CITY OF WATERLOO
1--Cojt 001t
Council Communication
City Council Meeting: March 7, 2011
Prepared: March 1, 2011
Dept. Head Signature: Eric Thorson, PE., City Engineer
# of Attachments:
SUBJECT: F.Y. 2011 SIDEWALK REPAIR PROGRAM- ZONE 1 AND TRAIL REPAIRS
CONTRACT NO. 804
Submitted by: W.Wayne Castle, PLS, EI,Associate Engineer
Recommended City Council Action:
It is recommended that Council approve these documents, set March 28, 2011, as the date for the
public hearing and bid opening and instruct the City Clerk to publish said notices.
Summary Statement
Transmitted herewith are the Plans and Specifications for the F.Y. 2011 SIDEWALK REPAIR
PROGRAM- ZONE 1 AND TRAIL REPAIRS, Contract No. 804, as prepared by the City
Engineer's Office.
Expenditure Required TBD at bid opening
Source of Funds G.O. Bonds
Policy Issue n/a
Alternative None
Background Information:
Cc: Louis Starks, Contracts & Grants Coordinator
td71-'
NOTICE OF PUBLIC HEARING
On Proposed Plans, Specifications, Form of Contract, f 1
And Estimate of Cost and the `
NOTICE TO BIDDERS
For the Taking of Construction Bids
For the
F.Y. 2011 SIDEWALK REPAIR PROGRAM -ZONE 1
AND
TRAIL REPAIRS
In the City of Waterloo, Iowa
CONTRACT NO. 804
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her
office in the City Hall of the said City on the 28th day of March, 2011, until 4:00 p.m. for
the construction of the F.Y. 2011 SIDEWALK REPAIR PROGRAM - ZONE 1 AND
TRAIL REPAIRS, Contract No. 804, as described in detail in the plans and
specifications now on file in the Office of the City Clerk.
OPENING OF BIDS
All proposals received will be opened in open Council meeting to be held in the Council
Chambers in the City Hall in the City of Waterloo, Iowa, on the 28th day of March, 2011,
at 5:30 p.m., and the proposals will be acted upon at such later time and place as may
then be fixed.
PUBLIC HEARING
Notice is hereby given that the Council of said City will conduct a public hearing on the
proposed plans, specifications, form of contract, and estimate of cost for the
construction of the above-described improvement project at 5:30 p.m. on March 28,
2011 said hearing to be held in the Council Chambers in the City Hall in said City. The
proposed plans, specifications, form of contract, and estimate of cost for said
improvements heretofore prepared by the City Engineer of the City of Waterloo are now
on file in the office of the City Clerk for public examination, and any person interested
therein may file written objection thereto with the City Clerk before the date set for said
hearing, or appear and make objection thereto with the City Clerk before the date set
for said hearing, or appear and make objection thereto at the meeting above set forth.
SCOPE OF WORK
DIVISION 1
This project consists of removing and replacing PCC sidewalk of various widths and
thicknesses and placement of ADA truncated domed ramps where required within Zone
1 of the City of Waterloo's Sidewalk Repair Program. This project is generally located in
an area bounded by:
West City Limits - North City Limits - Logan Avenue - East Mullen Avenue -
Conger Street - Fairview Avenue - Park Road - Park Road extended west to the
Cedar River - Cedar River
DIVISION 2
Trail repairs located along Cedar Valley Lakes Trail between Cedar Bend Park and US
Highway 218.
BEGINNING AND COMPLETION DATES
The work under the proposed contract shall be commenced within ten (10) working
days after receipt of "Notice to Proceed" and all items shall be completed on or before
July 1, 2011.
METHOD OF PAYMENT TO CONTRACTOR
The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-
five percent (95%) of the work as it is completed and materials delivered and work
approved. Final payment will be made thirty-one (31) days after completion of the work
and acceptance by the Council. Before final payment is made, vouchers showing that
all subcontractors and workmen and all persons furnishing materials have been fully
paid for such materials and labor will be required unless the City is satisfied that
material, men and laborers have been paid.
The Contractor is hereby notified that if the City does not have cash on hand to pay
monthly pay estimates, according to Chapter 384.57 of the Code of Iowa, payment may
be made by anticipatory warrants issued bearing a rate of interest not exceeding that
permitted by Chapter 74A, Code of Iowa.
PLANS AND SPECIFICATIONS
Plans and Specifications governing the construction of the proposed improvements
have been prepared by the City Engineer, which plans and specifications and also the
prior proceedings of the City Council referring to and defining said proposed
improvements are hereby made a part of this notice, and the proposed contract by
reference shall be executed in compliance therewith.
Plans and Specifications are available from the City Engineer upon the City's receipt of
a $25.00 refundable deposit. Deposits will be refunded if the plans are returned in
usable condition (i.e. free of highlights, ink markings, tears, stickers, water stains and
soiling) to the Engineer's Office by the end of the 14th consecutive day after the project
has been awarded. No deposits will be refunded for any plans received after the 14th
consecutive day, which includes plans returned via mail service. Plan holders are
responsible for ascertaining when the project has been awarded.
This deposit policy shall also apply to the prime contractor awarded the project for all
plans and specifications obtained and distributed by the prime contractor to their
subcontractors and suppliers in determining the prime contractor's bid, if the prime
contractor wishes for their deposit to be returned.
Upon award of oject, the prime contractor shall be supplied with the needed number
of plans and specifications at no additional cost.
CONTRACT AWARD
A contract will be awarded for each division of the contract to the qualified bidder
submitting the lowest bid.
The City reserves the right to reject any or all bids, re-advertise for new bids, and to
waive informalities in the bids submitted that might be in the best interest of the City.
Bids may be held by the City of Waterloo, Iowa, for a period not to exceed thirty (30)
days from the day of the opening of bids for the purpose of reviewing the bids and
investigating the qualifications of bidders, prior to awarding the contract.
By virtue of statutory authority, a preference will be given to products and provisions
grown and coal produced with the State of Iowa and preference will be given to local
domestic labor in the construction of the improvement.
PROPOSALS SUBMITTED
The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly
write or type the unit bid price and the bid item extension (Unit Price x Estimated Qty) in
numerals on the blanks provided. Should there be any discrepancy between the unit bid
price and extension, the City of Waterloo shall consider the unit bid price as being the
valid unit bid price.
The bidder has the option to submit a computer-generated spreadsheet in lieu of the
portion of the Form of Bid or Proposal, which includes the Bid Item Number,
Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price and Total Bid. The
computer-generated spreadsheet shall include all of the information listed in that portion
of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor
submitting the bid. For the bidders who submit a computer-generated spreadsheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in the space(s)
provided on the Form of Bid or Proposal.
BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or cashier's check
drawn on an Iowa bank, or a bank chartered under the laws of the United States, a
certified share draft drawn on a credit union in Iowa or chartered under the laws of the
United States, or bid bond, (on the form furnished by the City) payable to the City of
Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted,
which certified check, certified share draft or bid bond will be held as security that the
Bidder will enter into a Contract for the construction of the work and will furnish the
required bonds, and in case the successful Bidder shall fail or refuse to enter into the
Contract and furnish the required bonds, his bid security may be retained by said City
as agreed upon liquidated damages. If bid bond is used, it must be signed by both the
Bidder and the surety or surety's agent. Signature of surety's agent must be supported
by accompanying Power of Attorney.
PERFORMANCE & PAYMENT BONDS
The successful bidder will be required to furnish a "Performance Bond" and a "Payment
Bond" within ten (10) days after forms are presented to him in an amount equal to one
hundred percent (100%) of the contract price, said bond to be issued by a responsible
surety approved by the City Council and shall guarantee the faithful performance of the
contract and the terms and conditions therein contained, and shall guarantee the
prompt payment of all materials and labor and protect and save harmless the City from
claims of any kind caused by the operations of the contractor.
MAINTENANCE BOND
Before the Contractor shall be entitled to receive final payment for work done under this
contract, it shall execute and file a bond in the penal sum of not less than 100% of the
total amount of the contract, same to be known as "Maintenance Bond," and which
bond must be approved by the City Council, and which bond is in addition to the bond
given by the Contractor to guarantee the completion of the work.
CONTRACT COMPLIANCE PROGRAM /SUBCONTRACTING
The program proposes numerical projections regarding utilization of Minority Business
Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors
and suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa.
A goal of at least ten percent (10%) for MBE participation on all City funded
construction projects that are estimated at $50,000.00 or more. A goal of at least two
percent (2%) for WBE participation on all City funded construction projects that are
estimated at $50,000.00 or more. Any project funded in part or in total with federal
funds shall follow the respective agencies contract compliance program and goals. The
Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance
MBE/WBE goals. The MBE/WBE subcontractors, suppliers or vendors must provide the
Prime Contractor a reasonably competitive price for the service being rendered or the
Contractor is not required to accept their bid.
LIQUIDATED DAMAGES
Time is an essential element of this contract. It is important that the work be diligently
pursued to completion. If the work is not completed within the specified contract period,
plus authorized extensions, the contractor shall pay to the City Liquidated Damages in
the amount of five hundred dollars ($500.00) per day, for each day, as further described
herein, in excess of the authorized time.
Days beyond the specified completion date for which Liquidated Damages will be
charged will be working days that the contractor does, or could have worked, from
Monday through Saturday. Sundays will be counted only if work is performed. Partial
working days will be considered as a full working day. Days not chargeable for
Liquidated Damages will include rain days, Sunday if no work is done, and legal
holidays.
Working days will cease to be charged when only punch list items remain to be
completed. Punch list items do not include contract bid items or approved change/extra
work orders.
When the Contractor believes the project to be substantially completed, a written notice
stating the same shall be submitted to the Engineer and a request made for a Punch
List. If the work under the Contract extends beyond the normal construction season for
such work the Contractor shall submit to the Engineer in writing a request that working
days counted toward the project be suspended until work is resumed the following
construction season.
This amount is not construed as a penalty. These damages are for the cost to the City
of providing the required additional inspection, engineering and contract administration.
PRE-CONSTRUCTION CONFERENCE
Before the work is commenced on this contract, a conference shall be held for the
purpose of discussing the contract. " The conference shall be attended by the prime
contractor, subcontractors and City Officials.
RECIPROCAL RESIDENT BIDDER PREFERENCE
Attention of bidders is called to the requirement of complying with the provisions of the
Reciprocal Resident Bidder Preference requirement.
Each bidder submitting a bid shall execute and include with the bid, a Resident Bidder
Certification in the form herein provided, to the' effect that he will rot have as
employees, Illinois laborers on the work site.
SALES TAX EXEMPTION CERTIFICATES
Contractors and approved subcontractors will be provided a Sales Tax: Exemption
Certification to purchase building materials or supplies in the performance of
construction contracts let by the City 9fWaterloo.
Published pursuant to the provisions of Division VI of Chapter 384 of the City Code of
Iowa and upon order to the City Council of said Waterloo, Iowa, on the 7th day of March,
2011.
CITY OF WATERLOO, IOWA
BY:
Suzy Schares
City Clerk