Loading...
HomeMy WebLinkAboutModern Builders -CO#1 - Hangar No. 4 Repairs-11/7/2016CHANGE ORDER NO. 1 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date November 1, 2016 Project Hangar No. 4 Wall Repairs Owner's Contract No. State Contract No. 17448 Contractor Modern Builders, Inc. Date of Contract Start September 19, 2016 You are directed to make the followinti chanties in the Contract Documents. Description: ITEMN DESCRIPTION UNIT UNIT PRICE QUANTITY AMOUNT 101 Tuck Point and Seal West Office Wall LS $ 4,500.00 1 $ 4,500.00 TOTALS $ 4,500.00 Reason for Change Order: Item 101 — During construction activities at Hangar #4, it was determined that infiltration was also occurring along the west wall of the office area. This change order will provide tuck pointing of the west office wall, power washing of the wall, subgrade foundation coating of the wall below grade and painting of the wall. Hangar #4 Wall Repairs CO -1 (REVISED) 1 Project No — 60482850 CONTRACT PRICE Original: $ Previous C.O.s (ADD): $ This C.O. (ADD): $ Contract Price with all approved Change Orders: $ 76,668.00 72,168.00 0.00 4,500.00 CONTRACT TIMES (Calendar Date) Substantial Final completion completion Original: Previous C.O.s (ADD): This C.O. (ADD): REVISED: 11/18/2016 0 0 11/18/2016 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: Bye 0 Engineer (Authorized Si nature) APPROVED: By: Owner (Authorized Signature) ACCEPTED: By: Contr for (Authorized Signature) November 29, 2016 Date Date C k Aver uca'. t \ f1 fit, /2-9:1/ Date Hangar #4 Wall Repairs CO -1 (REVISED) 2 Project No — 60482850