_ PROJECT SPECIFICATIONS FOR
F.Y. 2014 3 -
,....
SIDEWALK REPAIR
- PROGRAM ZONE 4
— l l'° i . „-,
W
.i
— t,,,,,,,,,,--c-,,---Ne5?------- - _. _
4M
CONTRACT NO. 863
- I
? F S S��4,%% I hereby certify that this engineering document was prepared by me or under my direct
Q�000000aoo,a,000-1 111 personal supervis" and that I am a dul licensed Professional Engineer under the laws of
�1 'e� DENNIS ° ���) the State of low
4a Z/
1-Li o J.
o ; DAT
i u) $ GENTZ 8 Z DENNIS 1.GENTZ,P.E.
-Z. o *
1 0% 9662 0° rr7My License Renewal Date i December 31,2014.
o
v ao 00 �, License No.is Iowa 9662.
11111,°00000aoo,,o° �i Pages or sheets covered by this seal:
F.Y. 2014 SIDEWALK REPAIR PROGRAM - ZONE 4
CONTRACT NO. 863
CONTRACT DOCUMENTS
TABLE OF CONTENTS
1. NOTICE OF PUBLIC HEARING AND NOTICE TO BIDDERS
2. INSTRUCTIONS TO BIDDERS
3. FORM OF BID OR PROPOSAL
4. SALES TAX EXEMPTION INFORMATION FORM
5. FORM OF BID BOND
6. NON-COLLUSION AFFIDAVITS
7. EQUAL OPPORTUNITY CLAUSE
8. TITLE VI CIVIL RIGHTS
9. RESIDENT BIDDER AND NON-RESIDENT BIDDER CERTIFICATION
10. AFFIRMATIVE ACTION PROGRAM
11. POTENTIAL ITEMS OF WORK FOR MBE/WBE PARTICIPATION
SUBCONTRACTOR'S BID REQUEST FORM,
LETTER FORM FOR SUBCONTRACTOR QUOTES,
MBE/WBE SCOPE LETTER,
MBE AND/OR WBE PREBID CONTACT INFORMATION FORM
12. WATERLOO/CEDAR FALLS MINORITY AND WOMEN BUSINESSES
ENTERPRISE CONSTRUCTION AND MAINTENANCE
CONTRACTOR'S GUIDE
13. STATEMENT OF BIDDER'S QUALIFICATIONS
14. GENERAL SPECIAL PROVISIONS
15. SPECIAL PROVISIONS
16. GENERAL SPECIFICATIONS FOR CONSTRUCTION
17. SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION
18. FORM OF CONTRACT
19. FORM OF PERFORMANCE BOND
20. FORM OF PAYMENT BOND
NOTICE OF PUBLIC HEARING
On Proposed Plans, Specifications, Form of Contract,
And Estimate of Cost and the
NOTICE TO BIDDERS
For the Taking of Construction Bids
For the
F.Y. 2014 SIDEWALK REPAIR PROGRAM —ZONE 4
In the City of Waterloo, Iowa
CONTRACT NO. 863
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her
office in the City Hall of the said City on the 21st day of April, 2014, until 4:00 p.m. for the
construction of the F.Y. 2014 SIDEWALK REPAIR PROGRAM — ZONE 4, Contract
No. 863, as described in detail in the plans and specifications now on file in the Office of
the City Clerk.
OPENING OF BIDS
All proposals received will be opened in open Council meeting to be held in the Law
Court Theatre in the Waterloo Center for the Arts, 225 Commercial Street, in the City of
Waterloo, Iowa, on the 21st day of April, 2014, at 5:30 p.m., and the proposals will be
acted upon at such later time and place as may then be fixed.
PUBLIC HEARING
Notice is hereby given that the Council of said City will conduct a public hearing on the
proposed plans, specifications, form of contract, and estimate of cost for the
construction of the above-described improvement project at 5:30 p.m. on April 21, 2014
said hearing to be held in the Law Court Theatre in the Center for the Arts, 225
Commercial Street, in said City. The proposed plans, specifications, form of contract,
and estimate of cost for said improvements heretofore prepared by the City Engineer of
the City of Waterloo are now on file in the office of the City Clerk for public examination,
and any person interested therein may file written objection thereto with the City Clerk
before the date set for said hearing, or appear and make objection thereto with the City
Clerk before the date set for said hearing, or appear and make objection thereto at the
meeting above set forth.
SCOPE OF WORK
This project consists of removing and replacing PCC sidewalk of various widths and
thicknesses and placement of ADA truncated domed ramps where required within Zone
4 of the City of Waterloo's Sidewalk Repair Program. This project is generally located in
an area bounded by:
West Mullan-Cedar River-West 18th-Williston-West 6th-Washington-West Mullan
NOTICE OF HEARING CONTRACT NO. 863 Page 1 of 5
BEGINNING AND COMPLETION DATES
The work under the proposed contract shall be commenced within ten (10) working
days after receipt of "Notice to Proceed" and all items shall be completed on or before
September 12, 2014.
METHOD OF PAYMENT TO CONTRACTOR
The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-
five percent (95%) of the work as it is completed and materials delivered and work
approved. Final payment will be made thirty-one (31) days after completion of the work
and acceptance by the Council. Before final payment is made, vouchers showing that
all subcontractors and workmen and all persons furnishing materials have been fully
paid for such materials and labor will be required unless the City is satisfied that
material, men and laborers have been paid.
The Contractor is hereby notified that if the City does not have cash on hand to pay
monthly pay estimates, according to Chapter 384.57 of the Code of Iowa, payment may
be made by anticipatory warrants issued bearing a rate of interest not exceeding that
permitted by Chapter 74A, Code of Iowa.
PLANS AND SPECIFICATIONS
Plans and Specifications governing the construction of the proposed improvements
have been prepared by the City Engineer, which plans and specifications and also the
prior proceedings of the City Council referring to and defining said proposed
improvements are hereby made a part of this notice, and the proposed contract by
reference shall be executed in compliance therewith.
Plans and Specifications are available from the City Engineer upon the City's receipt of
a $25.00 refundable deposit. Deposits will be refunded if the plans are returned in
usable condition (i.e. generally free of highlights, ink markings, tears, stickers, water
stains and soiling) to the Engineer's Office by the end of the 14th consecutive day after
the project has been awarded. No deposits will be refunded for any requests or plans
received after the 14th consecutive day, which includes plans returned via mail service.
Plan holders are responsible for ascertaining when the project has been awarded. . If
the plan holder is the prime contractor or a subcontractor or supplier of the prime
contractor that has been awarded the project, Plans and Specifications do not need to
be returned to receive the deposit. The prime contractor must submit a list of his
subcontractors and suppliers for the City to verify eligibility for the refundable deposit.
Upon award of project, the prime contractor, his subcontractors and suppliers shall be
supplied with the needed number of plans and specifications at no additional cost.
CONTRACT AWARD
A contract will be awarded for each division of the contract to the qualified bidder
submitting the lowest bid.
The City reserves the right to reject any or all bids, re-advertise for new bids, and to
waive informalities in the bids submitted that might be in the best interest of the City.
NOTICE OF HEARING CONTRACT NO. 863 Page 2 of 5
Bids may be held by the City of Waterloo, Iowa, for a period not to exceed thirty (30)
days from the day of the opening of bids for the purpose of reviewing the bids and
investigating the qualifications of bidders, prior to awarding the contract.
By virtue of statutory authority, a preference will be given to products and provisions
grown and coal produced with the State of Iowa and preference will be given to local
domestic labor in the construction of the improvement.
PROPOSALS SUBMITTED
The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly
write or type the unit bid price and the bid item extension (Unit Price x Estimated Qty) in
numerals on the blanks provided. Should there be any discrepancy between the unit
bid price and extension, the City of Waterloo shall consider the unit bid price as being
the valid unit bid price.
The bidder has the option to submit a computer-generated spreadsheet in lieu of the
portion of the Form of Bid or Proposal, which includes the Bid Item Number,
Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price and Total Bid. The
computer-generated spreadsheet shall include all of the information listed in that portion
of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor
submitting the bid. For the bidders who submit a computer-generated spreadsheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in the space(s)
provided on the Form of Bid or Proposal.
BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or cashier's check
drawn on an Iowa bank, or a bank chartered under the laws of the United States, a
certified share draft drawn on a credit union in Iowa or chartered under the laws of the
United States, or bid bond, (on the form furnished by the City) payable to the City of
Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, which
certified check, certified share draft or bid bond will be held as security that the Bidder
will enter into a Contract for the construction of the work and will furnish the required
bonds, and in case the successful Bidder shall fail or refuse to enter into the Contract
and furnish the required bonds, his bid security may be retained by said City as agreed
upon liquidated damages. If bid bond is used, it must be signed by both the Bidder and
the surety or surety's agent. Signature of surety's agent must be supported by
accompanying Power of Attorney.
PERFORMANCE & PAYMENT BONDS
The successful bidder will be required to furnish a "Performance Bond" and a "Payment
Bond" within ten (10) days after forms are presented to him in an amount equal to one
hundred percent (100%) of the contract price, said bond to be issued by a responsible
surety approved by the City Council and shall guarantee the faithful performance of the
contract and the terms and conditions therein contained, and shall guarantee the
prompt payment of all materials and labor and protect and save harmless the City from
claims of any kind caused by the operations of the contractor.
NOTICE OF HEARING CONTRACT NO. 863 Page 3 of 5
MAINTENANCE BOND
Before the Contractor shall be entitled to receive final payment for work done under this
contract, it shall execute and file a bond in the penal sum of not less than 100% of the
total amount of the contract, same to be known as "Maintenance Bond," and which bond
must be approved by the City Council, and which bond is in addition to the bond given
by the Contractor to guarantee the completion of the work.
CONTRACT COMPLIANCE PROGRAM / SUBCONTRACTING
The program proposes numerical projections regarding utilization of Minority Business
Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors
and suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa.
A goal of at least ten percent (10%) for MBE participation on all City funded construction
projects that are estimated at $50,000.00 or more. A goal of at least two percent (2%)
for WBE participation on all City funded construction projects that are estimated at
$50,000.00 or more. Any project funded in part or in total with federal funds shall follow
the respective agencies contract compliance program and goals. The
Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance
MBE/WBE goals. The MBE/WBE subcontractors, suppliers or vendors must provide
the Prime Contractor a reasonably competitive price for the service being rendered or
the Contractor is not required to accept their bid.
LIQUIDATED DAMAGES
Time is an essential element of this contract. It is important that the work be diligently
pursued to completion. If the work is not completed within the specified contract period,
plus authorized extensions, the contractor shall pay to the City Liquidated Damages in
the amount of five hundred dollars ($500.00) per day, for each day, as further described
herein, in excess of the authorized time.
Days beyond the specified completion date for which Liquidated Damages will be
charged will be working days that the contractor does, or could have worked, from
Monday through Saturday. Sundays will be counted only if work is performed. Partial
working days will be considered as a full working day. Days not chargeable for
Liquidated Damages will include rain days, Sunday if no work is done, and legal
holidays.
Working days will cease to be charged when only punch list items remain to be
completed. Punch list items do not include contract bid items or approved change/extra
work orders.
When the Contractor believes the project to be substantially completed, a written notice
stating the same shall be submitted to the Engineer and a request made for a Punch
List. If the work under the Contract extends beyond the normal construction season for
such work the Contractor shall submit to the Engineer in writing a request that working
days counted toward the project be suspended until work is resumed the following
construction season.
This amount is not construed as a penalty. These damages are for the cost to the City
of providing the required additional inspection, engineering and contract administration.
NOTICE OF HEARING CONTRACT NO. 863 Page 4 of 5
PRE-CONSTRUCTION CONFERENCE
Before the work is commenced on this contract, a conference shall be held for the
purpose of discussing the contract. The conference shall be attended by the prime
contractor, subcontractors and City Officials.
RESIDENT BIDDER/NON-RESIDENT BIDDER
Attention of bidders is called to compliance with the provisions of the Resident
Bidder/Non-Resident Bidder requirements.
Each bidder submitting a bid shall execute and include with the bid, a Resident Bid
Certification or a Non-Resident Bidder Certification in the form(s) herein provided. der
SALES TAX EXEMPTION CERTIFICATES
Contractors and approved subcontractors will be provided a Sales Tax Exemption
Certification to purchase building materials or supplies in the performance of
construction contracts let by the City of Waterloo.
Published pursuant to the provisions of Division VI of Chapter 384 of the City Code of
Iowa and upon order to the City Council of said Waterloo, Iowa, on the
day of 2014.
CITY OF WATERLOO, IOWA
BY:
Suzy Schares
City Clerk
NOTICE OF HEARING
CONTRACT NO. 863
Page 5 of 5
INSTRUCTIONS TO BIDDERS
1. EXPLANATIONS TO BIDDERS
Any explanation desired by a bidder regarding the meaning or
interpretation of the Notice to Bidders, Plans, Specifications, etc., must be
requested in writing and with sufficient time allowed for a reply to reach
bidders before submission of their bids. Any interpretation made will be in
the form of an amendment of the Notice to Bidders, Plans, Specifications,
etc., and will be furnished to all prospective bidders. Its receipt by the
bidder must be acknowledged in the space provided on the Proposal Form
or by letter or telegram received before the time set for opening of bids.
Oral explanations or instructions given before the award of the contract
will not be binding.
2. EXAMINATION OF PROPOSED WORK
Bidders should visit the site and take such other steps as may be
reasonably necessary to ascertain the nature and location of the work,
and the general and local conditions which can affect the work or the cost
thereof. Failure to do so will not relieve bidders from responsibility for
estimating properly the difficulty or cost of successfully performing the
work. The owner will assume no responsibility for any understanding or
representation concerning conditions made by any of its officers or agents
prior to the execution of the contract, unless included in the Notice to
Bidders, the Specifications or related documents.
3. PREPARATION OF BIDS
a. Bids shall be submitted on the forms furnished, or copies thereof,
and must be manually signed. If erasures or other changes appear
on the forms, each erasure or change must be initialed by the
person signing the bid.
The bidder has the option to submit a computer-generated
spreadsheet in lieu of the portion of the Form of Bid or Proposal,
which includes the Bid Item Number, Description, Unit, Estimated
Quantity, Unit Bid Price, Total Bid Price, and Total Bid. The
computer-generated spreadsheet shall include all of the information
listed in that portion of the Form of Bid or Proposal as well as bear
the signature of the Prime Contractor submitting the bid. For the
bidders who submit a computer-generated spread- sheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in
the space(s) provided on the Form of Bid or Proposal.
INSTRUCTIONS TO BIDDERS Page 1 of 14
b. The Bid Form may provide for submission of a price or prices for
one or more items, which may be lump sum bids, alternate prices,
schedule items resulting in a bid on a unit of construction or a
combination thereof, etc. When the Bid Form explicitly requires
that the bidder bid on all items, failure to do so will disqualify the
bid. When submission of a price on all items is not required,
bidders should insert the words "no bid" in the space provided for
any item on which no price is submitted.
c. Unless called for, alternate bids will not be considered.
d. Modifications of bids already submitted will be considered if
received at the office designated in the Notice to Bidders by the
time set for closing of bids. Telegraphic modifications will be
considered, but should not reveal the amount of the original or
revised bid.
e. In preparing his bid, the bidder shall specify the price, written legibly
in ink or with the typewriter, at which he proposes to do each item
of work. The unit price shall be stated in figures in the blank space
provided (i.e., $7.14). In items where unit price is required, the total
amount of each item shall be computed at the unit prices bid for the
quantities given on the Bid Form and stated in figures in the blank
space provided.
If the bidder chooses to submit the unit prices, total bid price, and
total bid on a computer-generated spreadsheet, all numbers shall
be easily legible.
f. Any changes or alterations made in the Bid Form, or any addition
thereto, may cause the rejection of the bid. No bid will be
considered which contains a clause in which the contractor
reserves the right to accept or reject a contract awarded him by the
city Council of Waterloo. Bids in which the unit prices are obviously
unbalanced may be rejected.
g. If the bidder does not qualify as a resident bidder, the nonresident
bidder shall specify on the project proposal whether any preference
to resident bidders, including but not limited to any preference to
bidders, the imposition of any type of labor force preference, or any
other form of preferential treatment to bidders or laborers from that
state or foreign country is in effect in the nonresident bidder's state
or country of domicile at the time of a bid submittal.
INSTRUCTIONS TO BIDDERS Page 2 of 14
4. SUBMISSION OF BIDS
a. A bid must be sealed in a separate envelope and marked to
indicate its contents and be accompanied by the bid security in a
separate envelope. If forwarded by mail, the two envelopes shall
be placed in a third and mailed to the City Clerk/Auditor. All bids
must be filed with the City Clerk/Auditor of the City of Waterloo at
his office in the City Hall before the time specified for closing bids.
b. Bids received prior to the advertised hour of opening will be
securely kept sealed. The officer whose duty it is to open them will
decide when the specified time has arrived, and no bid received
thereafter will be considered; except that when a bid arrives by mail
after the time fixed for opening, but before the reading of all other
bids is completed, and it is shown to the satisfaction of the City of
Waterloo, Iowa, that the non-arrival on time was due solely to delay
in the mails for which the bidder was not responsible, such bid will
be received and considered.
c. Bidders are cautioned that, while telegraphic modifications of bids
may be received as provided above, such modifications, if not
explicit and if in any sense subject to misinterpretation, shall made
the bid so modified or amended, subject to rejection.
5. LATE BIDS AND MODIFICATIONS OR WITHDRAWALS
Bids and modifications or withdrawals thereof received at the office
designated in the Notice to Bidders after the exact time set for closing of
bids will not be considered. However, a modification which is received
from an otherwise successful bidder, and which makes the terms of the
bid more favorable to the City of Waterloo, will be considered at any time it
is received and may therefore be accepted. Bids may be withdrawn by
written or telegraphic request received from bidders prior to the time set
for closing of bids.
6. PUBLIC OPENING OF BIDS
Bids will be publicly opened at that time and place set for opening in the
Notice to Bidders. Their content will be made public for the information of
bidders and others interested who may be present either in person or by
representative.
7. BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or
cashier's check drawn on an Iowa bank, or a bank chartered under the
INSTRUCTIONS TO BIDDERS Page 3 of 14
laws of the United States, a certified share draft drawn on a credit union in
Iowa or chartered under the laws of the United States, or bid bond (on the
form furnished by the City) payable to the City of Waterloo, Iowa, in the
sum of not less than five percent (5%) of the bid submitted, which certified
check, certified share draft or bid bond will be held as security that the
Bidder will enter into a Contract for the construction of the work and will
furnish the required bonds, and in case the successful Bidder shall fail or
refuse to enter into the Contract and furnish the required bond, his bid
security may be retained by said City as agreed upon liquidated damages.
If bid bond is used, it must be signed by both the bidder and the surety or
surety's agent. Signature of surety's agent must be supported by
accompanying Power of Attorney.
8. COLLUSIVE AGREEMENTS
a. Each bidder submitting a bid shall execute and include with the bid,
a Non-Collusion Affidavit in the form herein provided, to the effect
that he as not colluded with any other person, firm, or corporation in
regard to any bid submitted.
b. Each bidder submitting a bid shall have each proposed
subcontractor, if any, execute and submit to the City Contract
Compliance Officer by 5:00 P.M. the business day following the day
bids on this project are due, a Non-Collusion Affidavit in the form
herein provided, to the effect that he has not colluded with any
other person, firm, or corporation in regard to any bid submitted.
Before executing any subcontract, the successful bidder shall
submit the name of any proposed subcontractor for approval by the
City.
9. MINORITY AND/OR WOMEN BUSINESS ENTERPRISE
SUBCONTRACTORS
a. CITY OF WATERLOO AND/OR WOMEN BUSINESS
ENTERPRISE PRE-BID CONTACT INFORMATION FORM
The City of Waterloo Minority and/or Women Business Enterprise
Pre-Bid Contact Information Form shall be submitted with the Form
of Bid or Proposal. Failure to do so shall be grounds for the bid
being rejected if subcontracting is proposed by the prime
contractor.
INSTRUCTIONS TO BIDDERS Page 4 of 14
10. MBE/WBE CONTRACT COMPLIANCE PROGRAM
PURPOSE
The purpose of the Contract Compliance Program (hereinafter
called Program) is to act as an impetus for increasing the
participation of minority and women disadvantaged business
enterprise (MBE/WBE) in City awarded construction contracts.
The Program does not propose to eliminate any bonafide contractor
or subcontractor from bidding on City contracts, but it will hopefully
serve as a needed stimulus to help local MBE/WBE's grow and
eventually become mainstream contractors and subcontractors.
This Contract Compliance Program does not propose to include
any set-aside or quotas, but only flexible goals where "good-faith
efforts" are required by the contractor to use MBE/WBE
subcontractors.
This Program shall not eliminate the need for contractors to
continue their "good-faith efforts" in using MBE/WBE
subcontractors on City contracts estimated at less than $50,000.
The City of Waterloo will make every effort to reduce in-house
construction and maintenance work that would be more cost
effectively performed by the private sector and, thus, would allow
additional bidding opportunities for MBE/VVBE firms.
The City Contract Compliance Officer shall be advised of all City of
Waterloo awarded construction contracts.
DEFINITIONS
Goals:
A flexible numerically expressed objective which contractors are
required to make "good-faith efforts." The key to the requirement is
to make documented efforts. Goals are neither set-a-sides nor a
device to achieve proportional representation or equal results.
Numerical goals do not create set-a-sides for specific groups, nor
are they designed to achieve proportional representation or equal
results. Rather, the goal-setting process in affirmative action
planning is used to target and measure the effectiveness of
affirmative action efforts to eradicate and prevent discrimination.
INSTRUCTIONS TO BIDDERS Page 5 of 14
Quota:
A flat numerical requirement that the contractor is required to meet
in order to obtain the benefit or be in compliance. The numerical
goal component of affirmative action programs is not designed to
be, nor may it properly or lawfully be interpreted as, permitting
unlawful preferential treatment and quotas with respect to persons
of any race, color, religion, sex, or national origin. The regulations
at 41 CFR 60-2.12(a), 60-2.15 and 60-2.30, specifically prohibit
discrimination and the use of goals as quotas. (U.S. Department of
Labor)
Set-Aside:
An arrangement in which a particular contract is reserved for
competition solely among minority and women business
enterprises.
Contractor.
As used in this document means contractor, subcontractor,
supplier, vendor, and professional service provider.
Minority Business Enterprise (MBE)
Any business, which is at least 51%, owned by one or more
minorities and whose management and daily business operations
are controlled by one or more such individuals and is on the current
State Unified Certification List, or were listed on the City of
Waterloo Certified MBE/WBE Contractors list as of July 1, 2002
Women Business Enterprise (WBE):
Any business which is at least 51% owned by one or more women
and whose management and daily business operations are
controlled by one or more such individuals and is on the current
State Unified Certification List, or were listed on the City of
Waterloo Certified MBE/WBE Contractors list as of July 1, 2002
Minority:
Any person or persons who are considered as socially and
economically disadvantaged because of their identity as a group
member without regard to their individual qualities. The groups
include: Black American, Hispanic American, Native Americans,
Eskimos, Aleuts, and Asian-Pacific Americans. 13 C.F.R. 124-
1.1(c)(3)(ii)(1983).
Lowest Responsible Bidder:
Bidder who has offered the lowest bid and who has exhibited skill
relative to the type of work bid on, judgment, financial responsibility,
and evidence of working with the Affirmative Action Employment
INSTRUCTIONS TO BIDDERS Page 6 of 14
Program and the Contract Compliance Program.
Broker:
One buying or selling for others on commission or other fee basis
without maintaining a warehouse or other similar inventory storage
facility.
Mayor's Advisory Committee:
Mayor's Advisory Committee for Minority, Female, and
Disadvantaged Business Enterprise.
Good Faith Efforts:
The successful bidder shall be selected on the basis of having
submitted the lowest responsible bid. The obligation of the bidder is
to make good faith efforts. The bidder can demonstrate that it has
done so by the following:
1. The Prime Contractor met the project goal - No Action necessary
2. If the Prime Contractor failed to meet the goal, they must submit
documentation of good faith efforts.
CONTRACT COMPLIANCE PROGRAM SUBCONTRACTING
The program proposes numerical projections or goals regarding
utilization of Minority Business Enterprise (MBE) and Women
Business Enterprise (WBE) as subcontractors in the performance
of contracts awarded by the City of Waterloo, Iowa.
A goal of at least 10% for MBE participation on all City funded
construction projects that are estimated at $50,000 or more and
projects under $50,000 where applicable at the Contract
Compliance Officer's discretion. There is at least 2% WBE goal on
City funded projects. Any project which is funded solely or in part
with Federal funds shall follow the respective agencies contract
compliance program and goals. Any project which is funded solely
or in part with State funds shall follow the respective agencies
contract compliance program and goals. The City of Waterloo
Contract Compliance Program is for City awarded construction
contracts only. The prime contractor shall make "good-faith efforts"
to meet the Contract Compliance MBE/WBE goals. The MBE/WBE
subcontracts must provide the prime contractor a reasonably
competitive price for the service being rendered or the contractor is
not required to accept the bid.
INSTRUCTIONS TO BIDDERS Page 7 of 14
Administrative Reconsideration:
As part of this reconsideration, the bidder will have the opportunity _
to provide written documentation or arguments concerning the
issue of whether they made adequate good faith efforts to meet the
goals. The bidder will have the opportunity to meet in person with
the City of Waterloo's Administrative Reconsideration Committee to
discuss the issue of whether they made adequate good faith efforts.
The Administrative Reconsideration Committee will forward a
written decision on reconsideration to the Mayor and City Council,
explaining the basis for finding that the bidder did or did not meet
the goal or make adequate good faith efforts to do so.
Documentation required will include but is not limited to the
following:
* Making portions of the work available for MBE/WBE
subcontracting
* Evidence of negotiating with MBE/WBE firms
* MBE/WBE quotes obtained and non-MBE/WBE quotes used
* Reasons agreements were not reached
* Follow-up after initial solicitations
* Efforts to assist in obtaining equipment, supplies and materials (at
competitive prices), bonding, lines of credit, insurance, etc.
* Evidence of past compliance or non-compliance by same
contractor
The Contract Compliance Officer will determine the weight to be
given to each item listed above (supported by appropriate
documentation) based on overall program goals.
RESPONSIBILITIES
1. City of Waterloo
A. The City Contract Compliance Officer has the responsibility
to assure the City's compliance with Federal, State and
Municipal regulations.
B. The City Contract Compliance Officer is responsible for
maintaining a current directory of certified firms. Certification
of MBE/WBE/DBE contractors is through the Iowa
Department of Transportation and its Unified Certification
Program. Only firms certified based on guidelines prescribed
in 49 CFR Part 26 and provisions of this agreement, shall be
recognized as certified by the City of Waterloo.
INSTRUCTIONS TO BIDDERS Page 8 of 14
C. The City Contract Compliance Officer is responsible for
making available a list of future project information notices to
MBE/WBE firms.
D. The City Contract Compliance Officer shall send notices to
appropriate MBE/WBE firms in the directory of each bid
solicitation with opening date.
E. The City Contract Compliance Officer will receive MBE/WBE
Letter(s) of Intent to Bid and within two (2) business days
forward the complete list of MBE/WBE bidders who
submitted a Letter of Intent to Bid to prime contractors.
Prime Contractors
In order to be in compliance with the guidelines of this program, the
prime contractor must show good-faith efforts in following the
MBE/WBE Contract Compliance Program. Good-faith efforts
include, but are not limited to, the following:
A. Prime contractors shall send solicitation letters (Form CCO-
3) to appropriate MBE/WBE (those certified in directory
prepared by City Contract Compliance Officer) at least seven
(7) working days prior to bid date. Letters should identify
specific items to be subcontracted. A minimum of three (3)
disadvantaged business contacts must be made and
documented, if there are at least three disadvantaged
businesses offering services in the area to be subcontracted
(See City of Waterloo MBE/WBE Certification List). If less
than three (3) are offering the services to be subcontracted,
then a contact is required for any that are listed as providing
that service. If the Prime Contractor submits a MBE/WBE
contact not on the City's MBE/WBE list, attach a copy of the
MBE/WBE/DBE Certifications from another government
agency.
B. If a prime contract bidder is unable to identify MBE/WBE
firms to perform portions of the work, the City Contract
Compliance Officer should be contacted for assistance
immediately.
C. Prime contract bidders may solicit MBE/VVBE proposals by
telephone or personal interviews, but all such contacts shall
be confirmed by Certified Mail, or subcontract bid request
forms (Form CCO-2).
D. If any MBE/WBE business submitting bids is not selected for
subcontract award, documentation must accompany the
INSTRUCTIONS TO BIDDERS Page 9 of 14
"MBE/WBE Business Enterprise Pre-Bid Contact Information
Form" (Form CCO-4 and CCO-4A) on why the MBE/WBE
was not selected. These reasons could include:
a. Not low bid. Copies of the competing bids may be
required for verification.
b. MBE/WBE did not bid, withdrew bid or non-responsive.
c. Documentation of other business-related reason for not
selecting the MBE/WBE business for a subcontract.
d. Prime contractor self performs work.
e. Any other reason relied on by prime.
The Contract Compliance Officer will determine the weight to be
given to each item listed above (supported by appropriate
documentation) based on overall program goals.
ll. MBE! BE Firms
A. MBE/WBE firms shall be certified by the Iowa Department of
Transportation as owners and controllers of their respective
businesses, or were listed on the City of Waterloo Certified
MBE/WBE Contractors list as of July 1, 2002.
B. MBE/WBE firms must perform the work on the project; they
cannot act as a broker by subcontracting the work out to
others.
C. Each MBE/WBE firm planning to submit quotes on
construction projects with goals, shall submit a Letter of
Intent to Bid (Form CCO-5) to the City Contract Compliance
Officer seven (7) working days prior to bid opening, listing
specific items which the MBE/WBE firm is interested in
bidding. If sufficient Letters of Intent to Bid are not received
by the City Contract Compliance Officer seven (7) working
days prior to bid opening, goals on subject project will be
reduced accordingly. Agreements between the
bidder/proposer and a MBE/WBE in which the MBENVBE
promises not to provide subcontracting quotations to other
bidders/proposers are prohibited.
NON-COMPLIANCE OF CONTRACTORS
A. Noncompliance exists when the contractor's actions are not
consistent with the requirements of the Contract Compliance
Program in the areas of employment and subcontracting.
INSTRUCTIONS TO BIDDERS Page 10 of 14
B. A bidder's failure to show good-faith efforts to meet project
goals or a failure to use certified MBE/WBE firms may be
grounds for finding its bid not responsible.
C. The Contract Compliance Officer shall submit to City Council
his/her recommendation on any non-compliant contract in
writing.
NOTICE TO PROCEED
Notice to proceed on any project with goals will not be issued until
City Contract Compliance Officer determines the lowest responsible
bidder has used good-faith efforts to comply with this Compliance
Program and the bid was responsive.
CONCLUSION
This program repeals or revises all sections of previous Waterloo
Contract Compliance Programs.
11. EMPLOYMENT AND BUSINESS OPPORTUNITY
To the greatest extent feasible, suppliers, subcontractors, and low income
workers owning businesses or living in the Waterloo area must be given
priority in supplying materials, bidding for subcontract work, or applying for
employment by the contractor on this project. Opportunities for training
and for employment arising in connection with this project, shall to the
greatest extent feasible be made available to lower income persons
residing in the project area. The contract area is the City of Waterloo.
The City of Waterloo will require the contractor to document his efforts in
securing lower income workers living in the project area and in purchasing
supplies from, and awarding subcontracts to, businesses owned by
persons residing in the project area.
12. STATEMENT OF BIDDER'S QUALIFICATIONS
Each bidder shall, upon request of the City of Waterloo, Iowa, submit on
the form furnished for that purpose (a copy of which is included in the
contract documents), a statement of bidder's qualifications, his experience
record in constructing the type of improvements embraced, and his
organization and equipment available for the work contemplated; and,
when specifically requested, a detailed financial statement. The City of
Waterloo, Iowa, shall have the right to take such steps as it deems
necessary to determine the ability of the bidder to perform his obligations
under the contract, and the bidder shall furnish the City of Waterloo, Iowa,
all such information and data for this purpose as it may request. The right
INSTRUCTIONS TO BIDDERS Page 11 of 14
is reserved to reject any bid where an investigation of the available
evidence or information does not satisfy the City of Waterloo, Iowa, that
the bidder is qualified to carry out properly the terms of the contract.
13. AWARD OF CONTRACT
a. Award of contract will be made to that responsive and responsible
bidder whose bid, conforming to the Specifications, is most
advantageous to the City of Waterloo; price and other factors
considered. The intention is to award the contract at any time of
opening bids, but the right is reserved to postpone such action for a
reasonable time, not exceeding thirty (30) days.
b. The City Council may, when in its interest, reject any or all bids or
waive any informality in bids received.
c. The bidder shall submit bids on all the items listed in the proposal
and shall state the unit bid price in words in the blank spaces
provided beneath the item description. Should there be any
discrepancy between the unit bid price in words and listed numeral
unit bid price, the City of Waterloo shall consider the unit bid price
in words as being the valid unit bid price. A computer-generated
spreadsheet as herein provided shall also be acceptable.
Proposals requiring mathematical computations to determine unit
prices or totals will be rejected. A contract will be awarded to the
qualified bidder submitting the lowest total bid as indicated in the
NOTICE TO BIDDERS.
d. When a contract for a public improvement is to be awarded to the
lowest responsive and responsible bidder, a resident bidder shall
be allowed a preference as against a nonresident bidder from a
state or foreign country if that state or foreign country gives or
requires any preference to bidders from that state or foreign
country, including but not limited to any preference to bidders, the
imposition of any type of labor force preference, or any other form
of preferential treatment to bidders or laborers from that state or
foreign country. The preference allowed shall be equal to the
preference given or required by the state or foreign country in which
the nonresident bidder is a resident. In the instance of a resident
labor force preference, a nonresident bidder shall apply the same
resident labor force preference to a public improvement in this state
as would be required in the construction of a public improvement by
the state or foreign country in which the nonresident bidder is a
resident.
INSTRUCTIONS TO BIDDERS Page 12 of 14
14. EXECUTION OF AGREEMENT, BONDS, AND CERTIFICATE OF
INSURANCE
a. Subsequent to the award and within ten (10) days after the
prescribed forms are presented for signature, the successful bidder
shall execute and deliver to the City of Waterloo, Iowa, an
agreement in the form included in the contract documents in such
number of copies as the City of Waterloo, Iowa, may require.
b. Having satisfied all conditions of award as set forth elsewhere in
these documents, the successful bidder shall, within the period
specified in paragraph "a" above, furnish a surety bond and a
payment bond in a penal sum not less than the amount of the
contract as awarded, as security for the faithful performance of the
contract and terms and conditions therein contained and shall
guarantee the prompt payment of all persons, firms, or corporations
to whom the contractor may become legally indebted for labor,
materials, tools, equipment, or services of any nature including
utility and transportation services, employed or used by him in
performing the work. The bonds shall protect and save harmless
the City from claims and damages of any kind caused by the
operations of the contractor and shall also guarantee the
maintenance of the contract improvements for the period stated in
the Notice of Hearing from and after completion of said
improvements and their acceptance by the City. Such bonds shall
be in the same form as that included in the contract documents and
shall bear the same date as, or a date subsequent to that of the
agreement. The current Power of Attorney for the person who
signs for any surety company shall be attached to such bonds.
c. The successful bidder shall, within the period specified in
paragraph "a" above, furnish a certificate of insurance for approval
in amounts of not less than the amounts specified in the General
Specifications for Construction, Section F. No. 4 "Liability
Insurance," Pages 14 to 15 of 19 Pages. The certificate of
insurance shall be furnished in such number of copies as the City of
Waterloo may require. The City of Waterloo shall be named as an
"Additional Insured." The contractor shall similarly submit his
subcontractor's certificates of insurance in the amounts for approval
before each commences work. The contractor shall carry or
require that there be Workmen's Compensation Insurance for all his
employees and those of his subcontractors engaged in work at the
site, in accordance with State Workmen's Compensation Laws.
d. The failure of the successful bidder to execute such agreement and
to supply the required bond or bonds within ten (10) days after the
INSTRUCTIONS TO BIDDERS Page 13 of 14
prescribed forms are presented for signature, or within such
extended period as the City of Waterloo, Iowa, may grant, based
upon reasons determined sufficient by the City of Waterloo, Iowa,
may either award the contract to the next lowest bidder or re-
advertise for bids, and may charge against the bidder the difference
between the amount of the bid an the amount for which a contract
for the work is subsequently executed, irrespective of whether the
amount thus due exceeds the amount of the bid guaranty. If a
more favorable bid is received by re-advertising, the defaulting
bidder shall have no claim against the City of Waterloo, Iowa, for a
refund.
15. RECIPROCAL RESIDENT BIDDER PREFERENCE
Attention of bidders is called to the requirement of complying with the
provisions of the Resident Bidder/Non-Resident Bidder requirement.
Each bidder submitting a bid shall execute and include with the bid, a
Resident Bidder Certification or a Non-Resident Bidder Certification in the
form(s) herein provided.
INSTRUCTIONS TO BIDDERS Page 14 of 14
FORM OF BID OR PROPOSAL
F.Y. 2014 SIDEWALK REPAIR PROGRAM —ZONE 4
CONTRACT NO. 863
CITY OF WATERLOO, IOWA
Honorable Mayor and City Council
Waterloo, Iowa
Gentlemen:
1. The undersigned, being a Corporation existing under the laws of the State of
, a Partnership consisting of the following partners:
having familiarized (himself) (themselves) (itself) with the existing conditions on
the project area affecting the cost of the work, and with all the contract documents
listed in the Table of Contents and Addenda (if any), as prepared by the City
Engineer of the City of Waterloo now on file in the office of the City Clerk, City
Hall, Waterloo, Iowa, hereby proposes to furnish all supervision, technical
personnel, labor, materials, machinery, tools, appurtenances, equipment, and
services, including utility and transportation services required to construct and
complete this F.Y. 2014 SIDEWALK REPAIR PROGRAM — ZONE 4, Contract
No. 863, all in accordance with the above-listed documents and for the unit prices
for work in place for the following items and quantities:
F.Y. 2014 SIDEWALK REPAIR PROGRAM - ZONE 4
CONTRACT NO. 863
BID DESCRIPTION-DIVISION 1 UNIT EST.QTY. UNIT BID TOTAL BID
ITEM PRICE PRICE
1 REMOVE & REPLACE PCC SIDEWALK, 4" SF 18,418.6 $ $
2 NEW SIDEWALK, 4" PCC SF 53.2 $
3 REMOVE SIDEWALK, 4" PCC SF - $ $
4 REMOVE & REPLACE PCC PAVING, 4" SF - $ $
5 REMOVE & REPLACE PCC PAVING, 5" SF 175.0 $ $
6 REMOVE & REPLACE PCC SIDEWALK, 6" SF 14,145.4 $ $
7 NEW SIDEWALK, 6" PCC SF 294.4 $ $
8 REMOVE PCC SIDEWALK, 6" SF 519.2 $ $
FORM OF BID CONTRACT NO. 863 Page 1 of 5
9 DETECTABLE WARNING SURFACE SF 784.0 $ $
REMOVE & REPLACE 24" PCC CURB &
10 GUTTER, 6" LF 39.0 $ $
REMOVE & REPLACE 24" PCC CURB &
11 GUTTER, 7" LF - $ $
REMOVE & REPLACE 24" PCC CURB &
12 GUTTER, 8" LF 369.2 $ $
REMOVE & REPLACE 24" PCC CURB &
13 GUTTER, 9" LF 247.6 $ $
REMOVE& REPLACE 24" PCC CURB &
14 GUTTER, 10" LF 29.3 $ $
REMOVE & REPLACE 24" PCC CURB &
15 GUTTER, 11" LF 94.1 $ $
REMOVE & REPLACE 24" PCC CURB &
16 GUTTER, 12" LF 198.0 $ $
17 JOINT SEAL LF 5.0 $ $
18 PCC SIDEWALK PATCHING EACH 3.0 $ $
19 HMA PAVEMENT PATCHING SF 59.0 $ $
20 MANHOLE ADJUSTMENT EACH 5.0 $ $
21 RETAINING WALL LF 35.0 $ $
22 3/4" ROADSTONE TON 20.0 $ $
23 TRAFFIC CONTROL LS 1.0 $ $
24 EXCAVATION, CLASS 10 CY 50.0 $ $
TOTAL BID - BASE BID $
--,-vs. DESCRIPTION ALTERNATE BID = UNIT, EST.QTY. UNIT BID °TOTALBID°'
ITEM" PRICE` ' `" PRICE
1 REMOVE & REPLACE PCC SIDEWALK, 4" SF 6,591.2 $ $
2 NEW SIDEWALK, 4" PCC SF 43.4 $ $
3 REMOVE SIDEWALK, 4" PCC SF 65.6 $ $
4 REMOVE & REPLACE PCC PAVING, 4" SF 148.8 $ $
5 REMOVE & REPLACE PCC PAVING, 5" SF 50.0 $ $
6 REMOVE & REPLACE PCC SIDEWALK, 6" SF 8,907.6 $ $
7 NEW SIDEWALK, 6" PCC SF 54.7 $ $
FORM OF BID CONTRACT NO. 863 Page 2 of 5
8 REMOVE PCC SIDEWALK, 6" SF 249.0 $ $
9 DETECTABLE WARNING SURFACE SF 1,167.0 $ $
REMOVE & REPLACE 24" PCC CURB &
10 GUTTER, 6" LF 19.9 $ $
REMOVE & REPLACE 24" PCC CURB &
11 GUTTER, 7" LF 166.3 $ $
REMOVE & REPLACE 24" PCC CURB &
12 GUTTER, 8" LF 455.7 $ $
REMOVE & REPLACE 24" PCC CURB &
13 GUTTER, 9" LF 270.4 $ $
REMOVE & REPLACE 24" PCC CURB &
14 GUTTER, 10" LF - $ $
REMOVE & REPLACE 24" PCC CURB &
15 GUTTER, 11" LF 109.9 $ $
REMOVE & REPLACE 24" PCC CURB &
16 GUTTER, 12" LF 76.7 $ $
17 JOINT SEAL LF 10.0 $ $
18 PCC SIDEWALK PATCHING EACH - $ $
19 HMA PAVEMENT PATCHING SF 177.0 $ $
20 MANHOLE ADJUSTMENT EACH - $ $
21 RETAINING WALL LF 48.5 $ $
22 3/4" ROADSTONE TON - $ $
23 TRAFFIC CONTROL LS 1.0 $ $
24 EXCAVATION, CLASS 10 CY 200.0 $ $
TOTAL BID — ALTERNATE BID $
TOTAL BID — BASE BID + ALTERNATE BID $
2. It is understood that the quantities set forth are approximate only and subject to
variation and that the unit bid price for the work done shall govern in the actual
payment to Contractor.
3. In submitting this bid, the bidder understands that the right is reserved by the City
of Waterloo, Iowa, to reject any or all bids. If written notice of the acceptance of
this bid is mailed, telegraphed, or delivered to the undersigned within thirty (30)
days after the opening thereof, or at any time thereafter before this bid is
withdrawn, the undersigned agrees to execute and deliver an agreement in the
prescribed form and furnish the required bond and certificate of the insurance
FORM OF BID CONTRACT NO. 863 Page 3 of 5
within ten (10) days after the agreement is presented to him for signature, and
start work within ten (10) days after"Notice to Proceed" is issued.
4. Security in the sum of
Dollars ($ ) in the form of
is submitted herewith in accordance with the INSTRUCTIONS TO BIDDERS.
5. Attached hereto is a Non-Collusion Affidavit of Prime Contractor.
6. Attached hereto is a Resident Bidder Certification ( ), or Non-Resident
Bidder Certification ( ). (Mark one.)
7. The bidder is prepared to submit a financial and experience statement upon
request.
8. The Prime Contractor and Subcontractor(s), which have performed an aggregate
of $10,000.00 in work for the City in the current calendar year, are prepared to
submit an AAP or Update and an EOC, within ten (10) days of notification that the
bid submitted is lowest and acceptable.
9. The bidder has received the following Addendum or Addenda:
Addendum No. Date
10. The bidder shall list the MBE/WBE subcontractor(s), amount of subcontracts and
bid items on the City of Waterloo Minority and/or Women Business Pre-bid
Contact Information Form submitted with this Form of Bid or Proposal. The
apparent low Bidder shall submit a list of all other Subcontractor(s) to be used on
this Project to the City of Waterloo by 5:00 p.m. the business day following the day
Bids on this Project are due along with the Non-Collusion Affidavits of All
Subcontractor(s).
The Contractor shall submit information on subcontractors on
"SUBCONTRACTOR REQUEST AND APPROVAL" Form to be provided by City
prior to approval of contract.
The subcontractors listed on this proposal and/or submitted to the Contract
Compliance Officer cannot be changed except for the following reasons:
1) The City of Waterloo does not approve the subcontractors.
2) The subcontractors submit in writing that they cannot fulfill their
subcontracts.
FORM OF BID CONTRACT NO. 863 Page 4 of 5
11. The bidder has filled in all blanks on this proposal. Those blanks not applicable
are marked "none" or"NA".
12. The bidder has attached all applicable forms.
13. The Owner reserves the right to select alternates, delete line items, and/or to
reduce quantities prior to the award of a contract due to budgetary limitations.
(Name of Bidder) (Date)
BY: Title
Official Address: (Including Zip Code):
I.R.S. No.
FORM OF BID CONTRACT NO. 863 Page 5 of 5
INFORMATION NEEDED
FOR
IOWA CONSTRUCTION SALES TAX EXEMPTION CERTIFICATE
CONTRACTOR NAME:
ADDRESS:
(Check One) PRIME SUBCONTRACTOR _
FEDERAL ID#:
PROJECT NAME:
PROJECT CONTRACT NO.:
DESCRIPTION OF WORK:
❑ Brickwork ❑ Landscaping
❑ Carpentry ❑ Painting
❑ Concrete ❑ Paving
❑ Drywall-Plaster-Insulation ❑ Plumbing
❑ Electrical ❑ Roofing-Siding-Sheet Metal
❑ Excavation/Grading ❑ Windows
❑ Flooring ❑ Wrecking-Demolition
❑ Heavy Construction ❑ Other (Please specify)
❑ Heating-Ventilating-Air Cond
BID BOND
KNOW ALL MEN BY THESE PRESENTS,that we,
as Principal, and
as Surety are held and firmly bound unto the CITY OF WATERLOO , Iowa, hereinafter called
"OWNER." In the penal sum
Dollars ($ ) lawful money of the United States,for the payment
of which sum will and truly be made, we bind ourselves, our heirs, executors, admin strators, and
successors, jointly and severally, firmly by these presents. The condition of this obligatior is such that
whereas the Principal has submitted the accompanying bid dated the day of
, 20 ,for
NOW,THEREFORE,
(a) If said Bid shall be rejected, or in the alternate,
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form specified
and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons
performing labor or furnishing materials in connection therewith, and shall in all other respects perform the
agreement created by the acceptance of said Bid,
Then this obligation shall be void, otherwise the same shall remain in force and effect; it bung expressly
understood and agreed that the liability of the Surety for any and all claims hereunder shall in no event,
exceed the penal amount of this obligation as herein stated.
By virtue of statutory authority,the full amount of this bid bond shall be forfeited to the Owner in liquidation of
damages sustained in the event that the Principal fails to execute the contract and provide the bond as
provided in the specifications or by law.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond
shall be in no way impaired or affected by any extension of the time within which the Owner may accept
such Bid or execute such contract;and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and seals, and such
of them as are corporations, have caused their corporate seals to be hereto affixed and these presents to be
signed by their proper officers this day of ,A.D. 201
(Seal)
Principal
By
(Title)
(Seal)
Witness Surety
By
Witness Attorney-in-fact
GREER'S WORKS
2003 Plainview Street
Waterloo, IA 50703
Phone: (319) 233-4701
Contact: Willie Greer
Specializing in:
DRIVEWAYS, SIDEWALKS, CARPENTRY, ROOFING, GENERAL CONSTRUCTION
OLD GREER'S WORKS
2309 Springview Street
Waterloo, IA 50707
Phone: (319) 233-2150
Contact: David L. Greer, Sr.
Specializing in:
ROOFING& GENERAL CONSTRUCTION
QUICK CONSTRUCTION
217 Bates Street
Waterloo, IA 50703
Phone: (319)215-4166
Contact: Leroy Harrington
Specializing in:
ALL TYPES OF CONCRETE FLATWORKAND GENERAL CONSTRUCTION
CERTIFIED WBE CONTRACTORS
ATLAS PAINTING, INC.*
911 Sycamore Street
P.O. BOX 65
Waterloo, IA 50704
Phone: (319) 232-9164
Specializing in:
MBE WBE Certified Contractors list.Revised 4-2-14
Page 3 of 4
COMMERCIAL AND INDUSTRIAL PAINTING
PETERMAN & HAES CARPET ONE*
4003 University Avenue
Waterloo, IA 50701
Phone : (319)233-6131
FAX: (319) 233-6133
email: JR11486@cfu.net
Certified: City of Waterloo WBE
Contact : Carol Reese
Specializing in:
FLOOR COVERING
WATCO CONSTRUCTION, INC.*
2920 Texas Street
Waterloo, IA 50702 --
Phone : (319) 233-7481
Certified: City of Waterloo WBE
Contact : Patricia J. Kimball
Specializing in:
STORM SEWER, INLETS, DRAIN TILE, WATER MAIN, SANITARY SEWER, INTAKE
STRUCTURES
* DENOTES WOMEN BUSINESS ENTERPRISE
1 1BE/WBE Certified Contractors List,Revised 4-2-14
Page 4 4
STATEMENT OF BIDDER'S QUALIFICATIONS
(To be submitted by the Bidder only upon the specific request of the City of Waterloo,
Iowa.)
All questions must be answered and the date given must be clear and comprehensive.
This statement must be notarized. If necessary, questions may be answered on
separate attached sheets. The Bidder may submit any additional information he
desires.
1. Name of bidder.
2. Permanent main office address.
3. When organized.
4. If a corporation, when incorporated.
5. How many years have you been engaged in the contracting business under
your present firm or trade name?
6. Contracts on hand: (Schedule these, showing amount of each contract and the
appropriate anticipated dates of completion.)
7. General character of work performed by your company.
8. Have you ever failed to complete any work awarded to you? If so, where and
why?
9. Have you ever defaulted on a contract? If so, where and why?
10. List the more important projects recently completed by your company, stating
the approximate cost for each, and the month and year completed.
11. List your major equipment available for this contract.
12. Experience in construction work similar in importance to this project.
13. Background and experience of the principal members of your organization,
including the officers.
14. Credit available: $
15. Give bank reference:
STATEMENT OF BIDDER'S QUALIFICATIONS PAGE 1 OF 2 PAGES
16. Will you, upon request, fill out a detailed financial statement and furnish any
other information that may be required by the City of Waterloo, Iowa?
17. The undersigned hereby authorizes and requests any person, firm, or
corporation to furnish any information requested by the City of Waterloo, Iowa,
in verification of the recitals comprising this Statement of Bidder's
Qualifications.
Dated at , this day of
, 201 .
(Name of Bidder)
By:
Title:
State of )
) ss:
County of )
, being duly sworn deposes and says
that he is of
(Name of Organization)
and that the answers to the foregoing questions and all statements therein contained
are true and correct.
Subscribed and sworn to before me this day of
, 201
Notary Public
My commission expires .
STATEMENT OF BIDDER'S QUALIFICATIONS PAGE 2 OF 2 PAGES
GENERAL SPECIAL PROVISIONS
1. SCOPE OF WORK
The work covered by this contract consists of furnishing all labor, equipment, and
materials and performing all operations, in connection with the F.Y. 2014
SIDEWALK REPAIR PROGRAM — ZONE 4, Contract No. 863 in accordance with
these specifications.
The plans and specifications are dated April 7, 2014. They have the general title of
F.Y. 2014 SIDEWALK REPAIR PROGRAM —ZONE 4, Contract No. 863.
The standard specifications of the City of Waterloo are to be used along with the
special provisions described herein and shall be considered as part of the contract
documents.
The Contractor shall not be compensated for delays and/or extra costs due to
conflicts with existing conditions.
An arrow drawn away from a line represents the boundary where a series of panels
will be removed and replaced.
2. CONFLICTING SPECIFICATIONS
All requirements of other specifications contained in the contract documents
which conflict with the provisions of the special provisions will be considered
void.
3. DUMPING AREAS
Excess dirt and rubble resulting from construction operations shall be hauled
to the County Landfill, approved Rubble Site or other area secured by the
contractor and approved by the City Engineer. Rubble, rubbish, trees, brush, and
other unsuitable backfill material, as designated by the City Engineer, shall be
hauled to the County Landfill. All Landfill charges are to be considered incidental
to the contract and are the responsibility of the contractor.
4. CONSTRUCTION DAMAGE
The Contractor shall exercise care during construction operations to ensure the
safety and protection to existing features located near or within the limits of
construction. Damage caused by negligence or poor workmanship, as determined
by the Engineer, shall be considered the Contractor's responsibility.
5. REMOVED MATERIALS
All materials removed as part of this Contract shall remain the property of the City
unless the City determines that the materials are not salvageable and the City does
not want to retain ownership of the materials. Materials designated in the field by
GENERAL SPECIAL PROVISIONS CONTRACT NO. 863 Page 1 of 5
the Engineer as non-salvageable shall be hauled and disposed of by the
Contractor at no cost to the City. All other materials shall be transported to
locations as directed by the Engineer. No separate measurement or payment will
be made for hauling or disposing of removed materials and it shall be considered
incidental to applicable items.
6. OVERHAUL
Overhaul will not be paid for "surplus material" obtained from any of the items of
construction under this contract. The cost of overhaul will be considered as
incidental to the items to which it applies.
7. MAILBOXES
The Contractor shall notify the United States Postal Department of mailboxes
which interfere with any part of the work before removing them, and the Contractor
will relocate them as required by the Postmaster. The removal and replacement of
mailboxes will not be considered for direct payment, but will be considered
incidental to the item to which it applies.
8. PAY ITEMS
All pay items are listed in the proposal and shall include the purchase of all
materials, delivery of these materials, and furnishing all labor, plant, and
miscellaneous work needed to make the item complete. All such cost shall be
incidental to the proposed item to which it applies and shall not be considered for
separate payment.
9. BREAKDOWN OF LUMP-SUM CONTRACT PRICE ITEMS
The Contractor shall, immediately upon execution and delivery of the contract,
before the first estimate for payment is made, deliver to the City Engineer a
detailed estimate giving a complete breakdown of the lump-sum contract prices.
The submitted breakdown shall be approved by the City Engineer prior to any
payment of any lump-sum price item.
10. PERMISSION TO HAUL OVER STREETS, RAILROADS, AND HIGHWAYS
The Contractor will be required to secure, from the proper authorities, permission
or permit which may be required to haul over streets, highways, railroads or private
property, and any hauling operations of the Contractor shall be subject to the
requirements of such permits, permission, and to all applicable regulations, laws,
and ordinances governing hauling and movement of equipment over streets,
railroads, highways, and private property. Any costs or inconvenience caused by
obtaining any necessary permits or permission shall be considered completely
covered by the price bid for the items in the proposal.
GENERAL SPECIAL PROVISIONS CONTRACT NO. 863 Page 2 of 5
11. CONSTRUCTION SCHEDULING
The City Engineer shall approve Contractor's work schedule prior to starting. All
revisions shall also be approved. The City Engineer may change the schedule to
accommodate changing construction conditions.
The Contractor shall coordinate the work under this contract with contractors
performing work under other contracts which may be performed concurrently.
The Contractor shall be responsible to notify the Police, Fire, Street, and
Engineering Departments of the closing and opening of streets.
The Contractor shall commence work within ten (10) days after receipt of the
"Notice to Proceed" and diligently execute the work of the contract to completion.
12. BEGINNING OF CONSTRUCTION
The Contractor shall coordinate with the City Engineering Department the date
which the construction of this contract may begin.
13. PRE-CONSTRUCTION CONFERENCE
Before any work is started, the Contractor shall arrange with the City Engineering
Department to hold a preconstruction conference to discuss problems and
schedules of contracts.
14. UNDERGROUND UTILITIES
It is the responsibility of the Contractor to obtain the location of gas lines, water
lines, electric, telephone, and cable television cables or wires from the various
utility companies and the City electrician before starting any excavation. The
Contractor shall be responsible for any damage to any underground utilities. The
Contractor shall expose those utilities indicated on the plans so that elevations may
be determined before beginning construction. This work shall be considered
incidental to other items of work.
If the Contractor believes that additional costs have been incurred due to a utility
being improperly located, the resolution of the additional costs incurred shall be
made between the contractor and the respective utility company.
15. TRAFFIC SIGNS AND STREET SIGNS
The Contractor shall contact the City of Waterloo Traffic Operations Department to
have any street sign that will be affected by construction removed and replaced
when the work has been completed.
GENERAL SPECIAL PROVISIONS CONTRACT NO. 863 Page 3 of 5
16. TRAFFIC CONTROL DURING CONSTRUCTION
The Contractor shall, without further or other order, provide, erect, and maintain, at
all times during the progress and suspension of the work and until completion and
final acceptance thereof, suitable and requisite barricades, signs, or other
adequate protection, as required by the latest edition of the "Iowa Manual on
Uniform Traffic Control Devices for Streets and Highways" and shall provide, keep,
and maintain such barricades, signs, etc., as may be required or as may be
ordered by the Engineer, to ensure the safety of the public as well as those
engaged on the work. All barricading plans shall be reviewed by the Engineer.
All barricades required for this project shall be standard Type II, or Ill with high-
intensity sheeting with flashing amber light attached.
For all locations where construction is required within the street, a standard "ROAD
WORK AHEAD" sign, 4' x 4' dimension with high-intensity sheeting with a flashing
amber light attached, shall be located as directed by the Engineer.
Where alley approach walks are removed the Contractor shall use Type II or Type
Ill barricades with steady burn or flashing amber lights and high intensity sheeting,
on both the alley and street side of the approach.
The barricades described above for pedestrian traffic shall also be required with
high-intensity sheeting. The Contractor shall replace the alley approach walk the
day it is removed.
The Contractor shall barricade both ends of each area where curb cut or sidewalk
is removed. The Contractor shall use Type II or Type Ill barricades, as described
herein.
Barricades shall be clean with good reflective properties and constructed with high-
intensity sheeting as determined in the field by the Engineer. If the reflectivity of
the barricade sheeting deteriorates, the contractor shall clean the barricade, as
acceptable to the Engineer. All said barricade cleaning shall be considered
"Incidental" to the applicable items.
17. GRADES, LINES, LEVELS, AND SURVEYS
The Contractor shall verify all grades, lines, levels and dimensions as shown on the
drawings, and he shall report any errors or inconsistencies in the same to the City
Engineer before commencing work.
18. SAFETY OF WORKERS AND PUBLIC
The Contractor shall, at all times, take necessary precautions to protect the life and
health of all persons employed on this project and the public. He shall provide
necessary safety devices and safeguards in accordance with latest and best
accident prevention practices. All such protection shall be furnished to employees
without cost.
GENERAL SPECIAL PROVISIONS CONTRACT NO. 863 Page 4 of 5
No direct measurement of payment shall be made for this protection but shall be
considered incidental to other items of work. The public shall be kept outside of
any work area.
19. WORKING ON SATURDAYS, SUNDAYS AND LEGAL HOLIDAYS
The Contractor shall notify the Engineer in writing forty-eight (48) hours in advance
if work on Saturday is planned.
Work on Sunday requires prior approval of the Engineer in accordance with the
Waterloo Standard Specifications. The Contractor shall not work the following
days in 2014 due to City holidays: May 26, July 4, and September 1.
GENERAL SPECIAL PROVISIONS CONTRACT NO. 863 Page 5 of 5
SPECIAL PROVISIONS
1. STANDARD SPECIFICATIONS
The Standard Specifications, which are referenced in the contract documents,
are designated as follows:
WATERLOO STANDARD SPECIFICATIONS - "Standard Specifications for
Municipal Public Works Construction, City of Waterloo, Iowa" and "City of
Waterloo Driveway and Sidewalk Specifications."
IDOT STANDARD SPECIFICATIONS - "Standard Specifications for Highway
and Bridge Construction, Iowa Department of Transportation, Ames, Iowa,
Series of 2009" and current revisions thereof.
2. BASE AND ALTERNATE BID
This year's sidewalk repair program has more identified sidewalk repairs than
appropriated funding can likely repair. Sidewalk repairs designated "BASE" are
primary repairs to be completed this year. Sidewalk repairs designated
"ALTERNATE" are repairs that would be completed if funding allowed.
ALTERNATE repairs may be included in this year's sidewalk repair program if
construction bids are favorable.
3. SPECIAL NOTES ON SELECT BID ITEMS
A. NEW PCC SIDEWALK, 4" —At various locations, new sidewalk sections
will be installed to provide new pedestrian accessibility ramps or allow
pedestrians to easily access traffic control buttons. Any new sidewalk
section installed shall not exceed a 2% cross slope. In cases where the
section will be a pedestrian accessibility ramp landing, neither the cross
slope or the running slope shall exceed 2%. Contractor shall replace
adjoining sidewalk sections, as needed, to allow these new sidewalk
sections to meet the cross and running slope requirements.
B. REMOVE PCC SIDEWALK, 4" and 6" — At various locations, existing
sidewalks and pedestrian accessibility ramps are no longer needed.
Identified sidewalks and accessibility ramps shall be removed and the
resulting hole filled with topsoil and seeded. Topsoil, seeding and
erosion control matting shall be considered incidental to the sidewalk
removal bid item. The dropped curb sections for these removed ramps
shall be replaced with full height curb in accordance with the
specifications for curb replacement. Those replaced sections of curb
shall be paid for under the appropriate curb replacement bid item.
C. REMOVE & REPLACE PCC PAVING, 4" — At various locations,
SPECIAL PROVISIONS CONTRACT NO. 863 Page 1 of 8
adjoining properties have paved the right-of-way adjoining or between
the accessibility ramps. At some of these locations, the reconstruction of
the accessibility ramps will require that this "private" paving be removed
and replaced to allow for the proper construction of the ramps.
D. REMOVE & REPLACE PCC PAVING, 5" — At the northwest corner of
Johnson Street & West 7th Street (sheet 72) a private driveway was
constructed around an existing accessibility ramp. This ramp at this
location is to be relocated to remove it from the driveway. This item is —
for the removal and replacement of this residential driveway.
E. NEW PCC SIDEWALK, 6" — This item is for the construction of new —
pedestrian accessibility ramps at several locations within the sidewalk
zone. These new ramps shall be constructed per City specifications. If
existing sidewalk panels need to be removed and replaced to allow, they —
shall be paid for under the appropriate bid item.
F. JOINT SEAL — At several repair locations, the sidewalk panels are in —
good shape but have developed wide joints. Under this item, the
Contractor will clean and fill designated sidewalk joints with an approved
joint filling compound.
G. SIDEWALK PATCH — At several repair locations, the sidewalk sections
are in generally good shape save for small deteriorated holes. At each
patch location, the Contractor shall remove all loose material, clean the
work area of all debris and dirt, and then patch the hole with patching
material approved in the current Waterloo sidewalk specifications.
H. ASPHALT PATCH — At various locations, adjoining properties have —
paved the right-of-way adjoining or between the accessibility ramps. At
some of these locations, the reconstruction of the accessibility ramps will
require that this "private" paving be removed and replaced to allow for
the proper construction of the ramps. This bid item includes all materials
and labor necessary to properly discard removed material and to return
the disturbed approach to good condition.
MANHOLE ADJUSTMENT — The reconstruction of several accessibility
ramps will likely require the Contractor to adjust an existing manhole to
allow the ramp to meet current ADA requirements. This bid item
includes all materials and labor necessary to adjust the manhole to
proper grades. —
J. RETAINING WALL — At several locations, reconstruction of the
handicap ramp to ADA regulations will require significant excavation to —
lower the turning spaces and ramp grades. In certain instances, to avoid
regrading private property, concrete retaining walls will be required to be
constructed. —
K. 3/4" ROADSTONE — In certain locations, the sidewalk repair work will
SPECIAL PROVISIONS CONTRACT NO. 863 Page 2 of 8
occur in alley approaches that are abutting rocked alleys and the repair
work will require the contractor to remove some of the alley surfacing
material. The contractor shall supply, place and compact 3/4" roadstone,
as needed, to return the alley surfacing to pre-construction conditions.
L. TRAFFIC CONTROL - There are proposed sidewalk repairs along both
US Highway 218 and US Highway 63 that will require the Contractor to
work in the roadway. The Contractor will need to coordinate traffic
control with the IOWA DOT Waterloo Maintenance office. Work along
these highways may only commence once the appropriate traffic control
has been installed. The Contractor is directed to work quickly along
these highways to minimize lane closures. The Engineering Department
will obtain the necessary Work in Right-of-Way permits from the DOT.
M. EXCAVATION, CLASS 10 — At a number of locations, the
reconstruction of the accessibility ramps will require excavation to lower
the turning space and ramps to bring them into conformance with ADA
regulations. This item covers the excavation and hauling of material
generated by ramp reconstruction. Any excess material generated may
be used as fill at other ramp locations provided it is quality top soil and
free of any debris. Contractor shall dispose of any remaining excess
material at approved disposal sites at no additional cost to the City.
4. SIDEWALK CONSTRUCTION
Construction of sidewalks, pedestrian accessibility ramps and curb and gutter
sections shall meet the requirements of the current City of Waterloo Driveway
and Sidewalk Specifications. These specifications and detail sheets are
included at the end of these Special Provisions.
5. SIDEWALK REMOVAL
The Contractor shall remove the sidewalk panels as shown on the plans or as
designated in the field by the Engineer. If only portions of a stretch of sidewalk
are to be removed, the boundaries of the removed panels shall be made by a
vertical full-depth saw cut before breaking the panels for removal. The
Contractor shall not receive compensation for removing any sidewalk panels or
pavement sections not designated for removal. Any areas of sidewalk or
neighboring pavements broken or damaged by the Contractor's operations
shall be sawed full depth at the next panel joint beyond the damage, and
removed and replaced by the Contractor without compensation.
6. EXISTING THIN/BRITTLE CONCRETE SIDEWALK
The Contractor is advised that some sections of sidewalk have a thin top layer
of concrete that is very brittle. The Contractor shall be extremely careful during
removal of these sidewalk panels so as not to disturb adjacent sidewalk panels.
Any sidewalk repair outside the area marked for replacement that is necessary
SPECIAL PROVISIONS CONTRACT NO. 863 Page 3 of 8
percent requirement.
14. VOLUNTARY PARTNERING
The City of Waterloo intends to encourage the formation of a partnership with
the contractor and its principal subcontractors. This partnership will be
structured to draw on the strengths of each organization to identify and achieve
mutually beneficial goals. The objectives are effective and efficient contract
performance and completion within budget, on schedule, and in accordance
with plans and specifications.
This partnership will be multi-lateral in makeup, and participation will be totally
voluntary. Any cost associated with effectuating this partnering will be agreed
to by all parties and will be shared equally by the participating parties.
The establishment of a partnership charter on this project will not change the
legal relationship of the parties to the contract nor relieve the parties from any
of the terms of the contract.
15. QUANTITY ADJUSTMENTS
The following Bid Items are exempted from consideration under the provisions
of Section B. "Scope of Work," Paragraph 7 of the "General Specifications for
Construction" concerning the variance of the "As-Built" quantity of the listed
item by more than twenty (20%) percent from the estimated quantity specified
in the contract:
SPECIAL PROVISIONS CONTRACT NO. 863 Page 7 of 8
BASE BID
BID ENGR. EST
ITEM ITEM DESCRIPTION UNIT QUANTITIES
2 NEW SIDEWALK, 4" PCC SF 53.2
3 REMOVE SIDEWALK, 4" PCC SF -
4 REMOVE&REPLACE PCC PAVING,4" SF -
5 REMOVE&REPLACE PCC PAVING, 5" SF 175.0
10 REMOVE& REPLACE 24" PCC CURB&GUTTER, 6" LF 39.0
14 REMOVE&REPLACE 24" PCC CURB&GUTTER, 10" LF 29.3
15 REMOVE& REPLACE 24" PCC CURB&GUTTER, 11" LF 94.1
17 JOINT SEAL LF 5.0
18 PCC SIDEWALK PATCHING EACH 3.0
19 HMA PAVEMENT PATCHING SF 59.0
20 MANHOLE ADJUSTMENT EACH 5.0
21 RETAINING WALL LF 35.0
22 3/4" ROADSTONE TON 20.0
24 EXCAVATION, CLASS 10 CY 50.0
BASE BID+ALTERNATE BID
BID ENGR. EST
ITEM ITEM DESCRIPTION UNIT QUANTITIES
2 NEW SIDEWALK, 4" PCC SF 96.6
3 REMOVE SIDEWALK, 4" PCC SF 65.6
4 REMOVE& REPLACE PCC PAVING, 4" SF 148.8
5 REMOVE&REPLACE PCC PAVING, 5" SF 225.0
10 REMOVE&REPLACE 24" PCC CURB&GUTTER, 6" LF 58.9
15 REMOVE& REPLACE 24" PCC CURB&GUTTER, 11" LF 29.3
16 REMOVE&REPLACE 24" PCC CURB&GUTTER, 12" LF 204.0
17 JOINT SEAL LF 15.0
18 PCC SIDEWALK PATCHING EACH 3.0
19 HMA PAVEMENT PATCHING SF 236.0
20 MANHOLE ADJUSTMENT EACH 5.0
21 RETAINING WALL LF 83.5
22 3/4" ROADSTONE TON 20.0
24 EXCAVATION, CLASS 10 CY 250.0
SPECIAL PROVISIONS CONTRACT NO. 863 Page 8 of 8
GENERAL SPECIFICATIONS FOR CONSTRUCTION
CITY OF WATERLOO, IOWA
Department of Engineering
SECTION A - Definitions of Terms
SECTION B - Scope of work
SECTION C - Control of Materials and Work
SECTION D - Procedure and Progress
SECTION E - Measurements and Payments
SECTION F - Legal Relations and Responsibility
SECTION A - DEFINITIONS OF TERMS
1. CITY. The City of Waterloo, Iowa, which is the Party of the First
Part of the accompanying contract, acting through its authorized representative.
2. COUNCIL. The duly elected Council of the City of Waterloo, Iowa.
3. ENGINEER. The City Engineer of Waterloo, Iowa, or his
authorized representative.
4. INSPECTOR. The authorized representative of the Engineer,
assigned to the detailed inspection of the work or materials therefor and to such
other duties as may be delegated to him in these specifications.
5. CONTRACTOR. The Party of the Second Part in the
accompanying contract for the improvement covered by these specifications, or
his authorized representative.
6. SUBCONTRACTOR. Any person, firm, or corporation who has,
with the approval of the Council, contracted with the Contractor to execute and
perform in his stead all or any part of the contract.
7. BIDDER. Any individual, firm, or corporation submitting a proposal
for all or a part of the work provided for in these specifications.
8. PROPOSAL GUARANTEE. The security designed in the Notice of
Bidders or Proposal to be furnished by the bidder as a guarantee of good faith to
enter into a contract and furnish an acceptable bond for the work contemplated if
it be awarded him.
9. SURETY. The corporate body bound with and for the Contractor
for the acceptable performance of the contract.
GENERAL SPECS Page 1 of 18
10. PROPOSAL. The written Proposal, submitted by the bidder in the
prescribed manner and on the standard form, for the improvements covered by
these specifications.
11. SPECIFICATIONS. The documents that set forth the manner in
which the proposed work is to be accomplished which have been prepared by
the Engineer and approved by the City Council, official copies of which are now
on file with the City Clerk.
12. SPECIAL PROVISIONS. Clauses or memoranda not contained
herein, applying to the contract of which these specifications are a part, which
change or supplement these specifications.
13. CONTRACT. The agreement entered into between the City and
the Contractor, setting forth the terms under which the work covered by the plans
and specifications is to be performed. The contract includes all conditions,
definitions, and instructions set forth in the official publications relating to the
work, the official contract and specifications, the Proposal, official plans, and all
supplemental agreements entered into by the parties to the contract.
14. NOTICE TO BIDDERS. The notice called attention of bidders to
the time and place for receiving bids, containing a brief description of the work,
and briefly setting forth the requirements and conditions for submission of
Proposals.
15. INSTRUCTIONS TO BIDDERS. The clauses setting forth in detail
the information relative to the proposed work and requirements for the
submission of Proposals.
16. PLANS. The plans for the improvement covered by the
specifications and approved by the Council, official copies of which are on file
with the City Clerk.
17. CONTRACT BOND. The bond executed by the Contractor and his
surety in favor of the City of Waterloo, Iowa, guaranteeing the complete
execution of the contract in accordance with the plans and specifications, the
payment of all debts pertaining to the work, and maintenance of the work as
provided by law or by the specifications.
18. CONTRACT PERIOD. The period from the specified date for
beginning the work to the specified date of completion, both dates inclusive. The
contract period may be extended by the Council, as provided in these
specifications, in which event the contract period includes the new date of
completion.
19. OFFICIAL PUBLICATIONS. The official publications are the
formal resolutions and notices relative to the proposed improvement that are
required by law to be published in a prescribed manner and that have actually
GENERAL SPECS Page 2 of 18
been published in accordance with the statutes
directedon is
r to the fact that these official
the force effect these official
obligations.
relatingy thereto.
publications are by statute vestedtwith'all of
9 ns.
20" AST M• Abbreviation for American Socie
ty for Testing Materials.
21" WORK. The term "Work"
includes labor or materials or both of the
equipment, transportation,
ati and
necessary to complete the contract. Subcontractor
p rtation, or other facilities
ME. A
22. TIME. All time limits stated i
essence the IM . in the contract documents are of the
SECTION B - SCOPE OF WORK
1. CORRELATION
documents are complementary,AND INTENT OF DOCUMENTS.
documents
ast if for byry, and what is called for bynyThe Contract
bilanding
materials,called all. The intention of the documents is to include e as
execution a work.equipment, and transportation allr
havex aMaterials or work described wordsne necessary
cch so
well-known technical or tradeproper
recognized standard. meaning shall be applied,
held to refer to such
2. DRAWINGS AND SPECIFICATIONS.
in the contract documents the engineer shall f
of
charge, Unless Contractor,
g , copies of drawings urnish to the provided
charge,executi all the work. g and specifications reasonablyCocessar free the
The Contractor shall keep necessary for
on the work available to the Engineer one
to his ore all drawings and specifications
3.
CONTRACTORS representatives.
agreed that the Conractor has, b UNDERSTANDING. It is nature, Y careful examination, satisfied himself understood
character and location of the work, the conformanceand
character, quality, andto the
the equipment quantity of the to the ground,r the
qui meant and facilities needed materials to be encountered, the character
of the work, the general and local condpons, '
preliminary to ande during thewhich prosecutioncan,
any way,onversation withthe
work and all other matters in
under this contract.
any officer, agent, or employeeNo verbal agreement or
cafter the execution of the of the City, either before or
obligations herein contained.Contract, shall affect or
modify any of the terms or
4. REPORTING ERRORS
in the course of the AND DISCREPA
NCIES. theContractor,
physical conditions of the locality,any discrepancies between theeplansor any
omission and the
in plans or in the
s, it shall be his duty to inform the
GENERAL SPECS
Page 3 of 18
Engineer immediately, in writing,
and the Engineer shall promptly correct the
same. plans are
ALTERATION OR CORRECTIONo eOFa PLANS.N. The the foreseen
5. that are presumably be required
made up from surveysmodification of the plans which may
the construction or any corrections made necessary
byconstruction requirements. Any the Engineer. Should
the exigencies of surveys, will be made by
specifications require a different
because of errors in mtodifications
originalthe or sp in the Proposal are
q
corrections or mf workficatthan thatof planswhich the unit pricesarts of the work
based,uality or class of than uponrequired in p
modifications result in an increased cost
s to the
or if the modification or corrections are such
Contractor,
or, the
and suchfrom
paid for work resulting
Contractor, the amount at be me the changes are ordered and before thework
upon in writing the t
agreed Contractor. No allowance will be made for anticipate profits
is begun by the
work not performed.
THE WORK. The City, without invalidating the
altering, adding to, or
6. CHANGES IN es by agreement to, or
contract, may order extra work or make changes being adjusted by
a
deductingAll such work shall beo
from the work, tngecontract work is undertaken. that any
executedrbitration before such dchangoriginal contract, exceptsuch
caused thereby shall be adjusted at the time of ordering
r
under the conditions of the
extension of time rt
change. OR DECREASED QUANTITIES. The right is
INCREASED performance of such work of
7 the contract, to order the p
airing Proposal or to increase or decrease the
reserved without impairing
in the fullyeand satisfactorily
a class not contemplated to completecompleted a toout
quantities as may be considered necessary when the work is
quantity of any item of work varies by
the work included in , ae contract. asu measured quantitywrk specified the
change in the plans, 20% from the estimated
percent ( � be made for such item of work
lbof
more than twenty price may subject to the approval contract, t adjustment in adjustment.
Engineer and the Contractor,
such an
agreement between the to the contract may q
the City Council. Either party shall provide the lands
LANDS AND RIGHT - WAY• The City
this contract is to be done, except that the Contractor
$ construction facilitiesacr
hall which the land work under fthe right m access to same.
shallprovide required for they erection 9 teofmporary
together and storage of his material, tog
The Contractor shall be allowed o use City
Water
Water
9. CITY WATER. application tosome other
bu
water is used, he shall make app drant or by era water
Works
beforeo any water connection from a fire by
connection o for a temporary e will be charged at the rate for temp rY
Water usag
e . method. regulations, and water rates are availablenumber is the t Waterloo
Water orks officeshe rules, at325 Sycamore Street or their telephone
19-
Water W
232-6280. Page 4 of 18
GENERAL SPECS
10. RIGHTS OF VARIOUS INTERESTS. Whenever work being done
by the City's forces or by other Contractors is contiguous to work covered by this
contract, the respective rights of the various interests involved shall be
established by the Engineer to secure the completion of the various portions of
the work in general harmony.
11. CLOSING STREETS TO TRAFFIC. The Engineer shall be the
judge of how many streets or parts of streets it is necessary for the Contractor to
close at any time and may refuse to permit the closing of additional streets until
such of the work is finished and opened to traffic as he may direct.
12. OBSTRUCTION OF STREETS. The work is to be carried on in
such manner as to obstruct the streets, highways, and alleys as little as possible.
The Contractor shall carry on the different parts of the work so as to complete the
whole, as nearly as practicable, at the same time. In doing the work, the
Contractor shall follow the directions of the Engineer as to the place or places
where work shall be started or be carried on and the direction in which it shall be
done.
13. SHANTIES AND BUILDINGS. Shanties or other buildings shall not
be erected in or upon any street, highway, or alley without permission of the
Engineer. If such permission be granted, it may be upon any reasonable terms
prescribed by the person or body granting such permission.
14. SANITARY CONVENIENCES. The Contractor shall furnish the
necessary sanitary conveniences, properly secluded, for the laborers on the
work, and these shall be maintained in a manner that will be inoffensive to the
public.
15. CLEANING UP. The Contractor shall, as directed by the Engineer,
remove from the City's property and from all public and private property, at his
own expense, all temporary structures, rubbish, and waste materials resulting
from his operations before work can be considered completed. The Contractor
shall also renew or replace any and all fences, sidewalks, or other property
damaged or disturbed by his work.
16. OMISSION OF PARTS OF GENERAL SPECIFICATIONS. Parts
of the General Specifications deemed not to apply to some particular work may
be omitted by special reference in other parts of the contract documents
SECTION C - CONTROL OF MATERIALS AND WORK
1. SUPERVISION AND INSPECTION. The Engineer shall have
supervision of the construction provided for in this Contract and shall decide any
and all questions which may arise as to the quality and acceptability of materials
furnished, work performed, manner of performance, rate of progress on the work,
and all questions regarding the acceptable fulfillment of the terms of the Contract.
GENERAL SPECS Page 5 of 18
Materials and construction work shall, at all times, be subject to the inspection of
the Engineer or his representatives. The Contractor shall be held strictly to the
true intent of these specifications as regards the quality of materials,
workmanship, and the diligent prosecution of the work.
The Engineer and his representatives shall, at all times, have access to
the work wherever it is in preparation of progress, and the Contractor shall
provide proper facilities for such access and for inspection.
If the specifications, the Engineer's instructions, law ordinances, or any
public authority require any work and/or materials to be especially tested or
approved, the Contractor shall give the Engineer timely notice of readiness for
inspection. If the inspection is to be made by authority other than the Engineer,
the Contractor shall notify the engineer of the date fixed for inspection.
Inspections by the Engineer will be promptly made and, where practicable, at the
source of supply. If any work should be covered up without the approval or
consent of the Engineer, it must, if required by the Engineer, be uncovered for
examination at the Contractor's expense.
Re-examination of questioned work may be ordered by the Engineer, and,
if so ordered, the work must be uncovered by the Contractor. If such work be
found in accordance with the Contract, the City shall pay the cost of re-
examination and replacement. If such work be found not in accordance with the
Contract, the Contractor shall pay such cost unless he shall show that the defect
in the work was caused by another Contractor, and, in that event, the City shall
pay the cost.
2. AUTHORITIES AND DUTIES OF INSPECTORS. Inspectors may
be stationed on the work to report to the Engineer as to the progress of the work
and the manner in which it is being performed; also, to report whenever it
appears that materials furnished and work performed by the Contractor fail to
fulfill the requirements of the specifications and Contract, and to direct the
attention of the Contractor to such failure or infringement; but such inspection
shall not relieve the Contractor from any obligations to furnish acceptable
materials or to provide completed construction that is satisfactory in every
particular.
In case of any dispute arising between the Inspector and the Contractor as
to materials furnished or the manner of performing the work, the Inspector shall
have the authority to reject materials or suspend the work until the question at
issue can be referred to and decided by the Engineer. Inspectors are not
authorized to revoke, alter, enlarge, relax, or release any requirements of these
specifications. The Inspector shall, in no case, act as foreman or perform other
duties for the Contractor, or interfere with the management of the work by the
latter.
GENERAL SPECS Page 6 of 18
3. STATUS OF THE ENGINEER. The Engineer shall have general
supervision and direction of the work. He has authority to stop the work
whenever such stoppage may be necessary to insure the proper execution of the
Contract. He shall also have authority to reject any work and/or materials which
do not conform to the specifications, to direct the application of forces to any
portion of the work as, in his judgment, is required, and to order the force
increased or diminished, and to decide questions which arise in the execution of
the work.
4. ENGINEER'S DECISIONS. The Engineer shall, within a
reasonable time, make decisions on all claims of the Contractor and on all other
matters relating to the execution and progress of the work or the interpretation of
the contract documents.
All such decisions of the Engineer shall be final except as to the element
of time and financial consideration involved, which, if no agreement in regard
thereto is reached, shall be subject to arbitration.
5. STAKES AND INSTRUCTIONS. The Contractor shall provide
reasonable and necessary opportunities and facilities for setting stakes and
making measurements. The Contractor shall not furnish stakes or men to set
them. He shall not proceed until he has received from the Engineer such stakes
and instructions as may be necessary to the progress of the work.
The Contractor shall carefully preserve bench marks, reference points,
and stakes, and in case of willful or careless destruction, he shall be charged
with the resulting extra expense and shall be responsible for any mistakes that
may be caused, by their loss or disturbance.
6. SUPERINTENDENCE. The Contractor shall keep on his work
during its progress a competent superintendent and any necessary assistants, all
satisfactory to the Engineer. The Superintendent shall not be changed except
with the consent of the Engineer, unless the Superintendent proves to be
unsatisfactory to the Contractor and ceases to be in his employ. The
Superintendent shall represent the Contractor in his absence, and all directions
given to him shall be as binding as if given to the Contractor. Important decisions
shall be confirmed in writing to the Contractor. Other directions shall be so
confirmed on written request in each case.
The Contractor shall give efficient supervision to the work using his best
skill and attention. He shall carefully study and compare all drawings,
specifications, and other instructions, and shall report at once to the Engineer
any error, inconsistency, or omission which he may discover.
7. REMOVAL OF UNAUTHORIZED WORK. Work done without lines
and grade being give, work done beyond lines shown on the plans or as given,
except as herein provided, or any extra or additional work done without authority,
will be considered as unauthorized and at the expense of the Contractor and will
GENERAL SPECS Page 7 of 18
not be paid for under the provisions of the Contract. Work so done may be
ordered removed and replaced at the Contractor's expense.
8. REMOVAL OF DEFECTIVE MATERIALS OR WORK. The
Contractor shall promptly remove from the premises all materials condemned by
the engineer as failing to conform to the Contract; whether incorporated in the
work or not, and the Contractor shall promptly replace and re-execute his own
work in accordance with the contract and without expense to the City, and shall
bear the expense of making good all work of other Contractors destroyed or
damaged by such removal or replacement.
If the Contractor does not remove such condemned work and materials
within a reasonable time, fixed by written notice, the City may remove them and
may store the material at the expense of the Contractor. If the Contractor does
not pay the expense of such removal within a reasonable time thereafter, the City
may, upon ten (10) days' written notice, sell such materials at auction or at
private sale and shall account for the net proceeds thereof, after deducting all the
costs and expense that should have been borne by the Contractor; or, if the net
proceeds of such sale are insufficient to pay the expenses of removal, the City
may deduct the balance from any amounts due the Contractor.
9. MATERIALS, EQUIPMENT, APPLIANCES, AND FACILITIES.
Unless otherwise stipulated, the Contractor shall provide and pay for all
materials, labor, water, tools, equipment, light, power, transportation, and other
facilities necessary for the execution and completion of the work. Materials shall
be of the quality specified for each particular part of the work.
Whenever, in construction of the work or in the manufacture of any article
of appliance necessary for the construction or operation of the work, it is
necessary to use any material that is not fully specified in these specifications, it
shall be of good quality and shall meet with the approval of the Engineer.
Any appliance that is necessary for the construction or operation of the
work and is commonly recognized as a part of the work, shall be furnished by the
Contractor as part of the work, whether or not it is specifically called for in the
plans and specifications, and such appliance shall be of good quality and
standard make and shall meet with the approval of the Engineer.
10. MATERIAL SAMPLES. Before the contract is awarded, the bidder
may be required to furnish a statement of the origin, composition, and
manufacture of any and all materials proposed for use in the performance of the
Contract, together with samples of the material. These samples will be
considered as representative and typical of the material to be obtained from any
particular source.
11. CHARACTER OF WORKMEN AND EQUIPMENT. The Contractor
shall employ competent and efficient workmen for every kind of work. Any
person employed on the work who shall refuse or neglect to obey the directions
GENERAL SPECS Page 8 of 18
of the engineer or Inspector, or who shall be deemed incompetent or disorderly,
or who shall commit trespass upon public or private property in the vicinity of the
work, shall be dismissed when the Engineer so orders, and shall not be re-
employed unless express permission be given by the Engineer. The Contractor
shall, at all times, enforce discipline and good order among his employees.
The methods, equipment, and appliances used on the work, and the labor
employed, shall be such as will produce a satisfactory quality of work and shall
be adequate to complete the contract within the specified time limit.
12. HIRING CITY EMPLOYEES. The Contractor shall not employ and
hire any of the City's employees without the permission of the Engineer.
13. LABOR. Local labor shall be given preferences so far as
practicable.
14. THE CITY'S RIGHT TO DO WORK. If the Contractor should
neglect to prosecute the work properly or fail to perform any provision of this
Contract, the City of Waterloo, after three (3) days' written notice to the
Contractor may, without prejudice to any other remedy he may have, make good
such deficiencies and may deduct the cost thereof from the payment then or
thereafter due the Contractor, provided, however, that the Engineer shall approve
both such action and the amount charged to the Contractor.
SECTION D - PROCEDURE AND PROGRESS
1. ORDER OF COMPLETION - USE OF COMPLETED PORTIONS.
The Contractor shall complete any portion or portions of the work in such order or
time as the Engineer may require. The City shall have the right to take
possession of an use completed or partially completed portion of the work at any
time, but such taking possession and use shall not be deemed an acceptance of
work so taken or used, or any part thereof. If such prior use increases the cost of
or delays the work, the Contractor shall be entitled to such extra compensation or
extension of time, or both, as the Engineer may determine.
2. WEATHER. During stormy or inclement weather, all work shall be
suspended, except such as can be done in an acceptable manner. Permission
to work during freezing, stormy, or inclement weather shall in no way be
construed as a release of the Contractor's responsibility regarding the quality of
the finished work at such time.
3. SUNDAYS AND LEGAL HOLIDAYS. Except for such work as
may be required to properly maintain or protect completed or partially completed
construction or to maintain lights and barricades, no work will be permitted on
Sundays or legal holidays without specific permission of the Engineer.
GENERAL SPECS Page 9 of 18
4. DELAYS AND EXTENSION OF TIME. If the Contractor be
delayed in the completion of the work by an act of neglect of the City, or its
employees; or by any other Contractor employed by the City; or by changes
ordered in the work; or by strikes, lockouts, fire, unusual delays in transportation,
unavoidable casualties, or any cause beyond the Contractor's control; or by
delay authorized by the Engineer pending arbitration; or by any cause which the
Engineer shall decide justifies the delay, then the time of completion shall be
extended for such reasonable time as the Engineer may decide will compensate
for such delay.
No such extension shall be made for delay occurring more than thirty (30)
days before claim therefor is made in writing to the Engineer. In the case of a
continuing cause of delay, only one claim is necessary.
This article does not exclude the recovery of damages for delay by either
party under provisions in the contract documents.
5. TEMPORARY SUSPENSION OF WORK. The Engineer shall have
authority to suspend the work, wholly or in part, for such period or periods of time
as he may deem necessary, due to unsuitable weather or such other conditions
as are considered unfavorable for the suitable prosecution of the work, or for
such time as is necessary due to the failure to the Contractor to carry out orders
given or to perform any or all provisions of the Contract.
6. NOTICES - HOW SERVED. Any notice to be given by the City to
the Contractor under this contract shall be deemed to be served if the same be
delivered to the man in charge of any office used by the Contractor or his
foreman or agent at or near the work, or deposited in the post office, postpaid,
addressed to the Contractor at his last known place of business.
7. PROGRESS OF WORK. The progress of the work shall be such
that, at the expiration of one-fourth (1/4) of the contract period, one-eighth (1/8)
of the work shall be completed; at the expiration of one-half (1/2) of the contract
period, three-eighths (3/8) of the work shall be completed; at the expiration of
three-fourths (3/4) of the contract period, the work shall be three-fourths (3/4)
completed, and the whole work shall be completed at the expiration of the
contract period.
If, at any time the above schedule is not being maintained, the Council
may give written notice to the Contractor and his sureties that the specifications
are not being complied with. Such notice shall state what action on the part of
the Contractor is required to bring the work within the requirements of the
specifications. If the Contractor fails, within ten (10) days, to proceed as directed
in the said notice, then the Council shall have authority to annul this contract
without process or action at law and take over the prosecution and completion of
the work, as provided under the article covering City's right to terminate contract.
GENERAL SPECS Page 10 of 18
8. CITY'S RIGHT TO TERMINATE CONTRACT. If the Contractor
should be adjudged a bankrupt; or if he should make a general assignment for
the benefit of this creditor; or if a Receiver should be appointed on account of his
insolvency; or if he should persistently or repeatedly refuse or should fail, except
in cases for which extension of time is provided, to supply enough skilled
workmen or proper materials; or if he should fail to make prompt payment to
Subcontractors or for materials or labor; or if he should persistently disregard
laws, ordinances, or the instructions of the Engineer; or if he should otherwise be
guilty of a substantial violation of any provision of the contract, then the City,
upon the certificate of the Engineer that sufficient cause exists to justify such
action, may, without prejudice to any other rights or remedy, and after giving the
Contractor seven (7) days' written notice, terminate the employment of the
Contractor and take possession of the premises and of all materials, tools and
appliances thereon and finish the work by whatever method he may deem
expedient. In such cases, the Contractor shall not be entitled to receive any
further payment until the work is finished.
If the unpaid balance of the contract price shall exceed the expenses of
finishing the work, including compensation for additional managerial and
administration services, such excess shall be paid to the Contractor. If such
expense shall exceed such unpaid balance, the Contractor shall pay the
difference to the City. The expense incurred by the City as herein provided and
the damage incurred through the Contractor's default shall be certified by the
Engineer.
9. REMOVAL OF EQUIPMENT. In the case of annulment of this
contract before completion, from any cause whatsoever, the Contractor, if
notified to do so by the City; shall promptly remove any part or all of his
equipment and supplies from the property of the City, failing which, the City shall
have the right to remove such equipment and supplies at the expense of the
Contractor.
SECTION E - MEASUREMENTS AND PAYMENT
1. STANDARD OF MEASUREMENT. All work completed under the
contract shall be measured by the Engineer according to the United States
standard measures.
2. SCOPE OF PAYMENTS. The Engineer's measurements of
quantities shall be the basis for final payment for the work performed under this
Contract. After the work is completed, the Engineer will make measurements
and computations of the number of units of each of the various items of work
completed, and the Contractor will be paid for the actual amount of work
performed at the rates specified in his Proposal. Before final settlement is made,
the Council may require the Contractor to submit a list of all persons furnishing
labor or materials, with evidence that such persons have been paid in full.
GENERAL SPECS Page 11 of 18
Payment shall be made in the manner set forth in official publications and
Council Proceedings relative thereto.
3. PAYMENT FOR EXTRA WORK. Such extra work as may have
been ordered by the Engineer and performed by the Contractor shall be
compensated for as provided herein. If work is to be done or materials are to be
furnished by the Contractor which cannot properly be classified under unit prices
included in the Proposal, the Contractor shall be paid therefor the actual
reasonable cost of the labor and materials entering permanently in such work,
plus fifteen percent (15%) of the cost thereof. In computing the labor cost on
such extra work, the following items shall be included:
(a) Actual payroll expenditures for labor at the current rate therefor,
and cost of materials.
(b) Pay of foreman and timekeepers for actual time required on the
extra work.
(c) Liability insurance, prorated, for the extra work.
Labor cost items on extra work shall be furnished in duplicate by the
Contractor to the Inspector daily. The Inspector shall check the items, and if he
finds them to be correct, he shall so certify on the statement of cost, returning
one copy to the Contractor and filing one copy with the Engineer.
The Engineer shall determine the cost of materials entering into extra work
from the materials and receipted freight bills for the same.
For any special machine, power tools, or equipment, including fuel and
lubricants, but not including small hand tools, which may be deemed necessary
or desirable to use, the Contractor shall be allowed a reasonable rental thereon,
to be agreed upon in writing by the Engineer before such work is begun, and to
which sum no percentage is to be added.
The item of cost shall not include repairs or replacement of equipment or
overhead expenses of any character. The fifteen percent (15%) allowed is
considered to cover the use of hand tools and all overhead expenses except
liability insurance.
In no case will a claim for extra compensation be allowed unless the work
upon which the claim is based has been ordered in writing, except as provided
hereinafter.
4. CLAIMS FOR EXTRA COST. If the Contractor claims that any
instructions, by drawings or otherwise, involved extra cost under this contract, he
shall give the Engineer written notice thereof within ten (10) days after
completion of the work.
GENERAL SPECS Page 12 of 18
No such claim shall be valid unless so made.
5. CLAIMS FOR EXTRA COMPENSATION. If the Contractor deems
that extra compensation is due him for work and/or materials that he considered
is not clearly covered in the items for which he submitted unit prices in his bid
and that were not ordered in writing by the Engineer as an extra s heretofore
provided, the Contractor shall notify the Engineer, in writing, of his intention to
make claim for extra compensation for work and/or material before starting
construction. If such written notification is not given or the Engineer is not
afforded proper facilities by the Contractor for keeping strict account of actual
cost as defined herein, then the Contractor hereby agrees to waive the claim for
extra compensation. Such notice to the engineer and the fact that the Engineer
has kept account of cost as aforesaid, shall not in any way be construed as
proving the validity of the claim, which must be passed upon by the Council. In
the event that the Council finds the claim to be just, it shall be allowed and paid
for as extra work as provided herein.
6. COMPLETION REPORT AND OBJECTIONS THERETO. Within
ten (10) days after the full completion of the work to be done under this contract,
the Engineer shall make a written statement of all the work done by the
Contractor hereunder, stating the quantity of each item as found by him and
including a statement of all credits for extra work and all credits or debits for
changes, alterations, omissions, and defects, and shall forthwith deliver a copy of
such statement to the Contractor. The Contractor shall compare such statement
with his own records and shall then, in writing, either approve such statement or
point out any claimed errors or omissions. If any of such claims are found
correct, the Engineer shall, within ten (10) days, prepare a new statement, a copy
of which shall in like manner be delivered unto the Contractor. The Engineer will
not file a formal completion report with the City until the Contractor has approved
the same.
If the figures of the Engineer and the Contractor cannot be reconciled, or
there is a difference of opinion regarding some item or items, then such
difference of opinion shall be submitted to arbitration as hereinafter provided, and
the decision of the arbitrator or arbitrators shall be final, and the Engineer shall,
within a period of five (5) days, file his completion report.
Before action by the City Council upon such completion report, the
Contractor shall also file a written statement of any claims he may have against
the City, other than those shown by such completion report, growing out of this
contract or the work done hereunder. The City shall retain ten percent (10%) of
the amount due the Contractor on the completion report for a period of thirty (30)
days. If no claims are filed against the Contractor within thirty (30) days, the final
ten percent (10%) shall then be paid to the Contractor.
7. WAIVER. By the execution of this contract ,the Contractor agrees
that any objections he may have to the statement of the amount of work done
hereunder included by the Engineer in this completion report, and any claims of
GENERAL SPECS Page 13 of 18
the Contractor against the City growing out of this contract and the work done
hereunder which are not stated in writing in the manner and within the time
provided in Article 6, Section E hereof, shall be waived, and no such claim shall
thereafter be asserted against the City.
SECTION F - LEGAL RELATIONS AND RESPONSIBILITIES
1. LAWS RELATING TO WORK. The Contractor is presumed to be
familiar with all laws, ordinances, and regulations which may, in any manner,
affect those engaged or employed upon the work or the materials or equipment
used in or upon the work, and shall conduct the work so as not to conflict with
such laws, ordinances, and regulations.
2. PROTECTION OF WORK AND PROPERTY. The Contractor for
any part of the improvement shall be held responsible for the care of materials
and of partially completed and completed work until final acceptance of the same
by the Council. He will be required to make good at his own expense any
damage which the work may sustain from any cause prior to the filing of the
engineer's certificate of completion. He shall take all risk from floods and
casualties of every description and make no charge for delay due to such cause.
He may, however, be allowed a reasonable extension of time on account of such
delays. He shall correct or make good at his own expense all damages to
adjacent property due to the acts or negligence of his employees of the
prosecution of his work, and save the City harmless therefor.
The Contractor shall be held liable and responsible for all damages done
to water, sewer, drain, or other underground pipes and structures, and to
sidewalks and private property.
3. RESPONSIBILITY FOR ACCIDENTS. The Contractor shall
assume full responsibility for all damages sustained by persons or property due
to the carrying on of his work until final acceptance thereof, or until released by
the Engineer in writing.
4. LIABILITY INSURANCE. The Contractor shall carry liability
insurance which shall save the City harmless and protect the public and any
person from injury sustained by the reason of the prosecution of the work or the
handling or storing of materials therefor, and said Contractor shall also carry
liability insurance which shall meet the requirements of the Iowa Worker's
Compensation Law.
Before work shall be started on this contract, the Contractor shall furnish
the City Clerk with proper affidavit or Affidavits executed by representatives of
duly qualified insurance companies, evidencing that said insurance company or
companies have issued liability insurance policies, effective during the life of the
contract, or for a period of a least ten (10) days following the filing of written
notice of cancellation, protecting the public and any person from injuries or
GENERAL SPECS Page 14 of 18
damages sustained by reason of carrying on the work involved in the Contract.
The affidavit shall specifically evidence the following forms of insurance
protection:
(a) Public liability insurance covering all operations performed by
persons directly employed by the Contractor.
(b) Public liability insurance covering all operations performed by any
Subcontractor to whom a portion of the work may have been
assigned.
(c) Public liability insurance covering all work upon the project
performed by any independent Contractor working under the
direction of either the principal Contractor or a Subcontractor.
(d) Motor vehicle bodily injury liability insurance and property damage
liability insurance on all motor vehicles employed on the work,
whether owned by the Contractor or by other persons, firms, or
corporations.
(e) The minimum protection shall be as follows:
Comprehensive General Liability Insurance
General Aggregate Limit $ 5,000,000.00
Products—Completed Operations
Aggregate Limit $ 5,000,000.00
Each Occurrence Limit $ 5,000,000.00
Comprehensive Automobile Liability
Insurance $ 1,000,000.00
The Contractor shall have the City of Waterloo, Iowa, named as an
"Additional Named Insured". A certificate, or a policy if requested, shall be filed
with the Owner.
All certificates and/or policies of insurance furnished by the Contractor to
be filed with the City Clerk shall include the name and address of the agency
issuing the same. It shall also be required that the City Clerk be notified by
registered mail of the cancellation or expiration of the above insurance.
5. BARRICADES AND SIGNS. The Contractor shall, at his own
expense and without further or other order, provide, erect, and maintain, at all
times during the progress and suspension of the work and until completion and
final acceptance thereof, suitable and requisite barricades, signs, or other
adequate protection, as required by the latest edition of the "Iowa Manual on
GENERAL SPECS Page 15 of 18
Uniform Traffic Control Devices for Streets and Highways" and shall provide,
keep, and maintain such barricades, signs, etc., as may be required or as may
be ordered by the City Engineer, to insure the safety of the public as well as
those engaged on the work. All barricading plans shall be approved by the City
Engineer.
6. ROYALTIES AND PATENTS. The Contractor shall pay all
royalties and license fees. He shall defend all suits or claims for infringement of
any patent rights and shall save the City harmless from loss on account thereof,
except that the City shall be responsible for all such loss when a particular
process or the product of a particular manufacturer is specified.
7. PERMITS AND REGULATIONS. Permits and licenses of a
temporary nature for the prosecution of the work shall be secured and paid for by
the Contractor. Permits, license, and easements for permanent changes in
existing facilities shall be secured and paid for by the City.
8. CLAIMS FOR DAMAGES. Any claim for damages arising under
this Contract shall be made in writing to the party liable within a reasonable time
of the first observance of such damage and no later than the time of final
payment, except as expressly stipulated otherwise in the case of faulty work or
materials, and shall be adjusted by agreement or arbitration.
The Contractor shall be held for the payment of all just claims against him
arising out of the prosecution of this contract, and his bond will not be released
until such claims are paid for dismissed.
9. ASSIGNMENT OF CONTRACT. The Contractor shall not sell or
assign the contract or sublet any portion of the work provided for therein without
the written consent of the City Council.
10. SUBCONTRACTORS. The Contractor shall, as soon as
practicable after the signature of the contract, notify the Engineer in writing of the
names of the Subcontractors proposed for the work and shall not employ any
that the Engineer may, within a reasonable time, object to as incompetent or
unfit.
The Contractor agrees that he is as fully responsible to the City for the
acts and omission of his Subcontractors and of persons either directly or
indirectly employed by them as he is for the acts and omissions of persons
directly employed by him.
Nothing contained in the contract documents shall create any contractual
relation between any Subcontractor and the City.
11. ARBITRATION. All questions subject to arbitration under this
Contract shall be submitted to arbitration at the choice of either party to the
dispute.
GENERAL SPECS Page 16 of 18
The Contractor shall not cause a delay of the work during any arbitration
proceedings, except by agreement with the Engineer.
The demand for arbitration shall be filed in writing with the Engineer, in the
case of an appeal from his decision, within ten (10) days of its receipt, and in any
other case, within a reasonable time after cause thereof, and in no case later
than the time of final payment, except as otherwise expressly stipulated in the
contract. If the Engineer fails to make a decision within a reasonable time, an
appeal to arbitration may be taken as if his decision had been rendered against
the part appealing.
No one shall be nominated or act as an arbitrator who is in any way
financially interested in the contract or in the business affairs of either the City or
the Contractor.
The general procedure shall conform to the laws of the State of Iowa.
Unless otherwise provided by such laws, the parties may agree upon one
arbitrator; otherwise, there shall be three--one named in writing by each party to
this contract to the other party, and the third chosen by these two arbitrators, or,
if they fail to select a third within ten (10) days, then he shall be chosen by the
Comptroller of the State of Iowa. Should either party refuse or neglect to supply
the arbitrators with any papers or information demanded in writing, the arbitrators
are empowered by both parties to proceed ex parte.
If there be one arbitrator, his decision shall be binding; if three, the
decision of any two shall be binding. Such decision shall be a condition
precedent to any right of legal action, and, wherever permitted by law it may be
filed in Court to carry it into effect.
The arbitrators, if they deem that the case demands it, are authorized to
award to the party whose contention is sustained such sums as they shall deem
proper for the time, expense, and trouble incident to the appeal, and, if the
appeal was taken without reasonable cause, damages for delay, the arbitrators
shall fix their own compensation unless otherwise provided by agreement, and
shall assess the costs and charges of the arbitration upon either or both parties.
The award of the arbitrators must be in writing, and it shall not be open to
objections on account of the form of proceeding or the award, unless otherwise
provided by the laws of Iowa.
In the event of such laws providing on any matter covered by this article
otherwise than as hereinbefore specified, the method of procedure throughout
and the legal effect of the award shall be wholly in accordance with the laws of
the State of Iowa, it being intended hereby to lay down a principle of action to be
followed, leaving its local application to be adopted to the legal requirements of
the place in which the work is to be done.
GENERAL SPECS Page 17 of 18
12. PERFORMANCE AND PAYMENT BONDS. The Contractor shall,
at the time of execution and delivery of this contract and before the taking effect
of same, furnish and deliver to the City written bonds of indemnity to the amount
required by law in form and substance, and with surety thereon satisfactory and
acceptable to the City, to insure the faithful performance and payment by the
Contractor of all the covenants and agreements on the part of the Contractor
contained in this contract. These bonds shall remain in force and effect for the
full amount of the Contract.
13. PERSONAL LIABILITY OF PUBLIC OFFICIALS. In carrying out
any of the provisions of the Contract or in exercising any power or authority
granted him thereby, there shall be no liability upon the Engineer or his
authorized assistants, either personally or as an official of the City, it being
understood that in such matters he acts as the agent and representative of the
City.
14. JURISDICTION. Any action in Court against the Contractor or
sureties on his bond because of damages to property or individuals by said
Contractor or his workmen, or because of the violation of any provisions of the
specifications, or on account of the failure of said Contractor to comply fully with
these provisions, shall be brought in the District Court of the State of Iowa in and
for Black Hawk County.
15. TERMINATION OF RESPONSIBILITY. The Contract shall be
considered as completed and the Contractor released from further obligations
except as to the requirements of his bond, after the work has been completed
and finally accepted and final estimates have been allowed and the completion
report of the engineer has been filed and approved by the Council.
16. CITY'S LEGAL RIGHTS. The City shall not be precluded by any
measurements, estimate, or certificate made, either before or after the
completion and acceptance of the work and payment therefor, from showing the
true amount and character of the work performed and materials furnished by the
Contractor, or from showing that any such measurement, estimate, or certificate
is untrue or incorrectly made, or the work or materials do not, in fact, conform to
the Contract.
The City shall not be precluded, notwithstanding any such measurements,
estimate, or certificate and payment in accordance therewith, from recovering
from the Contractor and his surety such damages as it may sustain by reason of
his failure to comply with the terms of the Contract. Neither the acceptance by
the City or any of its representatives, nor any payment for or acceptance of the
whole or any part of the work, nor any extension of time, nor any possession -
taken by the City, shall operate as a waiver on any portion of the contract or of
any power herein reserved, or any right to damages herein provided. A waiver of
any breach of the contract shall not be held to be a waiver of any other or
subsequent breach.
GENERAL SPECS Page 18 of 18
SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION
1. SUBCONTRACTS
The contractor shall cause appropriate provisions to be inserted in all
subcontracts relative to the work to require compliance by each
subcontractor with the applicable provisions of the contract for the
improvements embraced in this contract.
2. REVIEW BY THE CITY OF WATERLOO
The City of Waterloo, its authorized representatives and agents, shall at all
times have access to and be permitted to observe and review all work,
materials, equipment, payrolls, personnel records, employment conditions,
material invoices, and other relevant data and records pertaining to this
contract, provided, however, that all instructions and approval with respect
to the work will be given to the contractor only by the City of Waterloo
through its authorized representative or agents.
3. INSPECTION
a. The contractor shall furnish promptly all materials reasonably
necessary for any tests, which may be required. All tests by the
City of Waterloo will be performed in such manner as not to delay
the work unnecessarily and will be made in accordance with the
provisions of the Technical Specifications.
b. Inspection of materials and appurtenances to be incorporated in the
improvements embraced in this contract may be made at the place
of production, manufacture or shipment, whenever the quantity
justifies it, and such inspection and acceptance, unless otherwise
stated in the Technical Specifications, shall be final, except as
regards (1) latent defects, (2) departures from specific requirements
of the contract, (3) damage or loss in transit, or (4) fraud or such
gross mistakes as amount to fraud. Subject to the requirements
contained in the preceding sentence, the inspection of materials as
a whole or in part will be made at the project site.
4. WARRANTY OF TITLE
No material, supplies, or equipment to be installed or furnished under this
contract shall be purchased subject to any chattel mortgage or under a
conditional sale, lease-purchase or other agreement by which an interest
therein or in any part thereof is retained by the seller or supplier. The
contractor shall warrant good title to all materials, supplies, and equipment
SUPPLEMENTAL GENERAL SPECIFICATIONS
installed or incorporated in the work and upon completion of all work, shall
deliver the same together with all improvements and appurtenances
constructed or placed thereon by him to the City of Waterloo free from any
claims, liens, or charges. Neither the contractor nor any person, firm, or
corporation furnishing any material or labor for any work covered by this
contract shall have any right to a lien upon any improvement or
appurtenance thereon. Nothing contained in this paragraph, however,
shall defeat or impair the right of persons furnishing materials or labor to
recover under any bond given by the contractor for their protection or any
rights under any law permitting such persons to look to funds due the
contractor in the hands of the City of Waterloo. The provisions of this
paragraph shall be inserted in all subcontracts and material contracts and
notice of its provisions shall be given to all persons furnishing materials for _
the work when no formal contract is entered into for such materials.
SUPPLEMENTAL GENERAL SPECIFICATIONS
FORM OF CONTRACT
CONTRACT FOR THE CONSTRUCTION OF
F.Y. 2014 SIDEWALK REPAIR PROGRAM —ZONE 4
CITY OF WATERLOO, IOWA
CONTRACT NO. 863
This contract made and entered into this day of , 20__, by and
between the City of Waterloo, Iowa, a Municipal Corporation, (hereinafter referred to
as City), and of Waterloo, Iowa, (hereinafter
referred to as Contractor), WITNESSETH:
PAR. 1 Contractor agrees to build and construct the
and furnish all necessary tools,
equipment, materials, and labor necessary to do all the work called for in
the plans and specifications in a workmanshiplike manner and for the
prices set forth in Contractor's proposal, which was accepted by the City,
and which is understood and agreed to be a part of this contract.
PAR. 2 It is understood and agreed that the resolution adopted by the City Council
ordering the construction of the improvement, the Notice to Contractors as
published, the Instruction to Bidders, the Form of Proposal, the
Construction and Maintenance Bonds, the Council Proceedings relating to
this matter, and the Plans and Specifications shall all be considered as
forming a part of the contract the same as though they were each set out in
said contract.
PAR. 3 The Contractor agrees to furnish at its own cost and expense, all
necessary materials and labor for said work and to construct said
improvements in a thorough, substantial, and workmanlike manner, and in
strict accordance with the requirements of this contract, and of the plans
and specifications made a part hereof by reference, and to the satisfaction
and approval of the City and its engineer.
FORM OF CONTRACT PAGE 1 OF 5 PAGES
PAR. 4 The Contractor agrees to perform said work and install said improvements
on the terms set out in bid or proposal to the City which has been accepted
by the City and which is by reference made a part of this contract.
PAR. 5 The Contractor agrees to commence said work within ten (10) working
days after receipt of "Notice to Proceed" and complete it on or before
unless an extension of time is granted in writing by the
Council of the City.
PAR. 6 Should the Contractor fail to complete said improvements in strict
accordance with the terms and conditions of this contract, or the plans and
specifications therefor promptly by the date herein specified, the City may
pay such additional sums as it may be required to pay by reason of the
failure of said contractor and deduct any and all such sums from any
amount then due the Contractor.
PAR. 7 The Contractor agrees to comply with and obey all ordinances of the City
of Waterloo, Iowa, relating to the obstruction of streets and alleys, keeping
open passage ways for water, traffic, and protecting any excavations in any
street or alley, and maintaining proper and sufficient barricades with lights
and signals during all hours of darkness, to see that the backfilling is
properly done, and agrees to keep the City whole and defend any and all
suits that may be brought against the City by reason of any injuries that
may be sustained by any person or property allegedly caused by the
Contractor, or his agents, while work is done pursuant to this agreement.
PAR. 8 The Contractor agrees that in the event a law suit is brought against the
City for damages allegedly sustained by reason of any act, omission or
negligence of the Contractor or its agents, or on account of any injuries
allegedly sustained by reason of any obstruction, hole, depression or
barrier placed or dug by the defendant or its agents, in the doing of the
work herein contracted for, that it will defend said suit and save the City
harmless therein, and in case judgment is rendered against the City, the
Contractor agrees to pay the same promptly. The Contractor agrees to
carry public liability insurance in a solvent company in a sufficient amount
to protect the City and those who use the streets of the City.
PAR. 9 The City shall have the right to appoint one or more construction reviewers
who shall review the progress of the work in detail; also, to make any test
or any material to be used in such work. No material shall be used in any
work until the same has first been approved by the construction reviewer.
Such construction reviewer shall have full authority to pass judgment upon
all materials and upon the manner of doing the work, and their judgment on
rejecting any materials, substance, or manner of work shall be final unless
it is revoked or modified by the City Engineer.
FORM OF CONTRACT PAGE 2 OF 5 PAGES
PAR. 10 Any material, which has been rejected by the construction reviewer, shall
be at once removed from the line of work and shall not be again taken
thereon or placed with the material proposed to be used without the written
consent of the City Engineer.
PAR. 11 The Contractor shall maintain no cause of action against the City on
account of delays and prosecution of work, but if said work is delayed by
the City, the Contractor shall have such extra time for completion of the job
as was lost by reason of the delay caused by the City.
PAR. 12 The Contractor agrees to pay punctually all just claims of labor, material,
men, or subcontractors who shall perform labor or furnish materials
entering into this improvement. It is agreed that the City need not pay the
Contractor until all such claims are paid by the Contractor. It is agreed that
the City shall not be liable for said labor, material, or men under this
contract.
PAR. 13 The Contractor agrees to furnish the City, simultaneously with this contract,
a bond on a form to be provided by the City in the amount provided by law
as stated in the Notice to Bidders, which shall be for the benefit of the City,
and any and all persons injured by the breach of any of the terms of this
contract. Said bond shall be filed with the City Clerk and shall be subject to
the approval of the City Council, and is by reference made a part of this
contract.
PAR. 14 The Contractor agrees that should it abandon work under this contract or
cease the prosecution thereof for a period of thirty (30) consecutive days
without reasonable cause, and should it fail to proceed with said work
within ten (10) days after a notice to continue or carry it on has been mailed
to it at the address given herein by the City, or after such notice has been
served on it, then the City may proceed to complete said work, using any
material, tools, or machinery found along said line of work, doing the work
either by contract or as it may elect, and the Contractor and the sureties on
its bond shall be liable to the City for the costs and expenses so paid out.
Said costs shall be retained by the City from any compensation due, or to
become due the Contractor, and may be recovered by the City in an action
upon Contractor's bond.
PAR. 15 In consideration of the full compliance on the part of the Contractor with all
the provisions, stipulations, and conditions hereof, or contained in the
various instruments made a part of this contract by reference, and upon
completion and acceptance of said work, the City agrees to pay to the
Contractor, in the manner set out in the Notice to Contractors, the amount
of money due the Contractor for work performed and accepted, at the unit
FORM OF CONTRACT PAGE 3 OF 5 PAGES
prices set out in the Contractor's proposal, which has been accepted by the
City.
PAR. 16 The total amount of the contract, based on the Engineer's estimates of
quantities and the Contractor's unit bid prices, and for which 100% surety
bond is required is $
PAR. 17 After the completion of said work, the Contractor agrees to remove all
debris and clean up said streets, and to save the City harmless from any
damage allegedly resulting from a failure to clean up and remove the
debris or put the street back in a proper condition for travel.
PAR. 18 This contract is not divisible, but in the event of a conflict between this
contract and the various instruments incorporated by reference, this
contract shall govern.
PAR. 19 Before the Contractor shall be entitled to receive final payment for work
done under this contract, it shall execute and file a bond in the penal sum
of not less than 100% of the total amount of the contract, same to be
known as "Maintenance Bond," and which bond must be approved by the
City Council, and which bond is in addition to the bond given by the
Contractor to guarantee the completion of the work.
PAR. 20 The Contractor shall maintain all work done hereunder in good order for
the period of two (2) years from and after the date it is accepted by the
Council of the City of Waterloo, Iowa. Said maintenance shall be made
without expense to the City or the abutting property. In the event of the
failure or default of the Contractor to remedy any or all defects appearing in
said work within a period of two (2) years from the date of its acceptance
by said Council, and after having been given ten (10) days notice so to do
by registered letter deposited in the United States Post Office in said town,
addressed to said contractor at the address herein given, then the City may
proceed to remedy such defects. The costs and expenses thereof to be
recovered from the Contractor and the sureties on its maintenance bond by
an action brought in any court of competent jurisdiction.
PAR. 21 The Contractor shall give notice to said City by registered letter directed to
the Mayor or City Clerk/Auditor thereof not more than four (4) and not less
than three (3) months prior to the expiration of the term during which the
Contractor is required to maintain said improvements, in good repair by the
terms of its Contract. The liability of the Contractor and of the sureties on
its bond for maintenance of the said improvements shall continue until
three (3) months after such notice has been given to the City, and, in any
event, until two (2) years after the acceptance of the work.
FORM OF CONTRACT PAGE 4 OF 5 PAGES
CITY OF WATERLOO, IOWA
Mayor
City Clerk
Contractor
BY:
Title:
Approved by the City Council of the City of Waterloo, Iowa, this
day of , 20 .
ATTEST: , City Clerk
Waterloo, Iowa
FORM OF CONTRACT PAGE 5 OF 5 PAGES