Loading...
HomeMy WebLinkAboutCOUNCIL COMMUNICATIONS - RESOLUTION 2012-71 CITY OF WATERLOO r , Avt Council Communication City Council Meeting: January 30, 2012 ( { '7 Prepared: 'January 24.2012 �} # � ` Dept.Head Signature: Eric Thorson, PE. City Engineer # of Attachments: SUBJECT: AMENDMENT TO ASSESSEMENT F.Y. 2012 SIDEWALK REPAIR ASSESSMENT PROGRAM- ZONE 1 B &B BUILDERS AND SUPPLY CON TRACT NO. 811 Submitted by: W.Wayne Castle, PLS, El,Associate Engineer Recommended City Council Action: Approve amendment to assessment due to correction of documents and amount. Ms. Evelyn Jordan 840 Newton Street. PIN 8913-14-352-019 Control# 8110477 Cert#0012641 Old Assessment$383.85 New Assessment$188.51 Summary Statement:Ms.Jordan was originally sent a proposal of one sidewalk panel needing replacement with a second panel possibly needing replacement, dependant upon review of the tree roots. Construction required only one panel to be replaced. Ms.Jordan contacted Engineering upon review of her bill,where we found an error in the quantity accounting. The inspector's field notes were correct in showing only one panel replaced,but the information was entered incorrectly into the computer, causing her to receive a bill for two panels replaced. This correction also requires that the final contract amount, final change order and retainage amount be changed as the contractor was earlier paid for the replacement of two panels at this location. No other mistakes of this type have been found. Expenditure Required Source of Funds Property Owner Assessments Policy Issue N/A Alternative None Background Information: cc: Pauline Closson, Engineering Department