Loading...
HomeMy WebLinkAboutPROJECT SPECIFICATIONS F.Y. 2009 BIG ROCK ROAD BRIDGES REPLACEMENT WITH BOX CULVERTS CITY OF WATERLOO, IOWA BLACK HAWK COUNTY CITY CONTRACT NO. 739 Prepared For: City of Waterloo, Iowa Prepared By: AECOM March 2009 000111111111111111,,, I hereby certify that this engineering document was prepared by me or under my GEES S 10/v"'",,�� direct personal supervision and at I am a duly licensed Professional Engineer �� •q! under the laws of the state of wa. 44, •DOUGLAS W. 2 • SCHINDEL 12 = //J�7/ 8 y b .� DOU LAS W. SCHINDE .E. Date '••.....•' '•* License No. 11457 IOWik 'l'nnn Hill l a`. My license renewal date is December 31, 2010. Pages or sheets covered by this seal: �. /+46c Date Issued: FY 2009 BIG ROCK ROAD BRIDGES REPLACEMENT WITH BOX CULVERTS CITY OF WATERLOO, IOWA BLACK HAWK COUNTY CITY CONTRACT NO. 739 CONTRACT DOCUMENTS TABLE OF CONTENTS Page 1. NOTICE OF PUBLIC HEARING AND NOTICE TO BIDDERS NPHB-1 to NPHB-4 2. INSTRUCTIONS TO BIDDERS IB-1 to IB-9 3. FORM OF BID OR PROPOSAL BF-1 to BF-4 4. SALES TAX EXEMPTION INFORMATION FORM STE-1 5. FORM OF BID BOND BB-1 6. NON-COLLUSION AFFIDAVITS NCA-1 to NCA-2 7. EQUAL OPPORTUNITY CLAUSE EOC-1 to EOC-2 8. RECIPROCAL RESIDENT BIDDER PREFERENCE AND RESIDENT BIDDER CERTIFICATION RR-1 to RR-2 9. AFFIRMATIVE ACTION PROGRAM 1 to 9 10. POTENTIAL ITEMS OF WORK FOR MBE/WBE PARTICIPATION M-1 SUBCONTRACTOR'S BID REQUEST FORM, M-2 .� LETTER FORM FOR SUBCONTRACTOR QUOTES, M-3 MBE/WBE SCOPE LETTER, M-4 MBE AND/OR WBE PREBID CONTACT INFORMATION FORM M-5 to M-6 11. CERTIFIED MBE/WBE CONTRACTORS -CITY OF WATERLOO 1-5 12. STATEMENT OF BIDDER'S QUALIFICATIONS SQ-1 to SQ-2 13. GENERAL SPECIAL PROVISIONS GSP-1 to GSP-4 14. SPECIAL PROVISIONS SP-1 -SP-3 Section 01316 - Engineer's Status During Construction 01316-1 to 01316-5 Section 100 -Clearing and Grubbing 100-1 Section 101 - Earthwork 101-1 to 101-2 Section 102 - Granular Materials 102-1 to 102-2 Section 103- Bridge Approach Pavement, RK-18 103-1 to 103-2 Section 104 - Removal of Existing Bridges 104-1 -- Section 105 -Cast-in-Place Concrete Culvert 105-1 to 105-2 Section 106-Subdrains 106-1 Section 107- Erosion Protection 107-1 to 107-2 Section 108 - Removal of Pavement 108-1 BigRockRdBridges-103174.16 Section 109 -Traffic Control 109-1 Section 110 - Mobilization 110-1 Section 111 - Pipe Supports 111-1 Section 112- Removal of Field Fence 112-1 Section 113 -Seeding 113-1 Section 114 -Silt Fence for Ditch Checks 114-1 Pollution Prevention Plan PPP-1 to PPP-3 15. GENERAL SPECIFICATIONS FOR CONSTRUCTION GS-1 to GS-13 16. SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION SGS-1 17. FORM OF CONTRACT C-1 to C-4 18. FORM OF PERFORMANCE BOND PFB-1 to PFB-2 19. FORM OF PAYMENT BOND PB-1 to PB-2 BigRockRdBridges-103174.16 NOTICE OF PUBLIC HEARING On Proposed Plans, Specifications, Form of Contract, - And Estimate of Cost and the NOTICE TO BIDDERS For the Taking of Construction Bids For the F.Y. 2009 BIG ROCK ROAD BRIDGES REPLACEMENT WITH BOX CULVERTS In the City of Waterloo, Iowa CONTRACT NO. 739 RECEIVING OF BIDS Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her office in the City Hall of the said City on the 6th day of April, 2009, until 4:00 p.m. for the construction of the F.Y. 2009 BIG ROCK ROAD BRIDGES, REPLACEMENT WITH BOX CULVERTS, Contract No. 739, as described in detail in the plans and specifications now on file in the Office of the City Clerk. OPENING OF BIDS All proposals received will be opened in open Council meeting to be held in the Council Chambers in the City Hall in the City of Waterloo, Iowa, on the 6th day of April, 2009, at 5:30 p.m., and the proposals will be acted upon at such later time and place as may then be fixed. PUBLIC HEARING Notice is hereby given that the Council of said City will conduct a public hearing on the proposed plans, specifications, form of contract, and estimate of cost for the construction of the above-described improvement project at 5:30 p.m. on April 6, 2009, said hearing to be held in the Council Chambers in the City Hall in said City. The proposed plans, specifications, form of contract, and estimate of cost for said _., improvements heretofore prepared by AECOM are now on file in the office of the City Clerk for public examination, and any person interested therein may file written objection thereto with the City Clerk before the date set for said hearing, or appear and make objection thereto with the City Clerk before the date set for said hearing, or appear and make objection thereto at the meeting above set forth. SCOPE OF WORK The extent of the work involved is the construction of grading, box culvert construction, bridge removal, paving, drainage and other incidental items for the BIG ROCK ROAD BRIDGES, REPLACEMENT WITH BOX CULVERTS, on Big Rock Road, between Wagner Road and Burton Avenue. -" BEGINNING AND COMPLETION DATES The work under the proposed contract shall be commenced within ten (10) working days after receipt of "Notice to Proceed" and all items shall be completed on or before September 15, 2009. The completion date will be administered based on ninety (90)working days. Contract No.739 NPHB-1 BigRockRdBridges-103174.16 METHOD OF PAYMENT TO CONTRACTOR The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-five percent (95%) of the work as it is completed and materials delivered and work approved. Final payment will be made thirty- one (31) days after completion of the work and acceptance by the Council. Before final payment is made, vouchers showing that all subcontractors and workmen and all persons furnishing materials have been fully paid for such materials and labor will be required unless the City is satisfied that material, men and laborers have been paid. The Contractor is hereby notified that if the City does not have cash on hand to pay monthly pay estimates, according to Chapter 384.57 of the Code of Iowa, payment may be made by anticipatory warrants issued bearing a rate of interest not exceeding that permitted by Chapter 74A, Code of Iowa. PLANS AND SPECIFICATIONS Plans and Specifications governing the construction of the proposed improvements have been prepared by AECOM, which plans and specifications and also the prior proceedings of the City Council referring to and defining said proposed improvements are hereby made a part of this notice, and the proposed contract by reference shall be executed in compliance therewith. Plans and Specifications are obtainable by a qualified bidder from the City Engineer upon payment of $25.00. The payment is not refundable. The prime contractor, subcontractors, or suppliers working on the project shall retain their own set of plans and specifications for use on the project. The prime contractor will be supplied with the needed number of reduced sets of plans and specifications at no additional cost. CONTRACT AWARD A contract will be awarded to the qualified bidder submitting the lowest bid. The City reserves the right to reject any or all bids, re-advertise for new bids, and to waive informalities in the bids submitted that might be in the best interest of the City. Bids may be held by the City of Waterloo, Iowa, for a period not to exceed thirty(30)days from the day of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced with the State of Iowa and preference will be given to local domestic labor in the construction of the improvement. PROPOSALS SUBMITTED The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly write or type the unit bid price and the bid item extension (Unit Price x Estimated Qty) in numerals on the blanks provided. Should there be any discrepancy between the unit bid price and extension, the City of Waterloo shall consider the unit bid price as being the valid unit bid price. The bidder has the option to submit a computer-generated spreadsheet in lieu of the portion of the Form of Bid or Proposal, which includes the Bid Item Number, Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price and Total Bid. The computer-generated spreadsheet shall include all of the information listed -" in that portion of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor submitting the bid. For the bidders who submit a computer-generated spreadsheet, the TOTAL BID (with alternates, if applicable)shall also be indicated in the space(s) provided on the Form of Bid or Proposal. Contract No. 739 NPHB-2 BigRockRdBridges-103174.16 BID SECURITY REQUIRED All bids must be accompanied in a separate envelope by a certified or cashier's check drawn on an Iowa bank, or a bank chartered under the laws of the United States, a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, or bid bond, (on the form furnished by the City) payable to the City of Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, which certified check, certified share draft or bid bond will be held as security that the Bidder will enter into a Contract for the construction of the work and will furnish the required bonds, and in case the successful Bidder shall fail or refuse to enter into the Contract and furnish the required bonds, his bid security may be retained by said City as agreed upon liquidated damages. If bid bond is used, it must be signed by both the Bidder and the surety or surety's agent. Signature of surety's agent must be supported by accompanying Power of Attorney. PERFORMANCE AND PAYMENT BONDS The successful bidder will be required to furnish Performance and Payment Bonds within ten (10) days after forms are presented to him in an amount equal to one hundred percent (100%) of the contract price, said bonds to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City from claims of any kind caused by the operations of the contractor. MAINTENANCE BOND Before the Contractor shall be entitled to receive final payment for work done under this contract, it shall execute and file a bond in the penal sum of not less than 100% of the total amount of the contract, same to be known as "Maintenance Bond," and which bond must be approved by the City Council, and which bond is in addition to the bond given by the Contractor to guarantee the completion of the work. CONTRACT COMPLIANCE PROGRAM/SUBCONTRACTING The program proposes numerical projections regarding utilization of Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors and suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa. A goal of at least ten percent (10%) for MBE participation on all City funded construction projects that are estimated at $50,000.00 or more. A goal of at least two percent (2%) for WBE participation on all City funded construction projects that are estimated at$50,000.00 or more. Any project funded in part or in total with federal funds shall follow the respective agencies contract compliance program and goals. The Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance MBE/WBE goals. The MBE/WBE subcontractors, suppliers or vendors must provide the Prime Contractor a reasonably competitive price for the service being rendered or the Contractor is not required to accept their bid. LIQUIDATED DAMAGES Time is an essential element of this contract. It is important that the work be diligently pursued to completion. If the work is not completed within the specified contract period, plus authorized extensions, the contractor shall pay to the City Liquidated Damages in the amount of five hundred dollars ($500.00) per day, for each day, as further described herein, in excess of the authorized time. Days beyond the specified completion date for which Liquidated Damages will be charged will be working days that the contractor does, or could have worked, from Monday through Saturday. Sundays will be counted only if work is performed. Partial working days will be considered as a full working day. Days not chargeable for Liquidated Damages will include rain days, Sunday if no work is done, and legal holidays. Contract No. 739 NPHB-3 BigRockRdBridges-103174.16 Working days will cease to be charged when only punch list items remain to be completed. Punch list items do not include contract bid items or approved change/extra work orders. When the Contractor believes the project to be substantially completed, a written notice stating the same shall be submitted to the Engineer and a request made for a Punch List. If the work under the Contract extends beyond the normal construction season for such work the Contractor shall submit to the Engineer in writing a request that working days counted toward the project be suspended until work is resumed the following construction season. This amount is not construed as a penalty. These damages are for the cost to the City of providing the required additional inspection, engineering and contract administration. PRE-CONSTRUCTION CONFERENCE Before the work is commenced on this contract, a conference shall be held for the purpose of discussing the contract. The conference shall be attended by the prime contractor, subcontractors and City Officials. RECIPROCAL RESIDENT BIDDER PREFERENCE Attention of bidders is called to the requirement of complying with the provisions of the Reciprocal Resident Bidder Preference requirement. Each bidder submitting a bid shall execute and include with the bid, a Resident Bidder Certification in the form herein provided, to the effect that he will not have as employees, Illinois laborers on the work site. SALES TAX EXEMPTION CERTIFICATES Contractors and approved subcontractors will be provided a Sales Tax Exemption Certification to purchase building materials or supplies in the performance of construction contracts let by the City of Waterloo. Published pursuant to the provisions of•B+4+s &ft-ef-Chapter 384.of the Qi4y Code of Iowa and upon order to the City Council of said Waterloo, Iowa, on the day of , 2009. CITY OF WATERLOO, IOWA BY: Nancy Eckert City Clerk Contract No. 739 NPHB-4 BigRockRdBridges-103174.16 INSTRUCTIONS TO BIDDERS 1. EXPLANATIONS TO BIDDERS Any explanation desired by a bidder regarding the meaning or interpretation of the Notice to Bidders, Plans, Specifications, etc., must be requested in writing and with sufficient time allowed for a reply to reach bidders before submission of their bids. Any interpretation made will be in the _ form of an amendment of the Notice to Bidders, Plans, Specifications, etc., and will be furnished to all prospective bidders. Its receipt by the bidder must be acknowledged in the space provided on the Proposal Form or by letter or telegram received before the time set for opening of bids. Oral explanations or instructions given before the award of the contract will not be binding. 2. EXAMINATION OF PROPOSED WORK Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The owner will assume no responsibility for any understanding or representation concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Notice to Bidders, the Specifications or related documents. 3. PREPARATION OF BIDS a. Bids shall be submitted on the forms furnished, or copies thereof, and must be manually signed. If erasures or other changes appear on the forms, each erasure or change must be initialed by the person signing the bid. The bidder has the option to submit a computer-generated spreadsheet in lieu of the portion of the Form of Bid or Proposal, which includes the Bid Item Number, Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price, and Total Bid. The corn puter- generated spreadsheet shall include all of the information listed in that portion of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor submitting the bid. For the bidders who submit a computer-generated spread- sheet, the TOTAL BID (with alternates, if applicable) shall also be indicated in the space(s) provided on the Form of Bid or Proposal. b. The Bid Form may provide for submission of a price or prices for one or more items, which may be lump sum bids, alternate prices, schedule items resulting in a bid on a unit --- of construction or a combination thereof, etc. When the Bid Form explicitly requires that the bidder bid on all items, failure to do so will disqualify the bid. When submission of a price on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted. c. Unless called for, alternate bids will not be considered. d. Modifications of bids already submitted will be considered if received at the office designated in the Notice to Bidders by the time set for closing of bids. Telegraphic modifications will be considered, but should not reveal the amount of the original or revised bid. e. In preparing his bid, the bidder shall specify the price, written legibly in ink or with the typewriter, at which he proposes to do each item of work. The unit price shall be stated in figures in the blank space provided (i.e., $7.14). In items where unit price is required, Contract No. 739 IB-1 BigRockRdBridges-103174.16 the total amount of each item shall be computed at the unit prices bid for the quantities given on the Bid Form and stated in figures in the blank space provided. If the bidder chooses to submit the unit prices, total bid price, and total bid on a computer-generated spreadsheet, all numbers shall be easily legible. f. Any changes or alterations made in the Bid Form, or any addition thereto, may cause the rejection of the bid. No bid will be considered which contains a clause in which the contractor reserves the right to accept or reject a contract awarded him by the city Council of Waterloo. Bids in which the unit prices are obviously unbalanced may be rejected. 4. SUBMISSION OF BIDS a. A bid must be sealed in a separate envelope and marked to indicate its contents and be accompanied by the bid security in a separate envelope. If forwarded by mail, the two envelopes shall be placed in a third and mailed to the City Clerk/Auditor. All bids must be filed with the City Clerk/Auditor of the City of Waterloo at his office in the City Hall before the time specified for closing bids. b. Bids received prior to the advertised hour of opening will be securely kept sealed. The officer whose duty it is to open them will decide when the specified time has arrived, and no bid received thereafter will be considered; except that when a bid arrives by mail after the time fixed for opening, but before the reading of all other bids is completed, and it is shown to the satisfaction of the City of Waterloo, Iowa, that the non-arrival on time was due solely to delay in the mails for which the bidder was not responsible, such bid will be received and considered. c. Bidders are cautioned that, while telegraphic modifications of bids may be received as provided above, such modifications, if not explicit and if in any sense subject to misinterpretation, shall made the bid so modified or amended, subject to rejection. 5. LATE BIDS AND MODIFICATIONS OR WITHDRAWALS Bids and modifications or withdrawals thereof received at the office designated in the Notice to Bidders after the exact time set for closing of bids will not be considered. However, a modification which is received from an otherwise successful bidder, and which makes the terms _ of the bid more favorable to the City of Waterloo, will be considered at any time it is received and may therefore be accepted. Bids may be withdrawn by written or telegraphic request received from bidders prior to the time set for closing of bids. -- 6. PUBLIC OPENING OF BIDS Bids will be publicly opened at that time and place set for opening in the Notice to Bidders. Their content will be made public for the information of bidders and others interested who may be present either in person or by representative. 7. BID SECURITY REQUIRED All bids must be accompanied in a separate envelope by a certified or cashier's check drawn on an Iowa bank, or a bank chartered under the laws of the United States, a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, or bid bond (on the form furnished by the City) payable to the City of Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, which certified check, certified share draft or bid bond will be held as security that the Bidder will enter into a Contract for the construction of the work and will furnish the required bonds, and in case the successful Bidder shall fail or refuse to enter into Contract No. 739 IB-2 BigRockRdBridges-103174.16 DEFINITIONS Goals: A flexible numerically expressed objective which contractors are required to make "good- faith efforts." The key to the requirement is to make documented efforts. Goals are neither set-a-sides nor a device to achieve proportional representation or equal results. - . Numerical goals do not create set-a-sides for specific groups, nor are they designed to achieve proportional representation or equal results. Rather, the goal-setting process in affirmative action planning is used to target and measure the effectiveness of affirmative action efforts to eradicate and prevent discrimination. Quota: A flat numerical requirement that the contractor is required to meet in order to obtain the -- benefit or be in compliance. The numerical goal component of affirmative action programs is not designed to be, nor may it properly or lawfully be interpreted as, permitting unlawful preferential treatment and quotas with respect to persons of any race, color, religion, sex, or national origin. The regulations at 41 CFR 60-2.12(a), 60-2.15 and 60-2.30, specifically prohibit discrimination and the use of goals as quotas. (U.S. Department of Labor) Set-Aside: An arrangement in which a particular contract is reserved for competition solely among minority and women business enterprises. Contractor: As used in this document means contractor, subcontractor, supplier, vendor, and professional service provider. Minority Business Enterprise (MBE) Any business, which is at least 51%, owned by one or more minorities and whose management and daily business operations are controlled by one or more such individuals and is on the current State Unified Certification List, or were listed on the City of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002 Women Business Enterprise (WBE): Any business which is at least 51% owned by one or more women and whose management and daily business operations are controlled by one or more such individuals and is on the current State Unified Certification List, or were listed on the City of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002 Minority: -- Any person or persons who are considered as socially and economically disadvantaged because of their identity as a group member without regard to their individual qualities. The groups include: Black American, Hispanic American, Native Americans, Eskimos, Aleuts, and Asian-Pacific Americans. 13 C.F.R. 124-1.1(c)(3)(ii)(1983). Lowest Responsible Bidder: Bidder who has offered the lowest bid and who has exhibited skill relative to the type of work bid on, judgment, financial responsibility, and evidence of working with the Affirmative Action Employment Program and the Contract Compliance Program. Broker: One buying or selling for others on commission or other fee basis without maintaining a warehouse or other similar inventory storage facility. Mayor's Advisory Committee: Contract No. 739 IB-4 BigRockRdBridges-103174.16 Mayor's Advisory Committee for Minority, Female, and Disadvantaged Business Enterprise. Good Faith Efforts: The successful bidder shall be selected on the basis of having submitted the lowest responsible bid. The obligation of the bidder is to make good faith efforts. The bidder can demonstrate that it has done so by the following: 1. The Prime Contractor met the project goal - No Action necessary 2. If the Prime Contractor failed to meet the goal, they must submit documentation of good faith efforts. CONTRACT COMPLIANCE PROGRAM SUBCONTRACTING The program proposes numerical projections or goals regarding utilization of Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) as subcontractors in the performance of contracts awarded by the City of Waterloo, Iowa. A goal of at least 10% for MBE participation on all City funded construction projects that are estimated at $50,000 or more and projects under $50,000 where applicable at the Contract Compliance Officer's discretion. There is at least 2% WBE goal on City funded projects. Any project which is funded solely or in part with Federal funds shall follow the respective agencies contract compliance program and goals. Any project which is funded solely or in part with State funds shall follow the respective agencies contract compliance program and goals. The City of Waterloo Contract Compliance Program is for City awarded construction contracts only. The prime contractor shall make "good-faith efforts" -- to meet the Contract Compliance MBE/WBE goals. The MBE/WBE subcontracts must provide the prime contractor a reasonably competitive price for the service being rendered or the contractor is not required to accept the bid. Administrative Reconsideration: As part of this reconsideration, the bidder will have the opportunity to provide written -- documentation or arguments concerning the issue of whether they made adequate good faith efforts to meet the goals. The bidder will have the opportunity to meet in person with the City of Waterloo's Administrative Reconsideration Committee to discuss the issue of whether they made adequate good faith efforts. The Administrative Reconsideration Committee will forward a written decision on reconsideration to the Mayor and City Council, explaining the basis for finding that the bidder did or did not meet the goal or make adequate good faith efforts to do so. Documentation required will include but is not limited to the following: • Making portions of the work available for MBE/WBE subcontracting • Evidence of negotiating with MBE/WBE firms • MBE/WBE quotes obtained and non-MBE/WBE quotes used • Reasons agreements were not reached Follow-up after initial solicitations • Efforts to assist in obtaining equipment, supplies and materials (at competitive prices), bonding, lines of credit, insurance, etc. • Evidence of past compliance or non-compliance by same contractor The Contract Compliance Officer will determine the weight to be given to each item listed above(supported by appropriate documentation) based on overall program goals. Contract No. 739 IB-5 BigRockRdBridges-103174.16 RESPONSIBILITIES 1. City of Waterloo A. The City Contract Compliance Officer has the responsibility to assure the City's compliance with Federal, State and Municipal regulations. B. The City Contract Compliance Officer is responsible for maintaining a current directory of certified firms. Certification of MBE/WBE/DBE contractors is through the Iowa Department of Transportation and its Unified Certification Program. Only firms certified based on guidelines prescribed in 49 CFR Part 26 and provisions of this agreement, shall be recognized as certified by the City of Waterloo. C. The City Contract Compliance Officer is responsible for making available a list of future project information notices to MBE/WBE firms. D. The City Contract Compliance Officer shall send notices to appropriate MBE/WBE firms in the directory of each bid solicitation with opening date. E. The City Contract Compliance Officer will receive MBE/WBE Letter(s) of Intent to Bid and within two (2) business days forward the complete list of MBE/WBE bidders who submitted a Letter of Intent to Bid to prime contractors. ll. Prime Contractors In order to be in compliance with the guidelines of this program, the prime contractor must show good-faith efforts in following the MBE/WBE Contract Compliance Program. Good-faith efforts include, but are not limited to, the following: A. Prime contractors shall send solicitation letters (Form CCO-3) to appropriate MBE/WBE (those certified in directory prepared by City Contract Compliance Officer) at least seven (7) working days prior to bid date. Letters should identify specific items to be subcontracted. A minimum of three (3) disadvantaged -" business contacts must be made and documented, if there are at least three disadvantaged businesses offering services in the area to be subcontracted (See City of Waterloo MBE/WBE Certification List). If less than three (3) are offering the services to be subcontracted, then a contact is required for any that are listed as providing that service. If the Prime Contractor submits a MBE/WBE contact not on the City's MBE/WBE list, attach a copy of the MBE/WBE/DBE Certifications from another government agency. B. If a prime contract bidder is unable to identify MBE/WBE firms to perform portions of the work, the City Contract Compliance Officer should be contacted for assistance immediately. C. Prime contract bidders may solicit MBE/WBE proposals by telephone or personal interviews, but all such contacts shall be confirmed by Certified Mail, or subcontract bid request forms (Form CCO-2). D. If any MBE/WBE business submitting bids is not selected for subcontract award, documentation must accompany the "MBE/WBE Business Enterprise Pre-Bid Contact Information Form" (Form CCO-4 and CCO-4A) on why the MBE/WBE was not selected. These reasons could include: Contract No. 739 IB-6 BigRockRdBridges-103174.16 a. Not low bid. Copies of the competing bids may be required for verification. b. MBE/WBE did not bid, withdrew bid or non-responsive. c. Documentation of other business-related reason for not selecting the MBE/WBE business for a subcontract. d. Prime contractor self performs work. e. Any other reason relied on by prime. The Contract Compliance Officer will determine the weight to be given to each item listed above (supported by appropriate documentation) based on overall program goals. lll. MBE/WBE Firms A. MBE/WBE firms shall be certified by the Iowa Department of Transportation as owners and controllers of their respective businesses, or were listed on the City of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002. B. MBE/WBE firms must perform the work on the project; they cannot act as a broker by subcontracting the work out to others. C. Each MBE/WBE firm planning to submit quotes on construction projects with goals, shall submit a Letter of Intent to Bid (Form CCO-5) to the City Contract Compliance Officer seven (7) working days prior to bid opening, listing specific items which the MBE/WBE firm is interested in bidding. If sufficient Letters of Intent to Bid are not received by the City Contract Compliance Officer seven (7) working days prior to bid opening, goals on subject project will be reduced accordingly. Agreements between the bidder/proposer and a MBE/WBE in which the MBE/WBE promises not to provide subcontracting quotations to other bidders/proposers are prohibited. NON-COMPLIANCE OF CONTRACTORS A. Noncompliance exists when the contractor's actions are not consistent with the requirements of the Contract Compliance Program in the areas of employment and subcontracting. B. A bidder's failure to show good-faith efforts to meet project goals or a failure to use certified MBE/WBE firms may be grounds for finding its bid not responsible. C. The Contract Compliance Officer shall submit to City Council his/her recommendation on any non-compliant contract in writing. NOTICE TO PROCEED Notice to proceed on any project with goals will not be issued until City Contract Compliance Officer determines the lowest responsible bidder has used good-faith efforts to comply with this Compliance Program and the bid was responsive. CONCLUSION This program repeals or revises all sections of previous Waterloo Contract Compliance Programs. Contract No. 739 IB-7 BigRockRdBridges-103174.16 11. EMPLOYMENT AND BUSINESS OPPORTUNITY To the greatest extent feasible, suppliers, subcontractors, and low income workers owning businesses or living in the Waterloo area must be given priority in supplying materials, bidding for subcontract work, or applying for employment by the contractor on this project. Opportunities for training and for employment arising in connection with this project, shall to the greatest extent feasible be made available to lower income persons residing in the project area. The contract area is the City of Waterloo. The City of Waterloo will require the contractor to document his efforts in securing lower income workers living in the project area and in purchasing supplies from, and awarding subcontracts to, businesses owned by persons residing in the project area. 12. STATEMENT OF BIDDER'S QUALIFICATIONS Each bidder shall, upon request of the City of Waterloo, Iowa, submit on the form furnished for that purpose (a copy of which is included in the contract documents), a statement of bidder's qualifications, his experience record in constructing the type of improvements embraced, and his organization and equipment available for the work contemplated; and, when specifically requested, a detailed financial statement. The City of Waterloo, Iowa, shall have the right to take such steps as it deems necessary to determine the ability of the bidder to perform his obligations under the contract, and the bidder shall furnish the City of Waterloo, Iowa, all such information and data for this purpose as it may request. The right is reserved to reject any bid where an investigation of the available evidence or information does not satisfy the City of Waterloo, Iowa, that the bidder is qualified to carry out properly the terms of the contract. 13. AWARD OF CONTRACT a. Award of contract will be made to that responsive and responsible bidder whose bid, conforming to the Specifications, is most advantageous to the City of Waterloo; price and other factors considered. The intention is to award the contract at any time of opening bids, but the right is reserved to postpone such action for a reasonable time, not exceeding thirty(30) days. b. The City Council may, when in its interest, reject any or all bids or waive any informality in bids received. c. The bidder shall submit bids on all the items listed in the proposal and shall state the unit bid price in words in the blank spaces provided beneath the item description. Should there be any discrepancy between the unit bid price in words and listed numeral unit bid price, the City of Waterloo shall consider the unit bid price in words as being the valid unit bid price. A computer-generated spreadsheet as herein provided shall also be acceptable. Proposals requiring mathematical computations to determine unit prices or totals will be rejected. A contract will be awarded to the qualified bidder submitting the lowest total bid as indicated in the NOTICE TO BIDDERS. 14. EXECUTION OF AGREEMENT, BONDS, AND CERTIFICATE OF INSURANCE a. Subsequent to the award and within ten (10) days after the prescribed forms are presented for signature, the successful bidder shall execute and deliver to the City of Waterloo, Iowa, an agreement in the form included in the contract documents in such number of copies as the City of Waterloo, Iowa, may require. b. Having satisfied all conditions of award as set forth elsewhere in these documents, the successful bidder shall, within the period specified in paragraph "a" above, furnish a surety bond and a payment bond in a penal sum not less than the amount of the contract Contract No. 739 IB-8 BigRockRdBridges-103174.16 as awarded, as security for the faithful performance of the contract and terms and conditions therein contained and shall guarantee the prompt payment of all persons, firms, or corporations to whom the contractor may become legally indebted for labor, materials, tools, equipment, or services of any nature including utility and transportation services, employed or used by him in performing the work. The bonds shall protect and save harmless the City from claims and damages of any kind caused by the operations of the contractor and shall also guarantee the maintenance of the contract improvements for the period stated in the Notice of Hearing from and after completion of said improvements and their acceptance by the City. Such bonds shall be in the same form as that included in the contract documents and shall bear the same date as, or a date subsequent to that of the agreement. The current Power of Attorney for the person who signs for any surety company shall be attached to such bonds. c. The successful bidder shall, within the period specified in paragraph "a" above, furnish a certificate of insurance for approval in amounts of not less than the amounts specified in the General Specifications for Construction, Section F. No. 4 "Liability Insurance," Pages GS-10 to GS-11. The certificate of insurance shall be furnished in such number of copies as the City of Waterloo may require. The City of Waterloo shall be named as an "Additional Insured." The contractor shall similarly submit his subcontractor's certificates of insurance in the amounts for approval before each commences work. The contractor shall carry or require that there be Workmen's Compensation Insurance for all his employees and those of his subcontractors engaged in work at the site, in accordance with State Workmen's Compensation Laws. d. The failure of the successful bidder to execute such agreement and to supply the required bond or bonds within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the City of Waterloo, Iowa, may grant, based upon reasons determined sufficient by the City of Waterloo, Iowa, may either award the contract to the next lowest bidder or re-advertise for bids, and may charge against the bidder the difference between the amount of the bid an the amount for which a contract for the work is subsequently executed, irrespective of whether the amount thus due exceeds the amount of the bid guaranty. If a more favorable bid is received by re- advertising, the defaulting bidder shall have no claim against the City of Waterloo, Iowa, — fora refund. 15. RECIPROCAL RESIDENT BIDDER PREFERENCE Attention of bidders is called to the requirement of complying with the provisions of the Reciprocal Resident Bidder Preference requirement. Each bidder submitting a bid shall execute and include with the bid, a Resident Bidder Certification in the form herein provided, to the effect that he will not have as employees, Illinois laborers on the work site. Contract No. 739 IB-9 BigRockRdBridges-103174.16 FORM OF BID OR PROPOSAL F.Y.2009 BIG ROCK ROAD BRIDGES REPLACEMENT WITH BOX CULVERTS CITY CONTRACT NO. 739 CITY OF WATERLOO, IOWA Honorable Mayor and City Council Waterloo, Iowa Gentlemen: 1. The undersigned, being a Corporation existing under the laws of the State of , a Partnership consisting of the following partners: - , having familiarized (himself) (themselves) (itself) with the existing conditions on the project area affecting the cost of the work, and with all the contract documents listed in the Table of Contents and Addenda (if any), as prepared by the City Engineer of the City of Waterloo now on file in the office of the City Clerk, City Hall, Waterloo, Iowa, hereby proposes to furnish all supervision, technical personnel, labor, materials, machinery, tools, appurtenances, equipment, and services, including utility and transportation se-vices required to construct and complete this F.Y. 2009 BIG ROCK ROAD BRIDGES, REPLACEMENT WITH BOX CULVERTS, Contract No. 739 all in accordance with the above-listed documerts and for the unit prices for work in place for the following items and quantities: F.Y. 2009 BIG ROCK ROAD BRIDGES REPLACEMENT WITH BOX CULVERTS CONTRACT NO. 739 EST. UNIT BID PRI( TOTAL BID ITEM NO. ITEM CODE ITEM DESCRIPTION UNIT QTY. PRICE - BASE BID 1 2101-0850001 CLEARING AND GRUBBING ACRE ($ $ 2 2102-2625000 EMBANKMENT-IN-PLACE CY 94($ $ EXCAVATION, CLASS 10, ROADWAY AND 3 2102-2710070 BORROW CY 66'$ $ _ 4 2104-2710020 EXCAVATION, CLASS 10, CHANNEL CY 28 $ _ $ - 5 2105-8425015 TOPSOIL, STRIP, SALVAGE AND SPREAD CY 56,$ _ $ 6 2115-0100000 MODIFIED SUBBASE CY 4'$ $ 7 2121-7425020 GRANULAR SHOULDRES,TYPE B TON 6C$ _ $ 8 2123-7450000 SHOULDER CONSTRUCTION, EARTH STA. :$ $ BRIDGE APPROACH PAVEMENT, 9 2301-0690180 AS PER PLAN SY 211 $ Contract No. 739 BF-1 BigRockRdl3ridges-103174.16 EST. UNIT BID TOTAL BID ITEM NO. ITEM CODE ITEM DESCRIPTION UNIT QTY. PRICE PRICE 10 2307-0025005 AGGREGATE, ROADWAY COVER, 1/2-INCH TON 34.2 $ $ 11 2307-0600456 BINDER BITUMEN, CRS-2P GAL. 806.2 $ $ GRANULAR SURFACING ON ROAD, CLASS A 12 2312-8260050 CRUSHED STONE CY 40.3 $ $ 13 2599-9999055 REMOVAL OF EXISTING BRIDGES EACH 2.0 $ $ 14 2402-0425030 GRANULAR BACKFILL CY 176.9 $ $ — 15 2402-2720000 EXCAVATION, CLASS 20 CY 1,202.0 $ $ 16 2403-0100020 STRUCTURAL CONCRETE (RCB CULVERT) CY 335.8 $ $ 17 2404-7775000 REINFORCING STEEL LB 13,724.0 $ $ 18 2404-7775005 REINFORCING STEEL, EPDXY COATED LB 31,603.0 $ $ 19 2502-8212106 SUBDRAIN, PLASTIC PIPE, 6-IN. DIA. LF 20.0 $ $ 20 2502-8220196 SUBDRAIN, OUTLET, RF-19E EACH 1.0 $ $ 21 2506-4984000 FLOWABLE MORTAR CY 74.8 $ $ 22 2507-3250005 ENGINEERING FABRIC SY 695.6 $ $ CONCRETE GROUT FOR REVETMENT OR _ 23 2507-4011100 GABION CY 24.0 $ $ 24 2507-6800061 REVETMENT, CLASS E TON 247.4 $ $ 25 2510-6745850 REMOVAL OF PAVEMENT SY 69.8 $ $ 26 2528-8445110 TRAFFIC CONTROL LS 1.0 $ $ 27 2533-4980005 MOBILZATION LS 1.0 $ $ - 28 2599-9999003 GRANULAR BEDDING CY 142.5 $ $ 29 2599-9999005 PIPE SUPPORTS EACH 2.0 $ $ 30 2599-9999009 REMOVAL OF FIELD FENCE LF 272.0 $ $ 31 2601-2634100 MULCHING ACRE 0.7 $ $ 32 2601-2636043 SEEDING AND FERTILIZING (RURAL) ACRE 0.7 $ _ $ 33 2602-0000030 SILT FENCE FOR DITCH CHECKS LF 480.0 $ $ Contract No. 739 BF-2 BigRockRdEridges-103174.16 EST. UNIT BID TOTAL BID ITEM NO. ITEM CODE ITEM DESCRIPTION UNIT QTY. PRICE PRICE REMOVAL OF SILT FENCE FOR DITCH 34 2602-0000070 CHECKS LF 480.0 $ $ CLEAN-OUT OF SILT FENCE FOR DITCH 35 2602-0000100 CHECKS LF 480.0 $ $ TOTAL BID $ $ 2. It is understood that the quantities set forth are approximate only and subject to variation and that the unit bid price for the work done shall govern in the actual payment to Contractor. 3. In submitting this bid, the bidder understands that the right is reserved by the City of Waterloo, Iowa, — to reject any or all bids. If written notice of the acceptance of this bid is mailed, telegraphed, or delivered to the undersigned within thirty(30) days after the opening thereof, or at any time thereafter before this bid is withdrawn, the undersigned agrees to execute and deliver an agreement in the prescribed form and furnish the required bond and certificate of the insurance within ten (10) days after the agreement is presented to him for signature, and start work within ten (10) days after "Notice to Proceed" is issued. 4. Security in the sum of Dollars ($ ) in the form of is submitted herewith in accordance with the INSTRUCTIONS TO BIDDERS. 5. Attached hereto is a Non-Collusion Affidavit of Prime Contractor. 6. Attached hereto is a Resident Bidder Certification. 7. The bidder is prepared to submit a financial and experience statement upon request. 8. The Prime Contractor and Subcontractor(s), which have performed an aggregate of $10,000.00 in work for the City in the current calendar year, are prepared to submit an AAP or Update and an EOC, within ten (10)days of notification that the bid submitted is lowest and acceptable. 9. The bidder has received the following Addendum or Addenda: Addendum No. Date 10. The bidder shall list the MBE/WBE subcontractor(s), amount of subcontracts and bid items on the City of Waterloo Minority and/or Women Business Pre-bid Contact Information Form submitted with this Form of Bid or Proposal. The apparent low Bidder shall submit a list of all other Subcontractor(s) to be used on this Project to the City of Waterloo by 5:00 p.m. the business day following the day Bids on this Project are due along with the Non-Collusion Affidavits of All Subcontractor(s). The subcontractors listed on this proposal and/or submitted to the Contract Compliance Officer cannot be changed except for the following reasons: 1) The City of Waterloo does not approve the subcontractors. 2) The subcontractors submit in writing that they cannot fulfill their subcontracts. 11. The bidder has filled in all blanks on this proposal. Those blanks not applicable are marked "none" or"NA". 12. The bidder has attached all applicable forms. Contract No. 739 BF-3 BigRockR 1Bridges-103174.16 13. The Owner reserves the right to select alternates, delete line items, and/or to reduce quantities prior to the award of a contract due to budgetary limitations. (Name of Bidder) (Date) BY: Title Official Address: (Including Zip Code): I.R.S. No. Contract No. 739 BF-4 BigRockRdBridges-103174.16 CITY OF WATERLOO, IOWA tr4i--- / t WATERLOO ENGINEERING DEPARTMENT 715 Mulberry St. • Waterloo,IA 50703 • (319) 291-4312 Fax(319) 291-4262 dtertoo`off ERIC THORSON,P.E. • City Engineer Mayor INFORMATION NEEDED TIMOTHY J. FOR HURLY IOWA CONSTRUCTION SALES TAX EXEMPTION CERTIFICATE COUNCIL MEMBERS CONTRACTOR NAME: REGINALD A. SCHMITT ADDRESS: Ward 1 -- CAROLYN COLE Ward 2 HAROLD (Check One) PRIME: SUBCONTRACTOR: GETTY Ward 3 JOHN A. FEDERAL ID#: KINCAID Ward 4 RON PROJECT NAME: WELPER Ward 5 BOB DESCRIPTION OF WORK: GREENWOOD At-Large ❑ Brickwork 0 Landscaping ERIC GUNDERSON ❑ Carpentry 0 Painting At-Large 0 Concrete 0 Paving ❑ Drywall-Plaster-Insulation 0 Plumbing O Electrical 0 Roofing-Siding-Sheet Metal ❑ Excavation/Grading 0 Windows 0 Flooring 0 Wrecking-Demolition ❑ Heavy Construction 0 Other (Please Specify) 0 Heating-Ventilating-Air Cond. 0 WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer Contract No. 739 STE-1 BigRockRdBridges-103174.16 BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, as Principal, and — as Surety are held and firmly bound unto the CITY OF WATERLOO , Iowa, hereinafter called"OWNER," in the penal sum Dollars ($ ) lawful money of the United States,for the payment of which sum will and truly be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. The condition of this obligation is such that whereas the — Principal has submitted the accompanying bid dated the day of , 200_, for NOW, THEREFORE, (a) If said Bid shall be rejected, or in the alternate, (b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form specified and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid, Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. By virtue of statutory authority, the full amount of this bid bond shall be forfeited to the Owner in liquidation of damages sustained in the event that the Principal fails to execute the contract and provide the bond as provided in the specifications or by law. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the Owner may accept such Bid or execute such contract; and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and seals, and _ such of them as are corporations, have caused their corporate seals to be hereto affixed and these pres- ents to be signed by their proper officers this day of , A.D. 200_. (Seal) Principal By (Title) (Seal) Witness Surety By Witness Attorney-in-fact Contract 739 BB-1 BigRockRdBridges-103174.16 NON-COLLUSION AFFIDAVIT OF PRIME BIDDER State of )ss County of ) , being first duly sworn, deposes and says that: 1. He is (Owner, Partner, Officer, Representative, or Agent) , of , the Bidder that has submitted the attached Bid; 2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost element of the bid price or the bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Waterloo, Iowa, or any person interested in the Proposed Contract; and 5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant. (Signed) Title Subscribed and sworn to before me this day of , 200_ Title My commission expires Contract No. 739 NCA-1 BigRockRdBridges-103174.16 NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR State of ss: County of , being first duly sworn, deposes and says that: 1. He is (Owner, Partner, Officer, Representative, or Agent) , of hereinafter referred to as the"Subcontractor;" 2. He is fully informed respecting the preparation and contents of the subcontractor's proposal submitted by the subcontractor to , contract pertaining to the project in (City or County and State) 3. Such subcontractor's proposal is genuine and is not a collusive or sham proposal; 4. Neither the subcontractor nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affiant, has in any way colluded, conspired, connived, or agreed, directly or indirectly, with any other bidder, firm or person to submit a collusive or sham proposal in connection with such contract or to refrain from submitting a proposal in connection with such contract, or has in any manner, directly or indirectly, sought by unlawful agreement or connivance with any other bidder, firm or person to fix the price or prices in said subcontractor's proposal, or to fix any overhead, profit or cost element of the price of prices in said subcontractor's proposal, or to secure through collusion, conspiracy, connivance or unlawful agreement any advantage against the City of Waterloo, Iowa, or any person interested in the proposed contract; and 5. The price or prices quoted in the subcontractor's proposal are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant. (Signed) Title Subscribed and sworn to before me this day of , 200 . Title My commission expires Contract No. 739 NCA-2 BigRockRdBridges-103174.16 EQUAL OPPORTUNITY CLAUSE (As provided in Executive Order No. 11246) All contractors, subcontractors, vendors and suppliers of goods and services doing business with the City and value of said business equals or exceeds ten thousand dollars ($10,000.00) annually agree as follows: 1. The contractors, subcontractor, vendor and supplier of goods and services will not discriminate against any employee or applicant for employment because of race, color, creed, sex, national origin, economic status, age, mental or physical handicap, political opinions or affiliations. The contractor, subcontractor, vendor and supplier will develop an Affirmative Action program to ensure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, sex, national origin, religion, economic status, age, mental or physical disability, political opinions or affiliations. Such actions shall include but not be limited to the following: a. Employment b. Upgrading c. Demotion or Transfer d. Recruitment and Advertising e. Layoff or Termination f. Rates of Pay or Other Forms of Compensation g. Selection for Training Including Apprenticeship 2. The contractor, subcontractor, vendor and supplier of goods and services will, in all solicitations or advertisements for employees, state that all qualified applicants will receive consideration for employment without regard to race, creed, color, sex, national origin, religion, economic status, age, mental or physical disabilities, political opinion or affiliations. 3. The contractor, subcontractor, vendor and supplier or his/her collective bargaining representative will send to each labor union or representative of workers which he/she has a collective bargaining agreement or other contract or understanding, a notice advising said labor union or workers' representative of the contractor's commitment under this section. 4. The contractor, subcontractor, vendor and supplier of goods and services will comply with all published rules, regulations, directives, and order of the City of Waterloo Affirmative Action Program Contract Compliance Provisions. 5. The contractor, subcontractor, vendor and supplier of goods and services will furnish and file _ compliance reports within such time and upon such forms as provided by the Affirmative Action Officer. Said forms will elicit information as to the policies, procedures, patterns, and practices of each subcontractor as well as the contractor himself/herself and said contractor, subcontractor, vendor and supplier will permit access to his/her employment books, records and accounts to the City's Affirmative Action Officer, for the purpose of investigation to ascertain compliance with this contract and with rules and regulations of the City's Affirmative Action Program—Contract Compliance Provisions relative to Resolution No. 24664. 6. In the event of the contractor's non-compliance with the non-discrimination clauses of this contract or with any of such rules, regulations and orders, this contract may be canceled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further contracts in --- accordance with procedures authorized by the City Council. 7. The contractor, subcontractor, vendor and supplier of goods and services will include, or incorporate by reference, the provisions of the non-discrimination clause in every contract, Contract No. 739 EOC-1 BigRockRdBridges-103174.16 subcontract or purchase order unless exempted by the rules, regulations or orders of the City's Affirmative Action Program, and will provide in every subcontract, or purchase order that said provisions will be binding upon each contractor, subcontractor, or supplier. 8. We, the undersigned, recognize that we are morally and legally committed to non-discrimination in employment. Any person who applies for employment with our company will not be discriminated against because of race, creed, color, sex, national origin, economic status, age, mental or physical disabilities. (Signed) (Appropriate Official) (Title) (Date) Contract No. 739 EOC-2 BigRockRdBridges-103174.16 RECIPROCAL RESIDENT BIDDER PREFERENCE In response to Illinois' law concerning resident preference and in accordance with Section 73A.21 of the Iowa Code, all non-federal-aid public improvement projects, which include road construction, shall be performed by a qualified resident bidder.The resident bidder has been further defined as follows: To be a qualified resident bidder, the person, corporation, partnership, or firm shall not have, as employees, Illinois laborers on the work site of a non-federal-aid project within Iowa. An Illinois laborer is any person who has resided in Illinois for at least 30 days and intends to become or remain an Illinois resident. This applies to all labor on the project, whether skilled, semi-skilled, or unskilled; whether manual or non-manual. This also applies to work subcontracted by or to the resident bidder on a non-federal-aid project within Iowa. The resident bidder may place on such work no more than three residents of Illinois who are his regularly employed executive and technical experts. As noted, this definition gives a preference as to whom the contractors or subcontractors can employ. The contractor shall provide the City with a certification that he is a qualified resident bidder according to the above definition. The Certification shall be submitted with the contractor's bid. A copy of the form of "Resident Bidder Certification" is included in the Contract Documents. If it is determined that the contractor does not meet this qualification after he begins work, a shutdown notice shall be issued and the voiding of the contract shall begin unless the contractor becomes qualified. DJG/cs 01/13/97 Contract No. 739 RR-1 BigRockRdBridges-103174.16 RESIDENT BIDDER CERTIFICATION CONTRACT NO: PROJECT NAME: DATE OF LETTING: To be a qualified resident bidder, the person, corporation, partnership, or firm shall not have, as employees, Illinois laborers on the work site of a non-federal-aid project within Iowa. An Illinois laborer is any person who has resided in Illinois for at least 30 days and intends to become or remain an Illinois resident. This applies to all labor on the project, whether skilled, semi-skilled, or unskilled, whether manual or non-manual. This also applies to work subcontracted by or to the resident bidder on a non- - federal-aid project within Iowa. The resident bidder may place on such work no more than three residents of Illinois who are his regularly employed executive and technical experts. This qualification as resident bidder shall be maintained by the contractor and his subcontractors at the work site until this project is completed. I hereby certify that no Illinois resident laborer as defined above will be employed at the work site during the contract period from the start of the project until its completion. COMPANY NAME CORPORATE OFFICER TITLE DATE Contract No. 739 RR-2 BigRockRdBridges-103174.16 Revised February 2003 CONTRACTOR'S OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Check box that applies to party completing program: ( ) General Contractor ( ) Subcontractor Section A to be completed by GENERAL CONTRACTORS only: A. Name of Company Address of Company Zip Telephone Number ( Federal ID Number (if no Federal ID Number, Owner/President's Social Security Number) Name of Equal Employment Officer Name of Project Project Contract Number Estimated Construction Work Dates / Section B to be completed by SUBCONTRACTORS only: B. Name of General or Prime Contractor Name of Subcontractor Subcontractor's Address Zip_ Subcontractor's Telephone Number ( Subcontractor's Federal ID Number(if no Federal ID Number Owner/President's Social Security Number) Name of Equal Employment Officer - 1 - C. Remainder of program to be completed by party completing program, either Prime or Subcontractor. 1. The Owners and/or Principals of your company: Ethnic Name Address Position Sex Origin 2. Other Areas of Interest: If your company has branches or subsidiaries, or if your company is a branch or subsidiary of a parent organization, give the following information: Type of Name Address Affiliation Degree II. EMPLOYER'S POLICY(Please read carefully.) A. We, the undersigned, recognize that we are morally and legally committed to nondiscrimination in employment. Any person who applies for employment with our company will not be discriminated against because of race, color, creed, sex, national origin, economic status, age, mental or physical handicap. B. The employment policies and practices of the undersigned are to recruit and hire employees without discrimination, and to treat them equally with respect to compensation and opportunities for advancement, including training, upgrading, promotion, and transfer. However, we realize the inequities associated with employment training, upgrading, contracting and subcontracting for minorities and women and we will direct our efforts to correcting any deficiencies to the maximum extent possible. The same will be required of our SUBCONTRACTORS and suppliers. C. We submit this program to assure compliance with Executive Order 11246, as amended, and other subsequent orders that may pertain to equal employment opportunity and merit employment policies, fully realizing that our qualification and/or merit system should be evaluated and revised, if necessary. D. We agree to put forth the maximum effort to achieve full employment and utilization of capabilities and productivity of all our citizens without regard to race, creed, color, sex, national origin, economic status, age, and mental or physical handicap. E. will give training _ (Name of Company) and employment opportunities to local residents of Waterloo, Iowa, to the greatest extent feasible. -2 - III. AFFIRMATIVE ACTION A. recognizes that the (Name of Company) effective application of a policy of merit employment involves more than just a policy statement, and (Name of Company) will, therefore, re-evaluate our Affirmative Action Program to ensure that equal employment opportunities are available on the basis of individual merit, and to actively encourage minorities, women and local residents to seek employment with our company on this basis. B. will undertake the (Name of Company) following six(6) steps to improve our Affirmative Action Program: 1. Minority Recruitment and Employment; 2. Local Recruitment and Employment; 3. Disabled Veteran and Vietnam Era Veteran Recruitment and Employment; 4. Handicapped Recruitment and Employment; 5. Female Recruitment and Employment; and 6. Training, Upgrading and Promotional Opportunities. C. will take (Name of Company) whatever steps are necessary to ensure that our total work force has adequate minority, female, and local representation. We will utilize the following methods in our recruitment — attempts: 1. Local advertising media (newspapers, radio, TV); 2. Community organizations (churches, clubs, schools); 3. Public and private institutions in the area (UNI, Hawkeye Community College); 4. Job Service of Iowa; and 5. Other. D. will seek qualified minority, (Name of Company) female, and local group applicants for all job categories and will make asserted efforts to increase minority, female and group representation in occupations at the higher levels or skill and responsibility. E. All sources of employment used shall be aware that we are an Equal Employment Opportunity Employer. Labor organizations representing our employees will be notified of our Equal Employment Opportunity Policy and Affirmative Action Program. F. Training, upgrading, promotion and transfer activities at all levels will be monitored to ensure that full consideration has been given to qualified minority, female, and local group employees. G. will encourage other (Name of Company) companies with whom we are associated and/or do business, to do the same and we will assist them in their efforts. -3 - H. has taken the following (Name of Company) — Affirmative Action to ensure that minority, female, local contractors and/or suppliers were provided opportunities to negotiate and/or bid on this project: (if none, write "NONE") 1. 2. As a result of the above efforts, we have involved minority, female, and local contractors and/or suppliers in the following areas of subcontracting: (if none, write "NONE") 1. 2. J. will require approved (Name of Company) Affirmative Action Programs from all nonexempt contractors who propose to work on this project and will take whatever steps are necessary to ensure that non-minority contractors have adequate representation of minority, female and local persons in their total work force. K. In further accordance with rules and guidelines issued pursuant to Executive Order 11246 as amended, we establish the goals for our company, based on parity percentages supplied by the City, and we realize these goals will be reviewed on an annual basis. L. will keep records of (Name of Company) specific actions relative to recruitment, employment, training, upgrading and promotion and will provide the City of Waterloo with any information relative to same, including activities of our SUBCONTRACTORS and suppliers as necessary or when requested. M. Parity figures for companies located in Waterloo are as follows: Minority Parity= .08(8%) N. Affirmative Action (Name of Company) Employment Goals: The definition of Affirmative Action Goals is as follows: "Goals may not be rigid and inflexible quotas which must be met, but must be targets, reasonably attainable by means of applying every good faith effort to make all aspects of the entire Affirmative Action Program work." For the year 200_, please submit percentage targets for employing minorities and women. If you already have reached your target for hiring minorities and women, please —' submit that percentage. *Goals for Minorities: — Goals for Women: *your affirmative action goals should be between 1% and 10% or more for minorities and 1% and 5% or more for women. -4 - Please be advised that the goals or targets are purely your estimation of how many women and minorities your company can reasonably expect to hire in 200_. Note, that none of the goals are rigid or inflexible. They are targets that your company calculates as reasonably attainable. This will help the City in its monitoring procedures as required by City of Waterloo Resolution No. 1984-142(4). -5 - CONTRACTOR'S TOTAL WORK FORCE (WATERLOO) HOURLY NAME AND ADDRESS JOB CATEGORY RACE SEX , WAGE INDICATE: DISABLED VETERAN: DV VIETNAM ERA VETERAN: VV HANDICAPPED: H -6 - We hereby certify that we are in compliance with all City and Federal Affirmative Action Regulations and agree to accept all liability for failure to comply. Respectfully submitted, By: Company Executive Date -• By: Equal Employment Opportunity Officer - Date City of Waterloo Affirmative Action Officer Approved Disapproved Reason: By: Date: -7 - DESCRIPTION OF JOB CATEGORIES 1. Officials/Manager: Occupations in which employees set broad policies, exercise overall responsibility for execution of all policies, or direct individual departments or special phases of the agency's operations or provide specialized consultation on a regional, district or area basis. Includes: department heads, bureau chiefs, division chiefs, directors, deputy directors, controllers, examiners, wardens, superintendents, unit supervisors, sheriffs, police and fire chiefs and inspectors and kindred workers. 2. Professionals: Occupations which require specialized and theoretical knowledge which is usually required through college training or thorough work experience and other training which provides comparable knowledge. Includes: personnel and labor relations workers, social workers, doctors, psychologists, registered nurses, economists, dietitians, lawyers, system analysts, accountants, engineers, employment and vocational rehabilitation counselors, teachers or instructors, police and fire captains and lieutenants and kindred workers. 3. Technicians: Occupations which require a combination of basic scientific or technical knowledge and manual skill which can be obtained through specialized post-secondary school education and through equivalent on-the-job training. Includes: computer programmers and operations, draftsmen, surveyors, licensed practical nurses, photographs, radio operators, technical illustrators, police and fire sergeants and kindred workers. 4. Office/Clerical: Workers are responsible for internal and external communication, recording and retrieval of data and/or information and other paper work required in an office. Includes: bookkeepers, messengers, office machine operators, clerk-typists, stenographers, court transcribers, hearing reporters, statistical clerks, dispatchers, license distributors, payroll clerks and kindred workers. 5. Skilled Craft Workers: Workers perform jobs which require special manual skill and a thorough and comprehensive knowledge of the processes involved in the work which is acquired through on-the-job training programs. Includes: Mechanics and repairman, electricians, heavy equipment operators, stationary engineers, skilled machine occupations, carpenters, compositors and typesetters and kindred workers. 6. Sales Workers: Occupations engaging wholly and primarily in direct selling. Includes: advertising agents and salesman, insurance agents and brokers, real estate agents and brokers, stock and bond salesmen, demonstrators, salesmen and sales clerks, grocery clerks and cashier checkers, and kindred workers. 7. Operatives (semi-skilled): Workers who operate machine or processing equipment or perform other factory-type duties of intermediate skill level which can be mastered in a few weeks and require only limited training. Includes: apprentices (auto mechanics), plumbers, building trades, metal working trades, bricklayers, carpenters, electricians, machinists, mechanics, printing trades, etc., operatives, attendants (auto service and parking), plasterers, chauffeurs, deliverymen and furnacemen, heaters (metal), laundry and dry cleaning operatives, milliners, mine operatives and laborers, motormen, oilers and greasers, (except auto painters), (except construction and maintenance), photographic process workers, stationary fireman, truck and tractor drivers, weavers, (textile), welders and flame cutters and kindred workers. 8. Laborers (unskilled): Workers in manual occupations which generally require no special training. Perform elementary duties that may be learned in few days and require the application of little or no independent judgment. Includes: garage laborers, car washers and greasers, gardeners (except farm) and groundskeepers, longshoremen, and stevedores, lumbermen, raftsmen and woodchoppers, laborers performing lifting, digging, mixing, loading and pulling operations and kindred workers. -8 - 9. Apprentices: Persons employed in a program including work training and related instruction to learn a trade or craft which is traditionally an apprenticeship, regardless of whether the program is registered with a Federal or State agency. 10. Trainees (on-the-lob): Production, persons in formal training for craftsmen when not trained under apprentice programs--operative laborer, and service occupations. White Collar. . . persons engaged in formal training for clerical, managerial, professional, technical, sales, office and clerical occupations. -9 - ITEMS OF POTENTIAL MBE/WBE PARTICIPATION NOTICE TO PROSPECTIVE BIDDERS: The following are items from the F.Y. 2009 BIG ROCK ROAD BRIDGES, REPLACEMENT WITH BOX CULVERTS project, Contract No. 739, that have a potential for MBE/WBE Participation. This listing, however, is not intended to be all encompassing; to preclude MBE/WBE Contractors from bidding on any items of the Proposal as a Subcontractor or the entire Proposal as a Prime Contractor. BID ITEM ITEM CODE DESCRIPTION EST. QTY. 30 2599-9999009 Removal of Field Fence 272.0 LF 31 2601-2634100 Mulching 0.7 Acre 32 2601-2636043 Seeding and Fertilizing (Rural) 0.7 Acre 33 2602-0000030 Silt Fence for Ditch Checks 480.0 LF 34 2602-0000070 Removal of Silt Fence for Ditch Checks 480.0 LF 35 2602-0000100 Clean-Out of Silt Fence for Ditch Checks 480.0 LF MBE/WBE GOALS FOR THIS PROJECT IMPORTANT: Prime Contract Bidders should be aware that ten percent (10%) MBE goal and two percent 12%)WBE goal is attached to this project. "Certified Return Receipt" letters are no longer needed with the bid showing proof of contacting MBE or WBE Subcontractors, but the Pre-Bid Contact Information Form mast be filled out completely. City of Waterloo Contract Compliance Officer: Contract Compliance Officer Community Development Board Carnegie Annex, Suite 202 620 Mulberry Street Waterloo, Iowa 50703 Phone: (319) 291-4429 Contract No. 739 M-1 BigRockRcBridges-103174.16 SUBCONTRACTOR'S BID REQUEST FORM PRIME BIDDER'S LETTERHEAD Contract No.: Letting Date: I, (subcontractor's name), hereby attest that I have been solicited for a bid on (project name) in the area of(description of work and bid item no.). (Prime contractor) has informed me that if I am interested in bidding, a subcontracting b d proposal must be submitted to the company office by(date) and (time). -- Subcontractor's Company Name Date Subcontractor's Signature Date Prime Bidder's Signature Contract No. 739 M-2 BigRockRdbridges-103174.16 LETTER TO BE USED WHEN SOLICITING FOR SUBCONTRACTOR QUOTES Subcontractor Company Name Address RE: Contract No.: Dear • (Prime Contractor's Company Name) is presently soliciting for the following work in connection with the above referenced project. (Insert bid Item Nos. and Description of Work) (Prime Contractor's Company Name) is an Equal Opportunity Employer, and all qualified bidders will not be discriminated against due to race, religion, color, sex, or origin. If interested in bidding your proposal must be turned in to this office by and (Date) (Time) Sincerely, (Prime Contractor's Representative) Form CCO-3 (11/28/2001) Contract No.739 M-3 BigRockRdBridges-103174.16 LETTER OF INTENT TO BID (MBE/WBE LETTER) According to the Current MBE/WBE Contract Compliance Program - 2002, all MBE/WBE Contractors interested in submitting subcontractor quotes on construction projects with goals, MUST submit a LETTER OF INTENT TO BID to the City of Waterloo Contract Compliance Officer at least seven (7) days prior to bid opening. The LETTER OF INTENT TO BID must list the specific items which the MBE/WBE Contractor is interested in bidding. Letter should include the following: Name of Project: Your Company Name: Address: Phone: Date: List of Specific items to be bid: Item No. Description: Item No. Description: Item No. Description: Item No. Description: Item No. Description: (Subcontractor's Company Name and authorized signature) Return this LETTER OF INTENT TO BID to: Contract Compliance Officer Community Development Board 620 Mulberry St. " Carnegie Annex, Suite 202 Waterloo, IA 50703 Phone: (319) 291-4429 Form CCO-5 (06-20-2002) —' Contract No. 739 M-4 BigRockRdBridges-103174.16 L 0 0 OC O ,C ,W a) a) W W U U >, i �..' CO -0 "0 o cn U Y w m Cr) N 21 Es 5) a) co •C E E N a) U .CCg O O 111 cc >0 C C0 •- n - • 7 C '� N o d .� m W C U U o 0 •C C — o) O •C (0 U w a) OU -O a) n co co •o 'r' a) w L y co a) (/) (6 0 U O o .- a) (a o -o 0 E Cl) ..' 7 .a •+� O 7 N 'O O W O w 'o �+ f0 O. (n .� f0 7 - z C - N a) 'C .n O E O co Cl) U� O 7 U 0 ° C .`. y O O , �L O C 'CL > c 0 _ 0 O m a) OU =o =_ O -. aa� -C -a •c ow cLa LL w E U � § 0 a_ a)s- a-oo C mm C Z CO 7 0 C ° (n ° co W �' � 0 0 0 E C aa>i .o w a) L a3 Cp -0m O 1= W o �7 2 0 oE0 :o (a � 02 E Q m a) a) a = a) ca o -o 2 2 is :o 0- ---. co .0 o 8 co m (n (n • Q' - '0 m 0 m o O 0 _ 0 O a) a; c O c p U o LL - 2 c O ° E w > Vaa)) U a) Z > +: n c 'oCC • ° � co Ow co I— Oo C m co a) c � - 000 °UU aia) -c U aSt C . b >, cE ° o Cl) (n > (n ° � BSc a) < co E � c .0 4- (� � a a) 0a E (� _c m0 .0 H o c o 2 ° -° o 0 7 Oty C .n 'O O .0 p O Z a (0 U C L a) o m co a) U n CZ C O O II) co •- 7 o - a) _ ~ c a) m a) °) `o U S ink N a ci °)a ch � (nc U ca CO 0 am Eo o 7 camco ci re CI) a ° w E m c o m a E c o ... � a Lu I- W - c 0 p w c ° O co m N — 3 p (Ns as w c •o 0 0 0 > E 0 ° ... � " a) 0 ,_ vw o Yc c .0° 0 . o0 O. Wwo 0 00m c° o Ca) '5 (a w oc Li- C a) ' 7 L (n a) w y 10 W0 2 � vi E m "= mow o 3L v°i W � L co ZLL OWy c ocm 3 d w '3 UL CC) N N3 .oE WZ ym0 - ° ? � � 00w � H Ea) u' EaQ O g 0 c -' N- w N H . .� E N co c Z o m o) m w Z � c n ° a>i w cow 3 aa)) co co 0 L.. o)< CO N - U a) FT) oOm O - ^� - u) _c c (nc a) 3OYW m LL O H 7 C y 7 O W a) (`a O a) o) o vn) o 2 "o w J (n Z_ E L C c U Z 0 Q U co E c 3 m 1- •_ '3 m •C a) a) > 7 CT) O O CO0 0 4) O .� O V Qom p @ .c •c m � c °n 3 0 ain �L W 2 ` o LL EO > v uoiwm 'y w c cU � 0 � c°`am Zc aW o m °3 a0oio om � a °c o .o ,ma3 U � � @ U °E cm � - W Ca) ia -o ` a0io o yaciNc 0 3fii c ai O m LU O � .0 �� � c o (a a) c o Om �. W U c ° ° Z 0 UJ c m Z ., m ° 0 Ti.) a) m c co c 'iv o - c0 � (� � ° ° 0 c o_ E0a) 03 c0 w 0 = Uco a; 0 '5 0 c >, (nco Ua) o ° am O. o0 � r 0 ooia a��i > Cwpuni c3 � 30 ° ai � 2 ED m O E o 0 'C 3 3 Li' -C m E co 4) o Q co o c)-o m L p .- 0 .Q c@ = .a> d ui c c)c>i ow 0 9- )) a � � r� ° a) E � co ° c a; 0 � � o a � co 3 = O '-' >, -c.-) co ▪ cc ° 0 00 (pc ° ° E (a -0 0 ° N a) -@0 m O C '' >O coo ° coo OL O-� c)O ° 'LO .y E -0 7 N y ,, c E 0 m 0 > won-. c m -0 c.) c.) a) 7 o c = N c) a) n 0000 0_ m 0 v) a) 7 ) N '0 Z 3 ° .� O ` .> O .0 0 o' a a) m E a E •5 "c U .P9 a) n(13° a) 0 a U 7 co c w C -o C c U a) `) 7 F- O 2 L ,� . a) d 0) 3 U L = 0 '0 .- H . a W a) d w o E) > (n (n Q u) n O a) 2 U - C a) C o c „ O w (NI C N >O 00 .N -o c0i a) ca c Q O o ,- c 0 IS o O C CV 0) 0 tG O N 0 O) c .5 E 3 a) p C c o O (� (a C c O O N y w a) U O U i m (°a wo m 0 f6s m E .o m c cZ ow E E a0') 0Lo+.. 5 c 2U s O U O0 H m C O o a (. (n C O 0 o ° wo _ ,, ° °) a � oo CL mcici a)w -c0 m � 0 E a) >,U� o o o a . 000 0 a3 Ucc Z O m p .cc ci • < om 70 ° (na) oo < uCID,, - < U (a m � � � a)c0 0 c .CE E (n2o c ° 0ci 2Uc6oai @ C) 2 0 ° c � OU m . . •c ° � 0 c 0U WUf° c6 � m w >'- E L .� @ t Ucso o E cz - o .c cm UE c U '00oaa)) oEQ00•0 0 H u- m -Co W oom� o a an � o .- LLo c c) ( U v � criCL Ha r- 000 (a Li_ Contract No. 739 M-5 BigRockRdBridges-103174.16 \ E E / q L. f a)In \ 0 / _ \ @k n § ID R \ 0 20- CO a k a) _c / 2 £ = 0 e 00 \ $ c < CO § = O. \ \ j \ / w $ _f ƒ £ / 6 / ,_ % 2 E k k 'ES. \ � / / \ 0 / \ k / 0 _ 2 .n a) ) ¥ % t c < o = c a) £ c g m § o cut- -0 3 � ® / o \ \ 3 \ \ / \ o0 k / k &/ e � = a � = o = m = a/ ° ° 7 £ 6 _ $ 2 [ � c$ o 0 a® L / / f E 0 \\ / / \ ( f \ \ Fp a) EE _ ° ° m E / ( / o / / ° ° / © — _ / _ $ / \ o = a. o ce m ° / w % 2 £ ° @i_ E \ - ƒ I- / ) / ƒ wo 2 z 2 $ 0 a) e = g ■ _ 0 22 0 .0 .gbq # k " w ° k � � ,c \ / / \ a Ef m � I � 7 22 = > = E o5 � \ ° 22 » U � � ± ) 0 ? \ � 8 F kw k - / E _ £ 22 m7 � df 0w W E o m2 E - / 2 � 5 / 7a £ 32 $ E Ik / / / \ ƒ � \ / � � � � \ Z co _ - 0 § � 2 ƒ.� G / E § & < - J - ° Da) % k9- f G 03 0 .7 7 0 \ # „, - o_ f o co w re D 2 / k s E / \ ƒ E \ \ _ � ± @g � $ % F ® b $ 2 Z � � 2 O 2 ,F \ & = a \ § o @ u W a Z q 5 2 - 2 p E '� % O w 2 2 2 F2 / E \ y2o mE _12 � o - ■ - � ■ coo � F5 / / \ E b / / o � = 5 O — - / \ / 20 7 / c E .§ \ % 2 @ / / 7 \ 0 7 ƒ « L 7 $ � \ c.) co 2 � 6 - , U) N z = I � \ a) \t .4 \ 2 u2 \ 60cO / � 20 \ \ / J \ § 03k ^ o E o & b - Z 00 \ k \\ > — \ ƒ b 0 & \ I � / � � � � -- C / E � = « = - / a \ \ - E = n @ @ p « 0 s : / w / \ Gz ® o SIB § \ f O z 04141 0 co as _ \ 0 /\ 2 'k ° C o c 0 t \ c m 9 _ = 7 o m E E ` � � \ as 2 moo = a75 £ A { o x e o m _ = o = r n b o ± z = e o � _ 0 >- & co 3 E - 0 CERTIFIED MBE / WBE CONTRACTORS CITY OF WATERLOO, IOWA m E'rloo `- CONTRACT COMPLIANCE OFFICE Community Development Board Carnegie Annex, Suite 202 620 Mulberry Street Waterloo, Iowa 50703 City WEB Site: www.ci.waterloo.ia.us Contract Compliance WEB Site for listing updates: http://www.wplwloo.lib.ia.us/contractcompliance/ Contact: Louis Starks, Contracts and Grants Coordinator Email: louis.starksnwaterloo-ia.org Phone: (319) 291-4429 Fax: (319) 291-4431 Contract No. 739 _ MBE/WBE Certified Contractors List Page 1 of 5 CERTIFIED MBE CONTRACTORS CARTER ELECTRIC 725 Adams Street Waterloo, IA 50703 Phone: (319) 232-9808 Pager: (319) 235-4021 Contact: Derrick Carter Specializing in: ELECTRICAL CONTRACTOR CULPEPPER ELECTRIC 1731 Cottage Grove Avenue Waterloo, IA 50707 Phone: (319) 235-0885 Fax: (319) 236-8177 Contact: Martin Culpepper Certified: City of Waterloo Certified MBE, Licensed Electrician Specializing in: ELECTRICAL CONTRACTOR _ DANIELS HOME IMPROVEMENT 339 Albany Street Waterloo, IA 50703 Phone: (319) 961-1659 Contact: Sammy Daniels Specializing in: ALL TYPES OF CONCRETE FLATWORK, POURED WALLS ALL TYPES, FOOTINGS, LIGHT DEMOLITION CERTIFIED MBE CONTRACTORS D.C. CORPORATION 426 Beech Street Waterloo, IA 50703 Phone: (319) 236-9075 FAX: (319) 236-0515 Contact: Terry Phillips Contract No. 726 MBE'WBE Certified Contractors List Page 2 of 5 Certified: City of Waterloo Certified MBE, Iowa DOT, TSB Certified Specializing in: COMMERCIAL AND RESIDENTIAL DEMOLITION, CONCRETE PAVING, DRIVEWAYS, TRUCKING (ALL TYPES), GENERAL CONSTRUCTION GREER'S WORKS 2003 Plainview Street Waterloo, IA 50703 Phone: (319) 233-4701 Contact: Willie Greer Specializing in: DRIVEWAYS, SIDEWALKS, CARPENTRY, ROOFING, GENERAL CONSTRUCTION LOVE'S ENTERPRISE 835 West Fifth St. P.O. Box 246 Waterloo, IA 50704 Phone: (319) 233-3260 Contact: David Love Certified: Iowa DOT, City of Waterloo Certified MBE Specializing in: CONCRETE PAVING, ASPHALT, DRIVEWAYS, SIDEWALKS, TRUCKING OLD GREER'S WORKS 2309 Springview Street Waterloo, IA 50707 Phone: (319) 233-2150 Contact: David L. Greer, Sr. Specializing in: GENERAL CONSTRUCTION PAULINE COMPANY, INC. 139 Clark Street P. O. Box 1623 Waterloo, IA 50703 Phone: (319) 236-2345 FAX: (319) 236-1568 Contract No. 726 MBE/WBE Certified Contractors List Page 3 of 5 email: DJToay(aaol.com Certified: Targeted Small Business, Iowa DOT, City of Waterloo Certified MBE Contact: W.C. Stokes, Owner Specializing in: EROSION CONTROL, TRUCKING, GUARDRAIL, CLEARING AND GRUBBING CONCRETE PAVING, ASPHALT, CURB AND GUTTER, DRIVEWAYS, SIDEWALKS, MASONRY WORK, ROOFING, CD BASKETS, ROADWAY PIPE, TILE LOCATING, REVETMENT, SHOULDERS, FIELD FENCE, GENERAL CONSTRUCTION WORK QUICK CONSTRUCTION 217 Bates Street Waterloo, IA 50703 Phone: (319) 215-4166 Contact: Leroy Harrington Specializing in: ALL TYPES OF CONCRETE FLATWORK AND GENERAL CONSTRUCTION CHARLIE SCHAUF TRUCKING 627 Adams Street Waterloo, IA 50703 Phone: (319) 232-4717 Contact: Charles Schauf Specializing in: TRUCKING CERTIFIED WBE CONTRACTORS ATLAS PAINTING, INC.* 911 Sycamore Street P.O. BOX 65 Waterloo, IA 50704 Phone: (319) 232-9164 Specializing in: COMMERCIAL AND INDUSTRIAL PAINTING Contract No. 726 MBE WBE Certified Contractors List Page 4 of 5 _ PETERMAN & HAES CARPET ONE* 4003 University Avenue Waterloo, IA 50701 Phone : (319) 233-6131 FAX: (319) 233-6133 email: JR11486(aIcfu.net Certified: City of Waterloo WBE Contact : Carol Reese Specializing in: FLOOR COVERING WATCO CONSTRUCTION, INC.* 2920 Texas Street Waterloo, IA 50702 Phone : (319) 233-7481 Certified: City of Waterloo WBE Contact : Patricia J. Kimball Specializing in: STORM SEWER, INLETS, DRAIN TILE, WATER MAIN, SANITARY SEWER, INTAKE STRUCTURES * DENOTES WOMEN BUSINESS ENTERPRISE Contract No.726 MBE WBE Certified Contractors List Page 5 of 5 STATEMENT OF BIDDER'S QUALIFICATIONS (To be submitted by the Bidder only upon the specific request of the City of Waterloo, Iowa.) All questions must be answered and the date given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of bidder. 2. Permanent main office address. 3. When organized. 4. If a corporation, when incorporated. 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion.) 7. General character of work performed by your company. 8. Have you ever failed to complete any work awarded to you? If so, where and why? 9. Have you ever defaulted on a contract? If so, where and why? 10. List the more important projects recently completed by your company, stating the approximate cost for each, an the month and year completed. 11. List your major equipment available for this contract. 12. Experience in construction work similar in importance to this project. 13. Background and experience of the principal members of your organization, including the officers. 14. Credit available: $ 15. Give bank reference: 16. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the City of Waterloo, Iowa? Contract No. 739 SQ-1 BigRockRdBridges-103174.16 17. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the City of Waterloo, Iowa, in verification of the recitals comprising this Statement of Bidder's Qualifications. Dated at this day of , 200 . (Name of Bidder) By: Title: State of ) ss: County of , being duly sworn deposes and says that he is of (Name of Organization) and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of , 200 . Notary Public My commission expires , Contract No. 739 SQ-2 BigRockRdBridges-103174.16 GENERAL SPECIAL PROVISIONS 1. SCOPE OF WORK The work covered by this contract consists of furnishing all labor, equipment, and materials and performing all operations, in connection with the F.Y. 2009 BIG ROCK ROAD BRIDGES, REPLACEMENT WITH BOX CULVERTS, Contract No. 739 as shown on the contract drawings and in accordance with these specifications. The contract drawings, which accompany and form a part of this contract anc specifications, are dated March 12, 2009 . They have the general title of F.Y. 2009 BIG ROCK. ROAD BRIDGES, REPLACEMENT WITH BOX CULVERTS, Contract No. 739. The drawings are numbered and separately entitled as follows: SHEET NO. DESCRIPTION A.01 TITLE SHEET AND PLAN CERTIFICATIONS A.02 LEGEND AND SYMBOL INFORMATION C.01 GENERAL NOTES AND SURVEY CONTROL POINTS C.02 ESTIMATED QUANTITIES AND REFERENCE NOTES C.03 TYPICAL SECTIONS AND DETAILS C.04 POLLUTION PREVENTION PLAN C.05 SILT FENCE DETAILS D.01 BIG ROCK ROAD PLAN AND PROFILE -WEST CULVERT-TWIN 1 i'X4' D.02 BIG ROCK ROAD PLAN AND PROFILE - EAST CULVERT-TWIN 1 C X6' V.01-V.08 TWIN 10'X4' RCB CULVERT GENERAL NOTES, SITUATION PLAN i ND DETAILS V.09-V.16 TWIN 10'X6' RCB CULVERT GENERAL NOTES, SITUATION PLAN AND DETAILS The Iowa Department of Transportation English Standard Specifications for Highway and Bridge Construction, Series 2001 (as referenced) are to be used along with the special provisions and General Specifications for Construction described herein and shall be considered as part of the contract documents. 2. CONFLICTING SPECIFICATIONS All requirements of other specifications contained in the contract documents which conflict with the provisions of the special provisions will be considered void. 3. DUMPING AREAS Excess material resulting from construction operations shall be hauled to the County Landfill or other area secured by the Contractor and approved by the City Engineer. Rubble, rubbish, trees, brush, and other unsuitable backfill material, as designated by the City Engineer, shall be hauled to the County Landfill. All Landfill charges are to be considered incidental to the contract and are the responsibility of the Contractor. 4. CONSTRUCTION DAMAGE The Contractor shall exercise care during construction operations to ensure the safety and protection to existing features located near or within the limits of construction. Damage caused by negligence or poor workmanship, as determined by the Engineer, shall to considered the Contractor's responsibility. Contract No. 739 GSP-1 BigRockRdBridges-103174.16 5. REMOVED MATERIALS All materials removed, as part of this Contract shall remain the property of the City unless the City determines that he materials are not salvageable and the City does not want to retain ownership of the materials. Materials designated in the field by the Engineer as non-salvageable shall be hauled and disposed of by the Contractor at no cost to the City. All other materials shall be transported to locations as directed by the Engineer. No separate measurement or payment will be made for hauling or disposing of removed materials and it shall be considered incidental to applicable items. 6. MAILBOXES The Contractor shall notify the United States Postal Department of mailboxes that interfere with any part of the work before removing them, and the Contractor will relocate them as required by the Postmaster. The removal and replacement of mailboxes will not be considered for direct payment, but will be considered incidental to the item to which it applies. 7. PAY ITEMS All pay items are listed in the proposal and shall include the purchase of all materials, delivery of these materials, and furnishing all labor, plant and miscellaneous work needed to make the item complete. All such cost shall be incidental to the proposed item to which it applies and shall not be considered for separate payment. 8. BREAKDOWN OF LUMP SUM CONTRACT PRICE ITEMS The Contractor shall, immediately upon execution and delivery of the contract, before the first estimate for payment is made, deliver to the City Engineer a detailed estimate giving a complete breakdown of the lump sum contract prices. The submitted breakdown shall be approved by the City Engineer prior to any payment of any lump sum price item. 9. PERMISSION TO HAUL OVER STREETS, RAILROADS AND HIGHWAYS The Contractor will be required to secure, from the proper authorities, permission or permit which may be required to haul over streets, highways, railroads or private property, and any hauling operations of the Contractor shall be subject to the requirements of such permits, permission, and to all applicable regulations, laws, and ordinances governing hauling and movement of equipment over streets, railroads, highways and private property. Any costs or inconvenience caused by obtaining any necessary permits or permission shall be considered completely covered by the price bid for the items in the proposal. 10. CONSTRUCTION SCHEDULING The City Engineer shall approve Contractor's work schedule prior to starting. All revisions shall also be approved. The City Engineer may change the schedule to accommodate changing construction conditions. The Contractor shall coordinate the work under this contract with contractors performing work under other contracts, which may be performed concurrently. The Contractor shall be responsible to notify the Police, Fire, Street and Engineering Departments of the closing and opening of streets. The Contractor shall commence work within ten (10) days after receipt of the "Notice to Proceed" and diligently execute the work of the contract to completion. Contract No. 739 GSP-2 BigRockRdBriu ges-103174.16 11. PRE-CONSTRUCTION CONFERENCE Before any work is started, the Contractor shall arrange with the City Engineer to hold a pre- construction conference to discuss problems and schedules of contracts. 12. UNDERGROUND UTILITIES It is the responsibility of the Contractor to obtain the location of gas lines, water lines, electric, telephone, and cable television cables or wires from the various utility companies and the City electrician before starting any excavation. The Contractor shall be responsible for any damage to any underground utilities. The Contractor shall expose those utilities indicated on the plans so that elevations may be determined before beginning construction. This work shall be considered incidental to other items of work. If the Contractor believes that additional costs have been incurred due to a utility being improperly located, the resolution of the additional costs incurred shall be made between the Contractor and the respective utility company. 13. TRAFFIC SIGNS AND STREET SIGNS The Contractor shall contact the City of Waterloo Traffic Operations Department to have any street sign that will be affected by construction removed and replaced when the work has been completed. 14. TRAFFIC CONTROL DURING CONSTRUCTION The Contractor shall, at his own expense and without further or other order, provide, erect and maintain, at all times during the progress and suspension of the work and until completion and final acceptance thereof, suitable and requisite barricades, signs or other adequate protection, as required by the latest edition of the "Iowa Manual on Uniform Traffic Control Devices for Streets and Highways" and shall provide, keep and maintain such barricades, signs, etc., as may be required or as may be ordered by the Engineer, to ensure the safety of the public as well as those engaged on the work. The Engineer shall review all barricading plans. The Contractor shall determine, provide and obtain approval from the City Engineer on all detour locations for all street closings, barricades and posting prior to construction. These shall meet requirements of the City Police Traffic Department. The Contractor shall notify the City Engineer's Office and the Police, Fire and Street Departments when the street is closed for construction. All barricading shall be in accordance with the latest edition of the "Iowa Manual on Uniform Traffic Control Devices for Street and Highways." Encapsulated lens sheeting is not required on this project. 15. GRADES, LINES, LEVELS AND SURVEYS All necessary grades, lines, levels and surveys shall be established by AECOM and maintained by the Contractor. The Contractor shall verify all grades, lines, levels and dimensions as sown on the drawings, and he shall report any errors or inconsistencies in the same to AECOM before commencing work. 16. SAFETY OF WORKERS AND PUBLIC The Contractor shall, at all times, take necessary precautions to protect the life and health of all persons employed on this project and the public. He shall provide necessary safety devices and safeguards in accordance with latest and best accident prevention practices. All such protection shall be furnished to employees without cost. Contract No. 739 GSP-3 BigRockRdBridges-103174.16 No direct measurement of payment shall be made for this protection, but shall be considered incidental to other items of work. The public shall be kept outside of any work area. 17. WORKING ON SATURDAYS, SUNDAYS AND LEGAL HOLIDAYS The Contractor shall notify the Engineer in writing forty-eight (48) hours in advance if work on • Saturday is planned. By noon the Friday before the planned Saturday work, the Contractor shall confirm the Saturday work schedule with the project inspector. Work on Sunday requires prior approval of the Engineer in accordance with the Waterloo Standard Specifications. The Contractor shall not work the following days in 2009 due to City holidays: May 23-25, July 3 -5, September 5- 7. Contract No. 739 GSP-4 BigRockRdBridges-103174.16 SPECIAL PROVISIONS 1. TRAFFIC CONTROL—IMPROPER MAINTENANCE The Engineer, or authorized representative, shall periodically review traffic control that has been put in place by the Contractor. If traffic control devices are found to be without proper maintenance, penalties shall be assessed. Improper maintenance shall include, but not be limited to, the following situations: A. Less than 100 percent of lights in working order. B. Any barricade or sign moved or tipped over. C. Fencing not supported in a vertical position. D. Fencing not placed around excavations when workers/equipment are not working at the location. E. Lack of proper barricades or signage. Each incident is treated as a separate citation on an individual basis. It is not intended that minor deficiencies be price adjusted if corrected the day notification is given. In addition to a price adjustment, the Engineer may suspend work for irresponsible and/or repeated failure to construct the project using proper traffic control procedures. Penalties: 1st Offense Written warning given by City. 2nd Offense $ 100 3rd Offense $ 250 _ 4th Offense $ 500 5th Offense $1,000 6th Offense Engineer's discretion (amount or more equal or greater than $1,000) 2. LIQUIDATED DAMAGES Time is an essential element of this contract. It is important that the work be diligently pursued to completion. If the work is not completed within the specified contract period, plus authorized extensions, the Contractor shall pay to the City Liquidated Damages in the amount of $500.00 per day, for each day, as further described herein, in excess of the authorized time. Days beyond the specified completion date for which Liquidated Damages will be charged will be working days that the Contractor does, or could have worked from Monday through Saturday. Sundays will be counted only if work is performed. Partial working days will be considered as a full working day. Days not chargeable for Liquidated Damages will include rain days, Sundays if no work is done, and legal holidays. Working days will cease to be charged when only punch list items remain to be completed. Punch list item do not include contract bid items or approved change/extra work orders. When the Contractor believes the project to be substantially completed, a written notice stating the — same shall be submitted to the Engineer and a request made for a Punch List. If the work under the Contract extends beyond the normal construction season for such work, the Contractor shall submit to the Engineer in writing a request that working days counted toward the project be suspended until work is resumed the following construction season. This amount is not construed as a penalty. These damages are for the cost to the City of providing the required additional inspection, engineering and contract administration. Contract No. 739 SP-1 BigRockRdBridges-103174.16 3. HAUL ROUTES — Haul routes to and from the project site shall be submitted for review by the Engineer. In general, the Contractor shall request haul routes over the main streets in the area, staying on streets within the project as much as possible and should not include truck-embargoed streets. — 4. STANDARD SPECIFICATIONS The Standard Specifications, which are referenced in the contract documents, are designated as follows: IDOT STANDARD SPECIFICATIONS - "Standard Specifications for Highway and Bridge Construction, Iowa Department of Transportation, Ames, Iowa, Series 2001" (unless otherwise — noted)and current revisions thereof. WATERLOO STANDARD SPECIFICATIONS - "Standard Specifications for Municipal Public Works Construction, City of Waterloo, Iowa." 5. PERCENT OF CONTRACT TO BE PERFORMED BY CONTRACTOR A. The prime contractor shall be required to perform at least 35 percent of the total contract amount of the project. 6. SPECIAL PROVISIONS Standard Specifications are amended by the following additions. These are Special Provisions and shall prevail over those published in the Standard Specifications. Section 01316 - Engineer's Status During Construction Section 100 - Clearing and Grubbing Section 101 - Earthwork — Section 102-Granular Materials Section 103- Bridge Approach Pavement, RK-18 Section 104 - Removal of Existing Bridges Section 105- Cast-in-Place Concrete Culvert Section 106-Subdrain Section 107 - Erosion Protection Section 108- Removal of Pavement — Section 109-Traffic Control Section 110 - Mobilization Section 111 - Pipe Supports Section 112 - Removal of Field Fence Section 113-Seeding Section 114-Silt Fence for Ditch Checks Pollution Prevention Plan 7. QUANTITY ADJUSTMENTS — The following Bid Items are exempted from consideration under the provisions of Section B. "Scope of Work," paragraph 7 of the "General Specifications for Construction" concerning the variance of the "As- Built" quantity of the listed item by more than twenty(20%) percent from the estimated quantity specified in the contract. — Contract No. 739 SP-2 BigRockRdBridges-103174.16 BID ITEM DESCRIPTION EST. QTY/UNIT 30 Removal of Field Fence 272.0 LF 31 Mulching 0.7 Acre 32 Seeding and Fertilizing (Rural) 0.7 Acre 33 Silt Fence for Ditch Checks 480.0 LF 34 Removal of Silt Fence for Ditch Checks 480.0 LF 35 Clean-Out of Silt Fence for Ditch Checks 480.0 LF -- Contract No. 739 SP-3 BigRockRdBridges-103174.16 SECTION 01316 ENGINEER'S STATUS DURING CONSTRUCTION PART 1 GENERAL 1.01 OWNER'S REPRESENTATIVE A. Project has been designed by AECOM who is hereinafter called ENGINEER, and who is to act as OWNER'S representative, assume duties and responsibilities, and have rights and authority assigned to ENGINEER in Contract Documents in connection with completion of Work in accordance with Contract Documents. 1.02 DEFINITIONS A. ENGINEER: 1. As used in Specifications and on Drawings refers to AECOM. 2. As used in other documents is defined in General Specifications. B. OWNER: 1. As used in Specifications and used on Drawings is defined as City of Waterloo. 1.03 VISITS TO SITE A. ENGINEER will make visits to Site at intervals appropriate to various stages o construction as ENGINEER deems necessary in order to observe as experienced and qualified design professional progress that has been made and quality of various aspects of CONTRACTOR's executed Work. Based on information obtained during such visits and observations, ENGINEER, for benefit of OWNER,will determine, in general, if Work is proceeding in accordance with Contract Documents. ENGINEER will not be required to make exhaustive or continuous inspections m Site to check quality or quantity of Work. ENGINEER's efforts will be directed toward provicing for OWNER greater degree of confidence that completed Work will conform generally to Contract Documents. On basis of such visits and observations, ENGINEER will keep OWNER informed on progress of Work and will endeavor to guard OWNER against defective Work. B. ENGINEER will furnish Resident Project Representative (RPR), assistants, and other field staff to assist ENGINEER in observing Work. Through additional observations of CONTRACTOR's Work in progress and field checks of materials and equipment by RPR and assistants, ENGINEER shall endeavor to provide further protection for OWNER against defects and deficiencies in Work. However, ENGINEER shall not, during such visits or result of such observations of CONTRACTOR's work in progress,supervise,direct,or have control over CONTRACTOR's Work nor shall ENGINEER have authority over or responsibility for means, methods, techniques, sequences or procedures selected by CONTRACTOR, for safety precautions or programs incident to CONTRACTOR's performing Work, or responsibility of construction for CONTRACTOR'S failure to perform Work in accordance with Contract Documents. C. RPR'S duties and responsibilities limited to those of ENGINEER in agreement with OWNER and in Contract Documents, and further limited and described as follows: 1. General: RPR is ENGINEER'S agent at Site,will act as directed by and under supervision of ENGINEER, and will confer with ENGINEER regarding RPR'S actions. RPR'S dealings in matters pertaining to CONTRACTOR's Work in progress shall, in general be with ENGINEER and CONTRACTOR keeping OWNER advised as necessary. RPR'S dealings with Contract No. 739 01316-1 BigRockRdBldges-103174.16 Subcontractors through or with full knowledge and approval of CONTRACTOR. RPR shall generally communicate with OWNER with knowledge of and under direction of ENGINEER. 2. Duties and Responsibilities of RPR Representative: a. Conduct preconstruction conference with OWNER, CONTRACTOR(s), utilities, and other appropriate parties affected by Project. b. Attend meetings with CONTRACTOR,such as progress meetings,job conferences and other Project related meetings. c. Report to ENGINEER when clarifications and interpretations of Contract Documents are needed and transmit to CONTRACTOR clarifications and interpretations as issue by ENGINEER. d. Review Applications for Payment with CONTRACTOR for compliance with established procedure for their submission and forward with recommendation to ENGINEER. e. Provide direction for assistants and coordinate observation activities. f. Direct visiting inspectors representing public or other agencies having jurisdiction over Project to OWNER or CONTRACTOR as appropriate. g. Administer modifications amending, modifying or supplementing Contract Documents as Project proceeds. h. Report to ENGINEER whenever RPR believes that any part of CONTRACTOR's Work in progress will not produce completed Project that conforms generally to Contract Documents or will prejudice integrity of design concept of completed Project as functioning whole as indicated in Contract Documents, or has been damaged, or does not meet requirements of any inspection, test or approval required to be made; and advise ENGINEER of that part of Work in progress that RPR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or approval. i. Review testing of equipment and systems provided by CONTRACTOR and assess its compliance with Contract Documents. j. Determine final quantities for Work installed which will serve as basis for final payment to CONTRACTOR. k. Coordinate efforts required to prepare record drawings showing those changes during construction process, based on marked-up prints,drawings,and other data furnished by CONTRACTOR to ENGINEER and which ENGINEER considers significant. I. Participate in inspections for substantial and final completion of Project and prepare list of items to be corrected or completed. 3. Duties and Responsibilities of RPR'S Assistant(s): a. Assistant(s)shall function under direction and supervision of RPR. b. Observe Work activities, as directed, and report their observations to RPR. Observed variance in Work activities from intent of Contract Documents will be reported to RPR. c. Inform RPR when situations develop such that change in Contract Documents would serve to improve Project. d. Gather and maintain information required for pay estimate review by RPR. e. Perform other duties as directed by RPR. f. Assistant(s)will have limitations on responsibilities and authority. Assistant(s)will: 1) Not be authorized to modify or otherwise change Contract Documents. — 2) Not have authorization necessary to accept any Work on behalf of OWNER. 3) Not be authorized to delete or order any additional Work. 4) Not, through his efforts, relieve CONTRACTOR of CONTRACTOR'S ultimate _ responsibility for quality of Work. Contract No. 739 01316-2 BigRockRdBridges-103174.16 1.04 CLARIFICATIONS AND INTERPRETATIONS A. ENGINEER will, with reasonable promptness, render a written clarification or interpretation of requirements of Contract Documents. The ENGINEER'S written decision will be final and binding on OWNER and CONTRACTOR, subject to provisions for making claims. 1.05 AUTHORIZED VARIATIONS IN WORK A ENGINEER may authorize minor variations in Work from requirements of Contract Documents which do not involve adjustment in Contract Price or Contract Times and are compatible with design concept of completed project as functioning whole as indicated by Contract Documents. These may be accomplished by Field Order and will be binding on OWNER and also on CONTRACTOR, who shall perform Work involved promptly. If OWNER or CONTRACTOR believes that a Field Order justifies an adjustment in the Contract Price or Contract Times, or both, and the parties are unable to agree on entitlement to or on amount or extent, if any, of any adjustment, a claim may be made therefor as provided in Article B.6 of General Specifications. 1.06 REJECTING DEFECTIVE WORK A. ENGINEER will have authority to disapprove or reject Work which ENGINEER believes to be defective,or that ENGINEER believes will not produce completed Project that conforms to Contract Documents or that will prejudice integrity of design concept of a completed Project as functioning whole as indicated by Contract Documents. ENGINEER will also have authority to require special inspection or testing of Work whether or not Work is fabricated, installed or completed. 1.07 DECISIONS ON REQUIREMENTS OF CONTRACT DOCUMENTS AND ACCEPTABILITY OF WORK A. ENGINEER will be initial interpreter of requirements of Contract Documents and judge of acceptability of Work thereunder. All matters in question and other matters between OWNER and CONTRACTOR arising prior to the date of final payment is due relating to the acceptability of the Work, and interpretation of requirements of Contract Documents pertaining to performance of Work will be referred initially to ENGINEER in writing within 30 days of the event giving rise to the question. B. Notice: Written notice stating general nature of each such Claim shall be delivered by claimant to ENGINEER and other party to Contract promptly(but in no event later than 30 days)after start of event giving rise thereto. The responsibility to substantiate a Claim shall rest with the party making the Claim. Notice of amount or extent of Claim, with supporting data shall be delivered to ENGINEER and other party to Contract within 60 days after start of such event(unless ENGINEER allows additional time for claimant to submit additional or more accurate data in support of such claim. Claim for adjustment in Contract Price or Contract Time shall be prepared in accordance with Contract Documents. Each Claim shall be accompanied by claimant's written statement that adjustment claimed is entire adjustment to which claimant is entitled as result of said event. Opposing party shall submit any response to ENGINEER and claimant within 30 days after receipt of claimant's last submittal (unless ENGINEER allows additional time). C. ENGINEER's Action: ENGINEER will review each Claim and, within 30 days after receipt of last submittal of claimants or last submittal of claimant or last submittal of opposing party, if any, take one of the following actions in writing: 1. deny the Claim in whole or in part, 2. approve the Claim, or 3. notify the parties that the ENGINEER is unable to resolve the Claim if, in the ENGINEER'S sole discretion, it would be in appropriate for the ENGINEER to do so. For the purposes of further dispute resolution of the Claim, such notice shall be deemed a denial. Contract No. 739 01316-3 BigRockRdBridges-103174.16 D. In the event that the ENBGINEER does not take action on a Claim within said 30 days, the Claim shall be deemed denied. E. ENGINEER'S written action under paragraph C above or denial pursuant will be final and binding upon OWNER and CONTRACTOR , unless OWNER and CONTRACTOR invoke the dispute resolution procedure set forth in the Contract Documents. F. When functioning as interpreter and judge under above paragraphs, ENGINEER will not show partiality to OWNER or CONTRACTOR and will not be liable in connection with interpretation or decision rendered in good faith in such capacity. A decision by ENGINEER shall be required as a condition precedent to any exercise by OWNER or CONTRACTOR of any rights or remedies either may otherwise have under Contract Documents or by Laws or Regulations in respect to such claims. 1.08 SHOP DRAWINGS AND SAMPLES A. ENGINEER's Review: 1. ENGINEER will provide timely review of Shop Drawings and Samples in accordance with schedule of submittals acceptable to ENGINEER. ENGINEER's review and approval will be only to determine if items covered by submittals will,after installation or incorporation in Work, conform to information given in Contract Documents and be compatible with design concept of completed Project as functioning whole as indicated by Contract Documents. 2. ENGINEER'S review and approval will not extend to means, methods,techniques,sequences or procedures of construction(except where specific means,method,technique,sequence or procedure of construction is specifically and expressly called for by Contract Documents)or to safety precautions or programs incident thereto. Review and approval of separate item as such will not indicate approval of assembly in which item functions. 3. ENGINEER'S review and approval shall not relieve CONTRACTOR from responsibility for any variation from requirements of Contract Documents unless CONTRACTOR has in writing called ENGINEER'S attention to each such variation at time of submittal and ENGINEER has given written approval of each such variation by specific written notation thereof incorporated in or accompanying Shop Drawing or Sample. ENGINEER'S approval will not relieve CONTRACTOR from responsibility for complying with CONTRACTOR's submittal procedures established in Contract Documents. B. Resubmittal Procedures: 1. CONTRACTOR shall make corrections required by ENGINEER, and return required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. CONTRACTOR shall direct specific attention in writing to revisions other than corrections called for by ENGINEER on previous submittals. C. Where Shop Drawing or Sample is required by Contract Documents,related Work performed prior to ENGINEER'S review and approval of pertinent submittal will be at CONTRACTOR'S sole expense and responsibility. 1.09 SUBSTITUTIONS -- A. ENGINEER's Evaluation: 1. ENGINEER will be allowed reasonable time within which to evaluate each proposed substitute. ENGINEER will be sole judge of acceptability. No substitute will be ordered, installed or utilized until ENGINEER'S review is complete,which will be evidenced by either a Change Order or approved Shop Drawing. ENGINEER will advise CONTRACTOR in writing of any negative determination. OWNER may require CONTRACTOR to furnish, at CONTRACTOR'S expense, special performance guarantee or other surety with respect to any substitute. Contract No. 739 01316-4 BigRockRdBridges-103174.16 1.10 LIMITATIONS ON ENGINEER'S AUTHORITY AND RESPONSIBILITIES A. Neither ENGINEER'S authority or responsibility under this Specification Section or under any other provision of Contract Documents nor any decision made by ENGINEER in good faith to either exercise or not exercise such authority or responsibility or undertaking, exercise,or performance of any authority or responsibility by ENGINEER shall create, impose, or give rise to any duty in contract, tort, or otherwise owed by ENGINEER to CONTRACTOR, any Subcontractor, any Supplier, or any other individual or entity, or to any surety for or employee or agent of any of them. -- B. Whenever in Contract Documents terms"as allowed", "as approved"or terms of like effect or import are used, or adjectives"reasonable", "suitable", "acceptable,""proper"or"satisfactory"or adjectives of like effect or import are used to describe action or determination of ENGINEER as to Work, it is intended that such action or determination will be solely to evaluate, in general,completed Work for compliance with requirements of and information in Contract Documents and conformance with design concept of completed Project as functioning whole as shown or indicated in Contract Documents (unless there is specific statement indicating otherwise). Use of any such term or adjective shall not be effective to assign ENGINEER any duty or authority to supervise or direct performance of Work or any duty or authority to undertake responsibility contrary to provisions of Contract Documents. C. ENGINEER will not supervise, direct, control or have authority over or be responsible for CONTRACTOR'S means, methods,techniques,sequences or procedures of construction,or safety precautions and programs incidental thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to performance of Work. ENGINEER will not responsible for CONTRACTOR'S failure to perform Work in accordance with Contract Documents. D. ENGINEER will not be responsible for acts or omissions of CONTRACTOR or of any Subcontractor, any Supplier, or of any other individual or entity performing any Work. E. Limitations upon authority and responsibility set forth shall also apply to ENGINEER's Consultants, Resident Project Representative, and assistants. 1.11 STAKING A. Proposed work will be staked once, by ENGINEER, at no expense to CONTRACTOR. Should CONTRACTOR request restaking,this work will be done as ENGINEER'S schedule permits and at expense of CONTRACTOR. Notify ENGINEER at least 3 days prior to start of open-cut work or 7 days prior to start of jacked or augered work and when making periodic requests for line and grade stakes. 1. ENGINEER will provide one line of survey stakes for utility work and prepare separate cut —' sheets where multiple pipes are located in common trench. 2. CONTRACTOR shall maintain survey stakes. PART 2 PRODUCTS (Not Used) PART 3 EXECUTION (Not Used) 't** END OF SECTION Contract No. 739 01316-5 BigRockRdBridges-103174.16 SECTION 100 CLEARING AND GRUBBING 100-1 GENERAL A. Description: 1. Clearing and grubbing shall include areas as noted in plans. 100-2 SPECIFICATIONS A. IDOT Specifications: 1. In accordance with IDOT specifications for Highway and Bridge Construction, Series 2001, Section 2101.01 and Section 2101.02 and as amended herein. 100-3 EXECUTION A. Disposal: 1. Disposal of all materials resulting from clearing and grubbing shall be the responsibility of the CONTRACTOR. Disposal shall be made in accordance with all applicable federal, state, county and local laws and regulations. 100-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Clearing and Grubbing. Clearing and Grubbing will be measured in acres per IDOT Standard Specifications. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. ** * END OF SECTION ** * Contract No. 739 100-1 BigRockRdBridges-103174.16 -- SECTION 101 EARTHWORK Embankment-in-Place _„ Excavation, Class 10, Roadway and Borrow Excavation, Class 10, Channel Topsoil, Strip, Salvage and Spread Shoulder Construction, Earth Excavation, Class 20 101-1 GENERAL A. Description: 1. This section shall cover all earthwork to be encountered in this project. Any work not specifically listed as a bid item or mentioned in the method of measurement will be considered as incidental to the work to which it pertains and will not be paid separately. 2. Embankment-in-Place shall be in accordance with Section 2102 of the IDOT Specifications. 3. Class 10 Excavation shall consist of excavation, grading, borrow, construction of slopes and embankments necessary for the construction of the roadway and channel work to the —� lines, grades and dimensions shown on the drawings and in accordance with these specifications. Type A compaction is required. 4. Topsoil, Strip, Salvage and Spread shall be in accordance with Section 2105 of the IDOT Specifications. 5. Shoulder Construction, Earth, shall be in accordance with Section 2123 of the IDOT Specifications. 6. Excavation, Class 20, shall be in accordance with Section 2402 of the IDOT Specifications. 101-2 SPECIFICATIONS A. IDOT Specifications: 1. Term "IDOT Specifications" in this section refers to Standard Specifications for Highway and Bridge Construction, Series of 2001, Iowa Department of Transportation, including current revised and supplemental specifications. 2. Construction shall be in accordance with Sections 2102, 2104, 2105, 2123 and 2402 of the IDOT Specifications, except as amended herein. 101-3 EXECUTION -- A. Embankment-in-Place shall be in accordance with Section 2102 of the IDOT Specifications. B. Class 10 Excavation, Roadway and Borrow: 1. The work described under Class 10 Excavation shall be in accordance with IDOT Specification 2102 and shall be finished in a workmanlike manner to the lines, grades and elevations shown on the drawings. 2. Overhaul will not be measured or paid for separately for this project, but will be considered incidental to this bid item. Contract No. 739 101-1 BigRockRdBridges-103174.16 C. Excavation, Class 10, Channel, shall be in accordance with Section 2104 of the IDOT Specifications. D. Topsoil, Strip, Salvage and Spread shall be in accordance with Section 2105 of the IDOT Specifications. E. Shoulder Construction, Earth, shall be in accordance with Section 2123 of the IDOT Specifications. F. Excavation, Class 20 shall be in accordance with Section 2402 of the IDOT Specifications. 101-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Embankment-in-Place. Embankment-in-Place will be measured in cubic yards per IDOT Standard Specifications. 2. Excavation, Class 10, Roadway and Borrow. Class 10 Excavation will be measured in cubic yards per IDOT Standard Specifications. 3. Excavation, Class 10, Channel. Class 10 Channel will be measured in cubic yards per IDOT Standard Specifications. 4. Topsoil, Strip, Salvage and Spread. Topsoil, Strip, Salvage and Spread will be measured in cubic yards per IDOT Standard Specifications. 5. Shoulder Construction, Earth. Shoulder Construction, Earth, will be measured in stations per IDOT Standard Specifications. 6. Excavation, Class 20. Excavation, Class 20, will be measured in cubic yards per IDOT Standard Specifications. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. ** * END OF SECTION ** * ` Contract No. 739 101-2 BigRockRdBridges-103174.16 SECTION 102 GRANULAR MATERIALS Modified Subbase Granular Shoulders, Type B Aggregate, Roadway Cover, '/z-In. Binder Bitumen Granular Surfacing on Road, Class A Crushed Stone Granular Backfill Granular Bedding 102-1 GENERAL A. Description: 1. Modified Subbase for P.C. concrete paving shall be in accordance with Section 2115 of the IDOT Specifications. -- 2. Granular Shoulders, Type B, shall be in accordance with Section 2121 of the IDOT Specifications. 3. Aggregate, Roadway Cover, 1/2-In., shall be in accordance with Section 2307 of the IDOT _ Specifications. 4. Binder Bitumen shall be in accordance with Section 2307 of the IDOT Specifications. 5. Granular Surfacing on Road, Class A Crushed Stone, shall be in accordance with Section 2312 of the IDOT Specifications. 6. Granular Backfill shall be in accordance with Section 2402 of the IDOT Specifications. 7. Granular Bedding shall be in accordance with project plans. 102-2 SPECIFICATIONS A. Referenced Specifications: 1. Standard Specifications for Highway and Bridge Construction, Iowa Department of Transportation, Series of 2001, and all current supplemental specifications (Iowa DOT Specifications). 2. Construction shall be in accordance with Section 2115, 2121, 2307, 2312 and 2402 of the IDOT Specifications, except as amended herein. 102-3 MATERIALS A. Modified Subbase material shall meet the requirements of Section 2115 of the IDOT Specifications. B. Granular Shoulders,Type B, shall meet the requirements of Section 2121 of the IDOT Specifications. C. Aggregate, Roadway Cover, '/z-In., shall meet the requirements of Section 2307 of the IDOT Specifications. D. Binder Bitumen shall meet the requirements of Section 2307 of the IDOT Specifications. E. Granular Surfacing on Road,Class A Crushed Stone, shall meet the requirements of Section 2312 of IDOT Specifications. F. Granular Backfill shall meet the requirements of Section 2402 of the IDOT Specifications. G. Granular Bedding shall be specified in the project plans. Contract No. 739 102-1 BigRockRdBridges-103174.16 102-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Modified Subbase. Modified Subbase will be measured in cubic yards per the IDOT Specifications. 2. Granular Shoulders, Type B. Granular Shoulders, Type B, will be measured in tons per the IDOT Specifications. 3. Aggregate, Roadway Cover, '/2-In. Aggregate, Roadway Cover, '/2-In., will be measured in tons per IDOT Specifications. 4. Binder Bitumen. Binder Bitumen will be measured in gallons per the IDOT Specifications. 5. Granular Surfacing on Road, Class A Crushed Stone. Granular Surfacing on Road, Class A Crushed Stone will be measured in cubic yards per the IDOT Specifications. 6. Granular Backfill. Granular Backfill will be measured in cubic yards per the IDOT Specifications. 7. Granular Bedding. Granular Bedding will be measured in cubic yards as indicated in the project plans. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity(as determined in the Method of Measurement)by the unit price on the Proposal Form in accordance with the Standard Specifications. * * * END OF SECTION ** * Contract No. 739 102-2 BigRockRdBridges-103174.16 SECTION 103 BRIDGE APPROACH PAVEMENT, AS PER PLAN 103-1 GENERAL -- A. The work covered in this section of the specifications consists of the construction of Portland cement concrete pavements of varying full depth thicknesses at the location shown on the plans. 103-2 SPECIFICATIONS A. IDOT Specifications-Standard Specifications for Highway and Bridge Construction, Iowa Department of Transportation, Series of 2001 and all current Supplemental Specifications. B. Construction shall be in accordance with Section 2301 of the IDOT Specifications, except as modified below. C. ASTM -American Society for Testing Materials. D. AASHTO-American Association of State Highway and Transportation Officials. 103-3 QUALITY ASSURANCE A. Required Certifications: 1. Certification of P.C. concrete ingredients from materials producers. 2. A mix design in accordance with these specifications shall be submitted and certification from the -- supplier that the P.C. concrete furnished for this project meets the submitted mix design. 103-4 MATERIALS A. P.C.concrete paving shall be standard or slip formed, nonreinforced in accordance with Section 2301 of the IDOT Specifications. 1. Concrete shall be Class C, Mix No. C-4. The use of water reducing admixtures and fly ash are allowed within the limitations of IDOT Specification Section 2301.04. 2. Aggregate durability shall be Class 3 or better. B. Curing compound for paving shall meet the requirements of Section 4105 of the IDOT Specifications. C. Joint sealer for paving and approach expansion and contraction joints shall be in accordance with one of the appropriate materials specified in Section 4136 of the IDOT Specifications. D. Reinforcement for paving (dowels) shall meet the requirements of Section 4151 of the IDOT Specifications. 103-5 EXECUTION A. Construction of P.C. concrete paving shall meet the requirements of Section 2301 of the IDOT Specifications and shall be completed in a workmanlike manner to the lines,grades,thicknesses,typical cross sections and elevations shown on the Drawings. Contract No. 739 103-1 BigRockRdBridges-103174.16 103-6 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Bridge Approach Pavement, As Per Plan. Bridge Approach pavement will be measured in square yards per IDOT Specifications. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity(as determined in the Method of Measurement)by the unit price on the Proposal Form in accordance with the Standard Specifications. *** END OF SECTION **' Contract No.739 103-2 BigRockRdBridges-103174.16 SECTION 104 REMOVAL OF EXISTING BRIDGES 104-1 DESCRIPTION A. Work under this section includes the removal of the two existing bridges as specified in the project plans. 104-2 SPECIFICATIONS A. IDOT Specifications: 1. Term "IDOT Specifications" in this section refers to Standard Specifications for Highway and Bridge Construction, Series of 2001, Iowa Department of Transportation, including current revised and supplemental specifications. 104-3 EXECUTION A. Construction shall be in accordance with Sections 2401 of the IDOT Specifications and as indicated in the project plans. 104-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Removal of Existing Bridges. Removal of Existing Bridges will be measured each as indicated in the project plans. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. ** * END OF SECTION ** * Contract No.739 104-1 BigRockRdBridges-103174.16 SECTION 105 CAST-IN-PLACE CONCRETE CULVERT Structural Concrete(RCB Culvert) Reinforcing Steel Reinforcing Steel, Epoxy Coated Flowable Mortar 105-1 GENERAL A. The work covered in this section of the specifications consists of the construction of two cast-in- place Portland cement concrete box culvert and headwalls of varying dimensions at the location shown on the plans. 105-2 SPECIFICATIONS A. IDOT Specifications: Standard Specifications for Highway and Bridge Construction, Iowa Department of Transportation, Series of 2001, and all current Supplemental Specifications. B. Construction shall be in accordance with Sections 2403, 2404 and 2506 of the IDOT Specifications, except as modified below. C. ASTM: American Society for Testing Materials. D. AASHTO: American Association of State Highway and Transportation Officials. 105-3 QUALITY ASSURANCE -- A. Required Certifications: 1. Certification of PC concrete ingredients from materials producers. 2. A mix design in accordance with these specifications shall be submitted and certification from the supplier that the PC concrete furnished for this project meets the submitted mix design. 105-4 MATERIALS A. PC concrete culverts and headwalls shall be cast-in-place, reinforced PCC in accordance with Section 2403 of the IDOT Specifications and the project plans. 1. Concrete shall be Class C. The use of admixtures and flyash are allowed within the limitations of IDOT Specifications Section 2403.03. 2. Aggregate durability shall be Class 2 or better. B. Structural concrete shall be wet cured. C. Reinforcement for box culvert and headwall shall meet the requirements of Sections 2404 and 4151 of the IDOT Specifications. D. Flowable Mortar shall be in accordance with Section 2506 and per the details shown in the plans. 105-5 EXECUTION A. Construction of PC concrete box culvert and headwall shall meet the requirements of Section 2403 of the IDOT Specifications and shall be completed in a workmanlike manner to the lines, grades, thicknesses, typical cross sections and elevations shown on the Drawings. City Contract No. 739 105-1 BigRockRdBridges-103174.16 B. Reinforcement shall be furnished and placed in accordance with Section 2404 of the IDOT Specifications. 105-6 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Structural Concrete (RCB Culvert). Structural Concrete (RCB Culvert) 'rill be measured in cubic yards per IDOT Specifications. 2. Reinforcing Steel. Reinforcing Steel will be measured in pounds per IDO T Specifications. 3. Reinforcing Steel, Epoxy Coated. Reinforcing Steel, Epoxy Coated, will be measured in pounds per IDOT Specifications. 4. Flowable Mortar. Flowable Mortar will be measured in cubic yards per IDOT Specifications. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. * * * END OF SECTION ** * City Contract No. 739 105-2 BigRockRdkridges-103174.16 SECTION 106 SUBDRAIN Subdrain, Plastic Pipe, 6-In. Dia. Subdrain Outlet, RF-19E 106-1 DESCRIPTION A. Work under this section includes furnishing and installing subdrains and subdrain outlets of the size and type shown in the Contract Documents. 106-2 SPECIFICATIONS A. IDOT Specifications: 1. Term "IDOT Specifications" in this section refers to Standard Specifications for Highway and Bridge Construction, Series of 2001, Iowa Department of Transportation, including current revised and supplemental specifications. 106-3 EXECUTION A. Construction shall be in accordance with Section 2502 of the IDOT Specifications. B. IDOT Standard Road Plan RF-19E is included and considered to be part of these specifications. 106-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Subdrain, Plastic Pipe, 6-In. Dia. Subdrain, Plastic Pipe, 6-In. Dia., will be measured in lineal feet per IDOT Specifications. 2. Subdrain Outlet, RF-19E. Subdrain Outlet, RF-19E, will be measured each per IDOT Specifications. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. *** END OF SECTION ** * City Contract No. 739 106-1 BigRockRdBridges-103174.16 ... W " Is 3..6z 20; I 2 r. ,9 kg fl 0m HIil I a 5! !U .. m call"m Ew L°v g 4. 0 E • E CO N IIII i i in O C$ NE a s -'E o Fm E o��E.m c g o £rn „m 3 c Ern .� o E W M d , ill O N gEc rn o n e gEm= E°6 E „ n civ £ i i t g U a y g I g l a LL v H_o E2 E U II Q "6.2t „ a I1tI ��cEm 11111 nmg2. "- 5 No m 0Ca) 0 OG '-10 t am1 >.Q .Ha g «a `o T°:i m � i Q \mow m m _ QZ � EE og mtP m c� EaE nn� aN£ mo n`° S of d O 00 Q c ' i o.v$ m 5 43 c c E n_ r 3 c 8 A may. Fi• ai E 2 ' c m E. . g E E R$ E E a-V E' m n a s t 2 S a LAl Z _ c m �i E c c E E rn '�' w" cg 2 rn Ta E 2 o m H s Ti SE `o E 0 .. ca a c g 9 .+ u 2 U H i/7 _ „ yy; sa .2 e o o E E o .0 7 m j g' V na' 8 o E .8 5 N q y a �n 1} 'E'no � S .all R.c m • n ""-sr,, t 3 E E s m E_v `8 U=v f n 52 E E d E E , O c� E [7 to o v io 7a d U n r cg 8 U o F io o n e e 8 6 0 8 e 8 0 0 • _ 0 i c a L. k 400 1 O O W p 49 ; E 1 y ti )4' a° poorPo—lio 7 Ti.., LS .„, 9 , AC''' .4 . a � oES W 5 0 -15 OLW�a 0 b 4 IkL d it.' t O Mu \�\ 11 Or Ll la :: ,i1._ / ---=--. / w > 16..li a' A ki t #_=, / ,.0: 1,, , ri.) — , 7 f; i P.. : i ff- , I=1 i , „.......4 ...,.. .... yJ'j IA! . ' I / / .... a•4g4 I 44, ee , 1 tt :Lii _El 1 I R. 0...N v a 1 I c = a 0 p 8NC Fo: `I F I © I 0 • _ _oiJ SECTION 107 EROSION PROTECTION Engineering Fabric Concrete Grout for Revetment or Gabion Revetment, Class E 107-1 GENERAL A. Description: 1. This work shall include the installation of engineering fabric for riprap placement and shall also include the furnishing, transportation and placing of riprap and associated concrete grout to protect the channel bottom and channel banks from erosion. This work shall be completed in accordance with the typical sections shown in the Contract Documents. 107-2 SPECIFICATIONS A. IDOT Specifications: 1. Standard Specifications for Highway and Bridge Construction, Iowa Department of Transportation, Series of 2001. 107-3 EXECUTION A. Construction shall be in accordance with Section 2507 of the IDOT Specifications. 107-4 INSTALLATION A. Placement: 1. Prior to placement of the stone layer, the slope or area to be covered with riprap shall be excavated and graded in such a manner as will result in the completed bank protection or riprap surface being in substantial compliance with the lines and grades of the channel and side slopes as shown on the plans. 2. The engineering fabric shall be placed in the manner and at the locations shown on the project plans. The earth surface to receive the fabric shall be prepared to a smooth condition free of obstructions, depressions and debris. The fabric shall be placed on the slopes so as to provide a minimum overlay of 6 in. The riprap shall be placed so that the fabric is not punctured. The riprap shall completely cover the fabric. 3. The protective layer of stone shall be placed on the areas indicated and to the depth shown on the plans. The depth of the stone layer shall be measured normal to the slope or area to be covered. 4. Stone for riprap shall be placed on the riprap engineering fabric in a manner which will produce a reasonably well-graded mass of stone with the minimum practicable percentage or voids. The entire mass of stone shall be placed in conformance with the lines, grades and thicknesses shown on the plans. Riprap shall be placed in such a manner as to avoid displacing the underlaying riprap engineering fabric. Placing riprap by dumping into chutes, dumping over the top of the bank and similar methods likely to cause segregation will not be permitted. Riprap shall be so placed and distributed that there will be no accumulations of either the larger or smaller size of stone. Stones shall be placed in close, firm contact with each other and shall be firmly bedded against the bank. Spalls shall be driven into all openings between the stones. Hand placing or rearranging of individual stones by mechanical equipment may be required to the extent necessary to secure the results specified. City Contract No.739 107-1 BigRockRdBridges-103174.16 5. Riprap and riprap engineering fabric shall be placed as soon as possible after construction of drainage facilities and as ordered by the ENGINEER. 6. Concrete grout for revetment or gabions shall be in accordance with Section 2507 of the IDOT Specifications. 107-5 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Engineering Fabric. Engineering Fabric will be measured in square yards per IDOT Specifications. 2. Concrete Grout for Revetment or Gabions. Concrete Grout for Revet vent or Gabions will be measured in cubic yards per IDOT Specifications. 3. Revetment, Class E. Revetment, Class E, will be measured in tons per IDOT Specifications. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. ' * * END OF SECTION City Contract No. 739 107-2 BigRockRdBridges-103174.16 SECTION 108 REMOVAL OF PAVEMENT 108-1 DESCRIPTION A. Work under this section includes removal of pavement. 108-2 SPECIFICATIONS A. IDOT Specifications: 1. Term "IDOT Specifications" in this section refers to Standard Specifications for Highway and Bridge Construction, Series of 2001, Iowa Department of Transportation, including current revised and supplemental specifications. 108-3 EXECUTION A. Construction shall be in accordance with Section 2510 of the IDOT Specifications. 108-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Removal of Pavement. Removal of Pavement will be measured in square yards per IDOT Specifications. *** END OF SECTION * * * City Contract No. 739 108-1 BigRockRdBridges-103174.16 SECTION 109 TRAFFIC CONTROL Traffic Control 109-1 DESCRIPTION A. The work under this item includes traffic control during construction as shown in the Contract Documents. 109-2 SPECIFICATIONS A. IDOT Specifications: 1. Term "IDOT Specifications" in this section refers to Standard Specifications for Highway and Bridge Construction, Series of 2001, Iowa Department of Transportation, including current revised and supplemental specifications. 109-3 EXECUTION A. Provide traffic control in accordance with Section 2528 of the IDOT Specifications and as shown in the Contract Documents. 109-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Traffic Control. No separate measurement will be made for Traffic Control. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. ** * END OF SECTION ** * Contract No. 739 109-1 BigRockRdBridges-103174.16 SECTION 110 MOBILIZATION 110-1 DESCRIPTION A. Work under this section includes mobilization. 110-2 IDOT SPECIFICATIONS A. IDOT Specifications: 1. Term "IDOT Specifications" in this section refers to Standard Specificat ons for Highway and Bridge Construction, Series of 2001, Iowa Department of Transpc-tation, including current revised and supplemental specifications. 110-3 EXECUTION A. Mobilization shall be in accordance with Section 2533 of the IDOT specifications. 110-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Mobilization. No separate measurement will be made for Mobilization. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. * * * END OF SECTION * * * Contract No. 739 110-1 BigRockRcBridges-103174.16 SECTION 111 PIPE SUPPORTS 111-1 DESCRIPTION A. Work under this section includes construction of pipe supports as indicated in project plans. 111-2 SPECIFICATIONS A. IDOT Specifications: 1. Term "IDOT Specifications" in this section refers to Standard Specifications for Highway and Bridge Construction, Series of 2001, Iowa Department of Transportation, including current revised and supplemental specifications. 111-3 EXECUTION A. Construction of pipe supports for sanitary sewer force main shall be in accordance with project plans. 111-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Pipe Supports. Pipe Supports will be measured each as indicated in the project plans. B. Basis of Payment: 1. Payment for the item listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. ** * END OF SECTION ** * City Contract No. 739 111-1 BigRockRdBridges-103174.16 SECTION 112 REMOVAL OF FIELD FENCE 112-1 DESCRIPTION A. Work under this section includes removal of field fence as per plan. 112-2 SPECIFICATIONS A. IDOT Specifications: 1. Term "IDOT Specifications" in this section refers to Standard Specifications for Highway _ and Bridge Construction, Series of 2001, Iowa Department of Transportation, including current revised and supplemental specifications. 112-3 EXECUTION A. Construction shall be in accordance with the project plans. 112-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Removal of Field Fence. Removal of Field Fence will be measured in lineal feet removed as indicated in the project plans. B. Basis of Payment: 1. Payment for the item listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. ** * END OF SECTION ** * malt b. City Contract No. 739 112-1 BigRockRdBridges-103174.16 SECTION 113 SEEDING Mulching Seeding and Fertilizing(Rural) 113-1 DESCRIPTION A. The work covered by this section of the specifications shall consist of furnishing all labor, _ supplies, equipment and materials, and performing all operations in connection with the operation of seedbed preparation, furnishing, sowing and covering the seed. B. All disturbed areas shall be seeded. 113-2 SPECIFICATIONS A. IDOT Specifications: 1. Term "IDOT Specifications" in this section refers to Standard Specifications for Highway and Bridge Construction, Series of 2001, Iowa Department of Transportation, including current revised and supplemental specifications. 113-3 EXECUTION A. For seeding and seedbed preparation, the applicable portions of Section 2601 of the IDOT Specifications shall apply. 113-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Mulching. Mulching will be measured in acres per IDOT Specifications. 2. Seeding and Fertilizing (Rural). Seeding and Fertilizing (Rural)will be measured in acres per IDOT Specifications. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. *** ENDOFSECTION '* * Egim imaly ogimb Contract No. 739 113-1 BigRockRdBridges-103174.16 SECTION 114 SILT FENCE FOR DITCH CHECKS Removal of Silt Fence for Ditch Checks Clean-Out of Silt Fence for Ditch Checks 114-1 DESCRIPTION A. The work covered by this section of the specifications is the construction, removal and clean-out of silt fencing at the locations shown on the plans and in accordance with these specifications. 114-2 SPECIFICATIONS A. IDOT Specifications - Standard Specifications for Highway and Bridge Construction, Iowa Department of Transportation, Series of 2001, and all current supplemental specifications (IDOT Specifications). 114-3 EXECUTION A. Construction shall be in accordance with Section 2602 of the IDOT Specifications, and as shown in the Contract Documents. B. Standard Road Plan RC-17 is attached and to be considered a part of this specification. 114-4 METHOD OF MEASUREMENT AND BASIS OF PAYMENT A. Method of Measurement: 1. Silt Fence for Ditch Checks. Silt Fence for Ditch Checks will be measured in lineal feet per IDOT Specifications. 2. Removal of Silt Fence for Ditch Checks. Removal of Silt Fence for Ditch Checks will be measured in lineal feet per IDOT Specifications. 3. Clean-Out of Silt Fence for Ditch Checks. Clean-Out of Silt Fence for Ditch Checks will be measured in lineal feet per IDOT Specifications. B. Basis of Payment: 1. Payment for the items listed in the Method of Measurement section will be determined by multiplying the item quantity (as determined in the Method of Measurement) by the unit price on the Proposal Form in accordance with the Standard Specifications. ** * END OF SECTION * * * Contract No. 739 114-1 BigRockRdBridges-103174.16 C ^ 3 e 8 Oa g - N � F- S aFA g z n �. as o - g 8 N.\ ® %® '® f o 2 N d c 3 0 i Li) 25 / % m = a a "v i8,t E aQ "s N,s 8' I -� a y n I E 2. t = ice gs �i♦♦ cn •♦♦♦• ♦ o v a) J 5 n ♦-��`r ♦•♦♦♦♦♦♦♦♦♦♦ LL 8. . (6 Q `mil JJ m a E m U 2 o w y g E '`-" Q ill ~O ,rc- S°9 H = 09 0 5 . z m '" .0 E °3 vu •• o-8 2 is v~ L O L ,p N _ Fm9 cE u .E m m0 E c L'o.°�.' E5 � a . 'u'iN3 °bo w � w b °2' LLa£ t :Oi N 11 o U g ; \ B e 3 O O 0 PO O g°-g(// c q e R" _ Z\ 6—1 \ u) No- N IN a2~E :J:e.:. a u -JU it ..° \,„ Mt ,) CI 2 / qt\ II: / . if Z .S' ...S.N...*.0 ',.:Ni:ROI '7 I-:\ \ o E •a a l\ ).- O4 ooz `• i v to e,,••' II7iZ — r g' rP'I�� a 2_ _ __ _ 7 ,,, ,.. p. r• _ _ 0}'vA?yix z \ - . [11 I- _LI 131 1.14.! 11 I-:Li'''' — ( IIFF' �N E d E a E POLLUTION PREVENTION PLAN All Contractors/Subcontractors shall conduct their operations in a manner that minimizes erosion and prevents sediments from leaving the project site. The prime contractor shall be responsible for compliance and implementation of the Pollution Prevention Plan (PPP) for their entire contract. This responsibility shall be further shared with Subcontractors whose work is a source of potential pollution as defined in this PPP. 1. SITE DESCRIPTION This Pollution Prevention Plan (PPP) is for the construction of BIG ROCK ROAD BRIDGES, REPLACEMENT WITH BOX CULVERTS for the City of Waterloo, Iowa. The PPP covers approximately 1.4 acres, with an estimated 1.4 acres being disturbed. The PPP is located in an area of soil association of channeled Saude-Flagler. The estimated average SCS runoff curve number for this PPP after completion will be 80. Refer to the project plan and profile sheets for locations of typical slopes, ditch grades, and major structural and non-structural controls. A copy of this plan will be on file at the Project Engineer's office. Runoff from this work will flow into unnamed drainageways tributary to the Cedar River. POTENTIAL SOURCES OF POLLUTION: Site sources of pollution generated as a result of this work relate to silts and sediment, which may be transported as a result of a storm event. However, this PPP provides conveyance for other (non-project related) operations. These other operations have storm water runoff, the regulation of which is beyond the control of this PPP. Potentially this runoff can contain various pollutants related to site-specific land uses. -- COMMERCIAL AND INDUSTRIAL ACTIVITIES: Runoff from commercial, industrial and commerce land use may contain constituents associated with the specific operation. Such operations are subject to potential leaks and spills, which could be commingled with run-off from the facility. Pollutants associated with commercial and industrial activities are not readily available since they are typically proprietary. 2. CONTROLS w As locations where runoff can move off site, silt fence shall be placed along the perimeter of the areas to be disturbed prior to beginning grading, excavation or clearing and grubbing operations. As a minimum, silt fence shall be placed as shown on plans. Follow applicable Iowa Department of Transportation specifications and standards for silt fence materials and installation. Vegetation in areas not needed for construction shall be preserved. As areas are disturbed for sewer construction, additional silt fences, silt basins, intercepting ditches, sod flumes, letdowns and earth dikes shall be installed as specified in the plans and/or as required by the Project Engineer. This will include using silt fence as ditch checks and to protect intakes. Temporary stabilizing seeding shall be completed as the disturbed areas are constructed. If construction activity is not planned to occur in a disturbed area for at least 21 days, the area shall be stabilized by temporary seeding or mulching within 14 days. Other stabilizing methods shall be used outside the seeding time period. The work covered under this PPP shall be considered incidental to construction, and no separate measurement or payment shall be made. As the work progresses, additional erosion control items may be required as determined by the Engineer after field investigation. These may be items such as sod flumes, ditch checks and rock outlet protection. Other appropriate measures shall be installed by the Contractor as directed by �. Contract No. 739 PPP-1 BigRockRdBridges-103174.16 the Engineer. The Contractor will complete the construction with the establishment of permanent perennial vegetation of all disturbed areas. 3. OTHER CONTROLS Contractor disposal of unused construction materials and construction material wastes shall comply with applicable state and local waste disposal, sanitary sewer or septic system regulations. In the event of a conflict with other governmental laws, rules and regulations, the more restrictive laws, rules or regulations shall apply. APPROVED STATE OR LOCAL PLANS: During the course of this construction, it is possible that situations will arise where unknown materials will be encountered. When such situations are encountered, they will be handled according to all federal, state and local regulations in effect at the time. 4. MAINTENANCE The Contractor is required to maintain all temporary erosion control measures in proper working order, including cleaning, repairing or replacing them throughout the contract period. Cleaning of silt control devices shall begin when the features have lost 50 percent of their capacity. 5. INSPECTIONS Inspections shall be made jointly by the contractor and the contracting authority every seven calendar days and after each rain event that is 1/2" or greater. The Contractor shall immediately begin corrective action on all deficiencies found. The findings of this inspection shall be recorded in the project diary. This PPP may be revised based on the findings of the inspection. The ads contractor shall implement all revisions. All corrective actions shall be completed within three calendar days of the inspection. 6. NON-STORM DISCHARGES This includes subsurface drains (i.e., longitudinal and standard subdrains), slope drains and bridge end drains. The velocity of the discharge from these features may be controlled by the use of patio blocks, crushed stone or riprap. 7. SEQUENCE OF POLLUTION PREVENTION ACTIVITY a. Contractor to submit attached Certification Statement for Prime Contractor and Subcontractors. b. Install silt fence. _ . c. Remove ground cover/topsoil on areas as necessary for construction. d. Stage excavation to reduce open ground areas. e. Complete construction and immediately follow with final topsoil placement. f. Install temporary stabilization mix or permanent seeding/mulching ground cover, depending on specified, allowable seed application dates and provisions of Pollution Prevention Plan. g. Throughout construction, maintain silt fence. h. After permanent ground cover has been established, remove silt fence. Repeat above sequence as ground cover is removed by subsequent construction activity. Contract No. 739 PPP-2 BigRockRdBridges-103174.16 contract. No verbal agreement or conversation with any officer, agent, or employee of the City, either before or after the execution of the Contract, shall affect or modify any of the terms or obligations herein contained. 4. REPORTING ERRORS AND DISCREPANCIES. If the Contractor, in the course of the work, finds any discrepancies between the plans and the physical conditions of the locality, or any errors of omission in plans or in the layout as given by said stakes and instructions, it shall be his duty to inform the Engineer immediately, in writing, and the Engineer shall promptly correct the same. 5. ALTERATION OR CORRECTION OF PLANS. The plans are made up from surveys that are presumably correct and represent the foreseen construction requirements. Any modification of the plans which may be required by the exigencies of the construction or any corrections made necessary because of errors in the original surveys, will be made by the Engineer. Should corrections or modifications of the plans or specifications require a different quality or class of work than that upon which the unit prices in the Proposal are based, or if the modifications or corrections are required in parts of the work partially completed and such modifications result in an increased cost to the Contractor, the amount to be paid for work resulting from such changes shall be agreed upon in writing at the time the changes are ordered and before the work is begun by the Contractor. No allowance will be made for anticipated profits on work not performed. 6. CHANGES IN THE WORK. The City, without invalidating the contract, may order extra work or make changes by altering, adding to, or deducting from the work, the contract sum being adjusted by agreement or arbitration before such changed work is undertaken. All such work shall be executed under the conditions of the original contract, except that any claim for extension of time caused thereby shall be adjusted at the time of ordering such change. 7. INCREASED OR DECREASED QUANTITIES. The right is reserved without impairing the contract, to order the performance of such work of a class not contemplated in the Proposal or to increase or decrease the quantities as may be considered necessary to complete fully and satisfactorily the work included in the contract. However, when the work is completed without change in the plans, and the measured quantity of any item of work varies by more than twenty percent (20%) from the estimated quantity specified in the contract, an adjustment in price may be made for such item of work by agreement between the Engineer and the Contractor, subject to the approval of the City Council. Either party to the contract may request such an adjustment. 8. LANDS AND RIGHT OF WAY. The City shall provide the lands upon which the work under this contract is to be done, except that the Contractor shall provide land required for the erection of temporary construction facilities and storage of his material, together with the right of access to same. 9. CITY WATER. The Contractor shall be allowed to use City Water but before any water is used, he shall make application to the Waterloo Water Works for a temporary water connection from a fire hydrant or by some other connection method. Water usage will be charged at the rate for temporary water service. The rules, regulations, and water rates are available at the Waterloo Water Works offices at 325 Sycamore Street or their telephone number is 319-232-6280. — 10. RIGHTS OF VARIOUS INTERESTS. Whenever work being done by the City's forces or by other Contractors is contiguous to work covered by this contract, the respective rights of the various interests involved shall be established by the Engineer to secure the completion of the various portions of — the work in general harmony. 11. CLOSING STREETS TO TRAFFIC. The Engineer shall be the judge of how many streets or parts of streets it is necessary for the Contractor to close at any time and may refuse to permit the closing of additional streets until such of the work is finished and opened to traffic as he may direct. 12. OBSTRUCTION OF STREETS. The work is to be carried on in such manner as to obstruct the streets, highways, and alleys as little as possible. The Contractor shall carry on the different Contract No. 739 GS-3 BigRockRdBridges-103174.16 any obligations to furnish acceptable materials or to provide completed construction that is satisfactory in every particular. In case of any dispute arising between the Inspector and the Contractor as to materials furnished or the manner of performing the work, the Inspector shall have the authority to reject materials or suspend the work until the question at issue can be referred to and decided by the Engineer. Inspectors are not authorized to revoke, alter, enlarge, relax, or release any requirements of these specifications. The Inspector shall, in no case, act as foreman or perform other duties for the Contractor, or interfere with the management of the work by the latter. 3. STATUS OF THE ENGINEER. The Engineer shall have general supervision and direction of the work. He has authority to stop the work whenever such stoppage may be necessary to insure the proper execution of the Contract. He shall also have authority to reject any work and/or -- materials which do not conform to the specifications, to direct the application of forces to any portion of the work as, in his judgment, is required, and to order the force increased or diminished, and to decide questions which arise in the execution of the work. 4. ENGINEER'S DECISIONS. The Engineer shall, within a reasonable time, make decisions on all claims of the Contractor and on all other matters relating to the execution and progress of the work or the interpretation of the contract documents. All such decisions of the Engineer shall be final except as to the element of time and financial consideration involved, which, if no agreement in regard thereto is reached, shall be subject to arbitration. 5. STAKES AND INSTRUCTIONS. The Contractor shall provide reasonable and necessary opportunities and facilities for setting stakes and making measurements. The Contractor shall not furnish stakes or men to set them. He shall not proceed until he has received from the Engineer such -- stakes and instructions as may be necessary to the progress of the work. The Contractor shall carefully preserve bench marks, reference points, and stakes, and in case of willful or careless destruction, he shall be charged with the resulting extra expense and shall be responsible for any mistakes that may be caused, by their loss or disturbance. 6. SUPERINTENDENCE. The Contractor shall keep on his work during its progress a competent superintendent and any necessary assistants, all satisfactory to the Engineer. The Superintendent shall not be changed except with the consent of the Engineer, unless the Superintendent proves to be unsatisfactory to the Contractor and ceases to be in his employ. The Superintendent shall represent the Contractor in his absence, and all directions given to him shall be as binding as if given to the Contractor. Important decisions shall be confirmed in writing to the Contractor. Other directions shall be so confirmed on written request in each case. -- The Contractor shall give efficient supervision to the work using his best skill and attention. He shall carefully study and compare all drawings, specifications, and other instructions, and shall report at once to the Engineer any error, inconsistency, or omission which he may discover. 7. REMOVAL OF UNAUTHORIZED WORK. Work done without lines and grade being give, work done beyond lines shown on the plans or as given, except as herein provided, or any extra or additional work done without authority, will be considered as unauthorized and at the expense of the Contractor and will not be paid for under the provisions of the Contract. Work so done may be ordered removed and replaced at the Contractor's expense. 8. REMOVAL OF DEFECTIVE MATERIALS OR WORK. The Contractor shall promptly rora remove from the premises all materials condemned by the engineer as failing to conform to the Contract; whether incorporated in the work or not, and the Contractor shall promptly replace and re-execute his own work in accordance with the contract and without expense to the City, and shall bear the expense of making good all work of other Contractors destroyed or damaged by such removal or replacement. Contract No. 739 GS-5 BigRockRdBridges-103174.16 SECTION D - PROCEDURE AND PROGRESS 1. ORDER OF COMPLETION - USE OF COMPLETED PORTIONS. The Contractor shall complete any portion or portions of the work in such order or time as the Engineer may require. The City shall have the right to take possession of an use completed or partially completed portion of the work at any time, but such taking possession and use shall not be deemed an acceptance of work so taken or used, or any part thereof. If such prior use increases the cost of or delays the work, the Contractor shall be entitled to such extra compensation or extension of time, or both, as the Engineer may determine. 2. WEATHER. During stormy or inclement weather, all work shall be suspended, except such as can be done in an acceptable manner. Permission to work during freezing, stormy, or inclement weather shall in no way be construed as a release of the Contractor's responsibility regarding the quality of the finished work at such time. 3. SUNDAYS AND LEGAL HOLIDAYS. Except for such work as may be required to properly maintain or protect completed or partially completed construction or to maintain lights and barricades, no work will be permitted on Sundays or legal holidays without specific permission of the Engineer. 4. DELAYS AND EXTENSION OF TIME. If the Contractor be delayed in the completion of ._ the work by an act of neglect of the City, or its employees; or by any other Contractor employed by the City; or by changes ordered in the work; or by strikes, lockouts, fire, unusual delays in transportation, unavoidable casualties, or any cause beyond the Contractor's control; or by delay authorized by the Engineer pending arbitration; or by any cause which the Engineer shall decide justifies the delay, then the time of completion shall be extended for such reasonable time as the Engineer may decide will compensate for such delay. No such extension shall be made for delay occurring more than thirty (30) days before claim therefor is made in writing to the Engineer. In the case of a continuing cause of delay, only one claim is necessary. This article does not exclude the recovery of damages for delay by either party under provisions in the contract documents. 5. TEMPORARY SUSPENSION OF WORK. The Engineer shall have authority to suspend the work, wholly or in part, for such period or periods of time as he may deem necessary, due to unsuitable weather or such other conditions as are considered unfavorable for the suitable prosecution of the work, or for such time as is necessary due to the failure to the Contractor to carry out orders given or to perform any or all provisions of the Contract. 6. NOTICES - HOW SERVED. Any notice to be given by the City to the Contractor under this contract shall be deemed to be served if the same be delivered to the man in charge of any office used by the Contractor or his foreman or agent at or near the work, or deposited in the post office, postpaid, addressed to the Contractor at his last known place of business. 7. PROGRESS OF WORK. The progress of the work shall be such that, at the expiration of one-fourth (1/4)of the contract period, one-eighth (1/8) of the work shall be completed; at the expiration of one-half (1/2) of the contract period, three-eighths (3/8) of the work shall be completed; at the expiration of three-fourths (3/4) of the contract period, the work shall be three-fourths (3/4) completed, and the whole work shall be completed at the expiration of the contract period. If, at any time the above schedule is not being maintained, the Council may give written notice to the Contractor and his sureties that the specifications are not being complied with. Such notice shall state what action on the part of the Contractor is required to bring the work within the requirements of the specifications. If the Contractor fails, within ten (10) days, to proceed as directed in the said notice, then the Council shall have authority to annul this contract without process or action at law and take over the Contract No. 739 GS-7 BigRockRdBridges-103174.16 prosecution and completion of the work, as provided under the article covering City's right to terminate contract. 8. CITY'S RIGHT TO TERMINATE CONTRACT. If the Contractor should be adjudged a bankrupt; or if he should make a general assignment for the benefit of this creditor; or if a Receiver should be appointed on account of his insolvency; or if he should persistently or repeatedly refuse or should fail, except in cases for which extension of time is provided, to supply enough skilled workmen or proper materials; or if he should fail to make prompt payment to Subcontractors or for materials or labor; or if he should persistently disregard laws, ordinances, or the instructions of the Engineer; or if he should otherwise be guilty of a substantial violation of any provision of the contract, then the City, upon the certificate of the Engineer that sufficient cause exists to justify such action, may, without prejudice to any other rights or remedy, and after giving the Contractor seven (7) days' written notice, terminate the employment of the Contractor and take possession of the premises and of all materials, tools and — appliances thereon and finish the work by whatever method he may deem expedient. In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the contract price shall exceed the expenses of finishing the work, including compensation for additional managerial and administration services, such excess shall be paid to the Contractor. If such expense shall exceed such unpaid balance, the Contractor shall pay the difference to the City. The expense incurred by the City as herein provided and the damage incurred through the Contractor's default shall be certified by the Engineer. 9. REMOVAL OF EQUIPMENT. In the case of annulment of this contract before completion, from any cause whatsoever, the Contractor, if notified to do so by the City; shall promptly remove any part or all of his equipment and supplies from the property of the City, failing which, the City shall have the right to remove such equipment and supplies at the expense of the Contractor. SECTION E -MEASUREMENTS AND PAYMENT 1. STANDARD OF MEASUREMENT. All work completed under the contract shall be measured by the Engineer according to the United States standard measures. 2. SCOPE OF PAYMENTS. The Engineer's measurements of quantities shall be the basis for final payment for the work performed under this Contract. After the work is completed, the Engineer will make measurements and computations of the number of units of each of the various items of work completed, and the Contractor will be paid for the actual amount of work performed at the rates specified in his Proposal. Before final settlement is made, the Council may require the Contractor to submit a list of all persons furnishing labor or materials, with evidence that such persons have been paid in full. Payment shall be made in the manner set forth in official publications and Council Proceedings relative thereto. 3. PAYMENT FOR EXTRA WORK. Such extra work as may have been ordered by the Engineer and performed by the Contractor shall be compensated for as provided herein. If work is to be done or materials are to be furnished by the Contractor which cannot properly be classified under unit prices included in the Proposal, the Contractor shall be paid therefor the actual reasonable cost of the —` labor and materials entering permanently in such work, plus fifteen percent (15%) of the cost thereof. In computing the labor cost on such extra work, the following items shall be included: (a) Actual payroll expenditures for labor at the current rate therefor, and cost of materials. (b) Pay of foreman and timekeepers for actual time required on the extra work. (c) Liability insurance, prorated,for the extra work. Contract No. 739 GS-8 BigRockRdBridges-103174.16 Labor cost items on extra work shall be furnished in duplicate by the Contractor to the Inspector daily. The Inspector shall check the items, and if he finds them to be correct, he shall so certify on the - statement of cost, returning one copy to the Contractor and filing one copy with the Engineer. The Engineer shall determine the cost of materials entering into extra work from the materials and receipted freight bills for the same. For any special machine, power tools, or equipment, including fuel and lubricants, but not including small hand tools, which may be deemed necessary or desirable to use, the Contractor shall be _ allowed a reasonable rental thereon, to be agreed upon in writing by the Engineer before such work is begun, and to which sum no percentage is to be added. The item of cost shall not include repairs or replacement of equipment or overhead expenses of any character. The fifteen percent (15%) allowed is considered to cover the use of hand tools and all overhead expenses except liability insurance. In no case will a claim for extra compensation be allowed unless the work upon which the claim is based has been ordered in writing, except as provided hereinafter. 4. CLAIMS FOR EXTRA COST. If the Contractor claims that any instructions, by drawings or otherwise, involved extra cost under this contract, he shall give the Engineer written notice thereof within ten (10) days after completion of the work. No such claim shall be valid unless so made. 5. CLAIMS FOR EXTRA COMPENSATION. If the Contractor deems that extra compensation is due him for work and/or materials that he considered is not clearly covered in the items -- for which he submitted unit prices in his bid and that were not ordered in writing by the Engineer as an extra s heretofore provided, the Contractor shall notify the Engineer, in writing, of his intention to make claim for extra compensation for work and/or material before starting construction. If such written notification is not given or the Engineer is not afforded proper facilities by the Contractor for keeping strict account of actual cost as defined herein, then the Contractor hereby agrees to waive the claim for extra compensation. Such notice to the engineer and the fact that the Engineer has kept account of cost as aforesaid, shall not in any way be construed as proving the validity of the claim, which must be passed — upon by the Council. In the event that the Council finds the claim to be just, it shall be allowed and paid for as extra work as provided herein. 6. COMPLETION REPORT AND OBJECTIONS THERETO. Within ten (10) days after the — full completion of the work to be done under this contract, the Engineer shall make a written statement of all the work done by the Contractor hereunder, stating the quantity of each item as found by him and including a statement of all credits for extra work and all credits or debits for changes, alterations, -- omissions, and defects, and shall forthwith deliver a copy of such statement to the Contractor. The Contractor shall compare such statement with his own records and shall then, in writing, either approve such statement or point out any claimed errors or omissions. If any of such claims are found correct, the Engineer shall, within ten (10) days, prepare a new statement, a copy of which shall in like manner be delivered unto the Contractor. The Engineer will not file a formal completion report with the City until the Contractor has approved the same. If the figures of the Engineer and the Contractor cannot be reconciled, or there is a difference of opinion regarding some item or items, then such difference of opinion shall be submitted to arbitration as hereinafter provided, and the decision of the arbitrator or arbitrators shall be final, and the Engineer shall, within a period of five (5) days, file his completion report. Before action by the City Council upon such completion report, the Contractor shall also file a written statement of any claims he may have against the City, other than those shown by such completion report, growing out of this contract or the work done hereunder. The City shall retain ten percent(10%)of Contract No.739 GS-9 BigRockRdBridges-103174.16 the amount due the Contractor on the completion report for a period of thirty (30) days. If no claims are filed against the Contractor within thirty (30) days, the final ten percent (10%) shall then be paid to the Contractor. 7. WAIVER. By the execution of this contract ,the Contractor agrees that any objections he may have to the statement of the amount of work done hereunder included by the Engineer in this completion report, and any claims of the Contractor against the City growing out of this contract and the work done hereunder which are not stated in writing in the manner and within the time provided in Article 6, Section E hereof, shall be waived, and no such claim shall thereafter be asserted against the City. SECTION F - LEGAL RELATIONS AND RESPONSIBILITIES 1. LAWS RELATING TO WORK. The Contractor is presumed to be familiar with all laws, ordinances, and regulations which may, in any manner, affect those engaged or employed upon the work or the materials or equipment used in or upon the work, and shall conduct the work so as not to conflict with such laws, ordinances, and regulations. 2. PROTECTION OF WORK AND PROPERTY. The Contractor for any part of the improvement shall be held responsible for the care of materials and of partially completed and completed work until final acceptance of the same by the Council. He will be required to make good at his own expense any damage which the work may sustain from any cause prior to the filing of the engineer's certificate of completion. He shall take all risk from floods and casualties of every description and make — no charge for delay due to such cause. He may, however, be allowed a reasonable extension of time on account of such delays. He shall correct or make good at his own expense all damages to adjacent property due to the acts or negligence of his employees of the prosecution of his work, and save the City harmless therefor. The Contractor shall be held liable and responsible for all damages done to water, sewer, drain, or other underground pipes and structures, and to sidewalks and private property. 3. RESPONSIBILITY FOR ACCIDENTS. The Contractor shall assume full responsibility for all damages sustained by persons or property due to the carrying on of his work until final acceptance thereof, or until released by the Engineer in writing. 4. LIABILITY INSURANCE. The Contractor shall carry liability insurance which shall save the City harmless and protect the public and any person from injury sustained by the reason of the prosecution of the work or the handling or storing of materials therefor, and said Contractor shall also carry liability insurance which shall meet the requirements of the Iowa Worker's Compensation Law. Before work shall be started on this contract, the Contractor shall furnish the City Clerk with proper affidavit or Affidavits executed by representatives of duly qualified insurance companies, evidencing that said insurance company or companies have issued liability insurance policies, effective during the life of the contract, or for a period of a least ten (10) days following the filing of written notice of cancellation, protecting the public and any person from injuries or damages sustained by reason of carrying on the work involved in the Contract. The affidavit shall specifically evidence the following forms of insurance protection: (a) Public liability insurance covering all operations performed by persons directly employed by the Contractor. (b) Public liability insurance covering all operations performed by any Subcontractor to whom a portion of the work may have been assigned. Contract No. 739 GS-10 BigRockRdBridges-103174.16 (c) Public liability insurance covering all work upon the project performed by any independent Contractor working under the direction of either the principal Contractor or a Subcontractor. (d) Motor vehicle bodily injury liability insurance and property damage liability insurance on all motor vehicles employed on the work, whether owned by the Contractor or by other persons, firms, or corporations. (e) The minimum protection shall be as follows: Comprehensive General Liability Insurance General Aggregate Limit $ 5,000,000.00 Products—Completed Operations Aggregate Limit $ 5,000,000.00 Each Occurrence Limit $ 5,000,000.00 Comprehensive Automobile Liability Insurance $ 1,000,000.00 The Contractor shall have the Owner, City of Waterloo, Iowa, and Engineer, AECOM, named as an "Additional Named Insured". A certificate, or a policy if requested, shall be filed with the Owner. All certificates and/or policies of insurance furnished by the Contractor to be filed with the City Clerk shall include the name and address of the agency issuing the same. It shall also be required that the City Clerk be notified by registered mail of the cancellation or expiration of the above insurance. 5. BARRICADES AND SIGNS. The Contractor shall, at his own expense and without further or other order, provide, erect, and maintain, at all times during the progress and suspension of the work and until completion and final acceptance thereof, suitable and requisite barricades, signs, or other adequate protection, as required by the latest edition of the "Iowa Manual on Uniform Traffic Control Devices for Streets and Highways" and shall provide, keep, and maintain such barricades, signs, etc., as may be required or as may be ordered by the City Engineer, to insure the safety of the public as well as those engaged on the work. All barricading plans shall be approved by the City Engineer. 6. ROYALTIES AND PATENTS. The Contractor shall pay all royalties and license fees. He shall defend all suits or claims for infringement of any patent rights and shall save the City harmless from loss on account thereof, except that the City shall be responsible for all such loss when a particular process or the product of a particular manufacturer is specified. 7. PERMITS AND REGULATIONS. Permits and licenses of a temporary nature for the prosecution of the work shall be secured and paid for by the Contractor. Permits, license, and easements for permanent changes in existing facilities shall be secured and paid for by the City. 8. CLAIMS FOR DAMAGES. Any claim for damages arising under this Contract shall be made in writing to the party liable within a reasonable time of the first observance of such damage and no later than the time of final payment, except as expressly stipulated otherwise in the case of faulty work or materials, and shall be adjusted by agreement or arbitration. The Contractor shall be held for the payment of all just claims against him arising out of the prosecution of this contract, and his bond will not be released until such claims are paid for dismissed. 9. ASSIGNMENT OF CONTRACT. The Contractor shall not sell or assigr the contract or sublet any portion of the work provided for therein without the written consent of the City Council. Contract No. 739 GS-11 BigRockRdE ridges-103174.16 10. SUBCONTRACTORS. The Contractor shall, as soon as practicable after the signature of the contract, notify the Engineer in writing of the names of the Subcontractors proposed for the work and shall not employ any that the Engineer may, within a reasonable time, object to as incompetent or unfit. The Contractor agrees that he is as fully responsible to the City for the acts and omission of his Subcontractors and of persons either directly or indirectly employed by them as he is for the acts and omissions of persons directly employed by him. Nothing contained in the contract documents shall create any contractual relation between any Subcontractor and the City. 11. ARBITRATION. All questions subject to arbitration under this Contract shall be submitted to arbitration at the choice of either party to the dispute. The Contractor shall not cause a delay of the work during any arbitration proceedings, except by agreement with the Engineer. The demand for arbitration shall be filed in writing with the Engineer, in the case of an appeal from his decision, within ten (10) days of its receipt, and in any other case, within a reasonable time after cause thereof, and in no case later than the time of final payment, except as otherwise expressly stipulated in the contract. If the Engineer fails to make a decision within a reasonable time, an appeal to arbitration may be taken as if his decision had been rendered against the part appealing. No one shall be nominated or act as an arbitrator who is in any way financially interested in the contract or in the business affairs of either the City or the Contractor. The general procedure shall conform to the laws of the State of Iowa. Unless otherwise provided by such laws, the parties may agree upon one arbitrator; otherwise, there shall be three--one named in writing by each party to this contract to the other party, and the third chosen by these two arbitrators, or, if they fail to select a third within ten (10) days, then he shall be chosen by the Comptroller of the State of Iowa. Should either party refuse or neglect to supply the arbitrators with any papers or information demanded in writing, the arbitrators are empowered by both parties to proceed ex parte. -- If there be one arbitrator, his decision shall be binding; if three, the decision of any two shall be binding. Such decision shall be a condition precedent to any right of legal action, and, wherever permitted by law, it may be filed in Court to carry it into effect. The arbitrators, if they deem that the case demands it, are authorized to award to the party whose contention is sustained such sums as they shall deem proper for the time, expense, and trouble incident to the appeal, and, if the appeal was taken without reasonable cause, damages for delay, the arbitrators shall fix their own compensation unless otherwise provided by agreement, and shall assess the costs and charges of the arbitration upon either or both parties. _ The award of the arbitrators must be in writing, and it shall not be open to objections on account of the form of proceeding or the award, unless otherwise provided by the laws of Iowa. In the event of such laws providing on any matter covered by this article otherwise than as hereinbefore specified, the method of procedure throughout and the legal effect of the award shall be wholly in accordance with the laws of the State of Iowa, it being intended hereby to lay down a principle of action to be followed, leaving its local application to be adopted to the legal requirements of the place in which the work is to be done. 12. PERFORMANCE AND PAYMENT BONDS. The Contractor shall, at the time of execution and delivery of this contract and before the taking effect of same, furnish and deliver to the City written bonds of indemnity to the amount required by law in form and substance, and with surety thereon Contract No. 739 GS-12 BigRockRdBridges-103174.16 satisfactory and acceptable to the City, to insure the faithful performance and payment by the Contractor of all the covenants and agreements on the part of the Contractor contained in this contract. These bonds shall remain in force and effect for the full amount of the Contract. 13. PERSONAL LIABILITY OF PUBLIC OFFICIALS. In carrying out any of the provisions of the Contract or in exercising any power or authority granted him thereby, there shall be no liability upon -- the Engineer or his authorized assistants, either personally or as an official of the City, it being understood that in such matters he acts as the agent and representative of the City. 14. JURISDICTION. Any action in Court against the Contractor or sureties on his bond because of damages to property or individuals by said Contractor or his workmen, or because of the violation of any provisions of the specifications, or on account of the failure of said Contractor to comply fully with these provisions, shall be brought in the District Court of the State of Iowa in and for Black Hawk County. 15. TERMINATION OF RESPONSIBILITY. The Contract shall be considered as completed and the Contractor released from further obligations except as to the requirements of his bond, after the work has been completed and finally accepted and final estimates have been allowed and the completion report of the engineer has been filed and approved by the Council. 16. CITY'S LEGAL RIGHTS. The City shall not be precluded by any measurements, estimate, or certificate made, either before or after the completion and acceptance of the work and payment therefor, from showing the true amount and character of the work performed and materials furnished by the Contractor, or from showing that any such measurement, estimate, or certificate is untrue �. or incorrectly made, or the work or materials do not, in fact, conform to the Contract. The City shall not be precluded, notwithstanding any such measurements, estimate, or certificate and payment in accordance therewith, from recovering from the Contractor and his surety such damages as it may sustain by reason of his failure to comply with the terms of the Contract. Neither the acceptance by the City or any of its representatives, nor any payment for or acceptance of the whole or any part of the work, nor any extension of time, nor any possession taken by the City, shall operate as a waiver on any portion of the contract or of any power herein reserved, or any right to damages herein provided. A waiver of any breach of the contract shall not be held to be a waiver of any other or subsequent breach. Contract No. 739 GS-13 BigRockRdBridges-103174.16 SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION — 1. SUBCONTRACTS The contractor shall cause appropriate provisions to be inserted in all subcontracts — relative to the work to require compliance by each subcontractor with the applicable provisions of the contract for the improvements embraced in this contract. __ 2. REVIEW BY THE CITY OF WATERLOO The City of Waterloo, its authorized representatives and agents, shall at all times have access to and be permitted to observe and review all work, materials, equipment, — payrolls, personnel records, employment conditions, material invoices, and other relevant data and records pertaining to this contract, provided, however, that all instructions and approval with respect to the work will be given to the contractor only by the City of Waterloo through its authorized representative or agents. 3. INSPECTION — a. The contractor shall furnish promptly all materials reasonably necessary for any tests which may be required. All tests by the City of Waterloo will be performed in such manner as not to delay the work unnecessarily and will be made in accordance with the provisions of the Technical Specifications. b. Inspection of materials and appurtenances to be incorporated in the improvements embraced in this contract may be made at the place of production, — manufacture or shipment, whenever the quantity justifies it, and such inspection and acceptance, unless otherwise stated in the Technical Specifications, shall be final, except as regards (1) latent defects, (2) departures from specific requirements of the contract, (3) damage or loss in transit, or (4) fraud or such gross mistakes as amount to fraud. Subject to the requirements contained in the preceding sentence, the inspection of materials as a whole or in part will be made at the project site. 4. WARRANTY OF TITLE No material, supplies, or equipment to be installed or furnished under this contract shall "— be purchased subject to any chattel mortgage or under a conditional sale, lease-purchase or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. The contractor shall warrant good title to all materials, supplies, and _ equipment installed or incorporated in the work and upon completion of all work, shall deliver the same together with all improvements and appurtenances constructed or placed thereon by him to the City of Waterloo free from any claims, liens, or charges. Neither the contractor nor any person, firm, or corporation furnishing any material or labor _ for any work covered by this contract shall have any right to a lien upon any improvement or appurtenance thereon. Nothing contained in this paragraph, however, shall defeat or impair the right of persons furnishing materials or labor to recover under any bond given by the contractor for their protection or any rights under any law permitting such persons to look to funds due the contractor in the hands of the City of Waterloo. The provisions of this paragraph shall be inserted in all subcontracts and material contracts and notice of its provisions shall be given to all persons furnishing materials for the work when no formal — contract is entered into for such materials. — Contract No. 739 SGS-1 BigRockRdBridges-103174.16 FORM OF CONTRACT CONTRACT FOR THE CONSTRUCTION OF F.Y.2009 BIG ROCK ROAD BRIDGES REPLACEMENT WITH BOX CULVERTS CITY OF WATERLOO, IOWA BLACK HAWK COUNTY CONTRACT NO.739 This contract made and entered into this day of 20_, by and between the City of Waterloo, Iowa, a Municipal Corporation, (hereinafter referred to as (City), and , of Waterloo, Iowa, (hereinafter referred to as Contractor), W ITNESSETH: PAR. 1 Contractor agrees to build and construct the F.Y. 2009 BIG ROCK ROAD BRIDGES, REPLACEMENT WITH BOX CVULERTS, City Contract No.739 , and furnish all necessary tools, equipment, materials, and labor necessary to do all the work called for in the plans and specifications in a workmanshiplike manner and for the prices set forth in Contractor's proposal, which was accepted by the City, and which is understood and agreed to be a part of this contract. PAR. 2 It is understood and agreed that the resolution adopted by the City Council ordering the construction of the improvement, the Notice to Contractors as published, the Instruction to Bidders, the Form of Proposal, the Construction and Maintenance Bonds, the Council _ Proceedings relating to this matter, and the Plans and Specifications shall all be considered as forming a part of the contract the same as though they were each set out in said contract. PAR. 3 The Contractor agrees to furnish at its own cost and expense, all necessary materials and labor for said work and to construct said improvements in a thorough, substantial, and workmanlike manner, and in strict accordance with the requirements of this contract, and of the plans and specifications made a part hereof by reference, and to the satisfaction and approval of the City and its engineer. PAR. 4 The Contractor agrees to perform said work and install said improvements on the terms set out in bid or proposal to the City which has been accepted by the City and which is by reference made a part of this contract. PAR. 5 The Contractor agrees to commence said work within ten (10) working days after receipt of "Notice to Proceed" and complete it on or before September 15, 2009, unless an extension of time is granted in writing by the Council of the City. Contract No. 739 C-1 BigRockRdBridges-103174.16 PAR. 6 Should the Contractor fail to complete said improvements in strict accordance with the terms and conditions of this contract, or the plans and specifications therefor promptly by the date herein specified, the City may pay such additional sums as it may be required to pay by reason of the failure of said contractor and deduct any and all such sums from any amount then due the Contractor. PAR. 7 The Contractor agrees to comply with and obey all ordinances of the City of Waterloo, Iowa, relating to the obstruction of streets and alleys, keeping open passage ways for water, traffic, and protecting any excavations in any street or alley, and maintaining proper and sufficient barricades with lights and signals during all hours of darkness, to see that the backfilling is properly done, and agrees to keep the City whole and defend any and all suits that may be brought against the City by reason of any injuries that may be sustained by any person or property allegedly caused by the Contractor, or his agents, while work is done pursuant to this _ agreement. PAR. 8 The Contractor agrees that in the event a law suit is brought against the City for damages allegedly sustained by reason of any act, omission or negligence of the Contractor or its agents, or on account of any injuries allegedly sustained by reason of any obstruction, hole, depression or barrier placed or dug by the defendant or its agents, in the doing of the work herein contracted for, that it will defend said suit and save the City harmless therein, and in case judgment is rendered against the City, the Contractor agrees to pay the same promptly. The Contractor agrees to carry public liability insurance in a solvent company in a sufficient amount to protect the City and those who use the streets of the City. PAR. 9 The City shall have the right to appoint one or more construction reviewers who shall review the progress of the work in detail; also, to make any test or any material to be used in such work. No material shall be used in any work until the same has first been approved by the construction reviewer. Such construction reviewer shall have full authority to pass judgment upon all — materials and upon the manner of doing the work, and their judgment on rejecting any materials, substance, or manner of work shall be final unless it is revoked or modified by the City Engineer. PAR. 10 Any material, which has been rejected by the construction reviewer, shall be at once removed from the line of work and shall not be again taken thereon or placed with the material proposed to be used without the written consent of the City Engineer. PAR. 11 The Contractor shall maintain no cause of action against the City on account of delays and prosecution of work, but if said work is delayed by the City, the Contractor shall have such extra -- time for completion of the job as was lost by reason of the delay caused by the City. PAR. 12 The Contractor agrees to pay punctually all just claims of labor, material, men, or subcontractors who shall perform labor or furnish materials entering into this improvement. It is agreed that the City need not pay the Contractor until all such claims are paid by the Contractor. It is agreed that the City shall not be liable for said labor, material, or men under this contract. PAR. 13 The Contractor agrees to furnish the City, simultaneously with this contract, a bond on a form to be provided by the City in the amount provided by law as stated in the Notice to Bidders, which shall be for the benefit of the City, and any and all persons injured by the breach of any of the terms of this contract. Said bond shall be filed with the City Clerk and shall be subject to the approval of the City Council, and is by reference made a part of this contract. PAR. 14 The Contractor agrees that should it abandon work under this contract or cease the prosecution thereof for a period of thirty(30)consecutive days without reasonable cause, and should it fail to proceed with said work within ten (10) days after a notice to continue or carry it on has been mailed to it at the address given herein by the City, or after such notice has been served on it, _ Contract No. 739 C-2 BigRockRdBridges-103174.16 served on it, then the City may proceed to complete said work, using any material, tools, or machinery found along said line of work, doing the work either by contract or as it may elect, and _ the Contractor and the sureties on its bond shall be liable to the City for the costs and expenses so paid out. Said costs shall be retained by the City from any compensation due, or to become due the Contractor, and may be recovered by the City in an action upon Contractor's bond. PAR. 15 In consideration of the full compliance on the part of the Contractor with all the provisions, stipulations, and conditions hereof, or contained in the various instruments made a part of this contract by reference, and upon completion and acceptance of said work, the City agrees to pay to the Contractor, in the manner set out in the Notice to Contractors, the amount of money due the Contractor for work performed and accepted, at the unit prices set out in the Contractor's proposal,which has been accepted by the City. PAR. 16 The total amount of the contract, based on the Engineer's estimates of quantities and the Contractor's unit bid prices, and for which 100% surety bond is required is$ PAR. 17 After the completion of said work, the Contractor agrees to remove all debris and clean up said streets, and to save the City harmless from any damage allegedly resulting from a failure to clean up and remove the debris or put the street back in a proper condition for travel. PAR. 18 This contract is not divisible, but in the event of a conflict between this contract and the various instruments incorporated by reference, this contract shall govern. — PAR. 19 Before the Contractor shall be entitled to receive final payment for work done under this contract, it shall execute and file a bond in the penal sum of not less than 100% of the total amount of the contract, same to be known as "Maintenance Bond," and which bond must be approved by the City Council, and which bond is in addition to the bond given by the Contractor to guarantee the completion of the work. PAR. 20 The Contractor shall maintain all work done hereunder in good order for the period of two (2) years from and after the date it is accepted by the Council of the City of Waterloo, Iowa. Said maintenance shall be made without expense to the City or the abutting property. In the event of the failure or default of the Contractor to remedy any or all defects appearing in said work within _ a period of two (2) years from the date of its acceptance by said Council, and after having been given ten (10) days notice so to do by registered letter deposited in the United States Post Office in said town, addressed to said contractor at the address herein given, then the City may proceed to remedy such defects. The costs and expenses thereof to be recovered from the Contractor and the sureties on its maintenance bond by an action brought in any court of competent jurisdiction. Contract No.739 C-3 BigRockRdBridges-103174.16 PAR. 21 The Contractor shall give notice to said City by registered letter directed to the Mayor or City Clerk/Auditor thereof not more than four (4) and not less than three (3) months prior to the expiration of the term during which the Contractor is required to maintain said improvements, in good repair by the terms of its Contract. The liability of the Contractor and of the sureties on its bond for maintenance of the said improvements shall continue until three (3) months after such notice has been given to the City, and, in any event, until two (2) years after the acceptance of the work. CITY OF WATERLOO, IOWA Mayor City Clerk Contractor BY: Title: Approved by the City Council of the City of Waterloo, Iowa, this day of , 20 . ATTEST: , City Clerk Waterloo, Iowa Contract No. 739 C-4 BigRockRdBridges-103174.16 PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS: That we, , of _(hereinafter called the Principal), and of (hereinafter called the Surety), are held and firmly bound unto the City of Waterloo (hereinafter called the Obligee), in the penal sum of Dollars($ ), lawful money of the United States, to payment of which sum, well and truly to be made, the Principal here firmly binds himself/themselves, his/their heirs, executors, and administrators, and the said Surety binds himself, his successors, assigns, executors, and administrators, jointly and severally,firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that, WHEREAS the above bounden Principal did, on the Day of 20_, enter into a written contract with the City of Waterloo, Iowa, for the construction of , a copy of which contract, together with all of its terms, covenants, conditions, and stipulations, is incorporated herein and made a part hereof as full and completely as if said contract were recited at length herein; and WHEREAS, the Principal and Surety on this bond hereby agree to pay to all persons, firms or -- corporations having contracts directly with the Principal or with subcontractors, all just claims due them for labor performed or materials furnished in the performance of the contract on account of which bond is given when the same are not satisfied out of the portion of the contract price which the public corporation is _ required to retain until completion of the public improvement, but the Principal and Surety shall not be liable to said persons, firms, or corporation unless the claims of said claimants against said portion of the contract price shall have been established as provided by law. Now, if the Principal shall in all respects fulfill his said contract according to the terms and tenor thereof, and shall satisfy all claims and demands incurred for the same, and shall fully indemnify and save harmless the Obligee from all costs and damages which it may suffer by reason of failure to do so, and shall fully reimburse and repay the Obligee all outlays and expenses which it may incur in making good any such default, then the obligation is to be void and of no effect, otherwise to remain in full force and effect. Every Surety on this bond shall be deemed and held, any contract to the contrary notwithstanding, to consent without notice: 1. To any extension of time to the contract in which to perform the contract. 2. To any change in the plans, specifications, or contract when such change does not involve an increase of more than twenty percent (20%) of the total contract price, and shall then be released only as to such excess increase. 3. That no provision of this bond or of any other contract shall be valid which limits to less than one (1) year from the time of the acceptance of the work the right to sue on this bond for defect in workmanship or material not discovered or known to the Obligee at the time such work was accepted. Contract No. 739 PFB-1 BigRockRdBridges-103174.16 IN WITNESS WHEREOF,we have hereunto set our hands and seals this day of , 20_ Principal By: Surety Attorney-in-Fact Contract No. 739 PFB-2 BigRockRdBridges-103174.16 PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS: that (Name of Contractor) (Address of Contractor) a , hereinafter called Principal, (Corporation, Partnership or Individual) — and (Name of Surety) (Address of Surety) hereinafter called Surety, are held and firmly bound unto (Name of Owner) (Address of Owner) hereinafter called OWNER, in the penal sum of Dollars, $( ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents. — THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the OWNER, dated the day of 20_, a copy of which is hereto attached and made a part hereof for the construction of: NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, — SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the prosecution of the WORK provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such WORK, and all insurance — premiums on said WORK, and for all labor, performed in such WORK whether by SUBCONTRACTOR or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. — Contract No. 739 PB-1 BigRockRdBridges-103174.16 Non-Federal PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the WORK or to the SPECIFICATIONS. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. IN WITNESS HEREOF, this instrument is executed in counterparts, each one of (number) which shall be deemed an original, this the day of 20 ATTEST: Principal — (Principal)Secretary (SEAL) By (s) (Address) Witness as to Principal (Address) Surety — ATTEST: By Attorney-in-Fact Witness as to Surety (Address) (Address) NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is Partnership, all partners should execute BOND. Contract No. 739 PB-2 BigRockRdBridges-103174.16 Non-Federal