HomeMy WebLinkAboutSUPPLEMENTAL AGREEMENT NO. 4 /" :C0M AECOM 319 232 6531 tel 501 Sycamore Street 319 232 0271 fax Suite 222 Waterloo,Iowa 50703 www.aecom.com U.S. HIGHWAY 63 IMPROVEMENTS NEWELL STREET TO DONALD STREET WATERLOO, IOWA SUPPLEMENTAL AGREEMENT NO. 4 WHEREAS, Robinson Engineering Company and AECOM Technical Services, Inc. (ATS), formerly Earth Tech, Inc., entered into a Subconsultant Services Agreement dated April 3, 2006, for the U.S. Highway 63 Improvements from U.S. 218 to Donald Street in Waterloo, Iowa; and WHEREAS, Robinson Engineering and ATS entered into Supplemental Agreemert No. 1 dated April 28, 2010, to include a portion of the final design of the segment from Newell Street to Donald Street; and WHEREAS, Robinson Engineering and ATS entered into Supplemental Agreement No. 2 dated July 27, 2011, to include modifications to the storm sewer design of the segment from Newell Street to Donald Street; and WHEREAS, Robinson Engineering and ATS entered into Supplemental Agreement No. 3 dated June 4, 2012, to revise, repackage and split the project into two construction contracts; and WHEREAS, Robinson Engineering and ATS desire to amend the previous agreements to make various revisions to the design and combine the plans into a single construction contract. NOW THEREFORE, it is mutually agreed to amend the original Subconsultant Services Agreement as follows: Project Description The project consists of U.S. 63 improvements between Newell Street and Donald Street in Waterloo, Iowa. The final construction plans were completed as part of the "Final Design" services for the project. II. Scope of Services The Scope of Services includes modifying the previously-completed construction plans to combine the plans into one construction contract and to modify the staging at the Canadian National Railroad crossing. The following tasks are included: Task 1. Modify and Combine Construction Plans. This task consists of modifying the previously-completed construction plans to combine the project into one construction contract and to modify the plans near the Canadian National Railroad crossing. The storm sewer design will be modified to correspond with the revised construction staging plans. Temporary connections to the existing storm sewer system will be designed and included in the construction contract as needed. The plans and bid items will also be modified in accordance with the latest Iowa DOT Standard Road Plans and Specifications. The following sheets will be modified: Sheets M.1 to M.19 (Drainage and Storm Sewer Details) Task 2. Meetings. Attend one project review meeting. A=COM Page 2 The Subconsultant shall provide the services in accordance with the project schedule developed by ATS's project manager for the project. III. Compensation The Subconsultant shall be reimbursed on a fixed unit rate basis in accordance with the following cost summary: Hours Rate Amount Senior Engineer 32 $103.00 $3,296.00 Technician 24 70.00 1,680.00 $4,976.00 Maximum Amount Payable (Rounded) $5,000.00 The compensation for this supplemental agreement is to be integrated with that covered under Supplemental Agreement No. 3. IV. In all other respects, the obligation of the Subconsultant and ATS shall remain as specified in the Subconsultant Services Agreement dated April 3, 2006, and subsequent amendments. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 4 as of the dates shown below: ROBINSON ENGINEERING COMPANY n 1 By CrilkJ Date ) 1 `I Le`l Z AECOM TECHNICAL SERVICES, INC. By Date November 9, 2012 ouglas . Schindel, P.E. Sub-District Manager L:\work\ADMIN\AGREE\SUPPLE\RobinsonSA4Hwy631mpr.doc