Loading...
HomeMy WebLinkAboutJDE Eng - PSA - Expansion of NEIP-12/16/2013Mayor BUCK CLARK COUNCIL MEMBERS DAVID JONES Ward 1 CAROLYN COLE Ward HAROLD GETTY Ward QUENTIN HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMITT At -Large C TV OF WATER COMMUNITY PLANNING AND DEVELOPIV ENT 715 Mulberry Street • Waterloo, Iowa 50703-5783 (319) 291-4366 Fax (319) 291-4262, NOEL C. ANDERSON, Community Planning & Dc;'r:an neat Direclnr CITY OF WATERLOO Council Communication City Council Meeting: December 16, 2013 c Prepared: December 11, 2013 Dept. Head Signature: Noel Anderson, Community Planning & Develop emnt-Di ector # of Attachments: 3 SUBJECT: Approve a resolution authorizing the Professional Services Agreement with JDE Engineering for the Preliminary and Final Platting of land for the expansion of the Northeast Industrial Park, not to exceed $31,950, and authorize the Mayor and City Clerk to sign and fully execute all necessary documents. Submitted by: Noel Anderson, Community Planning & Development Director Recommended City Council Action: Adopt resolution and authorize signatures as requested. Summary Statement: The City of Waterloo is continuing to see development and requests for development in the Northeast Industrial Park area. This agreement will plat the land to the west of the existing industrial park (city -owned land) for additional development needs. Expenditure Required: $31,950 Source of Funds: TIF and bond funds Policy Issue: Economic Development Alternative: NA Background Information: The City developed the Northeast Industrial Park in 1995, and has worked with several businesses to locate there. This will allow for continued development. CITY WEBSITE: www.ci.waterloo.ia.tfs WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer „ME ENGINEERING (319) 464-7913 402 E. 4th Street, Suite 101, Waterloo, IA 50703 jdeeng(ii-1pctel.net December 3, 2013 PRELIMINARY AND FINAL PLATTING EXPANSION OF THE NORTHEAST INDUSTRIAL PARK NORTH OF MARTIN LUTHER KING JR. DRIVE AND WEST OF NORTHEAST DRIVE WATERLOO, IOWA PROFESSIONAL SERVICES AGREEMENT WHEREAS, the City of Waterloo, Iowa ("City") desires to expand the Northeast Industrial Park to continue to promote development of industrial activities in northeast portion of Waterloo, and WHEREAS, JDE Engineering, PLC ("Consultant") of Waterloo, Iowa desires to provide professional engineering services related to the development of preliminary and final platting for the industrial park expansion, NOW THEREFORE, it is mutually agreed that this Professional Services Agreement shall consist of the following: I. SCOPE OF SERVICES • Obtain boundary survey information for the industrial park expansion area (approx. 50 acres), • Conduct a field investigation to document the location of existing features, • Develop a preliminary plat for the industrial park expansion area (approx. 10 lots at 5 acres each), • Work with City staff to develop the area into the most beneficial layout for anticipated development projects, • Obtain existing utility information using Iowa One CaII, • Develop preliminary utility layout for the industrial park expansion (storm sewer, sanitary sewer, water main, electric, gas, fiber, cable, telephone, etc.) • Develop preliminary roadway layout, • Develop listing of anticipated design criteria for the expansion area, • Develop preliminary roadway profile and earthwork quantities to assist in evaluating parcel size layout options for the preliminary and final plats, 1 • Incorporate existing and proposed feature information into platting documents, and • Develop a final plat for the industrial park expansion area. 11. TIME OF BEGINNING AND COMPLETION The project shall begin following approval of the City Council and execution of this agreement by the Mayor of the City of Waterloo. It is anticipated final plats would be submitted to the City approximately 14 weeks following the approval of this agreement. Below is an anticipated schedule for development of the project: • Approval of the Professional Services Agreement December 2013 • Obtain Field Survey Information January 2014 • Develop Preliminary Plat Documents February 2014 • Develop Final Plat Documents March 2014 III. COMPENSATION The fee for the work detailed under "Section I. Scope of Services" is based on anticipated time -and - materials necessary to complete the work. Surveying services will be performed under this contract by Great Plains Survey of La Porte City, Iowa. Preliminary design services for the industrial park expansion will be performed by JDE Engineering, PLC of Waterloo, Iowa. The cost associated with each portion of the work is summarized below: Boundary Survey Preliminary Plat Final Plat Preliminary Design $ 5,500 $ 7,500 $ 6,500 $ 12,450 The total cost related to this proposal is estimated to be $31,950. This fee is considered a maximum not -to -exceed cost. IV. TERMS AND CONDITIONS The attached Terms & Conditions are considered part of this agreement. 2 IN WITNESS WHEREOF, the parties hereto have executed this Professional Services Agreement as of the dates shown below: JDE ENGINEERING, PLC cD oaL /z -3-t3 Jim D. Ellis, P.E. Date CITY OF WATERLOO, IOWA /.): Ernest G. Clark, Mayor Date 3