel.
PAR. 18 This contract is not divisible,but in the eventof a conflict between this contract and the
various instruments incorporated by reference,this contract shall govern.
PAR. 19 Before the Contractor shall be entitled to receive final payment for work done under this
contract, it shall execute and file a bond in the penal sum of not less than 100%of the
total amount of the contract, same to be known as "Maintenance Bond," and which bond
must be approved by the City Council, and which bond is in addition to the bond given
by the Contractor to guarantee the completion of the work.
PAR. 20 The Contractor shall maintain all work done hereunder in good order for the period of
two(2)years from and after the date it is accepted by the Council of the City of
Waterloo, Iowa. Said maintenance shall be made without expense to the City or the
abutting property. In the event of the failure or default of the Contractor to remedy any
or all defects appearing in said work within a period of two (2)years from the date of its
acceptance by said Council, and after having been given ten(10)days notice so to do by
registered letter deposited in the United States Post Office in said town, addressed to said
contractor at the address herein given,then the City may proceed to remedy such defects.
The costs and expenses thereof to be recovered from the Contractor and the sureties on
its maintenance bond by an action brought in any court of competent jurisdiction.
PAR.21 The Contractor shall give notice to said City by registered letter directed to the Mayor or
City Clerk/Auditor thereof not more than four(4)and not less than three(3)months
prior to the expiration of the term during which the Contractor is required to maintain
said improvements,in good repair by the tenus of its Contract. The liability of the
Contractor and of the sureties on its bond for maintenance of the said improvements
shall continue until three(3)months after such notice has been given to the City,and, in
any event,until two(2)years after the acceptance of the work.
PAR 22 The Contractor shall comply with E.O. 11246,"Equal Employment Opportunity,"as
amended by E.O. 11375, "Amending Executive Order 11246 Relating to Equal
Employment Opportunity,"and as supplemented by regulation at 41 CFR part 60,
"Office of Federal Contract Compliance Programs,Equal Employment Opportunity,
Department of Labor."
PAR 23 The Contractor shall comply with all applicable standards,orders or regulations issued
pursuant to the Clean Air Act(42 U.S.C. 7401 et. seq.),and the Federal Water Pollution
Control Act(33 U.S.C. 1251 et. seq.).
FORM OF CONTRACT CONTRACT NO.750 PAGE 4 OF 5
CITY WAT RLOO,IOWA
Mayor 4 rn
City C erk
•
•
AGISY ‘)\n"--f) 7...-?"-C-
Contractor
BY: L ��
Title: j" ' ifsihtz-
44\
Approved by the City Council of the City of Waterloo,Iowa,this '/ day of pu.5us ?' , 200
� ATTES , City Clerk, Waterloo,Iowa
•
i
FORM OF CONTRACT CONTRACT NO.750 PAGE 5 OF 5
PERFORMANCE BOND
Bond Number IAi. 87633
KNOW ALL MEN BY THESE PRESENTS:
That we, ELECTRIC PUMP, INC., of Des Moines, Iowa (hereinafter called
the Principal), and Merchants Bonding Company
Of 2100 Fleur Drive, Des Moines IA 50321
(hereinafter called the Surety), are held and firmly bound unto the City of Waterloo
(hereinafter called the Obligee), in the penal sum of Seven Hundred -Thirty
Thousand Two Hundred Eighty-One and 00/100 Dollars
($730,281.00), lawful money of the United States, to payment of which sum, well
and truly to be made, the Principal here firmly binds himself/themselves, his/their
heirs, executors, and administrators, and the said Surety binds himself, his
successors, assigns, executors, and administrators, jointly and severally, firmly by
these presents.
THE CONDITION OF THIS OBLIGATION is such that,
WHEREAS the above bounden Principal did, on the day of
, 20_, enter into a written contract with the City
of Waterloo, Iowa, for the construction of F.Y. 2008 West Commercial Street
Storm Water Pumps, (Base Bid + Alternate 2) , a copy of which contract,
together with all of its terms, covenants, conditions, and stipulations, is incorporated
herein and made a part hereof as full and completely as if said contract were recited
at length herein; and
WHEREAS, the Principal and Surety on this bond hereby agree to pay to all
persons, firms or corporations having contracts directly with the Principal or with
subcontractors, all just claims due them for labor performed or materials furnished in
the performance of the contract on account of which bond is given when the same
are not satisfied out of the portion of the contract price which the public corporation
is required to retain until completion of the public improvement, but the Principal and
Surety shall not be liable to said persons, firms, or corporation unless the claims of
said claimants against said portion of the contract price shall have been established
as provided by law.
Now, if the Principal shall in all respects fulfill his said contract according to
the terms and tenor thereof, and shall satisfy ail claims and demands incurred for
the same, and shall fully indemnify and save harmless the Obligee from all costs
and damages which it may suffer by reason of failure to do so, and shall fully
reimburse and repay the Obligee all outlays and expenses which it may incur in
making good any such default, then the obligation is to be void and of no effect,
otherwise to remain in full force and effect.
FORM OF BOND
PAGE 1 OF 2 PAGES
Every Surety on this bond shall be deemed and held, any contract to the
contrary notwithstanding, to consent without notice:
1. To any extension of time to the contract in which to perform the
contract.
2. To any change in the plans, specifications, or contract when such
change does not involve an increase of more than twenty percent
(20%) of the total contract price, and shall then be released only as to
such excess increase.
3. That no provision of this bond or of any other contract shall be valid
which limits to less than one (1) year from the time of the acceptance
of the work the right to sue on this bond for defect in workmanship or
material not discovered or known to the Obligee at the time such work
was accepted.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this
day of 20 .
Electric Pump, Inc.
Principal
By:
dwkQ,S r v1 i C
Merchants Bonding Company (Mutual)
Surety
Attorney-In-Eadt Mancy D. Schwarz
FORM OF BOND PAGE 2 OF 2 PAGES
PAYMENT BOND
Bond Number IAC 87633
KNOW ALL MEN BY THESE PRESENTS: that
Electric Pump, Inc.
(Name of Contractor)
4280 NE 14 Street, Des Moines IA 50313
(Address of Contractor)
a Corporation , hereinafter called Principal,
(Corporation,Partnership or Individual)
and Merchants Bonding Company (Mutual)
(Name of Surety)
2100 Fleur Drive, Des Moines IA 50321
(Address of Surety)
hereinafter called Surety, are held and firmly bound unto City of Waterloo
(Name of Owner)
(Address of Owner)
)
hereinafter called OWNER, in the penal sum of $730,281.00 Dollars, $(730,281.00
in lawful money of the United States, for the payment of which sum well and truly to be made,
we bind ourselves, successors, and assigns,jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a
certain contract with the OWNER, dated the day of
20 , a copy of which is hereto attached and made a part hereof for the construction of:
F. Y. 2008 West Commercial Street Storm Water Pumps, (Base Bid + Alternate 2)
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms,
SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the
prosecution of the WORK provided for in such contract, and any authorized extension or
modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and
coke, repairs on machinery, equipment and tools, consumed or used in connection with the
construction of such WORK, and all insurance premiums on said WORK, and for all labor,
performed in such WORK whether by SUBCONTRACTOR or otherwise, then this obligation
shall be void; otherwise to remain in full force and effect.
Fed-funded
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the contract or to the
WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in
any wise affect its obligation on this BOND, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of the contract or to the WORK or to the
SPECIFICATIONS.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
IN WITNESS HEREOF, this instrument is executed in 3 counterparts, each one of
jnumber)
which shall be deemed an original, this the 11 day of
20 O$ .
ATTEST:
Electric Pump, Inc.
Principal
dii4t4c_tNksac -C64 Qick_
(Principal)Secretary
(SE4 7 KATHLEEN HATFIELp By . , 7 (s)
ow:,
%cmmission
Number 185298
Ply m
4280 NE 14th Street
(Address)
Des Moines IA 50313
Plro
Witne•,as tg .ncipal
(Address)
Merchants Bonding Company (Mutual)
Surety
ATTEST: By ,
<` Attorney-in-Fact Nancy D. Schwarz
c�-(-`�t fa,A 4200 University Avenue #200
Witness as to Surety (Address)
4200 University Ave #200 West Des Moines IA 50266
West Des Moines (Address) IA 50266
NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is Partnership, all partners should execute BOND.
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's
most current list (Circular 570 as amended) and be authorized to transact business in the State
where the PROJECT is located.
Fed-funded
Merchants Bonding Company
(Mutual)
POWER OF ATTORNEY
Know All Persons By These Presents,that the MERCHANTS BONDING COMPANY(MUTUAL),a corporation du y organized under
the laws of the State of Iowa,and having its principal office in the City of Des Moines,County of Polk,State of Iowa,bath made,
constituted and appointed,and does by these presents make,constitute and appoint
F.Melvyn Hrubetz,Greg T.LaMair,Joyce O.Herbert,Nancy D.Schwarz,Mark B.Keairnes,
Patrick K.Duff,Jeffrey R.Baker,Joseph I.Scbmit
of Des Moines and State of Iowa its true and lawful Attorney-in-Fact,with full power
and authority hereby conferred in its name,place and stead,to sign,execute,acknowledge and deliver in its behalf as surety any
and all bonds,undertakings,recognizances or other written obligations in the nature thereof,subject to the limitation that any such
instrument shall not exceed the amount of:
TEN MILLION($10,000,000.00)DOLLARS
and to bind the MERCHANTS BONDING COMPANY(MUTUAL)thereby as fully and to the same extent as if such bond or
undertaking was signed by the duly authorized officers of the MERCHANTS BONDING COMPANY(MUTUAL),and all the acts of
said Attorney-In-Fact,pursuant to the authority herein given,are hereby ratified and confirmed.
This Power-of-Attorney is made and executed pursuant to and by authority of the following Amended Substituted and Restated By-
Laws adopted by the Board of Directors of the MERCHANTS BONDING COMPANY(MUTUAL)on November 18,2002.
ARTICLE II,SECTION 8-The Chairman of the Board or President or any Vice President or Secretary shall have power and
authority to appoint Attorneys-in-Fact,and to authorize them to execute on behalf of the Company,and attach the Seal of the
Company thereto,bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature
thereof.
ARTICLE II,SECTION 9-The signature of any authorized officer and the Seal of the Company may be affixed by facsimile
to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking,
recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the
same force and effect as though manually fixed.
In Witness Whereof,MERCHANTS BONDING COMPANY(MUTUAL)has caused these presents to be signed by its President and
its corporate seal to be hereto affixed,this 16th day of January,2006.
••• ,0.
•
03... ....erA. MERCHANTS BONDING COMPANY(MUTUAL)
:•O,.RPOR ,y•• •
•.'a'. 1933 .,;
e' 7 7yt•(7 ,`1�C i• By
STATE OF IOWA ••. �r •
.•
COUNTY OF POLK as. President
On this 16th day of January,2006,before me appeared Larry Taylor,tome personally known,who being by me duly sworn did say that
he is President of the MERCHANTS BONDING COMPANY(MUTUAL),the corporation described in the foregoing instrument,and that the
Seal affixed to the said instrument is the Corporate Seal of the said Corporation and that the said Instrument was signed and sealed in behalf
of said Corporation by authority of its Board of Directors.
In Testimony Whereof,I have hereunto set my hand and affixed my Official Seal at the City of Des Moines,Iowa,the day and year first
above written.
CINDY SMYTH et,464,t F Commission Number 173504o•, My Commission Ex ires
March 16,2008
Notary public,Polk County,Iowa
STATE OF IOWA
COUNTY OF POLK ss.
I
William
of the MERCHANTS BONDING COMPANY
is a true and acorrect coSecretary
y of theth POWER-OF--ATTORNEY executed by said MERCHANTS BONDI do NG CO that the above and MPANY(MUTUAL),foregoing
still In full force and effect and has not been amended or revoked.
In Witness Whereof,I have hereunto set my hand and affixed the seal of the Company on this day of
•.....• ,
.r..;• 2 -0- te+; •• �s� �
•
•'�\.t
1933 '3• Secretary
:•s '•tic:
POA 0001 (1/06) •. 'z•a.
Hug. 4. 20U8 12, 18PM o, 2405 P. 3/4
CIlent#:_7902 ELECPUMP
ACORDT, CERTIFICATE OF LIABILITY INSURANCE DATE(MWDO/YYYr)
PRODUCER
I 08/04/08
La Mair-Mulock-Condon Co, THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
4200 University Ave Ste 200
HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR
West Des Moines, IA 50266-5945 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
515 244-0166
INSURERS AFFORDING COVERAGE NAIC#
INSURED
Electric Pump,Inc. INSURER A-, Cincinnati Insurance Company
4280 NE 14th St INSURER El:
Des Moines,IA 50313 IN9URERCt
INSURER D:
INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING
ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
VER�dDO'L
IR (N$AG TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION
DATE IMM/DD/YYI DATE(MM/DD/YYI LIMITS
A GENERALLABILrrY 3661990 04/01/08 04/01/09 EACH OCCURRENCE 51,000,000
X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED
CLANS MADE I - I OCCUR PR °s:=^a^�e1 5500,000
MED EXP(Any ore person) $10.000
PERSONAL&ADV INJURY S1,000,000
GENERAL AGGREGATE $2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS.COMP/OP AGO 52,000,000
POLICY niFERey n Lo
A AL/Totowa LIABIUTY 3661990 04/01/08 04/01/09
X ANY AUTO (Ea a�6en SINGLE LIMIT $1,000,000
ALL OWNED AUTOS
SCHEDULED AUTOS BODILY INJURY $
(Perpersoo)
X HIRED AUTOS
X NON-OWNED AUTOS BODIY S
(Per ILY LY denINJqUR
X Drive Other Car
PRORYDAMA3E $
(Par aPEcddIa^t)
GARAGE LIABJLnT
7
ANY AUTO AUTO ONLY-EA ACCIDENT $
OTHER THAN EA ACC $
AUTO ONLY: AGO $
A EXCESS/UMBRELLA LIABILITY 3661990 04/01/08 04/01/09 EACH OCCURRENCE
OCCUR CLAIMS MADE $S,000,OOO
H
AGGREGATE $5,000,000
DEDUCTIBLE
$
RETENTION $ $
A WORKERS COMPENSATION AND 1922300 S
EMPLOYERS'LIABILITY O3/28/OB 03/28/09 ,X I TORY LTIMTRB IOER
ANY PROPRIETOR/PARTNER/EXECUTIVE
E.L.EACH ACCIDENT sSQQ,OOO
OFFICER/MEMBER EXCLUDED?
If pm,dee ibm under .L.DISEASE•EA EMP1(NEE SSOO,000
SPECIAL PROVISIONS below
OTHER EL DISEASE-POLICY LIMIT S500,000 •
•
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES I EXCLUSIONS ADDED SY ENDORSEMENT/SPECIAL PROVISIONS
Project: 2008 West Commercial Street Stormwater Pumps •
City of Waterloo&Wayne Claassen Engineering and Surveying,Inc,are named as Additional •
Insured as respects General Liability.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
City of Waterloo DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 11) DAYS WRITTEN
715 Mulberry Street NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,NUT FAILURE TO DO SO SHALL
Waterloo,IA 50703 IMPOSE NO OBLIGATION OR LIABIIJ'TY OF ANY KIND UPON THE INSURER,ITS AGENTS OR
REPRESENTATIVES,
ALIT RILED REPRESENTATIVE
ACORD 25 2001/08 IM-7 A, 4'
)1 of 2 #S140601/M135978 KELMU co ACORD CORPORATION 1988