PROJECT SPECIFICATIONS FOR
F.Y. 2014
STREET RECONSTRUCTION
PROGRAM
•
rc`�
(1 ''':'it
_ t, t;;;;'-‘--.' '''-'1V"'-'--Nir '''' et,
'0.i= *...' - ---- ----- - * ,
, '''''\:71-_, rr:-.„L:',.1- -
CONTRACT NO. 859
_ Essio
OF I herebycertify that this en; document was re ared byme or under m direct
o°0000000 fY g prepared Y
Q ,o'� moo�� personal supe •on aid t I ay a duly licensed Professional Engineer under the laws of
Q o DENNIS0 Cn the State of),
0 0 �
wo o �, - ;;_� /' 3 IV
�� Z g GENTZ ; Z i DENNI I�GENTZ,P.E/ �� DATE
V� 0 9662 0 My License Renewal bate is De •mber 1,2014.
v Q°a a 0 License No.is Iowa 9662.
�� °Oo,°poO000°° Pages or sheets covered by this seal:
—_. _FEss�o���
Q 4 >t I hereby certify that this engineering document was prepared by me or under my direct
°°0000°o -9
,� °°° °O°°o(�4 supervision and that I am a licensed P ofessional Engineer under the laws of the State of
lc, o°° ° ��4 Iowa.
f o° JAMIE A. % 0 0 �/
"� KNUTSON o —� r�'�"`�
z ° N UTSO ° Z R A i E A.KNUTSON,P.E. DA'
��� o o° /�, License Renewal Date is December 31,2015.
°j �°° ���� 'ages or sheets covered by this seal: ,
°p0000000°°°A
ICI
F.Y. 2014 STREET RECONSTRUCTION PROGRAM
CONTRACT NO. 859
CONTRACT DOCUMENTS
TABLE OF CONTENTS
1. NOTICE OF PUBLIC HEARING AND NOTICE TO BIDDERS
2. INSTRUCTIONS TO BIDDERS
3. FORM OF BID OR PROPOSAL
4. SALES TAX EXEMPTION INFORMATION FORM
5. FORM OF BID BOND
6. NON-COLLUSION AFFIDAVITS
7. EQUAL OPPORTUNITY CLAUSE
8. TITLE VI CIVIL RIGHTS
9. RESIDENT BIDDER AND NON-RESIDENT BIDDER CERTIFICATION
10. AFFIRMATIVE ACTION PROGRAM
10. POTENTIAL ITEMS OF WORK FOR MBE/WBE PARTICIPATION
SUBCONTRACTOR'S BID REQUEST FORM,
LETTER FORM FOR SUBCONTRACTOR QUOTES,
MBE/WBE SCOPE LETTER,
MBE AND/OR WBE PREBID CONTACT INFORMATION FORM
11. WATERLOO/CEDAR
CONSTRUINORITY CT IONAND WOMEN BUSINESSES
AND MAINTENANCE
CONTRACTORS GUIDE
12. STATEMENT OF BIDDER'S QUALIFICATIONS
13. GENERAL SPECIAL PROVISIONS
14. SPECIAL PROVISIONS
15. GENERAL SPECIFICATIONS FOR CONSTRUCTION
16. SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTI )N
17. FORM OF CONTRACT
18. FORM OF PERFORMANCE BOND
19. FORM OF PAYMENT BOND
NOTICE OF PUBLIC HEARING
On Proposed Plans, Specifications, Form of Contract,
And Estimate of Cost and the
NOTICE TO BIDDERS
For the Taking of Construction Bids
For the
F.Y. 2014 STREET RECONSTRUCTION PROGRAM
In the City of Waterloo, Iowa
CONTRACT NO. 859
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her
office in the City Hall of the said City on the 14th day of April, 2014, until 4:00 p.m. for
the construction of the F.Y. 2014 STREET RECONSTRUCTION PROGRAM, Contract
No. 859, as described in detail in the plans and specifications now on file in the Office of
the City Clerk.
OPENING OF BIDS
All proposals received will be opened in open Council meeting to be held in the Law
Court Theatre in the Waterloo Center for the Arts, 225 Commercial Street in the City of
Waterloo, Iowa, on the 14th day of April, 2014, at 5:30 p.m., and the prcposals will be
acted upon at such later time and place as may then be fixed.
PUBLIC HEARING
Notice is hereby given that the Council of said City will conduct a public hearing on the
proposed plans, specifications, form of contract, and estimate of cost for the
construction of the above-described improvement project at 5:30 p.m. on April 14, 2014
said hearing to be held in the Law Court Theatre in the Center for the Arts, 225
Commercial Street, in said City. The proposed plans, specifications, form of contract,
and estimate of cost for said improvements heretofore prepared by the City Engineer of
the City of Waterloo are now on file in the office of the City Clerk for public examination,
and any person interested therein may file written objection thereto with the City Clerk
before the date set for said hearing, or appear and make objection thereto with the City
Clerk before the date set for said hearing, or appear and make objection thereto at the
meeting above set forth.
SCOPE OF WORK
The extent of the work involved is the construction of street improvements in, along and
upon portions of certain streets, avenues, roads, and alleys, and such :)ther work as
may be incidental thereto along and upon the following streets, avenues, roads and
alleys.
NOTICE OF HEARING CONTRACT NO. 859 Page 1 of 6
Street improvements consisting of:
DIVISION I:
Alternate A:
• 5 '/2, 7, or 8 1/2 -inch thick HMA 1M or 3M Intermediate and Base, 3/4",
60% CR or 75% CR with a 2-inch thick HMA IM or 3M Surface, '/2" or 60%
CR or 75% CR between new 24-inch curb and gutter sections;
OR
Alternate B:
• 6, 7, or 8-inch non-reinforced PCC paving with integral curb and gutter
Subgrade drain tile, granular subbase, new storm sewer and appurtenances and other
such work as may be incidental thereto.
All street improvements consist of the reconstruction of an existing paved street, which
is to be replaced with a proposed street.
The list of streets, which are proposed for improvements, is as follows:
STREET FROM TO
Allen St. Mullan Ave., W. 4th St., W.
Bertch Ave. 8th St., W. Hammond Ave.
Downing Ave. Wren Rd. Ansborough Ave.
Easton Ave. Wisconsin St. La Porte Rd.
Hammond Ave. Mitchell Ave. South St.
Hyperion Dr. W of Candlewick Rd. Pavement End E of Greenbrier Rd.
Lafayette St. Indiana St. Fay St.
Oregon St. Ridgeway Ave., E. Mitchell Ave.
E. Mitchell Ave. Randolph St. Hammond Ave. (storm sewer)
Alley between 600 block of Magnolia Prkwy/Wallgate Ave. (storm sewer)
E. San Marnan Dr. @ Sovia Dr. (storm sewer)
DIVISION II: Reconstruction of water main on Easton Avenue (Wisconsin Street to La
Porte Road).
BEGINNING AND COMPLETION DATES
The work under the proposed contract shall be commenced within ten (10) working
days after receipt of "Notice to Proceed" and all items shall be completed on or before
November 21, 2014.
NOTICE OF HEARING CONTRACT NO. 859 Page 2 of 6
METHOD OF PAYMENT TO CONTRACTOR
The Contractor will be paid against bi-monthly estimates in materials o n dee th basis
andofninety-work
five percent (95%) of the work as it is completed
approved. Final payment will be made thirty-one (31) s days after
tevcomplletions o of
the
that
pp payment
and acceptance by the Council. Before final fully
all subcontractors and workmen and all persons furnishing materials sae been that
fd
paid for such materials
beren will
paid. required unless
material, men and laborers have
The Contractor is hereby notified that if the Citydoes
thetCode of Iowan have cash or payment may
hand to pay
monthly pay estimates, according to Chapter 384.5
be made by anticipatory warrants issued bearing a rate of interest not E xceeding that
permitted by Chapter 74A, Code of Iowa.
PLANS AND SPECIFICATIONS
nts
Plans and Specifications governing the construction
e cations ap d also osed the
have been prepared by the City Engineer, which plans and speci
prior proceedings of the City Council referring c to and the defining
aidcontract by proposed
improvements are hereby made a part of this notice,
reference shall be executed in compliance therewith.
Plans and Specifications are available from the City`Engineer if the upon
the he are returnedt of
a $25.00 refundable deposit. Deposits will be ref in
usable condition (i.e. generally free of highlights, ink markings, tears, stickers, water
ive
stains and soiling) to the Engineer's Office by the end
refunded for any nrequtestsdor plans
ay after
the project has been awarded. No deposits will be
received after the 14th consecutive day, which includes plans
eat returned
as via
n awarded.mailservice.
Plan holders are responsible for ascertaining when
project
the plan holder is the prime contractor or a subcontractor or supplier of the prime
contractor that has been awarded the project, Peans contractoand permustrsubmit alist of need
h s
to
be returned to receive the deposit. The prim
subcontractors and suppliers for the City to verify eligibility for the refundable deposit.
Upon award of project, the prime contractor, his subcontracts{rso ad di o pail rssthall be
supplied with the needed number of plans and specifications
CONTRACT AWARD
A contract will be awarded for each division of the contract to the qualified bidder
submitting the lowest bid.
The City reserves the right to reject any or all bids, re-advertise for new in the best interest of thesCity and to
waive informalities in the bids submitted that mightbe
Iowa,
may be held by the City of Waterloo, for a period not to exceed thirty (30)
days from the day of the opening of bids for the ur n sthe c e of review
wing the bids and
investigating the qualifications of bidders, prior to g
NOTICE OF HEARING
CONTRACT NO. 859 Page 3 of 6
By virtue of statutory authority, a preference will be given to products and
pr
grown and coal produced with the State of Iowa and preference will be given toovisions
loca
domestic labor in the construction of the improvement. I
PROPOSALS SUBMITTED
The bidder shall submit bids on the items listed in the proposal. The bidder shall
cl
write or type the unit bid price and the bid item extension (Unit Price x EstimatedQt arty
numerals on the blanks provided. Should there be any discrepancy between the unit
bid price and extension, the City of Waterloo shall consider the unit bidprice as
the valid unit bid price. being
The bidder has the option to submit a computer-generated spreadsheet in lieu of
the
portion of the Form of Bid or Proposal, which includes the Bid Item Number,
Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price and Total Bid. The
computer-generated spreadsheet shall include all of the information listed in that portion
of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor
submitting the bid. For the bidders who submit a computer-generated spreadsheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in the space
s
provided on the Form of Bid or Proposal. ( )
BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or cashier's check
drawn on an Iowa bank, or a bank chartered under the laws of the United States, a
certified share draft drawn on a credit union in Iowa or chartered under the laws of the
United States, or bid bond, (on the form furnished by the City)
Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, w'ty hicof
h
certified check, certified share draft or bid bond will be held as security that the Bidder
will enter into a Contract for the construction of the work and will furnish the required
bonds, and in case the successful Bidder shall fail or refuse to enter into the Contract
and furnish the required bonds, his bid security may be retained by said City as agreed
upon liquidated damages. If bid bond is used, it must be signed by both the Bidder and
the surety or surety's agent. Signature of surety's agent must be supported b
accompanying Power of Attorney. y
PERFORMANCE & PAYMENT BONDS
The successful bidder will be required to furnish a "Performance Bond"
Bond" within ten (10) days after forms are presented to him in an amount equalPayment
one
hundred percent (100%) of the contract price, said bond to be issued by a responsible
surety approved by the City Council and shall guarantee the faithful performance of the
contract and the terms and conditions therein contained, and shall guarantee the
prompt payment of all materials and labor and protect and save harmless the City from
claims of any kind caused by the operations of the contractor.
MAINTENANCE BOND
Before the Contractor shall be entitled to receive final payment for work done under this
contract, it shall execute and file a bond in the penal sum of not less than 100% of the
NOTICE OF HEARING
CONTRACT NO. 859
Page 4 of 6
total amount of the contract, same to be known as "Maintenance Bond," ar.d which bond
must be approved by the City Council, and which bond is in addition to the bond given
by the Contractor to guarantee the completion of the work.
CONTRACT COMPLIANCE PROGRAM / SUBCONTRACTING
The program proposes numerical projections regarding utilization of Minority Business
Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors
and suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa.
A goal of at least ten percent (10%) for MBE participation on all City funded construction
projects that are estimated at $50,000.00 or more. A goal of at least twc percent (2%)
for WBE participation on all City funded construction projects that are estimated at
$50,000.00 or more. Any project funded in part or in total with federal fun ds shall follow
the respective agencies contract compliance program and goals. The
Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance
MBE/WBE goals. The MBE/WBE subcontractors, suppliers or vendors must provide
the Prime Contractor a reasonably competitive price for the service beirg rendered or
the Contractor is not required to accept their bid.
LIQUIDATED DAMAGES
Time is an essential element of this contract. It is important that the work be diligently
pursued to completion. If the work is not completed within the specified contract period,
plus authorized extensions, the contractor shall pay to the City Liquidated Damages in
the amount of five hundred dollars ($500.00) per day, for each day, as further described
herein, in excess of the authorized time.
Days beyond the specified completion date for which Liquidated Damages will be
charged will be working days that the contractor does, or could have worked, from
Monday through Saturday. Sundays will be counted only if work is performed. Partial
working days will be considered as a full working day. Days not chargeable for
Liquidated Damages will include rain days, Sunday if no work is dcne, and legal
holidays.
Working days will cease to be charged when only punch list items remain to be
completed. Punch list items do not include contract bid items or approved change/extra
work orders.
When the Contractor believes the project to be substantially completed, a written notice
stating the same shall be submitted to the Engineer and a request made for a Punch
List. If the work under the Contract extends beyond the normal construction season for
such work the Contractor shall submit to the Engineer in writing a request that working
days counted toward the project be suspended until work is resumed the following
construction season.
This amount is not construed as a penalty. These damages are for the cost to the City
of providing the required additional inspection, engineering and contract administration.
NOTICE OF HEARING CONTRACT NO. 859 Page 5 of 6
PRE-CONSTRUCTION CONFERENCE
Before the work is commenced on this contract, a conference shall be held for the
purpose of discussing the contract. The conference shall be attended by the prime
contractor, subcontractors and City Officials.
RESIDENT BIDDER/NON-RESIDENT BIDDER
Attention of bidders is called to compliance with the provisions of the Resident
Bidder/Non-Resident Bidder requirements.
Each bidder submitting a bid shall execute and include with the bid, a Resident Bidder
Certification or a Non-Resident Bidder Certification in the form(s) herein provided.
SALES TAX EXEMPTION CERTIFICATES
Contractors and approved subcontractors will be provided a Sales Tax Exemption
Certification to purchase building materials or supplies in the performance of
construction contracts let by the City of Waterloo.
Published pursuant to the provisions of Division VI of Chapter 384 of the City Code of
Iowa and upon order to the City Council of said Waterloo, Iowa, on the
day of 2014.
CITY OF WATERLOO, IOWA
BY:
Suzy Schares
City Clerk
NOTICE OF HEARING CONTRACT NO. 859 Page 6 of 6
INSTRUCTIONS TO BIDDERS
1. EXPLANATIONS TO BIDDERS
Any explanation desired by a bidder regarding the meaning or
interpretation of the Notice to Bidders, Plans, Specifications, Etc., must be
requested in writing and with sufficient time allowed for a reoly to reach
bidders before submission of their bids. Any interpretation made will be in
the form of an amendment of the Notice to Bidders, Plans, Sr ecifications,
etc., and will be furnished to all prospective bidders. Its receipt by the
bidder must be acknowledged in the space provided on the Proposal Form
or by letter or telegram received before the time set for opening of bids.
Oral explanations or instructions given before the award of the contract
will not be binding.
2. EXAMINATION OF PROPOSED WORK
Bidders should visit the site and take such other steps as may be
reasonably necessary to ascertain the nature and location of the work,
and the general and local conditions which can affect the work or the cost
thereof. Failure to do so will not relieve bidders from responsibility for
estimating properly the difficulty or cost of successfully performing the
work. The owner will assume no responsibility for any understanding or
representation concerning conditions made by any of its officer s or agents
prior to the execution of the contract, unless included in th 3 Notice to
Bidders, the Specifications or related documents.
3. PREPARATION OF BIDS
a. Bids shall be submitted on the forms furnished, or copies thereof,
and must be manually signed. If erasures or other changes appear
on the forms, each erasure or change must be initialed by the
person signing the bid.
The bidder has the option to submit a compute -generated
spreadsheet in lieu of the portion of the Form of Bid c- Proposal,
which includes the Bid Item Number, Description, Unit Estimated
Quantity, Unit Bid Price, Total Bid Price, and Total Bid. The
computer-generated spreadsheet shall include all of the information
listed in that portion of the Form of Bid or Proposal as well as bear
the signature of the Prime Contractor submitting the bid. For the
bidders who submit a computer-generated spread- sheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in
the space(s) provided on the Form of Bid or Proposal.
INSTRUCTIONS TO BIDDERS Page 1 of 14
b. The Bid Form may provide for submission of a price or prices for
one or more items, which may be lump sum bids, alternate prices,
schedule items resulting in a bid on a unit of construction or a
combination thereof, etc. When the Bid Form explicitly requires
that the bidder bid on all items, failure to do so will disqualify the
bid. When submission of a price on all items is not required,
bidders should insert the words "no bid" in the space provided for
any item on which no price is submitted.
c. Unless called for, alternate bids will not be considered.
d. Modifications of bids already submitted will be considered if
received at the office designated in the Notice to Bidders by the
time set for closing of bids. Telegraphic modifications will be
considered, but should not reveal the amount of the original or
revised bid.
e. In preparing his bid, the bidder shall specify the price, written legibly
in ink or with the typewriter, at which he proposes to do each item
of work. The unit price shall be stated in figures in the blank space
provided (i.e., $7.14). In items where unit price is required, the total
amount of each item shall be computed at the unit prices bid for the
quantities given on the Bid Form and stated in figures in the blank
space provided.
If the bidder chooses to submit the unit prices, total bid price, and
total bid on a computer-generated spreadsheet, all numbers shall
be easily legible.
f. Any changes or alterations made in the Bid Form, or any addition
thereto, may cause the rejection of the bid. No bid will be
considered which contains a clause in which the contractor
reserves the right to accept or reject a contract awarded him by the
city Council of Waterloo. Bids in which the unit prices are obviously
unbalanced may be rejected.
g. If the bidder does not qualify as a resident bidder, the nonresident
bidder shall specify on the project proposal whether any preference
to resident bidders, including but not limited to any preference to
bidders, the imposition of any type of labor force preference, or any
other form of preferential treatment to bidders or laborers from that
state or foreign country is in effect in the nonresident bidder's state
or country of domicile at the time of a bid submittal.
INSTRUCTIONS TO BIDDERS Page 2 of 14
4. SUBMISSION OF BIDS
a. A bid must be sealed in a separate envelope and narked to
indicate its contents and be accompanied by the bid se aurity in a
separate envelope. If forwarded by mail, the two envelopes shall
be placed in a third and mailed to the City Clerk/Auditor. All bids
must be filed with the City Clerk/Auditor of the City of V'�aterloo at
his office in the City Hall before the time specified for clos ng bids.
b. Bids received prior to the advertised hour of openir g will be
securely kept sealed. The officer whose duty it is to ope them will
decide when the specified time has arrived, and no bi i received
thereafter will be considered; except that when a bid arri\es by mail
after the time fixed for opening, but before the reading .)f all other
bids is completed, and it is shown to the satisfaction of the City of
Waterloo, Iowa, that the non-arrival on time was due solely to delay
in the mails for which the bidder was not responsible, s ich bid will
be received and considered.
c. Bidders are cautioned that, while telegraphic modifications of bids
may be received as provided above, such modifications, if not
explicit and if in any sense subject to misinterpretation, shall made
the bid so modified or amended, subject to rejection.
5. LATE BIDS AND MODIFICATIONS OR WITHDRAWALS
Bids and modifications or withdrawals thereof received a the office
designated in the Notice to Bidders after the exact time set fc,r closing of
bids will not be considered. However, a modification which is received
from an otherwise successful bidder, and which makes the terms of the
bid more favorable to the City of Waterloo, will be considered at any time it
is received and may therefore be accepted. Bids may be withdrawn by
written or telegraphic request received from bidders prior to the time set
for closing of bids.
6. PUBLIC OPENING OF BIDS
Bids will be publicly opened at that time and place set for opening in the
Notice to Bidders. Their content will be made public for the information of
bidders and others interested who may be present either in person or by
representative.
7. BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by 3 certified or
cashier's check drawn on an Iowa bank, or a bank charter3d under the
INSTRUCTIONS TO BIDDERS Page 3 of 14
laws of the United States, a certified share draft drawn on a credit union in
Iowa or chartered under the laws of the United States, or bid bond (on the
form furnished by the City) payable to the City of Waterloo, Iowa, in the
sum of not less than five percent (5%) of the bid submitted, which certified
check, certified share draft or bid bond will be held as security that the
Bidder will enter into a Contract for the construction of the work and will
furnish the required bonds, and in case the successful Bidder shall fail or
refuse to enter into the Contract and furnish the required bond, his bid
security may be retained by said City as agreed upon liquidated damages.
If bid bond is used, it must be signed by both the bidder and the surety or
surety's agent. Signature of surety's agent must be supported by
accompanying Power of Attorney.
8. COLLUSIVE AGREEMENTS
a. Each bidder submitting a bid shall execute and include with the bid,
a Non-Collusion Affidavit in the form herein provided, to the effect
that he as not colluded with any other person, firm, or corporation in
regard to any bid submitted.
b. Each bidder submitting a bid shall have each proposed
subcontractor, if any, execute and submit to the City Contract
Compliance Officer by 5:00 P.M. the business day following the day
bids on this project are due, a Non-Collusion Affidavit in the form
herein provided, to the effect that he has not colluded with any
other person, firm, or corporation in regard to any bid submitted.
Before executing any subcontract, the successful bidder shall
submit the name of any proposed subcontractor for approval by the
City.
9. MINORITY AND/OR WOMEN BUSINESS ENTERPRISE
SUBCONTRACTORS
a. CITY OF WATERLOO AND/OR WOMEN BUSINESS
ENTERPRISE PRE-BID CONTACT INFORMATION FORM
The City of Waterloo Minority and/or Women Business Enterprise
Pre-Bid Contact Information Form shall be submitted with the Form
of Bid or Proposal. Failure to do so shall be grounds for the bid
being rejected if subcontracting is proposed by the prime
contractor.
INSTRUCTIONS TO BIDDERS
Page 4 of 14
10. M
BENVgE CONTRACT COM�'�IANCE PROGRAM
PURSE (hereinafter
of the Contract Compliance Program
calledTae purpose etus for increasing
n r a rosiness
Program) is to act as an impetus
participation of minority and women
ded codstad disadvantaged
ess
in City awarded enterprise (MBENVBE) bonafide contractor
Program does but wi l hopefully
The not propose to eliminate any on City contracts, row and
or subcontractor from bidding local MBENVBE .. g
serve as a needed stimulus to help
all become mainstream contractors and subcontt actors.
eventu Y
Program does not proposE to include
Compliance where "good-faithe
This Contract orqutas, but only flexible goals
any set-aside or q the contractor to use MBENVBE
efforts" are required by
subcontractors.
to
continue their
ram shall not eliminate the neednusing M for cc ntraactors ctors
This Prog "good-faith efforts"
BE
subcontrac
tors on City contracts estimated at less that $50,000.
effort to reduce in-house
The City of Waterloo will make every would allow
and maintenance work that would be more cost
thus,
construction the ,
effectively performed by private sector an
additional bidding opportunities for MBENVBE firms.
The City Contra
ct Compliance Officer shall be advisE d of all City of
Waterloo awarded construction contracts.
DEFINITIONS
Goals:A expressed objective which contractors are
required flexle numerically make "good-faith efforts." The key to the requirement is
to makeGoals are neither set-a-sides nor a
to make documented efforts. nor
device to achieve proportional representation or equal results.
specific groups,
Numerical goals do not create set-asides for or equal
designed to achieve proportional representation
are they g goal-setting process in affirmative action
plannings. is used to target and measure the effectiveness of
prevent discrimination.
affirmative action efforts to eradicate and
Page 5of14
INSTRUCTIONS TO BIDDERS
Quota:
A flat numerical requirement that the contractor is
in order to obtain the benefit or be in compliance.in f component f affirmative be i requirednumerical meet
not The
be, nor may it properly or lawfully be programs
, designed to
unlawful preferential treatment and
u color, t quotas with respect personsing
of any race,60-2or, a religion, sex, or national origin.
at 41 discrimination 60 and.1 (a), 60-2.15 and
1 goals 0 2.30, specifically The regulations
dabor) U prohibit
as quotas. (U.S. Department of
Set Aside:
An arrangement in which a
particular contract is reserved for
competition solely
Y among minority and women business
Contractor.
As used in this document means contractor, subcontractor,
supplier, vendor, and professional service provider.
Minority Business Enterprise (MBE)
Any business, which is at least 51%, owned by one
or
minorities and whose management and daily business more
are controlled by one or more such individuals and is on
State Unified Certification List, or were listed operations
Waterloo Certified MBE/WBE C on the City ofe current
Contractors list as of July 1, 2002
Women Business Enterprise (WBE):
Any business which is at least 51% owned by one or
and whose management and daily business operations
controlled by one or more such individuals andmore women
State Unified Certification List, or were listed on areof
Waterloo Certified MBE/VVBE Contractors list as of Julty
Minority: Y 1, 2002
Any person or persons who are considered as socially
and
economically disadvantaged because of their identity as a
member without regard to their individual
include: Black American, Hispanic American, Nativegroup
Eskimos, Aleuts, and Asian-Pacific qualities. The groups
ific Americans. Americans,
1.1(c)(3)(ii)(1983). 13 C.F.R. 124-
Lowest Responsible Bidder
Bidder who has offered the lowest bid and who has
relative to the type of work bid on exhibited skill
and evidence of working with the Affirmative Action'E ploymeal ibility,
mployment
INSTRUCTIONS TO BIDDERS
Page 6 of 14
Program and the Contract Compliance Program.
Broker:
One buying or selling for others on commission or other f,3e basis
without maintaining a warehouse or other similar inventor y storage
facility.
Mayor's Advisory Committee:
Mayor's Advisory Committee for Minority, Female, and
Disadvantaged Business Enterprise.
Good Faith Efforts:
The successful bidder shall be selected on the basis of having
submitted the lowest responsible bid. The obligation of the bidder is
to make good faith efforts. The bidder can demonstrate that it has
done so by the following:
1. The Prime Contractor met the project goal - No Action necessary
2. If the Prime Contractor failed to meet the goal, they n ust submit
documentation of good faith efforts.
CONTRACT COMPLIANCE PROGRAM SUBCONTRACTING
The program proposes numerical projections or goals regarding
utilization of Minority Business Enterprise (MBE) and Wo nen
Business Enterprise (WBE) as subcontractors in the performance
of contracts awarded by the City of Waterloo, Iowa.
A goal of at least 10% for MBE participation on all City funded
construction projects that are estimated at $50,000 or more and
projects under $50,000 where applicable at the Contract
Compliance Officer's discretion. There is at least 2% WBE goal on
City funded projects. Any project which is funded solely or in part
with Federal funds shall follow the respective agencies contract
compliance program and goals. Any project which is funded solely
or in part with State funds shall follow the respective agencies
contract compliance program and goals. The City of Waterloo
Contract Compliance Program is for City awarded constr fiction
contracts only. The prime contractor shall make "good-faith efforts"
to meet the Contract Compliance MBE/WBE goals. The MBE/WBE
subcontracts must provide the prime contractor a reasonably
competitive price for the service being rendered or the ccntractor is
not required to accept the bid.
INSTRUCTIONS TO BIDDERS Page 7 of 14
Administrative Reconsideration:
As part of this reconsideration, the bidder will have the opportunity
to provide written documentation or arguments concerning the
issue of whether they made adequate good faith efforts to meet the
goals. The bidder will have the opportunity to meet in person with
the City of Waterloo's Administrative Reconsideration Committee to
discuss the issue of whether they made adequate good faith efforts.
The Administrative Reconsideration Committee will forward a
written decision on reconsideration to the Mayor and City Council,
explaining the basis for finding that the bidder did or did not meet
the goal or make adequate good faith efforts to do so.
Documentation required will include but is not limited to the
following:
* Making portions of the work available for MBE/WBE
subcontracting
* Evidence of negotiating with MBE/WBE firms
* MBE/WBE quotes obtained and non-MBE/WBE quotes used
* Reasons agreements were not reached
* Follow-up after initial solicitations
* Efforts to assist in obtaining equipment, supplies and materials (at
competitive prices), bonding, lines of credit, insurance, etc.
* Evidence of past compliance or non-compliance by same
contractor
The Contract Compliance Officer will determine the weight to be
given to each item listed above (supported by appropriate
documentation) based on overall program goals.
RESPONSIBILITIES
1. City of Waterloo
A. The City Contract Compliance Officer has the responsibility
to assure the City's compliance with Federal, State and
Municipal regulations.
B. The City Contract Compliance Officer is responsible for
maintaining a current directory of certified firms. Certification
of MBE/WBE/DBE contractors is through the Iowa
Department of Transportation and its Unified Certification
Program. Only firms certified based on guidelines prescribed
in 49 CFR Part 26 and provisions of this agreement, shall be
recognized as certified by the City of Waterloo.
INSTRUCTIONS TO BIDDERS Page 8 of 14
C. The City Contract Compliance Officer is responsible for
making available a list of future project information notices to
MBE/WBE firms.
D. The City Contract Compliance Officer shall send notices to
appropriate MBE/WBE firms in the directory of each bid
solicitation with opening date.
E. The City Contract Compliance Officer will receive MBE/WBE
Letter(s) of Intent to Bid and within two (2) business days
forward the complete list of MBE/WBE bidders who
submitted a Letter of Intent to Bid to prime contractors.
Prime Contractors
In order to be in compliance with the guidelines of this program, the
prime contractor must show good-faith efforts in following the
MBE/WBE Contract Compliance Program. Good-faith efforts
include, but are not limited to, the following:
A. Prime contractors shall send solicitation letters (Form CCO-
3) to appropriate MBE/WBE (those certified in directory
prepared by City Contract Compliance Officer) at least seven
(7) working days prior to bid date. Letters should identify
specific items to be subcontracted. A minimum of Three (3)
disadvantaged business contacts must be made and
documented, if there are at least three disadvantaged
businesses offering services in the area to be subcontracted
(See City of Waterloo MBE/WBE Certification List). If less
than three (3) are offering the services to be subcontracted,
then a contact is required for any that are listed as providing
that service. If the Prime Contractor submits a MBEE/WBE
contact not on the City's MBE/WBE list, attach a copy of the
MBE/WBE/DBE Certifications from another goverr ment
agency.
B. If a prime contract bidder is unable to identify MBE/WBE
firms to perform portions of the work, the City Contract
Compliance Officer should be contacted for assistance
immediately.
C. Prime contract bidders may solicit MBE/WBE proposals by
telephone or personal interviews, but all such contacts shall
be confirmed by Certified Mail, or subcontract bid request
forms (Form CCO-2).
D. If any MBE/WBE business submitting bids is not selected for
subcontract award, documentation must accompar y the
INSTRUCTIONS TO BIDDERS 'age 9 of 14
"MBE/VVBE Business Enterprise Pre-Bid Contact Information
Form" (Form CCO-4 and CCO-4A) on why the MBE/WBE
was not selected. These reasons could include:
a. Not low bid. Copies of the competing bids may be
required for verification.
b. MBE/WBE did not bid, withdrew bid or non-responsive.
c. Documentation of other business-related reason for not
selecting the MBE/WBE business for a subcontract.
d. Prime contractor self performs work.
e. Any other reason relied on by prime.
The Contract Compliance Officer will determine the weight to be
given to each item listed above (supported by appropriate
documentation) based on overall program goals.
II. MBE/WBE Firms
A. MBE/WBE firms shall be certified by the Iowa Department of
Transportation as owners and controllers of their respective
businesses, or were listed on the City of Waterloo Certified
MBE/WBE Contractors list as of July 1, 2002.
B. MBE/WBE firms must perform the work on the project; they
cannot act as a broker by subcontracting the work out to
others.
C. Each MBE/WBE firm planning to submit quotes on
construction projects with goals, shall submit a Letter of
Intent to Bid (Form CCO-5) to the City Contract Compliance
Officer seven (7) working days prior to bid opening, listing
specific items which the MBE/WBE firm is interested in
bidding. If sufficient Letters of Intent to Bid are not received
by the City Contract Compliance Officer seven (7) working
days prior to bid opening, goals on subject project will be
reduced accordingly. Agreements between the
bidder/proposer and a MBE/WBE in which the MBE/WBE
promises not to provide subcontracting quotations to other
bidders/proposers are prohibited.
NON-COMPLIANCE OF CONTRACTORS
A. Noncompliance exists when the contractor's actions are not
consistent with the requirements of the Contract Compliance
Program in the areas of employment and subcontracting.
INSTRUCTIONS TO BIDDERS Page 10 of 14
B. A bidder's failure to show good-faith efforts to meet project
goals or a failure to use certified MBE/WBE firms may be
grounds for finding its bid not responsible.
C. The Contract Compliance Officer shall submit to City Council
his/her recommendation on any non-compliant contract in
writing.
NOTICE TO PROCEED
Notice to proceed on any project with goals will not be issued until
City Contract Compliance Officer determines the lowest responsible
bidder has used good-faith efforts to comply with this Compliance
Program and the bid was responsive.
CONCLUSION
This program repeals or revises all sections of previous, Waterloo
Contract Compliance Programs.
11. EMPLOYMENT AND BUSINESS OPPORTUNITY
To the greatest extent feasible, suppliers, subcontractors, and I)w income
workers owning businesses or living in the Waterloo area must be given
priority in supplying materials, bidding for subcontract work, or applying for
employment by the contractor on this project. Opportunities for training
and for employment arising in connection with this project, shall to the
greatest extent feasible be made available to lower income persons
residing in the project area. The contract area is the City of Waterloo.
The City of Waterloo will require the contractor to document his efforts in
securing lower income workers living in the project area and in purchasing
supplies from, and awarding subcontracts to, businesses owned by
persons residing in the project area.
12. STATEMENT OF BIDDER'S QUALIFICATIONS
Each bidder shall, upon request of the City of Waterloo, Iowa, submit on
the form furnished for that purpose (a copy of which is included in the
contract documents), a statement of bidder's qualifications, his experience
record in constructing the type of improvements embraced, and his
organization and equipment available for the work contemplated; and,
when specifically requested, a detailed financial statement. The City of
Waterloo, Iowa, shall have the right to take such steps as it deems
necessary to determine the ability of the bidder to perform his obligations
under the contract, and the bidder shall furnish the City of Wate loo, Iowa,
all such information and data for this purpose as it may request. The right
INSTRUCTIONS TO BIDDERS Page 11 of 14
is reserved to reject any bid where an investigation of the available
evidence or information does not satisfy the City of Waterloo, Iowa, that
the bidder is qualified to carry out properly the terms of the contract.
13. AWARD OF CONTRACT
a. Award of contract will be made to that responsive and responsible
bidder whose bid, conforming to the Specifications, is most
advantageous to the City of Waterloo; price and other factors
considered. The intention is to award the contract at the time of
opening bids, but the right is reserved to postpone such action for a
reasonable time, not exceeding thirty (30) days.
b. The City Council may, when in its interest, reject any or all bids or
waive any informality in bids received.
c. The bidder shall submit bids on all the items listed in the proposal
and shall state the unit bid price in words in the blank spaces
provided beneath the item description. Should there be any
discrepancy between the unit bid price in words and listed numeral
unit bid price, the City of Waterloo shall consider the unit bid price
in words as being the valid unit bid price. A computer-generated
spreadsheet as herein provided shall also be acceptable.
Proposals requiring mathematical computations to determine unit
prices or totals will be rejected. A contract will be awarded to the
qualified bidder submitting the lowest total bid for the BASE BID
plus ALTERNATE(S) chosen by the City as indicated in the
NOTICE TO BIDDERS.
d. When a contract for a public improvement is to be awarded to the
lowest responsive and responsible bidder, a resident bidder shall
be allowed a preference as against a nonresident bidder from a
state or foreign country if that state or foreign country gives or
requires any preference to bidders from that state or foreign
country, including but not limited to any preference to bidders, the
imposition of any type of labor force preference, or any other form
of preferential treatment to bidders or laborers from that state or
foreign country. The preference allowed shall be equal to the
preference given or required by the state or foreign country in which
the nonresident bidder is a resident. In the instance of a resident
labor force preference, a nonresident bidder shall apply the same
resident labor force preference to a public improvement in this state
as would be required in the construction of a public improvement by
the state or foreign country in which the nonresident bidder is a
resident.
INSTRUCTIONS TO BIDDERS Page 12 of 14
14. EXECUTION OF AGREEMENT, BONDS, AND CERTIF CATE OF
INSURANCE
a. Subsequent to the award and within ten (10) day.:; after the
prescribed forms are presented for signature, the successful bidder
shall execute and deliver to the City of Waterloo Iowa, an
agreement in the form included in the contract documents in such
number of copies as the City of Waterloo, Iowa, may req.wire.
b. Having satisfied all conditions of award as set forth elsewhere in
these documents, the successful bidder shall, within the period
specified in paragraph "a" above, furnish a surety b )nd and a
payment bond in a penal sum not less than the amount of the
contract as awarded, as security for the faithful perform ince of the
contract and terms and conditions therein contained and shall
guarantee the prompt payment of all persons, firms, or corporations
to whom the contractor may become legally indebted for labor,
materials, tools, equipment, or services of any nature including
utility and transportation services, employed or used by him in
performing the work. The bonds shall protect and save harmless
the City from claims and damages of any kind caused by the
operations of the contractor and shall also guarantee the
maintenance of the contract improvements for the period stated in
the Notice of Hearing from and after completion of said
improvements and their acceptance by the City. Such bonds shall
be in the same form as that included in the contract documents and
shall bear the same date as, or a date subsequent to that of the
agreement. The current Power of Attorney for the person who
signs for any surety company shall be attached to such bonds.
c. The successful bidder shall, within the period specified in
paragraph "a" above, furnish a certificate of insurance for approval
in amounts of not less than the amounts specified in the General
Specifications for Construction, Section F. No. 4 "Liability
Insurance," Pages 14 to 15 of 18 Pages. The certificate of
insurance shall be furnished in such number of copies as the City of
Waterloo may require. The City of Waterloo shall be named as an
"Additional Insured." The contractor shall similarly submit his
subcontractor's certificates of insurance in the amounts for approval
before each commences work. The contractor shall carry or
require that there be Workmen's Compensation Insurance for all his
employees and those of his subcontractors engaged in work at the
site, in accordance with State Workmen's Compensation Laws.
INSTRUCTIONS TO BIDDERS F age 13 of 14
d. The failure of the successful bidder to execute such agreement and
to supply the required bond or bonds within ten (10) days after the
prescribed forms are presented for signature, or within such
extended period as the City of Waterloo, Iowa, may grant, based
upon reasons determined sufficient by the City of Waterloo, Iowa,
may either award the contract to the next lowest bidder or re-
advertise for bids, and may charge against the bidder the difference
between the amount of the bid an the amount for which a contract
for the work is subsequently executed, irrespective of whether the
amount thus due exceeds the amount of the bid guaranty. If a
more favorable bid is received by re-advertising, the defaulting
bidder shall have no claim against the City of Waterloo, Iowa, for a
refund.
15. RECIPROCAL RESIDENT BIDDER PREFERENCE
Attention of bidders is called to the requirement of complying with the
provisions of the Resident Bidder/Non-Resident Bidder requirement.
Each bidder submitting a bid shall execute and include with the bid, a
Resident Bidder Certification or a Non-Resident Bidder Certification in the
form(s) herein provided.
INSTRUCTIONS TO BIDDERS Page 14 of 14
FORM OF BID OR PROPOSAL
F.Y. 2014 STREET RECONSTRUCTION PROGRAM
CONTRACT NO. 859
CITY OF WATERLOO, IOWA
Honorable Mayor and City Council
Waterloo, Iowa
Gentlemen:
1. The undersigned, being a Corporation existing under the law of the State of
, a Partnership consisting of the fol owing partners:
having familiarized (himself) (themselves) (itself) with the existing conditions on
the project area affecting the cost of the work, and with all the contract documents
listed in the Table of Contents and Addenda (if any), as prepared by the City
Engineer of the City of Waterloo now on file in the office of the City Clerk, City
Hall, Waterloo, Iowa, hereby proposes to furnish all supervision, technical
personnel, labor, materials, machinery, tools, appurtenances, equipment, and
services, including utility and transportation services required to construct and
complete this F.Y. 2012 STREET RECONSTRUCTION PROGRAM, Contract
No. 819, all in accordance with the above-listed documents and for the unit prices
for work in place for the following items and quantities:
F.Y. 2014 STREET RECONSTRUCTION PROGRAM
CONTRACT NO. 859
BID DIVISION I UNIT EST.QTY. UNIT BID TOTAL BID PRICE
ITEM a , PRICE
DESCRIPTION"
BASE BID—SECTION I
CONSTRUCT, MAINTAIN, REMOVE
1 TEMPORARY ACCESS AND RESTORE SY 93.3 $ $
2 MISC. PCC, 9", C-4 SY 190.0 $
3 REMOVE AND REPLACE MISC. 7.5" HMA SY 3.6 $ $
4 REMOVE AND REPLACE MISC. 9.0" HMA SY 218.6 $ $
5 REMOVE AND REPLACE MISC. 7" PCC, C-4 SY 341.0 $ $
REMOVE/REPLACE MISC. SEALCOAT W/2"
6 HMA SY 133.4 $ $
7 ACC DRIVEWAY APPROACH TON 11.6 $ $
8 DRIVEWAY APPROACH 6.5"ACC TON 16.6 $ $
FORM OF BID CONTRACT NO. 859 Page 1 of 10
9 DRIVEWAY APPROACH AND S/W, 6" PCC, C-4 SY 956.9 $ $
10 DRIVEWAY APPROACH AND S/W, 5" PCC, C-4 SY 3,524.7 $ $
11 SIDEWALK, 4" PCC, C-4 SY 725.2 $ $
PEDESTRIAN RAMP, PCC SIDEWALK, 6" PCC,
12 C-4 SY 929.0 $ $
PEDESTRIAN RAMP DETECTABLE WARNING
13 SURFACE SF 1,478.0 $ $
14 SIDEWALK CURB SECTION LF 315.9 $ $
15 MISCELLANEOUS CONCRETE CY 1.6 $ $
16 CONCRETE PAVEMENT REMOVAL SY 45,017.8 $ $
17 ASPHALT PAVEMENT REMOVAL SY 15,784.9 $ $
18 SIDEWALK AND DRIVEWAY REMOVAL SY 5,387.6 $ $
19 SIDEWALK REMOVAL SY 721.8 $ $
20 SAW CUT LF 2,794.0 $ $
21 GEOGRID SY 21,072.4 $ $
22 WOVEN GEOTEXTILE SY 32,322.5 $ $
23 MODIFIED SUBBASE TON 29,917.6 $ $
24 RECYLED ASPHALT PAVING TON 40.0 $ $
25 ROADSTONE, 3/4" TON 117.0 $ $
26 DRAIN TILE, 6" LF 30,981.0 $ $
27 DRAIN TILE, 4" LF 1,500.0 $ $
28 DRAIN TILE STUB, 4" LF 1,645.0 $ $
29 DRAIN TILE TAP AND COLLAR EACH 21.0 $ $
RF-19C, INLET OUTLET DETAIL (RODENT
30 GUARD) EACH 138.0 $ $
CONVERT WATER VALVE MANHOLE TO
31 ROADBOX EACH 27.0 $ $
32 WATER SERVICE CORPORATION, 3/4" EACH 98.0 $ $
33 WATER SERVICE CURB STOP, 3/4" EACH 98.0 $ $
34 WATER SERVICE PAVE BOX, 3/4" EACH 98.0 $ $
FORM OF BID CONTRACT NO. 859 Page 2 of 10
WWI
®COPPER WATER SERVICE, 3/4" is 2,491.0 $EgCH 2.0 $
MIMI
36 WATER SERVICE CORPORATION, 1" EACH 2.0 $
11111111
®WATER SERVICE CURB STOP, 1" EACH 2.0 $
gIIIIII
38 WATER SERVICE PAVE BOX, 1" 50 $
39 COPPER WATER SERVICE, 1" 111/1 Will
EACH 14.0 $ Mill
40 WATER SERVICE KILL EACH 2.0 $
41 WATER SERVICE TAP, 3/4" OR 1"
Mil
1.11111
42 LOWER WATER SERVICE, 314" OR 1"
EACH 6.0 $
TEREACH 19.0 $
11.111111
43 UNDERGROUND R CE 3/4", DOWANINGIIIII 1,254.0 $
LOWER WATER SER
ER
WWI
44 AVENUE 8,875.3116 $
gIIIIII
45 TOPSOIL, 4" 2.0
770.0 $
46 HYDROSEED Ell 10,762.7 $
. Will
TOPSOIL REMOVAL FROM PARKING,
1111111111
47 EARTHWORK 1111.111
1.0 $ Will
48 CONSTRUCTION SURVEY 1.0 $
Mill
49 TRAFFIC CONTROL 111011.1.
1.0 $
Will
50 DETOUR ROUTE- BERTCH ST. ® 1.0 $ Min
®DETOUR ROUTE-DOWNING AVE. 1.0 $
1110112.0 Mil
IS ST.DETOUR ROUTE-LAFAYETTE 1.0 $
11131112.0 . Mil
111 DETOUR ROUTE HAMMOND AVE. 1.0 $
AVE. Mill
54 DETOUR ROUTE-MITCHELL Illall® 1.0 $
MUM
®DETOUR ROUTE
ROADSTON ACLOSURE mai1.0 $
PE
RMANENTWill
MIN
56 BARRICADE WATER STA 57.36 $
ISPAINTED PAVEMENT MARKING,
BASED 13.0 $
Will
58 PAVEMENT MARKING, SYMBOL OR LEGEND EACH
EACH 1.0 $
59 RELOCATE STREET LIGHT 11111111
1111 45.0 `•' WWI
60 ROLLED EROSION CONTROL PRODUCT Page 3 of 10
CONTRACT NO. 859
FORM OF BID
TOTAL BASE BID-SECTION I
BID DESCRIPTION
UNIT EST.QTY, UNIT BID PRICE
61 STORM SEWER TOTAL BID PRICE
ITEM BASE BID._SECTION II
2000D, 42'
62 STORMS n 2,667ailliallill
EWER, 2000D, 36" ® .2
1MM..63 STORM SEWER, 2000D, 24" 1,159.0
Mill 64 STORM SEWER, 2000D, 18" 363.2 •
IIMIIIIMIIIII
65 STORM SEWER, 2000D, 15"
66 STORM ®IMIIIM 596
SEWER, 2000D 12" ® •9M
67 STORM MANHOLE, „ 2,568.E
Milialill
TYPE A, 48"
MANHOLE, TYPE 38.0
68 STORM
A, 60"
69 SW 402 RECTANGULAR STORM MANHOL EACH
5.0 •
70 SW 403 RECTANGULAR E .111111.11111111
EACH
19.0 . aill
STORM MANHOLE EACH
1.111111.11111
INREMOVE EXISTING STRUCTURE 1.0
®REMOVE STORM SEWER PIPE LESS THANEACH
36" 77.0
IMI
- 1111
61.0
TYPE E-1-C C INLET
74 TYPE E-2- EACH
C INLET 52.0 '•
®TYPE E-3-C INLETEACH
40.0a11111111111
0.0 ••
®76 TRENCH DRAIN EACH 11.0MIIIIaIIII
TYPE E- - all 64.0 1 C INLET, MODIFIED
78 TYPE E-2- EACH1.111111.1111111
INLET, MODIFIED 1.0
C
79 REM/REPL INLET BOXOUT EACH
1.0 ••
E-1-C EACH
80 REM/REPL INLET BOXOUT, 7.0 alliall.
E 2 C EACH
81 TAP AND COLLAR STRUCTURE OR PIPE 1.0
82 TAP EACH 14.0 gIIIIIMIII
AND COLLAR DRY RUN ARCH
INSULATE EXISTING COPPER WATER EACHallinalli
83 SERVICE 1.0
EACH
FORM OF BID 16.0
CONTRACT NO. 859
Page 4 of 10
EACH 2.0 $
FURNISH AND INSTALL MANHOLE RING AND
84 COVER EACH 2O4.0 $
STORM WATER
PROTECTION FOR
85 STRUCTURESEACH Mil
1.0 $
IN LINE CHECK ND INSTALL FOR 42" RCP,
86 011111111111111111111.
FURNISH
TOTAL BASE BID-SECTION II $
UNIT' EST., QTY. _' UNIT BI[ PRICE
BID DESCRIPTION ' •
ITEM BASE BID -SECTION III 300.4 $
$
R 24"
MINI
87 RECONSTRUCT SANITARY SEWER, ® 102.3$
88 RECONSTRUCT SANITARY SEWER, 21 1,110.4$
R 18"
111111111
89 RECONSTRUCT SANITARY SEWER, 11111111.1.
2,342.1 $
90 RECONSTRUCT SANITARY SEWER, 15 4,307.7 $
" 11111110. Mill
91 RECONSTRUCT SANITARY SEWER, 12 452.2$
" MI MUM
92 RECONSTRUCT SANITARY SEWER, 10 2 383.0 $ Will
93 RECONSTRUCT SANITARY
ACE SANITARY SEWER, 165.0$
REMOVE AN
D REP
IIIIIIII
94 8' 1111 4,983.0 $
95 SANITARY SEWER SERVICE, 6" MN.
EACH 31.0 $
96 STANDARD SANITARY MANHOLE, 48"
Mill MI
" EACH 2.0
97 STANDARD SANITARY DROP M NSAON LE TARP 37.0$
REMOVE EXISTING STRUCTURE, EACH
98 MANHOLE SIM
III/I
273.0
99 REMOVE SANITARY SEWER, 8"
EACH 1.0 "
100 TAP AND COLLAR DRY RUN ARCH 1.0$
EACH 5.0
EACH
1111111111
101 TAP AND COLLAR STRUCTURE OR PIPE EACH
FURNISH AND INSTALL MANHOLE RING AND
minim
102 COVER 20
103 TRACE SANITARY SEWER SERVICE 30.0
EACH
104 DYE TEST INVESTIGATION 8 0
EACH
105 UNDERGROUND INVESTIGATION-SANITARY Page 5 of 10
CONTRACT NO. 859
FORM OF BID
NTOTAL BASE BID-SECTION III
BID DESCRIPTION
UNIT EST.QTY.
UNIT BID PRICE TOTAL BID PRICE
ITEM BASE BID-SECTION IV
106 SAWING
107 SIDEWALK AND DRIVEWAY REMOVAL 80.0
rill REMOVE AND REPLACE MISC. 4.5" HMA
IMIIIIIIIIIIIIIIIIIIIIIIMIIII
108 OVER 6" PCC, IVI-4 34.3 all
ALLEY OR DRIVEWAY
109 6" PCC, C-4 APPROACH AND S/W
, ISM=
110 DRIVEWAY APPROACH 5"PCC, C-4
MI
®TAP 12.0MillMIN
AND COLLAR STORM MANHOLE
EACH
ISW511RECTANGULAR AREA INTAKE 1.0MIMI
EACH MIME
IMITYPE E-2-C INLET 1.0
114 STORM SEWER, 2000D, 12 EACH
1.0 '
1111
®FLARED 306.0 '
END SECTION, 2000D, 12"
IIIMIIII
116 CONSTRUCTION SURVEY EACH
1.0 a
llil
IEXCAVATION/GRADI
NG
MI
118 RECYLED ASPHALT PAVING 256.0 M
11.111.1111
119 TRAFFIC CONTROL TON 78.0
1111
TOTAL BASE BID-_ 1.0alle.111
SECTION IV
BID QESCRIPTION $
-
M, "
S
x ! OTAGRIDII
ITE BASE BID- EGT®Nf w :,
120 SIDEWALK
4" PCC,
MEMIN
IN
SIDEWALK 5" PCill C,
'
CC, C-4
IMO
®EXCAVATI 36.6 MIMI
ON FOR NEW SIDEWALK
IMIMEMNMIIII
11
TOTAL BASE BID-SECTION V
FORM OF BID
CONTRACT NO. 859
Page 6 of 10
TOTAL BASE BID—SECTIONS I, II, III, IV, V $
BID DESCRIPTION UNIT EST.QTY. UNIT BID F RICE TOTAL BID PRICE
ITEM ALTERNATE A
1A 2", HMA 1M S 1/2", 60% CR SY 22,016.0 $ $
2A 2 1/2", HMA 1M I 3/4", 60% CR SY 22,166.6 $ $
3A 3", HMA 1M B 3/4", 60% CR SY 22,166.6 $ $
4A 2", HMA 3M S 1/2", 75% CR SY 31,599.8 $ $
5A 4", HMA 3M I 3/4", 75% CR SY 21,663.4 $ $
6A 5 1/2", HMA 3M I 3/4", 75% CR SY 9,681.1 $ $
7A 3", HMA 3M B 3/4", 75% CR SY 31,344.5 $ $
CURB AND GUTTER, PCC, C-4, 24"WIDE, 7
8A 1/2" THICK LF 12,306.2 $ $
CURB AND GUTTER, PCC, C-4, 24"WIDE, 9"
9A THICK LF 13,708.7 $ $
CURB AND GUTTER, PCC, C-4, 24"WIDE,
10A 10.5"THICK LF 4,308.0 $ $
11A COLD WEATHER CONCRETE PROTECTION SY 3,209.1 $ $
12A LINSEED OIL TREATMENT SY 3,209.1 $ $
12A PAVEMENT SCARIFICATION SY 255.6 $ $
13A PAVEMENT SAMPLES AND TESTING LS 1.0 $ $
TOTAL BASE BID—ALTERNATE A $
- BID DESCRIPTION :x ` """ ri UNIT EST.QTY. UNIT BID RICE TOTAL BID PRICE
ITEM ALTERNATE B
1 B PCC PAVEMENT, 6", C-4 SY 25,399.9 $ $
$ $
2B PCC PAVEMENT, 7", C-4 SY 24,761.5
3B PCC PAVEMENT, 8", C-4 SY 10,744.1 $ $
4B COLD WEATHER CONCRETE PROTECTION SY 12,744.1 $ $
5B LINSEED OIL TREATMENT SY 12,744.1 $ $
FORM OF BID CONTRACT NO. 859 Page 7 of 10
6B 2", HMA 3M S 1/2°', 75% CR SY 255.6 $ $
7B PAVEMENT SCARIFICATION SY 255.6 $ $
8B SPEED HUMP, PER DETAIL LS 1.0 $ $
9B PAVEMENT SAMPLES AND TESTING LS 1.0 $ $
10B EXCAVATION CY 14,336.5 $ • $
TOTAL BASE BID-ALTERNATE B $
TOTAL BASE BID + ALTERNATE A $
TOTAL BASE BID + ALTERNATE B $
BID DIVISION �� UNIT EST.QTY. UNIT'BID TOTAL BID PRICE
ITEM PRICE
DESCRIPTION
BASE BID
DUCTILE IRON WATER MAIN, 6-INCH DIA.,
1 CLASS 52 LF 660.0 $ $
2 DUCTILE IRON WATER MAIN REMOVAL LF 660.0 $ $
3 GATE VALVE AND BOX, 6-INCH DIA. EACH 2.0 $ $
4 TEE, 6-INCH X 6-INCH DIA. EACH 1.0 $ $
5 SLEEVE, 6-INCH DIA. EACH 1.0 $ $
6 MEGALUGS, 6-INCH DIA. EACH 6.0 $ $
7 CONCRETE BLOCKING EACH 1.0 $ $
8 HYDRANT ASSEMBLY EACH 2.0 $ $
9 HYDRANT REMOVAL EACH 1.0 $ $
RECONNECT HYDRANT ASSEMBLY TO 6"X
10 6"TEE EACH 1.0 $ $
11 TEMPORARY PVC WATER MAIN LF 702.0 $ $
REMOVAL OF TEMPORARY PVC SURFACE
12 WATER MAIN CONNECTIONS TO DUCTILE EACH 1.0 $ $
IRON WATER MAIN
13 3/4" SHORT SIDE WATER SERVICES EACH 5.0 $ $
14 3/4°' LONG SIDE WATER SERVICES EACH 8.0 $ $
15 2" LONG SIDE WATER SERVICES EACH 1.0 $ $
FORM OF BID CONTRACT NO. 859 Page 8 of 10
DRIVE OVER PROTECTION FOR TEMPORARY
16 PVC WATER MAIN EACH 1.0 $ $
REMOVE INACTIVE PAVE BOX AND
17 ABANDON WATER SERVICE LINE STUB IN EACH 6.0 $ $
PLACE
TOTAL BID DIVISION II $
TOTAL BASE BID + ALTERNATE A + DIVISION II $
TOTAL BASE BID + ALTERNATE B + DIVISION II $
2. It is understood that the quantities set forth are approximate city and subject to
variation and that the unit bid price for the work done shall gc vern in the actual
payment to Contractor.
3. In submitting this bid, the bidder understands that the right is reserved by the City
of Waterloo, Iowa, to reject any or all bids. If written notice of the acceptance of
this bid is mailed, telegraphed, or delivered to the undersigne I within thirty (30)
days after the opening thereof, or at any time thereafter )efore this bid is
withdrawn, the undersigned agrees to execute and deliver an agreement in the
prescribed form and furnish the required bond and certificat€ of the insurance
within ten (10) days after the agreement is presented to him for signature, and
start work within ten (10) days after"Notice to Proceed" is issue .
4. Security in the sum of
Dollars ($ ) in the form of
is submitted herewith in accordance with the INSTRUCTIONS 10 BIDDERS.
5. Attached hereto is a Non-Collusion Affidavit of Prime Contractor
6. Attached hereto is a Resident Bidder Certification ( , or Non-Resident
Bidder Certification ( ). (Mark one.)
7. The bidder is prepared to submit a financial and experience statement upon
request.
8. The Prime Contractor and Subcontractor(s), which have performed an aggregate
of $10,000.00 in work for the City in the current calendar year, are prepared to
submit an AAP or Update and an EOC, within ten (10) days of notification that the
bid submitted is lowest and acceptable.
FORM OF BID CONTRACT NO. 859 Page 9 of 10
9. The bidder has received the following Addendum or Addenda:
Addendum No. Date
10. The bidder shall list the MBE/WBE subcontractor(s), amount of subcontracts and
bid items on the City of Waterloo Minority and/or Women Business Pre-bid
Contact Information Form submitted with this Form of Bid or Proposal. The
apparent low Bidder shall submit a list of all other Subcontractor(s) to be used on
this Project to the City of Waterloo by 5:00 p.m. the business day following the day
Bids on this Project are due along with the Non-Collusion Affidavits of All
Subcontractor(s).
The Contractor shall submit information on subcontractors on
"SUBCONTRACTOR REQUEST AND APPROVAL" Form to be provided by City
prior to approval of contract.
The subcontractors listed on this proposal and/or submitted to the Contract
Compliance Officer cannot be changed except for the following reasons:
1) The City of Waterloo does not approve the subcontractors.
2) The subcontractors submit in writing that they cannot fulfill their
subcontracts.
11. The bidder has filled in all blanks on this proposal. Those blanks not applicable
are marked "none" or"NA".
12. The bidder has attached all applicable forms.
13. The Owner reserves the right to select alternates, delete line items, and/or to
reduce quantities prior to the award of a contract due to budgetary limitations.
(Name of Bidder) (Date)
BY: Title
Official Address: (Including Zip Code):
I.R.S. No.
FORM OF BID CONTRACT NO. 859 Page 10 of 10
INFORMATION NEEDED
FOR
IOWA CONSTRUCTION SALES TAX EXEMPTION CERTIFICATE
CONTRACTOR NAME:
ADDRESS:
(Check One) PRIME SUBCONTRACTOR
FEDERAL ID#:
PROJECT NAME:
PROJECT CONTRACT NO.:
DESCRIPTION OF WORK:
❑ Brickwork ❑ Landscaping
❑ Carpentry ❑ Painting
❑ Concrete ❑ Paving
❑ Drywall-Plaster-Insulation ❑ Plumbing
❑ Electrical ❑ Roofing-Siding-Sheet Metal
❑ Excavation/Grading ❑ Windows
❑ Flooring ❑ Wrecking-Demolition
❑ Heavy Construction ❑ Other (Please specify)
❑ Heating-Ventilating-Air Cond
BID BOND
KNOW ALL MEN BY THESE PRESENTS,that we,
as Principal, and
as Surety are held and firmly bound unto the CITY OF WATERLOO , Iowa, hereinafter ca fed
"OWNER." In the penal sum
Dollars($ ) lawful money of the United States, for the payment
of which sum will and truly be made, we bind ourselves, our heirs, executors, administrators, and
successors, jointly and severally, firmly by these presents. The condition of this obligation is such that
whereas the Principal has submitted the accompanying bid dated the day of
, 20 ,for
NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate,
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the orm specified
and shall furnish a bond for his faithful performance of said contract, and for the payment Df all persons
performing labor or furnishing materials in connection therewith, and shall in all other respects perform the
agreement created by the acceptance of said Bid,
Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly
understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event,
exceed the penal amount of this obligation as herein stated.
By virtue of statutory authority,the full amount of this bid bond shall be forfeited to the Owner i liquidation of
damages sustained in the event that the Principal fails to execute the contract and providi the bond as
provided in the specifications or by law.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Suret,+and its bond
shall be in no way impaired or affected by any extension of the time within which the Own( r may accept
such Bid or execute such contract;and said Surety does hereby waive notice of any such exte ision.
IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and seals, and such
of them as are corporations, have caused their corporate seals to be hereto affixed and these presents to be
signed by their proper officers this day of ,A.D. 201
(Seal)
Principal
By
(Title)
(Seal)
Witness Surety
By
Witness Attorney-in-fact
NON-COLLUSION AFFIDAVIT OF PRIME BIDDER
State of
)ss
County of
, being first duly sworn, deposes and ays that:
1. He is (Owner, Partner, Officer, Representative, or Agent) , of
, the Bidder that has submitted the attached Bid;
2. He is fully informed respecting the preparation and contents of the attached I,id and of all
pertinent circumstances respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham Bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, rep esentatives,
employees, or parties in interest, including this affiant, has in any way colluded,
conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person
to submit a collusive or sham Bid in connection with the Contract for which the attached
Bid has been submitted or to refrain from bidding in connection with such Contract, or
has in any manner, directly or indirectly, sought by agreement or collusion or
communication or conference with any other Bidder, firm or person to fix the price or
prices in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost
element of the bid price or the bid price of any other Bidder, or to secure through any
collusion, conspiracy, connivance, or unlawful agreement any advantage against the City
of Waterloo, Iowa, or any person interested in the Proposed Contract; and
5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or
any of its agents, representatives, owners, employees, or parties in interest, including this
affiant.
(Signed)
Title
Subscribed and sworn to before me this day of
, 201_.
Title
My commission expires
NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR
State of
ss:
County of
, being first duly sworn, deposes and says
that:
1. He is (Owner, Partner, Officer, Representative, or Agent) , of
hereinafter referred to as the"Subcontractor;"
2. He is fully informed respecting the preparation and contents of the subcontractor's
proposal submitted by the subcontractor to
, contract pertaining to the
project in
•
(City or County and State)
3. Such subcontractor's proposal is genuine and is not a collusive or sham proposal;
4. Neither the subcontractor nor any of its officers, partners, owners, agents,
representatives, employees, or parties in interest, including this affiant, has in any way
colluded, conspired, connived, or agreed, directly or indirectly, with any other bidder, firm
or person to submit a collusive or sham proposal in connection with such contract or to
refrain from submitting a proposal in connection with such contract, or has in any manner,
directly or indirectly, sought by unlawful agreement or connivance with any other bidder,
firm or person to fix the price or prices in said subcontractor's proposal, or to fix any
overhead, profit or cost element of the price of prices in said subcontractor's proposal, or
to secure through collusion, conspiracy, connivance or unlawful agreement any
advantage against the City of Waterloo, Iowa, or any person interested in the proposed
contract; and
5. The price or prices quoted in the subcontractor's proposal are fair and proper and are not
tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the
bidder or any of its agents, representatives, owners, employees, or parties in interest,
including this affiant.
(Signed)
Title
Subscribed and sworn to before me this day of
, 201 .
Title
My commission expires
EQUAL OPPORTUNITY CLAUSE
(As provided in Executive Order No. 11246)
All contractors, subcontractors, vendors and suppliers of goods and services
doing business with the City and value of said business equals or e(ceeds ten
thousand dollars ($10,000.00) annually agree as follows:
1. The contractors, subcontractor, vendor and supplier of goods and services
will not discriminate against any employee or applicant for employment
because of race, color, creed, sex, national origin, economic status, age,
mental or physical handicap, political opinions or affiliations. The
contractor, subcontractor, vendor and supplier will develop an Affirmative
Action program to ensure that applicants are employed and that
employees are treated during employment without regard to their race,
creed, color, sex, national origin, religion, economic status, agE mental or
physical disability, political opinions or affiliations. Such actions shall
include but not be limited to the following:
a. Employment
b. Upgrading
c. Demotion or Transfer
d. Recruitment and Advertising
e. Layoff or Termination
f. Rates of Pay or Other Forms of Compensation
g. Selection for Training Including Apprenticeship
2. The contractor, subcontractor, vendor and supplier of goods a id services
will, in all solicitations or advertisements for employees, state that all
qualified applicants will receive consideration for employment without
regard to race, creed, color, sex, national origin, religion, economic status,
age, mental or physical disabilities, political opinion or affiliations.
3. The contractor, subcontractor, vendor and supplier or his/her collective
bargaining representative will send to each labor union or representative
of workers which he/she has a collective bargaining agreement or other
contract or understanding, a notice advising said labor union or workers'
representative of the contractor's commitment under this section.
4. The contractor, subcontractor, vendor and supplier of goods and services
will comply with all published rules, regulations, directives, and order of
the City of Waterloo Affirmative Action Program Contract Compliance
Provisions.
EQUAL OPPORTUNITY CLAUSE PAGE 1 OF 2 PAGES
5. The contractor, subcontractor, vendor and supplier of goods and services
will furnish and file compliance reports within such time and upon such
forms as provided by the Affirmative Action Officer. Said forms will elicit
information as to the policies, procedures, patterns, and practices of each
subcontractor as well as the contractor himself/herself and said contractor,
subcontractor, vendor and supplier will permit access to his/her
employment books, records and accounts to the City's Affirmative Action
Officer, for the purpose of investigation to ascertain compliance with this
contract and with rules and regulations of the City's Affirmative Action
Program—Contract Compliance Provisions relative to Resolution No.
24664.
6. In the event of the contractor's non-compliance with the non-discrimination
clauses of this contract or with any of such rules, regulations and orders,
this contract may be canceled, terminated or suspended in whole or in
part and the contractor may be declared ineligible for further contracts in
accordance with procedures authorized by the City Council.
7. The contractor, subcontractor, vendor and supplier of goods and services
will include, or incorporate by reference, the provisions of the non-
discrimination clause in every contract, subcontract or purchase order
unless exempted by the rules, regulations or orders of the City's
Affirmative Action Program, and will provide in every subcontract, or
purchase order that said provisions will be binding upon each contractor,
subcontractor, or supplier.
8. We, the undersigned, recognize that we are morally and legally committed
to non-discrimination in employment. Any person who applies for
employment with our company will not be discriminated against because
of race, creed, color, sex, national origin, economic status, age, mental or
physical disabilities.
(Signed)
(Appropriate Official)
(Title)
(Date)
EQUAL OPPORTUNITY CLAUSE PAGE 2 OF 2 PAGES
TITLE VI CIVIL RIGHTS
During the performance of this contract, the contractor (for itself), its assignees, and
successors in interest (hereinafter referred to as the "contractor") agrees as follows:
1. Compliance with Regulations: The contractor shall comply with the F egulations
relative to non-discrimination in Federally assisted programs of the D )T Title 49,
Code of Federal Regulations, Part 21, as they may be amended from time to
time, (hereinafter referred to as the Regulations), which are herein ini,orporated
by reference and made a part of this contract.
2. Nondiscrimination: The contractor, with regard to the work performed by it during
the contract, shall not discriminate on the grounds of race, color, national origin,
sex, age, or disability in the selection and retention of subcontractors including
procurement of materials and leases of equipment. The contractor shall not
participate either directly or indirectly in the discrimination prohibited by section
21.5 of the Regulations, including employment practices when the contract
covers a program set forth in Appendix B of the Regulations.
3. Solicitations for Subcontracts, Including Procurement of Materials and
Equipment: In all solicitations either by competitive bidding or negotiation made
by the contractor for work to be performed under a subcontract, including
procurement of materials or leases of equipment, each potential subcontractor or
supplier shall be notified by the contractor of the contractor's obligations under
this contract and the Regulations relative to non-discrimination on the grounds of
race, color, national origin, sex, age, or disability.
4. Information and Reports: The contractor shall provide all information and reports
required by the Regulations or directives issued pursuant there to, and shall
allow access to its books, records, accounts, other sources of information, and its
facilities as may be determined by the Contracting Authority, the Iowa DOT, or
FHWA to be pertinent to ascertain compliance with such Regulations orders and
instructions. Where any information required of a contractor is in the exclusive
possession of another who fails or refuses to furnish this information he
contractor shall so certify to the Contracting Authority, the Iowa DOT, or the
FHWA as appropriate, and shall set forth what efforts it has made to 7btain the
information.
5. Sanctions for Noncompliance: In the event of the contractor's noncompliance
with the nondiscrimination provisions of this contract, the Contracting Authority,
the Iowa DOT, or the FHWA shall impose such contract sanctions as they may
determine to be appropriate, including, but not limited to:
a. Withholding of payments to the contractor under the contract i ntil the
contractor complies, and/or
b. Cancellation, termination, or suspension of the contract, in whole or in
part.
6. Incorporation of Provisions: The contractor shall include the provisions of
paragraphs (1) through (6) in every subcontract, including procurement of
materials and leases of equipment, unless exempt by the Regulations, or
directives issued pursuant thereto. The contractor shall take such action with
respect to any subcontract or procurement as the Contracting Authority, the Iowa
DOT, or the FHWA may direct as a means of enforcing such provisions including
sanctions for non-compliance: Provided, however, that, in the event of a
contractor becomes involved in, or it threatened with, litigation with a
subcontractor or supplier as a result of such direction, the contractor may request
the Contracting Authority or the Iowa DOT to enter into such litigation to protect
the interests of the Contracting Authority or the Iowa DOT; and, in addition, the
contractor may request the United States to enter into such litigation to protect
the interest of the United States.
RESIDENT/NON-RESIDENT BIDDER
RESIDENT BIDDER:
In accordance with Section 73A.21 of the Iowa Code, all non-federal-aid public
improvement projects, which include road construction, shall be performed by a
qualified resident bidder. The resident bidder has been further defined as follows:
Resident Bidder:
A person or entity authorized to transact business in this state E nd
having a business for at least three years prior to the date of he
first advertisement for the public improvement. If another state or
foreign country has a more stringent definition of a resident bidcar,
the more stringent definition is applicable as to bidders from t iat
state or foreign country.
The contractor shall provide the City with a certification that he is a qualified
resident bidder according to the above definition. The Certification shall be
submitted with the contractor's bid. A copy of the form of "Resident Bidder
Certification" is included in the Contract Documents. If it is determined that the
contractor does not meet this qualification after he begins work, a shutdown
notice shall be issued and the voiding of the contract shall begin unless the
contractor becomes qualified.
NON-RESIDENT BIDDER:
The contractor shall provide the City with a certification that he is a non-resident
bidder according to the above definition. The Certification shall be submitted with
the contractor's bid. A copy of the form of "Non-Resident Bidder Certification" is
included in the Contract Documents.
DJG
01/02/12
RESIDENT BIDDER CERTIFICATION
CONTRACT NO:
PROJECT NAME:
DATE OF LETTING:
To be a qualified resident bidder, the bidder shall be a person or
entity authorized to transact business in this state and having a
business for at least three years prior to the date of the first
advertisement for the public improvement. If another state or
foreign country has a more stringent definition of a resident bidder,
the more stringent definition is applicable as to bidders from that
state or foreign country.
This qualification as resident bidder shall be maintained by the contractor and his
subcontractors at the work site until this project is completed.
I hereby certify that I am a resident bidder as defined above.
COMPANY NAME
CORPORATE OFFICER
TITLE
DATE
NON-RESIDENT BIDDER CERTIFICATION
CONTRACT NO.:
PROJECT NAME:
DATE OF LETTING:
I hereby certify that I am an Iowa non-resident bidder.
COMPANY NAME:
CORPORATE OFFICER:
TITLE:
DATE:
STATE/COUNTRY OF RESIDENCY:
Stated below are the preference(s) to resident bidders in the state/country of
(Preference to bidders, labor force, or other preferential treatment to bidden or laborers, etc.
Revised February 2)03
CONTRACTOR'S OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM
Check box that applies to party completing program:
( ) General Contractor
( ) Subcontractor
I. Section A to be completed by GENERAL CONTRACTORS only:
A.
Name of Company
Address of Company Zip
Telephone Number ( )
Federal ID Number (if no Federal ID Number, Owner/President's Sc cial
Security Number)
Name of Equal Employment Officer
Name of Project
Project Contract Number
Estimated Construction Work Dates /
Start Finish
Section B to be completed by SUBCONTRACTORS only:
B.
Name of General or Prime Contractor
Name of Subcontractor
Subcontractor's Address Zip
Subcontractor's Telephone Number ( )
Subcontractor's Federal ID Number (if no Federal ID Number
Owner/President's Social Security Number)
Name of Equal Employment Officer
- 1 -
C. Remainder of program to be completed by party completing program,
either Prime or Subcontractor.
1. The Owners and/or Principals of your company:
Ethnic
Name Address Position Sex Origin
2. Other Areas of Interest:
If your company has branches or subsidiaries, or if your company is a
branch or subsidiary of a parent organization, give the following
information:
Type of
Name Address Affiliation Degree
II. EMPLOYER'S POLICY (Please read carefully.)
A. We, the undersigned, recognize that we are morally and legally
committed to nondiscrimination in employment. Any person who
applies for employment with our company will not be discriminated
against because of race, color, creed, sex, national origin, economic
status, age, mental or physical handicap.
B. The employment policies and practices of the undersigned are to recruit
and hire employees without discrimination, and to treat them equally
with respect to compensation and opportunities for advancement,
including training, upgrading, promotion, and transfer. However, we
realize the inequities associated with employment training, upgrading,
contracting and subcontracting for minorities and women and we will
direct our efforts to correcting any deficiencies to the maximum extent
possible. The same will be required of our SUBCONTRACTORS and
suppliers.
C. We submit this program to assure compliance with Executive Order
11246, as amended, and other subsequent orders that may pertain to
equal employment opportunity and merit employment policies, fully
- 2 -
realizing that our qualification and/or merit system should bE evaluated
and revised, if necessary.
D. We agree to put forth the maximum effort to achieve full employment
and utilization of capabilities and productivity of all our citizens without
regard to race, creed, color, sex, national origin, economic status, age,
and mental or physical handicap.
E. will give trair ing
(Name of Company)
and employment opportunities to local residents of Watery'o, Iowa, to
the greatest extent feasible.
III. AFFIRMATIVE ACTION
A. recognizes that the
(Name of Company)
effective application of a policy of merit employment involve 3 more than
just a policy statement, and
(Name of Company)
will, therefore, re-evaluate our Affirmative Action Program to ensure that
equal employment opportunities are available on the basis of individual
merit, and to actively encourage minorities, women and lor.al residents
to seek employment with our company on this basis.
B. will undertak the
(Name of Company)
following six (6) steps to improve our Affirmative Action Pro jram:
1. Minority Recruitment and Employment;
2. Local Recruitment and Employment;
3. Disabled Veteran and Vietnam Era Veteran Rea uitment and
Employment;
4. Handicapped Recruitment and Employment;
5. Female Recruitment and Employment; and
6. Training, Upgrading and Promotional Opportunities.
C. will take
(Name of Company)
whatever steps are necessary to ensure that our total wHrk force has
adequate minority, female, and local representation. We vill utilize the
following methods in our recruitment attempts:
1. Local advertising media (newspapers, radio, TV);
2. Community organizations (churches, clubs, schools ;
3. Public and private institutions in the area (U"Jl, Hawkeye
Community College);
4. Job Service of Iowa; and
5. Other.
- 3 -
D. will seek qualified minority,
(Name of Company)
female, and local group applicants for all job categories and will make
asserted efforts to increase minority, female and group representation
in occupations at the higher levels or skill and responsibility.
E. All sources of employment used shall be aware that we are an Equal
Employment Opportunity Employer. Labor organizations representing
our employees will be notified of our Equal Employment Opportunity
Policy and Affirmative Action Program.
F. Training, upgrading, promotion and transfer activities at all levels will be
monitored to ensure that full consideration has been given to qualified
minority, female, and local group employees.
G. will encourage other
(Name of Company)
companies with whom we are associated and/or do business, to do the
same and we will assist them in their efforts.
H. has taken the following
(Name of Company)
Affirmative Action to ensure that minority, female, local contractors
and/or suppliers were provided opportunities to negotiate and/or bid on
this project: (if none, write "NONE")
1.
2.
As a result of the above efforts, we have involved minority, female, and
local contractors and/or suppliers in the following areas of
subcontracting: (if none, write "NONE")
1.
2.
J. will require approved
(Name of Company)
Affirmative Action Programs from all nonexempt contractors who
propose to work on this project and will take whatever steps are
necessary to ensure that non-minority contractors have adequate
representation of minority, female and local persons in their total work
force.
-4 -
K. In further accordance with rules and guidelines issued )ursuant to
Executive Order 11246 as amended, we establish the goals for our
company, based on parity percentages supplied by the C ty, and we
realize these goals will be reviewed on an annual basis.
L. will keep records of
(Name of Company)
specific actions relative to recruitment, employment, training, upgrading
and promotion and will provide the City of Waterloo with any information
relative to same, including activities of our SUBCONTRACTORS and
suppliers as necessary or when requested.
M. Parity figures for companies located in Waterloo are as folio,vs:
Minority Parity = .08 (8%)
N. Affirmative Ac tion
(Name of Company)
Employment Goals:
The definition of Affirmative Action Goals is as follows: "GI 3als may not
be rigid and inflexible quotas which must be met, but must be targets,
reasonably attainable by means of applying every good faith effort to
make all aspects of the entire Affirmative Action Program work."
For the year 201_, please submit percentage targets for employing
minorities and women. If you already have reached your target for
hiring minorities and women, please submit that percentage.
*Goals for Minorities:
Goals for Women:
*Your affirmative action goals should be between 1% and 10% or more
for minorities and 1% and 5% or more for women.
Please be advised that the goals or targets are purely yo Jr estimation
of how many women and minorities your company car reasonably
expect to hire in 201_. Note, that none of the goals are rigid or
inflexible. They are targets that your company calculates E s reasonably
attainable. This will help the City in its monitoring procedures as
required by City of Waterloo Resolution No. 1984-142(4).
- 5 -
CONTRACTOR'S TOTAL WORK FORCE
(WATERLOO)
HOURLY
NAME AND ADDRESS JOB CATEGORY RACE SEX WAGE
INDICATE: DISABLED VETERAN: DV
VIETNAM ERA VETERAN: VV
- 6 -
HANDICAPPED: H
We hereby certify that we are in compliance with all City and Federal
Affirmative Action Regulations and agree to accept all liability for f tilure to
comply.
Respectfully submitted,
By:
Company Executive
Date
By:
Equal Employment
Opportunity Officer
Date
City of Waterloo Affirmative Action Officer
Approved
Disapproved Reason:
- 7 -
DESCRIPTION OF JOB CATEGORIES
1. Officials/Manager: Occupations in which employees set bro id policies,
exercise overall responsibility for execution of all policies, or dire individual
departments or special phases of the agency's operations or provide
specialized consultation on a regional, district or area basis. Includes:
department heads, bureau chiefs, division chiefs, directors, deputy directors,
controllers, examiners, wardens, superintendents, unit supervisors, sheriffs,
police and fire chiefs and inspectors and kindred workers.
2. Professionals: Occupations which require specialized and theoretical
knowledge which is usually required through college training or thorough work
experience and other training which provides comparable knowledge.
Includes: personnel and labor relations workers, social workers, doctors,
psychologists, registered nurses, economists, dietitians, lawyers, system
analysts, accountants, engineers, employment and vocational rehabilitation
counselors, teachers or instructors, police and fire captains and lieutenants
and kindred workers.
3. Technicians: Occupations which require a combination of basic scientific or
technical knowledge and manual skill which can be obtair ed through
specialized post-secondary school education and through equivr=lent on-the-
job training. Includes: computer programmers and operations draftsmen,
surveyors, licensed practical nurses, photographs, radio operate-s, technical
illustrators, police and fire sergeants and kindred workers.
4. Office/Clerical: Workers are responsible for internal and external
communication, recording and retrieval of data and/or information and other
paper work required in an office. Includes: bookkeepers, messengers, office
machine operators, clerk-typists, stenographers, court transcribers, hearing
reporters, statistical clerks, dispatchers, license distributors, payroll clerks and
kindred workers.
5. Skilled Craft Workers: Workers perform jobs which require sp manual
skill and a thorough and comprehensive knowledge of the processes involved
in the work which is acquired through on-the-job training programs. Includes:
Mechanics and repairman, electricians, heavy equipment operators, stationary
engineers, skilled machine occupations, carpenters, compositors and
typesetters and kindred workers.
6. Sales Workers: Occupations engaging wholly and primarily in direct selling.
Includes: advertising agents and salesman, insurance agents and brokers,
real estate agents and brokers, stock and bond salesmen, demonstrators,
salesmen and sales clerks, grocery clerks and cashier checkers and kindred
workers.
7. Operatives (semi-skilled): Workers who operate machine c' processing
equipment or perform other factory-type duties of intermediate sk II level which
- 9 -
can be mastered in a few weeks and require only limited training. Includes:
apprentices (auto mechanics), plumbers, building trades, metal working
trades, bricklayers, carpenters, electricians, machinists, mechanics, printing
trades, etc., operatives, attendants (auto service and parking), plasterers,
chauffeurs, deliverymen and furnacemen, heaters (metal), laundry and dry
cleaning operatives, milliners, mine operatives and laborers, motormen, oilers
and greasers, (except auto painters), (except construction and maintenance),
photographic process workers, stationary fireman, truck and tractor drivers,
weavers, (textile), welders and flame cutters and kindred workers.
8. Laborers (unskilled): Workers in manual occupations which generally
require no special training. Perform elementary duties that may be learned in
few days and require the application of little or no independent judgment.
Includes: garage laborers, car washers and greasers, gardeners (except
farm) and groundskeepers, longshoremen, and stevedores, lumbermen,
raftsmen and woodchoppers, laborers performing lifing, digging, mixing,
loading and pulling operations and kindred workers.
9. Apprentices: Persons employed in a program including work training and
related instruction to learn a trade or craft which is traditionally an
apprenticeship, regardless of whether the program is registered with a Federal
or State agency.
10. Trainees (on-the-job): Production. . . persons in formal training for craftsmen
when not trained under apprentice programs--operative laborer, and service
occupations.
White Collar. . . persons engaged in formal training for clerical, managerial,
professional, technical, sales, office and clerical occupations.
- 10 -
ITEMS OF POTENTIAL MBE/WBE PARTICIPATION
NOTICE TO PROSPECTIVE BIDDERS:
The following are items from the F.Y. 2014 STREET RECONSTRUCTION PROGRAM,
Contract No. 859, that have a potential for MBE/WBE Participation. This listing,
however, is not intended to be all encompassing; to preclude MBE/WBE Contractors
from bidding on any items of the Proposal as a Subcontractor or the entire Proposal as
a Prime Contractor.
BID TOTAL
ITEM DESCRIPTION JNIT QTY
DIVISION I BASE BID -SECTION I
2 MISC. PCC, 9", C-4 SY 190.0
9 DRIVEWAY APPROACH AND S/W, 6" PCC, C-4 SY 956.9
10 DRIVEWAY APPROACH AND S/W, 5" PCC, C-4 SY 3,524.7
11 SIDEWALK, 4" PCC, C-4 SY 725.2
12 PEDESTRIAN RAMP, PCC SIDEWALK, 6" PCC, C-4 SY 929.0
13 PEDESTRIAN RAMP DETECTABLE WARNING SURFACE SF 1,478.0
14 SIDEWALK CURB SECTION LF 315.9
15 MISCELLANEOUS CONCRETE CY 1.6
19 SIDEWALK REMOVAL SY 721.8
20 SAW CUT LF 2,794.0
25 ROADSTONE, 3/4" "ON 117.0
26 DRAIN TILE, 6" LF 30,981.0
27 DRAIN TILE, 4" LF 1,500.0
28 DRAIN TILE STUB, 4" LF 1,645.0
29 DRAIN TILE TAP AND COLLAR EACH 21.0
30 RF-19C, INLET OUTLET DETAIL (RODENT GUARD) EACH 138.0
31 CONVERT WATER VALVE MANHOLE TO ROADBOX EACH 27.0
DIVISION I BASE BID -SECTION II
61 STORM SEWER, 2000D, 42" LF 2,667.2
62 STORM SEWER, 2000D, 36" LF 1,159.0
63 STORM SEWER, 2000D, 24" LF 363.2
64 STORM SEWER, 2000D, 18" LF 1,152.2
65 STORM SEWER, 2000D, 15" LF 596.9
66 STORM SEWER, 2000D, 12" LF 2,568.6
67 STORM MANHOLE, TYPE A, 48" E ACH 38.0
68 STORM MANHOLE, TYPE A, 60" E ACH 5.0
69 SW-402 RECTANGULAR STORM MANHOLE E ACH 19.0
70 SW-403 RECTANGULAR STORM MANHOLE EACH 1.0
71 REMOVE EXISTING STRUCTURE EACH 77.0
72 REMOVE STORM SEWER PIPE LESS THAN 36" LF 61.0
73 TYPE E-1-C INLET EACH 52.0
74 TYPE E-2-C INLET E ACH 40.0
75 TYPE E-3-C INLET EACH 11.0
76 TRENCH DRAIN LF 64.0
77 TYPE E-1-C INLET, MODIFIED EACH 1.0
78 TYPE E-2-C INLET, MODIFIED EACH 1.0
79 REM/REPL INLET BOXOUT, E-1-C EACH 7.0
80 REM/REPL INLET BOXOUT, E-2-C EACH 1.0
81 TAP AND COLLAR STRUCTURE OR PIPE EACH 14.0
82 TAP AND COLLAR DRY RUN ARCH EACH 1.0
83 INSULATE EXISTING COPPER WATER SERVICE EACH 16.0
84 FURNISH AND INSTALL MANHOLE RING AND COVER EACH 2.0
85 STORM WATER PROTECTION FOR STRUCTURES EACH 204.0
86 IN LINE CHECK VALVE FOR 42" RCP, FURNISH AND INSTALL EACH 1.0
DIVISION I BASE BID -SECTION IV 1
106 SAWING LF 80.0
107 SIDEWALK AND DRIVEWAY REMOVAL SY 34.3
108 REMOVE AND REPLACE MISC. 4.5" HMA OVER 6" PCC, M-4 SY 55.1
109 ALLEY OR DRIVEWAY APPROACH AND S/W, 6" PCC, C-4 SY 22.3
110 DRIVEWAY APPROACH 5" PCC, C-4 SY 12.0
111 TAP AND COLLAR STORM MANHOLE EACH 1.0
112 SW-511 RECTANGULAR AREA INTAKE EACH 1.0
113 TYPE E-2-C INLET EACH 1.0
114 STORM SEWER, 2000D, 12" LF 306.0
115 FLARED END SECTION, 2000D, 12" EACH 1.0
DIVISION I BASE BID -SECTION V
120 SIDEWALK, 4" PCC, C-4 SY 316.5
121 SIDEWALK, 5" PCC, C-4 SY 36.6
122 EXCAVATION FOR NEW SIDEWALK SY 353.1
DIVISION II-WATER MAIN
1 DUCTILE IRON WATER MAIN, 6-INCH DIA., CLASS 52 LF 660.0
2 DUCTILE IRON WATER MAIN REMOVAL LF 660.0
3 GATE VALVE AND BOX, 6-INCH DIA. EACH 2.0
4 TEE, 6-INCH X 6-INCH DIA. EACH 1.0
5 SLEEVE, 6-INCH DIA. EACH 1.0
6 MEGALUGS, 6-INCH DIA. EACH 6.0
7 CONCRETE BLOCKING EACH 1.0
8 HYDRANT ASSEMBLY EACH 2.0
9 HYDRANT REMOVAL EACH 1.0
10 RECONNECT HYDRANT ASSEMBLY TO 6"X 6"TEE EACH 1.0
11 TEMPORARY PVC WATER MAIN LF 702.0
REMOVAL OF TEMPORARY PVC SURFACE WATER MAIN
12 EACH 1.0
CONNECTIONS TO DUCTILE IRON WATER MAIN
13 3/4" SHORT SIDE WATER SERVICES EACH 5.0
14 3/4" LONG SIDE WATER SERVICES EACH 8.0
15 2" LONG SIDE WATER SERVICES EACH 1.0
16 DRIVE OVER PROTECTION FOR TEMPORARY PVC WATER MAIN EACH 1.0
17 REMOVE INACTIVE PAVE BOX AND ABANDON WATER SERVICE EACH 6.0
LINE STUB IN PLACE
MBE/WBE GOALS FOR THIS PROJECT
IMPORTANT: Prime Contract Bidders should be aware that ten pE rcent (10%) MBE
goal and a two percent (2%) WBE goal is attached to this project. "Certified Return
Receipt" letters are no longer needed with the bid showing proof of ( ontacting MBE or
WBE Subcontractors, but the Pre-Bid Contact Information Form r lust be filled out
completely.
City of Waterloo Contract Compliance Officer:
Contract Compliance Officer
Community Development Board
Carnegie Annex, Suite 202
620 Mulberry Street
Waterloo, IA 50703
Phone: (319) 291-4429
SUBCONTRACTOR'S BID REQUEST FORM
PRIME BIDDER'S LETTERHEAD
Contract No.:
Letting Date:
I, (subcontractor's name), hereby attest that I have been solicited for a I id on
(project name) in the area of (description of work and bid item no.).
(Prime contractor) has informed me that if I am interested in bidding, a
subcontracting bid proposal must be submitted to the company office b). (date)
and (time).
Subcontractor's Compa iy Name
Date Subcontractor's Signati re
Date Prime Bidder's Signatui
LETTER TO BE USED WHEN SOLICITING FOR
SUBCONTRACTOR QUOTES
Subcontractor Company Name
Address
RE: Contract No.:
Dear •
(Prime Contractor's Company Name) is presently soliciting for the following work
in connection with the above referenced project.
(Insert bid Item Nos. and Description of Work)
(Prime Contractor's Company Name) is an Equal Opportunity Employer, and all
qualified bidders will not be discriminated against due to race, religion, color, sex,
or origin.
If interested in bidding your proposal must be turned in to this office by
and
(Date) (Time)
Sincerely,
(Prime Contractor's Representative)
Form CCO- 3 (11/28/2001)
LETTER OF INTENT TO BID
(MBE/WBE LETTER)
According to the Current MBE/WBE Contract Compliance Program - 2002, all
MBE/WBE Contractors interested in submitting subcontractor quotes on
construction projects with goals, MUST submit a LETTER OF INTENT TO BID to
the City of Waterloo Contract Compliance Officer at least seven (7) days prior to
bid opening.
The LETTER OF INTENT TO BID must list the specific items which the
MBE/WBE Contractor is interested in bidding.
Letter should include the following:
Name of Project: _
Your Company Name:
Address:
Phone: Date:
List of Specific items to be bid:
Item No. Description:
Item No. Description:
Item No. Description:
Item No. Description:
Item No. Description:
(Subcontractor's Company Name and authorized signature)
Return this LETTER OF INTENT TO BID to:
Contract Compliance Officer
Community Development Board
620 Mulberry St.
Carnegie Annex, Suite 202
Waterloo, IA 50703
Phone: (319) 291-4429
Form CCO-5 (06-20-2002)
E 3
lo
a o c U) O ao
'LE U) o a) � -�
.c) o � ') c L. a) o y
as a) iii
U J0 O 0- m ,--
a) > it Lam,
co S o C W 0 O •-. a o
m w ..c0 o
§ _ E c w Q) U v, o 4
N N O .O m c
c z
n C U N ='
CI c N a) _' ` •O- U O,
a)a o E a) w eC .m. �
N Q) a > >, O C O C G
Z'
a) � o rn U orn
c "
c U
J Q) _ •a U •� .0 a a) _ d
2a) a.a) o ff ;
a) 0
NQ o � u) E o a) o 0
EAU E m
co
b
3 > �, ooN Lo W �
i co c LL U Y 3 +J E._ C.)
N Ce° o ° cn -a CO "C p., O
E o n . 12o /) a) Q
WQ ° o 22o oc -, aa)i _c � Z
L.L. o o a c .o n ' W O
0Z nsa a) - oia �. c a "�
L. a) N '� U U a) V
n' Q o -ate ` co O 0W v
Wh c6 °o cLi t 11.J FA ~ o > o am mV) � �
I- Q C ° O C o E O C7 A �"
p o
W � � m � .� ma�i 15 (13 E ZI cu
U
U WZ omg (a nu)� wYOo � a = Z
a 13 co WZ " a) D oo
oj > aZ N cn 0 d WO , ) o
HCO a) a)n -
OWc
o ,> a) w-
m o > to
•canF- Za 04
fl LN O 6) cn `O q WZ c
(,) -E-3,,
p "- N c c a) a) c Cr)
m Qcz O a d• Q O C U G =
U c)� c CO co � � W m
w � � '3 BEN °) ►�- � °) `�) O (14
CO CO Ha) Vita) a) - cac) Z LI- in v co
zcau CT Cwad) .- Na) coca. u- A o
a P c .E Was O W
( o 2 0 o - Q my W m
O v) N -J
>, N = N V n -o E W p m
~_ (13 } 0 C o .Q w m ' a
3
0 1—
ce O m con E � ''� a)
( o — .c
U 8 aWU o - m c9L
E `—' m �.o2a> - 3
F- 2 a c o a) -���, v c — o _
o o c
o
O T c � U o E � 0) E c � N
Q)
Z m 3 E O 0 -0 - o0) -0 m Pa ov >
O co O c V N 03 N v "Q a)
CC
v W u p) O c .- +-' C
(6 m t0 fn J L 5O
— c E F" J "O 6 = a C
„AL e4,a o W 0 o a ZQ _ � u°)) 2) c°)i > � �U
c�T��'1� 1 3 o U m (6 U O u) a) c. co a a) a) U
r'��� t 11 a) a) o m '3 0 c° 0 o in Y E
a. Z a) a 0 (/) o) cn >- W "- co _ E
�O c U D
o02
E a)
.r - u) L w u)
c a) U U_E .c o _a O z CO
—
U O - (n o
' E c0 >. a) a uoi c O O O O
p L U
U O QO N � N (p O W C p
Q.
a) W O .O .-. c W m QCj O U) Q
LC
° p ui o � W c U O Z � 70 E U L cn
a) a.) u, m Lw U O W U z Ev= >, c
C N U Zm a) m C O O W c0 .
p a) c L c iii p •E Q c 2 r 'a D U �W
a N O p a)
m W a) fY a) 3 ) c m
c -.° 2 L m te.-. O U m m p
O W v� o Z O - c c o ° g 3
0 7 co O JD 0 p N a) (a c N L a� m
-� CO L.L. >, a) a) L a) -t as
u) U C n a)as - c
Z v°)ico
m00 U E o C c E H o O o 0as o Q _ o ac) -0
oa ` ° Q CO U L >' .. > c
u> Q in CON p Z N voi O ° _c Q) CO
` cCOoY _ O1 a_a)) v°i L 0 Lc N yN
N2N � � � o o 0 O 'er � � o o � Eo � �
p ID y o a) E E � N a -I az
�, W •A m '3 3a L ,-. .c u) m O p c o co OL LE
u) p p - m i C O u) U_
— WCO � o U C C a) O CO W CO O N a) c E Q a
L
_ O N U o a)
Z W la a7U EO .0 - c a. La o (i) ° O OQNc "
W ° O (n co
�' mou) o � , � � U 3 � Ep w co - c .n
d2 2 .� oU � � �' p W3 vc m -6 � a'.� oL-
— W0 �_ a2 C �CT 03 ea aci 2aa)) aa)i0 3 a w °6m ) c�n -(12'' ))
ZLL oa) c° � BEN ac) U ac) �` w Wm oC W �' Noo
L L D u) O EL
WZ : cuct wao � mcca Z m c`um � � � >_ �
C c Z -8 c U >> c > W m N U a) - s o a) o
N o 0 o O u) o ° W c a) °' � w "_ a. o a)
_ (I) I.- gUo .0 HLE > t, m :aE o (Un _ a) mmaL) m CO 302 c
WQ .' .- • Q o C > � w E - 2 > c a) w :o c
z 2 a)) c COcn 2iu •-' cooa) E z_ o o coo o U Q o o �
— mLl- a) E ,_ rn u- oc Eooa) .c m � � � � � •� cn > Qo � � o
o Z c a) ioc c E w o L 3 o c o a) c 0. VI... 2
W m U _O C C a) o N
CO d N ~ (a a) - N C a) a) o a ° ` U o L• . U >''�' �' C
~ Y N• O V' U a) c v' ° a) N a) a) () O O = 0) p
Q � coa v� o la- d � E . `CO E o w ° � � � � � c o CO ? � 0)O � °
WF- •. � E m ) 2 moo ap ° ca a) pcopo
m Z o v � o � U c c rnw E N at)) o a) v '- o U C
L U a) o fy0 p •= o p N z V) CO `- U 3 c ° c Cr
� � c ° Y o Dorn c w ° � ° a) 0 3
U U N '� � m a co U ate) U N >, 00 N o 02 O � Lo c E cu Nip a0 •U
CI
OoC 7:3O U) C t N Q a) U Q U 5 �c ;o 9 ` a .c_ O c U N
�- C 00 5 d N N c w -a a) E .� U -0 cr a) u) ° O E Q j U N O
oO0) c a) 0 0 o_ u) L o U
W io U W a v) o . a) N U E >, m O E o o cn v) o n
7 U O .O
d p) O N CO O O Z c°) .N E ° a N O = u)
tl) c C O p W co L O C N .a -0 U > N a-. = O C = 0 U U
c E 3 � U °� o v) a 3 .) > (Ks 'a)-- EV •3 � ate) O •3 iri o0 :.- U
o o U p .0 .- E o - U n w a) 0- L m O o >
as
- c c E ° z '- �' m U c co m o o c N > O 0' Z u) Jo o a) L)'92 ° = ct ° Q
p p a) W O a) O O N U a) +- .� V) C ,. ° p C J
o rncca c Uw o m ° 0 ,cam_° U :o_ U 3 a0 0 c° ° o CO u) o .a ,_ v -a C)
E m U1 c -. � a) C a) w '• aa)) uu)i � a) a) cU o � c cn a) 6 c Qa a) p c)
U =aoc2 W ° .a pc ,- mc° Ea) cu' u' w0U coU O E �� c c�
C) v ,t o O z ° ao) a) o � � � .0 CO C = m :ow o m co o w E c U) a) C)
if) '-.= 7c ' Cc - nCO o = 03Q- WWnmcocua °) a) 4= --0c .N ...-
a-s. Qo = .o_)6 4.a . a- U -0 la >,74 (ID) m � 3 � a) U .0 E E u- _ill c � O E b
o m w ° aa) m was U rn W o o p n W c�i >O,U rn c cNo ce
,- L c c° o w c -0 E 2 € o o cm U c C wW om O •c c O ° O o ° c.
c c o o� �CCI � � m e oQ .- m � z2oaQ Q mU � rnm �'r
0 O �. S o L - u) om U O om cow ci 2IT aixi i -a ai : - gam. � co- O
_ c io c 0
U co �9 W .. co c ° to �. >,
a) a) � o o m Qc3o E .ca-° � ca o2 c � O a`) o .cU 2 •cW C:)
` C 7 u) O . c c CO W 0 > V U a) a) a) m
COE
'O '_ as o o c Q a) - UL ~ CO —. z c ° = w •� o� ci
-- a a a-0 .0 '- U Co c\i O .° U cfi v a) to W H o u) u.
CERTIFIED
MBE / WBE CONTRACTORS
CITY OF WATERLOO, IOWA
ij
7'
er10O10
CONTRACT COMPLIANCE OFFICE
Community Development Board
Carnegie Annex, Suite 202
620 Mulberry Street
Waterloo,Iowa 50703
City WEB Site: www.ci.waterloo.ia.us
_ Contract Compliance
WEB Site
for listing updates: http://www.cityofwaterlooiowa.com/contractcompliance
Contact: Rudy Jones,Community Development Director
Email: rudy.jones(a)waterloo-ia.org
Phone: (319) 291-4429
Fax: (319) 291-4431
N1BE'lk BE Certified Contractors List
Page 1 of 5
4
CERTIFIED MBE CONTRACTORS
CARTER ELECTRIC
725 Adams Street
Waterloo, IA 50703
Phone: (319)232-9808
Pager: (319) 235-4021
Contact: Derrick Carter —"
Specializing in:
ELECTRICAL CONTRACTOR
CULPEPPER ELECTRIC
1731 Cottage Grove Avenue
Waterloo, IA 50707
Phone: (319)235-0885
Fax: (319)236-8177
Contact: Martin Culpepper
Certified: City of Waterloo Certified MBE, Licensed Electrician
Specializing in:
ELECTRICAL CONTRACTOR --
DANIELS HOME IMPROVEMENT
339 Albany Street �-
Waterloo, IA 50703
Phone: (319) 961-1659
Contact: Sammy Daniels
Specializing in:
ALL TYPES OF CONCRETE FLATWORK, POURED WALLS ALL TYPES, FOOTINGS,
LIGHT DEMOLITION --
D.C. CORPORATION
426 Beech Street
Waterloo, IA 50703
Phone: (319)493-3225
FAX: (319)236-0515 --
Contact: Terry Phillips
Certified: City of Waterloo Certified MBE, Iowa DOT,TSB Certified
Specializing in:
COMMERCIAL AND RESIDENTIAL DEMOLITION, CONCRETE PAVING, DRIVEWAYS,
TRUCKING(ALL TYPES), GENERAL CONSTRUCTION
MBE/ BE Certified Contractors List
Pave 2 _° 5
GREER'S WORKS
2003 Plainview Street
Waterloo, IA 50703
Phone: (319)233-4701
Contact: Willie Greer
_ Specializing in:
DRIVEWAYS, SIDEWALKS, CARPENTRY, ROOFING, GENERAL CONSTRUCTIC_A
OLD GREER'S WORKS
2309 Springview Street
Waterloo, IA 50707
Phone: (319)233-2150
Contact: David L. Greer, Sr.
Specializing in:
ROOFING& GENERAL CONSTRUCTION
QUICK CONSTRUCTION
217 Bates Street
Waterloo, IA 50703
Phone: (319) 215-4166
Contact: Leroy Harrington
Specializing in:
ALL TYPES OF CONCRETE FLATWORKAND GENERAL CONSTRUCTION
-- CERTIFIED WBE CONTRACTORS
ATLAS PAINTING, INC.*
911 Sycamore Street
P.O.BOX 65
Waterloo, IA 50704
Phone: (319)232-9164
Specializing in:
COMMERCIAL AND INDUSTRIAL PAINTING
MBF WBE Certified Contractors List
Page 3 o f 5
PETERMAN & HAES CARPET ONE*
4003 University Avenue
Waterloo, IA 50701
Phone : (319) 233-6131
FAX: (319)233-6133
email: JR11486na,cfu.net
Certified: City of Waterloo WBE
Contact: Carol Reese
Specializing in:
FLOOR COVERING
WATCO CONSTRUCTION, INC.*
2920 Texas Street
Waterloo, IA 50702 -�
Phone : (319)233-7481
Certified: City of Waterloo WBE
Contact : Patricia J. Kimball
Specializing in:
STORM SEWER, INLETS, DRAIN TILE, WATER MAIN, SANITARY SEWER, INTAKE
STRUCTURES
MBi iWBE Certified Contractors List
Page 4 of 5
OEL CONSTRUCTION SERVICES, INC.*#
21072 Y Avenue
Steamboat Rock, IA 50672
Phone: 641-858-5090
Fax: 888-522-9307
Email: jenny@oelconstruction.com
Certified: State and Federal Funded Projects Only
Contact: Jenny Ingledue
Specializing in:
PUBLIC WORKS INFRASTRUCTURE NEW AND RENOVATION CONSTRUCTION
* DENOTES WOMEN BUSINESS ENTERPRISE
# DENOTES ELIGIBILITY FOR STATE AND FEDERAL FUNDED PROJECTS OALY
MBE VVBE Certified Contractors List
Page 3 „= 5
STATEMENT OF BIDDER'S QUALIFICATIONS
(To be submitted by the Bidder only upon the specific request of the (:ity of Waterloo,
Iowa.)
All questions must be answered and the date given must be clear and comprehensive.
This statement must be notarized. If necessary, questions may be answered on
separate attached sheets. The Bidder may submit any additional information he
desires.
1. Name of bidder.
2. Permanent main office address.
3. When organized.
4. If a corporation, when incorporated.
5. How many years have you been engaged in the contracting bu ,iness under
your present firm or trade name?
6. Contracts on hand: (Schedule these, showing amount of each ontract and the
appropriate anticipated dates of completion.)
7. General character of work performed by your company.
8. Have you ever failed to complete any work awarded to you? If ;o, where and
why?
9. Have you ever defaulted on a contract? If so, where and why?
10. List the more important projects recently completed by your con,pony, stating
the approximate cost for each, and the month and year complet
11. List your major equipment available for this contract.
12. Experience in construction work similar in importance to this prc sect.
13. Background and experience of the principal members of your or janization,
including the officers.
14. Credit available: $
15. Give bank reference:
STATEMENT OF BIDDER'S QUALIFICATIONS PAGE 1 OF 2 PAGES
16. Will you, upon request, fill out a detailed financial statement and furnish any —
other information that may be required by the City of Waterloo, Iowa?
17. The undersigned hereby authorizes and requests any person, firm, or
corporation to furnish any information requested by the City of Waterloo, Iowa,
in verification of the recitals comprising this Statement of Bidder's
Qualifications.
Dated at , this day of
, 201 .
(Name of Bidder)
By:
Title:
State of ) ,r
) ss:
County of )
, being duly sworn deposes and says
that he is of
(Name of Organization)
and that the answers to the foregoing questions and all statements therein contained
are true and correct.
Subscribed and sworn to before me this day of
, 201
Notary Public
My commission expires
STATEMENT OF BIDDER'S QUALIFICATIONS PAGE 2 OF 2 PAGES
GENERAL SPECIAL PROVISIONS
1. SCOPE OF WORK
The work covered by this contract consists of furnishing all lab)r, equipment, and
materials and performing all operations, in connection with the I°.Y. 2014 STREET
RECONSTRUCTION PROGRAM, Contract No. 859, as shown on tt e contract drawings
and in accordance with these specifications.
The contract drawings, which accompany and form a part of this contract and
specifications are dated March 24, 2014. They have the genera title of F.Y. 2014
STREET RECONSTRUCTION PROGRAM, Contract No. 859.
The drawings are numbered and separately entitled as follows:
DIVISION I — STREET RECONSTRUCTION
Sheet No. Description
1 Title Sheet
2 Location Map, Legend, Index of Streets
3 General Notes
4 — 7 Estimate of Quantities, Quantity Notes
8 Typical Pavement and Drain Tile Sections
9 — 12 Allen Street Plan/Profile & Tables
13 — 21 Bertch Avenue Plan/Profile, Tables, Inter. Details & S/W Tables, Detour
22 — 35 Downing Avenue Plan/Profile, Tables, Inter. Details & SW/Tables, Detour
36 — 38 Easton Avenue Plan/Profile, Tables, Inter. Details & S/VV Tables
39 — 63 Hammond Avenue Plan/Profile, Tables, Inter. Details & S/W Tables, Detour
64 - 67 Hyperion Drive Plan/Profile, Tables, Intersection Details
68 — 81 Lafayette Street Plan/Profile, Tables, Inter. Details & SMJ Tables, Detour
82 — 92 Oregon Street Plan/Profile, Tables, Inter. Details & SMJ Tables, Detour
93 — 95 1200 Block E. Mitchell Avenue Storm Sewer
96 600 Block Magnolia Ave.MJallgate Ave. Alley Storm Sew rr
97 1700 block E. San Marnan Dr./Sovia Dr. Storm Sewer, P an/Profile, Tables
98 — 100 Special Details
101 — 113 Standard Details
114 — 115 Storm Water Pollution Protection Details
DIVISION II - WATER MAIN
Sheet No. Description
1 Title Sheet
2 Easton Avenue —Wisconsin St. to La Porte Rd.
3 —4 Details
The standard specifications of the City of Waterloo are to be used alon j with the special
provisions described herein and shall be considered as part of the contract documents.
GENERAL SPECIAL PROVISIONS CONTRACT NO. 859 Page 1 of 5
2. CONFLICTING SPECIFICATIONS
All requirements of other specifications contained in the contract documents which _
conflict with the provisions of the special provisions will be considered void.
3. DUMPING AREAS
Excess material resulting from construction operations shall be hauled to the County
Landfill or other area secured by the Contractor and approved by the City Engineer.
Rubble, rubbish, trees, brush, and other unsuitable backfill material, as designated by the
City Engineer, shall be hauled to the County Landfill. All Landfill charges are to be
considered incidental to the contract and are the responsibility of the Contractor.
4. CONSTRUCTION DAMAGE
The Contractor shall exercise care during construction operations to ensure the safety
and protection to existing features located near or within the limits of construction.
Damage caused by negligence or poor workmanship, as determined by the Engineer,
shall be considered the Contractor's responsibility.
5. REMOVED MATERIALS
All materials removed as part of this Contract shall remain the property of the City unless
the City determines that he materials are not salvageable and the City does not want to
retain ownership of the materials. Materials designated in the field by the Engineer as
nonsalvageable shall be hauled and disposed of by the Contractor at no cost to the City. _
All other materials shall be transported to locations as directed by the Engineer. No
separate measurement or payment will be made for hauling or disposing of removed
materials and it shall be considered incidental to applicable items.
6. OVERHAUL
Overhaul will not be paid for "surplus material" obtained from any of the items of
construction under this contract. The cost of overhaul will be considered as incidental to
the items to which it applies.
7. MAILBOXES
The Contractor shall notify the United States Postal Department of mailboxes, which
interfere with any part of the work before removing them, and the Contractor will relocate
them as required by the Postmaster. The removal and replacement of mailboxes will not
be considered for direct payment, but will be considered incidental to the item to which it
applies.
8. PAY ITEMS
All pay items are listed in the proposal and shall include the purchase of all materials,
delivery of these materials, and furnishing all labor, plant and miscellaneous work needed
to make the item complete. All such cost shall be incidental to the proposed item to
which it applies and shall not be considered for separate payment.
GENERAL SPECIAL PROVISIONS CONTRACT NO. 859 Page 2 of 5
9. BREAKDOWN OF LUMP SUM CONTRACT PRICE ITEMS
The Contractor shall, immediately upon execution and delivery of the cot
first estimate for payment is made, deliver to the City Engineer a detailed esti
o before ne
a complete breakdown of the lump sum contract prices. The submitted eakdw giving
be approved by the City Engineer prior to any payment of any lumpsum ° n shall
10• PERMISSION TO HAUL OVER STREETS RAILROADS price item.
AND HIGHWAYS
The Contractor will be required to secure, from the proper authoriti( s,
permit which may be required to haul over streets, highways, rai -oads rmis private
tor
o
property, and any hauling operations of the Contractor shall be or private
requirements of such permits, permission, and to all applicable regulations laws,to
the
ordinances governing hauling and movement of equipment over streets, and
highways and private property. Any costs or inconvenience caused by railroads,
necessary permits or permission shall be considered completely covered y theipric any
for the items in the proposal. price bid
11• CONSTRUCTION SCHEDULING
The City Engineer shall approve Contractor's work schedule prior t) starting.
revisions shall also be approved. The City Engineer may change t le sched Ali
accommodate changing construction conditions. edule to
The Contractor shall coordinate the work under this contract with contrac r
work under other contracts which may be performed concurrently. ors performing
The Contractor shall be responsible to notify the Police, Fire, Street and
Departments of the closing and opening of streets. Engineering
The Contractor shall commence work within ten (10) days after receipt o1 the "
Proceed" and diligently execute the work of the contract to completion. Notice to
12. PRE-CONSTRUCTION CONFERENCE
Before any work is started, the Contractor shall arrange with the City Engi conference to discuss problems and schedules of contract;!leer to hold a
13. UNDERGROUND UTILITIES
It is the responsibility of the Contractor to obtain the location of
g
electric, telephone, and cable television cables or wires from the various s lintility es, ticomr lines,
and the City electrician before starting any excavation. The Contractor es
responsible for any damage to any underground utilities. The Contractor shall expose
those utilities indicated on the plans so that elevations mayshall be
beginning construction. This work shall be considered incidental to other be determinedi beforetems of work.
e
rk.
GENERAL SPECIAL PROVISIONS
CONTRACT NO. 859
Page 3 :rf5
d due to a
If the Co
ntractor believes that additional costs have been icurre shall be madeutility
being
ween
improperly located, the resolutioncompany.dadditional costs incurred
the Contractor and the respective utility
14. TRAFFIC SIGNS AND STREET SIGNS Department to have
The Contractor shall contact the City of Waterloo Trac st uction remo ed aratins ndoeplaced when the work
any street sign that will be affected by
has been completed.
15. TRAFFIC CONTROL DURING CONSTRUCTION order, provide,
ther
The Contractor shall, at his own expense and w►tandtsuspens su further or spension the work and until
erect and maintain, at all times during the progress
ns
other
completi
on and final acceptance thereof, suitable and requisite of the barricades,
signs or form
adequate protection, as required by the latest edition of Part Trafficthe safetyof
Control Devices and shall provide, keep and maintaing such
ensure barricades,
es, signs,
e
etc..,, be ordered by the E as may be required or as may tans shall be reviewed
the public as well as those engaged on the work. All barricading p
by the Engineer.
provide and obtain approval from the City Engineer on all
The Contractor shall determine,detour locations for all street closings, barricades and posting prior to construction.
tractor
These shall meet requirements of the City Police Traffic D d Street t. The
Departments when
shall notify the City Engineer's Office and the Police, Fire
the street is closed for construction. All barricading shall be in accordance
with the
latest lens
this edition of Part VI of the "Manual
on Uniform Traffic Control
sheeting is not required on project.
16. GRADES LINES LEVELS AND SURVEYS
rades, lines, levels and surveys shall be established and maintained by -
All necessa ry g
the Contractor.
verify all grades, lines, levels and dimensions as sown on the
The Contractor shall
drawings, arid he shall report any errors or inconsistencies in the same to the City
Engineer before commencing work.
17. SAFETY OF WORKERS AND PUBLIC
recautions to protect the life and
The Contractor shall, at all times, take necessary p ublic. He shall provide necessary
health of all persons employed on this project and the p
ac
safety
devices and safeguards in accordance with latest and bestcost.cident prevention
practices. All such protection shall be furnished to employees without
No dir
ect measurement of payment shall be made for this
s kept outside of any protection, but shall
be
ork
considered incidental to other items of work. The public shall
area.
CONTRACT NO. 859
Page 4 of 5
GENERAL SPECIAL PROVISIONS
18. CONSTRUCTION EQUIPMENT FOR PORTLAND CEMENT CONCRETE
PAVEMENT
Section IX "Construction Equipment" of the "Specifications for Concrete Paving,
Widening, and Curb and Gutter" of the Standard Specifications for Municipal Public
Works Construction, City of Waterloo, Iowa, shall be amended as follows:
Iowa Department of Transportation standard specification Section 2301.07 Construction
Equipment For Portland Cement Concrete Pavement shall apply with the following
exception to Section 2301.07.A.7.b Finishing Machine: The first sentence shall read as
"A finishing machine will be required on all uniform width slabs ten (10) feet or more in
width upon which a continuous line of forms more than one hundre d fifty (150) feet in
length may be set, except for intersections or otherwise approved by the Engineer."
19. WORKING ON SATURDAYS, SUNDAYS AND LEGAL HOLIDAYS
The Contractor shall notify the Engineer in writing forty-eight (48) hours in advance if
work on Saturday is planned. By noon the Friday before the planned Saturday work, the
Contractor shall confirm the Saturday work schedule with the project inspector.
Work on Sunday requires prior approval of the Engineer in accordance with the Waterloo
Standard Specifications. The Contractor shall not work the following days in 2014 due to
City holidays: May 26, July 4, September 1, November 11, and November 27 and 28.
•
GENERAL SPECIAL PROVISIONS CONTRACT NO. 859 'age 5 of 5
DIVISION I
SPECIAL PROVISIONS
CONCRETE AND ASPHALT PAVEMENTS; DRIVEWAYS AND S DEWALKS
1. PAVEMENT MATERIAL
A. PORTLAND CEMENT CONCRETE
SUDAS Division 7, Section 7010 shall apply with the followin, revisions:
1. City of Waterloo "Standard Specifications for Muni( ipal Public Works
Construction" General Specifications for Construction shall be used in
lieu of "General Provisions & Covenants" Division I.
2. 1.08.A.3: Cold weather protection and Linseed Oil application will be
measured by SY and paid by separate bid items.
3. Section 7040 - 1.08.H.3 & 1.3: Sawing for paveme it removal will be
measured and paid by linear foot.
Resawing, required due to negligence of the contracto shall not be paid
by the City.
All PC concrete removed from this project shall 3 disposed of at
approved recycle or rubble disposal sites.
All of the asphalt removed from this project is to be tie property of the
contractor.
When existing paving brick is encountered, they shal be taken to the
City's storage yard off of Falls Avenue (south of Falls Avenue, east of
Black Hawk Creek, north of University Avenue). The bricks shall be
removed in such a way as to minimize damage (no milling) and kept
reasonably free of soil or other materials. If railroad ties and rails are
encountered, these shall also be removed and dispos of as a part of
the Concrete Pavement Removal item.
Before leaving the project for the day, the Contracto shall shape the
subgrade to drain.
4. 2.01.K.2: Flexible foam expansion joint material, one-half (1/2) inch thick
and meeting the requirements of Iowa DOT Specification Section 4136,
may be used as joint material provided that the material is placed in such
a manner that the expansion joint material in the finished joint is smooth
(i.e. not wavy).
5. 3.01.B.1 b: Short distance for hand methods is considered as 150 feet or
less.
SPECIAL PROVIDSIONS CONTRACT 859 'age 1 of 34
6. 3.02.C: Surface Fixture Adjustments — "Minor Fixture Adjustments" shall
be considered incidental to applicable items.
7. 3.02.F: Use of paving machine required on all sections 150 feet or more.
8. 3.02.H.5: Surface treatment shall be burlap bag treatment only.
9. 3.02.K: All joints shall be sealed as per Standard Road Plan PV-101,
Details A, B & C.
10. 3.03.B: Hand finish methods may be used for curb and gutter sections
150' or less.
11. "Determining Coarseness and Workability Incentive" in IM530 shall not a
apply.
12. Linseed Oil Surface Treatment of PCC Paving and Curb and Gutter
This item shall consist of the curing of concrete and protecting the entire
finished concrete surface of the pavement and curbs from the de-icing
agents used during cold weather by applying a linseed oil solution. The
linseed oil solution application is required only on paving placed
after August 31.
A curing compound/linseed oil combination product shall be used.
Material shall conform to W.R. MEADOWS LIN-SEALTM WHITE Curing
and Anti-Spalling Compound or engineer approved equivalent.
Linseed oil treatment shall be paid at the unit price per square yard.
B. HOT MIX ASPHALT:
SUDAS Division 7, Section 7020 shall apply with the following revisions:
1. City of Waterloo "Standard Specifications for Municipal Public Works
Construction" General Specifications for Construction shall be used in
lieu of "General Provisions & Covenants" Division I.
2. Specific References to Base Widening do not apply to Full Depth
Construction on this project.
3. 1.02.B.2: Table 7020.01 will be modified by the following:
a. Surface Course:
HMA - 1M or 3M ESALS, S 1/2", No friction required
PG 58-28 for 1 M ESALS, PG 64-22 for 3M ESALS
1 M ESALS will be 60% crushed particles
3M ESALS will be 75% crushed particles
Type A Aggregate only
SPECIAL PROVIDSIONS CONTRACT 859 Page 2 of 34
b. Base and Intermediate Course(s):
HMA — 1 M or 3M ESALS, B/I 3/"
PG 58-28 for 1 M ESALS, PG 64-22 for 3M ES/LS
1 M ESALS will be 60% crushed particles
3M ESALS will be 75% crushed particles
Type A Aggregate only
4. 1.05.B: No unclassified RAP will be allowed.
1.05.C: Any HMA removed shall be property of the Contractor.
5. 1.08.1: Surface Fixture Adjustments — "Minor Fixture Adjustment" shall
be considered incidental to applicable items.
6. 1.08.J: Sawing for pavement removal will be mea: used and paid by
linear foot.
Resawing, due to negligence of contractor, shall not b( paid by the City.
All of the asphalt removed from this project is to be he property of the
Contractor.
When existing paving brick is encountered, they shall be taken to the
City's storage yard off of Falls Avenue (south of Falls Avenue, east of
Black Hawk Creek, north of University Avenue). The bricks shall be
removed in such a way as to minimize damage (nc milling) and kept
reasonably free of soil or other materials. If railroad ties and rails are
encountered, these shall also be removed and dispo: ed of as a part of
the Concrete Pavement Removal item.
Before leaving the project for the day, the Contract( r shall shape the
subgrade to drain.
7. 2.02: Use of warm mix asphalt (WMA) is not allowed.
8. 2.03.A No unclassified RAP will be allowed. Certifiec or classified RAP
is allowed in the IM Base and IM Intermediate Mixes, a id in the 3M Base
Mix. 60% CP content in the RAP may be include in the total CP
percentage.
9. 2.03.B: No recycled asphalt shingles (RAS) will be allo Ned.
10. 3.01.C2: Tack coat will be required per lift in this sectic n.
11. 3.06.A: The City may conduct the tests, hire an indepe ident testing
laboratory, or use the Contractor's test results.
SPECIAL PROVIDSIONS CONTRACT 859 Page 3 of 34
12. 3.06.A.2: The City will not prepare the mix designs. The Contractor will
have mix designs approved by the IDOT or independent lab. Any HMA
produced prior to submittal of JMF's and material certifications will not be
paid for.
13. 3.06.A.3.b.1: Binder will be accepted based on suppliers shipment
certification.
14. 3.06.A.3.b.6: No split samples for agency correlation are required.
15. 3.06.B.3: Will be modified as follows:
For base, intermediate and surface lifts, any mix on any street per stage
per day, over 700 feet in length or over 2400 SY in area will require
QMA. For base intermediate and surface lifts over 100 ton per street per
stage per day will require a hot box sample and gradation, unless
otherwise waived by the Engineer.
16. Maximum compacted thickness of any lift will be three (3) inches.
17. Multiple lifts of asphalt will not be allowed on the same street on the
same day until existing HMA has reached an ambient temperature with
its surroundings prior to the placement of the next layer of HMA. The
Engineer may waive this requirement.
2. EXISTING PAVEMENT SECTIONS
The following list of pavement sections are being included for the Contractor's
information. This has been based on cores taken by the City. The City does not
guarantee pavement sections in areas other than the location of the core. This
information shall not constitute a basis for additional compensation if conditions are
found to be different in other areas.
see next page
SPECIAL PROVIDSIONS CONTRACT 859 Page 4 of 34
— CORE
# STREET LOCATION OFFSET ACC PCC
1 ALLEN ST. 118 5.6' S. 4 1/2" 6" BROKEN
5 1/2"
2 ALLEN ST. 217 2.5' N. 4" BROKEN
1/4"
3 ALLEN ST. 324 5.3' S. 4 1/4" BROKEN
4 ALLEN ST. 425 4.5' N. 3 1/2" 6" BROKEN
BERTCH
5 AVE. 1016 7.1' S. 5" E 1/4"
BERTCH
6 AVE. 1129 5.9' N. 3 3/4" 5" BROKEN
BERTCH 4 1/2"
7 AVE. 1216 2.4' S. 6 1/2" BROKEN
BERTCH
— 8 AVE. 1317 5.3' N. 5 3/4" 5" BROKEN
DOWNING
9 AVE. 922 5.5' N. 4 1/2" 6"
DOWNING
10 AVE. 1021 4.3' S. 4 1/4" 5 1/4"
DOWNING
11 AVE. 1125 8.3' N. 3 3/4" 5 3/4"
— DOWNING
12 AVE. 1233 2.0' S. 4" 5"
— DOWNING
13 AVE. 1319 5.4' N. 4 1/2" 5"
DOWNING
14 AVE. 1429 4.2' S. 4" 7 1/2"
DOWNING
15 AVE. 1523 3.5' N. 4 1/2" 6 1/2"
DOWNING
16 AVE. 1625 4.0' S. 5" 7 1/2"
EASTON
17 AVE. 1915 4.7' S. 7"
EASTON
18 AVE. 1934 4.2' N. 7 1/4"
HAMMOND
— 19 AVE. 216 6.4'W. 5" 6" BROKEN
HAMMOND
20 AVE. 255 5.5' E. 3 3/4" 8 1/2"
HAMMOND 5 1/2"
21 AVE. 406 4.5'W. 4 1/2" BROKEN
SPECIAL PROVIDSIONS CONTRACT 859 Page 5 of 34
HAMMOND 5 1/2"
22 AVE. 523 4.9' E. 4" BROKEN
HAMMOND
23 AVE. 612 4.5'W. 5" 6" BROKEN
HAMMOND
24 AVE. 721 5.0' E. 5" 5" BROKEN
HAMMOND
25 AVE. 812 7.2'W. 2" 6" BROKEN
HAMMOND
26 AVE. 919 3.5' E. 2 1/2" 4 1/2"
HAMMOND
27 AVE. 1020 4.8'W. 3 1/4" 7 1/2"
HAMMOND
28 AVE. 1135 4.6' E. 3 1/4" 6"
HYPERION
29 DR. 1542 5.8' W. 8 1/4"
HYPERION
30 DR. 1621 4' S. 7 1/2"
HYPERION
31 DR. 1658 4.8' N. 7 1/4"
LAFAYETTE 5 1/2"
32 ST. 2321 2.6' S. 6" BROKEN
33 LAFAYETTE
ST. 2417 3.7' N. 5 1/4" 6" BROKEN
34 LAFAYETTE 5 1/2"
ST. 2522 11.2' S. 7" BROKEN
35 LAFAYETTE 5 1/2"
ST. 2615 9.6' N. 6 1/4" BROKEN
36 LAFAYETTE 5 1/2"
ST. 2716 2.5' S. 6" BROKEN
37 LAFAYETTE 4 1/2"
ST. 2839 2.8' N. 6 1/2" BROKEN
38 OREGON ST. 1021 5.0' E. 5"
39 OREGON ST. 1118 6.5'W. 5"
40 OREGON ST. 1221 9.3' E. 8 1/2"
41 OREGON ST. 1321 5.6' E. 8 1/2"
42 OREGON ST. 1407 4.7'W. 6 1/2"
43 30' S. OF
OREGON ST. PLYMOUTH PTR 4.7' E. 8 1/2"
SPECIAL PROVIDSIONS CONTRACT 859 Page 6 of 34
3. DETECTABLE WARNING SURFACES AND SIDEWALK CONSTRUCTION
Detectable warnings shall be placed at all new or reconstructed sidewalk accessibility
ramps and placed in accordance with the design plans for that particular style of ramp.
All detectable warning surfaces placed shall consist of truncated domes aligned in a
square grid pattern, manufactured in accordance with the current ADA detectable
warning regulations, and be installed per the manufacturer's specifications.
Detectable warning surfaces shall extend for the full width of the sidewalk ramp, but
not including the flare at the curb.
The detectable warning surfaces shall be cast iron.
Approved Vendors:
Cast Iron
• MetaDome, LLC — MetaCast
• EJ Group, Inc. — Detectable Warning Plates
• Neenah Foundry Company
Details are included in the plans indicating the estimated limits of sidewalk removal
and replacement to meet ADA requirements. All exc ovation required
construct/reconstruct sidewalk ramps and adjacent sidewalk is consi Jered incidental to
applicable items.
Sidewalk curb sections will be required along sidewalks where the grade between the
sidewalk and property line is impractical to grade. The contractor will build the
sidewalk and the curb section together, pinning the curb on after the sidewalk is
completed will not be allowed. The contractor will install curb on top of the sidewalk,
along the length of sidewalk shown in the plans or as directed in the field by the
engineer. The sidewalk will taper from nothing to a maximum of eight inches high.
Anything over this height will require a separate retaining wall to be built and paid
under a different bid item. Payment will be full compensation for II labor, materials
and equipment required to construct the curb section on the sidewall
4. RECYCLED ASPHALT PAVING
Recycled asphalt paving is included as a bid item for use at locations indicated on the
plans where access is to be maintained prior to paving being completed and open to
traffic. Maintenance of the temporary surfacing shall be the Contractor's responsibility.
Compensation shall be per ton based on weigh tickets of material used. RAP used for
the temporary accesses shall be part of the "CONSTRUCT TEMPORARY ACCESS"
bid item and not paid separately per ton.
EARTHWORK, SUBGRADE AND SUBBASE
5. EXCAVATION (STREETS)
Work under this item shall consist of removal and disposal of exiting subgrade to
accommodate the proposed paving section, and Modified Subbase It also includes
additional excavation, commonly referred to as Subgrade Repair, whch is determined
to be necessary based on field conditions and at the direction of the E ngineer.
SPECIAL PROVIDSIONS CONTRACT 859 Wage 7 of 34
This project includes estimated excavation quantities for the placement of eight (8) -
inches of modified subbase. However, due to the probable variability of the subgrade
the City reserves the right to increase or decrease the total thickness of the rock base _
layer and the corresponding quantity of "Excavation" based on field conditions. A
decision will be made in the field by the Engineer regarding total excavation required.
Excavation, which is required up to one (1) foot behind the curb, is included in the
estimated quantities (C.Y.) included in the street quantity breakdown in the plans.
Plan quantity will be used for pay quantity unless adjusted from the estimated quantity -
due to field conditions and the decision of the Engineer.
The Contractor's equipment used shall include an appropriately sized track dozer for -
excavation and grading operations.
The City may direct the contractor to stockpile excavated material at a location within -
the City limits or to take the material to another street currently under construction.
The stockpiled material would be intended for use on various streets within the project,
as needed.
AVERAGE EXCAVATION THICKNESS
-
ASPH
ASPH ALT ALT ASPH ALT PCC ALT PCC ALT PCC ALT
PAVING
AVG T, -
STREET AREA, SY EXC QTY, CY IN PROP PAVING T EXC QTY, CY AVG T, IN PROP PAVING T
ALLEN 4,300.0 933.3 7.8 7.5 947.0 7.9 6 -
BERTCH 5,142.0 1,607.3 11.3 7.5 1,393.0 9.8 6
DOWNING 10,005.0 2,476.5 8.9 9.0 2,031.1 7.3 7
EASTON 2,529.0 787.8 11.2 7.5 700.1 10.0 6 _
HAMMOND 14,756.0 6,430.0 15.7 10.5 5,405.2 13.2 8
HYPERION 3,881.7 936.5 8.7 7.5 778.7 7.2 6
LAFAYETTE
ST. 10,744.0 1,726.3 5.8 10.5 1,029.6 3.4 8
OREGON 9,547.0 2,417.9 9.1 7.5 1,978.1 7.5 6 -
6. EXCAVATION, NEW SIDEWALK CONSTRUCTION -
Excavation required for new sidewalk (versus reconstruction) shall be considered
incidental to applicable items, except for new sidewalk construction under Base -
Bid Section V (infill sidewalk).
SPECIAL PROVIDSIONS CONTRACT 859 Page 8 of 34 _
7. SUBGRADE PREPARATION
Subgrade preparation may be required as specified in "Standard Specifications for
Municipal Public Works Construction, Specifications for Earthwork, I.K."
Subgrade Preparation shall be used when the existing soil subgrade is of sufficient
quality that Excavation for the full thickness of modified subbase (see typical section
details in plans) is not necessary. The decision to use Subgrade Preparation shall be
made in the field by the Engineer.
Subgrade preparation is considered separately for payment ant shall be paid for
at the rate of$1.00/SY
8. LOAD TEST
This specification shall supersede SPECIFICATIONS FOR EARTHWORK X. LOAD
TEST in the City of Waterloo Standard Specifications.
The excavated subgrade shall be subjected to a wheel load test before placement of
drain tile, modified subbase material, setting of forms or any operation that would
prevent the test from being performed.
Equipment used for the wheel load test shall be furnished by the Contractor and will be
of similar size, loaded weight and load distribution as used to bring in granular material
or paving material, whichever is heavier. The expense of such load testing shall be
the Contractor's expense.
The Engineer may require test sections of varying thickness of modified subbase
aggregate or select material be tested before determining the actual depth of subgrade
repair required. If the test section fails and additional excavation is required, the
removal of the modified subbase aggregate or select material shall be paid for in cubic
yards of subgrade repair. The modified subbase aggregate or select material shall be
salvaged and reused.
When the unstable subgrade has been repaired and shaped to final cross-section and
elevation, another wheel load test shall be run. Visual checks will t len be made and
any additional repairs shall be made by the Contractor, as directed b! the Engineer.
If rainfall occurs on the subgrade after the load test has been performed, additional
load tests shall be performed, at the direction of the Engineer.
Whenever possible, transverse saw cuts in PCC paving will be made where repaired
subgrade meets natural subgrade. The excavation for subgrade repair shall be
tapered at the ends of the excavation so there is not an abrupt change in depth from
repaired areas to natural subgrade. In areas where drain tile is used and the subgrade
repair does not extend to the drain tile envelope, a lateral connecti:)n shall be made
from the subgrade repair to the main drain tile. This drain tile connection shall be paid
for at the bid unit price for drain tile construction.
SPECIAL PROVIDSIONS CONTRACT 859 Page 9 of 34
9. GEOGRID/GEOTEXTILES
GEOGRID or a geotextile is being considered for possible use in situations requiring
subgrade repair. The extent of its use is unknown. An evaluation of subgrade
conditions and estimated costs will determine when it is to be used.
There were no known locations for use of a geotextile fabric or Geogrid at the time of
design, but shall be used as directed in the field by the Engineer.
Geogrid used shall be Tensar Triax TX-140, Tensar Triax TX-160, Tensar BX4100
(SG-1) or Engineer-approved equal. Geotextile used shall be Geotextile Systems by
Propex Geotex® 350 ST, TenCate Mirafi® HP370, or approved equal.
Payment shall be made on a square-yard basis. Area considered for payment shall be
based on the area of subgrade covered, at the direction of the Engineer, and shall not
include double payment for overlapped areas.
10. MODIFIED SUBBASE
Unless adjusted in the field by the Engineer, the thickness of modified subbase shall
be placed as shown on the typical cross section with a tolerance of zero feet
less than specified thickness and 0.05 feet greater. Modified subbase shall be placed
in uniform lifts of not more than 8 inches in thickness. A clean aggregate interface shall
be maintained between the subbase material and the porous backfill of all longitudinal
or transverse subdrains. Equipment used shall conform with IDOT Article 2001.05,
Paragraphs B, C, D, or F except rollers shall have a minimum compactive effort of 300
pounds per inch (5.25 kg/mm) width. The Modified subbase material shall conform to
Section 2115 of the IDOT Standard Specifications (Gradation No. 14 of Section 4109).
No crushed concrete or composite pavement shall be allowed. Modified subbase
material shall be paid for per ton of material placed. If the Contractor places additional
width from that specified in the typical section or additional material than that approved
by the Engineer in the field, it shall be deducted from the total tons used at the rate of
140 pounds per cubic foot.
All modified subbase shall be compacted with a minimum of six roller passes. While
using the modified subbase as a work platform, the Contractor shall keep modified
subbase material at the specified minimum thickness and cross section.
11. TOPSOIL REMOVAL FROM PARKING, EARTHWORK
This bid item relates to Downing Avenue (north side) and Lafayette Street (both sides)
and the need to remove the buildup of soil between the sidewalk and the street. The
thickness of the buildup varies. After removal to a straight line between the front of the
sidewalk to the top of curb or street, the existing soil shall be scarified/loosened to a
depth of 4". The areas for this item will be identified on the project. The work for this
item will be paid on a square yard basis. The area measured will not include the area
backfilled behind the curb and will not be paid until the scarifying is completed.
SPECIAL PROVIDSIONS CONTRACT 859 Page 10 of 34
12. TOPSOIL PLACEMENT
Four (4") inches of topsoil shall be placed at locations disturbec by excavation or
grading operations as directed in the field by the Engineer. The Contractor may use
existing topsoil to restore the parking area if it is of an acceptable quality. Additional
topsoil that is required to complete the work, but is not available on the job, shall be
furnished by the Contractor. The topsoil shall be free of deleterious materials such as
rocks, bricks, stones, roots, or other debris. The topsoil shall be compacted, shaped
and raked to provide a suitable seed bed as directed by the Engineer. All topsoil
material
must be approved by the Engineer prior to its placement. Mea: urement of topsoil
areas shall be actual area up to three (3) feet from back of curb, except in isolated
locations where a street has been narrowed or physical geometry of an intersection
has been changed requiring additional topsoil. Other areas requiring topsoil beyond
three (3) feet from back of curb shall not be measured for payment. Payment will be
made on a square yard basis.
13. CONSTRUCT TEMPORARY ACCESS
This bid item shall be on a square yard basis for constructing, maintaining, and
removing the temporary accesses. Also included shall be the resto-ation of the areas
disturbed with topsoil, as necessary, and hydroseeded or sodded. The locations for
which this bid item applies are as follows:
Downing Avenue at Downing Court
Lafayette Street at Zuma Street
The material used for the driving surface shall be recycled asphalt m ving
material (RAP), unless otherwise indicated on the plans.
SEWERS AND STRUCTURES
14. SANITARY SEWERS AND CONSTRUCTION MATERIALS
The Standard Specifications for Municipal Public Works Constructior are
amended by the following modifications and additions.
2. SPECIFICATIONS FOR CONSTRUCTION MATERIALS
SECTION XXVII. SEWER AND MANHOLE MATERIALS
Flexible Pipes 12" — 30" Diameter
Dual Wall Polypropylene Pipe (PP) 12" to 30"
Material Specification Joint Specification Beddini ind Installation
ASTM F2736 ASTM D3212 AND F477 Class F -3 as stated in
(smooth interior, (integral bell/spigot with SUDAF. Figure 3010.103
corrugated exterior) elastomeric seals)
Pipe Stiftness per ASTM
D2412, 46 psi
SPECIAL PROVIDSIONS CONTRACT 859 'age 11 of 34
15. RECONSTRUCT SANITARY SEWER (OR CONSTRUCT NEW SANITARY
SEWER)
The Contractor shall remove existing sanitary sewer, if applicable, and replace with, or
construct, the new sanitary sewer pipe including reconnection of existing sanitary
house services and any adjustments or alterations to the water services as they are
encountered. Collar(s) required at any existing to new pipe connections or at
manholes shall be incidental to this item.
Laser alignment construction methods as approved by the Engineer shall be required.
Any adapters, fittings, concrete collars, etc., required for connection of existing house
services to the new sanitary sewer, as approved in the field by the Engineer, shall not
be measured for separate payment, but shall be considered incidental to applicable
items. Where the new service line meets the existing, the Contractor shall install a
FERNCO (or equal) coupling and construct a concrete collar. The length of sanitary
sewer service pipe replaced, including risers, shall be paid under the sanitary service
pipe bid item. The collars are considered incidental to the service pipe. When
connecting to existing truss pipe, a truss to truss double bell fitting shall be used.
Backfill of the coupling and collar shall not occur until the concrete collar has hardened
sufficiently to prevent deformation of the concrete.
Provisions shall be made for maintaining sewerage flow in all "upstream" sections of
the system by diverting the flow into the new sanitary main. Contractor shall provide
bypass pumping unless not required as determined by the engineer. No separate
payment shall be made for bypass pumping. The contractor shall take
appropriate measures to prohibit ground water, rain water, etc. from entering the pipe.
If this does occur and the pipe becomes dirty, the contractor shall be required to clean
the pipe at his expense prior to the City televising the line. No separate measurement
for payment will be made for said work, and it shall be considered incidental to
applicable items. Traffic control related to bypass pumping shall be considered
incidental. The intersections of Hammond Avenue/Williston Avenue and W. 9th
Street/Bertch Avenue shall not be restricted for traffic for by pass pumping.
Should the Engineer determine that the excavated material is not suitable for backfill
for the excavation, the material shall be disposed of and replaced with approved
backfill material obtained by the Contractor. Payment for the work of disposing of this
unsuitable material, obtaining approved backfill material, trucking of the material,
placing the material and compacting the material, shall be paid under "SPECIAL
SUBGRADE MATERIAL." The Contractor will not be paid for material from a City
stockpile or from other streets in this project.
Excavated material that has a greater than optimum moisture content, but is otherwise
acceptable shall not be considered unsuitable. The Contractor shall either dry out the
material to a suitable condition or furnish acceptable material from another source,
which shall be paid under "SPECIAL SUBGRADE MATERIAL." The Contractor will
not be paid for material from a City stockpile or from other streets in this project.
SPECIAL PROVIDSIONS CONTRACT 859 Page 12 of 34
The Contractor constructing the main shall be responsible for locating and marking the
locations of existing service lines. Dye testing or tracing may be required to determine
service line locations or the existence of shared service lines. Dye testing and tracing,
if required, will be paid on a per each basis. Once the location of the service tap to the
new sewer main has been established, the connection to the main shall be made.
The permanent connection of the sanitary sewer service lines shall be constructed
with the sanitary main construction so that the service connections (tap and tee or wye
construction) and a minimum of five (5) feet of the service line are constructed as the
sanitary main is constructed. The Contractor may reconstruct the entire required
length of the service line at the time of main construction.
When making the connection to the sanitary main for sanitary sewer service lines, the
Contractor shall use pre-manufactured tees/wyes for 8" and 10" mains. For pipe sizes
12" and larger, an Inserta-Tee, or equal may be used at the service location. If rigid
main is used, the Contractor shall use manufactured tees or wyes at the service line
connection locations.
Services to all properties adjacent to and/or served by the sanitary sewer
reconstruction, must be verified by the Contractor(s). Upon completion of the sanitary
sewer reconstruction, the Contractor shall contact the City Waste Management
Department (291-4553) to request televising of the sewer. Any service connections
missed shall be reconnected by the contractor with the City paying for only those items
originally needed for the installation.
The contractor installing the main shall record the location and pe of material for
each water service that is crossed during construction.
For each new sanitary manhole:
Manhole Chimney Seal — Internal Chimney Seal shall comply with: SODAS DIVISION
6, SECTION 6010 2.11 2. Internal Chimney Seal.
16. REMOVE AND REPLACE SANITARY SEWER
This item shall apply to locations in the project where "spot rep firs" are required.
These locations require using pipe, which has the same inside diamt ter as the existing
and the flowlines of new and old pipe match, unless otherwise approved by the
Engineer.
The Contractor shall remove existing sanitary sewer and replace with new sanitary
sewer pipe including reconnection of existing sanitary house services and any
adjustments or alterations to the water services as they are enco antered. Collar(s)
required at any existing to new pipe connections or at manholes shall be incidental to
this item.
The Contractor shall remove and replace that portion of the existing house services as
they are encountered by the limits of excavation, as shown on the plans and as
directed in the field by the Engineer. If any existing water services are damaged or
broken while performing work under this item, renewal shall be at Contractor's
expense.
SPECIAL PROVIDSIONS CONTRACT 859 Page 13 of 34
Any adapters, fittings, concrete collars, etc., required for connection of existing house
services to the new sanitary sewer, as approved in the field by the Engineer, shall not
be measured for separate payment, but shall be considered incidental to applicable
items. Where the new service line meets the existing, the Contractor shall install a
FERNCO (or equal) coupling and construct a concrete collar. The length of sanitary
sewer service pipe replaced shall be paid under the sanitary service pipe bid item.
The collars are considered incidental to the service pipe.
Backfill of the coupling and collar shall not occur until the concrete collar has hardened
sufficiently to prevent deformation of the concrete.
Provisions shall be made for maintaining sewerage flow in all "upstream" sections of -
the system by diverting the flow into the new sanitary main. No separate
measurement for payment will be made for said work and it shall be considered
incidental to applicable items.
Should the Engineer determine that the excavated material is not suitable for backfill of
the excavation, the material shall be disposed of and replaced with approved backfill _.
material obtained by the Contractor. Payment for the work of disposing of this
unsuitable material, obtaining approved backfill material, trucking of the material,
placing the material and compacting of the material, shall be paid under "SPECIAL
SUBGRADE MATERIAL". The Contractor will not be paid for material from a City
stockpile or from other streets in this project.
Excavated material that has a greater than optimum moisture content, but is otherwise
acceptable shall not be considered unsuitable. The Contractor shall either dry out the
material to a suitable condition or furnish acceptable material from another source,
which shall be paid under "SPECIAL SUBGRADE MATERIAL". The Contractor will
not be paid for material from a City stockpile or from other streets in this project.
17. COLLAR EXISTING SANITARY SEWER
Work to be completed under this bid item "Collar Existing Sanitary Sewer," shall
consist of excavating the sewer line in the vicinity of the defect and constructing a
standard concrete collar centered on the location determined by the field television
inspection reports. Concrete used in repair shall be Class "M" with 2 percent (2%)
calcium. Realignment of two pipe lengths of the existing sanitary sewer in the vicinity
of the repair shall be considered incidental to this item. If, after the defected area is
exposed, it is determined that removal and replacement is necessary instead of a
collar, the removal and replacement will be paid for under the respective bid item, as
directed by the Engineer.
A minimum of four (4) hours after the concrete collar has been completed, the
excavation may be back filled and compacted to a minimum of 95 percent (95%) of
Standard Proctor Density.
Any excess material resulting from the excavation shall be disposed of by the
Contractor as directed in the field by the Engineer. The work of disposing of said
material shall be considered incidental to applicable items.
SPECIAL PROVIDSIONS CONTRACT 859 Page 14 of 34
All work described above shall be measured for payment on a per each basis and
shall be considered as full compensation for completion of said work. The length of
each collar is either shown on the plans or otherwise considered to be the standard
shown in details.
Should the Engineer determine that the excavated material is not suitable for backfill of
the excavation, the material shall be disposed of and replaced with
approved backfill material obtained by the Contractor. Payment for the work of
disposing of the unsuitable material, obtaining approved backfill mat(,rial,
trucking of the material, placing the material and compacting of the material, shall be
paid under "SPECIAL SUBGRADE MATERIAL" in addition to bid item "COLLAR
EXISTING SANITARY SEWER".
Excavated material that has a greater than optimum moisture content, but is otherwise
acceptable shall not be considered unsuitable. The Contractor shall either dry out the
material to a suitable condition or furnish acceptable material from another source,
which shall be paid under "SPECIAL SUBGRADE MATERIAL".
18. REMOVAL OF EXISTING SANITARY SEWER
There are some locations where an existing sanitary sewer line may not be
reconstructed depending on whether or not the line has active services connected to it.
These lines are typically dead-end lines without existing manholes.
At the locations indicated on the plans, the Contractor will remove the existing sanitary
sewer. If active services are found, the line will be reconstructed and paid for under
the appropriate size of pipe to be reconstructed. If no active services are found, the
Contractor will remove the existing line and backfill the trench with appropriate
compaction. When this is the case, the Contractor will be paid u ider the bid item
"REMOVE EXISTING SANITARY SEWER."
When existing pipe being removed is within three (3) feet horizc itally of the new
sanitary main being constructed, separate payment for removal o- existing sanitary
sewer will not be made, unless otherwise noted on the plans
19. REMOVAL OF EXISTING STORM SEWER, LESS THAN 36" DIAM ETER
There are some locations where existing storm mains are to be remo.red. This
item does not include inlet runs. Payment will be made at the unit pri ;e per lineal
foot and includes, but is not limited to, removal, disposal and capping of pipe, if
necessary.
20. SPECIAL SUBGRADE MATERIAL, IF REQUIRED
This item applies to material that pertains to sewer trenches only (u ) to the elevation
of the bottom of the excavation for granular base).
SPECIAL PROVIDSIONS CONTRACT 859 P:Age 15 of 34
A. DRYING EXISTING MATERIAL
At the City's option, work under this item shall include spreading and drying out
existing material that is not unsuitable, but has a greater than acceptable
moisture content. After drying to an acceptable
condition, the material shall be placed and compacted to 95 percent (95%) of
standard proctor density. Payment for this work shall be on a cubic yard basis
and shall be negotiated between the Contractor and the City.
B. REMOVAL AND REPLACEMENT
At the City's option, the backfill material that has a greater than
acceptable moisture content can be removed and disposed of at a location
approved by the City, and then replaced with acceptable material from an
approved source. The payment for "SPECIAL SUBGRADE MATERIAL"
shall be in two items: 1) Hauling To and From the Site and 2) Material.
Hauling shall be on a per ton basis at the rate of $10.00/ton or agreed upon rate
per load. Material shall also be on a per ton basis or per load rate to be
negotiated with the City. The material used shall be approved by the City for
each location where this item is to be used.
Acceptable material from streets in this project, when directed by the Engineer,
may be used on other streets in this project. No additional compensation will be
made for hauling or material if this is the case.
Hauling would be paid if the contractor is directed to haul material from a City
stockpile.
If unsuitable material is found in the trench, the "REMOVAL AND REPLACEMENT"
option shall be used.
21. REMOVE EXISTING STRUCTURE
Work under this item shall consist of the removal and disposal of existing manholes,
inlets, inlet runs, etc., at locations shown on the plans and/or as directed in the field by
the Engineer. This item will also include backfilling the hole left by the removed
structure (when applicable). Backfill material shall be incidental and shall be approved
by the Engineer. Compaction shall be according to the requirement of
"MECHANICALLY COMPACTED BACKFILL." Old castings that are not to be reused
shall be delivered to the City Waste Management Yard. The Contractor shall be
responsible for protecting existing castings from theft or damage whether to be reused
in this project or to be delivered to the City Waste Management Yard. If theft or
damage of castings should occur, the castings shall be replaced at Contractor
expense.
22. TAP AND COLLAR STRUCTURE/TAP AND COLLAR DRY RUN ARCH
This work shall include the tapping of new sewer main pipe into existing manholes,
inlets, box culverts, or pipes including plugging existing pipes or openings, the
concrete collar and fillet modification as necessary, and as directed in the field by the
SPECIAL PROVIDSIONS CONTRACT 859 Page 16 of 34
Engineer. Payment for this work shall be on a per each basis under "TAP AND
COLLAR STRUCTURE" or "TAP AND COLLAR DRY RUN ARCH".
23. PLUGGING ABANDONED PIPES/UTILITIES
If existing abandoned pipes or utilities are found during excavatior , capping of these
pipes or utilities shall be considered incidental to applicable items unless otherwise
approved by the Engineer.
24. FURNISH AND INSTALL MANHOLE CASTING (RING AND COVE RI
Broken manhole frame and cover castings shall be transported to location(s)
designated by the Engineer. Replacement manhole frame and covers shall be
Neenah R-1642 or approved equal and shall be installed and grouted as directed in
the field by the Engineer. Only those broken castings authorized by the Engineer shall
be replaced per bid item "FURNISH AND INSTALL MANHOLE CASTING." Castings
broken due to the negligence of the Contractor shall be replaced b'✓ the Contractor at
the Contractor's expense.
25. UNDERGROUND INVESTIGATION
The work under this item shall consist of excavating at locations sho Ain on the plans or
as directed in the field by the Engineer. The pipe being investigated may be exposed
a maximum of 12 feet for each underground investigation made. After completing the
investigation, the excavation shall be backfilled with compaction as directed in the field
by the Engineer. All necessary work and equipment furnished
to complete the underground investigation will be considered for payment on a "per
each" basis for designated locations under Bid Item "UNDERGROUND
INVESTIGATION". Underground investigations, which result in corrective measures to
repair a problem, will be paid for under the respective bid item only.
Pavement removal shall be paid for under the respective bid item.
The locations that have been selected for underground investigatior s are indicated on
the plans, or may be selected by the Engineer.
Underground investigations for sanitary sewer services shall not be done until after the
main has been removed/replaced to determine if an underground investigation is
necessary.
26. DIE TEST FOR SANITARY SERVICE LOCATIONS
As the sanitary sewer main is reconstructed and the Contractors are locating the
existing sanitary services, it may be necessary for the Contractor to dye test in order to
determine active services or which service serves a particular property. Generally, this
will involve the Contractor going into the house and flushing the toilet after adding dye.
When this is necessary, the Contractor shall be paid for each dye test completed at
the unit bid price.
SPECIAL PROVIDSIONS CONTRACT 859 Page 17 of 34
27. TRACE SANITARY SEWER SERVICE
This bid item shall consist of the Contractor tracing the existing sewer line from inside
the house to the sewer main with a reliable locating system. The Contractor shall be
required to provide markings on the ground outside the house to show the current
location of the service. Payment for this bid item shall be on a per each basis and
shall include tracing the existing sewer service and marking the location.
28. STORM SEWER INLETS AND MANHOLES
Unit bid prices for inlets and manholes shall include excavation, furnishing all labor
and materials, backfilling and all other work necessary to complete the structure as
detailed on the plans or in the specifications. The Contractor shall be responsible for
replacement and for the cost of any casting, which is damaged due to his operations
or handling. Contractor shall install the IDOT RF-19C rodent guards for drain tile
connections to inlets (as necessary) and install perimeter rock as shown on inlet detail.
Each rodent guard shall be a complete assembly as shown on the detail. Modified
guards are not acceptable. Each complete rodent guard assembly shall be placed and
poured into the intake walls at the time of the inlet construction and not collared in at a
later time. The rodent guards shall be paid on a per each basis. Contractor shall also
construct a P.C.C. boxout/special shaping at each inlet, which are considered
incidental to the inlet bid price. Inlets may be backfilled four days after being poured
with C-4 mix and after two (2) days with M-4 mix. The forms may be removed after 12
hours.
An estimated length of pipe from existing structures has been included in the
estimated quantities for payment when reconstructing an existing inlet or manhole. If
the Contractors are able to use the existing pipe, no additional payment for pipe will be
made.
Boxouts shall be left 1/2" ± 1/4" lower than adjacent paving. Except for the porous
backfill at the lower 12", the backfill placed shall be Granular Subbase.
If the contractor constructs inlets prior to street closure and pavement removal, the
location of the inlet(s) shall be located in the field by construction staking based on the
information in the project plans.
29. TRENCH DRAIN
Trench drains will be PolyDrain as manufactured by ABT, Inc. or an approved equal.
The drains will be installed using the PolyClip system and the appropriate PolyWalls to
achieve the depth as shown on the plans. Grates and frames for the trench drains will
be model 2552A and made of ductile iron. Catch basins will be PolyDrain model 2611
or approved equal. Grates will be model 2604 and frames for the catch basins will be
model 2603, made of cast iron and be lockable. Contractor will submit shop drawings
to the engineer for approval.
Payment will be made on a linear foot basis. Payment shall be full compensation for
all shop drawings, equipment, labor, materials, rebar, excavation, backfill, expansion
SPECIAL PROVIDSIONS CONTRACT 859 Page 18 of 34
material, alley restoration, cutting hole in catch basin for outlet piE concrete collars,
etc. needed to install the trench drains and catch basins on tl is project as per
manufacturer's recommendations.
30. REMOVE AND REPLACE BOXOUTS: E-1-C INLET; E-2-C INLET, E-3-C INLET;
RA INSERTS AND TOPS, K INSERTS AND TOPS
These bid items involve removing and replacing concrete boxouts, inserts or tops
around castings of inlet structures. The Contractor shall remove the existing boxout
and casting from the structure, remove the concrete from the casting, reset the casting
to the proper elevation according to the standard detail included in the plans.
Any damages to the casting or structure caused by the Contractor's operations will be
the Contractor's responsibility. The Contractor shall be respons ble for protecting
existing castings from theft or damage whether to be reused in th s project or to be
delivered to the City Waste Management Yard. If theft or damage )f castings should
occur, the castings shall be replaced at Contractor expense.
31. CONVERTING WATER MANHOLE STRUCTURES TO ROAD BOXES
In cases where an existing water manhole is deteriorated or in huiz:ontal alignment
conflict with a proposed curb or pipe, the existing water manhole structure may be
removed and a water road box placed on the valve. The Waterloo Water Works shall
be contacted to assist in determining the feasibility of the conversion. If determined to
be converted to a water road box, the Waterloo Water Works will supply the road box
materials to the contractor at no charge to the contractor. These materials will be
available at the Water Works shop. All work involved in removing ar d disposing of the
existing structure, delivering the manhole casting to the Water Wor .s, the installation
of and the backfill around the valve shall be included in the unit hid price for each
conversion.
32. ROCK EXCAVATION
It is unknown if rock excavation will be required on this project. If encountered, rock
excavation will be paid by the cubic yard for the actual measured olume of granite,
trap, quartzite, chert, limestone, sandstone, hard shale, or slate in natural ledges or
displaced masses. It shall also include the estimated or measured volume of rock
fragments or boulders which occur on the surface or in subsurface deposits mixed with
earth, sand, or gravel when their size, number, or location prevents them from being
handled in a manner normal to excavation. Rock excavation will only be paid for
material extracted by means other than an excavator or backho i.e. by use of
blasting, jackhammer, etc. A unit price per cubic yard of rock E xcavation will be
negotiated with the contractor if rock excavation is encountered.
33. IN-LINE CHECK VALVE
Furnish and install a Tideflex Technologies Check Mate® Inline Check Valve in a 36"
diameter 2000D RCP located in the intersection of W. 9th Street ar d Byron Avenue.
Material shall be neoprene and installed with stainless steel banc clamps (contact
Darrell Bemrich of Willco, Inc. at 402-679-7079).
SPECIAL PROVIDSIONS CONTRACT 859 Page 19 of 34
SUBDRAINAGE
34. SUBDRAINS
SUDAS Division 4, Section 4040 applies with following revisions:
City of Waterloo "Standard Specifications for Municipal Public Works Construction"
General Specifications for Construction shall be used in lieu of "General Provisions &
Covenants" Division I.
A. Use Type 1 Subdrains for 4" and 6"; if HDPE, use Type S. For "Drain Tile, 4"
Stub" use 2.01 Footing Drain Collectors (solid wall pipe).
B. DRAIN TILE TAP AND COLLAR
This work shall include the tapping of new drain tile pipe into existing manholes,
inlets or pipe, including the concrete collar and fillet modification as necessary
and directed in the field by the Engineer. If an existing tap is found, connection
to this tap will be considered incidental. An IDOT RF-19C, Intake Outlet Detail
shall be constructed. All payments for above said work shall be made under
Bid Items "DRAIN TILE TAP AND COLLAR" and "IDOT RF-19C, Intake Outlet
Detail (Rodent Guard)."
WATER SERVICES
35. WATER SERVICE CORPORATIONS, CURB BOXES AND PAVE BOXES; PIPE
AND WATER SERVICE TAPS
Measurement and payment for furnishing and installing 3/4", 1" or 1-1/2" copper water
pipe shall be per lineal foot of approved material installed and shall include all material
and labor necessary, including trench excavation and backfilling with compaction.
Copper pipe shall be paid per lineal foot. The water service pave boxes, curb stops
and corporations shall be installed and paid on a per each basis as determined by field
conditions. For example, field conditions may require that an existing 5/8" corporation
be removed and a new 5/8" x 3/4" corporation adaptor be installed at the existing tap
location. If an existing corporation, curb stop or pave box is determined to be in
reliable operational condition and can be reused, no payment will be made for these
items.
At locations where a new tap is required, it shall be coordinated with the Waterloo
Water Works. New taps shall be paid on a per each basis.
Existing and new pave boxes at or near the property line shall be adjusted to grade by
the Contractor as required. All such work shall be considered incidental to applicable
items.
SPECIAL PROVIDSIONS CONTRACT 859 Page 20 of 34
Water Service Line Standard Design
The standard design criteria for a water service line requires that each water service
line is furnished with a curb stop controlling the water supply to the consumer, placed
at the outside edge of the sidewalk, or lacking plans for sidewalk placed six inches (6")
outside the property line. The curb stop shall be of the type known as the inverted key
and shall be equipped with a curb box (pave box) and stainles; steel rod. The
standard design criteria also requires that a water service line hall be extended
perpendicular to the water main and the property line.
The corporation, curb stop and curb box materials shall be listed b:low, or approved
equal. All curb boxes (pave boxes) shall have stainless steel rods.
Corporation Valves: Mueller H-15008 or H-15013, or approved equal.
Curb Stop Valves: Mueller B-25209, or approved equal.
Cur Box (Pave Box), with Stainless Steel Rod: Mueller H-10386, or approved equal.
Corporation Adaptors: Mueller H-15071, or approved equal.
36. INSULATED WATER SERVICES
Water service renewals may need to be insulated if they are fou id to be in close
proximity to, or in conflict with, sewer pipes or box culverts. There sl pall be a minimum
of 12" clearance between the bottom of the sewer and the insu ation around the
service pipe. The insulated area shall be minimum of eight (8) feet long, centered on
the sewer pipe or extend a minimum of four (4) feet beyond the edge of another
structure, such as a box culvert. Insulation shall be at least two (2") inches thick from
outside of water service pipe. Insulating material used shall be Ar naflex, wall foam
glass, or equal, with roofing jacket covering secured with nylon wre ties or copper
wire. The ends shall be formed to the pipe and sealed with an approved asphalt
material or approved equal by the Engineer and City Plumbing Inspector. This shall
be paid under bid item, "WATER SERVICE PIPE, 3/4" COPPER, INSULATED" on a
per each basis for the insulated area.
37. WATER SERVICE KILL
The work involved in this item is for the Contractor to locate the water service
connections at the addresses or locations indicated on the plans, and to remove
the existing water service line and curb box and stop, if necessary, and install a plug at
the tap location where the corporation is located. This item shall include all work
necessary to perform this work including excavation and backfilling operations. If the
water service is found to have already been killed (plugged), the Contractor shall be
paid for an Underground Investigation. If more than one kill is done per excavation,
only one water service kill will be paid. This bid item shall be paid on a per each basis.
When a water service kill can be made as part of another water servi,;e excavation, i.e.
as part of a new or renew water service installation, no separate )ayment shall be
made for the kill.
SPECIAL PROVIDSIONS CONTRACT 859 Page 21 of 34
38. LOWER WATER SERVICE, 3/4" — 1"
The "Lower Water Service" bid item will be used when a new storm sewer pipe or
system being constructed is in conflict with an existing copper water service. The
existing copper service line will be cut at locations on both sides of the
storm sewer, new copper pipe installed under the storm sewer or box culvert with a
minimum of 12-inch clearance and the new and existing copper service line connected
with an appropriate compression fitting. A maximum of ten (10) feet of new copper is
considered part of this item. If more length of new copper service pipe is required, the
additional length will be paid under the "Copper Water Service" bid item. All work
involved including excavation, backfill, materials, labor, etc. are considered incidental
to this item.
39. LOWER WATER SERVICE, 3/4", DOWNING AVENUE
The "Lower Water Service, Downing Avenue" bid item will be used on the long side
services. The existing copper service line will be replaced with new copper pipe
installed under the existing and new storm sewer with a minimum of 18-inch
clearance. All work involved including excavation, backfill, materials, labor, etc. are
considered incidental to this item. Fittings (corporation, pavebox, curb stop), if
needed, will be paid under separate items.
CONSTRUCTION SEQUENCING AND STAGING
40. ORDER OF CONSTRUCTION
A. RECONSTRUCTION
For both Alternates A and B, the following order of construction shall be followed:
A. Coordinate water main reconstruction requirements in contractor's schedule.
B. Placement of Informational Signs, informing public of pending construction; to
be placed six (6) calendar days in advance of street closing.
C. Notification of adjoining property owners 36 hours in advance for residences
and 10 days for businesses.
D. Install inlet protection and maintain throughout project as specified.
E. Reconstruct water main before pavement removal, if possible.
F. Pavement removal.
G. All other underground construction except longitudinal drain tile, unless
longitudinal not required on the street.
H. Subgrade removal and excavation for modified base and/or special backfill
base.
*I. Subgrade preparation and load test.
J. If load test fails, areas of subgrade repair shall be determined by the Engineer.
The subgrade repair excavation shall then be done.
K. Installation of longitudinal drain tile, if required.
L. Installation of subgrade repair aggregate or select material, if required.
M. Placement of modified subbase.
N. Paving.
SPECIAL PROVIDSIONS CONTRACT 859 Page 22 of 34
* NOTE: Steps I & J may be eliminated if subgrade re )air excavation is
determined to be necessary prior to I.
Alternate A:
1. Construct curb and gutter and saw joints; linseed oil if r wquired.
2. Joint sealing of curb and gutter.
3. Backfill curb and gutter after acceptable beam break and seven (7)
calendar days from the completion of the curb and gutter construction or
after attaining opening strength based on maturity method.
**4. Place base courses.
**5. Construct all driveways and sidewalks along street or phase, whether a
part of City contract or privately contracted.
6. Place surface course.
7. Fine grade backfill.
8. Final cleaning.
9. Pavement markings, if applicable.
10. Place signs indicating construction with local option do lars used
for street construction.
** Order is interchangeable.
Alternate B:
1. Construct paving; linseed application with cure, if required.
2. Seal joints. The backer rope in the joint, if required, shall be trimmed off
flush with the concrete at both ends of the joint at back of curb prior to
taping and sealing.
***3. Backfill after acceptable beam break and seven (7) calendar days from
the completion of the pour or after attaining opening strength based on
maturity method.
***4. Construct boxouts, driveways and sidewalks.
5. Cleanup.
6. Pavement markings, if applicable.
7. Place signs indicating local option dollars used for stree construction.
*** May be ongoing at same time.
NOTE: After construction is started on any street or stage/phase thereof, meaningful
progressive work shall continue each working day that is not affected by adverse
weather conditions or concrete curing requirements. Liquidated Damages in the
amount of $500.00 per day shall be assessed for noncompliance with this
requirement.
41. ACCESS TO PROPERTIES
The intent of construction staging is to maintain access to bus nesses, schools,
churches, apartments, etc. Other staging proposals submitted by lie Contractor will
be considered as long as adequate access is maintained.
The Contractor shall make every effort to minimize the amount of tine that access to
private properties and driveways is blocked. To allow businesses ':he opportunity to
SPECIAL PROVIDSIONS CONTRACT 859 Page 23 of 34
arrange alternate directional signing for customers, the Contractor shall inform
businesses ten (10) days in advance of the anticipated street closing. In cases where
residential ingress-egress is limited by the Contractor's operations, he shall give the
property owner involved at least 36 hours notice.
The contractor shall provide the Engineer with a copy of the notice (see order of
construction) mailed or delivered, the date of mailing or delivery, and a list of
addresses, properties, or persons contacted.
Those streets with staging indicated on the plans shall be constructed so that not more
than one stage is closed at a time (unless otherwise noted). The stage closed for
construction shall be completed prior to the subsequent stage being closed.
The staging for this project shall be as follows:
Allen Street
• The 400 block of Allen shall be completed during the public school summer
break (estimated dates of June 9 —August 16, 2014.
Bertch Avenue
• Stage 1 is subdivided into Stage 1A and 1 B. 1A is from W 8th to W 9th; Stage 2
is the W. 9th intersection. Stage 1A shall be completed through placement of
rock base before closing Stage 1 B.
• Stages 1A and 1 B may be paved as one stage; however, Stage 1 B shall not be
closed for more than two consecutive calendar weeks. Stage 1 B shall not be
closed with E. Mitchell Avenue (Randolph through Hammond).
• Traffic on W. 9th Street shall not be restricted during construction activities on
Stage 1A.
• Stage 2 is from W. 9th Street to Hammond Avenue. Stage 2 shall be completed
before Stage 3 of Hammond Avenue is closed.
Downing Avenue
• Stage 1 shall be completed during the public school summer break (estimated
dates of June 9 —August 16, 2014).
• Any one of Stage 4 — 7 may be closed at the same time as Stage 1.
• No two consecutive stages shall be closed at the same time.
Hammond Avenue
• Stage 1 shall not be closed with E. Mitchell Avenue (Randolph through
Hammond). Stages 1, 2, or 3 shall not be closed until Stage 2 of Bertch
Avenue is completed.
• Stage 4 may be closed with any other Hammond Avenue stage.
• The intersection of Hammond Avenue and Williston shall not be closed, or
partially closed, for any reason including bypass pumping for sanitary sewer
construction.
Hyperion Drive
• No two consecutive stages shall be closed at the same time, i.e., either the
intersection of Candlewick Road or Greenbrier Road shall be open at all times.
SPECIAL PROVIDSIONS CONTRACT 859 Page 24 of 34
Lafayette Street
• No two consecutive stages shall be closed at the same time.
• Access to Zuma Street shall be maintained at all times.
Oregon Street
• Stage 1 shall be completed during the public school summer I creak (estimated
dates of June 9 —August 16, 2014).
• Stages 1 and 3 may be closed at the same time.
E. Mitchell Avenue
• The intersections of Randolph Street and Hammond Avenue hall not be closed
at the same time.
• This street shall not be closed at the same time as Bertch AVE nue Stage 1 B
(intersection of W. 9th)
Staging for the construction of the surface course of the asphalt alternate may
not be required if approved by the Engineer.
PAYMENT, LIQUIDATED DAMAGES AND PENALTIES
42. PAYMENT FOR PAVING ITEMS
This paragraph shall apply to the unit prices for paving related items and restrict full
payment of the unit bid prices until a street or phase is completed and opened to traffic
or surface restored. By providing a breakdown of the unit price, the intent is to
encourage the Contractor to promptly complete the paving. The breakdown of the unit
price does not give the Contractor the choice of eliminating a portion of the work under
this unit price or delay his schedule for reason of obtaining pay nent based on a
certain percentage of his preference.
Payment shall be made on a breakdown of the unit bid price basis by withholding a
portion of the unit bid price based on work completed or by apportior ing the quantity of
completed work in accordance with the following schedule:
Payment as % of Coi tact
Work Performed Unit Price for Paving ''tems
A. All items of work related to paving,
except for those items identified in
"B" which follows. 80%
B. Fine grading of backfill, resetting
mail boxes, boxouts, final cleanup and
linseed oil surface treatment. 20%
When all work is completed, payment shall be made on 100 percent (100%) of the unit
bid price for paving related items. Topsoil is paid as a separate bi 1 item and will be
paid when completed.
SPECIAL PROVIDSIONS CONTRACT 859 Page 25 of 34
43. PAYMENT FOR SEWER PIPE AND DRAIN TILE
This paragraph shall apply to the unit prices of sanitary and storm sewer pipe and
drain tile and appurtenances and restrict full payment of the unit bid price until street is
completed and opened to traffic or surface is restored. By providing a breakdown on
the unit price, the intent is to encourage the Contractor to promptly restore the -
trenches. The breakdown of the unit price does not give the Contractor the choice of
eliminating a portion of the work under this unit price or delaying his schedule for
reason of obtaining payment based on a certain percentage of his preference.
Contract
for Sanitary or
Storm Work Performed Payment as % of
Sewer & Drain Tile and Pavement Removal Unit Price
A. Trench excavation, including removal 40%
and stockpiling of crushed rock and/
or topsoil from existing street, removal
of surfacing, laying of pipe, dewatering,
pumping, and other work as described under
sanitary or storm sewer pipe and drain tile
and required for the laying of pipe, and
placing two (2) feet of backfill above the
top of pipe.
B. Backfill of trench and compaction with 25%
moisture and density control of pipe
and appurtenances. If such compaction
with moisture and density control is not
required, 65% of the unit bid price will
be paid when backfill is complete.
C. Shaping of street surface ready to receive 35%
paving or surfacing or natural grade including
relaying of topsoil (where street surfacing will
not be required) and all other work as further
described in this paragraph.
When all work is completed, payment shall be made on 100% of the unit bid
price for sanitary, storm sewer pipe and drain tile.
Removal of existing pipe shall be considered incidental to the construction of
new pipe.
44. TRAFFIC CONTROL
The Engineer, or authorized representative, shall periodically review traffic control that
has been put in place by the Contractor. If traffic control devices are found to be
without proper maintenance, penalties shall be assessed. Improper maintenance shall
include, but not be limited to, the following situations:
SPECIAL PROVIDSIONS CONTRACT 859 Page 26 of 34
A. Less than 100 percent of lights in working order.
B. Any barricade or sign moved or tipped over,
C. Fencing not supported in a vertical position.
D. Fencing not placed around excavations when workers!,equipment are not
working at the location.
E. Lack of proper barricades or signage.
Each incident is treated as a separate citation on an individual basis. It is not intended
that minor deficiencies be price adjusted if corrected the day notific ation is given. In
addition to a price adjustment, the Engineer may suspend work for irresponsible
and/or repeated failure to construct the project using proper traffic col trol procedures.
Penalties: 1st Offense Written warning given by City.
2nd Offense $ 100
3rd Offense $ 250
4th Offense $ 500
5th Offense $1,000
6th Offense Engineer's discretion (amount
or more equal or greater than $1,000)
45. LIQUIDATED DAMAGES
Time is an essential element of this contract. It is important that the work be diligently
pursued to completion. If the work is not completed within the specified contract
period, plus authorized extensions, the Contractor shall pay to th 3 City Liquidated
Damages in the amount of $500.00 per day, for each day, as further described herein,
in excess of the authorized time.
Days beyond the specified completion date for which Liquidated Damages will be
charged will be working days that the Contractor does, or could have worked from
Monday through Saturday. Sundays will be counted only if work is performed. Partial
working days will be considered as a full working day. Days not chargeable for
Liquidated Damages will include rain days, Sundays if no work is done, and legal
holidays.
Working days will cease to be charged when only punch list items remain to be
completed. Punch list items do not include contract bid items or approved
change/extra work orders.
When the Contractor believes the project to be substantially completed, a written
notice stating the same shall be submitted to the Engineer and a re quest made for a
Punch List. If the work under the Contract extends beyond the normal construction
season for such work, the Contractor shall submit to the Engineer in writing a request
that working days counted toward the project be suspended until wcrk is resumed the
following construction season.
This amount is not construed as a penalty. These damages are for t le cost to the City
of providing the required additional inspection, engineerin j and contract
administration.
SPECIAL PROVIDSIONS CONTRACT 859 Page 27 of 34
MISCELLANEOUS
46. CONCRETE CLEAN-UP AND WASHOUT
Runoff from concrete cleanup is a caustic pollutant that can harm wildlife and
vegetation. DO NOT clean tools, equipment, and concrete trucks into or allow wastes
to enter into the streets, ditches, storm drains or waterways.
In Waterloo, failure to follow proper concrete clean-up procedures is a violation of the
City's Code of Ordinances and is considered a municipal infraction, punishable by
fines.
The current City of Waterloo schedule of fines is:
1st offense $200 fine and court costs
2nd offense $500 fine and court costs
3rd and subsequent offense $750 fine and court costs
All concrete wastes shall be deposited into pre-approved waste receptacles. Waste
receptacles may be installed on select City properties to provide a central location and
minimize costs. The locations selected to host the waste receptacles shall be
approved by the City Engineer prior to installation. Upon completion of construction,
the location of the waste receptacles shall be returned to pre-construction condition.
Earthen pits are not an acceptable waste receptacle.
47. CONSTRUCTION SURVEY
A. General Requirements
The Contractor shall furnish the engineering surveys necessary for construction
of all contract items as intended by the project plans and approved plan
revisions. The original stakes set by the Contractor shall be preserved. If in the
opinion of the Engineer any of the original survey stakes or marks have been
carelessly or willfully destroyed or disturbed by the Contractor, the cost of
replacing shall be charged to
the Contractor. Construction survey shall include qualified personnel,
equipment and supplies required for the following items of survey work, with
related classes of construction work:
1. Pavements (PCC & ACC)
a. Elevations on both sides at each even 25 ft. station interval or less
as indicated by intermediate stations on plans.
b. Alignment (tack line) on two sides.
2. Sanitary and Storm Sewers
a. Centerline.
b. Flow line elevation.
SPECIAL PROVIDSIONS CONTRACT 859 Page 28 of 34
3. Intakes and Manholes
a. Location.
b. Elevation of top, base and flow lines of pipes.
c. Back of curb (Intakes) or centerline (Manholes).
4. Sidewalk common square location only. Elevations to ae verified in field
by contractor.
Flats shall be placed at each hub with the station, offset and cut or fill
written on the flat. Copies of the "cut sheets" shall be given to the
Engineer and contractor as soon as possible after the staking has been
completed for the particular work. These can be provided to if e
Engineer by email or legible fax.
Survey work and recording of data in permanently bound survey books should
be reasonably in accord with instructions in the IDOT Inspector's Handbook to
be supplied by Contractor. Survey work shall be done with a registered
Professional Engineer or a registered Land Surveyor in responsible charge, in
accord with provisions of Chapter 114, Code of Iowa. The Contractor shall
submit a resume identifying the field survey personnel and tr eir capabilities to
perform the intended requirements.
The method of determining alignments and elevations and the method of
preserving control points shall be subject to review and approval by the
Engineer, but this approval shall not act to relieve the Contractor of the
responsibility for the correctness thereof.
The Engineer will provide benchmark elevations. Control poi Its and reference
points and property pins are not presently tied down in the fic Id. Centerlines of
streets were established by splitting the backs of curbs or fin( ing property pins
and establishing centerline.
All permanently bound survey books and data are to becom 3 property of the
City of Waterloo. The work of this specification will be co isidered finished
when the completed books and data are furnished to tP e Engineer and
accepted by him.
B. Payment
Construction survey will be paid for at the lump-sum contract price, which
includes all labor, equipment and supplies required to do this work. If additional
work is necessary, due to approved changes, it shall be on a per-hour basis,
and approved by the Engineer. The Contractor shall submit the per-hour rate
with the Form of Bid or Proposal. The Engineer may make partial payments
based on his estimate of the survey work completed. Final payment will be
made at the time the permanently bound survey books are Submitted to and
accepted by the Engineer.
SPECIAL PROVIDSIONS CONTRACT 859 Page 29 of 34
C. Extra Staking
For any extra or additional staking, including restaking, the City Inspector and
the Contractor responsible for the staking shall be notified of the following
information the same day the staking is done:
1. The reason for the staking.
2. The party responsible for the expense of the staking.
3. The estimated or actual number of hours and personnel to be charged.
48. HAUL ROUTES
Haul routes to and from the project site shall be submitted for review by the Engineer.
In general, the Contractor shall request haul routes over the main streets in the area,
staying on streets within the project as much as possible and should not include truck-
embargoed streets.
49. WATER ON GRADE
After paving has been removed on a street, and during the course of the project, the
prime contractor shall be responsible to pump out any water that has accumulated on
the grade at intersections or other low spots. This shall be completed within twenty-
four (24) hours of the source (rain, main break, etc.) of water being terminated. This
work shall be considered incidental to applicable items.
50. ARTIFICIAL LIGHTING
No artificial lighting will be allowed during construction of this project.
51. WIDENING OF EXISTING DRIVEWAYS
The Contractor will be paid for replacing existing driveways at their existing widths. If
any property owner desires to widen a driveway, it shall first be approved by the
Engineer. The property owner shall be responsible to make arrangements privately
with his own contractor for payment of driveway widening approved by the Engineer.
The City will not pay for the widening of any driveway, except at specific locations as
directed by the Engineer.
52. ROCK DRIVEWAYS
Existing rock in existing driveways shall be salvaged for reuse where possible. Drive
area disturbed by excavation work shall be rocked to a depth of six (6") inches. After
placement of existing rock and/or new rock, the drive area shall be compacted as
approved in the field by the Engineer.
53. QUANTITY ADJUSTMENTS
The following Bid Items are exempted from consideration under the provisions of
Section B. "Scope of Work," Paragraph 7 of the "General Specifications for
Construction" concerning the variance of the "As-Built" quantity of the listed item by _
more than twenty (20%) percent from the estimated quantity specified in the contract:
SPECIAL PROVIDSIONS CONTRACT 859 Page 30 of 34
BID ITEM DESCRIPTION UNIT TOTAL
QTY
DIVISION I BASE BID - SECTION I
14 SIDEWALK CURB SECTION LF 315.9
15 MISCELLANEOUS CONCRETE CY 1.6
20 SAW CUT LF 2,794.0
21 GEOGRID SY 21,072.4.
22 WOVEN GEOTEXTILE SY 32,322.5
23 MODIFIED SUBBASE TON 29,917.E
25 ROADSTONE, 3/4" TC)N 117.0
31 CONVERT WATER VALVE MANHOLE TO ROADBOX EACH 27.0
32 WATER SERVICE CORPORATION, 3/4" EACH 98.0
33 WATER SERVICE CURB STOP, 3/4" EACH 98.0
34 WATER SERVICE PAVE BOX, 3/4" EACH 98.0
35 COPPER WATER SERVICE, 3/4" LF 2,491.0
36 WATER SERVICE CORPORATION, 1" EACH 2.0
37 WATER SERVICE CURB STOP, 1" EACH 2.0
38 WATER SERVICE PAVE BOX, 1" EACH 2.1)
39 COPPER WATER SERVICE, 1" LF 50.0
41 WATER SERVICE TAP, 3/4" OR 1" EACH 2.0
42 LOWER WATER SERVICE, 3/4" OR 1" EACH 6.0
43 UNDERGROUND INVESTIGATION-WATER EACH 19.0
44 LOWER WATER SERVICE, 3/4", DOWNING AVENUE LF 1,254.0
47 TOPSOIL REMOVAL FROM PARKING, EARTHWORK SY 10,762.7
48 CONSTRUCTION SURVEY LS 1.0
DIVISION I BASE BID - SECTION II
83 INSULATE EXISTING COPPER WATER SERVICE EACH 16.0
84 FURNISH AND INSTALL MANHOLE RING AND COVER EACH 2.0
EACH 2O2.0
85 STORM WATER PROTECTION FOR STRUCTURES
DIVISION I BASE BID -SECTION III
102 FURNISH AND INSTALL MANHOLE RING AND COVER EACH 5.0
103 TRACE SANITARY SEWER SERVICE EACH 20.0
104 DYE TEST INVESTIGATION EACH 30.0
DIVISION I BASE BID -SECTION IV
118 RECYLED ASPHALT PAVING TON 78.0
DIVISION I BASE BID -SECTION V
120 SIDEWALK, 4" PCC, C-4 SY 316.5
121 SIDEWALK, 5" PCC, C-4 SY 36.6
122 EXCAVATION FOR NEW SIDEWALK SY 353.1
ALTERNATE A
11A COLD WEATHER CONCRETE PROTECTION SY 3,209.1
12A LINSEED OIL TREATMENT SY 3,209.1
14A EXCAVATION CY 17,389.3
BID ITEM DESCRIPTION UNIT TOTAL
QTY
ALTERNATE B
4B COLD WEATHER CONCRETE PROTECTION SY 12,744.1
5B LINSEED OIL TREATMENT SY 12,744.1
10B EXCAVATION CY 14,336.5
SPECIAL PROVIDSIONS CONTRACT 859 Page 31 of 34
54. PERCENT OF CONTRACT TO BE PERFORMED BY PRIME CONTRACTOR
The Prime Contractor shall be required to perform at least 30 percent of the total
contract amount of this project. Purchasing of materials for subcontractors will not be
an acceptable method for the prime contractor to meet the 30 percent requirement.
55. INFORMATIONAL SIGNS RELATING TO CONSTRUCTION
A. Advanced Informational Signs
Advanced information signs shall be placed near the beginning and
end of the project six (6) calendar days in advance of the street being closed
for construction. These signs shall be approximately 2' x 3' in size, with the
following wording: "This street to be closed for construction on (day of
the week). One percent local option dollars at work. Thank you for your
cooperation." Signs shall be placed on Hammond Avenue, Downing
Avenue, W. 9th Street/Bertch Avenue intersection, and Lafayette Street.
These informational signs shall be considered incidental to the traffic control
bid item.
B. After-Construction Signs
These signs shall be similar as the Advanced Informational Signs, except -
that the first line shall read: "This street constructed with Local Option
Dollars." After-construction signs shall be placed on all streets after they
have been completed and open to traffic.
The after-construction signs shall remain in place for at least four (4) weeks.
The cost of these signs shall be considered incidental to applicable items.56. VOLUNTARY PARTNERING
The City of Waterloo intends to encourage the formation of a partnership with the
contractor and its principal subcontractors. This partnership will be structured to draw
on the strengths of each organization to identify and achieve mutually beneficial goals.
The objectives are effective and efficient contract performance and completion within
budget, on schedule, and in accordance with plans and specifications.
This partnership will be multi-lateral in makeup, and participation will be totally
voluntary. Any cost associated with effectuating this partnering will be agreed to by all
parties and will be shared equally by the participating parties.
The establishment of a partnership charter on this project will not change the legal
relationship of the parties to the contract nor relieve the parties from any of the terms
of the contract.
57. PAVEMENT MARKING
This work involves placing temporary and permanent pavement markings and symbols
in accordance with I.D.O.T. Section 2527. All paint used on this project shall be
SPECIAL PROVIDSIONS CONTRACT 859 Page 32 of 34
waterborne paint and shall have reflectorizing spheres meeting Sectic n 4184 of the
I.D.O.T. Standard Specifications. All legends and symbols shall be piecut preformed
polymer or thermoplastic materials conforming to PreMark® by Flint 1 rading, Inc., or
equal.
The Contractor shall clean the pavement prior to placement of the pa, ement markings
and symbols.
The Contractor shall work with the City-Sign and Traffic Department ti] determine
exact placement of all markings and symbols in the field.
Payment for symbols and legends shall be on a per each basis. Payment shall be full
compensation for all equipment, labor, materials and cleaning of the pavement needed
to place all symbols in this project, as per manufacturers recommendations.
Payment for temporary and permanent pavement markings shall be on a station basis.
Payment shall be full compensation for all equipment, labor, materials and cleaning of
the pavement needed to place all symbols in this project.
See plan sheet for a tabulation of the pavement markings, symbols, a ld legends.
58. HYDRO-SEEDING (HYDRAULIC SEEDING)
Use standard urban mix; including grade preparation, in areas directec by the Engineer,
Contractor shall be paid per square yard of completed area.
SUDAS Standard Specifications, Division 9 — Site work and Landscaping, Section
9010 — seeding shall apply, except that measurement and payment will be made in
square yards.
59. STORM WATER POLLUTION PREVENTION
Storm water pollution prevention has become an important issue on construction
projects. Therefore, the City is requiring that the storm sewer system xi this project be
protected in order to reduce and minimize the impact of sediment-lac en runoff flowing
into the storm sewer system.
Detail sheets are included in the plans with representation of various : tructures and the
proposed protection to be provided. A tabulation is also included in th 3 plans indicating
the estimated number of structures (existing and new) to be protected.
Payment for protecting the structures will be made on a per each basis and includes all
labor and materials needed to do so during the course of the project. after construction,
protection at the inlets shall be left in place until vegetation has been e-established, or
the City authorizes removal of the protection. No separate payment will be made for
protection of open ends of storm sewer pipe, but this will be consid ;red incidental to
applicable items.
Should the protection not be provided or not maintained, the contracto s will be required
to remove sediment from the inlets or storm sewer at his own expense. The materials
SPECIAL PROVIDSIONS CONTRACT 859 P tge 33 of 34
shall be removed in such a manner as to present further contamination of the storm
sewer system and subsequent impairment of downstream receiving waters of the sewer,
60. STEP RECONSTRUCTION
On Allen Street there are several locations where existing steps will be impacted by the
street reconstruction. The contractor is advised to document the type of construction
(materials, patterns, etc.) that exist prior to removal to allow the reconstructed features to
match existing.
Reconstruction of steps will be paid as "MISCELLANEOUS CONCRETE" on a cubic
yard basis and includes all work and materials involved to form, grade, pour, etc. the
steps.
SPECIAL PROVIDSIONS CONTRACT 859 Page 34 of 34
c S-2013-07-22
CITY OF WATERLOO, IOWA
SUPPLEMENTAL SPECIFICATIONS
FOR SANITARY SEWERS AND CONSTRUCTION MATERIALS
Effective Date
July 22, 2013
THE STANDARD SPECIFICATINS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION ARE
AMENDED BY THE FOLLOWING MODIFICATIONS AND ADDITIONS. THESE ARE SL PLLMENTAL
SPECIFICATIONS AND THEY SHALL PREVAIL OVER THOSE PUBLISHED IN THE STAI\DARD
SPECIFICATIONS.
1. SPECIFICATIONS FOR SANITARY SEWERS
SECTION V. TESTING
A. Deflection Testing
The first paragraph shall be revised to read as follows:
Deflection tests shall be performed on all composite and flexible pipes. The deflection
test shall be conducted after the final backfill has been in place at least thirty (30) days.
2. SPECIFICATIONS FOR CONSTRUCTION MATERIALS
SECTION XXVII. SEWER AND MANHOLE MATERIALS
A. Pipe for Sanitary Sewers
Delete the following:
2. Flexible Pipes Material Specifications Joint Specification
Polyvinyl ASTM D3034-77 ASTM D3212-76
Chloride ASTM C3033-77 ASTM D2855-77
(PVC) (SDR<_ 35)
Page 1 of 2
Add the following:
2. Flexible Pipes 18"—36" Diameter
Polyvinyl Chloride (PVC)
Material Specification Joint Specifications Bedding and Installation
ASTM F949 ASTM D3212 ASTM D2321
and ASTM F477
PVC material shall be cell class 12454B with PCV compounds by ASTM D1784.
3. COMPOSITE PIPES
Delete the following:
Composite Pipes 8"— 15" Diameter
Polyvinyl Chloride (PVC) Composite
Material Specifications Joint Specifications Bedding and Installation
ASTM D2680 ASTM D3212 ASTM D2321
and ASTM F477
PVC material shall be cell class 12454B with PVC compounds by ASTM D1784.
Page 2 of 2
1NAT
IGLOO WATEk WORKS
_ _..,,,,,„.,.„,, _: , „,..-,-7,--t-.--------- .. -0580: .':.''' ,tttra!,-*-•-,,:,-Ar -,t „
F.Y. 2014 Street Reconstruction Progr am,
Contract No. 859
•Division II
Water Main Replacement and Extension
Special conditions
CERTIFICATION
`‘„ FESSIO "i,� I hereby certify that this engineering document was prepared by me or under my
�� �•••• •••�� /i. direct personal supervision and that I am a duly Licensed Professional Engineer
. Q �. under the laws of the State of Iowa.
co' DENNIS D. • 2�
w : CLARK :m _= Signature: s
=
v •• 9656 :'n Dennis D.Clark, P.E.
> • • -Z7�
Date: March 12,2014 License No. 9656
''',,e", 1Q P *��'•```` My license renewal date is December 31,2014 Divis m 11
���i' Iliii iOs Pages or sheets covered by this seal: Special Conditions
SC-1 of 17
SPECIAL CONDITIONS
ARTICLE 1 - Introduction
1 . 1 These special provisions are applicable to a water main replacement
and/or extension project on public streets in Waterloo, Iowa, and
are a part of the City of Waterloo F.Y. 2014 Street Reconstruction
Program, Contract No. 859.
1 . 2 The purpose of the project is to replace or extend certain water
mains to serve properties along public streets in Waterloo, IA.
1 . 3 The contractor shall coordinate the water main installation work
with all contractors or utility construction that is in any way
allied to the entire project.
1 . 4 No change order or alteration in the water main replacement plans,
specifications or contract documents will be made without the prior —
written approval of the Waterloo Water Works General Manager.
1 . 5 The following are standard specifications for the project, and
shall be considered as part of the contract documents .
Waterloo Water Works "Standard Specifications for Installation of
Water Main", dated August 22, 2007
Iowa Statewide Urban Design and Specifications (SUDAS) , current
edition
American Water Works AWWA Standards, current edition
City of Waterloo Standard Specifications for Municipal Public Works
Construction, City of Waterloo, Iowa
Standard Specifications for Highway and Bridge Construction, Iowa
Department of Transportation, Ames, Iowa, latest series and current
revisions thereof.
1 . 6 These special provisions contain statements that modify and
supersede the standard specification referenced in the above
Paragraph 1 . 5. Notes on the project plans supersede these special ,..
provisions and the standard specifications referenced in the above
Paragraph 1 . 5.
SC-2 of 17
1 .7 The contractor shall insure all required barricades, fencing,
—' delineators, and such additional safeguards, safety devices and
protective equipment are erected and maintained, and take such
actions as are reasonably necessary to protect the life and health
of their employees, subcontractors, and the public in the vicinity
of all construction work zones. The above referenced traffic
control devices shall be in conformance with Part 6 of the Manual
of Uniform Traffic Control Devices, current edition.
1 .8 The contractor shall notify the respective utilities and/or City
departments a minimum of forty-eight working hours in advance of
commencing work on the project and to thereafter coordinate
necessary adjustments and or relocations so as to eliminate delays
and service interruptions. The contractor shall not be compensated
for delays and/or extra costs due to conflicts with any utilities
or water/sewer facilities unless noted otherwise.
1. 9 All Division II bid items are exempted from consideration under the
provisions of Section B, "Scope of Work, " Paragraph 7 of the
"General Specifications for Construction" concerning the variance
of the "As-Built" quantity of any Division II items by more than
twenty (20%) from the estimated quantity specified in the contract.
SC-3 of 17
ARTICLE 2 - Pipe and Accessories
2 . 1 Except where noted on the plans, all permanent pipe shall be new
ductile iron slip joint Class 52 pipe as described in the "Standard Specifications for Installation of Water Main" and shall be
supplied by the contractor. All ductile iron water mains shall be
installed with polyethylene encasement per the ANSI/AWWA C105/A21 . 5
National Standard. The pipe and the polyethylene encasement shall
be supplied by the Contractor. When lifting polyethylene-encased
pipe, the contractor shall use a fabric-type sling or a suitably
padded cable to prevent damage to the polyethylene.
2 . 2 All permanent fittings, valves and pipe accessories shall be new
material as described in the appendix of the "Standard
Specifications for Installation of Water Main" and shall be
supplied by the contractor. All fittings, valves, and pipe
accessories shall be installed with polyethylene encasement per the
ANSI/AWWA C105/A21 . 5 National Standard. The fittings, valves,
polyethylene encasement and pipe accessories are to be supplied by —
the Contractor. The Waterloo Water Works will make all side taps
and corporation taps at no cost to the Contractor. Excavation,
backfill and compaction for side taps and corporation taps are to
be by Contractor. Megalug retainers shall be used on non-flanged
connections at locations directed by the Engineer.
2 . 3 Except for at temporary street crossing pipe-ramp locations, all
temporary surface water main pipe shall be 3-inch SDR 21 Polyvinyl
Chloride (PVC) , meeting ASTM D2241 specifications. At the
temporary street crossing pipe-ramp locations, the temporary water main in the pipe-ramp shall be 2-inch SDR 21 Polyvinyl Chloride
(PVC) , meeting all of the specifications of the 3-inch PVC
referenced in this section. The temporary water main shall be
white in color with industry standard markings on the exterior.
Joints in the temporary water main shall be PVC solvent weld
joints, with primer. PVC fittings shall be Schedule 40. Ball
valves at service lines shall be of brass construction. Ball
valves at the 2-inch feed line locations shall be of brass
construction. Installation of PVC water main in temporary street
crossing pipe drive over ramp locations shall be incidental to
temporary PVC water main.
SC-4 of 17
2 . 4 In locations only as indicated on the plans, permanent new water
main pipe shall be new C909 molecularly oriented Polyvinylratloride
pressure pipe, conforming to AWWA Standard C909, pressure
g
200 or higher. All iron water a�hefittings
ANSI/AWWA C105/A21n5tNational
d
with polyethylene encasement pertracer wire, and the
Standard. All pipe, fittings, bedding,
polyethylene encasement shall be supplied by the Contractor. When
lifting polyethylene-encased fittings, the contractornshallt usegeta
fabric-type sling or a suitably padded cable to p
the polyethylene.
C909 PVC pipe shall be bedded as shown on the plans . Bedding shall
be 1-inch clean limestone, with greater than 98% passing the 1-inch
sieve and less than 2% passing the Number 200 sieve.
All service connections for C909 pipe shall use pipe service
saddles. Pipe service saddles shall be Smith-Blair 317 or approved
equal, high strength ductile iron bodied saddlesa with
datwndo stainlalless
steel straps. The saddle body shall be epoxy
manufactured in accordance with AWWA C800. Each stainless steel
strap shall have a stainless steel bolt, washer and nut on each end
monl
of the strap to connect it to the ductile iron saddle.
SC-5 of 17
ARTICLE 3 - Modifications to Standard Specifications
3 . 1 The Contractor shall, in the presence of a Waterloo Water Works
inspector, make all connections to the existing system, cut
existing pipes and remove plugs with extreme caution to prevent
contamination. The Water Works will operate all valves necessary
to shut off and reactivate its water lines .
3 . 2 Section 9-7 of the "Standard Specifications for Installation of
Water Main" is hereby modified as shown on the drawings for
separation from sewers and will be established by location provided
to the Contractor in the field.
3 . 3 Section 17 (Pressure Tests) and Section 19 (Sterilization) are
modified to provide for chlorine tablets furnished by the Waterloo
Water Works to be inserted by the contractor at each pipe length,
water filled for at least 24 hours, and flushed out by the
contractor. The contractor shall dechlorinate all discharged
chlorinated water as necessary to comply with the current
requirements of the Iowa Department of Natural Resources . Both the
temporary PVC surface water main and the new permanent water main
shall be sterilized, satisfactorily tested for bacteria with two
consecutive tests, satisfactorily pressure tested, and approved by
the Waterloo Water Works before being placed in service. All work
associated with this item shall be performed by the contractor,
with the exception of sampling and testing the water for bacteria.
The contractor will assist the owner in obtaining a representative
sample of water for testing. Collecting and testing of the water
samples will be performed by the Waterloo Water Works. Failure of
a bacteria test shall cause the contractor to repeat the process
until satisfactory results are obtained, at no additional cost to
the Waterloo Water Works. After satisfactory bacteria tests are
obtained, the contractor shall pressurize and test the water main
as directed in the "Standard Specifications for Installation of
Water Main".
3 . 4 Section 18-5 of the "Standard Specifications for Installation of
Water Main" is hereby modified to delete the reference in the third --
paragraph which refers to lawn areas being restored with sod.
Backfill will be as specified in Article 5.2 of the Special
Conditions .
3. 5 Concrete blocking for thrust restraints shall be constructed at
locations shown on the plans or as directed by the Engineer.
SC-6 of 17
ARTICLE 4 - Measurement for Payment
4 . 1 Field measurements will be made to determine the actual quantity of
materials installed to determine quantity for payment .
4 . 2 The installation of polyethylene encasement and connections to the
existing system are incidental to the water main installation and
will not be measured for payment.
4 . 3 Temporary PVC surface water main will be field measured for length
to determine the quantity of PVC surface water main. installed.
Tees, 2x3 reducers, bushings, brass ball valves an other fittings
for service lines will not be measured for payment but will be
considered incidental to the unit bid price for th,: temporary PVC
water main. Connections to each end of the temporary PVC water
main, including but not limited to 2-inch corporat-ons, saddles, 2-
inch copper pipe, 2-inch brass ball valve, compression couplings,
and other necessary fittings, will not be measured for payment but
shall be considered incidental to the unit bid pri:e for the
temporary PVC water main. The contractor shall install one
additional tee, 2-inch brass ball valve with cap, and other necessary fittings at each end of each section of the temporary PVC
surface water main for use exclusively by the Waterloo Water Works.
Removal of the temporary PVC surface water main will not be
measured for payment and shall be included in the bid price for
temporary PVC surface water main. Sterilization, consecutive
bacteria testing, and pressure testing shall be incidental to the
temporary PVC surface water main. Installation of PVC water main in
temporary street crossing pipe drive over ramp locations shall be
incidental to temporary PVC water main.
4 . 4 Short side water services will be counted to determine the actual
quantity installed to determine quantity for payment. The bid item
shall include all costs to excavate and disconnect the existing
house service lines from the old water main; to reconnect the
service lines to the temporary water main; and to disconnect the
house service lines from the temporary PVC water main. The bid
item shall also include all costs to connect a ne4 service line to
the new water main; to install the new service line from the
corporation to the new curb stop; to install and connect a curb
stop and pave box with a stainless steel rod; one to install new
service pipe as necessary to connect the curb step to the existing
service line. Corporations, service saddles where required,
temporary service pipe extensions as necessary, permanent copper
service pipe from the corporation to the curb stcp, curb stops,
_ pave boxes with stainless steel rods, copper service pipe as
necessary from the curb stop to the existing service line, and
couplings shall not be measured for payment but will be
SC-7 of 17
considered incidental to the unit price for "short side water
services". Bid price shall include all labor, equipment,
excavation, compaction, and material needed for installation.
4 . 5 Long side water services will be counted to determine the actual
quantity installed to determine quantity for payment. The bid item
shall include all costs to excavate and disconnect the existing
house service lines from the old water main; to reconnect the
service lines to the temporary water main; and to disconnect the
house service lines from the temporary PVC water main. The bid item shall also include all costs to connect a new service line to
the new water main; to install the new service line from the
corporation to the new curb stop; to install and connect a curb
stop and pave box with stainless steel rod; and to install new
service pipe as necessary to connect the curb stop to the existing
service line. Corporations, service saddles where required,
temporary service pipe extensions as necessary, permanent copper
service pipe from the corporation to the curb stop, curb stop, pave
boxes with stainless steel rods, copper service pipe as necessary from the curb stop to the existing service line, and couplings —
shall not be measured for payment but will be considered incidental
to the unit price for "long side water service". Bid price shall
include all labor, equipment, excavation, compaction, and material
needed for installation.
4 . 6 At locations directed by the Engineer, temporary drive-over
protection locations of the temporary PVC surface water main will
be counted for payment. The bid item amount shall include all
costs to construct the drive over protection of durable and
sufficient material to bridge over the temporary water main without
damage to the temporary water main or to the vehicle passing over
the temporary protection, with barricades on each side of the
temporary drive-over protection. Bid price shall include all labor,
equipment, excavation, compaction, barricades, and material needed
for installation. Any damage to the temporary main due to
inadequate drive-over protection shall be promptly repaired by the
contractor at no additional cost to the Waterloo Water Works.
4 . 7 Permanent ductile iron water main or permanent C909 PVC water main
will be field measured for length to determine the quantity
installed. Bedding as specified, polyethylene encasement and
connections to the existing system are incidental to the water main
installation and will not be measured for payment. Bid price shall
include all labor, equipment, excavation, compaction, and material needed for installation. Sterilization, consecutive bacteria
testing, and pressure testing shall be incidental to the permanent
ductile iron or permanent C909 PVC water main.
SC-8 of 17
ARTICLE 5 - Pipe Installation and Backfill
5 . 1 All water main pipe shall be laid to a minimum depth that provides
six feet (6. 0' ) of cover after the road construction is completed.
5 . 2 The contractor shall backfill and compact ditches in the right-of-
way as required by the Waterloo City Engineer and the Waterloo
Water Works. All excavations that cross paving or are within 6
feet of paving, buildings, or other surface improvements shall be
compacted to a minimum of 95% of Standard Proctor Density at -2% to
+4% of optimum moisture and to a minimum of 90% in all other areas.
5. 3 Contractor shall confine construction equipment, the storage of
materials and equipment and the operations of workmen to public
property as provided or permitted by law, ordinances, permits or
the contract documents . If private property is used, the
Contractor shall make arrangements for use of land and pay for
damages done to the occupied property. The Contractor shall
promptly clean up all excavation material, excess concrete, and
unused materials . The Contractor shall restore surface features
and structures to conditions which existed prior to construction.
For areas damaged outside of construction limits, restoration of
damaged landscape work such as trees, shrubs, and grass shall be to
original condition or better, at no additional cost to the Waterloo
Water Works. Fence repair shall be incidental to the contract.
5. 4 Surface restoration for all areas that are disturbed for
construction of water main, in areas not scheduled for other
surface improvements, shall be restored as described in this
Article. Surface restoration, in all areas disturbed by Division
II construction, shall include providing a finished subgrade
elevation suitable for placement of a 4-inch thick topsoil layer.
Surface restoration shall also include placement of a 4-inch thick
topsoil layer in all areas. In the three-foot wide area behind
back of curb in areas immediately adjacent to new street
construction, the provisions of this article regarding the
placement of the 4-inch thick topsoil layer do not apply.
Furnishing and placing topsoil shall be in compliance with all
conditions and specifications of the Division I Street
Reconstruction project. All surface restoration applicable to this
Special Provision Article will not be measured for payment, but
shall be incidental to the new water main items. The contractor
- shall restore all disturbed surface areas . Areas disturbed outside
of construction limits shall be restored as specified by this
provision and as in Special Provision Article 5. 3 . Surface
restoration will not be measured for payment, but shall be
considered incidental to other water main items.
SC-11 of 17
5 . 5 The bid items listed in the proposal are intended to obtain for the
Waterloo Water Works a complete water distribution system in the
areas designated.
SC-12 of 17
ARTICLE 6 - Contractors Work Schedule
emmi
6. 1 The water main contractor shall coordinate their work with the
other contractors working in the project area to expedite the water
main installation project and the road construction project.
6.2 The existing water main and house services shall remain in service
until such time as the temporary surface water main or the new
ductile iron main is satisfactorily completed, tested and approved
by the Waterloo Water Works. All water mains, both temporary and
permanent shall be sterilized, consecutive bacteria tested, and
pressure tested prior to being placed in service. Interruption of
house services will only be permitted for the shortest time
possible during disconnection from the existing main and
reconnection to the temporary main or disconnection from the
temporary main and reconnection to the new main.
-•e
r..
SC-13 of 17
ARTICLE 7 - Description of Work
7 . 1 The following is a general description of the work to be performed.
The plans and other sections of these documents provide additional ..
details . When a work sequence is described or suggested, it is
intended as assistance to the Contractor and may be altered as the
Contractor sees fit or altered by other construction work, subject
to approval by the Waterloo Water Works. The Contractor shall
coordinate their work and schedule with other Contractors and
Utilities on the work site. --
7 . 2 The Contractor shall install the water mains, fittings, valves, and
accessories as shown on the plans and as directed by an authorized —
representative of the Waterloo Water Works . The plans and other
sections of these documents provide additional details.
7 . 3 All ductile iron water mains, fittings, valves, and pipe
accessories shall be installed with polyethylene encasement per the
ANSI/AWWA C105/A21 . 5 National Standard.
7 . 4 The project includes installation of new water main in
approximately the same location as the existing water main. The
existing water main and house services shall remain in service
until such time as the temporary PVC surface water main or the new
main is satisfactorily completed, tested and approved by the
Waterloo Water Works. All water mains, both temporary and
permanent, shall be pressure tested and bacteria tested prior to
being placed in service. Interruption of house services will only
be permitted for the shortest time possible during disconnection
from the existing main and reconnection to the temporary main or
disconnection from the temporary water main and reconnection to the
new water main.
7 . 5 The contractor shall install a temporary PVC surface water main in
the locations shown on the project plans. Whenever possible, water
shall be fed to both ends of the temporary main by means of a 2-
inch copper service line tapped into the existing water main
system. The Waterloo Water Works will tap the existing water main, —
at no charge to the contractor. The contractor will furnish and
install the 2-inch corporation, saddle, 2-inch brass ball valve,
and adequate length of 2-inch copper pipe to tie into the temporary —
PVC surface water main. The cost of providing and installing the
2-inch corporation, 2-inch brass ball valve, and 2-inch copper
service pipe shall be incidental to the cost of the temporary PVC
surface water main.
SC-14 of 17
7 . 6 The contractor shall provide and install brass 2-inch ball valves
at each end of each length of temporary PVC water main, as further
shown on the plans . The contractor will also provide and install a
service tee, brass ball valve, and fittings to connect the
temporary PVC water main to the property service line.
7 .7 The temporary PVC water main shall be protected with type 1
barricades, placed over the temporary main at 25-foot intervals .
Additional barricades shall be provided at driveways, sidewalks,
streets, and other critical locations to protect the temporary PVC
water main. The 2-inch brass ball valves at each end of each
length of the temporary PVC water and all open excavations for
connections to the PVC water mains shall be securely fenced with
orange plastic safety fence. Barricading and fencing as described
in this paragraph shall be incidental to the temporary PVC surface
water main.
7 . 8 After the temporary PVC surface water main is satisfactorily
completed, sterilized, consecutive bacteria tested, pressure
tested, and approved by the Waterloo Water Works, the contractor
shall carefully excavate and disconnect the existing house service
lines from the old main and reconnect the house services to the
temporary PVC water main. Any temporary additional length of
service line shall be provided by using copper service line or
temporary PEX line of the same size as the existing service line.
Any costs associated with extending the length of the service line
to the temporary PVC water main shall be incidental to the service
line bid item.
7 . 9 After the new water main is satisfactorily completed, sterilized,
consecutive bacteria tested, pressure tested, and approved by the
Waterloo Water Works, the contractor shall disconnect the existing
property service lines from the temporary PVC surface water main
and reconnect the property service lines to the new water main.
The disconnection of the existing property service lines from the
old water main, the connection of the service lines to the
temporary PVC water main, and the reconnection of the property
service lines to the new water main shall be performed by a
licensed and bonded master plumber approved by the City of
Waterloo. The Water Works will make the corporation taps in the
new water main, at no charge to the contractor. The licensed and
bonded master plumber approved by the City of Waterloo shall sign
up for the water main taps at the Waterloo Water Works office,
prior to the Waterloo Water Works making the service line taps in
the new water main. All materials, labor and equipment to remove
and reinstall the existing service lines shall be incidental to the
_ service line bid item, including, but not limited to new
SC-15 of 17
corporation, coupling, and piping. No separate payment shall be
made for maintaining and protecting the existing water mains and
house services during installation of the new water main. On short
side services, the contractor shall furnish and install a new
corporation, copper service pipe from the corporation to the new —
curb stop, curb stop, pave box with stainless steel rod, copper
service pipe as necessary from the curb stop to the existing
customer service line necessary couplings, and reconnect to the new --
water main, including all new materials . On long side services,
contractor shall furnish and install a new corporation, copper
service pipe from the corporation to the new curb stop, curb stop, —
pave box with stainless steel rod, copper service pipe as necessary
from the curb stop to the existing customer service line, necessary
couplings, and reconnect to the new water main, including all new —
materials . All service line fittings shall be conductive,
compression type fittings .
r_
7 . 10 The contractor shall install one additional tee, fittings, and 3-g-
inch brass ball valve with cap at each end of each section of the
temporary PVC surface water main for use exclusively by the
Waterloo Water Works. All costs associated with the end tees, ball
valves and fittings shall be incidental to the temporary PVC
surface water main.
7 . 12 The contractor shall remove the old water main, fittings, and valves
as the new ductile iron water main is installed. The contractor
shall deliver the old ductile iron main, fittings, and valves to a site in the City of Waterloo as designated by the Waterloo Water
Works.
7 . 13 At locations directed by the Engineer, the contractor shall provide
drive-over protection to the temporary water main. The protection
shall be constructed of durable and sufficient material to bridge
over the temporary water main without damage to the temporary water
main or to the vehicle passing over the temporary protection. Any
damage to the temporary main due to inadequate drive-over --
protection shall be promptly repaired by the contractor at no
additional cost to the Waterloo Water Works .
7 . 14 Surface restoration shall be in compliance with Special Provision
Article 5. 4 . Surface restoration will not be measured for payment,
but shall be incidental to the new ductile iron water main items.
The contractor shall restore all surfaces disturbed by Division II
construction.
7. 15 The Contractor shall use extreme caution when working around and
shall obtain locations of all utilities that may be affected by the
Contractor' s work.
SC-16 of 17
7 . 16 All fittings located at changes in direction of the water main shall
be installed with mega-lugs as directed by the Waterloo Water
Works. Concrete blocking shall be installed, at locations shown on
_ the plans or as directed by the Engineer, and as described in the
"Standard Specifications for Installation of Water Main" .
7 . 17 All hydrants shall be installed per drawing No. 5020 . 1 of the
"Standard Specifications for Installation of Water Main" . Complete
hydrant assemblies shall consist of the following:
1 Ea. 6' x 5 1/4" MJ Hydrant
1 Ea. MJ Anchoring Tee
1 Ea. 6" MJ Valve
1 Road Box Complete
1 6" by 24" to 60" Anchor Pipe, length to by field determined
2 Concrete thrust blocks
1 Gravel and solid concrete block for drainage and base
1 Polyethylene cover on top of gravel drainage rock
1 Ea. Tracer wire access box
smik 1 Ea. 6" offset, if required
Hydrants shall be set to grade so that the break away flange is 3-
inches above finish grade, +/- 1-inch. The use of an offset may be
required to properly set the hydrant to the specified grade.
The following are approved hydrant manufacturers and models for
this project:
Waterous WB67 with factory applied "Safety Blae" coating,
without chains on the caps .
7 . 18 Mailboxes shall be protected or promptly removed and reset as
necessary. No separate payment will be made. This work shall be
incidental to other items .
SC-17 of 17
r
s
Aim
lam
w..
!4.
I
I
I
I
111
I
1
I
4
GENERAL SPECIFICATIONS FOR CONSTRUCTION
CITY OF WATERLOO, IOWA
Department of Engineering
SECTION A - Definitions of Terms
SECTION B - Scope of work
SECTION C - Control of Materials and Work
SECTION D - Procedure and Progress
SECTION E - Measurements and Payments
SECTION F - Legal Relations and Responsibility
SECTION A - DEFINITIONS OF TERMS
1. CITY. The City of Waterloo, Iowa, which is the Party of the First
Part of the accompanying contract, acting through its authorized representative.
2. COUNCIL. The duly elected Council of the City of Waterloo, Iowa.
3. ENGINEER. The City Engineer of Waterloo, Iowa, or his
authorized representative.
4. INSPECTOR. The authorized representative of the Engineer,
assigned to the detailed inspection of the work or materials therefor and to such
other duties as may be delegated to him in these specifications.
5. CONTRACTOR. The Party of the Second Part in the
accompanying contract for the improvement covered by these specifications, or
his authorized representative.
6. SUBCONTRACTOR. Any person, firm, or corporation who has,
with the approval of the Council, contracted with the Contractor to execute and
perform in his stead all or any part of the contract.
7. BIDDER. Any individual, firm, or corporation submitting a proposal
for all or a part of the work provided for in these specifications.
8. PROPOSAL GUARANTEE. The security designed in the Notice of
Bidders or Proposal to be furnished by the bidder as a guarantee of good faith to
enter into a contract and furnish an acceptable bond for the work contemplated if
it be awarded him.
9. SURETY. The corporate body bound with and for the Contractor
for the acceptable performance of the contract.
GENERAL SPECS Page 1 of 18
10. PROPOSAL. The written Proposal, submitted by the bidder in the
prescribed manner and on the standard form, for the improvements covered by
these specifications.
11. SPECIFICATIONS. The documents that set forth the manner in
which the proposed work is to be accomplished which have been prepared by
the Engineer and approved by the City Council, official copies of which are now
on file with the City Clerk.
12. SPECIAL PROVISIONS. Clauses or memoranda not contained
herein, applying to the contract of which these specifications are a part, which
change or supplement these specifications.
13. CONTRACT. The agreement entered into between the City and
the Contractor, setting forth the terms under which the work covered by the plans
and specifications is to be performed. The contract includes all conditions,
definitions, and instructions set forth in the official publications relating to the
work, the official contract and specifications, the Proposal, official plans, and all
supplemental agreements entered into by the parties to the contract.
14. NOTICE TO BIDDERS. The notice called attention of bidders to
the time and place for receiving bids, containing a brief description of the work,
and briefly setting forth the requirements and conditions for submission of
Proposals.
15. INSTRUCTIONS TO BIDDERS. The clauses setting forth in detail
the information relative to the proposed work and requirements for the
submission of Proposals.
16. PLANS. The plans for the improvement covered by the
specifications and approved by the Council, official copies of which are on file
with the City Clerk.
17. CONTRACT BOND. The bond executed by the Contractor and his
surety in favor of the City of Waterloo, Iowa, guaranteeing the complete
execution of the contract in accordance with the plans and specifications, the
payment of all debts pertaining to the work, and maintenance of the work as
provided by law or by the specifications.
18. CONTRACT PERIOD. The period from the specified date for
beginning the work to the specified date of completion, both dates inclusive. The
contract period may be extended by the Council, as provided in these
specifications, in which event the contract period includes the new date of
completion.
19. OFFICIAL PUBLICATIONS. The official publications are the
formal resolutions and notices relative to the proposed improvement that are
required by law to be published in a prescribed manner and that have actually
GENERAL SPECS Page 2 of 18
been published in accordance with the statutes relating thereto. Attention is
directed to the fact that these official publications are by statute vested with all of
the force and effect of contract obligations.
20. A.S.T.M. Abbreviation for American Society for Testing Materials.
21. WORK. The term "Work" of the Contractor and Subcontractor
includes labor or materials or both, equipment, transportation, or other facilities
necessary to complete the contract.
22. TIME. All time limits stated in the contract documents are of the
essence in the contract.
SECTION B - SCOPE OF WORK
1. CORRELATION AND INTENT OF DOCUMENTS. The Contract
documents are complementary, and what is called for by any one shall be as
binding as if called for by all. The intention of the documents is to include all
labor, materials, equipment, and transportation necessary for the proper
execution of the work. Materials or work described in words which, so applied,
have a well-known technical or trade meaning shall be held to refer to such
recognized standard.
2. DRAWINGS AND SPECIFICATIONS. Unless otherwise provided
in the contract documents, the engineer shall furnish to the Contractor, free of
charge, all copies of drawings and specifications reasonably necessary for the
execution of the work.
The Contractor shall keep one (1) copy of all drawings and specifications
on the work available to the Engineer and to his representatives.
3. CONTRACTOR'S UNDERSTANDING. It is understood and
agreed that the Contractor has, by careful examination, satisfied himself as to the
nature, character and location of the work, the conformance to the ground, the
character, quality, and quantity of the materials to be encountered, the character
of the equipment and facilities needed preliminary to and during the prosecution
of the work, the general and local conditions, and all other matters which can, in
any way, affect the work under this contract. No verbal agreement or
conversation with any officer, agent, or employee of the City, either before or
after the execution of the Contract, shall affect or modify any of the terms or
obligations herein contained.
4. REPORTING ERRORS AND DISCREPANCIES. If the Contractor,
in the course of the work, finds any discrepancies between the plans and the
physical conditions of the locality, or any errors of omission in plans or in the
layout as given by said stakes and instructions, it shall be his duty to inform the
GENERAL SPECS Page 3 of 18
Engineer immediately, in writing, and the Engineer shall promptly correct the
same.
5. ALTERATION OR CORRECTION OF PLANS. The plans are
made up from surveys that are presumably correct and represent the foreseen
construction requirements. Any modification of the plans which may be required
by the exigencies of the construction or any corrections made necessary
because of errors in the original surveys, will be made by the Engineer. Should
corrections or modifications of the plans or specifications require a different
quality or class of work than that upon which the unit prices in the Proposal are
based, or if the modifications or corrections are required in parts of the work
partially completed and such modifications result in an increased cost to the
Contractor, the amount to be paid for work resulting from such changes shall be
agreed upon in writing at the time the changes are ordered and before the work
is begun by the Contractor. No allowance will be made for anticipated profits on
work not performed.
6. CHANGES IN THE WORK. The City, without invalidating the
contract, may order extra work or make changes by altering, adding to, or
deducting from the work, the contract sum being adjusted by agreement or
arbitration before such changed work is undertaken. All such work shall be
executed under the conditions of the original contract, except that any claim for
extension of time caused thereby shall be adjusted at the time of ordering such
change.
7. INCREASED OR DECREASED QUANTITIES. The right is
reserved without impairing the contract, to order the performance of such work of
a class not contemplated in the Proposal or to increase or decrease the
quantities as may be considered necessary to complete fully and satisfactorily
the work included in the contract. However, when the work is completed without
change in the plans, and the measured quantity of any item of work varies by
more than twenty percent (20%) from the estimated quantity specified in the
contract, an adjustment in price may be made for such item of work by
agreement between the Engineer and the Contractor, subject to the approval of
the City Council. Either party to the contract may request such an adjustment.
8. LANDS AND RIGHT OF WAY. The City shall provide the lands
upon which the work under this contract is to be done, except that the Contractor
shall provide land required for the erection of temporary construction facilities
and storage of his material, together with the right of access to same.
9. CITY WATER. The Contractor shall be allowed to use City Water
but before any water is used, he shall make application to the Waterloo Water
Works for a temporary water connection from a fire hydrant or by some other
connection method. Water usage will be charged at the rate for temporary water
service. The rules, regulations, and water rates are available at the Waterloo
Water Works offices at 325 Sycamore Street or their telephone number is 319-
232-6280.
GENERAL SPECS Page 4 of 18
10. RIGHTS OF VARIOUS INTERESTS. Whenever work being done
by the City's forces or by other Contractors is contiguous to work covered by this
contract, the respective rights of the various interests involved shall be
established by the Engineer to secure the completion of the various portions of
the work in general harmony.
11. CLOSING STREETS TO TRAFFIC. The Engineer shall be the
judge of how many streets or parts of streets it is necessary for the Contractor to
close at any time and may refuse to permit the closing of additional streets until
such of the work is finished and opened to traffic as he may direct.
12. OBSTRUCTION OF STREETS. The work is to be carried on in
such manner as to obstruct the streets, highways, and alleys as little as possible.
The Contractor shall carry on the different parts of the work so as to complete the
whole, as nearly as practicable, at the same time. In doing the work, the
Contractor shall follow the directions of the Engineer as to the place or places
where work shall be started or be carried on and the direction in which it shall be
done.
13. SHANTIES AND BUILDINGS. Shanties or other buildings shall not
be erected in or upon any street, highway, or alley without permission of the
Engineer. If such permission be granted, it may be upon any reasonable terms
prescribed by the person or body granting such permission.
14. SANITARY CONVENIENCES. The Contractor shall furnish the
necessary sanitary conveniences, properly secluded, for the laborers on the
work, and these shall be maintained in a manner that will be inoffensive to the
public.
15. CLEANING UP. The Contractor shall, as directed by the Engineer,
remove from the City's property and from all public and private property, at his
own expense, all temporary structures, rubbish, and waste materials resulting
from his operations before work can be considered completed. The Contractor
shall also renew or replace any and all fences, sidewalks, or other property
damaged or disturbed by his work.
16. OMISSION OF PARTS OF GENERAL SPECIFICATIONS. Parts
of the General Specifications deemed not to apply to some particular work may
be omitted by special reference in other parts of the contract documents.
SECTION C - CONTROL OF MATERIALS AND WORK
1. SUPERVISION AND INSPECTION. The Engineer shall have
supervision of the construction provided for in this Contract and shall decide any
and all questions which may arise as to the quality and acceptability of materials
furnished, work performed, manner of performance, rate of progress on the work,
and all questions regarding the acceptable fulfillment of the terms of the Contract.
GENERAL SPECS Page 5 of 18
Materials and construction work shall, at all times, be subject to the inspection of
the Engineer or his representatives. The Contractor shall be held strictly to the
true intent of these specifications as regards the quality of materials,
workmanship, and the diligent prosecution of the work.
The Engineer and his representatives shall, at all times, have access to
the work wherever it is in preparation of progress, and the Contractor shall
provide proper facilities for such access and for inspection.
If the specifications, the Engineer's instructions, law ordinances, or any
public authority require any work and/or materials to be especially tested or
approved, the Contractor shall give the Engineer timely notice of readiness for
inspection. If the inspection is to be made by authority other than the Engineer,
the Contractor shall notify the engineer of the date fixed for inspection.
Inspections by the Engineer will be promptly made and, where practicable, at the
source of supply. If any work should be covered up without the approval or
consent of the Engineer, it must, if required by the Engineer, be uncovered for
examination at the Contractor's expense.
Re-examination of questioned work may be ordered by the Engineer, and,
if so ordered, the work must be uncovered by the Contractor. If such work be
found in accordance with the Contract, the City shall pay the cost of re-
examination and replacement. If such work be found not in accordance with the
Contract, the Contractor shall pay such cost unless he shall show that the defect
in the work was caused by another Contractor, and, in that event, the City shall
pay the cost.
2. AUTHORITIES AND DUTIES OF INSPECTORS. Inspectors may
be stationed on the work to report to the Engineer as to the progress of the work
and the manner in which it is being performed; also, to report whenever it
appears that materials furnished and work performed by the Contractor fail to
fulfill the requirements of the specifications and Contract, and to direct the
attention of the Contractor to such failure or infringement; but such inspection
shall not relieve the Contractor from any obligations to furnish acceptable
materials or to provide completed construction that is satisfactory in every
particular.
In case of any dispute arising between the Inspector and the Contractor as
to materials furnished or the manner of performing the work, the Inspector shall
have the authority to reject materials or suspend the work until the question at
issue can be referred to and decided by the Engineer. Inspectors are not
authorized to revoke, alter, enlarge, relax, or release any requirements of these
specifications. The Inspector shall, in no case, act as foreman or perform other
duties for the Contractor, or interfere with the management of the work by the
latter.
GENERAL SPECS Page 6 of 18
3. STATUS OF THE ENGINEER. The Engineer shall have general
supervision and direction of the work. He has authority to stop the work
whenever such stoppage may be necessary to insure the proper execution of the
Contract. He shall also have authority to reject any work and/or materials which
do not conform to the specifications, to direct the application of forces to any
portion of the work as, in his judgment, is required, and to order the force
increased or diminished, and to decide questions which arise in the execution of
the work.
4. ENGINEER'S DECISIONS. The Engineer shall, within a
reasonable time, make decisions on all claims of the Contractor and on all other
matters relating to the execution and progress of the work or the interpretation of
the contract documents.
All such decisions of the Engineer shall be final except as to the element
of time and financial consideration involved, which, if no agreement in regard
thereto is reached, shall be subject to arbitration.
5. STAKES AND INSTRUCTIONS. The Contractor shall provide
reasonable and necessary opportunities and facilities for setting stakes and
making measurements. The Contractor shall not furnish stakes or men to set
them. He shall not proceed until he has received from the Engineer such stakes
and instructions as may be necessary to the progress of the work.
The Contractor shall carefully preserve bench marks, reference points,
and stakes, and in case of willful or careless destruction, he shall be charged
with the resulting extra expense and shall be responsible for any mistakes that
may be caused, by their loss or disturbance.
6. SUPERINTENDENCE. The Contractor shall keep on his work
during its progress a competent superintendent and any necessary assistants, all
satisfactory to the Engineer. The Superintendent shall not be changed except
with the consent of the Engineer, unless the Superintendent proves to be
unsatisfactory to the Contractor and ceases to be in his employ. The
Superintendent shall represent the Contractor in his absence, and all directions
given to him shall be as binding as if given to the Contractor. Important decisions
shall be confirmed in writing to the Contractor. Other directions shall be so
confirmed on written request in each case.
The Contractor shall give efficient supervision to the work using his best
skill and attention. He shall carefully study and compare all drawings,
specifications, and other instructions, and shall report at once to the Engineer
any error, inconsistency, or omission which he may discover.
7. REMOVAL OF UNAUTHORIZED WORK. Work done without lines
and grade being give, work done beyond lines shown on the plans or as given,
except as herein provided, or any extra or additional work done without authority,
will be considered as unauthorized and at the expense of the Contractor and will
GENERAL SPECS Page 7 of 18
not be paid for under the provisions of the Contract. Work so done may be
ordered removed and replaced at the Contractor's expense.
8. REMOVAL OF DEFECTIVE MATERIALS OR WORK. The
Contractor shall promptly remove from the premises all materials condemned by
the engineer as failing to conform to the Contract; whether incorporated in the
work or not, and the Contractor shall promptly replace and re-execute his own
work in accordance with the contract and without expense to the City, and shall
bear the expense of making good all work of other Contractors destroyed or
damaged by such removal or replacement.
If the Contractor does not remove such condemned work and materials
within a reasonable time, fixed by written notice, the City may remove them and
may store the material at the expense of the Contractor. If the Contractor does
not pay the expense of such removal within a reasonable time thereafter, the City
may, upon ten (10) days' written notice, sell such materials at auction or at
private sale and shall account for the net proceeds thereof, after deducting all the
costs and expense that should have been borne by the Contractor; or, if the net
proceeds of such sale are insufficient to pay the expenses of removal, the City
may deduct the balance from any amounts due the Contractor.
9. MATERIALS, EQUIPMENT, APPLIANCES, AND FACILITIES.
Unless otherwise stipulated, the Contractor shall provide and pay for all
materials, labor, water, tools, equipment, light, power, transportation, and other
facilities necessary for the execution and completion of the work. Materials shall
be of the quality specified for each particular part of the work.
Whenever, in construction of the work or in the manufacture of any article
of appliance necessary for the construction or operation of the work, it is
necessary to use any material that is not fully specified in these specifications, it
shall be of good quality and shall meet with the approval of the Engineer.
Any appliance that is necessary for the construction or operation of the
work and is commonly recognized as a part of the work, shall be furnished by the
Contractor as part of the work, whether or not it is specifically called for in the
plans and specifications, and such appliance shall be of good quality and
standard make and shall meet with the approval of the Engineer.
10. MATERIAL SAMPLES. Before the contract is awarded, the bidder
may be required to furnish a statement of the origin, composition, and
manufacture of any and all materials proposed for use in the performance of the
Contract, together with samples of the material. These samples will be
considered as representative and typical of the material to be obtained from any
particular source.
11. CHARACTER OF WORKMEN AND EQUIPMENT. The Contractor
shall employ competent and efficient workmen for every kind of work. Any
person employed on the work who shall refuse or neglect to obey the directions
GENERAL SPECS Page 8 of 18
of the engineer or Inspector, or who shall be deemed incompetent or disorderly,
or who shall commit trespass upon public or private property in the vicinity of the
work, shall be dismissed when the Engineer so orders, and shall not be re-
employed unless express permission be given by the Engineer. The Contractor
shall, at all times, enforce discipline and good order among his employees.
The methods, equipment, and appliances used on the work, and the labor
employed, shall be such as will produce a satisfactory quality of work and shall
be adequate to complete the contract within the specified time limit.
12. HIRING CITY EMPLOYEES. The Contractor shall not employ and
hire any of the City's employees without the permission of the Engineer.
13. LABOR. Local labor shall be given preferences so far as
practicable.
14. THE CITY'S RIGHT TO DO WORK. If the Contractor should
neglect to prosecute the work properly or fail to perform any provision of this
Contract, the City of Waterloo, after three (3) days' written notice to the
Contractor may, without prejudice to any other remedy he may have, make good
such deficiencies and may deduct the cost thereof from the payment then or
thereafter due the Contractor, provided, however, that the Engineer shall approve
both such action and the amount charged to the Contractor.
SECTION D - PROCEDURE AND PROGRESS
1. ORDER OF COMPLETION - USE OF COMPLETED PORTIONS.
The Contractor shall complete any portion or portions of the work in such order or
time as the Engineer may require. The City shall have the right to take
possession of an use completed or partially completed portion of the work at any
time, but such taking possession and use shall not be deemed an acceptance of
work so taken or used, or any part thereof. If such prior use increases the cost of
or delays the work, the Contractor shall be entitled to such extra compensation or
extension of time, or both, as the Engineer may determine.
2. WEATHER. During stormy or inclement weather, all work shall be
suspended, except such as can be done in an acceptable manner. Permission
to work during freezing, stormy, or inclement weather shall in no way be
construed as a release of the Contractor's responsibility regarding the quality of
the finished work at such time.
3. SUNDAYS AND LEGAL HOLIDAYS. Except for such work as
may be required to properly maintain or protect completed or partially completed
construction or to maintain lights and barricades, no work will be permitted on
Sundays or legal holidays without specific permission of the Engineer.
GENERAL SPECS Page 9 of 18
4. DELAYS AND EXTENSION OF TIME. If the Contractor be
delayed in the completion of the work by an act of neglect of the City, or its
employees; or by any other Contractor employed by the City; or by changes
ordered in the work; or by strikes, lockouts, fire, unusual delays in transportation,
unavoidable casualties, or any cause beyond the Contractor's control; or by
delay authorized by the Engineer pending arbitration; or by any cause which the
Engineer shall decide justifies the delay, then the time of completion shall be
extended for such reasonable time as the Engineer may decide will compensate
for such delay.
No such extension shall be made for delay occurring more than thirty (30)
days before claim therefor is made in writing to the Engineer. In the case of a
continuing cause of delay, only one claim is necessary.
This article does not exclude the recovery of damages for delay by either
party under provisions in the contract documents.
5. TEMPORARY SUSPENSION OF WORK. The Engineer shall have
authority to suspend the work, wholly or in part, for such period or periods of time
as he may deem necessary, due to unsuitable weather or such other conditions
as are considered unfavorable for the suitable prosecution of the work, or for
such time as is necessary due to the failure to the Contractor to carry out orders
given or to perform any or all provisions of the Contract.
6. NOTICES - HOW SERVED. Any notice to be given by the City to
the Contractor under this contract shall be deemed to be served if the same be
delivered to the man in charge of any office used by the Contractor or his
foreman or agent at or near the work, or deposited in the post office, postpaid,
addressed to the Contractor at his last known place of business.
7. PROGRESS OF WORK. The progress of the work shall be such
that, at the expiration of one-fourth (1/4) of the contract period, one-eighth (1/8)
of the work shall be completed; at the expiration of one-half (1/2) of the contract
period, three-eighths (3/8) of the work shall be completed; at the expiration of
three-fourths (3/4) of the contract period, the work shall be three-fourths (3/4)
completed, and the whole work shall be completed at the expiration of the
contract period.
If, at any time the above schedule is not being maintained, the Council
may give written notice to the Contractor and his sureties that the specifications
are not being complied with. Such notice shall state what action on the part of
the Contractor is required to bring the work within the requirements of the
specifications. If the Contractor fails, within ten (10) days, to proceed as directed
in the said notice, then the Council shall have authority to annul this contract
without process or action at law and take over the prosecution and completion of
the work, as provided under the article covering City's right to terminate contract.
GENERAL SPECS Page 10 of 18
8. CITY'S RIGHT TO TERMINATE CONTRACT. If the Contractor
should be adjudged a bankrupt; or if he should make a general assignment for
the benefit of this creditor; or if a Receiver should be appointed on account of his
insolvency; or if he should persistently or repeatedly refuse or should fail, except
in cases for which extension of time is provided, to supply enough skilled
workmen or proper materials; or if he should fail to make prompt payment to
Subcontractors or for materials or labor; or if he should persistently disregard
laws, ordinances, or the instructions of the Engineer; or if he should otherwise be
guilty of a substantial violation of any provision of the contract, then the City,
upon the certificate of the Engineer that sufficient cause exists to justify such
action, may, without prejudice to any other rights or remedy, and after giving the
Contractor seven (7) days' written notice, terminate the employment of the
Contractor and take possession of the premises and of all materials, tools and
appliances thereon and finish the work by whatever method he may deem
expedient. In such cases, the Contractor shall not be entitled to receive any
further payment until the work is finished.
If the unpaid balance of the contract price shall exceed the expenses of
finishing the work, including compensation for additional managerial and
administration services, such excess shall be paid to the Contractor. If such
expense shall exceed such unpaid balance, the Contractor shall pay the
difference to the City. The expense incurred by the City as herein provided and
the damage incurred through the Contractor's default shall be certified by the
Engineer.
9. REMOVAL OF EQUIPMENT. In the case of annulment of this
contract before completion, from any cause whatsoever, the Contractor, if
notified to do so by the City; shall promptly remove any part or all of his
equipment and supplies from the property of the City, failing which, the City shall
have the right to remove such equipment and supplies at the expense of the
Contractor.
SECTION E - MEASUREMENTS AND PAYMENT
1. STANDARD OF MEASUREMENT. All work completed under the
contract shall be measured by the Engineer according to the United States
standard measures.
2. SCOPE OF PAYMENTS. The Engineer's measurements of
quantities shall be the basis for final payment for the work performed under this
Contract. After the work is completed, the Engineer will make measurements
and computations of the number of units of each of the various items of work
completed, and the Contractor will be paid for the actual amount of work
performed at the rates specified in his Proposal. Before final settlement is made,
the Council may require the Contractor to submit a list of all persons furnishing
labor or materials, with evidence that such persons have been paid in full.
GENERAL SPECS Page 11 of 18
Payment shall be made in the manner set forth in official publications and
Council Proceedings relative thereto.
3. PAYMENT FOR EXTRA WORK. Such extra work as may have
been ordered by the Engineer and performed by the Contractor shall be
compensated for as provided herein. If work is to be done or materials are to be
furnished by the Contractor which cannot properly be classified under unit prices
included in the Proposal, the Contractor shall be paid therefor the actual
reasonable cost of the labor and materials entering permanently in such work,
plus fifteen percent (15%) of the cost thereof. In computing the labor cost on
such extra work, the following items shall be included:
(a) Actual payroll expenditures for labor at the current rate therefor,
and cost of materials.
(b) Pay of foreman and timekeepers for actual time required on the
extra work.
(c) Liability insurance, prorated, for the extra work.
Labor cost items on extra work shall be furnished in duplicate by the
Contractor to the Inspector daily. The Inspector shall check the items, and if he
finds them to be correct, he shall so certify on the statement of cost, returning
one copy to the Contractor and filing one copy with the Engineer.
The Engineer shall determine the cost of materials entering into extra work
from the materials and receipted freight bills for the same.
For any special machine, power tools, or equipment, including fuel and
lubricants, but not including small hand tools, which may be deemed necessary
or desirable to use, the Contractor shall be allowed a reasonable rental thereon,
to be agreed upon in writing by the Engineer before such work is begun, and to
which sum no percentage is to be added.
The item of cost shall not include repairs or replacement of equipment or
overhead expenses of any character. The fifteen percent (15%) allowed is
considered to cover the use of hand tools and all overhead expenses except
liability insurance.
In no case will a claim for extra compensation be allowed unless the work
upon which the claim is based has been ordered in writing, except as provided
hereinafter.
4. CLAIMS FOR EXTRA COST. If the Contractor claims that any
instructions, by drawings or otherwise, involved extra cost under this contract, he
shall give the Engineer written notice thereof within ten (10) days after
completion of the work.
GENERAL SPECS Page 12 of 18
No such claim shall be valid unless so made.
5. CLAIMS FOR EXTRA COMPENSATION. If the Contractor deems
that extra compensation is due him for work and/or materials that he considered
is not clearly covered in the items for which he submitted unit prices in his bid
and that were not ordered in writing by the Engineer as an extra s heretofore
provided, the Contractor shall notify the Engineer, in writing, of his intention to
make claim for extra compensation for work and/or material before starting
construction. If such written notification is not given or the Engineer is not
afforded proper facilities by the Contractor for keeping strict account of actual
cost as defined herein, then the Contractor hereby agrees to waive the claim for
extra compensation. Such notice to the engineer and the fact that the Engineer
has kept account of cost as aforesaid, shall not in any way be construed as
proving the validity of the claim, which must be passed upon by the Council. In
the event that the Council finds the claim to be just, it shall be allowed and paid
for as extra work as provided herein.
6. COMPLETION REPORT AND OBJECTIONS THERETO. Within
ten (10) days after the full completion of the work to be done under this contract,
the Engineer shall make a written statement of all the work done by the
Contractor hereunder, stating the quantity of each item as found by him and
including a statement of all credits for extra work and all credits or debits for
changes, alterations, omissions, and defects, and shall forthwith deliver a copy of
such statement to the Contractor. The Contractor shall compare such statement
with his own records and shall then, in writing, either approve such statement or
point out any claimed errors or omissions. If any of such claims are found
correct, the Engineer shall, within ten (10) days, prepare a new statement, a copy
of which shall in like manner be delivered unto the Contractor. The Engineer will
not file a formal completion report with the City until the Contractor has approved
the same.
If the figures of the Engineer and the Contractor cannot be reconciled, or
there is a difference of opinion regarding some item or items, then such
difference of opinion shall be submitted to arbitration as hereinafter provided, and
the decision of the arbitrator or arbitrators shall be final, and the Engineer shall,
within a period of five (5) days, file his completion report.
Before action by the City Council upon such completion report, the
Contractor shall also file a written statement of any claims he may have against
the City, other than those shown by such completion report, growing out of this
contract or the work done hereunder. The City shall retain ten percent (10%) of
the amount due the Contractor on the completion report for a period of thirty (30)
days. If no claims are filed against the Contractor within thirty (30) days, the final
ten percent (10%) shall then be paid to the Contractor.
7. WAIVER. By the execution of this contract ,the Contractor agrees
that any objections he may have to the statement of the amount of work done
hereunder included by the Engineer in this completion report, and any claims of
GENERAL SPECS Page 13 of 18
the Contractor against the City growing out of this contract and the work done
hereunder which are not stated in writing in the manner and within the time
provided in Article 6, Section E hereof, shall be waived, and no such claim shall
thereafter be asserted against the City.
SECTION F - LEGAL RELATIONS AND RESPONSIBILITIES
1. LAWS RELATING TO WORK. The Contractor is presumed to be
familiar with all laws, ordinances, and regulations which may, in any manner,
affect those engaged or employed upon the work or the materials or equipment
used in or upon the work, and shall conduct the work so as not to conflict with
such laws, ordinances, and regulations.
2. PROTECTION OF WORK AND PROPERTY. The Contractor for
any part of the improvement shall be held responsible for the care of materials
and of partially completed and completed work until final acceptance of the same
by the Council. He will be required to make good at his own expense any
damage which the work may sustain from any cause prior to the filing of the
engineer's certificate of completion. He shall take all risk from floods and
casualties of every description and make no charge for delay due to such cause.
He may, however, be allowed a reasonable extension of time on account of such
delays. He shall correct or make good at his own expense all damages to
adjacent property due to the acts or negligence of his employees of the
prosecution of his work, and save the City harmless therefor.
The Contractor shall be held liable and responsible for all damages done
to water, sewer, drain, or other underground pipes and structures, and to
sidewalks and private property.
3. RESPONSIBILITY FOR ACCIDENTS. The Contractor shall
assume full responsibility for all damages sustained by persons or property due
to the carrying on of his work until final acceptance thereof, or until released by
the Engineer in writing.
4. LIABILITY INSURANCE. The Contractor shall carry liability
insurance which shall save the City harmless and protect the public and any
person from injury sustained by the reason of the prosecution of the work or the
handling or storing of materials therefor, and said Contractor shall also carry
liability insurance which shall meet the requirements of the Iowa Worker's
Compensation Law.
Before work shall be started on this contract, the Contractor shall furnish
the City Clerk with proper affidavit or Affidavits executed by representatives of
duly qualified insurance companies, evidencing that said insurance company or
companies have issued liability insurance policies, effective during the life of the
contract, or for a period of a least ten (10) days following the filing of written
notice of cancellation, protecting the public and any person from injuries or
GENERAL SPECS Page 14 of 18
damages sustained by reason of carrying on the work involved in the Contract.
The affidavit shall specifically evidence the following forms of insurance
protection:
(a) Public liability insurance covering all operations performed by
persons directly employed by the Contractor.
(b) Public liability insurance covering all operations performed by any
Subcontractor to whom a portion of the work may have been
assigned.
(c) Public liability insurance covering all work upon the project
performed by any independent Contractor working under the
direction of either the principal Contractor or a Subcontractor.
(d) Motor vehicle bodily injury liability insurance and property damage
liability insurance on all motor vehicles employed on the work,
whether owned by the Contractor or by other persons, firms, or
corporations.
(e) The minimum protection shall be as follows:
Comprehensive General Liability Insurance
General Aggregate Limit $ 5,000,000.00
Products—Completed Operations
Aggregate Limit $ 5,000,000.00
Each Occurrence Limit $ 5,000,000.00
Comprehensive Automobile Liability
Insurance $ 1,000,000.00
The Contractor shall have the City of Waterloo, Iowa, named as an
"Additional Named Insured". A certificate, or a policy if requested, shall be filed
with the Owner.
All certificates and/or policies of insurance furnished by the Contractor to
be filed with the City Clerk shall include the name and address of the agency
issuing the same. It shall also be required that the City Clerk be notified by
registered mail of the cancellation or expiration of the above insurance.
5. BARRICADES AND SIGNS. The Contractor shall, at his own
expense and without further or other order, provide, erect, and maintain, at all
times during the progress and suspension of the work and until completion and
final acceptance thereof, suitable and requisite barricades, signs, or other
adequate protection, as required by the latest edition of the "Iowa Manual on
GENERAL SPECS Page 15 of 18
Uniform Traffic Control Devices for Streets and Highways" and shall provide,
keep, and maintain such barricades, signs, etc., as may be required or as may
be ordered by the City Engineer, to insure the safety of the public as well as
those engaged on the work. All barricading plans shall be approved by the City
Engineer.
6. ROYALTIES AND PATENTS. The Contractor shall pay all
royalties and license fees. He shall defend all suits or claims for infringement of
any patent rights and shall save the City harmless from loss on account thereof,
except that the City shall be responsible for all such loss when a particular
process or the product of a particular manufacturer is specified.
7. PERMITS AND REGULATIONS. Permits and licenses of a
temporary nature for the prosecution of the work shall be secured and paid for by
the Contractor. Permits, license, and easements for permanent changes in
existing facilities shall be secured and paid for by the City.
8. CLAIMS FOR DAMAGES. Any claim for damages arising under
this Contract shall be made in writing to the party liable within a reasonable time
of the first observance of such damage and no later than the time of final
payment, except as expressly stipulated otherwise in the case of faulty work or
materials, and shall be adjusted by agreement or arbitration.
The Contractor shall be held for the payment of all just claims against him
arising out of the prosecution of this contract, and his bond will not be released
until such claims are paid for dismissed.
9. ASSIGNMENT OF CONTRACT. The Contractor shall not sell or
assign the contract or sublet any portion of the work provided for therein without
the written consent of the City Council.
10. SUBCONTRACTORS. The Contractor shall, as soon as
practicable after the signature of the contract, notify the Engineer in writing of the
names of the Subcontractors proposed for the work and shall not employ any
that the Engineer may, within a reasonable time, object to as incompetent or
unfit.
The Contractor agrees that he is as fully responsible to the City for the
acts and omission of his Subcontractors and of persons either directly or
indirectly employed by them as he is for the acts and omissions of persons
directly employed by him.
Nothing contained in the contract documents shall create any contractual
relation between any Subcontractor and the City.
11. ARBITRATION. All questions subject to arbitration under this
Contract shall be submitted to arbitration at the choice of either party to the
dispute.
GENERAL SPECS Page 16 of 18
The Contractor shall not cause a delay of the work during any arbitration
proceedings, except by agreement with the Engineer.
The demand for arbitration shall be filed in writing with the Engineer, in the
case of an appeal from his decision, within ten (10) days of its receipt, and in any
other case, within a reasonable time after cause thereof, and in no case later
than the time of final payment, except as otherwise expressly stipulated in the
contract. If the Engineer fails to make a decision within a reasonable time, an
appeal to arbitration may be taken as if his decision had been rendered against
the part appealing.
No one shall be nominated or act as an arbitrator who is in any way
financially interested in the contract or in the business affairs of either the City or
the Contractor.
The general procedure shall conform to the laws of the State of Iowa.
Unless otherwise provided by such laws, the parties may agree upon one
arbitrator; otherwise, there shall be three--one named in writing by each party to
this contract to the other party, and the third chosen by these two arbitrators, or,
if they fail to select a third within ten (10) days, then he shall be chosen by the
Comptroller of the State of Iowa. Should either party refuse or neglect to supply
the arbitrators with any papers or information demanded in writing, the arbitrators
are empowered by both parties to proceed ex parte.
If there be one arbitrator, his decision shall be binding; if three, the
decision of any two shall be binding. Such decision shall be a condition
precedent to any right of legal action, and, wherever permitted by law, it may be
filed in Court to carry it into effect.
The arbitrators, if they deem that the case demands it, are authorized to
award to the party whose contention is sustained such sums as they shall deem
proper for the time, expense, and trouble incident to the appeal, and, if the
appeal was taken without reasonable cause, damages for delay, the arbitrators
shall fix their own compensation unless otherwise provided by agreement, and
shall assess the costs and charges of the arbitration upon either or both parties.
The award of the arbitrators must be in writing, and it shall not be open to
objections on account of the form of proceeding or the award, unless otherwise
provided by the laws of Iowa.
In the event of such laws providing on any matter covered by this article
otherwise than as hereinbefore specified, the method of procedure throughout
and the legal effect of the award shall be wholly in accordance with the laws of
the State of Iowa, it being intended hereby to lay down a principle of action to be
followed, leaving its local application to be adopted to the legal requirements of
the place in which the work is to be done.
GENERAL SPECS Page 17 of 18
12. PERFORMANCE AND PAYMENT BONDS. The Contractor shall,
at the time of execution and delivery of this contract and before the taking effect
of same, furnish and deliver to the City written bonds of indemnity to the amount
required by law in form and substance, and with surety thereon satisfactory and
acceptable to the City, to insure the faithful performance and payment by the
Contractor of all the covenants and agreements on the part of the Contractor
contained in this contract. These bonds shall remain in force and effect for the
full amount of the Contract.
13. PERSONAL LIABILITY OF PUBLIC OFFICIALS. In carrying out
any of the provisions of the Contract or in exercising any power or authority
granted him thereby, there shall be no liability upon the Engineer or his
authorized assistants, either personally or as an official of the City, it being
understood that in such matters he acts as the agent and representative of the
City.
14. JURISDICTION. Any action in Court against the Contractor or
sureties on his bond because of damages to property or individuals by said
Contractor or his workmen, or because of the violation of any provisions of the
specifications, or on account of the failure of said Contractor to comply fully with
these provisions, shall be brought in the District Court of the State of Iowa in and
for Black Hawk County.
15. TERMINATION OF RESPONSIBILITY. The Contract shall be
considered as completed and the Contractor released from further obligations
except as to the requirements of his bond, after the work has been completed
and finally accepted and final estimates have been allowed and the completion
report of the engineer has been filed and approved by the Council.
16. CITY'S LEGAL RIGHTS. The City shall not be precluded by any
measurements, estimate, or certificate made, either before or after the
completion and acceptance of the work and payment therefor, from showing the
true amount and character of the work performed and materials furnished by the
Contractor, or from showing that any such measurement, estimate, or certificate
is untrue or incorrectly made, or the work or materials do not, in fact, conform to
the Contract.
The City shall not be precluded, notwithstanding any such measurements,
estimate, or certificate and payment in accordance therewith, from recovering
from the Contractor and his surety such damages as it may sustain by reason of
his failure to comply with the terms of the Contract. Neither the acceptance by
the City or any of its representatives, nor any payment for or acceptance of the
whole or any part of the work, nor any extension of time, nor any possession
taken by the City, shall operate as a waiver on any portion of the contract or of
any power herein reserved, or any right to damages herein provided. A waiver of
any breach of the contract shall not be held to be a waiver of any other or
subsequent breach.
GENERAL SPECS Page 18 of 18
SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION
1. SUBCONTRACTS
The contractor shall cause appropriate provisions to be inserted in all
subcontracts relative to the work to require compliance by each
subcontractor with the applicable provisions of the contract for the
improvements embraced in this contract.
2. REVIEW BY THE CITY OF WATERLOO
The City of Waterloo, its authorized representatives and agents, shall at all
times have access to and be permitted to observe and review all work,
materials, equipment, payrolls, personnel records, employment conditions,
material invoices, and other relevant data and records pertaining to this
contract, provided, however, that all instructions and approval with respect
to the work will be given to the contractor only by the City of Waterloo
through its authorized representative or agents.
3. INSPECTION
a. The contractor shall furnish promptly all materials reasonably
necessary for any tests, which may be required. All tests by the
City of Waterloo will be performed in such manner as not to delay
the work unnecessarily and will be made in accordance with the
provisions of the Technical Specifications.
b. Inspection of materials and appurtenances to be incorporated in the
improvements embraced in this contract may be made at the place
of production, manufacture or shipment, whenever the quantity
justifies it, and such inspection and acceptance, unless otherwise
stated in the Technical Specifications, shall be final, except as
regards (1) latent defects, (2) departures from specific requirements
of the contract, (3) damage or loss in transit, or (4) fraud or such
gross mistakes as amount to fraud. Subject to the requirements
contained in the preceding sentence, the inspection of materials as
a whole or in part will be made at the project site.
4. WARRANTY OF TITLE
No material, supplies, or equipment to be installed or furnished under this
contract shall be purchased subject to any chattel mortgage or under a
conditional sale, lease-purchase or other agreement by which an interest
therein or in any part thereof is retained by the seller or supplier. The
contractor shall warrant good title to all materials, supplies, and equipment
SUPPLEMENTAL GENERAL SPECIFICATIONS
installed or incorporated in the work and upon completion of all work, shall
deliver the same together with all improvements and appurtenances
constructed or placed thereon by him to the City of Waterloo free from any
claims, liens, or charges. Neither the contractor nor any person, firm, or
corporation furnishing any material or labor for any work covered by this
contract shall have any right to a lien upon any improvement or
appurtenance thereon. Nothing contained in this paragraph, however,
shall defeat or impair the right of persons furnishing materials or labor to
recover under any bond given by the contractor for their protection or any
rights under any law permitting such persons to look to funds due the
contractor in the hands of the City of Waterloo. The provisions of this
paragraph shall be inserted in all subcontracts and material contracts and
notice of its provisions shall be given to all persons furnishing materials for
the work when no formal contract is entered into for such materials.
SUPPLEMENTAL GENERAL SPECIFICATIONS
FORM OF CONTRACT
CONTRACT FOR THE CONSTRUCTION OF
F.Y. 2014 STREET RECONSTRUCTION PROGRAM
CITY OF WATERLOO, IOWA
CONTRACT NO. 859
This contract made and entered into this day of , 20 , by and
between the City of Waterloo, Iowa, a Municipal Corporation, (hereinafter referred to
as City), and of Waterloo, Iowa, ;hereinafter
referred to as Contractor), WITNESSETH:
PAR. 1 Contractor agrees to build and construct the
and furnish all necessary tools,
equipment, materials,. and labor necessary to do all the work called for in
the plans and specifications in a workmanshiplike manner and for the
prices set forth in Contractor's proposal, which was accepted by the City,
and which is understood and agreed to be a part of this contract.
PAR. 2 It is understood and agreed that the resolution adopted by the City Council
ordering the construction of the improvement, the Notice to Contractors as
published, the Instruction to Bidders, the Form of Proposal, the
Construction and Maintenance Bonds, the Council Proceedings relating to
this matter, and the Plans and Specifications shall all be considered as
forming a part of the contract the same as though they were each set out in
said contract.
PAR. 3 The Contractor agrees to furnish at its own cost and expense, all
necessary materials and labor for said work and to construct said
improvements in a thorough, substantial, and workmanlike manner, and in
strict accordance with the requirements of this contract, and of the plans
and specifications made a part hereof by reference, and to the satisfaction
and approval of the City and its engineer.
FORM OF CONTRACT PAGE 1 OF 5 PAGES
PAR. 4 The Contractor agrees to perform said work and install said improvements
on the terms set out in bid or proposal to the City which has been accepted
by the City and which is by reference made a part of this contract.
PAR. 5 The Contractor agrees to commence said work within ten (10) working
days after receipt of "Notice to Proceed" and complete it on or before
unless an extension of time is granted in writing by the
Council of the City.
PAR. 6 Should the Contractor fail to complete said improvements in strict
accordance with the terms and conditions of this contract, or the plans and
specifications therefor promptly by the date herein specified, the City may
pay such additional sums as it may be required to pay by reason of the
failure of said contractor and deduct any and all such sums from any
amount then due the Contractor.
PAR. 7 The Contractor agrees to comply with and obey all ordinances of the City
of Waterloo, Iowa, relating to the obstruction of streets and alleys, keeping
open passage ways for water, traffic, and protecting any excavations in any
street or alley, and maintaining proper and sufficient barricades with lights
and signals during all hours of darkness, to see that the backfilling is
properly done, and agrees to keep the City whole and defend any and all
suits that may be brought against the City by reason of any injuries that
may be sustained by any person or property allegedly caused by the
Contractor, or his agents, while work is done pursuant to this agreement.
PAR. 8 The Contractor agrees that in the event a law suit is brought against the
City for damages allegedly sustained by reason of any act, omission or
negligence of the Contractor or its agents, or on account of any injuries
allegedly sustained by reason of any obstruction, hole, depression or
barrier placed or dug by the defendant or its agents, in the doing of the
work herein contracted for, that it will defend said suit and save the City
harmless therein, and in case judgment is rendered against the City, the
Contractor agrees to pay the same promptly. The Contractor agrees to
carry public liability insurance in a solvent company in a sufficient amount
to protect the City and those who use the streets of the City.
PAR. 9 The City shall have the right to appoint one or more construction reviewers
who shall review the progress of the work in detail; also, to make any test
or any material to be used in such work. No material shall be used in any
work until the same has first been approved by the construction reviewer.
Such construction reviewer shall have full authority to pass judgment upon
all materials and upon the manner of doing the work, and their judgment on
rejecting any materials, substance, or manner of work shall be final unless
it is revoked or modified by the City Engineer.
FORM OF CONTRACT PAGE 2 OF 5 PAGES
PAR. 10 Any material, which has been rejected by the construction reviewer, shall
be at once removed from the line of work and shall not be again taken
thereon or placed with the material proposed to be used without the written
consent of the City Engineer.
PAR. 11 The Contractor shall maintain no cause of action against the City on
account of delays and prosecution of work, but if said work is delayed by
the City, the Contractor shall have such extra time for completion of the job
as was lost by reason of the delay caused by the City.
PAR. 12 The Contractor agrees to pay punctually all just claims of labor, material,
men, or subcontractors who shall perform labor or furnish materials
entering into this improvement. It is agreed that the City need not pay the
Contractor until all such claims are paid by the Contractor, It is agreed that
the City shall not be liable for said labor, material, or men under this
contract.
PAR. 13 The Contractor agrees to furnish the City, simultaneously with this contract,
a bond on a form to be provided by the City in the amount provided by law
as stated in the Notice to Bidders, which shall be for the benefit of the City,
and any and all persons injured by the breach of any of the terms of this
contract. Said bond shall be filed with the City Clerk and shall be subject to
the approval of the City Council, and is by reference made a part of this
contract.
PAR. 14 The Contractor agrees that should it abandon work under this contract or
cease the prosecution thereof for a period of thirty (30) consecutive days
without reasonable cause, and should it fail to proceed with said work
within ten (10) days after a notice to continue or carry it on has been mailed
to it at the address given herein by the City, or after such notice has been
served on it, then the City may proceed to complete said work, using any
material, tools, or machinery found along said line of work, doing the work
either by contract or as it may elect, and the Contractor and the sureties on
its bond shall be liable to the City for the costs and expenses so paid out.
Said costs shall be retained by the City from any compensation due, or to
become due the Contractor, and may be recovered by the City in an action
upon Contractor's bond.
PAR. 15 In consideration of the full compliance on the part of the Contractor with all
the provisions, stipulations, and conditions hereof, or contained in the
various instruments made a part of this contract by reference, and upon
completion and acceptance of said work, the City agrees to pay to the
Contractor, in the manner set out in the Notice to Contractors, the amount
of money due the Contractor for work performed and accepted, at the unit
FORM OF CONTRACT PAGE 3 OF 5 PAGES
prices set out in the Contractor's proposal, which has been accepted by the
City.
PAR. 16 The total amount of the contract, based on the Engineer's estimates of
quantities and the Contractor's unit bid prices, and for which 100% surety
bond is required is $
PAR. 17 After the completion of said work, the Contractor agrees to remove all
debris and clean up said streets, and to save the City harmless from any
damage allegedly resulting from a failure to clean up and remove the
debris or put the street back in a proper condition for travel.
PAR. 18 This contract is not divisible, but in the event of a conflict between this
contract and the various instruments incorporated by reference, this
contract shall govern.
PAR. 19 Before the Contractor shall be entitled to receive final payment for work
done under this contract, it shall execute and file a bond in the penal sum
of not less than 100% of the total amount of the contract, same to be
known as "Maintenance Bond," and which bond must be approved by the
City Council, and which bond is in addition to the bond given by the
Contractor to guarantee the completion of the work.
PAR. 20 The Contractor shall maintain all work done hereunder in good order for
the period of two (2) years from and after the date it is accepted by the
Council of the City of Waterloo, Iowa. Said maintenance shall be made
without expense to the City or the abutting property. In the event of the
failure or default of the Contractor to remedy any or all defects appearing in
said work within a period of two (2) years from the date of its acceptance
by said Council, and after having been given ten (10) days notice so to do
by registered letter deposited in the United States Post Office in said town,
addressed to said contractor at the address herein given, then the City may
proceed to remedy such defects. The costs and expenses thereof to be
recovered from the Contractor and the sureties on its maintenance bond by
an action brought in any court of competent jurisdiction.
PAR. 21 The Contractor shall give notice to said City by registered letter directed to
the Mayor or City Clerk/Auditor thereof not more than four (4) and not less
than three (3) months prior to the expiration of the term during which the
Contractor is required to maintain said improvements, in good repair by the
terms of its Contract. The liability of the Contractor and of the sureties on
its bond for maintenance of the said improvements shall continue until
three (3) months after such notice has been given to the City, and, in any
event, until two (2) years after the acceptance of the work.
FORM OF CONTRACT PAGE 4 OF 5 PAGES
CITY OF WATERLOO, IOWA
Mayor
City Clerk
Contractor
BY:
Title:
Approved by the City Council of the City of Waterloo, Iowa, this
day of , 20 .
ATTEST: , City Clerk
Waterloo, Iowa
FORM OF CONTRACT PAGE 5 OF 5 PAGES
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS:
That we, of
(the "Principal"), and of
(the "Surety"), are held and firmly bound unto the City of
Waterloo, Iowa (the "Obligee"), in the penal sum of
Dollars ($ ), lawful money of the United
States, for the payment of said sum in connection with a contract (the "Contract") dated on
or about for the purpose of
. The Contract is
incorporated herein by reference as though fully set forth herein.
Whenever the Principal shall be and is declared by the Obligee to be in default under the
Contract, with the Obligee having performed its obligations in the Contract, then the
Surety, acknowledging that time is of the essence, may promptly remedy the default, or
shall promptly undertake to:
1. Complete the Contract in accordance with its terms and conditions; or
2. Obtain one or more bids for completing the Contract in accordance with its
terms and conditions, and upon determination by the Surety of the lowest
responsible bidder, or negotiated proposal, or, if the Obligee elects, upon
determination by the Obligee and the Surety jointly of the lowest responsible
bidder, or negotiated proposal, arrange for a contract between such party
and the Obligee. The Surety will make available as work progresses
sufficient funds to pay the cost of completion less the balance of the
Contract price. The cost of completion includes responsibilities of the
Principal for correction of defective work and completion of the Contract, the
Obligee's legal and design professional costs resulting directly from the
Principal's default, and liquidated damages or actual damages if no
liquidated damages are specified in the Contract. The term "balance of the
Contract price" means the total amount payable by the Obligee to the
Principal under the Contract and any amendments thereto, less the amount
properly paid by the Obligee to the Principal; or
3. Determine the amount for which it is liable to the Obligee and pay the
Obligee that amount as soon as practicable.
In the event this bond is enforced, Principal and Surety agree to indemnify Obligee and
hold Obligee harmless from and against any and all costs of enforcement, including but
not limited to reasonable attorneys' fees and expenses.
Every Surety on this bond shall be deemed and held, any contract to the contrary
notwithstanding, to consent to each and all of the following matters, without notice:
Performance Bond Page 1 of 2
1. To any extension of time to the Contract in which to perform the Contract.
2. To any change in the plans, specifications, or Contract when such change
does not involve an increase of more than twenty percent (20%) of the total
Contract price, and shall then be released only as to such excess increase.
3. That no provision of this bond or of any other contract shall be valid which
limits to less than one (1) year from the time of the acceptance of the work
the right to sue on this bond for defect in workmanship or material not
discovered or known to the Obligee at the time such work was accepted.
If the Principal performs the Contract, then this bond shall be null and void; otherwise it
shall remain in full force and effect. In no event shall the Surety's total obligation exceed
the penal amount of this bond.
Terms used herein shall include, as appropriate, the singular or plural number, or the _.
masculine, feminine or neuter gender.
IN WITNESS WHEREOF, the undersigned Principal and Surety have executed this
Performance Bond as of
PRINCIPAL SURETY
Name Name
By: By:
Title: Title:
[attach Power of Attorney]
NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is Partnership, all partners should execute BOND.
IMPORTANT: Surety companies executing bonds must appear on the Treasury
Department's most current list (Circular 570 as amended) and be authorized to transact
business in the State where the project is located.
Performance Bond Page 2 of 2
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: that
(Name of Contractor)
(Address of Contractor)
a , hereinafter called Principal,
(Corporation, Partnership or Individual)
and,
(Name of Surety)
(Address of Surety)
hereinafter called Surety, are held and firmly bound unto
(Name of Owner)
(Address of Owner)
hereinafter called OWNER, in the penal sum of Dollars,($_ )
in lawful money of the United States, for the payment of which sum well and truly to be made,
we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a
certain contract with the OWNER, dated the day of
20 , a copy of which is hereto attached and made a part hereof for the construction of:
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms,
SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the
prosecution of the WORK provided for in such contract, and any authorized extension or
modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and
coke, repairs on machinery, equipment and tools, consumed or used in connection with the
construction of such WORK, and all insurance premiums on said WORK, and for all labor,
performed in such WORK whether by SUBCONTRACTOR or otherwise, then this obligation
shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the contract or to the
WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall
in any wise affect its obligation on this BOND, and it does hereby waive notice of any such
change, extension of time, alteration or addition to the terms of the contract or to the WORK
or to the SPECIFICATIONS.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be
unsatisfied.
IN WITNESS HEREOF, this instrument is executed in counterparts, each one of
(number)
which shall be deemed an original, this the day of
20
ATTEST:
Principal
(Principal)Secretary
(SEAL) By (s)
(Address)
Witness as to Principal
(Address)
Surety
ATTEST: By
Attorney-in-Fact
Witness as to Surety (Address)
(Address)
NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is Partnership, all partners should execute BOND.
if thts prOAincludesiPe a .._ fj
IMPORTANT: Surety companies executing bonds must appear on the Treasury
Department's most current list (Circular 570 as amended) and be authorized to transact
business in the State where the project is located.