HomeMy WebLinkAboutPROJECT MANUAL Manual No.
_ /
PROJECT MANUAL
FOR
FY 2012 CHAMBERLAIN DEMOLITION PHASE 3
550 ESTHER STREET
CONTRACT NO. 806
CITY OF WATERLOO, IOWA
April 2012
OWNERSHIP OF DOCUMENT
This document, and the ideas and designs incorporated herein, as an
instrument of professional service, is the property of HR Green, Inc.
and is not to be used, in whole or in part, for any other project without
the written authorization of HR Green, Inc.
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
PROJECT MANUAL FOR: FY 2012 CHAMBERLIN DEMOLITION PHASE 3
CONTRACT NO. 806
550 ESTHER STREET
WATERLOO, IOWA
OWNER: CITY OF WATERLOO, IOWA
— OWNER'S AUTHORIZED CONTRACT NOEL ANDERSON
REPRESENTATIVE (CONTRACT COMMUNITY PLANNING AND DEVELOPMENT DIRECTOR
REPRESENTATIVE): CITY OF WATERLOO
715 MULBERRY STREET
WATERLOO, IOWA 50703
TELEPHONE: (319) 291-4366
NOEL.ANDERSON@WATERLOO-IA.ORG
ENGINEERING CONSULTANT: HR GREEN, INC.
(CONSULTANT) DON TEMEYER
8710 EARHART LANE SW
CEDAR RAPIDS, IOWA 52404
TELEPHONE: (319) 269-3281
DTEMEYER@HRGREEN.COM
PREBID MEETING: PLACE: CITY HALL
-- 715 MULBERRY STREET
WATERLOO, IOWA
DATE: MAY 7, 2012
TIME: 10 AM LOCAL TIME
BID SUBMITTAL: PLACE: CITY OF WATERLOO, IOWA
CITY CLERK
715 MULBERRY STREET
WATERLOO, IOWA 50703
DATE: MAY 21, 2012
TIME: 4:00 PM LOCAL TIME
MANUAL DATED: APRIL , 2012
"1
1
HR. Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
1
CERTIFICATION
I hereby certify that this engineering document was prepared by me or
under my direct personal supervision and that I am a duly licensed
- Professional Engineer under the laws of the State of Iowa.
,y�0141's`r�i4C;;!; Date: r ft
�,lv �� Nam: fJon E.Scharf. P. E
G\ License Number: 11786
{' 11786174 My renewal date is: December 31,2013
Pages or sheets covered by this seal:
,mot r Entire Bound Document •
I
1
I,
1
"yt
1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
TABLE OF CONTENTS
Section Title # Pages
DIVISION 00 BIDDING AND CONTRACT DOCUMENTS
NOTICE OF PUBLIC HEARING AND NOTICE TO BIDDERS 6
INSTRUCTIONS TO BIDDERS
- Instructions to Bidders 11
-Supplemental Instructions to Bidders 3
-Accidental Discovery Statement 2
- Iowa Construction Sales Tax Exemption Certificate 1
-Statement of Bidder's Qualifications 2
BID FORM AND SUPPLEMENTS TO BID FORMS
- Bid Form 3
- Bid Bond 2
- Non-Collusion Affidavit of Prime Bidder 1
- Bidder Suspension and Debarment Requirements and Certification 2
LABOR REQUIREMENTS
- Equal Opportunity Clause 2
- Equal Employment Opportunity Certification 2
-Affirmative Action Program 9
-MBE/WBE Participation 1
- Letter of Intent to Bid 1
-Subcontractor's Bid Request Form 1
-Soliciting for Subcontractor Quotes Letter 1
-MBE-WBE— Pre-Bid Contract Information Form 1
-MBE/WBE — Pre-Bid Contract Information Form Instructions 1
-Certified MBE/WBE Contractors 4
— -Section 3 Clause 3
- HUD 60002 Form 3
CONTRACT FORMS
-Notice of Award 2
-Form of Contract 5
-Performance Bond 2
-Payment Bond 3
-Notice to Proceed 1
-Non-Collusion Affidavit of Subcontractor 2
TABLE OF CONTENTS Page 1 of 2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
Section Title # Pages
GENERAL SPECIFICATIONS
- General Specifications for Construction, City of Waterloo, IA 16
- Supplemental General Specifications for Construction, City of Waterloo, IA 2
DIVISION 01 GENERAL REQUIREMENTS
01100 - Summary 3
01225 - Measurement and Payment 5
-- 01300 - Administrative Requirements 3
01350 - On-Site Health and Safety Requirements 3
01500 - Temporary Facilities and Controls 4
01570 - Environmental Protection and Controls 5
DIVISION 02 SITE CONSTRUCTION
02200 - Site Preparation 3
_ 02221 - Demolition and Removals 9
02316 - Fill and Backfill 3
02900 - Site Restoration 4
02900 - Off-Site Transportation and Disposal 5
FIGURES
1 Site Demolition Plan
2 Monitoring Well Location Map
3 Known Storm Sewer Inlet Location Map
ATTACHMENTS
A. City of Waterloo Assessors Information
TABLE OF CONTENTS Page 2 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
NOTICE OF PUBLIC HEARING
on Proposed Plans, Specifications, Form of Contract,
and Estimate of Cost and the
NOTICE TO BIDDERS
_ for the Taking of Construction Bids
for the
FY 2012 Chamberlain Demolition Phase 3
550 Esther
in the City of Waterloo, Iowa
CONTRACT NO. 806
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her office in
the City Hall of the said City on the 21st day of May, 2012, until 4:00 p.m. for the construction of
the FY 2012 Chamberlain Demolition Phase 3, Contract No. 806, as described in detail in
the plans and specifications now on file in the Office of the City Clerk.
OPENING OF BIDS
All proposals received will be opened in open Council meeting to be held in the Council
Chambers in the City Hall in the City of Waterloo, Iowa, on the 21st day of May 2012, at 5:30
p.m., and the proposals will be acted upon at such later time and place as may then be fixed.
PUBLIC HEARING
Notice is hereby given that the Council of said City will conduct a public hearing on the
proposed plans, specifications, form of contract, and estimate of cost for the construction of the
above-described improvement project at 5:30 p.m. on May 21, 2012, said hearing to be held in
the Council Chambers in the City Hall in said City. The proposed plans, specifications, form of
contract, and estimate of cost for said improvements heretofore prepared by HR Green, 8710
Earhart Lane S. W., Cedar Rapids, Iowa, 52409-9009 are now on file in the office of the City
Clerk for public examination, and any person interested therein may file written objection
thereto with the City Clerk before the date set for said hearing, or appear and make objection
thereto with the City Clerk before the date set for said hearing, or appear and make objection
thereto at the meeting above set forth.
SCOPE OF WORK
This project includes demolitions, removals, and restoration at the former Chamberlain
Manufacturing Plant site located in Waterloo, Iowa. This is a continuation of previous
demolition and removal projects at the site. Work of this project consists of demolition of the
NOTICE OF HEARING Page 1 of 6
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3 _
Project No. 10110021 City of Waterloo, Iowa
remainder of site structures, removal of footings and slabs (both Portland cement concrete and
asphaltic concrete), and removal of tanks. All debris from this project is to be hauled off-site for
disposal or recycling. Restoration includes backfilling and grading with a combination of
imported and on-site soils, spreading of topsoil, seeding and mulching.
BEGINNING AND COMPLETION DATES
The work under the proposed contract shall be commenced within ten (10) working days after
receipt of "Notice to Proceed" and shall be completed on or before September 30, 2012.
METHOD OF PAYMENT TO CONTRACTOR
The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-five
percent (95%) of the work as same is completed and materials delivered and work approved.
Final payment will be made thirty-one (31) days after completion of the work and acceptance by
the Council.
The Contractor is hereby notified that if the City does not have cash on hand to pay monthly
pay estimates, according to Chapter 384.57 of the Code of Iowa, payment may be made by
anticipatory warrants issued bearing a rate of interest not exceeding that permitted by Chapter
74A, Code of Iowa.
PLANS AND SPECIFICATIONS
Plans and Specifications governing the construction of the proposed improvements have been
prepared by HR Green, 8710 Earhart Lane S. W., Cedar Rapids, Iowa, 52409-9009, which
plans and specifications and also the prior proceedings of the City Council referring to and
defining said proposed improvements are hereby made a part of this notice, and the proposed
contract by reference shall be executed in compliance therewith.
Plans and Specifications are available from the City Engineer upon the City's receipt of a
$25.00 refundable deposit. Deposits will be refunded if the plans are returned in usable
condition (i.e. free of highlights, ink markings, tears, stickers, water stains and soiling) to the
Engineer's Office by the end of the 14th consecutive day after the project has been awarded.
No deposits will be refunded for any plans received after the 14th consecutive day, which
includes plans returned via mail service. Plan holders are responsible for ascertaining when the
project has been awarded.
This deposit policy shall also apply to the prime contractor awarded the project for all plans and
specifications obtained and distributed by the prime contractor to their subcontractors and
suppliers in determining the prime contractor's bid, if the prime contractor wishes for their
deposit to be returned.
Upon award of project, the prime contractor shall be supplied with the needed number of plans
and specifications at no additional cost.
NOTICE OF HEARING Page 2 of 6
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
CONTRACT AWARD
A contract will be awarded to the qualified responsive responsible bidder submitting the lowest
total bid.
The City reserves the right to reject any or all bids, readvertise for new bids, and to waive
informalities in the bids submitted that may be in the best interest of the City.
Bids may be held by the City of Waterloo, Iowa, for a period not to exceed thirty (30) days from
the day of the opening of bids for the purpose of reviewing the bids and investigating the
qualifications of bidders, prior to awarding the contract.
By virtue of statutory authority, a preference will be given to products and provisions grown and
coal produced with the State of Iowa and preference will be given to local domestic labor in the
construction of the improvement.
PROPOSALS SUBMITTED
The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly write or
type the unit bid price and the bid item extension (Unit Price x Estimated Qty) in numerals on
the blanks provided. Should there be any discrepancy between the unit bid price and
extension, the City of Waterloo shall consider the unit bid price as being the valid unit bid price.
The bidder has the option to submit a computer-generated spreadsheet in lieu of the portion of
the Form of Bid or Proposal, which includes the Bid Item Number, Description, Unit, Estimated
-- Quantity, Unit Bid Price, Total Bid Price and Total Bid. The computer-generated spreadsheet
shall include all of the information listed in that portion of the Form of Bid or Proposal as well as
bear the signature of the Prime Contractor submitting the bid. For the bidders who submit a
computer-generated spreadsheet, the TOTAL BID (with alternates, if applicable) shall also be
indicated in the space(s) provided on the Form of Bid or Proposal.
MBE/WBE REQUIREMENTS
FOR
FY 2012 Chamberlain Demolition Phase 3
This program is funded in part by federal HUD EDI GRANT funds. According to the City of
— Waterloo's Contract Compliance Program: "Any project which is funded solely or in part with
Federal funds shall follow the respective agencies contract compliance program."
Accordingly, the City of Waterloo's MBE/WBE goals of 10% and 2%, respectively, apply to this
Program and Section 3 of the Housing and Urban Development Act of 1968, as amended, 12
U.S.C. 1701u, 24 CFR Part 135 does apply.
NOTICE OF HEARING Page 3 of 6
-ti
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3 —
Project No. 10110021 City of Waterloo, Iowa
Section 3 states in pertinent part that:
"To the greatest extent feasible, opportunities for training and employment
be given lower income residents of the project area and contracts for
work in connection with the project be awarded to business concerns which
are located in, or owned in substantial part by persons residing in the area of the
project." —
In addition to Section 3 requirements, the City of Waterloo's Contract Compliance Program
states that "this program does not eliminate the need for contractors to continue their "good- —
faith efforts" in using MBE/WBE subcontractors on City Contracts"
BID SECURITY REQUIRED —
All bids must be accompanied in a separate envelope by a certified or cashier's check drawn on
an Iowa bank, or a bank chartered under the laws of the United States, a certified share draft _
drawn on a credit union in Iowa or chartered under the laws of the United States, or bid bond,
(on the form furnished by the City) payable to the City of Waterloo, Iowa, in the sum of not less
than five percent (5%) of the bid submitted, which certified check, certified share draft or bid —
bond will be held as security that the Bidder will enter into a Contract for the construction of the
work and will furnish the required bonds, and in case the successful Bidder shall fail or refuse to
enter into the Contract and furnish the required bonds, his bid security may be retained by said
City as agreed upon liquidated damages. If bid bond is used, it must be signed by both the
Bidder and the surety or surety's agent. Signature of surety's agent must be supported by
accompanying Power of Attorney.
BONDS
The successful bidder will be required to furnish a "Performance Bond" and a "Payment Bond" --
within ten (10) days after forms are presented to him in an amount equal to one hundred
percent (100%) of the contract price, said bonds to be issued by a responsible surety approved
by the City Council and shall guarantee the faithful performance of the contract and the terms --
and conditions therein contained, and shall guarantee the prompt payment of all materials and
labor and protect and save harmless the City from claims of any kind caused by the operations
of the contractor. As this project includes federal funds, Surety companies executing bonds —
must appear on the Treasury Department's most current list (Circular 570 as amended) and be
authorized to transact business in the State where the project is located.
CONTRACT COMPLIANCE PROGRAM /SUBCONTRACTING
The program proposes numerical projections regarding utilization of Minority Business
Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors and
suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa.
NOTICE OF HEARING Page 4 of 6
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
A goal of at least ten percent (10%) for MBE participation on all City funded construction
projects that are estimated at $50,000.00 or more. A goal of at least two percent (2%) for WBE
participation on all City funded construction projects that are estimated at $50,000.00 or more.
Any project funded in part or in total with federal funds shall follow the respective agencies
contract compliance program and goals. The Prime Contractor shall make "good-faith efforts"
to meet the Contract Compliance MBE/WBE goals. The MBE/WBE subcontractors, suppliers
or vendors must provide the Prime Contractor a reasonably competitive price for the service
being rendered or the Contractor is not required to accept their bid.
LIQUIDATED DAMAGES
Time is an essential element of this contract. It is important that the work be diligently pursued
to completion. If the work is not completed within the specified contract period, plus authorized
extensions, the contractor shall pay to the City Liquidated Damages in the amount of five
hundred dollars ($500.00) per day, for each day, as further described herein, in excess of the
authorized time.
Days beyond the specified completion date for which Liquidated Damages will be charged will
be working days that the contractor does, or could have worked, from Monday through
Saturday. Sundays will be counted only if work is performed. Partial working days will be
considered as a full working day. Days not chargeable for Liquidated Damages will include rain
days, Sunday if no work is done, and legal holidays.
Working days will cease to be charged when only punch list items remain to be completed.
Punch list items do not include contract bid items or approved change/extra work orders.
When the Contractor believes the project to be substantially completed, a written notice stating
the same shall be submitted to the Engineer and a request made for a Punch List. If the work
under the Contract extends beyond the normal construction season for such work the
Contractor shall submit to the Engineer in writing a request that working days counted toward
the project be suspended until work is resumed the following construction season.
This amount is not construed as a penalty. These damages are for the cost to the City of
providing the required additional inspection, engineering and contract administration.
PRE-CONSTRUCTION CONFERENCE
Before the work is commenced on this contract, a conference shall be held for the purpose of
discussing the contract. The conference shall be attended by City officials, the prime
contractor, and all subcontractors, if any.
NOTICE OF HEARING Page 5 of 6
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3 —
Project No. 10110021 City of Waterloo, Iowa
SALES TAX EXEMPTION CERTIFICATES —
Contractors and approved subcontractors will be provided a Sales Tax Exemption Certification
to purchase building materials or supplies in the performance of construction contracts let by
the City of Waterloo.
Published pursuant to the provisions of Chapter 26 of the City Code of Iowa and upon order to
the City Council of said Waterloo, Iowa, on the day of , 2012. —
CITY OF WATERLOO, IOWA
BY: Suzy Schares
City Clerk
NOTICE OF HEARING Page 6 of 6
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
INSTRUCTIONS TO BIDDERS
1. EXPLANATIONS TO BIDDERS
r
Any explanation desired by a bidder regarding the meaning or interpretation of the
Notice to Bidders, Plans, Specifications, etc., must be requested in writing and with
sufficient time allowed for a reply to reach bidders before submission of their bids. Any
interpretation made will be in the form of an amendment of the Notice to Bidders, Plans,
Specifications, etc., and will be furnished to all prospective bidders. Its receipt by the
bidder must be acknowledged in the space provided on the Proposal Form or by letter or
telegram received before the time set for opening of bids. Oral explanations or
instructions given before the award of the contract will not be binding.
2. EXAMINATION OF PROPOSED WORK
Bidders should visit the site and take such other steps as may be reasonably necessary
to ascertain the nature and location of the work, and the general and local conditions
which can affect the work or the cost thereof. Failure to do so will not relieve bidders
from responsibility for estimating properly the difficulty or cost of successfully performing
the work. The owner will assume no responsibility for any understanding or
representation concerning conditions made by any of its officers or agents prior to the
execution of the contract, unless included in the Notice to Bidders, the Specifications or
related documents.
3. PREPARATION OF BIDS
a. Bids shall be submitted on the forms furnished, or copies thereof, and must be
manually signed. If erasures or other changes appear on the forms, each
erasure or change must be initialed by the person signing the bid.
The bidder has the option to submit a computer-generated spreadsheet in lieu of
the portion of the Form of Bid or Proposal, which includes the Bid Item Number,
Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price, and Total
Bid. The computer-generated spreadsheet shall include all of the information
listed in that portion of the Form of Bid or Proposal as well as bear the signature
of the Prime Contractor submitting the bid. For the bidders who submit a
computer-generated spread- sheet, the TOTAL BID (with alternates, if
applicable) shall also be indicated in the space(s) provided on the Form of Bid or
-- Proposal.
b. The Bid Form may provide for submission of a price or prices for one or more
items, which may be lump sum bids, alternate prices, schedule items resulting in
a bid on a unit of construction or a combination thereof, etc. When the Bid Form
explicitly requires that the bidder bid on all items, failure to do so will disqualify
the bid. When submission of a price on all items is not required, bidders should
INSTRUCTIONS TO BIDDERS Page 1 of 11
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3 _
Project No. 10110021 City of Waterloo, Iowa
insert the words "no bid" in the space provided for any item on which no price is
submitted.
c. Unless called for, alternate bids will not be considered.
d. Modifications of bids already submitted will be considered if received at the office
designated in the Notice to Bidders by the time set for closing of bids.
Telegraphic modifications will be considered, but should not reveal the amount of
the original or revised bid.
e. In preparing his bid, the bidder shall specify the price, written legibly in ink or with the typewriter, at which he proposes to do each item of work. The unit price shall
be stated in figures in the blank space provided (i.e., $7.14). In items where unit
price is required, the total amount of each item shall be computed at the unit _
prices bid for the quantities given on the Bid Form and stated in figures in the
blank space provided.
If the bidder chooses to submit the unit prices, total bid price, and total bid on a
computer-generated spreadsheet, all numbers shall be easily legible.
f. Any changes or alterations made in the Bid Form, or any addition thereto, may
cause the rejection of the bid. No bid will be considered which contains a clause
in which the contractor reserves the right to accept or reject a contract awarded
him by the City Council of Waterloo. Bids in which the unit prices are obviously
unbalanced may be rejected.
4. SUBMISSION OF BIDS —
a. A bid must be sealed in a separate envelope and marked to indicate its contents
and be accompanied by the bid security in a separate envelope. If forwarded by _
mail, the two envelopes shall be placed in a third and mailed to the City
Clerk/Auditor. All bids must be filed with the City Clerk/Auditor of the City of
Waterloo at his office in the City Hall before the time specified for closing bids. _
b. Bids received prior to the advertised hour of opening will be securely kept sealed.
The officer whose duty it is to open them will decide when the specified time has
arrived, and no bid received thereafter will be considered; except that when a bid
arrives by mail after the time fixed for opening, but before the reading of all other
bids is completed, and it is shown to the satisfaction of the City of Waterloo,
Iowa, that the non-arrival on time was due solely to delay in the mails for which —
the bidder was not responsible, such bid will be received and considered.
c. Bidders are cautioned that, while telegraphic modifications of bids may be --
received as provided above, such modifications, if not explicit and if in any sense
subject to misinterpretation, shall made the bid so modified or amended, subject
to rejection. —
INSTRUCTIONS TO BIDDERS Page 2 of 11
•
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
5. LATE BIDS AND MODIFICATIONS OR WITHDRAWALS
Bids and modifications or withdrawals thereof received at the office designated in the
Notice to Bidders after the exact time set for closing of bids will not be considered.
However, a modification which is received from an otherwise successful bidder, and
which makes the terms of the bid more favorable to the City of Waterloo, will be
considered at any time it is received and may therefore be accepted. Bids may be
withdrawn by written or telegraphic request received from bidders prior to the time set for
closing of bids.
6. PUBLIC OPENING OF BIDS
Bids will be publicly opened at that time and place set for opening in the Notice to
Bidders. Their content will be made public for the information of bidders and others
interested who may be present either in person or by representative.
7. BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or cashier's check
drawn on an Iowa bank, or a bank chartered under the laws of the United States, a
certified share draft drawn on a credit union in Iowa or chartered under the laws of the
United States, or bid bond (on the form furnished by the City) payable to the City of
Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, which
certified check, certified share draft or bid bond will be held as security that the Bidder
will enter into a Contract for the construction of the work and will furnish the required
bonds, and in case the successful Bidder shall fail or refuse to enter into the Contract
and furnish the required bond, his bid security may be retained by said City as agreed
upon liquidated damages. If bid bond is used, it must be signed by both the bidder and
the surety or surety's agent. Signature of surety's agent must be supported by
accompanying Power of Attorney.
8. COLLUSIVE AGREEMENTS
„— a. Each bidder submitting a bid shall execute and include with the bid, a Non-
Collusion Affidavit in the form herein provided, to the effect that he as not
colluded with any other person, firm, or corporation in regard to any bid
submitted.
b. Each bidder submitting a bid shall have each proposed subcontractor, if any,
execute and submit to the City Contract Compliance Officer by 5:00 P.M. the
business day following the day bids on this project are due, a Non-Collusion
Affidavit in the form herein provided, to the effect that he has not colluded with
any other person, firm, or corporation in regard to any bid submitted. Before
executing any subcontract, the successful bidder shall submit the name of any
proposed subcontractor for approval by the City.
INSTRUCTIONS TO BIDDERS Page 3 of 11
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
9. MINORITY AND/OR WOMEN BUSINESS ENTERPRISE SUBCONTRACTORS
a. CITY OF WATERLOO AND/OR WOMEN BUSINESS ENTERPRISE PRE-BID
CONTACT INFORMATION FORM
The City of Waterloo Minority and/or Women Business Enterprise Pre-Bid
Contact Information Form shall be submitted upon request by the City. It is not
required to be submitted with the Form of Bid or Proposal.
10. MBE/WBE CONTRACT COMPLIANCE PROGRAM
PURPOSE
The purpose of the Contract Compliance Program (hereinafter called Program) is to act
as an impetus for increasing the participation of minority and women disadvantaged
business enterprise (MBENVBE) in City awarded construction contracts.
The Program does not propose to eliminate any bonafide contractor or subcontractor
from bidding on City contracts, but it will hopefully serve as a needed stimulus to help
local MBENVBE's grow and eventually become mainstream contractors and
subcontractors.
This Contract Compliance Program does not propose to include any set-aside or quotas,
but only flexible goals where "good-faith efforts" are required by the contractor to use
MBE/WBE subcontractors.
This Program shall not eliminate the need for contractors to continue their "good-faith
efforts" in using MBENVBE subcontractors on City contracts estimated at less than
$50,000.
The City of Waterloo will make every effort to reduce in-house construction and
maintenance work that would be more cost effectively performed by the private sector
and, thus, would allow additional bidding opportunities for MBENVBE firms.
The City Contract Compliance Officer shall be advised of all City of Waterloo awarded
construction contracts.
DEFINITIONS
Goals:
A flexible numerically expressed objective which contractors are required to
make "good-faith efforts." The key to the requirement is to make documented
efforts. Goals are neither set-a-sides nor a device to achieve proportional
representation or equal results. Numerical goals do not create set-a-sides for
specific groups, nor are they designed to achieve proportional representation or
equal results. Rather, the goal-setting process in affirmative action planning is
used to target and measure the effectiveness of affirmative action efforts to
INSTRUCTIONS TO BIDDERS Page 4 of 11
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
eradicate and prevent discrimination.
Quota:
A flat numerical requirement that the contractor is required to meet in order to
obtain the benefit or be in compliance. The numerical goal component of
"� affirmative action programs is not designed to be, nor may it properly or lawfully
be interpreted as, permitting unlawful preferential treatment and quotas with
respect to persons of any race, color, religion, sex, or national origin. The
regulations at 41 CFR 60-2.12(a), 60-2.15 and 60-2.30, specifically prohibit
discrimination and the use of goals as quotas. (U.S. Department of Labor)
_. Set-Aside:
An arrangement in which a particular contract is reserved for competition solely
among minority and women business enterprises.
— Contractor.
As used in this document means contractor, subcontractor, supplier, vendor, and
professional service provider.
Minority Business Enterprise (MBE)
Any business, which is at least 51%, owned by one or more minorities and
whose management and daily business operations are controlled by one or more
such individuals and is on the current State Unified Certification List, or were
listed on the City of Waterloo Certified MBE/WBE Contractors list as of July 1,
2002
Women Business Enterprise (WBE):
Any business which is at least 51% owned by one or more women and whose
management and daily business operations are controlled by one or more such
individuals and is on the current State Unified Certification List, or were listed on
the City of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002
Minority:
Any person or persons who are considered as socially and economically
disadvantaged because of their identity as a group member without regard to
their individual qualities. The groups include: Black American, Hispanic
American, Native Americans, Eskimos, Aleuts, and Asian-Pacific Americans. 13
C.F.R. 124-1.1(c)(3)(ii)(1983).
Lowest Responsible Bidder:
Bidder who has offered the lowest bid and who has exhibited skill relative to the
type of work bid on, judgment, financial responsibility, and evidence of working
with the Affirmative Action Employment Program and the Contract Compliance
Program.
INSTRUCTIONS TO BIDDERS Page 5 of 11
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa -"
Broker:
One buying or selling for others on commission or other fee basis without
maintaining a warehouse or other similar inventory storage facility.
Mayor's Advisory Committee: --
Mayor's Advisory Committee for Minority, Female, and Disadvantaged Business
Enterprise.
Good Faith Efforts:
The successful bidder shall be selected on the basis of having submitted the
lowest responsible bid. The obligation of the bidder is to make good faith efforts.
The bidder can demonstrate that it has done so by the following:
1. The Prime Contractor met the project goal - No Action necessary
2. If the Prime Contractor failed to meet the goal, they must submit
documentation of good faith efforts.
CONTRACT COMPLIANCE PROGRAM SUBCONTRACTING
The program proposes numerical projections or goals regarding utilization of Minority
Business Enterprise (MBE) and Women Business Enterprise (WBE) as subcontractors --
in the performance of contracts awarded by the City of Waterloo, Iowa.
A goal of at least 10% for MBE participation on all City funded construction projects that
are estimated at $50,000 or more and projects under $50,000 where applicable at the
Contract Compliance Officer's discretion. There is at least 2% WBE goal on City funded
projects. Any project which is funded solely or in part with Federal funds shall follow the
respective agencies contract compliance program and goals. Any project which is
funded solely or in part with State funds shall follow the respective agencies contract
compliance program and goals. The City of Waterloo Contract Compliance Program is
for City awarded construction contracts only. The prime contractor shall make "good-
faith efforts" to meet the Contract Compliance MBE/WBE goals. The MBE/WBE
subcontracts must provide the prime contractor a reasonably competitive price for the
service being rendered or the contractor is not required to accept the bid.
Administrative Reconsideration:
As part of this reconsideration, the bidder will have the opportunity to provide written
documentation or arguments concerning the issue of whether they made adequate good
faith efforts to meet the goals. The bidder will have the opportunity to meet in person
with the City of Waterloo's Administrative Reconsideration Committee to discuss the
issue of whether they made adequate good faith efforts. The Administrative
Reconsideration Committee will forward a written decision on reconsideration to the
Mayor and City Council, explaining the basis for finding that the bidder did or did not
meet the goal or make adequate good faith efforts to do so.
INSTRUCTIONS TO BIDDERS Page 6 of 11
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
Documentation required will include but is not limited to the following:
* Making portions of the work available for MBE/WBE subcontracting
* Evidence of negotiating with MBE/WBE firms
* MBE/WBE quotes obtained and non-MBE/WBE quotes used
* Reasons agreements were not reached
* Follow-up after initial solicitations
* Efforts to assist in obtaining equipment, supplies and materials (at competitive prices),
-- bonding, lines of credit, insurance, etc.
* Evidence of past compliance or non-compliance by same contractor
The Contract Compliance Officer will determine the weight to be given to each item
listed above (supported by appropriate documentation) based on overall program goals.
RESPONSIBILITIES
1. City of Waterloo
A. The City Contract Compliance Officer has the responsibility to assure the City's
compliance with Federal, State and Municipal regulations.
B. The City Contract Compliance Officer is responsible for maintaining a current
directory of certified firms. Certification of MBE/WBE/DBE contractors is through
the Iowa Department of Transportation and its Unified Certification Program.
Only firms certified based on guidelines prescribed in 49 CFR Part 26 and
provisions of this agreement, shall be recognized as certified by the City of
Waterloo.
C. The City Contract Compliance Officer is responsible for making available a list of
future project information notices to MBE/WBE firms.
D. The City Contract Compliance Officer shall send notices to appropriate
MBE/WBE firms in the directory of each bid solicitation with opening date.
E. The City Contract Compliance Officer will receive MBE/WBE Letter(s) of Intent to
Bid and within two (2) business days forward the complete list of MBE/WBE
bidders who submitted a Letter of Intent to Bid to prime contractors.
2. Prime Contractors
In order to be in compliance with the guidelines of this program, the prime contractor
must show good-faith efforts in following the MBE/WBE Contract Compliance
Program. Good-faith efforts include, but are not limited to, the following:
-- A. Prime contractors shall send solicitation letters (Form CCO-3) to appropriate
MBE/WBE (those certified in directory prepared by City Contract Compliance
Officer) at least seven (7) working days prior to bid date. Letters should identify
specific items to be subcontracted. A minimum of three (3) disadvantaged
business contacts must be made and documented, if there are at least three
disadvantaged businesses offering services in the area to be subcontracted (See
City of Waterloo MBE/WBE Certification List). If less than three (3) are offering
INSTRUCTIONS TO BIDDERS Page 7 of 11
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
the services to be subcontracted, then a contact is required for any that are listed
as providing that service. If the Prime Contractor submits a MBE/WBE contact
not on the City's MBE/WBE list, attach a copy of the MBE/WBE/DBE
Certifications from another government agency.
B. If a prime contract bidder is unable to identify MBE/WBE firms to perform
portions of the work, the City Contract Compliance Officer should be contacted
for assistance immediately.
C. Prime contract bidders may solicit MBE/WBE proposals by telephone or personal —
interviews, but all such contacts shall be confirmed by Certified Mail, or
subcontract bid request forms (Form CCO-2).
D. If any MBE/WBE business submitting bids is not selected for subcontract award,
documentation must accompany the "MBE/WBE Business Enterprise Pre-Bid
Contact Information Form" (Form CCO-4 and CCO-4A) on why the MBE/WBE
was not selected. These reasons could include:
a. Not low bid. Copies of the competing bids may be required for verification.
b. MBE/WBE did not bid, withdrew bid or non-responsive.
c. Documentation of other business-related reason for not selecting the
MBE/WBE business for a subcontract.
d. Prime contractor self performs work.
e. Any other reason relied on by prime.
The Contract Compliance Officer will determine the weight to be given to each
item listed above (supported by appropriate documentation) based on overall
program goals. —
3. MBE/WBE Firms
A. MBE/WBE firms shall be certified by the Iowa Department of Transportation as
owners and controllers of their respective businesses, or were listed on the City
of Waterloo Certified MBE/WBE Contractors list as of July 1, 2002. _
B. MBE/WBE firms must perform the work on the project; they cannot act as a
broker by subcontracting the work out to others.
C. Each MBE/WBE firm planning to submit quotes on construction projects with
goals, shall submit a Letter of Intent to Bid (Form CCO-5) to the City Contract
Compliance Officer seven (7) working days prior to bid opening, listing specific
items which the MBE/WBE firm is interested in bidding. If sufficient Letters of
Intent to Bid are not received by the City Contract Compliance Officer seven (7)
working days prior to bid opening, goals on subject project will be reduced
accordingly. Agreements between the bidder/proposer and a MBE/WBE in which
the MBE/WBE promises not to provide subcontracting quotations to other —
bidders/proposers are prohibited.
NON-COMPLIANCE OF CONTRACTORS
A. Noncompliance exists when the contractor's actions are not consistent with the
requirements of the Contract Compliance Program in the areas of employment and
subcontracting.
INSTRUCTIONS TO BIDDERS Page 8 of 11
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
B. A bidder's failure to show good-faith efforts to meet project goals or a failure to use
certified MBE/WBE firms may be grounds for finding its bid not responsible.
C. The Contract Compliance Officer shall submit to City Council his/her
recommendation on any non-compliant contract in writing.
NOTICE TO PROCEED
Notice to proceed on any project with goals will not be issued until City Contract
Compliance Officer determines the lowest responsible bidder has used good-faith efforts
to comply with this Compliance Program and the bid was responsive.
CONCLUSION
This program repeals or revises all sections of previous Waterloo Contract Compliance
Programs.
11. EMPLOYMENT AND BUSINESS OPPORTUNITY
To the greatest extent feasible, suppliers, subcontractors, and low income workers
owning businesses or living in the Waterloo area must be given priority in supplying
materials, bidding for subcontract work, or applying for employment by the contractor on
this project. Opportunities for training and for employment arising in connection with this
project, shall to the greatest extent feasible be made available to lower income persons
residing in the project area. The contract area is the City of Waterloo.
The City of Waterloo will require the contractor to document his efforts in securing lower
income workers living in the project area and in purchasing supplies from, and awarding
subcontracts to, businesses owned by persons residing in the project area.
12. STATEMENT OF BIDDER'S QUALIFICATIONS
Each bidder shall, upon request of the City of Waterloo, Iowa, submit on the form
furnished for that purpose (a copy of which is included in the contract documents), a
statement of bidder's qualifications, his experience record in constructing the type of
improvements embraced, and his organization and equipment available for the work
contemplated; and, when specifically requested, a detailed financial statement. The City
of Waterloo, Iowa, shall have the right to take such steps as it deems necessary to
determine the ability of the bidder to perform his obligations under the contract, and the
bidder shall furnish the City of Waterloo, Iowa, all such information and data for this
-- purpose as it may request. The right is reserved to reject any bid where an investigation
of the available evidence or information does not satisfy the City of Waterloo, Iowa, that
the bidder is qualified to carry out properly the terms of the contract.
INSTRUCTIONS TO BIDDERS Page 9 of 11
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
13. AWARD OF CONTRACT
a. Award of contract will be made to that responsive and responsible bidder whose
bid, conforming to the Specifications, is most advantageous to the City of
Waterloo; price and other factors considered. The intention is to award the
contract at any time of opening bids, but the right is reserved to postpone such
action for a reasonable time, not exceeding thirty (30) days.
b. The City Council may, when in its interest, reject any or all bids or waive any
informality in bids received.
c. The bidder shall submit bids on all the items listed in the proposal and shall state
the unit bid price in words in the blank spaces provided beneath the item
description. Should there be any discrepancy between the unit bid price in words
and listed numeral unit bid price, the City of Waterloo shall consider the unit bid
price in words as being the valid unit bid price. A computer-generated
spreadsheet as herein provided shall also be acceptable. Proposals requiring
mathematical computations to determine unit prices or totals will be rejected. A
contract will be awarded to the qualified bidder submitting the lowest total bid as
indicated in the NOTICE TO BIDDERS.
14. EXECUTION OF AGREEMENT, BONDS, AND CERTIFICATE OF INSURANCE
a. Subsequent to the award and within ten (10) days after the prescribed forms are —
presented for signature, the successful bidder shall execute and deliver to the
City of Waterloo, Iowa, an agreement in the form included in the contract
documents in such number of copies as the City of Waterloo, Iowa, may require. —
b. Having satisfied all conditions of award as set forth elsewhere in these —
documents, the successful bidder shall, within the period specified in paragraph
"a" above, furnish a surety bond and a payment bond in a penal sum not less
than the amount of the contract as awarded, as security for the faithful
performance of the contract and terms and conditions therein contained and shall
guarantee the prompt payment of all persons, firms, or corporations to whom the
contractor may become legally indebted for labor, materials, tools, equipment, or
services of any nature including utility and transportation services, employed or
used by him in performing the work. The bonds shall protect and save harmless
the City from claims and damages of any kind caused by the operations of the
contractor and shall also guarantee the maintenance of the contract
improvements for the period stated in the Notice of Hearing from and after
completion of said improvements and their acceptance by the City. Such bonds
shall be in the same form as that included in the contract documents and shall —
bear the same date as, or a date subsequent to that of the agreement. The
current Power of Attorney for the person who signs for any surety company shall
be attached to such bonds.
INSTRUCTIONS TO BIDDERS Page 10 of 11
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
c. The successful bidder shall, within the period specified in paragraph "a" above,
furnish a certificate of insurance for approval in amounts of not less than the
amounts specified in the General Specifications for Construction, Section F. No.
4 "Liability Insurance," Pages 14 to 15 of 19 Pages. The certificate of insurance
shall be furnished in such number of copies as the City of Waterloo may require.
The City of Waterloo shall be named as an "Additional Insured." The contractor
shall similarly submit his subcontractor's certificates of insurance in the amounts
for approval before each commences work. The contractor shall carry or require
that there be Workmen's Compensation Insurance for all his employees and
those of his subcontractors engaged in work at the site, in accordance with State
Workmen's Compensation Laws.
d. The failure of the successful bidder to execute such agreement and to supply the
required bond or bonds within ten (10) days after the prescribed forms are
presented for signature, or within such extended period as the City of Waterloo,
Iowa, may grant, based upon reasons determined sufficient by the City of
Waterloo, Iowa, may either award the contract to the next lowest bidder or re-
advertise for bids, and may charge against the bidder the difference between the
amount of the bid an the amount for which a contract for the work is
subsequently executed, irrespective of whether the amount thus due exceeds the
amount of the bid guaranty. If a more favorable bid is received by re-advertising,
the defaulting bidder shall have no claim against the City of Waterloo, Iowa, for a
refund.
15. BIDDER SUSPENSION AND DEBARMENT REQUIREMENTS
Attention of bidders is called to the requirement of complying with the provisions of the
Bidder Suspension and Debarment Requirement.
Each bidder submitting a bid shall execute and include with the bid, a Bidder Suspension
and Debarment Requirements in the form herein provided.
INSTRUCTIONS TO BIDDERS Page 11 of 11
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
SUPPLEMENTAL INSTRUCTIONS TO BIDDERS
1. SECTION 3 CLAUSE
The successful bidder shall, within five (5) days after the prescribed form is presented for
signature, execute a "Section 3 Clause" in the form herein provided.
— 2. DEPARTMENT OF LABOR NOTIFICATION
Pursuant to Requirement 41 CFR60-4.2(d)(3), contractors and subcontractors must
notify the Office of Federal Contract Compliance Programs (OFCCP) in writing within 10
working days of the award of any construction subcontract in excess of $10,000 that is
made under covered Federal or Federally-assisted construction contracts. Contractors
— and subcontractors may fulfill this requirement by notifying the nearest OFCCP district
office. The address is:
Director, Office of Federal Contract Compliance Programs
U.S. Department of Labor
230 South Dearborn Street, Room 434
Chicago, IL 60604
A copy of this notification shall also be mailed to:
— Rudy Jones
Contract Compliance Office
City of Waterloo
620 Mulberry Street
Suite 202
Waterloo, IA 50703
3. HAZARDOUS MATERIAL INFORMATION
The City of Waterloo completed a Phase I Environmental Site Assessment (May 2004),
a Phase II Environmental Site Assessment (May 2005), and a Supplemental Phase II
Site Assessment (September 2005) for the Former Chamberlain Manufacturing Property
located at 550 Esther Street, Waterloo, Iowa. Reports describing this work were
prepared by HR Green, Inc.. These reports are available for viewing by prospective
bidders by contacting the City.
-- The work revealed the presence of volatile organic compounds (VOC's) in the soil and
water in portions of the site. Depth to water was measured to be approximately ten to
twenty feet below the surface. Also, the reports indicate below grade anomalies which
suggest the presence of underground storage tank(s), buried drums, or other metals in
the northerly portions of the property.
SUPPLEMENTAL INSTRUCTIONS TO BIDDERS Page 1 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3 —
Project No. 10110021 City of Waterloo, Iowa
The US EPA issued a Unilateral Administrative Order for Cleanup of the former
Chamberlain Manufacturing site to the former owner in April 2010. This cleanup is
ongoing. Also due to the EPA order, ground water monitoring is ongoing. Locations of
monitoring wells and groundwater supply wells are indicated on Figures 1 and 2,
included in this project manual. These wells must be protected during this Work. Due to
potential contamination, no excess soil is to leave the project site. All soil should be used
in on-site backfill and grading operations.
The intent of this demolition and removal project to minimize the amount of subsurface
excavation that could potentially expose contaminated materials. However, exposure of
these materials is possible. During the course of this project, the Contractor must be —
prepared to protect their workers and the public from potential exposure of these
materials.
The City of Waterloo has completed two prior demolition projects to remove the majority
of above ground structures. At that time, all site structures were surveyed for asbestos
containing material (ACM) and other hazardous materials. Although the ACM and other
hazardous materials had been abated during these previous projects, the potential exists
for additional material to be discovered during this project. If suspect ACM or other
hazardous materials are discovered during this Work, the City must be notified prior to
proceeding. ACM and other hazardous materials must be tested and properly disposed
of.
4. DISCOVERY OF UNKNOWN CONTAMINANTS/CONTRACT INTERRUPTION
Due to the Unilateral Administrative Order for Cleanup of the former Chamberlain —
Manufacturing site and ongoing cleanup, the potential for discovery of underground
storage tanks, buried drums and/or not previously identified contaminants is possible. If
this occurs, the contractor shall notify the City who will inform EPA for proper disposition.
To the extent possible, the contractor will be directed to work at other locations on the
project site to complete removal of as much non-hazardous material from the site as
possible. In the unlikely event of a complete shut down and stoppage of the project due
to discovery of unknown contaminants, the contractor will be paid to date on bid items
completed and unit prices based on tonnage to date. No work stoppage, contract
interruption, or idle equipment charges will be paid. _
5. BUILDING STRUCTURE INFORMATION
The local Assessor's Office files contain general information on size, materials of
construction, etc. for the buildings on the former Chamberlain Manufacturing property. A
copy of this information is included in Attachment A of this Project Manual. —
SUPPLEMENTAL INSTRUCTIONS TO BIDDERS Page 2 of 2 —
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
Accidental Discovery of Archaeological Sites & Human Remains
Chamberlain Site Demolition Project
STATEMENT
In the event that an archeological site, subsurface features, artifacts, human burials, or human
remains are encountered during the implementation of this Project, the State Historical
— Preservation Office (SHPO) will be immediately informed of the discovery and excavation
activities will cease until an assessment has been made by a qualified archaeologist.
--- In the event that human remains are discovered, excavation activities will cease. Skeletal
remains and associated burial grounds will not be removed from the site or otherwise disturbed,
and local authorities and the Director of Burials at the Office of the State Archaeologist will be
contacted immediately.
ACTION PLAN
The Contractor will cease all excavation activities and inform the City of Waterloo, Community
Development Department immediately upon accidental discovery of an archeological site,
subsurface features, artifacts, human burials, or human remains. The City will contact the
following parties within 24 hours of an accidental discovery:
SHPO, Daniel Higginbottom, Archaeologist
600 East Locust, Des Moines, IA 50319
(515) 281-6412
-- Indian Tribe Requesting Consultation:
Sac & Fox Nation of Missouri, Deanne Bahr
305 North Main Street
Reserve, KS 66434
(785) 742-7471
Sac and Fox of the Mississippi in Iowa, Johnathan L. Buffalo
349 Meskwaki Road
Tama, Iowa 52339-9634
(641)484-4678
For the discovery of human remains, the following parties will also be immediately notified:
Director of Burials
Office of the State Archaeologist
700 Clinton St., Iowa City, IA 52240
(319) 384-0732
Page 1 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
Waterloo Police Department
715 Mulberry Street
Waterloo, Iowa 50703
(319) 291-4339
Work will not commence until a qualified archaeologist makes an assessment. If necessary,
work will not commence until approval from local authorities after the discovery of human
remains.
After consultation with the appropriate parties and approval by the agency official, the City will
send written notification to the contractor once work is able to proceed.
For any questions or concerns regarding this Action Plan, call Nancy Gulick, Community
Development, City of Waterloo at (319) 291-4429.
Contractor Date
Page 2 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
INFORMATION NEEDED
FOR
IOWA CONSTRUCTION SALES TAX EXEMPTION CERTIFICATE
CONTRACTOR NAME:
ADDRESS:
(Check One) PRIME SUBCONTRACTOR
FEDERAL ID#:
PROJECT NAME:
PROJECT CONTRACT NO.:
DESCRIPTION OF WORK:
E Brickwork El Landscaping
II Carpentry El Painting
Concrete II Paving
Drywall-Plaster-Insulation C Plumbing
El Electrical 11] Roofing-Siding-Sheet Metal
LI Excavation/Grading CI Windows
Li Flooring 11 Wrecking-Demolition
11 Heavy Construction Li Other (Please specify)
Heating-Ventilating-Air Cond.
Page 1 of 1
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
STATEMENT OF BIDDER'S QUALIFICATIONS
(To be submitted by the Bidder only upon the specific request of the City of Waterloo, Iowa.)
All questions must be answered and the date given must be clear and comprehensive. This
statement must be notarized. If necessary, questions may be answered on separate attached
sheets. The Bidder may submit any additional information he desires.
1. Name of bidder.
2. Permanent main office address.
3. When organized.
4. If a corporation, when incorporated.
5. How many years have you been engaged in the contracting business under your
present firm or trade name?
6. Contracts on hand: (Schedule these, showing amount of each contract and the
appropriate anticipated dates of completion.)
7. General character of work performed by your company.
8. Have you ever failed to complete any work awarded to you? If so, where and why?
9. Have you ever defaulted on a contract? If so, where and why?
10. List the more important projects recently completed by your company, stating the
approximate cost for each, and the month and year completed.
11. List your major equipment available for this contract.
12. Experience in construction work similar in importance to this project.
13. Background and experience of the principal members of your organization, including the
officers.
-' 14. Credit available: $
15. Give bank reference:
16. Will you, upon request, fill out a detailed financial statement and furnish any other
information that may be required by the City of Waterloo, Iowa?
STATEMENT OF BIDDER'S QUALIFICATIONS Page 1 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
17. The undersigned hereby authorizes and requests any person, firm, or corporation to
furnish any information requested by the City of Waterloo, Iowa, in verification of the
recitals comprising this Statement of Bidder's Qualifications.
Dated at , this day of
, 201 .
(Name of Bidder)
By:
Title:
State of )
) ss:
County of )
, being duly sworn deposes and says that he
is of
(Name of Organization)
and that the answers to the foregoing questions and all statements therein contained are true
and correct.
Subscribed and sworn to before me this day of
, 201
Notary Public
My commission expires ,
STATEMENT OF BIDDER'S QUALIFICATIONS Page 2 of 2
FORM OF BID OR PROPOSAL
FY 2012 Chamberlain Demolition Phase 3
550 Esther Street
CONTRACT NO. 806
CITY OF WATERLOO, IOWA
Honorable Mayor and City Council
Waterloo, Iowa
— Gentlemen:
1. The undersigned, being a Corporation existing under the laws of the State of
, a Partnership consisting of the following
partners: having
familiarized (himself) (themselves) (itself) with the existing conditions on the project area
— affecting the cost of the work, and with all the contract documents listed in the Table of
Contents and Addenda (if any), as prepared by the City Engineer of the City of Waterloo
now on file in the office of the City Clerk, City Hall, Waterloo, Iowa, hereby proposes to
_ furnish all supervision, technical personnel, labor, materials, machinery, tools,
appurtenances, equipment, and services, including utility and transportation services
required to construct and complete this FY 2012 Chamberlain demolition 3, Contract
No. 806, all in accordance with the above-listed documents and for the unit prices for
—' work in place for the following items and quantities:
2. BID PROPOSAL:
Bidder will complete the Work in accordance with the Contract Documents for the
following prices:
Item Estimated
No. Description of Work Unit Quantity Unit Price Total
Mobilization and General Project
1 Administration LS 1 $ $
Site Specific Safety Plan
2 Implementation LS 1 $ $
3 Clearing and Grubbing LS 1 $ $
Remove and Dispose of Above
4 Ground Tanks LS 1 $ $
Demolition of Remaining
5 Structures LS 1 $ $
Demolition and Removal of
6 Railroad Spur(rail and ties) LS 1 $ $
FORM OF BID Page 1 of 3
Item Estimated
No. Description of Work Unit Quantity Unit Price Total
Removal of Portland Cement
7 Concrete Slabs and Foundations Tons 35,000 $ $
Removal of Asphaltic Concrete
8 Slabs SY 19,788 $ $
9 Imported Backfill TON 1,000 $ $
-- Storm Water Permit and
10 Compliance LS 1 $ $
11 Silt Fence LF 1,000 $ $
12 Silt Fence Removal LF 1,000 $ $
13 Topsoil/Finish Grading CY 1,000 $ $
14 Seeding/Fertilizing/Mulching AC 22.8 $ $
BASE BID PRICE (SUMMATION OF BID ITEMS) $
3. In submitting this bid, the bidder understands that the right is reserved by the City of
Waterloo, Iowa, to reject any or all bids. If written notice of the acceptance of this bid is
mailed, telegraphed, or delivered to the undersigned within thirty (30) days after the
opening thereof, or at any time thereafter before this bid is withdrawn, the undersigned
agrees to execute and deliver an agreement in the prescribed form and furnish the
required bond and certificate of the insurance within ten (10) days after the agreement is
presented to him for signature, and start work within ten (10) days after "Notice to
Proceed" is issued.
4. Security in the sum of
Dollars ($ ) in the form of , is
submitted herewith in accordance with the INSTRUCTIONS TO BIDDERS.
5. Attached hereto is a Non-Collusion Affidavit of Prime Contractor.
6. Attached hereto is a Bidder Suspension and Debarment Requirements.
7. The bidder is prepared to submit a financial and experience statement upon request.
8. The Prime Contractor and Subcontractor(s), which have performed an aggregate of
FORM OF BID Page 2 of 3
$10,000.00 in work for the City in the current calendar year, are prepared to submit an
AAP or Update and an EOC, within ten (10) days of notification that the bid submitted is
lowest and acceptable.
9. The bidder shall list the MBE/WBE subcontractor(s), amount of subcontracts and bid
items on the City of Waterloo Minority and/or Women Business Pre-bid Contact
Information Form submitted with this Form of Bid or Proposal. The apparent low Bidder
shall submit a list of all other Subcontractor(s) to be used on this Project to the City of
Waterloo by 5:00 p.m. the business day following the day Bids on this Project are due
along with the Non-Collusion Affidavits of All Subcontractor(s). The subcontractors listed
— on this proposal and/or submitted to the Contract Compliance Officer cannot be changed
except for the following reasons:
1) The City of Waterloo does not approve the subcontractors.
2) The subcontractors submit in writing that they cannot fulfill their
subcontracts.
— 10. The bidder has received the following Addendum or Addenda:
Addendum No. Date
11. The bidder has filled in all blanks on this proposal. Those blanks not
— Applicable are marked "none" or"NA".
12. The bidder has attached all applicable forms.
13. The Owner reserves the right to select alternates, delete line
items, and/or to reduce quantities prior to the award of a
contract due to budgetary limitations.
— (Name of Bidder) (Date)
BY: Title
Official Address: (Including Zip Code):
I.R.S. No.
FORM OF BID Page 3 of 3
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we,
— as Principal, and
as Surety are held and firmly bound unto the CITY OF WATERLOO , Iowa, hereinafter
—' called
"OWNER." In the penal sum
Dollars ($ ) lawful money of the United States, for the payment
of which sum will and truly be made, we bind ourselves, our heirs, executors, administrators,
and successors, jointly and severally, firmly by these presents. The condition of this obligation
is such that whereas the Principal has submitted the accompanying bid dated the
day of , 20 , for
NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate,
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the
form specified and shall furnish a bond for his faithful performance of said contract, and for the
payment of all persons performing labor or furnishing materials in connection therewith, and
shall in all other respects perform the agreement created by the acceptance of said Bid,
Then this obligation shall be void, otherwise the same shall remain in force and effect; it being
expressly understood and agreed that the liability of the Surety for any and all claims hereunder
shall, in no event, exceed the penal amount of this obligation as herein stated.
By virtue of statutory authority, the full amount of this bid bond shall be forfeited to the Owner in
liquidation of damages sustained in the event that the Principal fails to execute the contract and
provide the bond as provided in the specifications or by law.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety
and its bond shall be in no way impaired or affected by any extension of the time within which
the Owner may accept such Bid or execute such contract; and said Surety does hereby waive
notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and
seals, and such of them as are corporations, have caused their corporate seals to be hereto
affixed and these presents to be signed by their proper officers this day of
, A.D. 201
BID BOND Page 1 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
(Seal)
Principal
By
(Title)
(Seal)
Witness Surety
By
Witness Attorney-in-fact
BID BOND Page 2 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
NON-COLLUSION AFFIDAVIT OF PRIME BIDDER
State of
)ss
County of )
, being first duly sworn, deposes and says that:
1. He is (Owner, Partner, Officer, Representative, or Agent) , of
, the Bidder that has submitted the attached Bid;
2. He is fully informed respecting the preparation and contents of the attached Bid and of
all pertinent circumstances respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham Bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives,
— employees, or parties in interest, including this affiant, has in any way colluded,
conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or
person to submit a collusive or sham Bid in connection with the Contract for which the
attached Bid has been submitted or to refrain from bidding in connection with such
Contract, or has in any manner, directly or indirectly, sought by agreement or collusion
or communication or conference with any other Bidder, firm or person to fix the price or
— prices in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost
element of the bid price or the bid price of any other Bidder, or to secure through any
collusion, conspiracy, connivance, or unlawful agreement any advantage against the
City of Waterloo, Iowa, or any person interested in the Proposed Contract; and
5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by
— any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or
any of its agents, representatives, owners, employees, or parties in interest, including
this affiant.
(Signed)
Title
Subscribed and sworn to before me this day of
— , 201 .
-- Title
My commission expires
NON-COLLUTION AFFIDAVIT OF PRIME BIDDER Page 1 of 1
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
BIDDER SUSPENSION AND DEBARMENT REQUIREMENTS
In response to federal law concerning suspension and debarment and in accordance with OMB
Guidance in 2 CFR Part 180 and Executive Orders 12549 and 12689, all federally funded
projects, which include road construction, shall be performed by a qualified bidder. The qualified
bidder has been further defined as follows:
To be a qualified bidder, the person, corporation, partnership, or firm shall not
have been suspended and disbarred from procurement for the Federal
Government.
The contractor shall provide the City with a certification that he is a qualified bidder according
to the above definition. The Certification shall be submitted with the contractor's bid. A copy of
the form of "Bidder Suspension and Debarment Certification" is included in the Contract
Documents. If it is determined that the contractor does not meet this qualification after he
begins work, a shutdown notice shall be issued and the voiding of the contract shall begin
unless the contractor becomes qualified.
BIDDER SUSPENSION AND DEBARMENT REQUIREMENTS Page 1 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
BIDDER SUSPENSION AND DEBARMENT CERTIFICATION
CONTRACT NO:
PROJECT NAME:
DATE OF LETTING:
To be a qualified bidder, the person, corporation, partnership, or firm shall not have been
suspended and disbarred from procurement from the Federal Government.
I hereby certify that (himself)(themselves)(itself) has not been suspended and disbarred from
procurement from the Federal Government.
COMPANY NAME
DUNS NUMBER
(Data Universal Numbering System Number assigned by Dun &
Bradstreet)
CORPORATE OFFICER
TITLE
DATE
BIDDER SUSPENSION AND DEBARMENT REQUIREMENTS Page 2 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
EQUAL OPPORTUNITY CLAUSE
(As provided in Executive Order No. 11246)
All contractors, subcontractors, vendors and suppliers of goods and services doing business
with the City and value of said business equals or exceeds ten thousand dollars ($10,000.00)
annually agree as follows:
1. The contractors, subcontractor, vendor and supplier of goods and services will not
discriminate against any employee or applicant for employment because of race, color,
creed, sex, national origin, economic status, age, mental or physical handicap, political
opinions or affiliations. The contractor, subcontractor, vendor and supplier will develop
an Affirmative Action program to ensure that applicants are employed and that
employees are treated during employment without regard to their race, creed, color, sex,
national origin, religion, economic status, age, mental or physical disability, political
opinions or affiliations. Such actions shall include but not be limited to the following:
a. Employment
b. Upgrading
_ c. Demotion or Transfer
d. Recruitment and Advertising
e. Layoff or Termination
_ f. Rates of Pay or Other Forms of Compensation
g. Selection for Training Including Apprenticeship
2. The contractor, subcontractor, vendor and supplier of goods and services will, in all
solicitations or advertisements for employees, state that all qualified applicants will
receive consideration for employment without regard to race, creed, color, sex, national
origin, religion, economic status, age, mental or physical disabilities, political opinion or
affiliations.
3. The contractor, subcontractor, vendor and supplier or his/her collective bargaining
—. representative will send to each labor union or representative of workers which he/she
has a collective bargaining agreement or other contract or understanding, a notice
advising said labor union or workers' representative of the contractor's commitment
under this section.
4. The contractor, subcontractor, vendor and supplier of goods and services will comply
with all published rules, regulations, directives, and order of the City of Waterloo
Affirmative Action Program Contract Compliance Provisions.
5. The contractor, subcontractor, vendor and supplier of goods and services will furnish
and file compliance reports within such time and upon such forms as provided by the
Affirmative Action Officer. Said forms will elicit information as to the policies,
procedures, patterns, and practices of each subcontractor as well as the contractor
EQUAL OPPORTUNITY CLAUSE Page 1 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
himself/herself and said contractor, subcontractor, vendor and supplier will permit
access to his/her employment books, records and accounts to the City's Affirmative
Action Officer, for the purpose of investigation to ascertain compliance with this contract
and with rules and regulations of the City's Affirmative Action Program—Contract
Compliance Provisions relative to Resolution No. 24664.
6. In the event of the contractor's non-compliance with the non-discrimination clauses of
this contract or with any of such rules, regulations and orders, this contract may be
-Y canceled, terminated or suspended in whole or in part and the contractor may be
declared ineligible for further contracts in accordance with procedures authorized by the
City Council.
7. The contractor, subcontractor, vendor and supplier of goods and services will include, or
incorporate by reference, the provisions of the non-discrimination clause in every
contract, subcontract or purchase order unless exempted by the rules, regulations or
orders of the City's Affirmative Action Program, and will provide in every subcontract, or
purchase order that said provisions will be binding upon each contractor, subcontractor,
or supplier.
8. We, the undersigned, recognize that we are morally and legally committed to non-
discrimination in employment. Any person who applies for employment with our
company will not be discriminated against because of race, creed, color, sex, national
origin, economic status, age, mental or physical disabilities.
(Signed)
(Appropriate Official)
(Title)
(Date)
EQUAL OPPORTUNITY CLAUSE Page 2 of 2
Equal Employment U.S.Department of Housing Department of Veterans Affairs
and Urban Development
Opportunity Certification Office of Housing OMB Control No.2502-0029
Excerpt From 41 CFR §60-1.4(b) Federal Housing Commissioner (exp. 7/3112009)
The applicant hereby agrees that it will incorporate or cause to be (6) In the event of the contractor's noncompliance with the
incorporated into any contract for construction work,or modifi- nondiscrimination clauses of this contract or with any of the
-1 cation thereof, as defined in the regulations of the Secretary of said rules, regulations, or orders,this contract may be can-
Labor at 41 CFR Chapter 60,which is paid for in whole or in part celed, terminated,or suspended in whole or in part and the
•
with funds obtained from the Federal Government or borrowed contractor may be declared ineligible for further Govern-
,1", on the credit of the Federal Government pursuant to a grant, ment contracts or federally assisted construction contracts in
contract,loan insurance,or guarantee,or undertaken pursuant to accordance with procedures authorized in Executive Order
any Federal program involving such grant,contract,loan,insur- 11246 of September 24, 1965,and such other sanctions may
ance, or guarantee,the following equal opportunity clause: be imposed and remedies invoked as provided in Executive
Order 11246 of September 24,1965,orby rule,regulation,or
7 During the performance of this contract,the contractor agrees as order of the Secretary of Labor,or as otherwise provided by law,
follows:
(7) The contractor will include the portion of the sentence imme-
(1) The contractor will not discriminate against any employee or diately preceding paragraph(1)and the provisions of pare-
applicant for employment because of race, color, religion, graphs(I)through(7)in every subcontract or purchase order
I` sex,or national origin. The contractor will take affirmative unless exempted by rules,regulations,or orders of the Sec-
action to ensure that applicants are employed,and that em- retary of Labor issued pursuant to section 204 of Executive
ployees are treated during employment without regard to Order 11246 of September 24, 1965,so that such provisions
,,,g their race,color,religion,sex,or national origin,such action will be binding upon each subcontractor or vendor. The
shall include,but not be limited to the following: Employ-
1contractor will take such action with respect to any subcon-
ment, upgrading, demotion, or transfer; recruitment or re- tract or purchase order as the administering agency may
cruitment advertising;layoff or termination; rates of pay or direct as a means of enforcing such provisions, including
other forms of compensation; and selection for training,
sanctions for noncompliance: Provided, however, That in
{ including apprenticeship. The contractor agrees to post in the event a contractor becomes involved in,or is threatened
conspicuous places, available to employees and applicants with,litigation with a subcontractor or vendor as a result of
for employment, notices to be provided setting forth the such direction by the administering agency the contractor
u•iiprovisions of this nondiscrimination clause. may request the United States to enter into such litigation to
I (2) The contractor will,in all solicitations or advertisements for protect the interests of the United States.
employees placed by or on behalf of the contractor,state that The applicant further agrees that it will be bound by the above equal
all qualified applicants will receive considerations for em- opportunity clause with respect to its own employment practices
a" ployment without regard to race, color, religion, sex, or
when it participates in federally assisted construction work:
-1 national origin.
Provided,That if the applicant so participating is a State or local
(3) The contractorwill send to each labor union or representative government,the above equal opportunity clause is not applicable
,,� of workers with which it has a collective bargaining agree to any agency,instrumentality or subdivision of such government
j ment or other contract or understanding, a notice to be which does not participate in work on or under the contract.
provided advising the said labor union or workers'represen-
tatives of the contractor's commitments under this section, The applicant agrees that it will assist and cooperate actively with
and shall post copies of the notice in conspicuous places the administering agency and the Secretary of Labor in obtaining
"1 the compliance of contractors and subcontractors with the equal
available to employees and applicants for employment. opportunity clause and the rules,regulations,and relevant orders
(4) The contractor will comply with all provisions of Executive of the Secretary of Labor, that it will furnish the administering
Order 11246 of September 24, 1965,and of the rules,regu- agency and the Secretary of Labor such information as they may
lations and relevant orders of the Secretary of Labor. require for the supervision of such compliance, and that it will
otherwise assist the administering agency in the discharge of the
(5) The contractor will furnish all information and reports re- agency's primary responsibility for securing compliance.
quired by Executive Order 11246 of September 24,1965,and The applicant further agrees that it will refrain from entering into
,V by rules,regulations,and orders of the Secretary of Labor,or any contract or contract modification subject to Executive Order
pursuant thereto,and will permit access to its books,records, 11246 of September 24,1965,with a contractor debarred from,or
and accounts by the administering agency and the Secretary who has not demonstrated eligibility for,Government contracts
of Labor for purposes of investigation to ascertain compli- and Federally-assisted construction contracts pursuant to the
ance with such rules,regulations,and orders. Executive order and will carry out such sanctions and penalties
for violation of the equal opportunity clause as may be imposed
Firm Name and Address By
Title
form HUD-92010(3/2006)
VA form 26-421
upon contractors and subcontractors by the administering agency (5) The contractor will furnish all information and reports
or the Secretary of Labor pursuant to Part II, Subpart D of the required by Executive Order 10925 of March 6, 1961, as 6..
Executive order.In addition,the applicant agrees that if it fails or amended, and by the regulations, and orders of the said
refuses to comply with these undertakings, the administering Committee,or pursuant thereto,and will permit access to his
agency may take any or all of the following actions: Cancel, books,records,and accounts by HUD and the Committee for
terminate,or suspend in whole or in part this grant(contract,loan, purposes of investigation to ascertain compliance with such .—
insurance,guarantee);refrain from extending any further assis- regulations,and orders.
tance to the applicant under the program with respect to which the (6) In the event of the contractor's non-compliance with
failure or refund occurred until satisfactory assurance of future the nondiscrimination clause of this contract or with any of
compliance has been received from such applicant;and refer the case the said regulations, or orders, this contract may be can- .—
to the Department of Justice for appropriate legal proceedings. celled, terminated or suspended in whole or in part and the
Excerpt from HUD Regulations contractor may be declared ineligible for further Govern-
ment contracts or Federally-assisted construction contracts
200.410Definition of term"applicant", in accordance with procedures authorized in Executive Order .—
(a) In multifamily housing transactions where controls over the 10925 of March 6,1961,as amende,and such other sanctions
mortgagor are exercised by the Commissioner either through may be imposed and remedies invoke s provided in the said —
the ownership of corporate stock or under the provisions of Executive Order or by regulations,or order of the President's
a regulatory agreement,the term"applicant"as used in this Committee on Equal Employment Opportunity,or as other- —
subpart shall mean the mortgagor. wise provided by law.
(7) The contractor will include the provisions of Para- -
(b) In transactions other than those specified in paragraph(a)of graphs(1)through(7)in every subcontract or purchase order
this section,the term"applicant"as used in this subpart shall unless exempted by regulations,or orders of the President's
mean the builder, dealer or contractor performing the con- Committee on Equal Employment Opportunity issued pursu-
struction,repair or rehabilitation work for the mortgagor or ant to Section 303 of Executive Order 10925 of March 6, —
other borrower. 1961, as amended, so that such provisions will be binding
200.420Equal Opportunity Clause to be included in contracts and upon each subcontractor or vender. The contractor will take
subcontracts. such action with respect to any subcontract or purchase
•
orders as HUD may direct as a means of enforcing such
(a) The following equal opportunity clause shall be included in provisions,including sanctions for noncompliance:Provided,
each contract and subcontract which is not exempt: however,that in the event the contractor becomes involved
•
During the performance of this contract,the contractor agrees in, or is threatened with, litigation with a subcontractor or
as follows: vender as a result of such direction by HUD,the contractor
(1) The contractor will not discriminate against any ern- may request the United States to enter into such litigation to
ployee or applicant for employment because of race,creed, protect the interests of the United States. ,�
color,or national origin.The contractor will take affirmative (b) Except in subcontracts for the performance of construction
action to ensured that applicants are employed, and that work at the site of construction,the clause is not required to <
employees are treated during employment without regard to be inserted in subcontracts below the second tier. Subcontracts
their race,creed,color,or national origin.Such action shall may incorporate by referenced to the equal opportunity clause.
include, but not be limited to the following: employment,
upgrading,demotion or transfer;recruitment or recruitment 200.425Modification in and exemptions from the regulations in
advertising;layoff or termination;rates of pay or other forms this subpart.
of compensation; and selection for training, including ap- ...
(a) The following transactions and contracts are exempt from the
prenticeship. The contractor agrees to post in conspicuous regulations in this subpart:
places, available to employees and applicants for employ-
ment,notices to be provided setting forth the provisions of (1) Loans,mortgages, contracts and subcontracts not ex-
the nondiscrimination clause, ceeding$10,000.
(2)The contractor will in all solicitations or advertisements for (2) Contract and subcontracts not exceeding$100,000 for
employees placed by or on behalf of the contractor,state that all standard commercial supplies or raw material;
qualified applicants will receive consideration for employment (3)Contracts and subcontracts under which work is to be or has
without regard race,creed,color,or national origin. been performed outside the United States and where no recruit-
(3) The contractor will send to each labor union or repre- ment of workers within the United States in involved.To the
•
sentative of workers with which he has a collective bargain- extent that work pursuant to such contracts is done within the
ing agreement or other contract or understanding,a notice,to Untied States,the equal opportunity clause shall be applicable;
6.
be provided,advising the said labor union or workers'repre- (4) Contracts for the sale of Government property where
sentative of the contractor's commitments under this section, no appreciable amount of work is involved;and
and shall post copies of the notices in conspicuous places (5) Contracts and subcontracts for an indefinite quantity
available to employees and applicants for employment. which are not to extend for ore than one year if the purchaser
(4) The contractor will comply with all provisions of Ex- determines that the amounts to be ordered under any such
ecutive Order 10925 of March 6 1961,as amended,and of the contract or subcontract are not reasonably expected to exceed
regulations,and relevant orders of the President's Commit- $100,000 in the case of contracts or subcontracts for standard
tee on Equal Employment Opportunity created thereby. commercial supplies and raw materials, or $10,000 in the
case of all other contracts and subcontracts.
form HUD-92010(3/06)
VA form 26-421
r..
ERR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
Revised February 20C 3
CONTRACTOR'S OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM
Check box that applies to party completing program:
( ) General Contractor
( ) Subcontractor
Section A to be completed by GENERAL CONTRACTORS only:
A.
Name of Company
Address of Company Zip
Telephone Number ( )
Federal ID Number (if no Federal ID Number, Owner/President's Social Security
Number)
Name of Equal Employment Officer
Name of Project
Project Contract Number
Estimated Construction Work Dates /
Start Finish
Section B to be completed by SUBCONTRACTORS only:
B.
Name of General or Prime Contractor
Name of Subcontractor
Subcontractor's Address Zip
Subcontractor's Telephone Number ( )
Subcontractor's Federal ID Number (if no Federal ID Number Owner/President's Social
Security Number)
CONTRACTOR' OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Page 1 of 9
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
Name of Equal Employment Officer
C. Remainder of program to be completed by party completing program,
- either Prime or Subcontractor.
1. The Owners and/or Principals of your company:
Ethnic
Name Address Position Sex Origin
2. Other Areas of Interest:
If your company has branches or subsidiaries, or if your company is a branch or
subsidiary of a parent organization, give the following information:
Type of
-� Name Address Affiliation Degree
II. EMPLOYER'S POLICY (Please read carefully.)
A. We, the undersigned, recognize that we are morally and legally committed to
nondiscrimination in employment. Any person who applies for employment with
our company will not be discriminated against because of race, color, creed, sex,
national origin, economic status, age, mental or physical handicap.
B. The employment policies and practices of the undersigned are to recruit and hire
employees without discrimination, and to treat them equally with respect to
compensation and opportunities for advancement, including training, upgrading,
promotion, and transfer. However, we realize the inequities associated with
employment training, upgrading, contracting and subcontracting for minorities
and women and we will direct our efforts to correcting any deficiencies to the
maximum extent possible. The same will be required of our
SUBCONTRACTORS and suppliers.
CONTRACTOR' OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Page 2 of 9
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
C. We submit this program to assure compliance with Executive Order 11246, as
amended, and other subsequent orders that may pertain to equal employment
opportunity and merit employment policies, fully realizing that our qualification
and/or merit system should be evaluated and revised, if necessary.
D. We agree to put forth the maximum effort to achieve full employment and
utilization of capabilities and productivity of all our citizens without regard to race,
creed, color, sex, national origin, economic status, age, and mental or physical
handicap.
migra E. will give training
(Name of Company)
and employment opportunities to local residents of Waterloo, Iowa, to the
greatest extent feasible.
III. AFFIRMATIVE ACTION
A. recognizes that the effective application
(Name of Company)
of a policy of merit employment involves more than just a policy statement, and
will, therefore, re-evaluate our Affirmative Action
(Name of Company)
Program to ensure that equal employment opportunities are available on the
basis of individual merit, and to actively encourage minorities, women and local
residents to seek employment with our company on this basis.
B. will undertake the following six (6)
(Name of Company)
steps to improve our Affirmative Action Program:
1. Minority Recruitment and Employment;
2. Local Recruitment and Employment;
3. Disabled Veteran and Vietnam Era Veteran Recruitment and
Employment;
4. Handicapped Recruitment and Employment;
5. Female Recruitment and Employment; and
6. Training, Upgrading and Promotional Opportunities.
C. will take whatever steps
(Name of Company)
are necessary to ensure that our total work force has adequate minority, female,
and local representation. We will utilize the following methods in our recruitment
attempts:
1. Local advertising media (newspapers, radio, TV);
2. Community organizations (churches, clubs, schools);
CONTRACTOR' OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Page 3 of 9
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
3. Public and private institutions in the area (UNI, Hawkeye Community
College);
4. Job Service of Iowa; and
5. Other.
D. will seek qualified minority, female, and
(Name of Company)
- local group applicants for all job categories and will make asserted efforts to
increase minority, female and group representation in occupations at the higher
levels or skill and responsibility.
.1164.
E. All sources of employment used shall be aware that we are an Equal
Employment Opportunity Employer. Labor organizations representing our
employees will be notified of our Equal Employment Opportunity Policy and
Affirmative Action Program.
F. Training, upgrading, promotion and transfer activities at all levels will be
monitored to ensure that full consideration has been given to qualified minority,
female, and local group employees.
G. will encourage other companies with
(Name of Company)
whom we are associated and/or do business, to do the same and we will assist
them in their efforts.
H. has taken the following Affirmative
(Name of Company)
Action to ensure that minority, female, local contractors and/or suppliers were
provided opportunities to negotiate and/or bid on this project: (if none, write
"NONE")
1.
2.
As a result of the above efforts, we have involved minority, female, and local
contractors and/or suppliers in the following areas of subcontracting: (if none,
write "NONE")
1.
2.
J. will require approved Affirmative
(Name of Company)
CONTRACTOR' OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Page 4 of 9
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. /0110021 City of Waterloo, Iowa
Action Programs from all nonexempt contractors who propose to work on this
project and will take whatever steps are necessary to ensure that non-minority
contractors have adequate representation of minority, female and local persons
in their total work force.
K. In further accordance with rules and guidelines issued pursuant to Executive
Order 11246 as amended, we establish the goals for our company, based on
parity percentages supplied by the City, and we realize these goals will be
reviewed on an annual basis.
L. will keep records of specific actions
(Name of Company)
relative to recruitment, employment, training, upgrading and promotion and will
provide the City of Waterloo with any information relative to same, including
activities of our SUBCONTRACTORS and suppliers as necessary or when
requested.
M. Parity figures for companies located in Waterloo are as follows:
Minority Parity = .08 (8%)
N. Affirmative Action Employment
(Name of Company)
Goals:
The definition of Affirmative Action Goals is as follows: "Goals may not be rigid
and inflexible quotas which must be met, but must be targets, reasonably
attainable by means of applying every good faith effort to make all aspects of the
entire Affirmative Action Program work."
For the year 201_, please submit percentage targets for employing minorities
and women. If you already have reached your target for hiring minorities and
women, please submit that percentage.
*Goals for Minorities:
Goals for Women: cyo
*your affirmative action goals should be between 1% and 10% or more for
minorities and 1% and 5% or more for women.
Please be advised that the goals or targets are purely your estimation of how
many women and minorities your company can reasonably expect to hire in
-- 201_. Note, that none of the goals are rigid or inflexible. They are targets that
your company calculates as reasonably attainable. This will help the City in its
monitoring procedures as required by City of Waterloo Resolution No. 1984-
142(4).
CONTRACTOR' OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Page 5 of 9
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
Respectfully submitted,
By:
Company Executive
Date
By:
Equal Employment
Opportunity Officer
Date
City of Waterloo Affirmative Action Officer
Approved
Disapproved Reason:
By:
Date:
CONTRACTOR' OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Page 7 of 9
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
DESCRIPTION OF JOB CATEGORIES
1. Officials/Manager: Occupations in which employees set broad policies, exercise
overall responsibility for execution of all policies, or direct individual departments or
special phases of the agency's operations or provide specialized consultation on a
regional, district or area basis. Includes: department heads, bureau chiefs, division
chiefs, directors, deputy directors, controllers, examiners, wardens, superintendents,
unit supervisors, sheriffs, police and fire chiefs and inspectors and kindred workers.
2. Professionals: Occupations which require specialized and theoretical knowledge which
is usually required through college training or thorough work experience and other
training which provides comparable knowledge. Includes: personnel and labor relations
workers, social workers, doctors, psychologists, registered nurses, economists,
dietitians, lawyers, system analysts, accountants, engineers, employment and
vocational rehabilitation counselors, teachers or instructors, police and fire captains and
lieutenants and kindred workers.
3. Technicians: Occupations which require a combination of basic scientific or technical
knowledge and manual skill which can be obtained through specialized post-secondary
school education and through equivalent on-the-job training. Includes: computer
programmers and operations, draftsmen, surveyors, licensed practical nurses,
photographs, radio operators, technical illustrators, police and fire sergeants and
kindred workers.
4. Office/Clerical: Workers are responsible for internal and external communication,
recording and retrieval of data and/or information and other paper work required in an
office. Includes: bookkeepers, messengers, office machine operators, clerk-typists,
stenographers, court transcribers, hearing reporters, statistical clerks, dispatchers,
license distributors, payroll clerks and kindred workers.
5. Skilled Craft Workers: Workers perform jobs which require special manual skill and a
thorough and comprehensive knowledge of the processes involved in the work which is
acquired through on-the-job training programs. Includes: Mechanics and repairman,
electricians, heavy equipment operators, stationary engineers, skilled machine
occupations, carpenters, compositors and typesetters and kindred workers.
6. Sales Workers: Occupations engaging wholly and primarily in direct selling. Includes:
advertising agents and salesman, insurance agents and brokers, real estate agents and
brokers, stock and bond salesmen, demonstrators, salesmen and sales clerks, grocery
clerks and cashier checkers, and kindred workers.
Operatives (semi-skilled): Workers who operate machine or processing equipment or
perform other factory-type duties of intermediate skill level which can be mastered in a
few weeks and require only limited training. Includes: apprentices (auto mechanics),
CONTRACTOR' OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Page 8 of 9
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
plumbers, building trades, metal working trades, bricklayers, carpenters, electricians,
machinists, mechanics, printing trades, etc., operatives, attendants (auto service and
parking), plasterers, chauffeurs, deliverymen and furnacemen, heaters (metal), laundry
and dry cleaning operatives, milliners, mine operatives and laborers, motormen, oilers
and greasers, (except auto painters), (except construction and maintenance),
photographic process workers, stationary fireman, truck and tractor drivers, weavers,
(textile), welders and flame cutters and kindred workers.
8. Laborers (unskilled): Workers in manual occupations which generally require no
special training. Perform elementary duties that may be learned in few days and require
the application of little or no independent judgment. Includes: garage laborers, car
washers and greasers, gardeners (except farm) and groundskeepers, longshoremen,
and stevedores, lumbermen, raftsmen and woodchoppers, laborers performing lifing,
digging, mixing, loading and pulling operations and kindred workers.
9. Apprentices: Persons employed in a program including work training and related
instruction to learn a trade or craft which is traditionally an apprenticeship, regardless of
whether the program is registered with a Federal or State agency.
10. Trainees (on-the-job): Production. . . persons in formal training for craftsmen when not
trained under apprentice programs--operative laborer, and service occupations.
White Collar. . . persons engaged in formal training for clerical, managerial,
professional, technical, sales, office and clerical occupations.
CONTRACTOR' OR SUBCONTRACTOR'S AFFIRMATIVE ACTION PROGRAM Page 9 of 9
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
ITEMS OF POTENTIAL MBE/WBE PARTICIPATION
NOTICE TO PROSPECTIVE BIDDERS:
The following are items from the FY 2012 Chamberlain Demolition Phase 3, Contract No.
806, that have a potential for MBE/WBE Participation. This listing, however, is not intended to
be all encompassing, to preclude MBE/WBE Contractors from bidding on any items of the
Proposal as a Subcontractor or the entire Proposal as a Prime Contractor.
Description of Work Unit Estimated Quantity
Remove and Dispose of Above Ground Tanks LS 1
Demolition and Removal of Remaining Structures LS 1
Demolition and Removal of Railroad Spur(rail and ties) LS 1
Removal of Portland Cement Concrete Slabs and Foundations Tons 35,000
Removal of Asphaltic Concrete Slabs SY 19,788
Imported Backfill TON 1,000
Silt Fence LF 1,000
_. Silt Fence Removal LF 1,000
Topsoil / Finish Grading CY 1,000
.� Seeding / Fertilizing / Mulching AC 22.8
MBE/WBE GOALS FOR THIS PROJECT
IMPORTANT: Prime Contract Bidders should be aware that ten percent (10%) MBE goal and a
two percent (2%) WBE goal is attached to this project. "Certified Return Receipt" letters are no
longer needed with the bid showing proof of contacting MBE or WBE Subcontractors, but the
Pre-Bid Contact Information Form must be filled out completely.
City of Waterloo Contract Compliance Officer:
-- Contract Compliance Officer
Community Development Board
Carnegie Annex, Suite 202
620 Mulberry Street
Waterloo, IA 50703
Phone: (319) 291-4429
POTENTIAL MBE/WBE PARTICIPATION Page 1 of 1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
LETTER OF INTENT TO BID
(MBE/WBE LETTER)
According to the Current MBE/WBE Contract Compliance Program - 2002, all MBE/WBE
Contractors interested in submitting subcontractor quotes on construction projects with goals,
MUST submit a LETTER OF INTENT TO BID to the City of Waterloo Contract Compliance
Officer at least seven (7) days prior to bid opening.
The LETTER OF INTENT TO BID must list the specific items which the MBE/WBE Contractor is
interested in bidding.
Letter should include the following:
Name of Project:
Your Company Name:
Address:
Phone: Date:
List of Specific items to be bid:
Item No. Description:
Item No. Description:
Item No. Description:
Item No. Description:
Item No. Description:
(Subcontractor's Company Name and authorized signature)
Return this LETTER OF INTENT TO BID to:
Contract Compliance Officer
Community Development Board
-- 620 Mulberry St.
Carnegie Annex, Suite 202
Waterloo, IA 50703
Phone: (319) 291-4429
Form CCO-5 (06-20-2002)
MBE/WBE LETTER OF INTENT TO BID Page 1 of 1
Howard R. Green Company Phase 2 Demolition, Former Chamberlain Mfg. Property
Project No. 722930J41 Contract No. 762, Waterloo, Iowa
SUBCONTRACTOR'S BID REQUEST FORM
PRIME BIDDER'S LETTERHEAD
Contract No.:
Letting Date:
I, (subcontractor's name), hereby attest that I have been solicited for a bid on (project name) in
the area of(description of work and bid item no.).
(Prime contractor) has informed me that if I am interested in bidding, a subcontracting bid
proposal must be submitted to the company office by (date) and (time).
Subcontractor's Company Name
Date Subcontractor's Signature
Date Prime Bidder's Signature
umnit
SUBCONTRACTOR'S BID REQUEST FORM Page 1 of 1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
LETTER TO BE USED WHEN SOLICITING FOR SUBCONTRACTOR QUOTES
Subcontractor Company Name
Address
RE: Contract No. :
Dear •
(Prime Contractor's Company Name) is presently soliciting for the following work in connection
with the above referenced project.
(Insert bid Item Nos. and Description of Work)
(Prime Contractor's Company Name) is an Equal Opportunity Employer, and all qualified
bidders will not be discriminated against due to race, religion, color, sex, or origin.
If interested in bidding your proposal must be turned in to this office by
and
(Date) (Time)
-- Sincerely,
(Prime Contractor's Representative)
Form CCO- 3 (11/28/2001)
SOLICITING FOR SUBCONTRACTOR QUOTES LETTER Page 1 of 1
U
i
O O U N
J M
..... N J U O Q) 0 4-
U
C Q cu -c �O
O o0 w
C o 0, C O CD
CIS C O U Q Cl) 0CQa
.., 0)
0 L O U E i ccs (a
6 Cal
U) E N — -a ++ C
a) W § a g u
.0 E E• a) CO p . E O
O " C 0 Q
-.. C to C .Q 7 O N 7 R
cl
U .�.. 0 -0 CO N a _
7 Lt5p W U O O
Q oo . O y Ca
o
3 E c,) W a) C.) 0a
O p 'O C m 0 M a
m Q c -_° ca
a c o CD a.) ` Q15
-
En CT
0). w e o ET.
J •a) ..,_, O Q U c4
g 0 a) 0_ C 30 � �0. Vi 0
— (n• O g aim U Vm � I
LL a) '�- w O - caw a U
n. Z CD Q p > C � z
Ts
Q_ O E a us 2 c m E
;o
IA
022
.,
o •MI F o N a) o DU �5
�
- 0 C o til co — CJO �a) c �o .o c -t mcn vUW QL a.) a, U U o .
re o = -0u) (° a a) Za >
W ® m c . EE �
u- u) cc o 4= 8 W ee
Eo 0 .0 Co EC OH CC
Z o L U a) z
E o o WZ .0 C
UlF- = E 00 Da)Ti. o Zt/)
0 V u) o - u) ` 0
_ CO QU co > YCU) W
F- Z 0 0
12 O Zm a W o mc -
m > 0_ COo f gN Q
mm O a. Wm O •O Oy a) � � �
a O
V m CO
a 'N �> > O N -o Z W
Qn Zin
W ® c ) E .7) o n
2
co m �2 o � Quo_ o LLOw .0 tY
C > C U U .� W m °+-0 cc: O
W '� cca a N a 8.
u) J c' c LL
— a/ — -.n ) u) m A 0 Z
a. 0 . 2 � 2cnE o � < u 0
O U '5 O N O 'F) U H
Za) o' >, ao � cD F-
a) o w •- Q m u) Q
m a o o c is W e
m u) as a) ov E o CO92 CCoj,.0.. O RI a) O N Q O
p .a C E a_
4- .0 >- w o ° m a3 Z
cn 3 uj 0 -a_ .c W 2 a)
Ce a) J co laHG a) _C 0
Oy CO 0 O) 7 c p Q
Qesi O W C
V 42 J •
o 1- T U L p L N I—
I-
Ce• . a. V _ H
A -p NW 0 Z
. c � ,,'" N C.)OU Q (.1
� .+
E
o V M0 O 2 �
>
❑
2, U C ' N p
zmmnO Qa) . - o 'a5 o J] C
CWOtoLNUWuU7a E -2a) u V
C
Ill a) QmO >- a �
\ am c cn Ce za) o- p 0 co Ol� y c O o F- o C —
a) a w m
% io o W U zw c m
5v p m .(15a) > U
4. � E
) a) E Lii
c � om 000 ° � a
— ' 'r�f� aO mo m ` [
Z U cn >.U >- E 4- v E -p
0 C •. w
a) o O 4—
a) m
O O U C o (o O)Q
.O0
o — ,� O C _ f
a) -0
01
c o- C N U c - a) z ° D U CO
U co N cm 0c c .° (L
C _c 0 w L LU 0 c
m a) U O C
Q O "� N O -° Q � N "a Q U
° "C c CC O a) O E Was
U
�O-'§ E u) i� 9 `o z ° C
.. U O N a) (o co . o N -0 o
,�. C 0 0 .� N C 0 C a) 0 U
0 as
O >.O 0 0 to 0 ( CO 0 L0 C
Qo ac 'ins m ` 0 W o O u) ° N
0 _- u- m U to
o , U) 0- 0 ° •= 0 z E U N
O
a).� p 10 -o m � W U 0 W U Ec- oO
'.. �-. E C6 O m a) F- m o `O W 0_
CZ `O o u) E wm �o
m
-° 0)O U -O m U W ` CY 0 ° O
CO > co ° ° � ' m a) 0 C m m 0
Z E E o �° (1) w O -d >. P 1 o � a)
0
sloo o v � w m Z
— CDC cca as
`° o
• co• U > a) >+ to u) 0 C1 C C a)
C
U u) O O E U .CO)on O O oE U 0
� � `n m c °) < o_TT') ° 'C � n
0 w z a) a) ° -0 0 o c w
Ce a`nicn � ° o c�o � c z � � co
LU I-- c uu)i 5 a)o ° O --0 Ws in 0a) n cn
fA .c ca C U E 0 U 0 a) E co
Cl) 0 o t u, io O O E cn o J a) -c) W
Z .0 C C6 C O 4- c u) 0_ m
�-' C W u) O ° v) m c o C 0 CU ° 2
r a G CO .OQ `_-) 92 2 E -0 W o iu a) a) E U ,
W � w � 0 a) a) . moo. C 0 > 0a) o
Z0 W m c w c a) a) .0 0 0 u) ,
u- m � O ,.- -cw LU � �• E w c n cn —
W U cm 0 - w § or CO o a'`-3
LJJ ® m N ea
- O > (Y m W p s - C
CO H O � aa) c m o .o E o "c) cn 03 c/)
W Q
Z n 0 w o � w m > w CO CO °) w al 0) aci a) � O
c z __ CO• 0 . s s eL� W
� ® a)▪ 0W Om -00 cn a) Boa`) o) 0 -' oa) m 1-
— om Via) o U E 2 c > a) DU) 0
CO U- ° QD c -1 "E W 2 to nD Qc D
W Z a) 0 � � zo 0 o o mtY
CD .5 �m CC c o03 E a) . w m .> 0) a) o 0- � � u)
U a) w n E m > m aim '5 c0 � ' c m Z
Q °) o Z 0 U o E W v c D o c o) c Q.� a`) —
W c6 H .E 0 C Ca mm a .0 9. < 2 fz U) O 0) o
m Z ca P. 0 C m O O O @ -o W O 2 ° ° > 0 CZ Q'
ov E E 0 on LUc .3 > O CU 0o) a) Q 0LL
0 3 C o Z 0 W CO ° o a) a) co c c c >
—+ o 0 U U CO aj 'O 0 Cg a) a) w E o a) °o - "N N Z
® E o � 0-o ° � .0 .5 a) Q N �) O U 3 c o ism O
LU o ° -Now m 0 o 0 2 >, .a c 0 m e n0 ca •C � 30 � E F-
E `o io C a) Q
Q' p co 3 uJ i6 N o io m cco O O Q co •° E °) Y a o c 6 °
— Q. o CL a) w' -c N w > N °' _c U o „n - .0 18 ch O a) ' O N U) c °- cC
a) uj m c w Li c ' O) C E `o U a Q � co 3 � E o aim a°'i 0
- U CO W O N O C c°n ° O >' �° ,Q CY E °) C �' '^ u) co w
cop_ co_ c c 0 -a m N 0 s- °--a �O ° -0 E � a) E L a`) L Z
Q' > _ a) —
moo
ryj C OU > W O O C C I N O ° Z U _0 `C O = 0 U 4F SD a) 0
a) ogoo n- coa) 10 o "w 0 > coo O � � ° � 3 tri o O o 0
�s? m � a) cn � a) � E 0 E 'oao E o_ °) nm Oa) ° O- Q
CO U ° a) - F- O L v- • o U a) O
15 U ai N E Hw Wcv i W c a) > N aQ N ° o a) 22 0 o' o c E O H
c -0 o -c Z N N co 0 0 > m o 0 m N N 0 4— N c S C c@ 0 ` o H
N c ° o oO c .� .Qm
p a) � � o aci �' °' o a�i cpU� oo N 0 2 m o- E rn-0 oo 0
C 0 °) c/) NN a) a`) w a) a) Ncn w -0 "- 2cao 0 S- EoQ -o 9 0
u) 00 a°) _C w co 0 w 07 E _c co c c) ? -o C c E ° U >,_a
a) :O 2 N .0 z 0 C N ° m O 2 0 >i o .- w0:1 C C N y U cocc O
`o u) o o � > = Dw o c�i a� mQ o � E a) 0 E w Ca ` mot a) ili
m
-- coa c),_ - 0) m - - ° m c o o o •m� o o O < ZOm 0 'c c° uj o m Coo O < a_
m a) a) m1- °a) 0 o a) c a) CQ mOZOn.. Q i3 0 0 UJOj TCO co v W
O• ° o , � o E N ° U � o N m � ci � O cow cj 0 ai c° o) y � �U a�i .o 0 CO
m E a) > oo �m "E
m o 0o Do U
0
E E of Eas < a0ia-o 0 > H "N "' W a) o •B Ca 00 E m
a) o a) • 0 a) 0 — Et L 3 0
a � a- o -o — w=o ciE E U cr i0 4 .0 csiw I— 0_ CI) w
CERTIFIED
MBE / WBE CONTRACTORS
CITY OF WATERLOO, IOWA
14111
I., P ,74
CONTRACT COMPLIANCE OFFICE
Community Development Board
Carnegie Annex, Suite 202
620 Mulberry Street
Waterloo,Iowa 50703
City WEB Site: www.ci.waterloo.ia.us
Contract Compliance
WEB Site
for listing updates: http://www.cityofwaterlooiowa.com/contractcompliance
Contact: Rudy Jones,Community Development Director
Email: rudy.jones(aiwaterloo-ia.org
Phone: (319) 291-4429
Fax: (319) 291-4431
MBE/WBE Certified Contractors List
Page 1 o f 4
CERTIFIED MBE CONTRACTORS
CARTER ELECTRIC
725 Adams Street
Waterloo, IA 50703
Phone: (319) 232-9808
Pager: (319) 235-4021
Contact: Derrick Carter
Specializing in:
ELECTRICAL CONTRACTOR
CULPEPPER ELECTRIC *�
1731 Cottage Grove Avenue
Waterloo, IA 50707
Phone: (319) 235-0885
Fax: (319) 236-8177
Contact: Martin Culpepper
Certified: City of Waterloo Certified MBE, Licensed Electrician
Specializing in:
ELECTRICAL CONTRACTOR
DANIELS HOME IMPROVEMENT
339 Albany Street
Waterloo, IA 50703
Phone: (319) 961-1659
Contact: Sammy Daniels
Specializing in:
ALL TYPES OF CONCRETE FLATWORK, POURED WALLS ALL TYPES, FOOTINGS,
LIGHT DEMOLITION
D.C. CORPORATION
426 Beech Street
Waterloo, IA 50703
Phone: (319) 236-9075 .
FAX: (319) 236-0515
Contact: Terry Phillips
Certified: City of Waterloo Certified MBE, Iowa DOT, TSB Certified
Specializing in:
COMMERCIAL AND RESIDENTIAL DEMOLITION, CONCRETE PAVING, DRIVEWAYS,
TRUCKING (ALL TYPES), GENERAL CONSTRUCTION
MBE/WBE Certified Contractors List
Page 2 o f 4
GREER'S WORKS
2003 Plainview Street
Waterloo, IA 50703
Phone: (319)233-4701
Contact: Willie Greer
Specializing in:
DRIVEWAYS, SIDEWALKS, CARPENTRY, ROOFING, GENERAL CONSTRUCTION
LOVE'S ENTERPRISE
835 West Fifth St.
P.O. Box 246
Waterloo, IA 50704
Phone: (319) 233-3260
Contact: David Love
Certified: Iowa DOT, City of Waterloo Certified MBE
Specializing in:
CONCRETE PAVING, ASPHALT, DRIVEWAYS, SIDEWALKS, TRUCKING
OLD GREER'S WORKS
2309 Springview Street
,-. Waterloo, IA 50707
Phone: (319) 233-2150
Contact: David L. Greer, Sr.
Specializing in:
GENERAL CONSTRUCTION
QUICK CONSTRUCTION
217 Bates Street
Waterloo, IA 50703
Phone: (319) 215-4166
Contact: Leroy Harrington
Specializing in:
ALL TYPES OF CONCRETE FLATWORK AND GENERAL CONSTRUCTION
1
1 MBE/WBE Certified Contractors List
Page 3 of 4
at
YJ!
i3
CERTIFIED WBF- CONTRACTORS
ATLAS PAINTING, INC.*
911 Sycamore Street
P.O. BOX 65
Waterloo, IA 50704
Phone: (319) 232-9164
Specializing in:
COMMERCIAL AND INDUSTRIAL PAINTING
PETERMAN & HAES CARPET ONE*
4003 University Avenue
Waterloo, IA 50701
Phone : (319) 233-6131
FAX: (319) 233-6133
email: JR11486@cfu.net
Certified: City of Waterloo WBE
Contact : Carol Reese
Specializing in:
FLOOR COVERING
WATCO CONSTRUCTION, INC.*
2920 Texas Street
Waterloo, IA 50702
Phone : (319)233-7481
Certified: City of Waterloo WBE
Contact : Patricia J. Kimball
Specializing in: .�
STORM SEWER, INLETS, DRAIN TILE, WATER MAIN, SANITARY SEWER, INTAKE
STRUCTURES
* DENOTES WOMEN BUSINESS ENTERPRISE
MBE/WBE Certified Contractors List
Page 4 o f 4 ..
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
MBE/WBE REQUIREMENTS
FOR
-- FY 2012 CHAMBERLAIN DEMOLITION PHASE 3
This program is funded in part by federal HUD EDI GRANT funds. According to the City of
Waterloo's Contract Compliance Program: "Any project which is funded solely or in part with
Federal funds shall follow the respective agencies contract compliance program."
Accordingly, the City of Waterloo's MBE/WBE goals of 10% and 2%, respectively, apply to this
Program and Section 3 of the Housing and Urban Development Act of 1968, as amended, 12
U.S.C. 1701u, 24 CFR Part 135 does apply.
Section 3 states in pertinent part that:
To the greatest extent feasible, opportunities for training and employment be given lower
income residents of the project area and contracts for work in connection with the project
be awarded to business concerns which are located in, or owned in substantial part by
persons residing in the area of the project.
In addition to Section 3 requirements, the City of Waterloo's Contract Compliance Program
-- states that "this program does not eliminate the need for contractors to continue their "good-faith
efforts" in using MBE/WBE subcontractors on City Contracts.
MBE/WBE REQIREMENTS Page 1 of 1
0.1
Section 3 of the Housing and Urban Development Act of 1968 requires that,recipients of
CDBG funds provide,to the greatest extent feasible,job training,employment and
contracting opportunities for low-or very low-income residents in connection with projects
and activities in their neighborhoods. The intent of Section 3 is to foster local economic
development,neighborhood economic improvement,and individual self-sufficiency.
Section 3 requirements apply to new hires only. It does not require the
ask
creation of economic opportunities for low-income persons simply for the sake of
creating jobs,but requires that when jobs are generated because a project
necessitates the employment of additional workers,preference be given to
Section 3 qualified individuals or businesses. If you or your contractors have no
need for additional workers,then the Section 3 requirements do not apply,
although you will have to report any existing workers that fall under Section 3
guidelines.
Section 3 residents are public housing residents or persons who live in the area
where a CDBG project is located and who have a household income that falls
below HUD's income limits.
A Section 3 business is a business that is 51%or more owned by Section 3
residents;employs Section 3 residents for at least 30%of its full-time,permanent
staff;or provides evidence of a commitment to subcontract to Section 3 business
•� concerns,25%or more of the dollar amount of an awarded contract.
You must take affirmative actions to achieve the Section 3 goals. Actions include
0.4
the following:
• Including Section 3 intent in all bid advertisements;
`1 • Requiring contractors to advertise employment opportunities locally;
• Notifying residents and businesses of economic opportunities available;
• Keeping contractors informed of their Section 3 responsibilities;
• Include the Section 3 clause in every solicitation and contract;and
• Report Section 3 results.
-w
W/MBE:
The Subrecipient will use its best efforts to afford minority and women-owned
business enterprises(at least fifty-one(51)percent owned and controlled by minority
,.� group members or women)the maximum practicable opportunity to participate in the
performance of the Agreement.
Section 3 Clause
A. The work to be performed under this contract is subject to the requirements of section 3 of the
Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (Section 3). The
purpose of Section 3 is to ensure that employment and other economic opportunities generated by
HUD assistance or HUD-assisted projects covered by Section 3, shall, to the greatest extent
feasible, be directed to low-and very low-income persons, particularly persons who are recipients
of HUD assistance for housing.
B. The parties to this contract agree to comply with HUD's regulations in 24 CFR part 135, which
implement Section 3.As evidenced by their execution of this contract, the parties to this contract
certify that they are under no contractual or other impediment that would prevent them from
complying with the part 135 regulations.
C. The contractor agrees to send to each labor organization or representative or workers with
which the contractor has a collective bargaining agreement or other understanding, if any, a notice
advising the labor organization or workers' representative of the contractor's commitments under —
this Section 3 clause, and will post copies of the notice in conspicuous places at the work site
where both employees and applicants for training and employment positions can see the notice.
The notice shall describe the Section 3 preference, shall set forth minimum number and job titles _
subject to hire, availability of apprenticeship and training positions, the qualifications for each; and
the name and location of the person(s) taking applications for each of the positions; and the
anticipated date the work shall begin. _
D. The contractor agrees to include this Section 3 clause in every subcontract subject to
compliance with regulations in 24 CFR part 135, and agrees to take appropriate action, as provided —
in an applicable provision of the subcontract or in this Section 3 clause, upon a finding that the
subcontractor is in violation of the regulations in 24 CFR part 135. The contractor will not
subcontract with any subcontractor where the contractor has notice or knowledge that the --
subcontractor has been found in violation of the regulations in 24 CFR part 135.
E. The contractor will certify that any vacant employment positions, including training positions, that are filled (1) after the contractor is selected but before the contract is executed, and (2) with
persons other than those to whom the regulations of 24 CFR part 135 require employment
opportunities to be directed, were not filled to circumvent the contractor's obligations under 24 CFR --
part 135.
F. Noncompliance with HUD's regulations in 24 CFR part 135 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts.
G. With respect to work performed in connection with Section 3 covered Indian housing assistance,
section 7(b) of the Indian Self-Determination and Education Assistance Act
(25 U.S.C. 450e) also applies to the work to be performed under this contract. Section 7(b)
requires that to the greatest extent feasible (i) preference and opportunities for training and
employment shall be given to Indians, and (ii) preference in the award of contracts and
subcontracts shall be given to Indian organizations and Indian-owned Economic Enterprises.
Parties to this contract that are subject to the provisions of Section 3 to the maximum extent
feasible, but not in derogation of compliance with section 7(b).
Section 3 Summary Report U.S.Department of Housing OMB Approval No: 2529-0043
Economic Opportunities for and Urban Development (exp.11/30/2010)
Low—and Very Low-Income Persons Office of Fair Housing
And Equal Opportunity HUD Field Office:
Section back of page for Public Reporting Burden statement
1.Recipient Name&Address: (street,city,state,zip) 2.Federal Identification: (grant no.) 3. Total Amount of Award:
4.Contact Person 5.Phone: (Include area code)
6.Length of Grant: 7.Reporting Period:
8.Date Report Submitted: 9.Program Code: (Use separate sheet 10. Program Name:
for each program code)
Part I: Employment and Training(**Columns B,C and F are mandatory fields. Include New Hires in E&F)
A B C D E F
Number of Number of New %of Aggregate Number %of Total Staff Hours Number of Section 3
Job Category New Hires Hires that are of Staff Hours of New Hires for Section 3 Employees Trainees
Sec.3 Residents that are Sec.3 Residents and Trainees
Professionals
Technicians
Office/Clerical _
Construction by Trade(List)
Trade
Trade
Trade
Trade
Trade
Other(List)
roma
Total
*Program Codes 3=Public/Indian Housing 4=Homeless Assistance 8=CDBG State Administered
1=Flexible Subsidy A=Development, 5=HOME 9=Other CD Programs
2=Section 202/811 B=Operation 6=HOME State Administered 10=Other Housing Programs
C=Modernization 7=CDBG Entitlement
sari
Page 1 of 2 form HUD 60002(6/2001)
Ref 24 CFR 135
Part II: Contracts Awarded
1. Construction Contracts:
A. Total dollar amount of all contracts awarded on the project $
B. Total dollar amount of contracts awarded to Section 3 businesses $
r..
C. Percentage of the total dollar amount that was awarded to Section 3 businesses
D. Total number of Section 3 businesses receiving contracts
2. Non-Construction Contracts:
A. Total dollar amount all non-construction contracts awarded on the project/activity $
B. Total dollar amount of non-construction contracts awarded to Section 3 businesses $ -
C. Percentage of the total dollar amount that was awarded to Section 3 businesses
D. Total number of Section 3 businesses receiving non-construction contracts
Part III: Summary
Indicate the efforts made to direct the employment and other economic opportunities generated by HUD financial assistance for housing
and community development programs,to the greatest extent feasible,toward low-and very low-income persons,particularly those who Vim
are recipients of government assistance for housing. (Check all that apply.)
Attempted to recruit low-income residents through: local advertising media,signs prominently displayed at the project site,
contracts with the community organizations and public or private agencies operating within the metropolitan area(or
nonmetropolitan county)in which the Section 3 covered program or project is located,or similar methods.
Participated in a HUD program or other program which promotes the training or employment of Section 3 residents. ...
Participated in a HUD program or other program which promotes the award of contracts to business concerns which meet the
definition of Section 3 business concerns.
Coordinated with Youthbuild Programs administered in the metropolitan area in which the Section 3 covered project is located.
Other;describe below.
Public reporting for this collection of information is estimated to average 2 hours per response,including the time for reviewing instructions, ...
searching existing data sources,gathering and maintaining the data needed,and completing and reviewing the collection of information.
This agency may not collect this information,and you are not required to complete this form,unless it displays a currently valid OMB
number.
Section 3 of the Housing and Urban Development Act of 1968,as amended,12 U.S.C.1701 u,mandates that the Department ensures that
employment and other economic opportunities generated by its housing and community development assistance programs are directed
toward low-and very-low income persons,particularly those who are recipients of government assistance housing. The regulations are
found at 24 CFR Part 135. The information will be used by the Department to monitor program recipients'compliance with Section 3,to
assess the results of the Department's efforts to meet the statutory objectives of Section 3,to prepare reports to Congress,and by
recipients as self-monitoring tool. The data is entered into a database and will be analyzed and distributed. The collection of information
involves recipients receiving Federal financial assistance for housing and community development programs covered by Section 3. The
information will be collected annually to assist HUD in meeting its reporting requirements under Section 808(e)(6)of the Fair Housing Act
and Section 916 of the HCDA of 1992. An assurance of confidentiality is not applicable to this form. The Privacy Act of 1974 and OMB
Circular A-108 are not applicable. The reporting requirements do not contain sensitive questions. Data is cumulative;personal identifying �.
information is not included.
Page 2 of 2 form HUD 60002(11/2010)
Ref 24 CFR 135
Form HUD-60002,Section 3 Summary Report,Economic Opportunities for Low-and Very Low-Income Persons.
Instructions: This form is to be used to report annual 8. Program Code: Enter the appropriate program code as listed at
accomplishments regarding employment and other economic the bottom of the page.
0,,4 opportunities provided to low-and very low-income persons under 9. Program Name: Enter the name of HUD Program corresponding
Section 3 of the Housing and Urban Development Act of 1968. The with the"Program Code"in number 8.
Section 3 regulations apply to any public and Indian housing
programs that receive: (1)development assistance pursuant to Part I: Employment and Training Opportunities
Section 5 of the U.S.Housing Act of 1937;(2)operating assistance Column A: Contains various job categories. Professionals are
pursuant to Section 9 of the U.S.Housing Act of 1937;or(3) defined as people who have special knowledge of an occupation(i.e.
modernization grants pursuant to Section 14 of the U.S.Housing Act supervisors,architects,surveyors,planners,and computer
of 1937 and to recipients of housing and community development programmers). For construction positions,list each trade and provide
assistance in excess of$200,000 expended for: (1)housing data in columns B through F for each trade where persons were
rehabilitation(including reduction and abatement of lead-based paint employed. The category of"Other'includes occupations such as
hazards);(2)housing construction;or(3)other public construction service workers.
projects;and to contracts and subcontracts in excess of$100,000 Column B: (Mandatory Field) Enter the number of new hires for
awarded in connection with the Section-3-covered activity. each category of workers identified in Column A in connection with
Form HUD-60002 has three parts,which are to be completed for this award. New hire refers to a person who is not on the contractor's
all programs covered by Section 3. Part I relates to employment or recipient's payroll for employment at the time of selection for the
and training.The recipient has the option to determine numerical Section 3 covered award or at the time of receipt of Section 3 covered
..� employment/training goals either on the basis of the number of hours assistance.
worked by new hires(columns B,D,E and F). Part II of the form Column C: (Mandatory Field) Enter the number of Section 3 new
relates to contracting,and Part III summarizes recipients'efforts to hires for each category of workers identified in Column A in
comply with Section 3. connection with this award. Section 3 new hire refers to a Section 3
Recipients or contractors subject to Section 3 requirements must resident who is not on the contractor's or recipient's payroll for
maintain appropriate documentation to establish that HUD financial employment at the time of selection for the Section 3 covered award or
assistance for housing and community development programs were at the time of receipt of Section 3 covered assistance.
directed toward low-and very low-income persons.` A recipient of Column D: Enter the percentage of all the staff hours of new hires
Section 3 covered assistance shall submit one copy of this report to (Section 3 residents)in connection with this award.
HUD Headquarters,Office of Fair Housing and Equal Opportunity. Column E: Enter the percentage of the total staff hours worked for
Where the program providing assistance requires an annual Section 3 employees and trainees(including new hires)connected
performance report,this Section 3 report is to be submitted at the with this award. Include staff hours for part-time and full-time
same time the program performance report is submitted. Where an positions.
annual performance report is not required,this Section 3 report is to be Column F: (Mandatory Field) Enter the number of Section 3
submitted by January 10 and,if the project ends before December 31, residents that were trained in connection with this award.
within 10 days of project completion. Only Prime Recipients are Part II: Contract Opportunities
required to report to HUD. The report must include Block 1: Construction Contracts
accomplishments of all recipients and their Section 3 covered Item A: Enter the total dollar amount of all contracts awarded on the
contractors and subcontractors. project/program.
HUD Field Office: Enter the Field Office name. Item B: Enter the total dollar amount of contracts connected with this
1. Recipient: Enter the name and address of the recipient project/program that were awarded to Section 3 businesses.
-- submitting this report. Item C: Enter the percentage of the total dollar amount of contracts
2. Federal Identification: Enter the number that appears on the connected with this project/program awarded to Section 3 businesses.
award form(with dashes). The award may be a grant, Item D: Enter the number of Section 3 businesses receiving awards.
cooperative agreement or contract. Block 2: Non-Construction Contracts
3. Dollar Amount of Award: Enter the dollar amount,rounded to the Item A: Enter the total dollar amount of all contracts awarded on the
nearest dollar,received by the recipient. project/program.
4&5. Contact Person/Phone: Enter the name and telephone number Item B: Enter the total dollar amount of contracts connected with this
of the person with knowledge of the award and the recipient's project awarded to Section 3 businesses.
implementation of Section 3. Item C: Enter the percentage of the total dollar amount of contracts
6. Reporting Period: Indicate the time period(months and year) connected with this project/program awarded to Section 3 businesses.
this report covers. Item D: Enter the number of Section 3 businesses receiving awards.
oat 7. Date Report Submitted: Enter the appropriate date. Part III: Summary of Efforts—Self-explanatory
Submit one(1)copy of this report to the HUD Headquarters Office of
Fair Housing and Equal Opportunity,at the same time the The Secretary may establish income ceilings higher or lower than 80 percent
performance report is submitted to the program office. The Section 3 of the median for the area on the basis of the Secretary's findings such that
report is submitted by January 10. Include only contracts executed variations are necessary because of prevailing levels of construction costs
,,,as4 during the period specified in item 8. PHAs/IHAs are to report all or unusually high-or low-income families. Very low-income persons mean
contracts/subcontracts. low-income families(including single persons)whose incomes do not
exceed 50 percent of the median family income area,as determined by the
* The terms"low-income persons"and very low-income persons"have Secretary with adjustments or smaller and larger families,except that the
the same meanings given the terms in section 3(b)(2)of the United Secretary may establish income ceilings higher or lower than 50 percent of
States Housing Act of 1937. Low-income persons mean families the median for the area on the basis of the Secretary's findings that such
'w{ (including single persons)whose incomes do not exceed 80 percent of variations are necessary because of unusually high or low family incomes.
the median income for the area,as determined by the Secretary,with
adjustments for smaller and larger families,except that
Page i form HUD 60002(11/2010)
Ref 24 CFR 135
yR
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
NOTICE OF AWARD
TO: «Contractor»
«CAddressl»
«CAddress2v
The extent of Work on this project is the furnishing of all labor, equipment, and materials
for the construction of FY 2012 Chamberlain Demolition Phase 3 Contract No. 806, for
the City of Waterloo, Iowa, generally described as follows:
This project includes demolitions, removals, and restoration at the former
Chamberlain Manufacturing Plant site located in Waterloo, Iowa. This is a
continuation of previous demolition and removal projects at the site. Work of this
project consists of demolition of the remainder of site structures, removal of
footings and slabs (both Portland cement concrete and asphaltic concrete), and
removal of tanks. All debris from this project is to be hauled off-site for disposal
or recycling. Restoration includes backfilling and grading with a combination of
imported and on-site soils, spreading of topsoil, seeding and mulching.
The Owner has considered the Bid submitted by you for the above-described Work.
You are hereby notified that your Bid has been tentatively accepted for items in the
amount of
dollars) $ ).
You are required by the Instructions to Bidders to execute the Agreement and furnish the
required Contractor's Performance Bond, Payment Bond and Certificates of Insurance
-- within ten (10) calendar days from the date of this Notice to you.
If you fail to execute said Agreement and to furnish said Bonds within ten (10) calendar
days after the date of receipt of this Notice, said Owner will be entitled to consider all
your rights arising out of the Owner's acceptance of your Bid as abandoned and as a
forfeiture of your Bid Bond. The Owner will be entitled to such other rights as may be
granted by law.
NOTICE OF AWARD Page 1 of 2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
You are required to return an acknowledged copy of this NOTICE OF AWARD to the
Owner.
Dated this day of , 2012.
City of Waterloo, Iowa
By
Title
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE OF AWARD is hereby acknowledged by:
«Contractor» _
this the day of , 2012.
By
«CAuthorizedSignature»,
«CAuthorizedTitle»
END OF SECTION
NOTICE OF AWARD Page 2 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
FORM OF CONTRACT
— CONTRACT FOR THE CONSTRUCTION OF
FY 2012 CHAMBERLAIN DEMOLITION PHASE 3
550 ESTHER STREET
CITY OF WATERLOO, IOWA
CONTRACT NO. 806
This contract made and entered into this day of , 20_, by and
between the City of Waterloo, Iowa, a Municipal Corporation, (hereinafter referred to
as City), and , of , Iowa, (hereinafter
referred to as Contractor), WITNESSETH:
PAR. 1 Contractor agrees to build and construct the FY 2012 CHAMBERLAIN
DEMOLITION PHASE 3 , and furnish all necessary tools, equipment, materials,
and labor necessary to do all the work called for in the plans and specifications in a
workmanshiplike manner and for the prices set forth in Contractor's proposal,
which was accepted by the City, and which is understood and agreed to be a part
of this contract.
PAR. 2 It is understood and agreed that the resolution adopted by the City Council
ordering the construction of the improvement, the Notice to Contractors as
published, the Instruction to Bidders, the Form of Proposal, the Construction
Bonds, the Council Proceedings relating to this matter, and the Plans and
-. Specifications shall all be considered as forming a part of the contract the same as
though they were each set out in said contract.
PAR. 3 The Contractor agrees to furnish at its own cost and expense, all necessary
materials and labor for said work and to construct said improvements in a
thorough, substantial, and workmanlike manner, and in strict accordance with the
requirements of this contract, and of the plans and specifications made a part
hereof by reference, and to the satisfaction and approval of the City and its
engineer.
PAR. 4 The Contractor agrees to perform said work and install said improvements on the
terms set out in bid or proposal to the City which has been accepted by the City
and which is by reference made a part of this contract.
FORM OF CONTRACT Page 1 of 4
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa —
PAR. 5 The Contractor agrees to commence said work within ten (10) working days after receipt of "Notice to Proceed" and complete it on or before September 30, 2012,
unless an extension of time is granted in writing by the Council of the City.
PAR. 6 Should the Contractor fail to complete said improvements in strict accordance with
the terms and conditions of this contract, or the plans and specifications therefor
promptly by the date herein specified, the City may pay such additional sums as it —
may be required to pay by reason of the failure of said contractor and deduct any
and all such sums from any amount then due the Contractor.
PAR. 7 The Contractor agrees to comply with and obey all ordinances of the City of
Waterloo, Iowa, relating to the obstruction of streets and alleys, keeping open
passage ways for water, traffic, and protecting any excavations in any street or _
alley, and maintaining proper and sufficient barricades with lights and signals
during all hours of darkness, to see that the backfilling is properly done, and
agrees to keep the City whole and defend any and all suits that may be brought
against the City by reason of any injuries that may be sustained by any person or —
property allegedly caused by the Contractor, or his agents, while work is done
pursuant to this agreement.
PAR. 8 The Contractor agrees that in the event a law suit is brought against the City for
damages allegedly sustained by reason of any act, omission or negligence of the
Contractor or its agents, or on account of any injuries allegedly sustained by —
reason of any obstruction, hole, depression or barrier placed or dug by the
defendant or its agents, in the doing of the work herein contracted for, that it will
defend said suit and save the City harmless therein, and in case judgment is
rendered against the City, the Contractor agrees to pay the same promptly. The
Contractor agrees to carry public liability insurance in a solvent company in a
sufficient amount to protect the City and those who use the streets of the City.
PAR. 9 The City shall have the right to appoint one or more construction reviewers who
shall review the progress of the work in detail; also, to make any test or any
material to be used in such work. No material shall be used in any work until the
same has first been approved by the construction reviewer. Such construction
reviewer shall have full authority to pass judgment upon all materials and upon the
manner of doing the work, and their judgment on rejecting any materials,
substance, or manner of work shall be final unless it is revoked or modified by the
City Engineer.
PAR. 10 Any material, which has been rejected by the construction reviewer, shall be at
once removed from the line of work and shall not be again taken thereon or placed
with the material proposed to be used without the written consent of the City
Engineer.
FORM OF CONTRACT Page 2 of 4
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
PAR. 11 The Contractor shall maintain no cause of action against the City on account of
delays and prosecution of work, but if said work is delayed by the City, the
Contractor shall have such extra time for completion of the job as was lost by
reason of the delay caused by the City.
PAR. 12 The Contractor agrees to pay punctually all just claims of labor, material, men, or
subcontractors who shall perform labor or furnish materials entering into this
improvement. It is agreed that the City need not pay the Contractor until all such
claims are paid by the Contractor. It is agreed that the City shall not be liable for
said labor, material, or men under this contract.
PAR. 13 The Contractor agrees to furnish the City, simultaneously with this contract, a bond
on a form to be provided by the City in the amount provided by law as stated in the
Notice to Bidders, which shall be for the benefit of the City, and any and all
persons injured by the breach of any of the terms of this contract. Said bond shall
be filed with the City Clerk and shall be subject to the approval of the City Council,
and is by reference made a part of this contract.
PAR. 14 The Contractor agrees that should it abandon work under this contract or cease
the prosecution thereof for a period of thirty (30) consecutive days without
reasonable cause, and should it fail to proceed with said work within ten (10) days
-- after a notice to continue or carry it on has been mailed to it at the address given
herein by the City, or after such notice has been served on it, then the City may
proceed to complete said work, using any material, tools, or machinery found
along said line of work, doing the work either by contract or as it may elect, and the
Contractor and the sureties on its bond shall be liable to the City for the costs and
expenses so paid out. Said costs shall be retained by the City from any
compensation due, or to become due the Contractor, and may be recovered by the
City in an action upon Contractor's bond.
PAR. 15 In consideration of the full compliance on the part of the Contractor with all the
provisions, stipulations, and conditions hereof, or contained in the various
instruments made a part of this contract by reference, and upon completion and
acceptance of said work, the City agrees to pay to the Contractor, in the manner
set out in the Notice to Contractors, the amount of money due the Contractor for
work performed and accepted, at the unit prices set out in the Contractor's
proposal, which has been accepted by the City.
PAR. 16 The total amount of the contract, based on the Engineering Consultants estimates
of quantities and the Contractor's unit bid prices, and for which 100% surety bond
is required is $
PAR. 17 After the completion of said work, the Contractor agrees to remove all debris and
clean up said streets, and to save the City harmless from any damage allegedly
resulting from a failure to clean up and remove the debris or put the street back in
a proper condition for travel.
FORM OF CONTRACT Page 3 of 4
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
PAR. 18 This contract is not divisible, but in the event of a conflict between this contract and
the various instruments incorporated by reference, this contract shall govern.
PAR. 19 Not Applicable
PAR. 20 Not Applicable
PAR. 21 Not Applicable —'
CITY OF WATERLOO, IOWA
Mayor
City Clerk
Contractor
BY:
Title:
Approved by the City Council of the City of Waterloo, Iowa, this
day of , 20 .
ATTEST: , City Clerk
Waterloo, Iowa
FORM OF CONTRACT Page 4 of 4
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS:
That we, of
(the "Principal"), and of
(the "Surety"), are held and firmly bound unto the City of Waterloo, Iowa
(the "Obligee"), in the penal sum of
Dollars ($ ), lawful money of the United States, for the payment of said
sum in connection with a contract (the "Contract") dated on or about
for the purpose of
. The Contract is incorporated herein by reference as
though fully set forth herein.
Whenever the Principal shall be and is declared by the Obligee to be in default under the
Contract, with the Obligee having performed its obligations in the Contract, then the Surety,
acknowledging that time is of the essence, may promptly remedy the default, or shall promptly
undertake to:
1. Complete the Contract in accordance with its terms and conditions; or
2. Obtain one or more bids for completing the Contract in accordance with its terms
and conditions, and upon determination by the Surety of the lowest responsible
bidder, or negotiated proposal, or, if the Obligee elects, upon determination by the
Obligee and the Surety jointly of the lowest responsible bidder. or negotiated
proposal, arrange for a contract between such party and the Obligee. The Surety
will make available as work progresses sufficient funds to pay the cost of
completion less the balance of the Contract price. The cost of completion includes
responsibilities of the Principal for correction of defective work and completion of
the Contract, the Obligee's legal and design professional costs resulting directly
from the Principal's default, and liquidated damages or actual damages if no
liquidated damages are specified in the Contract. The term "balance of the
Contract price" means the total amount payable by the Obligee to the Principal
under the Contract and any amendments thereto, less the amount properly paid by
the Obligee to the Principal; or
3. Determine the amount for which it is liable to the Obligee and pay the Obligee that
amount as soon as practicable.
In the event this bond is enforced, Principal and Surety agree to indemnify Obligee and hold
Obligee harmless from and against any and all costs of enforcement, including but not limited to
reasonable attorneys' fees and expenses.
Every Surety on this bond shall be deemed and held, any contract to the contrary notwithstanding,
to consent to each and all of the following matters, without notice:
PERFORMANCE BOND Page 1 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
1. To any extension of time to the Contract in which to perform the Contract.
2. To any change in the plans, specifications, or Contract when such change does
not involve an increase of more than twenty percent (20%) of the total Contract
price, and shall then be released only as to such excess increase. _
3. That no provision of this bond or of any other contract shall be valid which limits to
less than one (1) year from the time of the acceptance of the work the right to sue
on this bond for defect in workmanship or material not discovered or known to the
Obligee at the time such work was accepted.
If the Principal performs the Contract, then this bond shall be null and void; otherwise it shall
remain in full force and effect. In no event shall the Surety's total obligation exceed the penal
amount of this bond.
Terms used herein shall include, as appropriate, the singular or plural number, or the masculine,
feminine or neuter gender.
IN WITNESS WHEREOF, the undersigned Principal and Surety have executed this Performance
Bond as of
PRINCIPAL SURETY
Name Name
By: By:
Title: Title:
[attach Power of Attorney]
NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is Partnership, all partners should execute BOND.
If this project includes Federal µRan.Is,,the following applies to,the,payment bond —
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's
most current list (Circular 570 as amended) and be authorized to transact business in the State
where the project is located.
PERFORMANCE BOND Page 2 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: that
(Name of Contractor)
(Address of Contractor)
_ a , hereinafter called
Principal,
(Corporation, Partnership or Individual)
and
(Name of Surety)
(Address of Surety)
hereinafter called Surety, are held and firmly bound unto
(Name of Owner)
(Address of Owner)
hereinafter called OWNER, in the penal sum of Dollars, $(
in lawful money of the United States, for the payment of which sum well and truly to be made,
we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a
certain contract with the OWNER, dated the day of
20 , a copy of which is hereto attached and made a part hereof for the construction of:
PAYMENT BOND Page 1 of 3
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa —
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, —
SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the
prosecution of the WORK provided for in such contract, and any authorized extension or
modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and —
coke, repairs on machinery, equipment and tools, consumed or used in connection with the
construction of such WORK, and all insurance premiums on said WORK, and for all labor,
performed in such WORK whether by SUBCONTRACTOR or otherwise, then this obligation
shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees —
that no change, extension of time, alteration or addition to the terms of the contract or to the
WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in
any wise affect its obligation on this BOND, and it does hereby waive notice of any such
change, extension of time, alteration or addition to the terms of the contract or to the WORK or
to the SPECIFICATIONS.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR —
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
IN WITNESS HEREOF, this instrument is executed in counterparts, each one of —
(number)
which shall be deemed an original, this the day of
20
ATTEST:
Principal
(Principal) Secretary
(SEAL) By (s) —
(Address)
Witness as to Principal
PAYMENT BOND Page 2 of 3
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
(Address)
Surety
ATTEST: By
Attorney-in-Fact
Witness as to Surety (Address)
(Address)
NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is Partnership, all partners should execute BOND.
If this project Includes FederalTFunds the followmgvapplies to the payment bond;
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's
most current list (Circular 570 as amended) and be authorized to transact business in the State
where the project is located.
PAYMENT BOND Page 3 of 3
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
NOTICE TO PROCEED
TO:
DATE:
FY 2012 Chamberlain Demolition Phase 3
550 Esther Street
Contract No. 806
City of Waterloo
715 Mulberry Street
Waterloo, Iowa 50703
You are hereby notified to commence WORK in accordance with the Agreement dated
, 2012, on or after , 2012. The date of completion of all WORK is
2012.
City of Waterloo, Iowa
By
Title
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE TO PROCEED is hereby acknowledged by:
, this the day of , 2010.
By
END OF SECTION
NOTICE TO PROCEED Page 1 of 1
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR
State of
) ss:
County of )
_ , being first duly sworn, deposes and
says that:
1. He is (Owner, Partner, Officer, Representative, or Agent) , of
hereinafter
referred to as the "Subcontractor;"
2. He is fully informed respecting the preparation and contents of the subcontractor's
proposal submitted by the subcontractor to
, contract pertaining to the
project in
•
(City or County and State)
3. Such subcontractor's proposal is genuine and is not a collusive or sham proposal;
4. Neither the subcontractor nor any of its officers, partners, owners, agents,
representatives, employees, or parties in interest, including this affiant, has in any way
colluded, conspired, connived, or agreed, directly or indirectly, with any other bidder,
firm or person to submit a collusive or sham proposal in connection with such contract or
to refrain from submitting a proposal in connection with such contract, or has in any
manner, directly or indirectly, sought by unlawful agreement or connivance with any
other bidder, firm or person to fix the price or prices in said subcontractor's proposal, or
to fix any overhead, profit or cost element of the price of prices in said subcontractor's
proposal, or to secure through collusion, conspiracy, connivance or unlawful agreement
any advantage against the City of Waterloo, Iowa, or any person interested in the
proposed contract; and
5. The price or prices quoted in the subcontractor's proposal are fair and proper and are
not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part
of the bidder or any of its agents, representatives, owners, employees, or parties in
interest, including this affiant.
(Signed)
Title
NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR Page 1 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
Subscribed and sworn to before me this day of —
, 201 .
Title
My commission expires
NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR Page 2 of 2
HR Green. Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
GENERAL SPECIFICATIONS FOR CONSTRUCTION
CITY OF WATERLOO, IOWA
Department of Engineering
SECTION A - Definitions of Terms
SECTION B - Scope of work
SECTION C - Control of Materials and Work
SECTION D - Procedure and Progress
SECTION E - Measurements and Payments
SECTION F - Legal Relations and Responsibility
SECTION A - DEFINITIONS OF TERMS
1. CITY. The City of Waterloo, Iowa, which is the Party of the First Part of the
accompanying contract, acting through its authorized representative.
2. COUNCIL. The duly elected Council of the City of Waterloo, Iowa.
3. ENGINEER. The City Engineer of Waterloo, Iowa, or his authorized representative.
4. INSPECTOR. The authorized representative of the Engineer, assigned to the detailed
inspection of the work or materials therefor and to such other duties as may be
delegated to him in these specifications.
5. CONTRACTOR. The Party of the Second Part in the accompanying contract for the
improvement covered by these specifications, or his authorized representative.
6. SUBCONTRACTOR. Any person, firm, or corporation who has, with the approval of the
Council, contracted with the Contractor to execute and perform in his stead all or any
part of the contract.
7. BIDDER. Any individual, firm, or corporation submitting a proposal for a I or a part of the
work provided for in these specifications.
8. PROPOSAL GUARANTEE. The security designed in the Notice of Bidders or Proposal
to be furnished by the bidder as a guarantee of good faith to enter into a contract and
furnish an acceptable bond for the work contemplated if it be awarded hi n.
9. SURETY. The corporate body bound with and for the Contractor for the acceptable
performance of the contract.
10. PROPOSAL. The written Proposal, submitted by the bidder in the prescribed manner
and on the standard form, for the improvements covered by these specif cations.
11. SPECIFICATIONS. The documents that set forth the manner in which the proposed
work is to be accomplished which have been prepared by the Engineer and approved by
the City Council, official copies of which are now on file with the City Clerk.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 1 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
12. SPECIAL PROVISIONS. Clauses or memoranda not contained herein, applying to the
Contract of which these specifications are a part, which change or supplement these
specifications.
13. CONTRACT. The agreement entered into between the City and the Contractor, setting
forth the terms under which the work covered by the plans and specifications is to be
performed. The contract includes all conditions, definitions, and instructions set forth in the official publications relating to the work, the official contract and specifications, the
Proposal, official plans, and all supplemental agreements entered into by the parties to
the contract. _
14. NOTICE TO BIDDERS. The notice called attention of bidders to the time and place for
receiving bids, containing a brief description of the work, and briefly setting forth the
requirements and conditions for submission of Proposals.
15. INSTRUCTIONS TO BIDDERS. The clauses setting forth in detail the information
relative to the proposed work and requirements for the submission of Proposals.
16. PLANS. The plans for the improvement covered by the specifications and approved by
the Council, official copies of which are on file with the City Clerk. —
17. CONTRACT BOND. The bond executed by the Contractor and his surety in favor of the
City of Waterloo, Iowa, guaranteeing the complete execution of the contract in —
accordance with the plans and specifications, the payment of all debts pertaining to the
work, and maintenance of the work as provided by law or by the specifications.
18. CONTRACT PERIOD. The period from the specified date for beginning the work to the
specified date of completion, both dates inclusive. The contract period may be extended
by the Council, as provided in these specifications, in which event the contract period
includes the new date of completion.
19. OFFICIAL PUBLICATIONS. The official publications are the formal resolutions and
notices relative to the proposed improvement that are required by law to be published in
a prescribed manner and that have actually been published in accordance with the
statutes relating thereto. Attention is directed to the fact that these official publications
are by statute vested with all of the force and effect of contract obligations.
20. A.S.T.M. Abbreviation for American Society for Testing Materials.
21. WORK. The term "Work" of the Contractor and Subcontractor includes labor or
materials or both, equipment, transportation, or other facilities necessary to complete the
contract.
22. TIME. All time limits stated in the contract documents are of the essence in the contract.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 2 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
SECTION B - SCOPE OF WORK
1. CORRELATION AND INTENT OF DOCUMENTS. The Contract documents are
complementary, and what is called for by any one shall be as binding as if called for by
all. The intention of the documents is to include all labor, materials, equipment, and
transportation necessary for the proper execution of the work. Materials or work
described in words which, so applied, have a well-known technical or trade meaning
shall be held to refer to such recognized standard.
2. DRAWINGS AND SPECIFICATIONS. Unless otherwise provided in the contract
documents, the engineer shall furnish to the Contractor, free of charge, all copies of
drawings and specifications reasonably necessary for the execution of the work.
The Contractor shall keep one (1) copy of all drawings and specifications on the work
available to the Engineer and to his representatives.
3. CONTRACTOR'S UNDERSTANDING. It is understood and agreed that the Contractor
has, by careful examination, satisfied himself as to the nature, character and location of
the work, the conformance to the ground, the character, quality, and quantity of the
materials to be encountered, the character of the equipment and facilities needed
preliminary to and during the prosecution of the work, the general and local conditions,
and all other matters which can, in any way, affect the work under this contract. No
verbal agreement or conversation with any officer, agent, or employee of the City, either
before or after the execution of the Contract, shall affect or modify any of the terms or
obligations herein contained.
4. REPORTING ERRORS AND DISCREPANCIES. If the Contractor, in the course of the
work, finds any discrepancies between the plans and the physical conditions of the
locality, or any errors of omission in plans or in the layout as given by said stakes and
instructions, it shall be his duty to inform the Engineer immediately, in writing, and the
Engineer shall promptly correct the same.
5. ALTERATION OR CORRECTION OF PLANS. The plans are made up from surveys
that are presumably correct and represent the foreseen construction requirements. Any
modification of the plans which may be required by the exigencies of the construction or
any corrections made necessary because of errors in the original surveys, will be made
by the Engineer. Should corrections or modifications of the plans or specifications
require a different quality or class of work than that upon which the unit prices in the
Proposal are based, or if the modifications or corrections are required in parts of the
work partially completed and such modifications result in an increased cost to the
Contractor, the amount to be paid for work resulting from such changes shall be agreed
upon in writing at the time the changes are ordered and before the work is begun by the
Contractor. No allowance will be made for anticipated profits on work not performed.
6. CHANGES IN THE WORK. The City, without invalidating the contract, may order extra
work or make changes by altering, adding to, or deducting from the work, the contract
sum being adjusted by agreement or arbitration before such changed work is
undertaken. All such work shall be executed under the conditions of the original
contract, except that any claim for extension of time caused thereby shall be adjusted at
the time of ordering such change.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 3 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
7. INCREASED OR DECREASED QUANTITIES. The right is reserved without impairing
the contract, to order the performance of such work of a class not contemplated in the
Proposal or to increase or decrease the quantities as may be considered necessary to
complete fully and satisfactorily the work included in the contract. However, when the
work is completed without change in the plans, and the measured quantity of any item of
work varies by more than twenty percent (20%) from the estimated quantity specified in
the contract, an adjustment in price may be made for such item of work by agreement
between the Engineer and the Contractor, subject to the approval of the City Council.
Either party to the contract may request such an adjustment.
8. LANDS AND RIGHT OF WAY. The City shall provide the lands upon which the work
under this contract is to be done, except that the Contractor shall provide land required
for the erection of temporary construction facilities and storage of his material, together
with the right of access to same.
9. CITY WATER. The Contractor shall be allowed to use City Water but before any water
is used, he shall make application to the Waterloo Water Works for a temporary water
connection from a fire hydrant or by some other connection method. Water usage will
be charged at the rate for temporary water service. The rules, regulations, and water
rates are available at the Waterloo Water Works offices at 325 Sycamore Street or their
telephone number is 319-232-6280.
10. RIGHTS OF VARIOUS INTERESTS. Whenever work being done by the City's forces or
by other Contractors is contiguous to work covered by this contract, the respective rights
of the various interests involved shall be established by the Engineer to secure the
completion of the various portions of the work in general harmony.
11. CLOSING STREETS TO TRAFFIC. The Engineer shall be the judge of how many
streets or parts of streets it is necessary for the Contractor to close at any time and may
refuse to permit the closing of additional streets until such of the work is finished and
opened to traffic as he may direct.
12. OBSTRUCTION OF STREETS. The work is to be carried on in such manner as to
obstruct the streets, highways, and alleys as little as possible. The Contractor shall
carry on the different parts of the work so as to complete the whole, as nearly as
practicable, at the same time. In doing the work, the Contractor shall follow the
directions of the Engineer as to the place or places where work shall be started or be
carried on and the direction in which it shall be done.
13. SHANTIES AND BUILDINGS. Shanties or other buildings shall not be erected in or
upon any street, highway, or alley without permission of the Engineer. If such
permission be granted, it may be upon any reasonable terms prescribed by the person
or body granting such permission.
14. SANITARY CONVENIENCES. The Contractor shall furnish the necessary sanitary
conveniences, properly secluded, for the laborers on the work, and these shall be
maintained in a manner that will be inoffensive to the public.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 4 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
15. CLEANING UP. The Contractor shall, as directed by the Engineer, remove from the
City's property and from all public and private property, at his own expense, all
— temporary structures, rubbish, and waste materials resulting from his operations before
work can be considered completed. The Contractor shall also renew or replace any and
all fences, sidewalks, or other property damaged or disturbed by his work.
16. OMISSION OF PARTS OF GENERAL SPECIFICATIONS. Parts of the General
Specifications deemed not to apply to some particular work may be omitted by special
reference in other parts of the contract documents.
SECTION C - CONTROL OF MATERIALS AND WORK
1. SUPERVISION AND INSPECTION. The Engineer shall have supervision of the
construction provided for in this Contract and shall decide any and all questions which
may arise as to the quality and acceptability of materials furnished, work performed,
manner of performance, rate of progress on the work, and all questions regarding the
acceptable fulfillment of the terms of the Contract. Materials and construction work shall,
at all times, be subject to the inspection of the Engineer or his representatives. The
Contractor shall be held strictly to the true intent of these specifications as regards the
quality of materials, workmanship, and the diligent prosecution of the work.
The Engineer and his representatives shall, at all times, have access to the work
wherever it is in preparation of progress, and the Contractor shall provide proper
facilities for such access and for inspection.
If the specifications, the Engineer's instructions, law ordinances, or any public authority
require any work and/or materials to be especially tested or approved, the Contractor
shall give the Engineer timely notice of readiness for inspection. If the inspection is to be
made by authority other than the Engineer, the Contractor shall notify the engineer of the
date fixed for inspection. Inspections by the Engineer will be promptly made and, where
practicable, at the source of supply. If any work should be covered up without the
approval or consent of the Engineer, it must, if required by the Engineer, be uncovered
for examination at the Contractor's expense.
Re-examination of questioned work may be ordered by the Engineer, and, if so ordered,
the work must be uncovered by the Contractor. If such work be found in accordance
with the Contract, the City shall pay the cost of re-examination and replacement. If such
work be found not in accordance with the Contract, the Contractor shall pay such cost
unless he shall show that the defect in the work was caused by another Contractor, and,
— in that event, the City shall pay the cost.
2. AUTHORITIES AND DUTIES OF INSPECTORS. Inspectors may be stationed on the
— work to report to the Engineer as to the progress of the work and the manner in which it
is being performed; also, to report whenever it appears that materials furnished and work
performed by the Contractor fail to fulfill the requirements of the specifications and
Contract, and to direct the attention of the Contractor to such failure or infringement; but
such inspection shall not relieve the Contractor from any obligations to furnish
acceptable materials or to provide completed construction that is satisfactory in every
particular.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 5 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
In case of any dispute arising between the Inspector and the Contractor as to materials
furnished or the manner of performing the work, the Inspector shall have the authority to
reject materials or suspend the work until the question at issue can be referred to and
decided by the Engineer. Inspectors are not authorized to revoke, alter, enlarge, relax,or release any requirements of these specifications. The Inspector shall, in no case, act
as foreman or perform other duties for the Contractor, or interfere with the management
of the work by the latter. —
3. STATUS OF THE ENGINEER. The Engineer shall have general supervision and
direction of the work. He has authority to stop the work whenever such stoppage may
be necessary to insure the proper execution of the Contract. He shall also have
authority to reject any work and/or materials which do not conform to the specifications,
to direct the application of forces to any portion of the work as, in his judgment, is
required, and to order the force increased or diminished, and to decide questions which
arise in the execution of the work.
4. ENGINEER'S DECISIONS. The Engineer shall, within a reasonable time, make
decisions on all claims of the Contractor and on all other matters relating to the
execution and progress of the work or the interpretation of the contract documents.
All such decisions of the Engineer shall be final except as to the element of time and
financial consideration involved, which, if no agreement in regard thereto is reached,
shall be subject to arbitration.
5. STAKES AND INSTRUCTIONS. The Contractor shall provide reasonable and
necessary opportunities and facilities for setting stakes and making measurements. The
Contractor shall not furnish stakes or men to set them. He shall not proceed until he has
received from the Engineer such stakes and instructions as may be necessary to the
progress of the work. _
The Contractor shall carefully preserve bench marks, reference points, and stakes, and
in case of willful or careless destruction, he shall be charged with the resulting extra
expense and shall be responsible for any mistakes that may be caused, by their loss or
disturbance.
6. SUPERINTENDENCE. The Contractor shall keep on his work during its progress a
competent superintendent and any necessary assistants, all satisfactory to the Engineer.
The Superintendent shall not be changed except with the consent of the Engineer,
unless the Superintendent proves to be unsatisfactory to the Contractor and ceases to —
be in his employ. The Superintendent shall represent the Contractor in his absence, and
all directions given to him shall be as binding as if given to the Contractor. Important
decisions shall be confirmed in writing to the Contractor. Other directions shall be so
confirmed on written request in each case.
The Contractor shall give efficient supervision to the work using his best skill and _
attention. He shall carefully study and compare all drawings, specifications, and other
instructions, and shall report at once to the Engineer any error, inconsistency, or
omission which he may discover.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 6 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
— Project No. 10110021 City of Waterloo, Iowa
7. REMOVAL OF UNAUTHORIZED WORK. Work done without lines and grade being
give, work done beyond lines shown on the plans or as given, except as herein provided,
or any extra or additional work done without authority, will be considered as
unauthorized and at the expense of the Contractor and will not be paid for under the
provisions of the Contract. Work so done may be ordered removed and replaced at the
— Contractor's expense.
8. REMOVAL OF DEFECTIVE MATERIALS OR WORK. The Contractor shall promptly
remove from the premises all materials condemned by the engineer as failing to conform
to the Contract; whether incorporated in the work or not, and the Contractor shall
promptly replace and re-execute his own work in accordance with the contract and
without expense to the City, and shall bear the expense of making good all work of other
Contractors destroyed or damaged by such removal or replacement.
_ If the Contractor does not remove such condemned work and materials within a
reasonable time, fixed by written notice, the City may remove them and may store the
material at the expense of the Contractor. If the Contractor does not pay the expense of
such removal within a reasonable time thereafter, the City may, upon ten (10) days'
written notice, sell such materials at auction or at private sale and shall account for the
net proceeds thereof, after deducting all the costs and expense that should have been
borne by the Contractor; or, if the net proceeds of such sale are insufficient to pay the
expenses of removal, the City may deduct the balance from any amounts due the
Contractor.
— 9. MATERIALS, EQUIPMENT, APPLIANCES, AND FACILITIES. Unless otherwise
stipulated, the Contractor shall provide and pay for all materials, labor, water, tools,
equipment, light, power, transportation, and other facilities necessary for the execution
and completion of the work. Materials shall be of the quality specified for each particular
part of the work.
_ Whenever, in construction of the work or in the manufacture of any article of appliance
necessary for the construction or operation of the work, it is necessary to use any
material that is not fully specified in these specifications, it shall be of good quality and
shall meet with the approval of the Engineer.
Any appliance that is necessary for the construction or operation of the work and is
commonly recognized as a part of the work, shall be furnished by the Contractor as part
— of the work, whether or not it is specifically called for in the plans and specifications, and
such appliance shall be of good quality and standard make and shall meet with the
approval of the Engineer.
10. MATERIAL SAMPLES. Before the contract is awarded, the bidder may be required to
furnish a statement of the origin, composition, and manufacture of any and all materials
proposed for use in the performance of the Contract, together with samples of the
material. These samples will be considered as representative and typical of the material
to be obtained from any particular source.
— 11. CHARACTER OF WORKMEN AND EQUIPMENT. The Contractor shall employ
competent and efficient workmen for every kind of work. Any person employed on the
work who shall refuse or neglect to obey the directions of the engineer or Inspector, or
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 7 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
who shall be deemed incompetent or disorderly, or who shall commit trespass upon
public or private property in the vicinity of the work, shall be dismissed when the
Engineer so orders, and shall not be re-employed unless express permission be given
by the Engineer. The Contractor shall, at all times, enforce discipline and good order
among his employees.
The methods, equipment, and appliances used on the work, and the labor employed,
shall be such as will produce a satisfactory quality of work and shall be adequate to
complete the contract within the specified time limit.
12. HIRING CITY EMPLOYEES. The Contractor shall not employ and hire any of the City's
employees without the permission of the Engineer.
13. LABOR. Local labor shall be given preferences so far as practicable.
14. THE CITY'S RIGHT TO DO WORK. If the Contractor should neglect to prosecute the
work properly or fail to perform any provision of this Contract, the City of Waterloo, after
three (3) days' written notice to the Contractor may, without prejudice to any other
remedy he may have, make good such deficiencies and may deduct the cost thereof
from the payment then or thereafter due the Contractor, provided, however, that the
Engineer shall approve both such action and the amount charged to the Contractor.
SECTION D - PROCEDURE AND PROGRESS
1. ORDER OF COMPLETION - USE OF COMPLETED PORTIONS. The Contractor shall
complete any portion or portions of the work in such order or time as the Engineer may
require. The City shall have the right to take possession of an use completed or partially
completed portion of the work at any time, but such taking possession and use shall not
be deemed an acceptance of work so taken or used, or any part thereof. If such prior
use increases the cost of or delays the work, the Contractor shall be entitled to such
extra compensation or extension of time, or both, as the Engineer may determine.
2. WEATHER. During stormy or inclement weather, all work shall be suspended, except
such as can be done in an acceptable manner. Permission to work during freezing,
stormy, or inclement weather shall in no way be construed as a release of the
Contractor's responsibility regarding the quality of the finished work at such time.
3. SUNDAYS AND LEGAL HOLIDAYS. Except for such work as may be required to
properly maintain or protect completed or partially completed construction or to maintain
lights and barricades, no work will be permitted on Sundays or legal holidays without
specific permission of the Engineer.
4. DELAYS AND EXTENSION OF TIME. If the Contractor be delayed in the completion of
the work by an act of neglect of the City, or its employees; or by any other Contractor
employed by the City; or by changes ordered in the work; or by strikes, lockouts, fire,
unusual delays in transportation, unavoidable casualties, or any cause beyond the
Contractor's control; or by delay authorized by the Engineer pending arbitration; or by
any cause which the Engineer shall decide justifies the delay, then the time of
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 8 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
completion shall be extended for such reasonable time as the Engineer may decide will
compensate for such delay.
No such extension shall be made for delay occurring more than thirty (30) days before
claim therefor is made in writing to the Engineer. In the case of a continuing cause of
delay, only one claim is necessary.
This article does not exclude the recovery of damages for delay by either party under
-- provisions in the contract documents.
5. TEMPORARY SUSPENSION OF WORK. The Engineer shall have authority to suspend
the work, wholly or in part, for such period or periods of time as he may deem
necessary, due to unsuitable weather or such other conditions as are considered
unfavorable for the suitable prosecution of the work, or for such time as is necessary due
to the failure to the Contractor to carry out orders given or to perform any or all
provisions of the Contract.
6. NOTICES - HOW SERVED. Any notice to be given by the City to the Contractor under
this contract shall be deemed to be served if the same be delivered to the man in charge
of any office used by the Contractor or his foreman or agent at or near the work, or
deposited in the post office, postpaid, addressed to the Contractor at his last known
place of business.
7. PROGRESS OF WORK. The progress of the work shall be such that, at the expiration
of one-fourth (1/4) of the contract period, one-eighth (1/8) of the work shall be
completed; at the expiration of one-half (1/2) of the contract period, three-eighths (3/8) of
the work shall be completed; at the expiration of three-fourths (3/4) of the contract
period, the work shall be three-fourths (3/4) completed, and the whole work shall be
completed at the expiration of the contract period.
If, at any time the above schedule is not being maintained, the Council may give written
notice to the Contractor and his sureties that the specifications are not being complied
with. Such notice shall state what action on the part of the Contractor is required to
bring the work within the requirements of the specifications. If the Contractor fails, within
ten (10) days, to proceed as directed in the said notice, then the Council shall. have
authority to annul this contract without process or action at law and take over the
prosecution and completion of the work, as provided under the article covering City's
right to terminate contract.
8. CITY'S RIGHT TO TERMINATE CONTRACT. If the Contractor should be adjudged a
bankrupt; or if he should make a general assignment for the benefit of this creditor; or if
a Receiver should be appointed on account of his insolvency; or if he should persistently
or repeatedly refuse or should fail, except in cases for which extension of time is
provided, to supply enough skilled workmen or proper materials; or if he should fail to
make prompt payment to Subcontractors or for materials or labor; or if he should
persistently disregard laws, ordinances, or the instructions of the Engineer; or if he
should otherwise be guilty of a substantial violation of any provision of the contract, then
the City, upon the certificate of the Engineer that sufficient cause exists to justify such
action, may, without prejudice to any other rights or remedy, and after giving the
Contractor seven (7) days' written notice, terminate the employment of the Contractor
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 9 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
and take possession of the premises and of all materials, tools and appliances thereon
and finish the work by whatever method he may deem expedient. In such cases, the —
Contractor shall not be entitled to receive any further payment until the work is finished.
If the unpaid balance of the contract price shall exceed the expenses of finishing the —
work, including compensation for additional managerial and administration services,
such excess shall be paid to the Contractor. If such expense shall exceed such unpaid
balance, the Contractor shall pay the difference to the City. The expense incurred by the —
City as herein provided and the damage incurred through the Contractor's default shall
be certified by the Engineer.
9. REMOVAL OF EQUIPMENT. In the case of annulment of this contract before
completion, from any cause whatsoever, the Contractor, if notified to do so by the City;
shall promptly remove any part or all of his equipment and supplies from the property of —
the City, failing which, the City shall have the right to remove such equipment and
supplies at the expense of the Contractor.
SECTION E - MEASUREMENTS AND PAYMENT
1. STANDARD OF MEASUREMENT. All work completed under the contract shall be —
measured by the Engineer according to the United States standard measures.
2. SCOPE OF PAYMENTS. The Engineer's measurements of quantities shall be the basis for final payment for the work performed under this Contract. After the work is
completed, the Engineer will make measurements and computations of the number of
units of each of the various items of work completed, and the Contractor will be paid for
the actual amount of work performed at the rates specified in his Proposal. Before final
settlement is made, the Council may require the Contractor to submit a list of all persons
furnishing labor or materials, with evidence that such persons have been paid in full. —
Payment shall be made in the manner set forth in official publications and Council
Proceedings relative thereto.
3. PAYMENT FOR EXTRA WORK. Such extra work as may have been ordered by the
Engineer and performed by the Contractor shall be compensated for as provided herein.
If work is to be done or materials are to be furnished by the Contractor which cannot
properly be classified under unit prices included in the Proposal, the Contractor shall be —
paid therefor the actual reasonable cost of the labor and materials entering permanently
in such work, plus fifteen percent (15%) of the cost thereof. In computing the labor cost
on such extra work, the following items shall be included: —
(a) Actual payroll expenditures for labor at the current rate therefor, and cost of
materials.
(b) Pay of foreman and timekeepers for actual time required on the extra work.
(c) Liability insurance, prorated, for the extra work.
Labor cost items on extra work shall be furnished in duplicate by the Contractor to the
Inspector daily. The Inspector shall check the items, and if he finds them to be correct,
he shall so certify on the statement of cost, returning one copy to the Contractor and
filing one copy with the Engineer.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 10 of 16
HR Green, inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
The Engineer shall determine the cost of materials entering into extra work from the
materials and receipted freight bills for the same.
For any special machine, power tools, or equipment, including fuel and lubricants, but
not including small hand tools, which may be deemed necessary or desirable to use, the
Contractor shall be allowed a reasonable rental thereon, to be agreed upon in writing by
the Engineer before such work is begun, and to which sum no percentage is to be
added.
The item of cost shall not include repairs or replacement of equipment or overhead
expenses of any character. The fifteen percent (15%) allowed is considered to cover the
use of hand tools and all overhead expenses except liability insurance.
In no case will a claim for extra compensation be allowed unless the work upon which
the claim is based has been ordered in writing, except as provided hereinafter.
4. CLAIMS FOR EXTRA COST. If the Contractor claims that any instructions, by drawings
or otherwise, involved extra cost under this contract, he shall give the Engineer written
notice thereof within ten (10) days after completion of the work.
No such claim shall be valid unless so made.
5. CLAIMS FOR EXTRA COMPENSATION. If the Contractor deems that extra
compensation is due him for work and/or materials that he considered is not clearly
covered in the items for which he submitted unit prices in his bid and that were not
ordered in writing by the Engineer as an extra s heretofore provided, the Contractor shall
notify the Engineer, in writing, of his intention to make claim for extra compensation for
work and/or material before starting construction. If such written notification is not given
or the Engineer is not afforded proper facilities by the Contractor for keeping strict
account of actual cost as defined herein, then the Contractor hereby agrees to waive the
claim for extra compensation. Such notice to the engineer and the fact that the Engineer
has kept account of cost as aforesaid, shall not in any way be construed as proving the
validity of the claim, which must be passed upon by the Council. In the event that the
` Council finds the claim to be just, it shall be allowed and paid for as extra work as
provided herein.
-- 6. COMPLETION REPORT AND OBJECTIONS THERETO. Within ten (10) days after the
full completion of the work to be done under this contract, the Engineer shall make a
written statement of all the work done by the Contractor hereunder, stating the quantity
of each item as found by him and including a statement of all credits for extra work and
all credits or debits for changes, alterations, omissions, and defects, and shall forthwith
deliver a copy of such statement to the Contractor. The Contractor shall compare such
statement with his own records and shall then, in writing, either approve such statement
or point out any claimed errors or omissions. If any of such claims are found correct, the
Engineer shall, within ten (10) days, prepare a new statement, a copy of which shall in
like manner be delivered unto the Contractor. The Engineer will not file a formal
completion report with the City until the Contractor has approved the same.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 11 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
If the figures of the Engineer and the Contractor cannot be reconciled, or there is a
difference of opinion regarding some item or items, then such difference of opinion shall
be submitted to arbitration as hereinafter provided, and the decision of the arbitrator or
arbitrators shall be final, and the Engineer shall, within a period of five (5) days, file his
completion report.
Before action by the City Council upon such completion report, the Contractor shall also
file a written statement of any claims he may have against the City, other than those
shown by such completion report, growing out of this contract or the work done
hereunder. The City shall retain ten percent (10%) of the amount due the Contractor on
the completion report for a period of thirty (30) days. If no claims are filed against the
Contractor within thirty (30) days, the final ten percent (10%) shall then be paid to the
Contractor.
7. WAIVER. By the execution of this contract ,the Contractor agrees that any objections he
may have to the statement of the amount of work done hereunder included by the
Engineer in this completion report, and any claims of the Contractor against the City
growing out of this contract and the work done hereunder which are not stated in writing
in the manner and within the time provided in Article 6, Section E hereof, shall be
waived, and no such claim shall thereafter be asserted against the City.
SECTION F - LEGAL RELATIONS AND RESPONSIBILITIES
1. LAWS RELATING TO WORK. The Contractor is presumed to be familiar with all laws,
ordinances, and regulations which may, in any manner, affect those engaged or
employed upon the work or the materials or equipment used in or upon the work, and
shall conduct the work so as not to conflict with such laws, ordinances, and regulations.
2. PROTECTION OF WORK AND PROPERTY. The Contractor for any part of the
improvement shall be held responsible for the care of materials and of partially
completed and completed work until final acceptance of the same by the Council. He
will be required to make good at his own expense any damage which the work may
sustain from any cause prior to the filing of the engineer's certificate of completion. He
shall take all risk from floods and casualties of every description and make no charge for
delay due to such cause. He may, however, be allowed a reasonable extension of time
on account of such delays. He shall correct or make good at his own expense all
damages to adjacent property due to the acts or negligence of his employees of the
prosecution of his work, and save the City harmless therefor.
The Contractor shall be held liable and responsible for all damages done to water,
sewer, drain, or other underground pipes and structures, and to sidewalks and private
property.
3. RESPONSIBILITY FOR ACCIDENTS. The Contractor shall assume full responsibility
for all damages sustained by persons or property due to the carrying on of his work until
final acceptance thereof, or until released by the Engineer in writing.
4. LIABILITY INSURANCE. The Contractor shall carry liability insurance which shall save
the City harmless and protect the public and any person from injury sustained by the
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 12 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
reason of the prosecution of the work or the handling or storing of materials therefor, and
said Contractor shall also carry liability insurance which shall meet the requirements of
the Iowa Worker's Compensation Law.
Before work shall be started on this contract, the Contractor shall furnish the City Clerk
with proper affidavit or Affidavits executed by representatives of duly qualified insurance
companies, evidencing that said insurance company or companies have issued liability
insurance policies, effective during the life of the contract, or for a period of a least ten
-� (10) days following the filing of written notice of cancellation, protecting the public and
any person from injuries or damages sustained by reason of carrying on the work
involved in the Contract. The affidavit shall specifically evidence the following forms of
insurance protection:
(a) Public liability insurance covering all operations performed by persons directly
employed by the Contractor.
(b) Public liability insurance covering all operations performed by any Subcontractor
to whom a portion of the work may have been assigned.
(c) Public liability insurance covering all work upon the project performed by any
independent Contractor working under the direction of either the principal
Contractor or a Subcontractor.
(d) Motor vehicle bodily injury liability insurance and property damage liability
insurance on all motor vehicles employed on the work, whether owned by the
Contractor or by other persons, firms, or corporations.
(e) The minimum protection shall be as follows:
Comprehensive General Liability Insurance
General Aggregate Limit $ 5,000,000.00
Products—Completed Operations
Aggregate Limit $ 5,000,000.00
Each Occurrence Limit $ 5,000,000.00
Comprehensive Automobile Liability
Insurance $ 1,000,000.00
The Contractor shall have the City of Waterloo, Iowa, named as an "Additional Named
Insured". A certificate, or a policy if requested, shall be filed with the Owner.
All certificates and/or policies of insurance furnished by the Contractor to be filed with
the City Clerk shall include the name and address of the agency issuing the same. It
shall also be required that the City Clerk be notified by registered mail of the cancellation
or expiration of the above insurance.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 13 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
5. BARRICADES AND SIGNS. The Contractor shall, at his own expense and without
further or other order, provide, erect, and maintain, at all times during the progress and —'
suspension of the work and until completion and final acceptance thereof, suitable and
requisite barricades, signs, or other adequate protection, as required by the latest edition
of the "Iowa Manual on Uniform Traffic Control Devices for Streets and Highways" and —
shall provide, keep, and maintain such barricades, signs, etc., as may be required or as
may be ordered by the City Engineer, to insure the safety of the public as well as those
engaged on the work. All barricading plans shall be approved by the City Engineer. —
6. ROYALTIES AND PATENTS. The Contractor shall pay all royalties and license fees.
He shall defend all suits or claims for infringement of any patent rights and shall save the —
City harmless from loss on account thereof, except that the City shall be responsible for
all such loss when a particular process or the product of a particular manufacturer is
specified. —
7. PERMITS AND REGULATIONS. Permits and licenses of a temporary nature for the
prosecution of the work shall be secured and paid for by the Contractor. Permits,
license, and easements for permanent changes in existing facilities shall be secured and
paid for by the City.
8. CLAIMS FOR DAMAGES. Any claim for damages arising under this Contract shall be —
made in writing to the party liable within a reasonable time of the first observance of
such damage and no later than the time of final payment, except as expressly stipulated
otherwise in the case of faulty work or materials, and shall be adjusted by agreement or —
arbitration.
The Contractor shall be held for the payment of all just claims against him arising out of
the prosecution of this contract, and his bond will not be released until such claims are
paid for dismissed.
9. ASSIGNMENT OF CONTRACT. The Contractor shall not sell or assign the contract or
sublet any portion of the work provided for therein without the written consent of the City
Council.
10. SUBCONTRACTORS. The Contractor shall, as soon as practicable after the signature
of the contract, notify the Engineer in writing of the names of the Subcontractors
proposed for the work and shall not employ any that the Engineer may, within a —
reasonable time, object to as incompetent or unfit.
The Contractor agrees that he is as fully responsible to the City for the acts and —
omission of his Subcontractors and of persons either directly or indirectly employed by
them as he is for the acts and omissions of persons directly employed by him.
Nothing contained in the contract documents shall create any contractual relation
between any Subcontractor and the City.
11. ARBITRATION. All questions subject to arbitration under this Contract shall be
submitted to arbitration at the choice of either party to the dispute.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 14 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
... Project No. 10110021 City of Waterloo, Iowa
The Contractor shall not cause a delay of the work during any arbitration proceedings,
except by agreement with the Engineer.
The demand for arbitration shall be filed in writing with the Engineer, in the case of an
appeal from his decision, within ten (10) days of its receipt, and in any other case, within
a reasonable time after cause thereof, and in no case later than the time of final
payment, except as otherwise expressly stipulated in the contract. If the Engineer fails
to make a decision within a reasonable time, an appeal to arbitration may be taken as if
his decision had been rendered against the part appealing.
No one shall be nominated or act as an arbitrator who is in any way financially interested
in the contract or in the business affairs of either the City or the Contractor.
The general procedure shall conform to the laws of the State of Iowa. Unless otherwise
provided by such laws, the parties may agree upon one arbitrator; otherwise, there shall
be three--one named in writing by each party to this contract to the other party, and the
third chosen by these two arbitrators, or, if they fail to select a third within ten (10) days,
then he shall be chosen by the Comptroller of the State of Iowa. Should either party
refuse or neglect to supply the arbitrators with any papers or information demanded in
writing, the arbitrators are empowered by both parties to proceed ex parte.
If there be one arbitrator, his decision shall be binding; if three, the decision of any two
shall be binding. Such decision shall be a condition precedent to any right of legal
action, and, wherever permitted by law, it may be filed in Court to carry it into effect.
The arbitrators, if they deem that the case demands it, are authorized to award to the
party whose contention is sustained such sums as they shall deem proper for the time,
expense, and trouble incident to the appeal, and, if the appeal was taken without
reasonable cause, damages for delay, the arbitrators shall fix their own compensation
unless otherwise provided by agreement, and shall assess the costs and charges of the
arbitration upon either or both parties.
The award of the arbitrators must be in writing, and it shall not be open to objections on
account of the form of proceeding or the award, unless otherwise provided by the laws of
Iowa.
In the event of such laws providing on any matter covered by this article otherwise than
as hereinbefore specified, the method of procedure throughout and the legal effect of the
award shall be wholly in accordance with the laws of the State of Iowa, it being intended
hereby to lay down a principle of action to be followed, leaving its local application to be
adopted to the legal requirements of the place in which the work is to be done.
12. PERFORMANCE AND PAYMENT BONDS. The Contractor shall, at the time of
execution and delivery of this contract and before the taking effect of same, furnish and
deliver to the City written bonds of indemnity to the amount required by law in form and
substance, and with surety thereon satisfactory and acceptable to the City, to insure the
faithful performance and payment by the Contractor of all the covenants and agreements
on the part of the Contractor contained in this contract. These bonds shall remain in
force and effect for the full amount of the Contract.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 15 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
13. PERSONAL LIABILITY OF PUBLIC OFFICIALS. In carrying out any of the provisions
of the Contract or in exercising any power or authority granted him thereby, there shall
be no liability upon the Engineer or his authorized assistants, either personally or as an
official of the City, it being understood that in such matters he acts as the agent and
representative of the City.
14. JURISDICTION. Any action in Court against the Contractor or sureties on his bond
because of damages to property or individuals by said Contractor or his workmen, or
because of the violation of any provisions of the specifications, or on account of the
failure of said Contractor to comply fully with these provisions, shall be brought in the
District Court of the State of Iowa in and for Black Hawk County.
15. TERMINATION OF RESPONSIBILITY. The Contract shall be considered as completed
and the Contractor released from further obligations except as to the requirements of his
bond, after the work has been completed and finally accepted and final estimates have
been allowed and the completion report of the engineer has been filed and approved by
the Council.
16. CITY'S LEGAL RIGHTS. The City shall not be precluded by any measurements,
estimate, or certificate made, either before or after the completion and acceptance of the
work and payment therefor, from showing the true amount and character of the work
performed and materials furnished by the Contractor, or from showing that any such
measurement, estimate, or certificate is untrue or incorrectly made, or the work or
materials do not, in fact, conform to the Contract.
The City shall not be precluded, notwithstanding any such measurements, estimate, or
certificate and payment in accordance therewith, from recovering from the Contractor
and his surety such damages as it may sustain by reason of his failure to comply with
the terms of the Contract. Neither the acceptance by the City or any of its
representatives, nor any payment for or acceptance of the whole or any part of the work,
nor any extension of time, nor any possession taken by the City, shall operate as a
waiver on any portion of the contract or of any power herein reserved, or any right to
damages herein provided. A waiver of any breach of the contract shall not be held to be
a waiver of any other or subsequent breach.
GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 16 of 16
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION
1. SUBCONTRACTS. The contractor shall cause appropriate provisions to be inserted
in all subcontracts relative to the work to require compliance by each subcontractor with
V-- the applicable provisions of the contract for the improvements embraced in this
contract.
2. REVIEW BY THE CITY OF WATERLOO. The City of Waterloo, its authorized
representatives and agents, shall at all times have access to and be permitted to
observe and review all work, materials, equipment, payrolls, personnel records,
employment conditions, material invoices, and other relevant data and records
pertaining to this contract, provided, however, that all instructions and approval with
respect to the work will be given to the contractor only by the City of Waterloo through
its authorized representative or agents.
3. INSPECTION. The contractor shall furnish promptly all materials reasonably necessary
for any tests, which may be required. All tests by the City of Waterloo will be
performed in such manner as not to delay the work unnecessarily and will be made in
accordance with the provisions of the Technical Specifications.
Inspection of materials and appurtenances to be incorporated in the improvements
embraced in this contract may be made at the place of production, manufacture or
shipment, whenever the quantity justifies it, and such inspection and acceptance,
unless otherwise stated in the Technical Specifications, shall be final, except as
regards (1) latent defects, (2) departures from specific requirements of the contract, (3)
damage or loss in transit, or (4) fraud or such gross mistakes as amount to fraud.
Subject to the requirements contained in the preceding sentence, the inspection of
materials as a whole or in part will be made at the project site.
4. WARRANTY OF TITLE. No material, supplies, or equipment to be installed or fur-
nished under this contract shall be purchased subject to any chattel mortgage or under
a conditional sale, lease-purchase or other agreement by which an interest therein or in
any part thereof is retained by the seller or supplier. The contractor shall warrant good
title to all materials, supplies, and equipment installed or incorporated in the work and
upon completion of all work, shall deliver the same together with all improvements and
appurtenances constructed or placed thereon by him to the City of Waterloo free from
any claims, liens, or charges.
Neither the contractor nor any person, firm, or corporation furnishing any material or
labor for any work covered by this contract shall have any right to a lien upon any
improvement or appurtenance thereon. Nothing contained in this paragraph, however,
shall defeat or impair the right of persons furnishing materials or labor to recover under
any bond given by the contractor for their protection or any rights under any law
permitting such persons to look to funds due the contractor in the hands of the City of
Waterloo.
SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 1 of 2
HR Green, Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
The provisions of this paragraph shall be inserted in all subcontracts and material
contracts and notice of its provisions shall be given to all persons furnishing materials
for the work when no formal contract is entered into for such materials.
SUPPLEMENTAL GENERAL SPECIFICATIONS FOR CONSTRUCTION Page 2 of 2
Division 01
GENERAL REQUIREMENTS
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City c f Waterloo, Iowa
SECTION 01100
SUMMARY
PART 1 GENERAL
1.01 PROJECT DESCRIPTION
A. Project Name:FY 2012 Chamberlain Demolition Phase 3
_ 550 Esther Street
Waterloo, Iowa 50703
B. Owner: City of Waterloo, Iowa
Address: 715 Mulberry, Waterloo, IA 50703
C. Engineer: HR. Green Inc.
Address: 8710 Earhart Lane SW, Cedar Rapids, IA 52404
Phone: (319) 841-4000
Fax: (319) 841-4012
D. This project includes demolitions, removals, and restoration at the former Chamberlain
Manufacturing Plant site located in Waterloo, Iowa. This is a continuation of previous
demolition and removal projects at the site. Work of this project consists of demolition
of the remainder of site structures, removal of footings and slabs (both Portland cement
concrete and asphaltic concrete), and removal of tanks. All debris from this project is
to be hauled off-site for disposal or recycling. Restoration includes backfilling and
grading with a combination of imported and on-site soils, spreading of *opsoil, seeding
and mulching.
1.02 MEASUREMENT AND PAYMENT
A. Refer to Section 01225 — Measurement and Payment.
1.03 CONTRACTS
A. Perform Work under a single unit price contract with Owner. Contractor may subcontract
a portion or portions of Work as provided in these specifications to fulfill the terms of the
Contract. Under no circumstances does the subcontracted Work relieve the Contractor
from fulfilling the terms of the Contract.
B. Prior to award of the contract, the lowest responsive responsible bidder shall file a list of
the names and subcontract amounts of all subcontractors who are exr ected to work on
the project. The Contractor shall not sub-contract more than 50% of the value of the
work. No sub-contract shall be made unless approved by the Owner.
1.04 COMMENCEMENT OF THE WORK
A. The Contractor shall not commence Work nor allow Subcontractors to commence Work
until:
1. The Agreement has been fully executed.
2. The Owner has approved the Contractor's Performance and Maintenance and
Payment Bonds.
SUMMARY 01100 - 1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
3. The Owner has approved evidence of the Contractor's Liability Insurance and
other insurance required to be purchased by the Contractor.
4. The Owner has issued a Notice to Proceed.
1.05 COMPLETION TIME
A. Work under the proposed Contract Documents shall commence immediately after
receipt of the Notice to Proceed and shall be completed and ready for use or operation,
subject to any extension of time which may be granted by the Owner, as defined in the
Contract.
1.06 OWNER OCCUPANCY
A. The Owner shall have the right to take possession of and use any completed or
partially completed portions of the Work, notwithstanding the time for completing the
entire Work or such portions as may not have expired; but such taking, possession and
use shall not be deemed an acceptance of any Work not completed in accordance with
the Contract Documents.
B. Schedule the Work to accommodate Owner occupancy and operations.
1.07 CONTRACTOR USE OF SITE AND PREMISES
A. General: Contractor shall have full use of premises for construction operations,
including use of Project site, during construction period. Contractor's use of premises is
limited only by Owner's right to perform work or to retain other contractors on portions
of Project.
B. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not
disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine constructions operations to within parcel as detailed on plans.
2. Driveways and Entrances: Keep driveways, access easements, and entrances
serving premises clear and available to Owner, Owner's employees, and
emergency vehicles at all times. Do not use these areas for parking or storage of
materials.
1.08 WORKING HOURS
A. Contractor shall limit work hours on the Project from 7:00 a.m. to 7:00 p.m., Monday
through Saturday unless otherwise directed by the Engineer.
B. The Contractor must request the Owner, in writing, 24 hours in advance of any
deviation to these hours, such as overtime or Sunday work. The Contractor is
responsible for all additional expenses due to additional work hours. This includes, but
is not limited to: Engineer's expenses, Owner's Representative, Testing Laboratory
personnel, etc. Such additional engineering charges shall be a subsidiary obligation of
Contractor and no extra payment shall be made by Owner on account of such overtime
work.
C. Contractor shall secure the site when not working or working after standard working
hours.
SUMMARY 01100 - 2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
1.09 WORK RESTRICTIONS
A. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by
adjacent owners, tenants, or others unless permitted under the following conditions
and then only after arranging to provide temporary utility services according to
requirements indicated:
1. Notify Owner not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Owner's written permission.
B. Haul Routes:
1. Notify Owner of all haul routes to disposal sites.
1.10 WORK SEQUENCE
A. Coordinate construction schedule and operations with Owner.
1.11 PERMITS, FEES AND NOTICES
A. Contractor shall secure and pay for all permits and governmental fees, licenses and
inspections for the proper execution and completion of the Work which are customarily
secured after execution of the Contract and which were legally required at the time bids
were received.
1. All necessary Federal, State, and Local permits required for any dewatering.
2. Procurement and compliance with NPDES General Permit No. 2 for "Storm
Water Discharge Associated With Industrial Activity For Construction Activities".
3. Demolition Permit from the City of Waterloo.
1.12 COMPLIANCE WITH APPLICABLE LAWS AND ORDINANCES
A. Contractor shall comply with all applicable Federal, State and local laws throughout the
duration of this Contract. The fact that the applicable laws are not specifically noted in
the Specifications does not relieve the Contractor of his responsibility to comply with
said laws.
1.13 GROUNDWATER MONITORING AND WATER PRODUCTION WELLS
A. The locations of ground water monitoring wells and water production wells are
indicated on the Drawings. Contractor shall take all precautions required to prevent
damage to these wells. If conflicts arise, resolve these conflicts with the Engineer.
B. Costs associated with damages to any well as a result of Contractor negligence shall
be deducted from the Contractor's final pay request.
PART 2 PRODUCTS
(Not Used)
PART 3 EXECUTION
(Not Used)
END OF SECTION
SUMMARY 01100-3
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
SECTION 01225
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Application for Payment.
2. Retainage.
3. Partial Payments.
4. Final Payment.
5. Change Orders.
6. Measurement and Payment— Unit Prices.
1.02 SCOPE
A. Payments to the Contractor shall be made on the basis of the Bid Schedule items as
full and complete payment for furnishing all materials, labor, tools and equipment,
and for performing all operations necessary to complete the Work included in the
Contract Documents. Such compensation shall also include payment for any loss or
damages arising directly or indirectly from Work, or from any discrepancies between
the actual quantities of work and those shown in the Contract Documents, or from
any unforeseen difficulties which may be encountered during the prosecution of the
work until the final acceptance by the Owner.
B. The amounts stated in the Bid Schedule shall include all costs and expenses for
Ara taxes, labor, equipment, materials, commissions, transportation and hauling, bonds,
permit fees, insurance, overhead and profit together with any and all other costs
associated with the performance of the work required under this Contract. The Basis
of Payment for an item at the price shown in the Bid Schedule shall be in accordance
with its description as related to the work specified and shown on the Drawings. Unit
prices where used will be applied to the actual quantities furnished and installed in
conformance with the Contract Documents.
C. The quotations on the Bid Schedule shall establish a total price for completing the
Work in its entirety. Unless specifically noted as a bid item in the Bid Schedule, all
other work which must be performed to complete the project shall be considered as
"Incidental Work". Should the Contractor feel that the cost for any item of work has
not been established by the Bid Schedule or Basis of Payment, he shall include the
cost for that work in some other applicable bid item, so that his Proposal for the
project does reflect his total price for completing the Work in its entirety.
D. Defect Assessment: The Work, or portions of the Work, not conforming to specified
requirements, shall be replaced. If, in the opinion of the Engineer, it is not practical
MEASUREMENT AND PAYMENT 01225 - 1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
to remove and replace the Work, the Engineer will direct an appropriate remedy or
adjust payment.
1.03 APPLICATION FOR PAYMENT
A. In accordance with the "Section E" in the General Specifications For Construction
and "Method of Payment To Contractor" described in the Notice of Public Hearing.
1.04 RETAINAGE
A. In accordance with the "Section E" in the General Specifications For Construction
and "Method of Payment To Contractor" described in the Notice of Public Hearing.
1.05 PARTIAL PAYMENT
A. In accordance with the "Section E" in the General Specifications For Construction
and "Method of Payment To Contractor" described in the Notice of Public Hearing.
1.06 FINAL PAYMENT
A. In accordance with the "Section E" in the General Specifications For Construction
and "Method of Payment To Contractor" described in the Notice of Public Hearing.
1.07 CHANGE ORDERS
A. If Owner desires a change in the Work, Engineer will notify Contractor and provide a
written description, in the form of drawings or otherwise, of the change.
B. Contractor shall promptly submit to Engineer in writing a firm proposal for changes in
the Contract Sum and Contract Time, if any, resulting from the proposed change.
C. Owner shall have 30 days or such time as may be agreed upon, in which to accept
or reject Contractor's proposal after its submission, and Contractor shall not modify
or withdraw the proposal during this period without Owner's consent.
D. Contractor may also propose changes by submitting a request for change to the
Engineer and Owner, describing the proposed change and its full effect on the Work.
Include a statement describing the reason for the change, and the effect on the
Contract Sum/Price and Contract Time with full documentation and a statement
describing the effect on Work by Contractor.
1.08 MEASUREMENT AND PAYMENT (UNIT PRICES)
A. The quantities set forth in the Bid Schedule are estimates and have been provided to
establish a uniform basis for the comparison of bids. Owner reserves the right to
increase or decrease the quantity of any class or portion of the work during the
progress of construction in accordance with the terms of the Contract.
MEASUREMENT AND PAYMENT 01225 -2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
B. Unit prices are used as a means of computing the final figures for bid and Contract
-- purposes, for periodic payments for work performed, for determining value of
additions or deletions and wherever else reasonable.
C. Quantities and measurements supplied or placed in the Work shall determine
payment. Actual quantities, as determined by the Engineer, will determine payment.
D. Unit prices shall be full compensation for items associated with the performance of
the work required under this Contract. Each payment item includes everything
necessary for a complete installation under that item, except materials or items for
which direct payment is otherwise provided.
E. Payment Items:
1. Mobilization and General Project Administration:
a. Mobilization and general project administration activities, including but not
limited to bonds, insurance, administration, scheduling, temporary facilities,
movement of personnel, equipment, supplies and incidentals, and all other
activities necessary to prepare and complete the Contract Work. Also
includes all administration, management, and coordination items required
for the project except those items for which direct payment is otherwise
—= provided.
b. Progress payments for mobilization and general project administration shall
be made as follows
• When 5% of the original bid amount is earned, either 25% of the
contract price for mobilization or 2.5% of the bid amount, whichever is
less, may be paid.
• When 10% of the original bid amount is earned, either 50% of the
contract price for mobilization or 5% of the bid amount, whichever is
less, may be paid.
• The remaining amount for this item will be paid out proportionately over
the duration of the Contract.
2. Site Specific Safety Plan Implementation:
a. Includes development and implementation of a site safety plan specific for
this Work over the duration of the project in accordance with the Contract
Documents.
b. The lump sum price for this item will be paid out proportionately over the
duration of the Contract.
3. Clearing and Grubbing:
a. Includes removal and proper disposal of all woody and other herbaceous
vegetation within the project limits. Rubbish removal is incidental to the
"Demolition of Remaining Structures" item.
b. Payment will be at the lump sum price for this item.
MEASUREMENT AND PAYMENT 01225- 3
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
4. Remove and Dispose of Above Ground Tanks:
a. Includes removal, hauling, and disposal of designated tanks. Removal of —
concrete tank pads and foundations shall be included in the "Removal of
Portland Cement Concrete Slabs and Foundations" item.
b. Payment will be at the lump sum price for this item.
5. Demolition of Remaining Structures:
a. Includes demolition of identified structures including a shed, well-house,
and remnants of an electrical substation. Includes removal, hauling and off-
site disposal of structures and contents. This item also includes removal
and disposal of all trash, poles, railings, and surface debris within the
project limits that is not accounted for in other bid items. Backfilling of pits
and depressions, and general grading of the demolition and removal areas
is incidental to this item.
b. Payment will be at the lump sum price for this item
6. Demolition and Removal of Railroad Spur:
a. Includes demolition of a railroad spur within project limits. Includes —
removal, hauling, and disposal (or recycling) of steel rails and wood ties.
Backfilling and general grading of the rail spur demolition and removal area
is incidental to this item.b. Payment will be at the lump sum price for this item
•
7. Removal of Portland Cement Concrete Slabs and Foundations: _
a. Includes removal of all Portland concrete slabs and foundations within the
project limits to a depth of 42 inches. Removal and disposal of non-
hazardous debris (piping, trash, etc.) in the conduct of extracting slabs and
foundations is incidental to this item. Backfilling and general grading of the
slab and foundation removal area is incidental to this item.
b. Payment will be at the Contract unit price per ton of Portland concrete
material removed from the site. Measurement of quantities will be
documented by a certified scale in accordance with the specifications.
8. Removal of Asphaltic Concrete Slabs:
a. Includes removal of asphaltic slabs (driveways and parking lots).
Backfilling and general grading of the slab removal area is incidental to this
item. --
b. Payment will be at the Contract unit price per square yard of slab removed.
Measurement of quantities will be documented by the Engineer.
9. Imported Backfill:
a. Includes furnishing clean general backfill in accordance with the Contract
Documents for use in supplementing on-site soils in backfilling excavations
resulting from demolitions and removals. This item is for furnishing material
only. Placement and grading of the material is incidental to demolition and
removal items.
MEASUREMENT AND PAYMENT 01225-4
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
3.04 SUBMITTALS
A. Required submittals are specified in individual sections.
3.05 NUMBER OF COPIES OF SUBMITTALS
-- A. Documents for Review:
1. Submit the number of copies which the Contractor requires, plus three copies
which will be retained by the Engineer.
B. Documents for Information: Submit two copies.
3.06 SUBMITTAL PROCEDURES
A. Transmit each submittal with Contractor's standard submittal form.
B. Schedule submittals to expedite the Project, and deliver. Coordinate submission of
related items.
C. When the shop drawings have been completed to the satisfaction of the Engineer,
carry out the construction in accordance therewith and make no further changes
therein except upon written instructions from the Engineer.
3.07 ENGINEER'S REVIEW RESPONSIBILITIES, PROCEDURES AND DEFINITIONS
A. General
1. Review of shop drawings, data, and samples will be for general conformance with
the design concept and Contract Documents. They shall not be construed:
a. As permitting any departure from the Contract requirements;
b. As relieving the Contractor of responsibility for any errors, including details,
dimensions, and materials;
c. As approving departures from details furnished by the Engineer, except as
otherwise provided herein;
d. As approving substitutions to specified products or manufacturers.
B. All submittals that have been reviewed by Engineer will have Engineer's Review
-- Stamp affixed, initialed and dated, indicating Engineer's review action. No
submittals shall be used for construction unless they bear the initialed Engineer's
Review Stamp.
3.08 RE-SUBMITTALS
A. Re-submittals will be handled in the same manner as first submittals. On re-submittals,
direct specific attention, in writing on the transmittal letter and on re-submitted shop
drawings by use of revision triangles or other similar methods, to revisions other than
the corrections requested by the Engineer, on previous submissions. Any such
revisions which are not clearly identified shall be made at the risk of the Contractor.
Make corrections to any work done because of this type revision that is not in
accordance to the Contract Documents as may be required by the Engineer.
END OF SECTION
ADMINISTRATIVE REQUIREMENTS 01300- 3
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
SECTION 01350
-- ON-SITE HEALTH AND SAFETY REQUIREMENTS
-- PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Health and Safety requirements.
1.02 MEASUREMENT AND PAYMENT
A. Refer to Section 01225— Measurement and Payment.
1.03 DESCRIPTION
A. Contractor is responsible for implementation and enforcement of safe Work practices
including, but not limited to, personnel exposure to refuse, hazardous materials; use of
trenching, sheeting, and shoring; scaffolding; materials handling; operation of
equipment; and safety of public during progress of Work.
1.04 QUALITY ASSURANCE
— A. Regulatory Requirements:
1. Contractor shall plan for and ensure personnel comply with basic provisions of
OSHA Safety and Health Standards (29 CFR 1910), and General Construction
Standards (29 CFR 1926) as appropriate.
2. Comply with applicable laws and regulations of any public body having jurisdiction
for safety of persons or property.
1.05 OPERATIONS AND EQUIPMENT SAFETY
A. Contractor is responsible for initiating, maintaining, and supervising safety precautions
and programs in connection with Work. Contractor shall take necessary precautions
for safety of employees on Project site and other persons and organizations who may
be affected by Project.
B. Contractor's duties and responsibilities for safety in connection with Work shall
continue until such time as Work is complete as applicable under the Contract.
1.06 HEALTH AND SAFETY
A. Contractor is responsible for implementation and enforcement of health and safety
requirements and will take necessary precautions and provide protection for following.
1. Personnel working on or visiting Project site, irrespective of employer.
2. Work and materials or equipment to be incorporated in Work area on- or off-site.
3. Other property at or adjacent to Project site.
4. Public exposed to job related operations or potential release of toxic or hazardous
materials.
B. Contractor shall prepare site-specific health and safety plan (HASP) following the
ON-SITE HEALTH AND SAFETY REQUIREMENTS 01350 - 1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
requirements of 29-CFR 1910.120, and 29-CFR 1910.146. Such plan shall include
appropriate measures for confined space entry as project conditions warrant. If —
Contractor does not have capability to prepare HASP, Contractor shall employ
consultants with appropriate capabilities. Contractor is solely responsible for
adequacy of HASP's preparation, monitoring, management, and enforcement. At —
minimum, Contractor's HASP shall address following.
1. Site description and history.
2. Project activities, including coordination with other Contractors. —
3. Hazard evaluation.
4. On-site safety responsibilities.
5. Work zones.
6. Personnel training.
7. Medical monitoring.
8. Atmospheric monitoring.
9. Personal protection, clothing, and equipment.
10. Decontamination procedures.
11. Emergency procedures.
1.07 ENGINEER'S RESPONSIBILITIES
A. When Engineer is required to be present on Project site to perform engineering
services, Engineer will comply with Contractor's safety plans, programs, and —
procedures.
B. If Engineer determines Contractor's safety plans, programs, and procedures do not
provide adequate protection for Engineer, Engineer may direct its employees to leave
Project site or implement additional safeguards for Engineer's. If taken, these actions
will be in furtherance of Engineer's responsibility to its own employees only, and
Engineer will not assume responsibility for protection of any other persons affected by
Work.
C. If Engineer observes situations which appear to have potential for immediate and
serious injury to persons, Engineer may warn persons who appear to be affected by
such situations. Such warnings, if issued, shall be given based on general
humanitarian concerns, and Engineer will not, by issuance of any such warning,
assume responsibility to issue future warnings or any general responsibility for —
protection of persons affected by Work.
1.08 SUBMITTALS ^
A. Submit copies of HASP to Owner and Engineer within 10 days after Notice to Proceed.
Work on-site shall not proceed until HASP has been submitted.
1. Submittal of Contractor's HASP to Engineer is to inform Engineer and Owner so —
they can comply with HASP during performance of their on-site responsibilities as
described in Contract Documents.
2. Submittal of Contractor's HASP shall neither impose on Engineer responsibility for
adequacy of HASP nor relieve Contractor from full responsibility therefore.
ON-SITE HEALTH AND SAFETY REQUIREMENTS 01350 -2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
PART 2 PRODUCTS
(Not Used)
PART 3 EXECUTION
(Not Used)
END OF SECTION
ON-SITE HEALTH AND SAFETY REQUIREMENTS 01350 -3
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City cf Waterloo, Iowa
SECTION 01500
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Temporary construction facilities for Engineer and Contractor including telephone,
water, sanitary, security, temporary fencing, parking, scale, and field office.
1.02 MEASUREMENT AND PAYMENT
A. Refer to Section 01225— Measurement and Payment.
1.03 QUALITY ASSURANCE
B. Items provided under this section shall be listed and labeled by UL or other Nationally
Recognized Testing Laboratory (NRTL).
1. Term "NRTL" shall be as defined in OSHA Regulation 1910.7.
2. Terms "listed" and "labeled" shall be as defined in National Electrical Code,
Article 100.
C. Regulatory Requirements:
1. National Electrical Code (NEC): Components and installation shall comply with
National Fire Protection Code (NFPA) 70.
D. Comply with federal, state, and local codes and regulations, and with utility company
requirements.
PART 2 PRODUCTS
2.01 TEMPORARY UTILITIES
A. Contractor shall provide and pay for all electrical power, lighting, water, heating and
cooling, and ventilation required for construction purposes.
2.02 TEMPORARY HEAT
A. Contractor shall provide and pay for heat devices and heat as requi^ed to maintain
specified conditions for construction operations.
2.03 TEMPORARY TELEPHONE SERVICE
A. A cellular phone shall be acceptable as temporary phone service. Provide telephone
number(s) at which responsible representatives of Contractor cal be reached
evenings, weekends and holidays.
2.04 TEMPORARY WATER SERVICE
A. Make suitable arrangements for temporary water service as requ red for Work.
Contractor shall provide and pay for water service and all water used.
TEMPORARY FACILITIES AND CONTROLS 01500 - 1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa —
2.05 TEMPORARY SANITARY FACILITIES —
A. Provide and maintain temporary toilet facilities and enclosures for Contractor's workers,
Engineer's personnel and Owner's personnel. Provide at time of project mobilization and maintain until project completion.
B. Portable toilets shall be acceptable. Comply with all applicable codes and regulations.
Arrange for regular cleaning and/or replacement of portable toilets. —
C. Maintain daily in clean and sanitary condition.
D. Provide portable toilets with hand sanitizer dispensers and adequate supply of hand
sanitizer.
2.06 BARRIERS
A. Provide barricades required by governing authorities for public rights-of-way and for
public access to existing structures, if required.
B. Provide protection for plants designated to remain. Replace damaged plants.
C. Protect vehicular traffic, stored materials, site, and structures from damage.
2.07 FENCE AND GATES
A. Maintain existing fencing sufficient to prevent unauthorized entry to construction areas
and to protect existing facilities and adjacent properties from damage from construction
operations.
B. Materials shall be sufficiently durable to be effective for duration of construction period.
C. Lock gates as needed to prevent unauthorized entry. —
2.10 FIELD OFFICES AND BUILDINGS
A. If required by Contractor, erect where designated by Engineer, and maintain in good
condition, temporary field office, tool, and storage building(s) for Contractor's use.
1. Tool storage building(s) shall be of ample size to provide space for tools and
equipment. —
2. Building(s) shall be neat and well constructed, surfaced with plywood, drop siding,
masonite, or other similar material, well painted and void of advertisements.
2.11 WEIGHING EQUIPMENT —
A. Contractor is required to provide scale for measurement of bid items that are based on
weight. Scale may be located either on-site or off-site. --
1. Weighing equipment shall meet IDOT 2001.07.
2. Be accurate to 2 lbs per 1,000 lbs of weight.
3. All trucks to be weighed shall be initially tared before being loaded and daily
thereafter.
B. Scale tickets
1. Accompany each load to be furnished to the Engineer —
TEMPORARY FACILITIES AND CONTROLS 01500 -2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
2. Scale tickets also to be furnished when tares are determined for verification and
check weighing.
C. Check weighing and verification weighing may be made at any time as directed by the
Engineer. The Engineer may check the operation of the equipment at any time.
PART 3 EXECUTION
3.01 WATER CONTROL
A. Conform to the regulations and requirements of legally authorized surface water
management agencies.
B. Grade site to drain. Maintain excavations free of water. Provide, operate, and
maintain pumping equipment.
C. Keep trenches and other areas free from water as required to allow continuous
progress of work, to prevent damage to Contractor's work, and to work of others.
-- D. Conduct operations in such a manner to prevent sediment from reaching existing
sewers, storm drains, and river.
E. Protect site from puddling or running water. Provide water barriers as required to
protect site from soil erosion.
F. Cover exposed excavated areas and spoil piles when runoff from rain is likely to cause
turbidity to enter local waterways. Suspend work in the rain if such work cannot be
performed without causing turbid runoff.
G. Where necessary, divert runoff through closed pipe system to minimize downstream
-- erosion, sedimentation, and turbidity during construction.
3.02 SECURITY
A. Provide security and facilities to protect Work, existing facilities, and Owner's
operations from unauthorized entry, vandalism, or theft.
B. Coordinate with Owner's security program and City Police Department.
3.03 VEHICULAR ACCESS AND PARKING
A. Maintain existing roads.
B. Coordinate access and haul routes with governing authorities and Owner.
C. Construct and maintain temporary roads accessing public thoroughfares to serve
construction area.
D. Extend and relocate as Work progress requires. Provide detours necessary for
unimpeded traffic flow.
E. Provide and maintain access to fire hydrants, free of obstructions.
F. Provide means of removing mud from vehicle wheels before entering streets.
TEMPORARY FACILITIES AND CONTROLS 01500 - 3
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
G. Do not allow vehicle parking on existing pavement.
3.04 PROTECTION OF INSTALLED WORK
A. Protect installed Work and provide special protection where specified in individual
specification Sections.
B. Provide temporary and removable protection for installed Products. Control activity in
immediate work area to prevent damage.
3.05 CLEAN UP
A. Street Cleaning:
1. Prevent dirt and dust from escaping trucks departing the project site by covering
dusty loads, washing truck tires before leaving the site, or other reasonable
methods.
2. Clean paved streets and roadways as required by the Engineer to remove dirt
caused by the contractor's activities.
3. If above requirements are violated and no action taken after notification of
infraction by Engineer, Owner reserves the right to have streets in question
cleaned. The expense of the operation shall be charged to the Contractor.
3.06 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary utilities, equipment, facilities, materials, prior to Final Application for
Payment inspection.
B. Clean and repair damage caused by installation or use of temporary work.
C. Restore new permanent facilities used during construction to specified condition.
END OF SECTION
TEMPORARY FACILITIES AND CONTROLS 01500-4
HR Green Inc. FY 2012 Chamberlain Demolition
Project No. 10110021 City of Waterloo, Iowa
SECTION 01570
ENVIRONMENTAL PROTECTION AND SPECIAL CONTROLS
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Requirements to minimize pollution of air, water, or land; control of noise, and the
disposal of solid waste materials.
a. Control of erosion and sedimentation due to construction activities.
b. Solid waste disposal.
c. Control of chemical waste.
d. Control of dust.
e. Control of noise.
f. Protection of roadways.
1.02 MEASUREMENT AND PAYMENT
A. Refer to Section 01225 — Measurement and Payment.
1.03 SUBMITTALS
A. Contractor's Storm Water Pollution Prevention Plan.
B. Submit in accordance with Section 01300.
1.04 REFERENCES
A. EPA National Pollutant Discharge Elimination System (NPDES), Const uction General
Permit; current edition; http://cfpub.epa.gov/npdes/stormwater/cgp.cfm.
B. FHWA FLP-94-005 - Best Management Practices for Erosion and Sediment Control;
Federal Highway Administration; 1995.
1.05 NPDES PERMIT
A. Contractor shall procure and pay for the required National Pollutant Discharge
Elimination System (NPDES) General Permit Number 2 for "Storm Water Discharge
Associated with Industrial Activity for Construction Activities".
B. Provide all monitoring and test reporting relating to the discharges as !equired by the
permit.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
3.01 GENERAL
ENVIRONMENTAL PROTECTION AND SPECIAL CONTROLS 01570 - 1
HR Green Inc. FY 2012 Chamberlain Demolition
Project No. 10110021 City of Waterloo, Iowa
A. Employ and utilize environmental protection methods, obtain all necessary permits,
and fully observe all local, state, and federal regulations. Contractor shall be —
responsible for any and all fines imposed by any regulatory agency due to the
Contractors activities.
B. Land Protection:
1. Except for any work or storage area and access routes specifically assigned for the
use of the Contractor, the land areas outside the limits of construction shall be
preserved in their present condition. Contractor shall confine his activities to areas —
defined for Work within the Contract Documents.
2. Manage and control all borrow areas, work or storage areas, access routes and
embankments to prevent sediment from entering nearby water or land adjacent to
the work site.
3. Restore all disturbed areas and establish permanent type of locally adaptable
vegetative cover. Grade all disturbed areas to drain and prevent on-site ponding of
water.
4. Unless earthwork is immediately paved or surfaced, protect all side slopes and
backslopes immediately upon completion of final grading.
5. Plan and execute earthwork in a manner to minimize duration of exposure of
unprotected soils.
6. Except for areas designated by the Contract Documents to be cleared and
grubbed, the Contractor shall not deface, injure or destroy trees and vegetation,
nor remove, cut, or disturb them without approval of the Engineer. Any damage
caused by the Contractor' equipment or operations shall be restored as neatly as
possible to its original condition at the Contractor's expense.
3.02 EROSION AND SEDIMENTATION CONTROL
A. Prepare a Storm Water Pollution Prevention Plan:
1. Submit copy to Engineer prior to start of site work.
2. Include:
a. Site plan identifying soils and vegetation, existing erosion problems, and areas —
vulnerable to erosion due to topography, soils, vegetation, or drainage.
b. Site plan showing grading; new improvements; temporary roads, traffic
accesses, and other temporary construction; and proposed preventive
measures.
c. Where extensive areas of soil will be disturbed, include storm water flow and
volume calculations, soil loss predictions, and proposed preventive measures.
d. Schedule of temporary preventive measures, in relation to ground disturbing
activities.
e. Other information required by law.f. Format required by law is acceptable, provided any additional information
specified is also included.
3. Obtain the approval of the Plan by authorities having jurisdiction.
B. Erosion Protection:
1. Utilize methods necessary to effectively prevent erosion and control of
sedimentation. Such methods may include but are not necessarily limited to the
following:
ENVIRONMENTAL PROTECTION AND SPECIAL CONTROLS 01570 -2
HR Green Inc. FY 2012 Chamberlain Demolition
Project No. 10110021 City of Waterloo, Iowa
a. Retardation: Mechanically retard rate of runoff by construction of diversion
ditches, terraces, and berms. Divert run off to protect drainage courses.
b. Protect side and backslopes as soon as rough grading is complete by
accelerated growth of permanent vegetation, temporary vegetation, mulching
or netting.
c. Where slopes are too steep for stabilization, use hydroseeding, mulching
anchored in place, cover by anchored netting, sodding, or combination to
prevent erosion.
d. Remove temporary protection prior to final grading operations.
C. Comply with all requirements of U.S. Environmental Protection Agency and Iowa
Department of Natural Resources for erosion and sedimentation control.
D. Best Management Practices Standard: Federal Highway Administration Best
Management Practices for Erosion and Sediment Control.
_ E. Do not begin clearing, grading, or other work involving disturbance of ground surface
cover until applicable permits have been obtained; furnish all documentation required
to obtain applicable permits.
1. Obtain and pay for permits and provide security required by authority having
jurisdiction.
2. Owner will withhold payment to Contractor equivalent to all fines resulting from
non-compliance with applicable regulations.
F. Timing: Put preventive measures in place as soon as possible after disturbance of
surface cover and before precipitation occurs.
G. Storm Water Runoff: Control increased storm water runoff due to disturbance of
surface cover due to construction activities for this project.
1. Prevent runoff into storm and sanitary sewer systems, including open drainage
-- channels, in excess of actual capacity or amount allowed by authorities having
jurisdiction, whichever is less.
2. Anticipate runoff volume due to the most extreme short term and 24-hour rainfall
events that might occur in 25 years.
H. Erosion On Site: Minimize wind, water, and vehicular erosion of soil on project site
due to construction activities for this project.
1. Control movement of sediment and soil from temporary stockpiles of soil.
2. Prevent development of ruts due to equipment and vehicular traffic.
3. If erosion occurs due to non-compliance with these requirements, restore eroded
areas at no cost to Owner.
I. Erosion Off Site: Prevent erosion of soil and deposition of sediment on other
properties caused by water leaving the project site due to construction activities for this
project.
1. Prevent windblown soil from leaving the project site.
2. Prevent tracking of mud onto public roads outside site.
— 3. Prevent mud and sediment from flowing onto sidewalks and pavements.
4. If erosion occurs due to non-compliance with these requirements, restore eroded
areas at no cost to Owner.
ENVIRONMENTAL PROTECTION AND SPECIAL CONTROLS 01570 -3
HR Green Inc. FY 2012 Chamberlain Demolition
Project No. 10110021 City of Waterloo, Iowa
J. Sedimentation of Waterways On Site: Prevent sedimentation of waterways on the
project site, including rivers, streams, lakes, ponds, open drainage ways, storm
sewers, and sanitary sewers.
1. If sedimentation occurs, install or correct preventive measures immediately at no
cost to Owner; remove deposited sediments; comply with requirements of
authorities having jurisdiction.
2. If sediment basins are used as temporary preventive measures, pump dry and
remove deposited sediment after each storm.
K. Sedimentation of Waterways Off Site: Prevent sedimentation of waterways off the
project site, including rivers, streams, lakes, ponds, open drainage ways, storm
sewers, and sanitary sewers.
1. If sedimentation occurs, install or correct preventive measures immediately at no
cost to Owner; remove deposited sediments; comply with requirements of
authorities having jurisdiction.
L. Open Water: Prevent standing water that could become stagnant.
M. Maintenance: Maintain temporary preventive measures until permanent measures
have been established.
3.03 SOLID WASTE DISPOSAL
A. Contractor generated:
1. Collect solid waste on a daily basis.
2. Dispose of non-hazardous waste generated on-site at an approved facility.
3. Solid waste generated off-site shall not be brought onto or accepted at the site as
part of this Contract.
4. Refer to individual specification sections for disposal requirements for other solid
waste, demolition debris, and non-hazardous waste resulting from this project. —
3.04 CONTROL OF DUST
A. The control of dust shall mean that no construction activity shall take place without
applying all such reasonable measures as may be required to prevent particulate
matter from becoming airborne so that it remains visible beyond the limits of
construction.
B. Utilize methods and practices of construction to eliminate dust in full observance of
agency regulations.
C. The Engineer will determine the effectiveness of the dust control program and may
request the Contractor to provide additional measures, at no additional cost to Owner.
3.05 PROTECTION OF AIR QUALITY A. Minimize air pollution by requiring use of properly operating combustion emission
control devices on construction vehicles and equipment and encourage shutdown of
motorized equipment not in use.
B. Do not burn trash on construction site.
ENVIRONMENTAL PROTECTION AND SPECIAL CONTROLS 01570-4
HR Green Inc. FY 2012 Chamberlain Demolition
Project No. 10110021 City of Waterloo, Iowa
3.06 CONTROL OF NOISE
-- A. Conduct operations to cause least annoyance to residents in vicinity of Work, and
comply with applicable local ordinances.
B. Equip compressors, hoists, and other apparatus with mechanical devices necessary to
minimize noise and dust. Equip compressors with silencers on intake lines.
C. Equip gasoline or oil-operated equipment with silencers or mufflers on intake and
exhaust lines.
D. Route vehicles carrying soil, debris, or other material over such streets as will cause
least annoyance to public and do not operate on public streets outside of times
specified in Contract Documents.
3.07 PROTECTION OF ROADWAYS
A. Contractor is responsible for maintenance and restoration of public roads used for
hauling of materials and equipment to and from the site.
B. Contractor shall clean debris resulting from his operations from the haul roads on a
"- daily basis, or as instructed by the Engineer.
C. The Contractor shall not utilize local storm sewer inlets to wash and remove debris
from the haul roads.
D. All hauling operations on- and off-site shall be completed in a manner that minimizes
deposition of litter and debris on adjacent roadways.
3.08 FUELS AND LUBRICANTS
A. Comply with local, state and federal regulations concerning transportation and storage
of fuels and lubricants.
B. Fuel storage area and fuel equipment shall be approved by Engineer prior to
installation. Submit containment provisions to Engineer for approval.
C. Report spills or leaks from fueling equipment or construction equipment to Engineer
and cleanup as required.
-- D. Engineer may require Contractor to remove damaged or leaking equipment from
Project site.
3.09 COMPLETION OF WORK
A. Upon completion of work, leave area in a clean, natural looking condition.
B. Remove all signs of temporary construction and activities incidental to construction of
required permanent work.
-- END OF SECTION
ENVIRONMENTAL PROTECTION AND SPECIAL CONTROLS 01570 - 5
Division 02
SITE WORK
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City jf Waterloo, Iowa
SECTION 02200
— SITE PREPARATION
PART 1 GENERAL
1.01 SECTION INCLUDES
— A. Traffic control measures during demolition activities adjacent to public streets and
sidewalks, and during hauling operations.
B. Disconnection, capping and protection of existing utilities.
C. Removal trees and vegetation.
D. Removal of debris and trash on property grounds.
E. Related Sections
1. Section 01500 - Temporary Facilities and Controls
2. Section 02221 —Demolition and Removals
1.02 MEASUREMENT AND PAYMENT
A. Refer to Section 01225 — Measurement and Payment.
PART 2 PRODUCTS
(Not Used)
PART 3 EXECUTION
3.01 TRAFFIC CONTROL MEASURES
A. Determine haul routes and obtain approval of agency having jurisdiction over proposed
roadway.
B. Street or lane closures shall be coordinated with the appropriate Jurisdiction authority.
It shall be the Contractor's responsibility to acquire the necessary obstruction permits
and to place adequate barricades and warning signs.
1. Street closings shall be kept to the minimum time necessary to coriplete the work.
The City or Engineer will determine how many streets or parts of streets may be
closed by the Contractor at one time, and may refuse to allow the closing of
additional streets or portions of streets until some of the improvement is finished
and opened to traffic.
2. Notify the Engineer 48 hours in advance (excluding weekends) of closing any
roads, streets, or public thoroughfares. No road or street shall be closed without
prior approval from the Engineer.
C. Arrange and pay for traffic control measures, such as temporary Barr cades, signage
and signals, to minimize interference with pedestrian and vehicular traffic, and to
SITE PREPARATION 02200 - 1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
provide protection for and from Contractor onsite operations and hauling to/from the
project site.
1. As required by local, state and/or federal requirements, such as specified by the
Federal Highway Administration Manual on Uniform Traffic Control Devices, 1988,
plus supplements, and the Iowa Manual on Uniform Traffic Control Devices —
(MUTCD).
2. Erect and maintain from initiation of project through final completion, as necessary.
D. During construction, areas to be maintained for traffic shall be kept clear of all
hazardous materials, including but not limited to construction debris, dust, and mud.
E. Existing Permanent Signage
1. Do not remove, relocate, or reset any permanent City traffic control devices unless
authorized to do so by the Engineer or contract documents. If a sign must be
removed or relocated for any phase of construction, notify the Engineer of the
necessity for removal. The Engineer shall arrange for the removal, relocation, or
resetting of permanent traffic control devices by City personnel as needed to allow
the work to proceed. If City personnel are not available, the authorized City
representative may give authorization to the Contractor to remove, relocate, or
reset the permanent traffic control devices.
2. In the event the Contractor removes or relocates a traffic control sign without prior
notice to or authorization from the Engineer, the Contractor shall bear all --
responsibility and liability to any person sustaining bodily injury or property damage
on account thereof.
3.02 EXISTING UTILITIES
A. Coordinate work with utility companies; notify before starting work and comply with
their requirements, to include obtaining and complying with required permits.1. Utility locations shown on the Drawings are approximate and may not be complete.
Contractor shall field verify all utility locations.
2. Provide notice to each utility sufficiently in advance of such operations to allow the
utility time to mark the location of, relocate, adjust, or otherwise protect their
facilities. Reach an agreement with each utility on appropriate action necessary to
protect or relocate the utility facilities. Utilize Iowa Utility One-Call (800-292-8989)
for locates for those utilities which subscribe to this service.
3. At all times conduct operations so that necessary clearances are maintained and
said utility facilities are protected. Comply with all Local, State, and Federal, or
other regulations in performing work near utility facilities. —
4. Should the Contractor damage any of the utility facilities during Contractor's
operations or determine the work cannot be performed safely, the Contractor shall
immediately notify the utility involved and cease work until arrangements are made to prevent further damage or a serious accident. Contractor is responsible for the
cost to repair any damage, including disruption of service, to any utility facility
resulting from Contractor's operation.5. Do not disrupt public utilities without permit from authority having jurisdiction.
B. Prepare building demolition areas by disconnecting and capping utilities as indicated in
this Section.SITE PREPARATION 02200-2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
C. If required, provide temporary utilities that bypass buildings and structures to be
demolished and that maintain continuity of service to other buildings and structures.
D. Remove exposed piping, valves, meters, equipment, supports, and foundations of
disconnected and abandoned utilities.
E. Locate and mark utilities to remain; mark using highly visible tags or flags, with
identification of utility type; protect from damage due to subsequent construction, using
substantial barricades if necessary.
F. Sanitary Sewer and Water Service Disconnection: If required, coordinate with the City
Water Department.
G. Mark location of terminated utilities physically and on Record Drawings.
3.03 ON-SITE BURIED PIPING AND CONDUIT
A. Abandoned buried pipe and conduit that is exposed during the structure demolition
shall be cut off at the edge of the excavation.
3.04 VEGETATION
A. Remove and dispose of all existing trees, plants and other vegetation prior to
beginning demolition operations.
B. Do not mix with demolition debris, and dispose of properly offsite. Do not burn or bury
materials onsite.
3.05 DEBRIS
A. Remove debris, rubbish and trash from exterior grounds prior to building demolition
and slab and foundation removals.
B. Do not burn or bury materials on site.
C. Maintain public streets, alleys, or other thoroughfares used in carrying out disposal
free of litter or debris attributable to this operation. Equip and load trucks or other
vehicles to prevent leakage, blowing off, or other escape of any portion of whatsoever.
3.06 RESTORATION
A. Restore existing utilities, surface features, and structures that are to remain in equal or
better condition that existed prior to Work.
END OF SECTION
SITE PREPARATION 02200 - 3
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
SECTION 02221
BUILDING DEMOLITION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Demolition and removal of all building structures, contents, and debris.
B. Demolition and removal of site improvements and debris adjacent or integral to
building or structure to be demolished.
C. Removal of Portland concrete and asphaltic concrete slabs and footings.
C. Related Sections
1. Section 02200 - Site Preparation.
2. Section 02990 - Off-Site Transportation and Disposal.
3. Section 02316 — Fill and Backfill
1.02 MEASUREMENT AND PAYMENT
A. Refer to Section 01225— Measurement and Payment.
1.03 SUBMITTALS
A. Identification of demolition firm and subcontractors, and qualifications to be submitted
prior to award.
B. Demolition Plan to include:
1. Summary of safety procedures.
2. Proposed Environmental Protection and Dust-Control Measures: Indicate
proposed measures for use, proposed locations, and proposed time frame for their
operation. Identify options if proposed measures are later determined to be
inadequate.
3. Site Plan showing/describing:
a. Location and construction of barricades and fences
b. Areas for temporary construction and field offices.
c. Areas for temporary and permanent placement of removed materials.
d. Extent of demolition
e. Removal sequence
f. Bracing and shoring
g. Locations of temporary protection and means of egress, including for other
tenants of adjacent property affected by building demolition operations.
C. Copies of permits required for building demolition.
D. Project Schedule:
1. Detailed sequence of work, with starting and ending dates for each activity.
2. Coordination for shutoff, capping, and continuation of utility services.
E. Pre-demolition Photographs or Video:
DEMOLITION OF BUILDING STRUCTURES 02221 - 1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
1. Show existing conditions of adjoining construction and site improvements,
including finish surfaces that might be misconstrued as damage caused by building —
demolition operations.
2. Submit before Work begins.
3. Submit in electronic format on CD or DVD. —
F. Disposal locations and haul routes:
1. In accordance with Section 02990 — Off-Site Transportation and Disposal
G. Disposal Records:
1. In accordance with Section 02990 — Off-Site Transportation and Disposal
H. Hazardous Material Disposal, Testing, and Air monitoring: —
1. If applicable, maintain records on site for review by governing authorities as
required by other sections, authorities, or jurisdictions for demolition activities.
I. Project Record Documents:
1. Survey and record actual locations of capped and active utilities and subsurface
construction.
2. Survey and record final excavation depths and locations of piling, or other —
foundations left in place, if any.
J. Health and Safety Plan: —
1. In accordance with Section 01350 —On-Site Health and Safety Requirements.
K. Evidence showing that weighing equipment required for measurement of bid items
based on weight meets IDOT 2001.07.1. In accordance with Section 01500 —Temporary Facilities and Controls
1.04 QUALITY ASSURANCE
A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition
work similar in material and extent to that indicated for this Project.
1. Statement of Qualifications to be submitted upon request of the City.
B. Regulatory Requirements: Comply with governing OSHA, IDNR and US EPA
notification regulations before beginning demolition. Comply with hauling and disposal
regulations of authorities having jurisdiction.C. Standards: Comply with ANSI A10.6 and NFPA 241 and 51 B.
D. Pre-demolition Conference: Attend conference at Project site. _
E. Only the Contractor and its employees are allowed to demolish, dismantle, detach or
dispose of any part of the demolition structure or its contents.
1.05 DESCRIPTION OF WORK
A. Unless directed otherwise in the Contract Documents, the Contractor shall:
1. Remove and properly dispose of designated structures, contents of structures, —
trash, rubbish, floor slabs and foundations in accordance with federal, state and
local regulations.
2. Remove trash and surface debris from entire site.
DEMOLITION OF BUILDING STRUCTURES 02221 -2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
3. Remove and properly dispose of portland cement concrete slabs and footings and
asphaltic concrete cement pavement from within project limits.
— 4. Remove and properly dispose railroad spur, including steel rails and wood ties.
5. Restore site to result in grass vegetated surface that allows positive drainage,
without ponding. Restoration includes backfilling of pits and depressions, general
grading, final grading of topsoil, and fertilizing/seeding/mulching.
1.06 PROTECTION OF THE PUBLIC AND PROPERTIES
A. Litter:
1. Remove any demolition debris or mud from any street, alley or right-of-way
resulting from the execution of the demolition work. Any cost incurred by the
Owner in cleaning up any litter or mud shall be charged to the Contractor and be
deducted from funds due for the work.
2. Littering of the site shall not be permitted.
3. All waste materials shall be promptly removed from the site.
B. Street Closure:
1. Conduct demolition and debris removal operations to ensure minimum interference
with roads, streets, walkways, and other adjacent occupied and used facilities.
2. Refer to traffic and control measures in Section 02200 -Site Preparation.
C. Protection of the Public:
A. Sidewalks: The Contractor shall be responsible for any damage to public sidewalks
and roadways abutting or adjacent to the demolition properties resulting from the
execution of the demolition work. The cost of repair or replacement shall be
— considered incidental to the work and the Contractor shall obtain all permits and
pay any fees.
B. Pedestrian Access: Place and construct the necessary warning signs, barricades,
fencing and temporary pedestrian sidewalks, as directed by the Engineer; and to
maintain alternate pedestrian access for sidewalks around the demolition site. The
cost of these items shall be considered incidental to the work.
C. Temporary Fence: Erect temporary fence around all excavation, dangerous
building(s) or structure(s) to prevent access to the public. Such fence shall be
consistently restrictive from top to grade, and without horizontal openings wider
than two inches. The fence shall be erected before demolition and shall not be
�- removed until the hazard is removed.
a. Fence shall remain in place until the demolished materials are removed from
the site and all holes or excavated areas are backfilled. The temporary fence
material and posts shall remain the property of the Contractor
b. Refer to fence requirements on Drawings and in Section 01550 - Temporary
Facilities and Controls.
D. Demolition Hours:
1. Comply with any restrictions to working hours as included in Section 01100,
Summary.
2. Comply with all applicable ordinances and restrictions of the City.
DEMOLITION OF BUILDING STRUCTURES 02221 -3
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
E. Noise Pollution: All construction equipment used in conjunction with this project shall
be in good repair and adequately muffled. Contractor shall comply with any noise —
pollution requirements of the City.
F. Dust Control: Comply with applicable air pollution control requirements of the City.
Contractor shall take appropriate actions to minimize atmospheric pollution. To —
minimize atmospheric pollution, the Engineer shall have the authority to require that
reasonable precautions be taken to prevent particulate matter from becoming airborne.
Such reasonable precautions shall include, but not be limited to: •-
1. The use of water or chemicals for control of dusts in the demolition of existing
buildings or structures, construction operations, the grading of roads, or the
clearing of land. —
2. Covering, at all times when in motion, open-bodied trucks transporting materials
likely to give rise to airborne dusts.
G. Requirements for the Reduction of Fire Hazards:
1. Removal of Material: Before demolition of any part of any building, remove all
volatile or flammable materials, such as gasoline, kerosene, benzene, cleaning
fluids, paints or thinners in containers, and similar substances. --
2. Fire Extinguishing Equipment: Maintain the correct type and class of fire
extinguisher on site. When a cutting torch or other equipment that might cause a
fire is being used, a fire extinguisher shall be placed close at hand for instant use _-
3. Fires: No fires of any kind will be permitted in the demolition work area.
4. Hydrants: No material obstructions or debris shall be placed or allowed to
accumulate within fifteen feet of any fire hydrant. All fire hydrants shall be
accessible at all times.
5. Debris: Debris shall not be allowed to accumulate on roofs, floors, or in areas
outside of and around any structure being demolished. Excess debris and
materials shall be removed from the site as the work progresses.6. Telephone Service: Arrange for access to and use of, during working hours, one or
more telephones in the vicinity of the work site for the purposes of making calls in
case of fire or other emergencies, and shall keep all personnel on the job, and the
local jurisdiction informed of the location of such telephones. The Contractor's
foreman, or at least one regular member of each shift, shall be charged with the
responsibility of promptly calling emergency services when necessary. The same —
person shall be required to inspect the building and the site frequently for possible
fires or fire-producing conditions and to apply appropriate corrective action,
particularly at the close of work each working day.H. Protection of Public Utilities: The Contractor shall not damage existing fire hydrants,
street lights, traffic signals, power poles, telephone poles, fire alarm boxes, wire
cables, pole guys, underground utilities or other appurtenances in the vicinity of the
demolition sites. The Contractor shall pay for temporary relocation of utilities, which
are relocated at the Contractor's request for his convenience.
1. Refer to Section 02200 —Site Preparation.I. Protection of Adjacent Property:
1. Conduct operations to minimize effects on and interference with adjacent
structures and occupants.
DEMOLITION OF BUILDING STRUCTURES 02221 -4
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
2. Obtain written permission from owners of adjacent properties when demolition
equipment will traverse, infringe upon or limit access to their property.
3. Protect adjacent walkways, loading docks, building entries, and other building
facilities during demolition operations.
4. Do not damage any public right-of-way, structures, parking lots, drives, streets,
sidewalks, utilities, lawns or any other property adjacent to demolition project. Cost
of repair or replacement shall be considered incidental to the work and the
Contractor shall obtain all permits and pay any fees.
— 5. Provide such sheeting and shoring as required to protect adjacent property during
demolition. Prevent the spread of dust and flying particles.
6. Restore existing drain tiles or roadway subdrains that are cut or removed, including
drainable backfill, to original condition. Repairs shall be subject to approval by the
jurisdictional entity.
J. Protection of On-Site Features to Remain:
— 1. Preserve the following known features:
a. Three water production wells. The approximate locations, labeled Well #1,
Well #2, and Well #3 are shown on Figure 1.
b. Sixteen groundwater monitoring wells. The approximate locations, labeled
MW-1 through MW-16, are shown on Figure 2.
c. Storm water piping, manholes and intakes. The approximate layout of known
storm water piping is shown on Figure 3. Other storm water piping and
structures that may be discovered during this work shall also be preserved.
d. Preserve two storm water skimmer structures. The approximate locations are
shown on Figure 1.
2. These features are within the designated locations of demolitions and removals.
Contractor shall provide measures necessary to protect these features as
demolition and removals occur.
3. Contractor is responsible to repair or replace any structure designated to remain
that is damaged due to Contractor's negligence. This shall be at no additional cost
to the Owner.
—' 1.07 RISK OF LOSS
A. Contractor shall accept the site in its present condition and shall inspect the site for its
character and the type of structures to be demolished.
B. City assumes no responsibility for the condition of existing buildings, structures, and
other property within the demolition area, or the condition of the property before or
— after the solicitation for proposals. No adjustment of proposal price or allowance for
any change in conditions that occur after the acceptance of the lowest responsible,
responsive proposal will be allowed.
1.08 PROPERTY OWNERSHIP
A. Unless otherwise indicated in the Contract Documents, upon execution of the contract,
all rights, title, and interest of the City in and to buildings, structures and other property
to be demolished and/or removed by the Contractor on part or all of said project area
as described in the Contract Documents, shall be deemed to be vested in the
Contractor.
DEMOLITION OF BUILDING STRUCTURES 02221 - 5
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
B. Land: No property rights, title, or interest of any kind whatsoever, in or to the land or
premises upon which such buildings or structures stand, is created, assigned, —
conveyed, granted, or transferred to the Contractor, or any other person or persons,
except only the license and right of entry to remove such buildings and structures in
strict accordance with the Contract Documents. Contractor shall not use the land or _
premises, or allow any other party to use the land or premises, for any purpose other
than activities in direct support of the demolition of the building.
1.09 VACATING OF BUILDINGS —
A. The structures identified in the Contract Documents shall be vacated before a Notice
to Proceed is issued and the Contractor begins work.
B. In case the Contractor finds that any structure is not vacated, the Contractor shall
immediately notify the City and shall not begin demolition or site clearance operations
on such property until further directed by the City.
C. The Contractor's responsibility for such buildings will not begin until the City issues a
Notice to Proceed. No claim for extension of time or increase in price will be
considered because of occupancy of any buildings. In case such occupancy is —
prolonged, the City reserves the right to delete the structure from the work.
1.10 RELEASE OF BUILDINGS
A. The demolition area shall be released to the Contractor upon Award of Contract and
Notice to Proceed.
B. The Contractor shall have full control of the demolition progress and clearance of the
site, subject to the provisions of the Contract Documents.
1.11 PERMITS AND FEES A. The Contractor shall obtain all the necessary permits and pay all permit fees that may
be required in conjunction with the demolition work.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
3.01 PREPARATION
A. Obtain required permits.
B. Survey existing conditions and correlate with contract requirements. Inventory and
record the condition of items to be removed and salvaged.
C. Existing Utilities: Locate, identify, disconnect, and seal or cap off utilities serving
buildings and structures to be demolished. Do not start demolition work until utility
disconnecting and sealing have been completed and verified in writing. —
DEMOLITION OF BUILDING STRUCTURES 02221 -6
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
1. In accordance with Section 02200 - Site Preparation.
D. Perform an engineering survey of condition of building to determine whether removing
any element might result in structural deficiency or unplanned collapse of any portion
of structure or adjacent structures during building demolition operations.
E. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or
structural support to preserve stability and prevent unexpected movement or collapse
of structure being demolished.
1. Strengthen or add new supports when required during progress of demolition.
2. Shoring and bracing design, construction, and removal shall be the responsibility
of the Contractor.
F. Provide the Engineer with a minimum of 48 hours advance notification prior to
beginning the execution of demolition of any structure.
3.02 DEWATERING OF STRUCTURES
A. Remove water from flooded areas of structures prior to demolition.
B. Maintain pumping as needed to keep structure and excavations free of water until
-' debris is removed and excavations are backfilled.
C. Dispose of water from flooded buildings in sanitary sewer as directed by Engineer.
3.03 DEMOLITION AND REMOVALS
A. Structural Parts of Buildings:
1. No wall or part thereof shall be permitted to fall outwardly from any building except
through chutes or by other controlled means or methods, which will ensure safety
and minimize dust, noise and other nuisance.
2. Subject to site restrictions, outside chimneys or outside portions of chimneys shall
be razed in advance of general demolition of each building. Any portion of a
chimney inside a building shall be razed as soon as it becomes unsupported by
reason of removal of other parts of the building.
3. Any part of a building, whether structural, collateral, or accessory, which has
become unstable through removal of other parts, shall be removed as soon as
practicable and no such unstable part shall be left free-standing or inadequately
braced against all reasonably possible causes of collapse at the end of any
working day.
B. Basements and Foundation Walls: Remove all basement walls, slabs, and
foundations to a minimum of 42-inches below final grade.
C. Abandoned buried pipe and conduit that is exposed during the structure demolition
shall be cut off at the edge of the excavation.
D. Concrete Slabs: Contractor shall remove all concrete slabs, asphalt slabs, surface
obstructions, masonry slabs, and appurtenances as indicated on drawings.
-" E. Retaining Walls: Retaining walls or curbs within the project limits shall be removed
unless otherwise indicated in the Contract Documents. The Contractor shall employ
hand labor or other suitable tools and equipment necessary to complete the work
DEMOLITION OF BUILDING STRUCTURES 02221 -7
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
without damage to adjacent public or private property. Where such retaining walls or
curbs are removed, the embankment shall be graded to a slope of not greater than --
10:1 horizontal:vertical or as directed by the Engineer. The cost of any tree or brush
removal due to the removal and grading out of the retaining wall shall be considered
incidental.F. Fences: Fences, guardrails, bumpers, signs, clotheslines, and similar facilities shall be
completely removed from the site, except fences on the apparent boundary between a
contract parcel and an improved non-contract parcel shall not be removed unless specifically stated. All posts for support shall be pulled out or dug up so as to be
entirely removed.
G. Partially Buried Objects: All piping, posts, reinforcing bars, anchor bolts, railings and all —
other partly buried objects protruding from the ground shall be removed. The
remaining void shall be filled with soil and compacted.
H. Vegetation: The Contractor shall remove all dead trees, trees identified for removal,
stumps, all trees which are not an asset to the property, bushes, vegetation, brush and
weeds, whether standing or fallen, unless specifically stated otherwise by the
Engineer. The Contractor shall protect all trees not removed from damage by the
demolition operation.
I. If ACM or other hazardous materials (not identified and removed as part of previous —
abatement projects) are discovered during removal operations, stop work and notify
Engineer.
J. Engineering Surveys: Perform surveys as the Work progresses to detect hazards that
may result from building demolition activities.
K. Dust Suppression: _
1. Use water mist and other suitable methods to limit spread of dust and dirt.
2. Comply with governing environmental-protection regulations. Do not use water
when it may damage adjacent construction or create hazardous or objectionable
conditions, such as ice, flooding, and pollution.
3.04 DEBRIS I WASTE MANAGEMENT
A. Dispose or recycle demolition materials, with the exception of those items specifically
designated for salvage by Owner. All buildings, building materials, contents of
structures, and equipment resulting from this work shall be removed from the premises
at once. Salvaged material shall be removed immediately from the premises, right-of- —
way, streets or alleys.
B. Storage or sale of removed items or materials on-site is not permitted.
C. Regulatory Requirements: Contractor is responsible for knowing and complying with
regulatory requirements, including but not limited to Federal, State and local
requirements, pertaining to legal disposal of all construction and demolition waste
materials, ACM, and other hazardous materials.
D. Remove demolished materials from Project site and legally dispose or recycle them at
an approved facility licensed in accordance with state and/or local regulations, laws, —
DEMOLITION OF BUILDING STRUCTURES 02221 -8
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
and zoning. Do not allow demolished materials to accumulate on-site. The Contractor
shall be responsible to pay all fees for waste disposal. Submit to the Engineer copies
— of all disposal tickets which identify the specific address of the origin of the debris
associated with each ticket. The cost of all disposal fees shall be considered
incidental to the demolition.
1. Remove and transport debris in a manner that will prevent spillage on adjacent
surfaces and areas.
2. Methods of trash/debris/waste disposal that are not acceptable are:
a. Burning on the project site.
b. Burying on the project site.
c. Dumping or burying on other property, public or private.
d. Other illegal dumping or burying.
3.05 CLEAN UP
A. At the end of each workday, the Contractor shall clean sidewalks, streets, and private
— property of any debris caused by the demolition operation.
B. Final Cleaning Up: Before acceptance of the demolition work, the Contractor shall
remove all unused material and rubbish from the site of the work, remedy any
objectionable conditions the Contractor may have created on private property, and
leave the right-of-way in a neat and presentable condition. The Contractor shall not
make agreements that allow salvaged or unused material to remain on private
property. All ground occupied by the Contractor in connection with the work shall be
restored.
— C. Final cleaning up shall be subject to approval of the Engineer and in accordance with
applicable regulations.
3.06 RESTORATION
A. Fill voids to surrounding grades and grade to drain in accordance with Section 02316 -
Fill and Backfill.
B. Topsoil, seed, and mulch in accordance with Section 02900 - Site Restoration.
END OF SECTION
DEMOLITION OF BUILDING STRUCTURES 02221 -9
HR Green Inc. FY 2012 Chamberlain Demolition 3
Project No. 10110021 City of Waterloo, Iowa
SECTION 02316
FILL AND BACKFILL
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Filling, backfilling, and compacting for excavations and voids remaining from building
demolition and removals.
B. Site grading.
1.02 MEASUREMENT AND PAYMENT
A. Refer to Section 01225— Measurement and Payment.
1.03 SUBMITTALS
A. Materials Sources: Submit name, location and soil type of imported materials source.
B. Test results.
1. Fill borrow source test(s) and certification that material is clean and free from
contamination.
2. Compaction tests.
1.04 PROJECT CONDITIONS
A. Provide sufficient quantities of fill to meet project schedule and requirements.
B. When fill materials need to be stored on site, locate stockpiles where designated by
Owner.
1. Prevent contamination.
2. Protect stockpiles from erosion and deterioration of materials.
PART 2 PRODUCTS
2.01 FILL MATERIALS
A. General Fill: Clean, fine earth, rock, or sand, free from organic based soil, grass, roots,
brush, or other vegetation, lumps larger than 6 inches, rocks larger than 3 inches, and
debris.
B. To the extent possible, general fill is to be obtained on-site, near the areas where fill is
needed. To a limited extent, imported fill material meeting these requirements may be
used when sufficient satisfactory backfill materials are not available onsite.
FILL AND BACKFILL 02316 - 1
HR Green Inc. FY 2012 Chamberlain Demolition 3
Project No. 10110021 City of Waterloo, Iowa
PART 3 EXECUTION
3.01 PREPARATION
A. Until ready to fill, maintain excavations and prevent loose soil from falling into
excavation.
B. Shoring, Sheeting and Bracing: Shore, brace, or slope to angle of repose excavations
to protect workmen, adjacent paving, structures, and utilities, in compliance with OSHA
requirements.
1. Extend shoring and bracing to the bottom of the excavation. Shore excavations
that are carried below the elevations of adjacent existing foundations.
C. Excavation Drainage: Operate pumping equipment, and/or provide other materials,
means and equipment as required, to keep excavations free of water and subgrades
dry, firm, and undisturbed until approval of permanent work has been received from
Owner.
3.02 FILLING AND COMPACTING
A. Do not use frozen material or place on frozen subgrade.
B. Maintain optimum moisture content of fill materials to attain required compaction
density.
C. Place and compact fill material in equal continuous layers not exceeding 8 inches
compacted depth.
D. Compaction:
1. Ordinary compaction achieved with a dozer or excavator bucket.
3.04 SITE GRADING
A. Uniformly grade areas to smooth surface, free from irregular surface changes. Comply
with compaction requirements.
1. Provide smooth transition between existing adjacent grades and new grades.
2. Maximum acceptable slope 10:1
B. Fill settled areas where excavations or trenches were backfilled and holes made by
demolition, slab, and foundation removal, tree removal, and site preparation work.
C. Provide for a minimum depth of 4 inches of topsoil over the graded area (refer to
Section 02900 — Site Restoration).
D. Slope grades to direct water toward existing storm water inlets located on the property
and to prevent ponding. The locations of existing storm water structures is included as
Figure 3.
E. Hand Labor: The Contractor shall employ hand labor where the use of power
machinery is unsafe or unable to produce a finished job. Hand labor shall also be
used to clean the site of any debris.
END OF SECTION
FILL AND BACKFILL 02316 -2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
SECTION 02900
SITE RESTORATION
— PART 1 GENERAL
1.01 SECTION INCLUDES
— A. Preparation of subsoil and placement of 4 inch layer of topsoil.
B. Seeding, mulching, and fertilizer.
— 1.02 MEASUREMENT AND PAYMENT
A. Refer to Section 01225— Measurement and Payment.
1.03 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Certification of Grass Seed: From seed vendor for each grass-seed mono-stand or
mixture stating the botanical and common name and percentage by weight of each
species and variety, and percentage of purity, germination, and weed seed. Include
the year of production and date of packaging.
C. Product Certificates: For fertilizers, signed by product manufacturer.
D. Material Test Reports: For existing surface soil and imported topsoil.
E. Planting Schedule: Indicating anticipated planting dates for each type of planting.
1.04 QUALITY ASSURANCE
A. Deliver grass seed mixture in original, sealed, labeled, containers. Seed in damaged
packaging is not acceptable.
B. Weather Limitations: Proceed with planting only when existing and forecasted weather
conditions permit. Owner will withhold retainage until seeding is complete, grass has
germinated, and is accepted.
C. Seeding Guarantee: Guarantee seeded area for duration of one year after seeding to
be alive and in satisfactory growth at end of guarantee period.
1. For purpose of establishing acceptable standard, scattered bare spots, none larger
than 1-sq ft will be allowed up to maximum of 3% seeded area.
2. Acceptance will be based upon meeting this standard one year after substantial
completion or after reseeding.
3. No weed seeds allowed. If excessive weeds grow, Contractor may be required to
spray and reseed at Owner's discretion.
4. During the warranty period, correct and reseed as originally specified, any defects
in the seeded areas and grass stand, such as weedy areas, eroded areas, and
bare spots, until all affected areas are accepted by the Engineer.
5. Areas reseeded under the warranty shall be warranted for an additional one-year
period.
SITE RESTORATION 02900 - 1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
1.05 DEFINITIONS
A. Finish Grade: Elevation of finished surface of planting soil.
B. Manufactured Soil: Soil produced off-site by homogeneously blending mineral soils or
sand with stabilized organic soil amendments to produce topsoil or planting soil.C. Planting Soil: Native or imported topsoil, manufactured topsoil, or surface soil modified
to become topsoil; mixed with soil amendments. —
D. Sub-grade: Surface or elevation of subsoil remaining after completing excavation, top
surface of a fill or backfill immediately beneath planting soil.
PART 2 PRODUCTS
2.01 SEED MIXTURE
A. Seed Species: Seed of grass species as follows, with not less than 95 percent
germination, not less than 85 percent pure seed, and not more than 0.5 percent weed
seed:
1. IDOT 2601.04C Rural Seed Mix
2.02 TOPSOIL
A. Topsoil: Organic material content; free of stones 1 inch or larger in any dimension and
other extraneous materials harmful to plant growth. —
1. Topsoil Source: Furnished by Contractor.
2.03 MULCH —
A. Straw Mulch: Provide air-dry, clean, mildew- and seed-free, salt hay or threshed straw
of wheat, rye, oats, or barley.
B. Fiber Mulch: Biodegradable, dyed-wood, cellulose-fiber mulch; nontoxic; free of plant-
growth or germination inhibitors; with maximum moisture content of 15 percent and a
pH range of 4.5 to 6.5.
C. Non-asphaltic Tackifier: Colloidal tackifier recommended by fiber-mulch manufacturer
for slurry application; nontoxic and free of plant-growth or germination inhibitors.
2.04 FERTILIZER —
A. Fertilizer: Granular type and delivered to site in the original bag in good condition for
proper distribution.
1. N-P-K, 13-13-13 or equivalent.
SITE RESTORATION 02900-2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
PART 3 EXECUTION
— 3.01 EXTENT OF SURFACE RESTORATION
A. Topsoil shall be applied and fertilized, seeded, and mulched in all areas disturbed by
demolition activities except in areas where pavement is to remain.
3.01 SOIL PREPARATION
A. Preparation for Seeding:
— 1. Areas Accessible to Machinery: Thoroughly work areas accessible to field
machinery to a depth of not less than 3 in. Soil brought to a loose, friable
condition, and picked free of rocks and debris in excess of 1" diameter where
weed growth has developed extensively. Use of a disc allowed to disc these
weeds into the ground if the weeds can be completely covered by this method.
2. Areas inaccessible to machinery: Prepare areas inaccessible to field machinery
by hand to a depth of not less than 1-1/2 in. The soil shall be brought to a loose
friable condition.
3. The seedbed shall be inspected and approved by the Engineer prior to seeding.
3.02 INSTALLATION
A. Fertilizer:
1. Rate of Fertilizer: Spread fertilizer uniformly at a rate of 750 pounds per acre.
2. Fertilize all areas to be seeded, in accordance with IDOT 2601.04B
B. Seeding:
_ 1. Seeding Dates: Spring seeding dates shall be between March 1st and May 31st.
Fall seeding dates shall be between August 10th and September 30th. Legumes
shall only be seeded during Spring planting season before April 15th.
2. Method of Seeding: On areas accessible to field machinery, all grasses and
legume seed will be applied with a seed drill with a no till attachment. Hydraulic
seeder on areas inaccessible to field machinery.
3. Seed Application Rate: 53 lbs/acre, in accordance with IDOT 2601.04C
C. Mulching:
1. Mulch all seeded areas as soon as seed is applied.
— 2. Rate: Apply mulch at a rate of two tons per acre.
3. Application of Mulch: The mulching shall be the final operation of seeding. Evenly
and uniformly distribute and anchor the mulch into the soil. Anchor mulch into soil
by means of mulch crimper.
3.03 MAINTENANCE
A. Begin maintenance of planted areas immediately after each portion is planted and
continue until final acceptance.
B. Maintain seeded area by watering, mowing, and replanting as necessary to produce
— uniform stand of grass until Work is accepted in accordance with guarantee.
SITE RESTORATION 02900 -3
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
3.04 GUARANTEE
A. Guarantee seeded area for duration of one year after Substantial Completion to be
alive and in satisfactory growth at end of guarantee period.
1. For purpose of establishing acceptable standard, scattered bare spots, none larger
than 1-sq ft will be allowed up to maximum of 3% seeded area.
2. Acceptance will be based upon meeting this standard one year after substantial
completion or after reseeding.
3. No weed seeds allowed. If excessive weeds grow, Contractor may be required to
spray and reseed at Owner's discretion.
B. Retainage will be held back to cover full cost of reseeding until vegetative cover is
established and accepted by Owner.
3.05 ACCEPTANCE OF SEEDED AREAS
A. Notify Engineer in writing 7 days prior to inspecting seeded area for acceptance.
B. Contractor and Engineer shall inspect seeded areas for contract compliance and
acceptance of work. Upon completion of inspecting seeded areas, Owner shall provide
written acceptance or rejection to Contractor with further requirements for completing
the seeding work. Seeding work remaining to be completed shall be reinspected by
Owner before final acceptance
END OF SECTION
SITE RESTORATION 02900 -4
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
SECTION 02990
OFF-SITE TRANSPORTATION AND DISPOSAL
-- PART 1 GENERAL
1.01 SUMMARY
A. Requirements for the transportation and disposal of materials generated during this
project which require off-site disposal and/or storage. Materials that will or may be
found onsite requiring off-site recycling or disposal include:
1. Rubbish, trash, railroad ties, and miscellaneous garbage.
2. Building demolition debris and rubble, slabs and foundations.
3. Steel rails, structural steel, and other miscellaneous salvagable/recyclable metals.
B. Furnish all labor, equipment, materials and incidentals required to transport all
materials required to be recycled or disposed of off-site.
1.02 MEASUREMENT AND PAYMENT
A. Costs for transportation and disposal are incidental to the demolition and removal
items listed on the bid form.
1.03 SUBMITTALS
A. Within 10 days after Notice to Proceed:
1. Names and locations of all facilities proposed to be used for the disposal of
materials off-site.
2. Acceptance criteria, if any for each type of waste stream at each facility proposed.
3. Sampling and analytical criteria, if any, for each type of waste stream at each
facility proposed.
4. Any other restrictions which may be imposed by each of the proposed facilities.
B. As the Work proceeds:
1. Blank sample of shipping documents and disposal manifests for each type of
waste stream a minimum of three days prior to their proposed date of use.
2. Copies of certificates of disposal, destruction, treatment, recycling as applicable
and as issued by the disposal facility following acceptance and final disposition of
the various waste streams.
3. Proposed transportation routes and alternate transportation routes to each
disposal facility.
C. At Contract Closeout:
1. Summary spreadsheet of all waste and recyclable materials hauled from the site,
quantities, and identification of the disposal, recycle, or salvage facility.
1.04 QUALITY ASSURANCE
A. Ensure each of facility possesses all necessary permits required for accepting and
disposing of wastes and that these permits are current.
OFF-SITE TRANSPORTATION AND DISPOSAL 02990 - 1
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
B. Use only disposal facilities previously approved by Owner for performance of Work.
C. Contractor shall have responsibility to meet requirements of these Specifications, and
acceptance of bid does not constitute nor imply approval of proposed off-site waste
disposal facility(ies). Owner shall have right to deny approval of any/all facility(ies) that
do not comply with these Specifications.
D. Owner may schedule inspections of disposal facility, as appropriate, to assess
compliance status.
E. In event that identified and approved facility ceases to accept stated waste materials
or facility ceases operations, it is Contractor's responsibility to locate alternate
approved and permitted facility for accepting waste materials. Contractor is
responsible for making necessary arrangements to utilize facility, and alternate facility
must be approved by Owner in same manner and with same information as for original
facility.
1.05 REFERENCE STANDARDS
A. Comply with all applicable Federal, State and local laws, codes and ordinances which
govern or regulate waste transportation and disposal.
PART 2 PRODUCTS
(Not used)
PART 3 EXECUTION
3.01 TRANSPORTATION AND ENTRY/EXIT REQUIREMENTS
A. Transport all waste streams from the site in conformance with department of
transportation, federal, state and local regulations governing the type of waste stream
being transported. This includes, but not limited to, requirements for operator training
and requirements for packaging, labeling, marking, placarding of various waste
shipments.
B. All waste streams shall be transported directly to the disposal facility from the site.
Neither the route nor the mode of transportation shall deviate from the approved route
without prior written approval from the Owner or Owner's Agent,
C. Inspect existing roadways immediately adjacent to the site and document their
condition prior to project start-up. Any/all repairs or improvements, including permits
and/or approvals, to accommodate off-site transportation of wastes shall be
responsibility of Contractor. Provide documentation to Engineer prior to any hauling
operations.
D. Document all entry/exit procedures for transports in Off-Site Transportation and
Disposal Plan and shall instruct and provide written instructions to all transporters as to
these procedures. Contractor shall see that all personnel are provided with adequate
protective equipment in accordance with Contractor's health and safety plan.
OFF-SITE TRANSPORTATION AND DISPOSAL 02990 -2
HR Green Inc. FY 2012 Chamberlain Demolition Phase 3
Project No. 10110021 City of Waterloo, Iowa
3.02 LOADING OF MATERIALS INTO TRANSPORT CONTAINERS
A. Furnish, install, and maintain any on-site temporary loading facilities as required.
Provide equipment, personnel, and on-site facilities necessary to handle and load
waste materials designated for off-site transport.
B. Ensure that all waste materials loaded for off-site transportation have been accurately
identified and are in compliance with appropriate State and Federal regulations.
C. Each container shall be visually inspected upon loading to ensure it is properly sealed
and there are no signs of spillage or leakage. All vehicles hauling bulk wastes from
the site shall be inspected by the Contractor prior to leaving the site. Contractor shall
certify proper containerization for each transporter leaving the site.
D. Containers found to be leaking or bulk transports found leaking shall not be loaded
until source of leaking is located and source contained. Area where leaking occurred
and any contaminated equipment shall be decontaminated.
E. Contractor shall be responsible for any and all cleanup activities involving waste
spilled in transit or during loading operations, and shall be at the Contractor's expense.
F. Contractor shall be responsible for verifying appropriate container sizes for off-site
disposal in accordance with Federal Department of Transportation (DOT), State, and
local regulations. Any requirements and expenses for oversize load are Contractor's
responsibility.
3.03 HAULING REQUIREMENTS
A. Implement hauling or transport schedule minimizing congestion on and around site.
B. Transport waste from site only to those facilities approved by Owner.
C. Routes and timing must be coordinated with appropriate State regulatory agencies. All
highway and road restrictions shall be adhered to by Contractor.
3.04 VEHICLE DECONTAMINATION
A. Decontaminate transport vehicles and containers in a designated decontamination
area prior to their leaving the site. Decontamination shall include the removal of
material on the tires and axles of trucks and any other material on the vehicle as a
result of loading operations.
3.05 OFF-SITE DISPOSITION
A. Dispose the various waste streams at the Owner-preapproved facilities. All waste
facilities must have a valid facility permit from the regulating authority (U.S. or State)
for that type of facility and for the type of waste which will be received. All disposal
facilities must be constructed in a manner which meets or exceeds the requirements of
federal regulations governing the type of disposal facility. No change in disposal
facility for any type of waste stream shall be allowed without prior written approval of
the Owner or Owner's Agent.
END OF SECTION
OFF-SITE TRANSPORTATION AND DISPOSAL 02990 - 3
^ ^
km
-11`ti' $^-k, , Chamberlain Demolition Legend
fihpli`ffle ',, Phase III Project Limits
.,.�:� .
I „if J a Contract # 806
�'10o J ,!, ;f s< Q Remaining Structures
� , "`
r
;s
I
w 1 }
a'
$ :1
_G Two Fuel Tanks
■
4.,_ /
•
21
r
,N Storm Water Skimmer Structure
.414 .r= .
{
( Shed
Well #3
-
�� �{ , .._.__ Well House
_" __.` _ -.-s it
,_
lit 41\
,, ' ; '' Irrk - ,ST , a
ow, ..�i
Z ^"` %�
. 1
. ., .-. . Well #1 v.
� -**', ,3
rio ....
,,,,,,
1 _ „„ , -
_ _ , ,,,,
,, x
Substation Storm V.ater Skimmer Structure
}
rN
150 75 150 -.'' 4 ,er - - "\ yy.,,.: - y,F • W' �&�E
Feet yt 1 +
- -5 .: ` to . �,, p
FIGURE 1 —SITE DEMOLITION PLAN
GENERAL NOTES:
1. NOTIFY UTILITY COMPANIES 72 HOURS PRIOR TO DEMOLITION.VERIFY LOCATION OF ALL EXISTING UTILITIES BEFORE DEMOLITION.
IOWA ONE CALL: 1-800-292-8989.
2. DEMOLISH REMAINING STUCTURES SHOWN ON FIGURE, INCLUDING RAILROAD SPUR, TWO FUEL TANKS,
SHED,WELL HOUSE,AND SUBSTATION. REMOVE ALL CONCRETE AND ASPHALT SLABS AND FOUNDATIONS
LOCATED WITHIN PROJECT LIMITS TO 42 INCHES BELOW GRADE. FILL PITS AND DEPRESSIONS FROM THE
REMOVALS TO PROVIDE POSITIVE DRAINAGE TOWARD EXISTING STORM WATER DRAINS. PLACE TOPSOIL PER
ENGINEERS DIRECTION OVER DEMOLITION AREA AND SEED/FERTILIZE/MULCH PER SPECIFICATIONS.
3. PRESERVE ALL MONITORING WELLS AND WATER PRODUCTION WELLS ON SITE. NOTE THAT PRODUCTION WELL#3 IS LOCATED IN A WELL HOUSE
AND MUST BE PRESERVED DURING DEMOLITION OF THE STRUCTURE. LOCATIONS OF MONITORING WELLS ARE SHOWN ON FIGURE 2.
4. STORM WATER SKIMMERS LOCATED NEAR THE SUBSTATION AREA AND WITHIN THE SHED STRUCTURE MUST BE PRESERVED DURING DEMOLITION
OF THE STRUCTURES. SECURE THE OPENINGS OF THE SKIMMERS WITH COVERS TO PREVENT FUTURE ACCESS BY THE PUBLIC. HEAVEY METAL PLATE
SALVAGED FROM THIS PROJECT SHALL BE CUT AND SIZED FOR THIS PURPOSE. COVERS SHALL BE FABRICATED AND SECURED TO THE
SKIMMER STRUCTURES TO THE SATISFACTION OF THE ENGINEER.
5.WHERE SLABS MEET PROJECT LIMITS AND EXISTING FENCE, SLABS SHALL BE SAW CUT FULL DEPTH AS CLOSE TO FENCE AS PRACTICAL AND
CAREFULLY REMOVE LEAVING STRAIGHT EDGE OF PAVEMENT TO REMAIN. GRADE SITE TO MEET TOP OF REMAINING PAVEMENT.
f I I
I
I
I I
I
OSGP-16
+
RES, RES. RES.
OSMW-1
I
- - OSGP-17
LOUISE ST.
r
__ -3 r i r ..I L----,
1 MW-15
MW-1
MW-9 u
i r
RES. � RES. RES. -� � � `
.\
I .
1.-► 4. MW-5 ,'
1 MW-2 r
j I j `. r�
MW-4 i MW-6
1 r
QSGP-1 flik GP-26
LA.I MWti
OSMit
1 -5 r----- 1 MW-1 ' QSMW-2,
I (} I
GP-30 r MW-8
RES. RES.z co MW10 ,/`/
/ t
1 /
co + ui W-13 // I
I / /f
OSGP-2 ,OSMW-7 i ; I__I _ / GATES PARE
s
ESTHER ST.
I 1 1 /
t 1 1 / Q
/
RES. RES. MW-11 :A
A \ %,, %
t ,'
y t
MW-16
k OSMW-6
,- -; L MW-12 j�ti
a
�y I
t
1ifl � lliil ! If, 13a191'IiiT�'I-l1Ti�17` � ��, ',I � t ,
HANOVER ST. GP-29 I lifi ,
� SGP-4 GP-27„ T ///1//, I ,`1,
1 •• ;: � i'E OG
i OSMW-4 OSf�1f11-3 /ti,i i •a/��GA
RES, 1 RES. I_ -___.-- !/i
1
i GP-28 -
i C} M on. u- or ; h9 Welts
o W-8 ,�� / "To Se- PIE,S ERA)EID
OSMW-10
! /k
— OSGP-10
E.ARLINGTON ST. 1 ' 4 LEGEND
'� ,-
i — LESTER$L PROPERTY LINE
1 �t��_
1 r. 'J r I �"_I f_ RAILROAD
1 r — 1 4 MONITORING WELL
I i' 1
I �� i RES. RESIDENTIAL
/��, //`/ RES. 1 RES. + FORMER GEOPROBE SAMPLES
t / (I) PROPOSED MONITORING WELL
' f /// // NOTE:ON-SITE BUILDINGS HAVE BEEN
1 [ 412 DEMOLISHED AND ARE DEPICTED FOR
1 / REFERENCE ONLY.
s I I ,� OSGP-7 CHARLES ST.
t2
it
N FIGURE 2 - MONITORING WELL LOCATION MAP ,
u,
FY 2012 CHAMBERLAIN DEMOLITION PHASE 3
c a ,0
f s 1
` APFIlUAIMATE SCALE
DIAGRAM I4 FOR GENERAL LOCATION ONLY.AND IS NO IN rENucu run wrva I nuu uun runruaca
Mapping Reference: Terracon, December 2011
F
1
i
i
if, _0
AI i
• I C
Va: a1.117e Sr.
.: , 1'71:I . ..... \ i i. /i e
1.
1 j ' , 7 t' 1. -'=�, , i
1
•
or..I \ - —..., -
1� •• • • i ° f e
el-
# s
P 1 { ifi
1- , ; tS d
1 - 4—...r..,,, `-�1 bpi
1 i t e r 2
1
.l .„ age r‘
. f
1
F ER SY ra b �^ { , ` r f
i Vie' .--- `a ` '
d.
r—
_ 1 i ? *�
ri". —. 1�� r 1 7.. .y
ti-M .1 d c '��r a `°t .
.S p
fff I ti y Nr.,
SAS I T.' .a.. €
�' l
C)
C
I oN M
1 _ : . — W 7
........wswear Ngwrw ....i..w ..it ...g...o44�..t.... .. �..j ^
wt,:►....
2 Z
_ N -- - $` Q' D O
S
I x TT
X Cn
� O
c
. 0 0
m
O
r— m
X
n ` Q Z
Z I—
r i
N D r
r
'� _ .1 . p V1 4 0
Black Hawk County Assessor
Detailed Parcel Report
Former Chamberlain Manufacturing Site
550 Esther Street
Waterloo, Iowa
•
, t. c. ,••3\l'CII•li t. 1 , 7 , ; ns...„ii .
.. . ., :
•
,:.... . . t).
,... 1,:e * I ..., ...4.4-,.. ....:_i 1 ,,"3 : .4, .. cc t...,),. ::
•
/ . ., f•.1
-. � .. it 41 " '1
•t 4 • .
I
-
ttr .
} ' I -, ® , i
b
C:iY .
•
n -�:
4- r i
Iit' :1 of ,,
st
. * et
„ .
. . .
•
. ,, E
ti, _ .,. .. ..........____
-....
- +. , , . ___. _ ,
,....... .,.. ... , ,. 6 . .
4 t I
Contract # 806 a Chamberlain Footings and Slabs *
Bldg.# Square Footage Floor Depth
Bldg.#1 1,822 6 inch
Bldg.#2 37,503 6 inch
Bldg.#3 10,727 6 inch
Bldg.#4 9,728 6 inch
Bldg.#5 828 6 inch
—
Bldg.#6 18,516 N.A.
Bldg.#7 18,765 6 inch
_ Bldg.#8 12,826 6 inch
Bldg.#9 66,677 6 inch
Bldg.#10 6,280 6 inch
_ Bldg.#11 4,082 6 inch
Bldg.#12 11,200 6 inch
Bldg.#13 8,000 6 inch
— Bldg.#14 48,600 6 inch
Bldg.#15 19,440 6 inch
Bldg.#16 93,430 6 inch
— Bldg.#17 11,232 6 inch
Bldg.#18 10,896 6 inch
Bldg.#19 48,548 6 inch
— Bldg.#20 5,600 6 inch
Bldg.#21 5,640 6 inch
Bldg.#22 3,300 6 inch
— Bldg.#23 12,000 6 inch
Bldg.#24 6,000 N.A.
— subtotal 471,640
Misc.
Y-2 PCC Paving 105,000
— Y-4 Guard Shack 48
Y-9 Pump Bldg. 160
Y-10 Pump House 968
Y-11 Motor&Pump House 480
Y-13 Storage Bldg. 858
Y-14 Shed 320
Y-15 Shed 100
subtotal 107,934
— Total 579,574
Y-6 Railroad wells; 1080 ft. x 4 ft.high x 2 *Source-Black Hawk County Assessor
Y-7 Tank Containment;300 ft.x 4 ft. high This is general information.Contractors
Y-12 4 Propane tank saddles must make their own calculations for
2-28 ft.x 27 ft.high 125,000 gallon storage tanks quantities.
ACC Paving 178,000 sq.ft.
Black Hawk County Building Sketches Page 1 of 1
There is 1 building sketch of parcel 891313176002.
Y•3.,._
Y-8_ BLDG 24 200 Y-10
Y 7, [9000] 60 60 BLDG 23 [480]
150 [12000]
0:El ---Y-7 [—]
Y-4 Y-6
p6] BLDG 10 Iti. 100 140 ` {f
[6280] Lr' _
— 157 Y-11'
80 BLDG 13 $0 BLDG 12 40 [858]
[8000] [t1200] BLDG 11
26 157 ----. --14082]
— 50 300 118
47
80 39 BLDG 3 80
[10727]✓
266 123 BLDG 2 33
39 [37503] ✓ 157
70 BLDG 6 9 65[18516] BLDG 4 47 -- s- -BLDG 1
160 4 26 ' 80 [9728] 60 60 CANOPY [1822] ✓
BLDG5-"---"' 36 24 80 246'6" [63)
— [828]
http://www2.co.black-hawk.ia.us/website/bhmap/bhParImages.asp?apn=891313176002&... 11/11/2010
-" Black Hawk County Detailed Parcel Report Page 1 of 9
X
BLACK HAWK COUNTY REAL ESTATE ASSESSMENT ax Mail to ND TA INFORMATION
`Parcel ID Deed Holder CITY OF WATERLOO
— 8913-13-176-002 CITY OF WATERLOO 715 MULBERRY ST
PDF No. Map Area Contract Buyer CITY OWNEDWATERLOO, IA 50703-0000
13 PDF13EWTLO
Property Address Current Recorded Transfer
550 ESTHER ST Date Drawn Date Filed Recorded Document `_Type,
- WATERLOO, IA 50703-2099 12/22/2005 12/30/2005 2006 016524 D
SALES BUILDING PERMIT
- Date Amoun NUTC I Type Date Number Amount Reason
3/13/1996:600,000 ANY SALE THAT HAS SINCE 3/3/2009 FC 0 Demo/Rmvl
BEEN SPLIT OR COMBINED/ 9/12/2008 WA 07654 0 Demo/Rmvl
_ _
Deed 4/25/2008 WA 01294 0 Demo/Rmvl
4/25/2008 WA 01293 0 ,Demo/Rmvl
- ASSESSED VALUES/CREDITS
Year Class
2010 E —
100% Land Dwelling Building MIE Total Acres
Value 149,110 0 387,020 0 536,130 •0
_ _
Taxable Land Dwelling _Building MIE Total
Value 149,110 0 387,020 0 536,130 I
Year Class — -
2009 E
100% Land 'Dwelling Building MIE Total Acres
Value 149,110 ID 387,020 0 536,130 0
M!E Total
Taxable Land Dwelling Buildin 9 536,130
- Value 149,110 0 387,020 0
ear Class
00$ E
100% Land Dwellin. Building MIE Total cres
Value 149,110 0 584,840 0 733,950 0
,_,- -_--- _------— Taxable Land Dwelling -- Building MIE iTotal
Value 149,110 0 '584,840 0 1733,950
— TAX INFORMATION ASSESSMENT YEAR 2009 PAYABLE 2010/2011
Tax 940001 -WATERLOO
District �- -
Gross Value Taxable Value Military Exemption Levy Rate GtFss Tax Net Tax
Corp 0 0 0 42.76081 $ .0 0 $0.00
Nocorp 0 0 0 0 $0.0 0
Homestead Disabled Veteran Property Tax Relief Ag Family Farm
_ Credit Credit Credit Credit Credit
Corp $0.00 $0.00 $0.00 $0 00 $0.00
Nocorp $0.00 _
http://www2.co.black-hawk.ia.us/website/bhmap/bhRepDet.asp?apn=891313176002 11/11/2010
Black Hawk County Detailed Parcel Report
Page 2 of 9
LEGAL
LOGAN DALE HEIGHTS A PARCEL OF LAND LOCATED IN PARTS OF BLKS NOS 1, 10, AND 11 LOGAN
DALE HEIGHTS, BLKS 10, 11, 15 AND 16 ENTERPRISE PLACE, BLK 6 NORTH WATERLOO PLACE, THE
SW QTR SEC 13 T 89 R 13 AND VAC STREETS AND ALLEYS DESC AS FOL: BEG AT NW COR LOT 16 BLK
10 SAID LOGAN DALE HEIGHTS TH E ALONG SLY LINE ANITA ST DIST OF 138 FT TH N DIST OF 547.46 FT TO NW COR LOT 1 BLK 1 SAID LOGAN DALE HEIGHTS TH E DIST OF 178.05 FT TO NW COR BLK 10 _
SAID ENTERPRISE PLACE TH N DIST OF 50 FT TO SW COR BLK 9 SAID ENTERPRISE PLACE TH E
ALONG NLY LINE VAC LOUISE ST DIST OF 324 FT TO SW COR BLK 8 SAID ENTERPRISE PLACE TH S
DIST OF 50 FT TO NW COR BLK 11 SAID ENTERPRISE PLACE TH E ALONG SLY LINE LOUISE ST DIST OF
99.88 FT TH S DIST OF 191.30 FT TH S 37 DEG 41 MIN 53 SEC E DIST OF 380.80 FT TO SW COR BLK 12
SAID ENTERPRISE PLACE TH S DIST OF 204 FT TO NLY LINE BLK 16 SAID ENTERPRISE PLACE TH S 32
DEG 37 MIN 07 SEC W DIST OF 492.37 FT TH S 14 DEG 45 MIN 05 SEC E DIST OF 239.21 FT TH N 76 DEG
47 MIN 05 SEC W DIST OF 14.81 FT TH S 10 DEG 43 MIN 42 SEC W DIST OF 40 FT TO NLY LINE WLOO RR
CO TH WLY ALONG A CURVE CONCAVE SLY AND HAVING A RADIUS OF 1838.82 FT AND LONG CHORD
BEARING N 84 DEG 36 MIN 33 SEC W DIST OF 342.55 FT TH W ALONG SAID NLY ROW LINE DIST OF
399.21 FT TO ELY LINE E 4TH ST TH N ALONG ELY LINE E 4TH ST DIST OF 188.92 FT TO NW COR LOT 9
BLK 11 SAID LOGAN DALE HEIGHTS TH E DIST OF 119.54 FT TO NE COR LOT 9 BLK 11 SAID LOGAN
DALE HEIGHTS TH S DIST OF 149.89 FT TO SE COR LOT 7 BLK 11 SAID LOGAN DALE HEIGHTS TH E
DIST OF 14 FT TO SW COR LOT 6 BLK 11 SAID LOGAN DALE HEIGHTS TH N DIST OF 359.80 FT TO SW
COR LOT 8 BLK 10 SAID LOGAN DALE HEIGHTS TH W DIST OF 14 FT TO SE COR LOT 9 BLK 10 SAID
LOGAN DALE HEIGHTS TH TH N ALONG ELY LINE LOT NOS 9 AND 10 BLK 10 SAID LOGAN DALE HEIGHTS DIST OF 65.03 FT TH W DIST OF 121.40 FT TO ELY LINE E 4TH ST TH N ALONG ELY LINE E 4TH
ST A DIST OF 335.28 FT TO PT OF BEG AND ALSO LOT 12 BLK 11 SAID LOGAN DALE HEIGHTS EXC LOT
9 BLK 11 IN LOGAN DALE HEIGHTS
LAND
Basis Front Rear Side 1 Side 2 Lot lArea Acres
Acres x
993168 22.8 Rate —
Totals:
993168 22.8
COMMERCIAL BUILDINGS AND ADDITIONS
-,a — c
es Desri•tion --
���� Stories
Office-General BLDG 1 MllIllMIIIIIIIIIII1822 1
Style Brick/BIk-Frame ---_�=
• - Base Square Feet 1,822
Inf• • • Basement Square Feet 0
GBA S•uare Feet 1822
j T — _
• Ouanti
S•rinkler-ex•osed wet
•
IIIMIIMEIMINtlii Item Count Extended Descri•tion
v Cano•
1 °•3 SF, Frame, Avera•e Pricin.
Descri•tion
Size
Ftr& Fdtn Reinforced Concrete LF: 0
Exterior Wall Brick on Block- LF: 0
Exterior Wall Solid Brick-8" UEEIIIIIIMI ,
Exterior Wall Structural Glass LF: 18
Interior Wall Drywall or Equiv —
erticals & Wall Facing Incl.w/Walls LF: 0
Horizontals SF: 0
endows Incl. w/Base LF: 0
Fronts/Doors Incl. w/Base LF: 0 _
Roof Tar and Gravel/Wood Dk SF: 1822
Ceiling Suspended Blk-Fiber SF: 1822
Struct. Floor R'Concrete SF: 1822
Floor Cover Quar Tile SF: 1822 —
_
http://www2.co.black-hawk.ia.us/website/bhmap/bhRepDet.asp?apn=891313176002 11/11/2010
-1
Black Hawk County Detailed Parcel Report Page 3 of 9
ii
Floor Cover Carpet SF: 0
Partitions Incl. w/Base SF: 1822
- Framing Wood-Average SF: 1822
Framing Steel-Average SF: 0
Sprinkler Exposed Wet SF: 1822
HVAC Combination FHA-AC SF: 1822
Lighting Recessed Fluorescent SF: 1822
Descri•tion ear = rea Stories
BLDG 2
_ 37503 1
Style C'Blk- Frame
dditional Base Square Feet 37,503
Information Basement Square Feet 0
GBA Square Feet 37503
Item - Quantity
Laveto 9
_ Plumbing ater Closet 9
Sink-Service(Porce) 1
Sink-Kitchen
Item Quanti
t _ A _ 37503
Officeinternal '1061
Description Size -
Ftr& Fdtn Reinforced Concrete LF: 0
Exterior Wall C'Blk or Tile- LF: 263
— Exterior Wall C'Blk or Tile- LF: 300
Exterior Wall C'Blk or Tile- LF: 60
Windows Comm. Steel Sash LF: 0
Roof Rubber Membrane/Wood SF: 37503
Struct. Floor 6" R'Concrete SF: 37503
erticals& Partitions Incl. w l Base SF: 37503
Horizontals Framing Wood-Average SF: 37503
Framing Steel-Average - SF: 0
Interior Wall Panel-Softwood LF: 0
Fronts/Doors Incl. w/Base LF: 0
— •rinkler Exposed Wet SF: 37503
Lighting Halide SF: 37503
Lighting Recessed Fluorescent SF: 0
_ HVAC Steam-(1 Pipe) SF: 37503
HVAC Combination FHA-AC SF: 0
ape Description Year Built Area Stories
- Office- General BLDG 3 1938 10727 2
Style Brick/Blk- Frame
Additional Base Square Feet 10,727
Information Basement Square Feet 0
GBA Square Feet 21454
Item Quantity
Water Closet 19
Lavatory 8
Plumbing Urinal -Floor 7
Sink-Kitchen 2
— 36" Circ. Wash-SStI 2
— http://www2.co.black-hawk.ia.us/website/bhmap/bhRepDet.asp?apn=891313176002 11/11/2010
Black Hawk County Detailed Parcel Report Page 4 of 9
Empty 11
Stall Shower or Tub 2 -
Column Showers 9
- - —
Adjustmen Quantity
Item
Sprinkler-ex.osed wet
21454 —
Description ize —
Ftr& Fdtn Reinforced Concrete LF: 0
Exterior Wall C'BIk or Tile- LF: 0
Exterior Wall Brick on Block- LF: 0
Interior Wall D wall or Equiv LF: 0
Interior Wall Panel -Softwood
Wall Facing Incl. w/Walls SF: 0 —
Windows Comm. Steel Sash
LF: 0
Fronts/Doors Incl. w/Base --._
- - LF0
Verticals& Roof Rubber Membrane/Wood
SF 10727 —
Horizontals Ceiling Suspended Blk-Fiber
SF: 10727 ,
Struct. Floor 6" R'Concrete
SF:
10727
Floor Cover Asphalt Tile SF: 10727
Partitions Incl. w/ Base SF: 10727
Framing Wood -Average SF: 10727
Floor Cover Quarry Tile
__ SF: 0 - - -
Floor Cover Carpet _ SF: 0 —
Sprinkler Exposed Wet SF:: 2
21454
HVAC Combination FHA-AC SF: 10727
Lighting Recessed Fluorescent
SF: 10727 —
T 'e Description Tl11 1 tories
Manufacturin. BLDG 4 1948 9728
Style C'Blk-Frame
•dditional Base Square Feet
--
Information :;Basement SquareFeet
Plumbing
Quanti
Roush Plumbing 1
_.djustmen Item Quanti
S•rinkler ex..osed wet 9728
Description Size
Ftr& Fdtn Reinforced Concrete
Exterior Wall C'Blk or Tile- LF: 0
Interior Wall Unfinished LF: 0
Wall Facing Incl. w/Walls SF: 0
erticals& Roof Rubber Membrane/Wood SF: 9712 —'
Horizontals Struct. Floor Concrete SF: 9712
Partitions Incl. w/Base SF: 9712
Framing Steel-Average F: 9712 —
Sprinkler Exposed Wet SF: 9728
HVAC Steam- (1 Pipe) SF: 9728
Lighting Halide SF: 9728
'Type Description Year Built 'Area Stories_
Manufacturin BLDG 5 "1950 828 1
Style CBIk-Frame
Additional Base Square Feet 828
http://www2.co.black-hawk.ia.us/website/bhmap/bhRepDet.asp?apn=891313176002 11/11/2010
Black Hawk County Detailed Parcel Report Page 5 of 9
Information Basement Square Feet 0
GBA Square Feet 828
Adjustmentsltem
Sprinkler-exposed wet 828
�,, _
Description Size
Ftr& Fdtn Reinforced Concrete
Exterior Wall C'BIk or Tile- LF: 86
Interior Wall Unfinished LF: 0
Verticals& Roof 4-Ply Compo/Stl Bar Joist SF: 828
Horizontals Struct. Floor R'Concrete SF: 828
Framing Steel-Average SF: 828
Sprinkler Exposed Wet SF: 828
HVAC Steam-(1 Pipe) SF: 828
Lighting Incandescent SF: 828
Descri.tion Year Built rea Stories
anufacturin. BLDG 6 '1967 18516
Style C'BIk-Frame
_ 'dditionat Base Square Feet 18,516
Information Basement Square Feet 0
GBA Square Feet 18516
Item Q ua nti'
Lavatory
Plumbing ater Closet87
Urinal - Floor
Sink-Kitchen ,
Item _
djustmen —
Sprinkler-exposed wet 18516
Description Size
Ftr& Fdtn Reinforced Concrete LF: 0
Exterior Wall C'Blk or Tile- LF: 0
Exterior Wall C'BIk or Tile- LF: 0
Interior Wall Drywall or Equiv LF: 0
Interior Wall Panel - Softwood LF: 0
Wall Facing Incl. w/Walls SF: 0
Roof Rubber Membrane/Wood SE 18516
Roof 4-Ply Compo/Stl Bar Joist
Struct. Floor R'Concrete SF: 18516
_ erticals& Partitions Incl. w/ Base SF: 18516
Horizontals Framing WoodAverage ;
516
Framing Steel-Average S
Sprinkler Exposed WetMIIIEEIIIIIII"
Floor Cover Asphalt Tile SF: 18516
Floor Cover Ceramic SF: 0
Floor Cover Carpet SF: 0
—
HVAC Combination FHA-AC SF: 11200
HVAC Central AC SF: 7316
HVAC Hot Water SF: 7316
Lightin. Halide SF: 18516
Lighting Strip Fluorescent SF: 0
ape_ Description Year Built _ Area Stories
Manufacturin• BLDG 10 1946 6280 _c2
http://www2.co.black-hawk.ia.us/website/bhmap/bhRepDet.asp?apn=891313176002 11/11/2010
Black Hawk County Detailed Parcel Report Page 6 of 9
Style C'BIk-Frame
•dditional Base Square Feet 6,280
Information Basement Square Feet 0
GBA S.uare Feet 12560
Item Quanti
Plumbing Lavatory
ater Closet OI®
Urinal- Floor 1
FItem Quantity _=
Sprinkler exposed wet 12560
Description Size
Ftr& Fdtn Reinforced Concrete LF: 0
Exterior Wall C'Blk or Tile- LF: 0
Exterior Wall C'Blk or Tile- LF: 0
Windows Comm. Steel Sash LF: 0 _
Roof 4-Ply Compo/Stl Bar Joist SF: 6280
erticals& Roof Rubber Membrane/Stl SF: 0
Horizontals Framing Steel -Average SF: 6280
Struct. Floor 6" R'Concrete SF: 6280
Partitions Incl. w/ Base SF: 6280
Fronts/Doors Incl. w/ Base LF: 0
Sprinkler Exposed Wet SF: 12560 —
Lighting Strip Fluorescent SF: 6280
HVAC Steam- (1 Pipe) SF: 6280
ype Description Year Built Area Stories
Office -General BLDG 11 1951 4082 1
Style C'Blk-Frame
dditional Base Square Feet 4,082
Information Basement Square Feet 0
GBA S.uare Feet 4082
Plumbing Item Quantity
Rough Plumbing 1
•djustmen,ltem —
082 Quantity
Sprinkler-ex•osed wet '
Description Size
Ftr& Fdtn Reinforced Concrete LF: 0
Exterior Wall C'Blk or Tile- LF: 0
Interior Wall D wall or Eeuiv LF: 0
Interior Wall Panel-Softwood LF: 0
ndows Incl.w/ Base LF: 0
Fronts/Doors Incl. w/ Base LF: 0
Roof 4-Ply Campo/Wood Deck SF:4082
verticals & Ceiling Suspended Blk-Fiber SF: 4082
Horizontals Struct. Floor 6" R'Concrete SF: 4082
Floor Cover Carpet SF: 4082
Floor Cover Asphalt Tile SF: 0
Floor Cover Quarry Tile SF: 0
Partitions Incl. w/Base SF: 4082 _
Framing Wood Average SF: 4082
Sprinkler Exposed Wet SF: 4082
Lirhtin. Recessed Fluorescent SF: 4082
all Facing Incl. w/Walls SF: 0
http://www2.co.black-hawk.ia.us/websiteilohmap/bhRepDet.asp?apn=89 1 3 13176002 11/11/2010
Black Hawk County Detailed Parcel Report Page 7 of 9
I IHVAC Combination FHA-AC JSF:4082 I
— •e Description Year Built • rea Stories
Manufacturin« BLDG 12 1951 11200 ®1
Style C'BIk-Frame
'dditiional Base Square Feet 11,200
Information Basement Square Feet 0
BA Square Feet 11200
Item Quanti
Plumbing vato
Urinal - Floor _ ■
Water Closet
Item - y
Quantit
« - exposed - 11200
Description Size
Ftr& Fdtn Reinforced Concrete LF: 0
Exterior Wall C'Blk or Tile- LF: 0
Interior Wall Panel -Softwood LF: 0
Windows Comm. Steel Sash LF: 0
Roof 4-Ply Compo/Wood Deck
SF: 11200
Ceiling Incl. w/Base SF: 11200
erticals& Struct. Floor 6" R'Concrete SF: 112 11
00
— Horizontals Interior Wall Drywall or Equiv LF: 0
Partitions Incl. w/Base SF: 11200
Framing Wood-Average SF: 11200
— Pilasters 8"Brk or Blk LF: 0
Sprinkler Exposed Wet
SF: 11200
Lighting Halide SF: 11200
HVAC Central AC
SF: 11200
HV
AC Steam-(1 Pipe
_ SF: O
se Description Year Built area Stories
Manufacturing BLDG 13 1985 8000
Style C'BIk- Frame
dditional Base Square Feet 8,000
Information Basement Square Feet 0
GBA Square Feet 8000
•-djustmen,Item Quantity
Sprinkler-ex*osed wet 8000
Extras Description Item Count Extended Description
Door 1 Q.H. Door- Power. 12 Ft Wide, 12 Ft Hip
Description Size
Ftr& Fdtn Reinforced Concrete LF: 0
Exterior Wall C'Bik or Tile- LF: 0
Interior Wall Unfinished LF: 0
Pilasters 8" Brk or Bik LF: 0
Verticals & Fronts/Doors Incl. w/Base LF: 0
Horizontals Roof Rubber Membrane/Stl SF: 8000
Ceiling Unfinished SF: 8000
Struct. Floor 6" R'Concrete SF: 8000
Framing Steel-Average SF: 8000
Lighting Halide 8
SF: 8000
- HVAC Steam-(1 Pipe) SF: 8000
a
http://www2.co.black-hawk.ia.us/website/bhmap/bhRepDet.asp?apn=891313176002 11/11/2010
Black Hawk County Detailed Parcel Report Page 8 of 9
! 'Sprinkler Exposed Wet "SF: 8000 1
•e Description Year Built rea Stories
Metal Warehouse-Steel Frame BLDG 23 1967 12000 1
Width 60
Height 20
Base Square Feet 12,000
information Basement Square Feet 0
GBA Square Feet 12000
Item Quantity
Plumbing Sink-Service Porce 1
Item Quantity
djustment Office - internal 144
Liner-wood (SFSA) — _ -
Extras Description Item Count Extended Descri•tion —
Door 1 O.H. Door-Manual, 10 Ft Wide, 16 Ft Nish
Description Size
Ftr& Fdtn Reinforced Concrete 1
Exterior Wall Mtl/Stl/ Insul LF: 0
Interior Wall Liner(See Adj's LF: 480
Windows Comm. Steel Sash LF: 0 '
erticals& Fronts/Doors Incl. w/Base LF: 0
Horizontals Roof Metal/Stl1 Insul 51'-79 SF: 12000
Ceiling Unfinished SF: 12000
Struct. Floor 6" R'Concrete SF: 12000
Framin• Steel-Average SF: 12000
HVAC Suspended Gas Unit SF: 12000
Lighting Strip Fluorescent SF: 12000 _.
Type Description 'Year_Built 'Area Stories
Metal Warehouse - Steel Frame BLDG 24 1969 J9000 1
Width 60
Additional Height 14
Information Base Square Feet 9,000
Basement Square Feet 0
IGBA Square Feet 9000 ._._ _-
Extras Description Item Count Extended Description
Door 1 O.H. Door-Manual, 12 Ft Wide, 14 Ft High
Description Size _
Ftr& Fdtn Reinforced Concrete LF: 0
Exterior Wall Metal/Steel (51 LF: 0 _
Interior Wall Unfinished LF: 0
Verticals& _Windows Comm. Steel Sash LF: 0
Horizontals Fronts/Doors Incl.w/ Base LF: 0
Roof Metal/Steel (51'-79'Wid SF: 9000
EMI'll .. - oncr- _ SF: 9000
Framing Steel-Average ME10111111.Lighting Mercury Vapor SF: 9000
YARD EXTRAS _
Description Year Quantity Plot Extended Description
Built No.
Paving 1960 1 178,000 SF, Asphalt Parking, Low Pricing
http://www2.co.black-hawk.ia.us/website/bhmap/bhRepDet.asp?apn=891313176002 11/11/2010
Black Hawk County Detailed Parcel Report Page 9 of 9
Paving 1960 1 105,000 SF, Concrete Parking, Low Pricing
Fencing -Chain 1960 1 3 Strand Barb, 6 Ft-Hgh, 4,100 LF, 0 LF-
Gates
MTL GUARD SHACK 6 X 8 1960 1 Quantity=48, Units=Square Feet, Height=8
RAILROAD WELL 16 X 1080 1938 1 Quantity=2,178, Units=Lineal Feet, Height=1
CONC CONTAINMENT WALL 8" 1938 1 Quantity=300, Units=Lineal Feet, Height=4
OIL STORAGE TANKS 28 X 27 "VER 1976 2 Quantity=125,000, Units=Gallons, Height=27
CONC PUMP BLDG 10 X 16 �1976 -1 Quantity=160, Units=Square Feet, Height=8
MTL/STL PUMP HOUSE 22 X 44 1980 1 Quantity=968, Units=Square Feet, Height=12
— MTL/STL MOTOR & PUMP HOUSE 1967 1 Quantity=480, Units=Square Feet, Height=14
20
MTL/STL STORAGE BLDG 22 X 39 1952 1 1 Quantity=858, Units=Square Feet, Height=12
http://www2.co.black-hawk.ia.us/website/bhmap/bhRepDet.asp?apn=891313176002 11/11/2010
CITY OF WATERLOO
WATERLOO,IA
YARD AND OUTSIDE
REPL DEPR. SOUND VAL
VALUE
Y-I Asphalt Paving
178,000 S.F.of
asphalt paving.
Various stages. $231,400 60/60 $37,020
Y-2 Concrete Paving
105,000 S.F.of
concrete paving.
Various ages. $199,500 60/60 S31,920
Y-3 PAM
4,100 L.F.of 6'chain
link fence with barbs.
Various ages. $27,700 60/60 $4,430
Y-4 S}jg
6'x 8'x 8'high metal
panel guard shack
with wood panel
interior and wood
floor. $1,000 20/50
$400
Y-5 R.l1road Siding
1,650 L.F.of railroad
siding average
weight,gravel ballast,
creosote ties,iron
plates,one bumper.
Age unknown. S67,000 60/60 SI0,720
Y-6 Railroad Well
16'wide x 1,080'
long x 4'deep
railroad well with
2,178 L.F.of 8"
reinforced concrete
wall below grade.Age
unto:tov+'n. S45,700 60/60 S7,310
Y-7') Containment Well
300 L.F.of 8"
reinforced concrete
containment wall,4'
high.(1976) S6,300 35/60 S1,640
54
Y-8 Oil Storage Tanks _.
Two 21'diameter x
27'high vertical steel
storage tanks,125,000
gallons each.(1976) $87,500 35/60 $22,750
Y-9
10'x 16'x 8'high
one story concrete
block ib wture.
Reinforced concrete
foundation and floor.
Flat,rehtforced
concrete roof.
(1976+/--) $3,700 35/60 $960
Y-10 puma House
22'x 44'x 12'high
one story galvanized
• metllsteel structure.
Reinforces cite
foundation and floor.
Insulated interior.
Pipe conduit wiring
with explosion proof
light flatnvs. Two
unit
suspended1980+/-) $17,800 25/60 56,680
Y-11 =-• a_&Xisno Ha
20'x 24'x 14'high
one story ntotal/steel
structure. Reinforced
concrete foundation
and floor. Unfinished
interior electric. Ono
pair of wood sliding
doors.(1967+/=) $9,500 50/60 $1,900
Y-12 Liquid Prone Tanks
Two 9'diameter's 57'
long horizontal steel
pressure tanks on
concrete saddles.
30,000 galkma each.
(1952) $54,000 60/60 58,640
Y-13 Storage Building
22'x39'x 12'high
one story metal/light
steel structure.
Reinforced concrete _
floor, Electric. Two
10'x 10'overhead
doors.(1952+1-) S13,600 60/10/60 $1,960
55
Y-14 Pump Shed.
10'x 32'x 8'high
one story ribbed a Zeta!
structure. Reinforced
concrete floor.
(1973+/-) S3,100 40/60 S740
Y-15 Pun pShed
10'x 10'x 8'high
one story ribbed metal
structure. Reinforced
concrete floor.
(1973+/-) S 1,200 40/60 5290
Y-16 Concrete Pevina
5,300 S.F.concrete
paving.(1980) 510,100 50/60 $2,020
Y�17 Concrete PavingS10.104 50/60 $L020
TOTAL 5739,200 5141,400
TOTAL LESS OVERALL ECONOMIC DEPR.35% S91,910
56