CHANGE or EXTRA WORK ORDER NO. 2
PROJECT: Midport Boulevard Phase III, City Contract # 894
Date Prepared: November 22, 2016 AMOUNT: $ 11,717.94 Decrease
TO: Cedar Valley Corporation , Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform
the following extra work on your contract dated April 5, 2016.
A. Description of change to be made or extra work to be done:
Adjust original construction quantities to actual construction quantities.
B. Reason for ordering change or extra work:
As -built quantities varied for some bid items.
C. Settlement for cost of work to be made as follows:
Compensation already made to contractor through original bid items.
See attached summary.
Total Net Decrease $11,717.94
CITY OF WATERLOO
BY: _ _ b UV�I tZ� _/I J�
Mayor Date
ATTEST:
1 Z l2`�lp
City Clerk Date
PRINTED NAME:c.NvE�
TITLE: 7/o e�� /�q✓gs,t/
►dIMUNO]1/CID7
0
0
0
= 01
0
0
'0
m. N
E°-qtOo
j 01
(11 > °
a
m
t = Lfl
o 0 0
— 0 co 0
-o >- ' 0
= ' 04
(0
=0
IE
4
$ 36234.25
$ 39,397.56
$
$ 8,376.50
$ 2,076.00
$ 466.80
$ 12,040.38
$ 36,722.58
$ 212,245.43
$
$ 2,050.00
$ 12,642.50
$ 750.00
$ 9,600.00
$ 14,000.00
$ 3,300.00
$ 22,925.00
$ 12,402.50
$ 50,243.30
$ 10,564.40
$
$
$ 200.00
$ 1,000.00
$ 900.00
$ 588.00
$ 253.50
$ 1,408.00
$ 1,400.00
$ 19,285.00
$
$ 15,210.00
$ 5,096.00
$
4,000.00
$ 280.20
$
$ 209.60
$ 1,467.96
$ (1,800.00)
$
$
$ (225.00)
$
$
$
$ 70.00
$ 247.50
$ (716.90)
$
$ (44.00)
$ (420.00)
$
$
$
0
$ (1,806.00)
$ 117.00
$ 39.20
$ (2,064.00)
$
0,
6
, 0
W
w
Lfl
0)
0 C)
Quanity
Oifference
0
0 000
0
000
00
0
NL0
0
6
N L00
,�'t �n'
0
OLflN •
rd
00
e4r-j
'0 •
6
r000
d6du'
tn
m0
-
r,l,-4
-
FnaI
Quantity
1,114.90
6,828.00
3,046.00
17.30
0000
00000
100.00
655.00
225.50
749.90
137.20
00000000
00 0
c0-lrn0
r -'0r,
'0 •"( Lfl
w'• -u-
00000
rLOr
,-1
01
'-
0000u1nJ00
oor4ou--1
r -Jr 0
u,ui
Original
Quantity
1114.9
6828.0
50.0
3,046.0
17.3
31.1
6,689.1
1,114.9
5,542.4
100.0
00000c0coN00oo00u1W00rnNr-r0
r4 01 ro ro
0 01 ( 0 N
44 44 44 GO GO
r 01 -1 o-4
0 01 01
?4
01
0(nr4tomr'J?-1
-41m
-
'4
Unit Cost
$ 32.50
$ 5,77
$ 75.00
$ 2.75
$ 120.00
0001010
$ 1,025.00
$ 6.50
$ 75.00
$ 3,200.00
$ 3,500.00
00000
2.00
$ 35.00
$ 100.00
$ 125.00
$ 50.00
$ 14.00
$ 13.00
$ 40.00
$ 1,400.00
$ 19,283.00
$ 175.00
$ 2,925.00
$ 980.00
$ 400.00
4,000.00
0�r0,0
t04r1GoGo
00000
0101l
(0(001 tON
(4(4.4.444
Unit
4
>- >- >- >-
nt
0 u- 0 0 0u-L1-u-u--
Zttt
« 01
04040404
10
,-.
t_'uj
4-JJ--J-J_Ju1
wwuj
040404
444<
E
SPECIAL BACKFILL
EXCAVATION, CLAS$ 10, ROADWAV AND BORROW
EXCAVATION, CLASS 12, BOULDERS OR ROCK FRAGMENTS
TOPSOIL, STRIP, SALVAGE AND SPREAD
SPECLALCOMPACTION OFSIJBGRA0E
REMOVALOF PAVEMENT
SUBGRADE STABILIZATION MATERIAL, POLYMER GRID
MODIFIED SUBBASE
PCC PAVEMENT, CLASS C, CLASS 3 DURABIL(TY, 10 IN.
GRANIJLAR SURFACENG ON ROAD, CLASS A CRUSHED STONE
APRONS, CONCRETE, 18 IN. DIA.
SLJBDRAIN, LONGITUD)NAL, (SHOIJLDER) 4 N. DIA.
SUBDRAIN OUTLET (RF49C)
)NTAKE, SW -508
NTAKE, SW.S10
STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 20000, 15 IN.
STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 20000,18 IN.
STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 20000,24 IN.
STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 20000,30 IN.
STORM SEWER GRAVITY MAIN, TRENCRED, RCP, 20000,36 IN.
ENGINEERING FABR(C
EROSION STONE
SAFETY CLOSURE
REMOVAL OF TYPE A SIGN
DEUNEATOR, RIGID'TYPE
;WOOD POSTS FOR TYPE A OR B S]GNS, 4 IN. X 4 IN.
TYPE ASIGNS, SREETALUMINUM
PAINTED PAVEMENT MARK(NG, WATERBORNE OR SOLVENT -BASED
TRAFFIC CONTROL
MOBILIZATION
MOWING
MULCHING
SEEDING AND FERTILIZING (URBAN)
STABILIZING CROP . SEEDING AN0 FERTIL(ZING
SWPPP - MANAGEMENT
6
z
E
w
-4r'4mL0L0N
0
Go
o-4 44 (0 10
'- -'1-
(0 N 00 01 0
rr-
- ('1 01 e /1
r -J r-Jr'Jr-JN
'0 N 00 01 0
44444401010101(0(0
44 01 < 1(1
$
$ 240.00
$ 50.00
$ 2,300.00
$
$ 818.50
$ 5,871.00
$ 1,200.00
$ 400.00
$ 2,000.00
ID
L0
s
Pay Est #1 $ 54,150.76 Original Contract Amount $ 559,975.14
Pay Est #2 $ 73,762.89 Change Order#1 $ 1,046.36
Pay Est #3 $ 132,453.76 Increase/Oecrease Cbange Order $ (11,717.94)
Pay Est #4 $ 213,990.76 Final Contract Amount $ 549,303.56
Pay Est #5 $ 6,870.40
Pay Est 46 $ 21,997.07
Pay Est 47 $ 18,612.74
PayEst#8 $ 27,465.18
Total 411 Payments $ 549,303.56
c0
-4
t4
ncrease/
Decrease
$ (500.00)
$ (600.00)
$ (160.00)
$ (900.00)
$ (160.00)
$ 18.50
$ (646.00)
$ (300.00)
$ (100.00)
$
1"
•-1
•1
0,
Quanfty
Difference
(10.00)
(300.00)
(320.00)
(450.00)
(1,600.00)
0 0 0 0
q0qq
N r4 r4
01 10 - -
000
000000
0.0q
0000Qq
000
r0w
r0b��4.-4
100
- - -4
10 10
c c
(0
0
.4
.4
Origina)
Quantity
10.0
420.0
420.0
1,600.0
1,600.0
009000
0 (10 0 0 .4
-
0 .-4 .
10 01
-4
Un)t Cost
00000
$ 0.50
$ 19.00
$ 150.00
$ 50.00
$ 2,000.00
ID
00.tn.0.-
01
0r40010
ID
10
0,
E
SWPPP - QUALIFYFNG RANFALL INSPECTION
WATTLES - )NSTALLA11ON
W4T1'LES - REMOVAL
S(LT FENCE - INSTALLATION
SILT FENCE - REMOVAL OF SE0IMENT
SILT FENCE - REMOVAL OF 0EVICE
SPECIAL DITCH CONTRDL RECP TYPE 3
)NLET PROTECTION DEV]CE
)NLET PROTECTION 0EV)CE MAINTENANCE
TWO-VEAR MAINTENANCE BOND
REMOVE EXISTING HEADER, 0RILL/GROUT BARS
Increase/Decrease
0)
0
Z
E
0)
m Coversheet
CITY OF WATERLOO
Council Communication
Page 1 of 1
Motion approving Change Order No. 2 for a net decrease of $11,717.94 for the F.Y. 2016 Midport Boulevard Extension - Phase III, Contract No.
894, and authorize the May d. City Clerk to execute said document.
City Council Mectin .12/12/2016
Prepared: 12/7/2016 2/12/2016
Prepared:
ATTACHMENTS:
Description Type
Cont 894 final CO Cover Memo
Cont 894 final qty summary Cover Memo
Motion approving Change Order No 2 for a net decrease of $11,717.94 for the F Y 2016 Midport
SUBJECT: Boulevard Extension - Phase in. Contract No 894 and authorize the Mayor and City Clerk to execute
said document.
Submitted by: Submitted Bw Jeff Bales, Associate Engineer
This is the accumulated amount of adjustments from original to final quantities that were determined
Summary Statement: necessary timing the construction of the project, which results in a decrease to the total project cost.