HomeMy WebLinkAboutTRANSMITTAL COM
Letter of Transmittal
DATE: May 15,2013 JOB ID NO.60279867
TO: Iowa Department of Natural Resources ATTENTION:
Wastewater Department RE: Waterloo, Iowa
900 East Grand La Porte Road Pumping Station and Force Main
Des Moines, Iowa 50319 City Contract No.847
WE ARE SENDING YOU:
x❑ Attached El Prints ❑ Under Separate Cover Via the Following Items:
❑ Shop Drawings ❑ Change Order ❑ Plans ❑ Samples El Specifications
❑ Copy of Letter ❑
Copies Date No. Description
1 1 Each Plans,Specifications, Permit Application Forms and Permit Application Fee for the
La Porte Road Pumping Station and Force Main
THESE ARE TRANSMITTED AS CHECKED BELOW:
❑x For Approval ❑ Approved as Submitted ❑ Resubmit Copies for Approval
El For Your Use ❑ Approved as Noted ❑ Submit Copies for Distribution
❑ As Requested ❑ Returned for Corrections ❑ Return Corrected Prints
❑ For Review and Comment ❑
❑ For Bids Due 20 ❑ Prints Returned After Loan to Us
REMARKS: Please review and approve these documents and we will submit additional copies following your review. Thank you.
COPY TO: Larry:ct :: : :i::::)
mih SIGNED:REB :c Robert , P.E.
If enclosures are not as noted,kindly notify us at once.
501 Sycamore Street,Suite 222 • P.O.Box 1497 • Waterloo,Iowa 50704-1497 • (319)232-6531 • Fax: (319)232-0271
L:\work\project\60279867\200_Correspondence\5-15-13 DNR-P&S Rvw Set-LaPorteRd.docx
IOWA DEPARTMENT OF NATURAL RESOURCES CASHIER'S USE ONLY
DNRWastewater Disposal System Construction Permit 332-202 NPDE CP 0570
Application Fee Form Owner
Owner Name: City of Waterloo, Iowa
Address: 715 Mulberry Street
City, State, Zip: Waterloo, Iowa, 50703
Project Identification: La Porte Road Pumping Station and Force Main, City Contract No. 847
E $100 Fee enclosed
Please sign and return this form with a check or money order payable to "Iowa Department of Natural Resources".
Place it and the check or money order on top of other Construction Permit Application documents.
Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems required by
Iowa Code 4556.173 and rules in Iowa Administrative Code 567 IAC 64, must be accompanied by the fee required by
Iowa Code 4556.197 and Iowa Administrative Code 567 IAC 64.16(3)"c".
The fee is $100 for each application, regardless of project size and project type including sanitary sewers, pump
stations,treatment units or a combination thereof. The fee shall be submitted with the certified engineering documents
necessary to apply for a construction permit (plans, specifications and related application schedules A, F, and G as well
as the appropriate schedules indentified on page 2 of Schedule A). The construction permitting process is initiated as
planning for construction begins. Planning coordination and submittal of preliminary engineering reports or facility
plans precedes submittal of technical documents necessary to constitute a construction permit application. The
application fee is not necessary when submitting a planning document but must accompany construction permit
application documents. A fee should accompany each permit application received on or after July 1, 2006.
Failure to submit a fee with the application may delay the processing of a construction permit. If you have any questions
regarding the application fee, please contact Donna Gomm at 515-281-8502 or Donna.Gomm@dnr.iowa.gov
Signature of Owner or Representative: 7
j1 f� /
Printed Name: t-v-tr �S—{- 6. Cr(cut ,� Cz 1L'1- { itH
Telephone or email contact:
Mail to:
Iowa Department of Natural Resources
Wastewater Engineering Section
502 East 9th Street
Des Moines, IA 50319-0034
06/2011 cmz DNR Form 542-1245
, -. Exhibit 11A
Iowa Department of Natural Resources Wastewater Engineering Section
Construction Permit Application
SCHEDULE A, General Information
APPLICANT ENGINEER
OWNER E-MAIL ADDRESS FIRM E-MAIL ADDRESS
City of Waterloo, IA larry.smith@waterloo-ia.org AECOM todd.allyn@aecom.com
ADDRESS ADDRESS
715 Mulberry Street,Waterloo, IA 50703 500 SW 7th Street, Suite 301, Des Moines, Iowa 50309
REPRESENTATIVE TELEPHONE PROJECT OFFICER TELEPHONE
Larry Smith 319-291-4553 Todd Allyn 515-323-7921
PROJECT IDENTIFICATION ESTIMATED START DATE* ESTIMATED COMPLETION DATE
La Porte Road Pumping Station&Force Main 06/03/13 09/30/13
City Contract No. 847
PLEASE RESPOND TO ALL QUESTIONS YES NO
1. Has an engineering report,facilities plan or other information previousl been submitted for this project? ❑
If Yes=> PROJECT IDENTITY DATE SUBMITTED
2. Does the project and construction permit application, as submitted,follow the recommendations, design
loadings,construction schedule, permit limits, and conclusions of the approved engineering report or
facilities plan? ❑
If No=> Provide the design basis and technical information justifying all changes.
3. Are there three complete sets of plans and specifications accompanying this application? ® ❑
For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design
Standard 11.1,two complete sets will be adequate for expeditious approval. For more complex projects,
three sets of plans and specifications may be requested.
4. Are approved standard specifications a part of this application? ® ❑
If Yes=> APPROVED STANDARD SPECIFICATIONS OF DATE APPROVED
(municipality or firm) 2012
SUDAS Specifications
5. Does each set of plans and specifications or engineering report accompanying this application contain a
"professional engineering seal" executed in conformance with 542B.16, Code of Iowa? ® ❑
If No=> Processing will be delayed pending receipt of applicable design schedules and certified plans.
specifications or engineering report.
6. Is this a joint wastewater and water supply project? ❑ El
If Yes=>A construction permit application for the water supply project should be submitted separately to the
Water Supply Section. A water supply permit fee may be required.
7. Is the applicant to provide treatment of effluent resulting from this construction? ® ❑
If No=>A Sewage Treatment Agreement(DNR Form 29)executed by the authority providing treatment must
accompany this application.
8. Is a new or amended operation permit necessary to use the facilities described in this application? ❑
If Yes=>A new or amended permit to operate may be requested prior to the receipt of a construction permit.
9. Is any waterline located within 10 feet; or any private or public well, lake,or public recreation area located
within 400 feet of the proposed construction? ❑
If Yes=> Identify and locate the facility(s)relative to the proposed construction.
10. Will construction inspection be conducted by a licensed engineer employed by the applicant? ❑
If No=> NAME OF ENGINEERING FIRM CONDUCTING INSPECTION
AECOM
11. Will this project utilize CWSRF loan funds? ❑
CERTIFICATION
APPLICANT ENGINEER
I certify that I am the authorized representative of the owner and I certify that all aspects of design included in this application
state tha project identified abov is a oved by the owner. conform to applicable standards contained in Chapter 567 IAC
64, or that an explanation and justification for any proposed
variations from such standards is attached. I am familiar with the
information contained in this application, and to the best of my
5/
y? j-3 knowledge, such information is complete and accurate.
SIGN TURE DATE SIGNATURE DATE
*Estimated Construction StJA-a-ty-kr
rt De: Complete applications must be sub ' e a 20 days in advance of the ate for
starting construction in accordance with Rules 567 IAC 60.4 and 64.2 --
PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM
DNR form 28A (Sept 2010) 542-3129
L:\work\project\60279867\400_Technicaa420_Specs\60279887-LaPorte Road Pump Sta-Force Mam\XX-La Porte Road-SCHEDULE A doc
Construction Permit Application
SCHEDULE A, General Information, page 2
DOCUMENT CHECKLIST
Identify all categories included in this project. Also, identify schedules attached to this application.
INCLUDED IN SUBMITTAL
SCHEDUL TITLE ATTACHED PROJECT DATE
E
B Collection system M ® 04/03/13
C Lateral Sewer Extension ❑ ❑
D Trunk& Interceptor Sewer ❑ ❑
E Wastewater Pump Station ® ® 04/03/13
F Treatment Project Site Selection ❑ ❑
G Treatment Project Design Data ❑ ❑
H1 Schematic Flow Diagram ❑ ❑
H2 Treatment Process Loading and ❑ ❑
Removal Efficiency
H3 Mechanical Plant Reliability ❑ ❑
I Screening, Grit Removal and Flow ❑ ❑
Measurement
J Septic Tank System ❑ ❑
K1 Controlled Discharge Pond ❑ ❑
K2 Aerated Pond ❑ ❑
K3 Anaerobic Lagoon ❑ ❑
L Setting Tanks ❑ ❑
M Fixed Film Reactor—Stationary ❑ ❑
Media
N Rotating Biological Contactor ❑ ❑
O Aeration Tanks or Basins ❑ ❑
P Gas Chlorination ❑ ❑
Q Sludge Digestion and Holding ❑ ❑
R1 Sludge Dewatering and Disposal ❑ ❑
R2(A& B) Low Rate Land Application of ❑ ❑
Sludge
R3 Land Application of Sewage Sludge ❑ ❑
(To be developed)
S Land Application of Wastewater ❑ ❑
(To be developed)
Sewage Treatment Agreement ❑ ❑
Identify any categories included in this project which are not provided in the above list of schedules.
DNR form 28A(Sept 2010) 542-3129
L:\work\project\60279867\400_Technical\420_Specs\60279867-LaPorte Road Pump Sta-Force MainVO4La Porte Road-SCHEDULE A.doc
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE B, Collection system
DATE PREPARED PROJECT IDENTITY DNR USE
04/03/13 La Porte Road Pumping Station&Force Main, City of Waterloo,Iowa PROJECT NO.
City Contract No.847
DATE REVISED
PERMIT NO.
1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the system. If no portion is
subject to flooding,state none.
Segment Flooding Protection
None
*2 Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station,and 3) all downstream
segments where flow restriction may occur. Indicate the source and accuracy of numerical data.
Segment Segment Segment
Location 15"Dia.@
Discharge of New
F.M.
Design capacity,MGD
1.6
Peak Hourly Dry weather Flow
MGD(actual) 0.01
Peak Hourly Wet Weather Flow
MGD(actual) 0.03
*3. Identify treatment facility,the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data.
Facility name and number Waterloo Water Pollution Control Facility-IDNR Permit#0790001
Facility Loading MGD #BOD5/day
Design 34.8 88,000
Average Wet Weather(actual) 24.5 31,500
Peak Hourly Wet Weather(actual) 60± 48,000
Provide projected design loading increase,which will be added to this facility as a result of this project. None. This project replaces an existing
private pumping station with a city-owned pumping station and reroutes flow from a problem area;however,it does not add any flow or
area to the system.
Design Loading Initial Design Year(
Residential service area Acres Acres
Population Persons Persons
Flow(100 GPCD) GPD GPD
BOD5(0.17#/d/cap) #/day #/day
Industrial service area Acres Acres
Rated flow GPD GPD
BOD5 #/day #/day
Other Acres Acres
Rated Flow GPD GPD
BOD5 #/day #/day
Total BOD5 #/day #/day
Total Flow GPD GPD
Peak Hourly Flow GPD GPD
`Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded.
DNR form 28B(Nov 00) 542-3095
60279867/500/--La Porte Road-SCHEDULE B.docx
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE E, Wastewater Pump Station
DATE PREPARED PROJECT IDENTITY DNR USE
04/03/13 La Porte Road Pumping Station&Force Main, City of Waterloo,Iowa PROJECT NO.
DATE REVISED City Contract No.847
PERMIT NO.
1. Design Basis Initial Design Year(
Residential Area,Acres
Population, Persons
PHDW Flow, MGD
Industrial Area,Acres
PHDW Flow, MGD
Other ,Acres
PHDW Flow, MGD
Peak Hourly Infiltration, MGD
Peak Hourly Inflow, MGD
Total PHDW Flow, MGD
Total PHWW Flow, MGD
2. Provide pump information
Pump Opening Capacity TDH(ft.) Operating Level
No. Type (in) HP GPM Computed Rated On Off
1 Submersible 4 10 200 60 68 846.25 843.75
Sewage Pump
2 Submersible 4 10 200 60 68 846.25 843.75
Sewage Pump
3
4
5
Sump
Are pumps specified as being capable of passing three-inch diameter spheres? Yes ® No ❑
Can remaining pumps handle PHWW flow with largest pump out of service? Yes 0 No ❑
3. Wet-well effective volume 1,000 gallons. Maximum retention time: Initial flow 5 minutes.
Design flow 5 minutes.
4. Is forced air ventilation provided? No
Continuous: wet-well dry-well Intermittent: wet-well dry-well
dry-well air changes/hour dry-well _ air changes/hour
Are spark-proof materials specified? Yes ® No ❑
5. Force main: Is profile of force main provided? Yes 0 No ❑
Size 6 in. Length 4,857 ft. Detention time at ADW design flow hours.
Pipe material PVC Joint Restrained @ Trenchless&Unrestrained @ Trenched
Minimum cover 6 ft. Minimum velocity fps
Number of high points 2 Are air relief valves provided? Yes 0 No ❑
Number of thrust blocks provided? At location(s)
Is pressure test specified? Yes ® No El Does installation conform to AWWA C600? Yes 0 No ❑
If no,explain
6. Are valves provided on the suction&discharge lines? Yes 0 No ❑
Type: Discharge Gate&Check Valves Suction
7. Is an alarm system provided? Yes ® No ❑ Type SCADA System
Indicate where audio/visual warning signals will be located Waterloo Wastewater Treatment Plant
8. Method of pump control Floats
9. Are the pumps protected from clogging? Yes ® No ❑
Method of cleaning Self-Cleaning Pumps
Method of pump removal Guides&Lifting Cable Are lifting hook/arms provided? Yes
10. Are permanent emergency piping bypass connections provided? No
Is an emergency power supply available? Yes
Describe station operation in an emergency(equipment, piping,bypass,etc.) Portable generator connected to station during
power outage. Duplex system allows station to
function even with single pump failure.
11. Is the wastewater pump station located in a floodplain? Yes ❑ No El
Elevation of 100 year flood(MSL) Elevation of 25 year flood(MSL)
DNR form 28E(Nov 00) 542-3098
60279867/420/—La Porte Road-SCHEDULE E.docx
CHECK NO. 213175
- 'ATE INVOICE NO. DESCRIPTION NET AMOUNT
05/02/2013 2013-00003438 LAPORTE RD PUMPING STATION APP FEE 100.00
POS Rearderri 12C5u::=
ORIGINAL CHECK PRINTED ON PAPER THAT HAS TRUE WATERMARK,GREEN AND RED VISIBLE FIBERS,AND IS CHEMICAL REACTIVE
CITY OF WATERLOO, IOWA REGIONS 72-43/739
715 MULBERRY ST.
DATE Ba,K AMOUNT CHECK
WATERLOO, IA 50703
319-291-4323 05/13/2013 $100.00 213175
PAY One Hundred and 00/100 Dollars
VOID AFTER 120 DAYS
By Order of the City Council
TO
THE
ORDER C� dCl1C 2)
OF IOWA DEPT OF NATURAL RESOURCES
Chief Financial Officer
RESOURCES
WASTEWATER ENGINEERING SECTION
502 EAST 9TH STREET
DES MOINES, IA 50319 Mayor